JPH035567A - Temporary installation method for working suspension scaffold - Google Patents

Temporary installation method for working suspension scaffold

Info

Publication number
JPH035567A
JPH035567A JP13950189A JP13950189A JPH035567A JP H035567 A JPH035567 A JP H035567A JP 13950189 A JP13950189 A JP 13950189A JP 13950189 A JP13950189 A JP 13950189A JP H035567 A JPH035567 A JP H035567A
Authority
JP
Japan
Prior art keywords
work
suspended
scaffold
suspended scaffold
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13950189A
Other languages
Japanese (ja)
Other versions
JPH0694723B2 (en
Inventor
Tadao Takasaki
高崎 忠雄
Shizuka Kuruo
久留生 静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON BISOO KK
Original Assignee
NIPPON BISOO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON BISOO KK filed Critical NIPPON BISOO KK
Priority to JP1139501A priority Critical patent/JPH0694723B2/en
Publication of JPH035567A publication Critical patent/JPH035567A/en
Publication of JPH0694723B2 publication Critical patent/JPH0694723B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE:To increase the efficiency of a temporary installing work by a method wherein a wire for a suspension scaffold is suspended along the side of a structure, a gondola for a work is elevatably and traversably mounted, and a scaffold plate is suspended to a given position by means of the gondola and is secured to a wire. CONSTITUTION:Suspension wires 2 for securing a suspension scaffold 12 are suspended from the upper part of a structure along the side of the structure with a given distance therebetween. A gondola 4a being elevatable and traversable along the side of the structure is mounted. A suspension member 13 and coupling metals 2a and 2b are mounted to the scaffold plate 2. The scaffold plate 2 is hoisted up to a given position by the gondola 4a, and the suspension wire 12 is secured by means of a cable lock device 19. Lateral coupling of the scaffold plate 2 is effected by means of the metals 2a and 2b. This constitution improves the efficiency of a scaffold temporary installing work.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は作業用吊足場の仮設方法の改良に関し、上下
移動に加え左右移動もできるゴンドラ等の作業用ケージ
を用いて吊足場を移動しながら構造物から吊り下げたワ
イヤロープなどの索条に固定できるようにしたものであ
る。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to an improvement in a method for temporarily constructing a suspended scaffold for work, and involves moving the suspended scaffold using a work cage such as a gondola that can move horizontally as well as vertically. However, it can be fixed to a cable such as a wire rope suspended from a structure.

〔従来の技術〕[Conventional technology]

ビル、船舶1発電所、タンク、煙突そして橋梁等の構造
物の側面に対して作業を行う場合、作業に伴う落下物を
防止したり、ごみなどの飛散を防止するため、構造物の
側面を養生ネットなどで覆うことが行われている。
When working on the side of a structure such as a building, ship, power station, tank, chimney, bridge, etc., be sure to close the side of the structure to prevent objects from falling during the work and to prevent debris from scattering. It is being covered with protective nets, etc.

この養生ネットの取付けにあたっては、構造物の屋上部
分などからワイヤロープを吊下げ、このワイヤロープに
養生ネットを取付けるとともに、構造物の地上部分に通
路などのスペースを確保するためワイヤロープに吊足場
を吊下げて構造物に固定し、養生ネットの底部分となる
吊足場を仮設することも多い。
To install this protection net, wire ropes are hung from the roof of the structure, the protection net is attached to the wire ropes, and scaffolding is suspended from the wire ropes in order to secure space for passages etc. on the ground part of the structure. It is often suspended and fixed to a structure, and temporary scaffolding is installed to serve as the bottom of the curing net.

このような吊足場の仮設は、構造物の側面の幅に対応し
て複数枚の吊足場を地上で連結し、連結された吊足場の
一定間隔ごとに巻上機を取付けておき、この巻上機に養
生ネットが取付けられるワイヤロープを巻き掛けて吊足
場を所定の高さまで吊り上げるようにしている。
The temporary construction of such suspended scaffolds involves connecting multiple suspended scaffolds on the ground according to the width of the side of the structure, installing hoisting machines at regular intervals between the connected suspended scaffolds, and then A wire rope with a protective net attached to it is wrapped around the upper machine to lift the suspended scaffold to a predetermined height.

そして、このような養生ネットと吊足場で囲まれた空間
内で、ゴンドラなどによって作業を行うようにしている
Work is carried out using gondolas and other equipment in a space surrounded by such protective nets and hanging scaffolding.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

このような吊足場の仮設方法では、吊足場を吊り上げる
ための巻上機が一定間隔ごとに4台必要であり、大量の
巻上機を使用しないと構造物の側面の幅に対応した吊足
場を仮設することが出来ず、しかも、設置後は巻上機を
他の用途に使用することが出来ない拘束状態となるため
仮設に要する費用が嵩むという問題がある。
This temporary construction method for suspended scaffolding requires four hoisting machines at regular intervals to lift the suspended scaffolding. It is not possible to temporarily install the hoist, and furthermore, after installation, the hoist is in a restricted state where it cannot be used for other purposes, so there is a problem in that the cost required for temporary installation increases.

また、多数の巻上機を用いるため吊足場を水平に保つた
めには、それぞれの巻上機の巻上量の調整が必要となり
、繁雑となるとともに、それぞれの巻上機に電力などを
供給しなければならないという問題がある。
In addition, since many hoisting machines are used, in order to keep the suspended scaffolding horizontal, it is necessary to adjust the hoisting amount of each hoisting machine, which becomes complicated and requires the power etc. to be supplied to each hoisting machine. The problem is that you have to do it.

また、吊足場の仮設作業途中に床板上で行わねばならな
い作業もあり、安全上の問題があるとともに、仮設後に
おいても吊足場上の多数の巻上機が作業の邪魔になると
いう問題もある。
In addition, during the temporary construction of the suspended scaffolding, some work must be done on the floorboards, which poses safety issues, and even after temporary construction, the numerous hoisting machines on the suspended scaffolding become a hindrance to the work. .

さらに、地上での吊足場の組立に必要な面積が大きいと
いう問題があるとともに、仮設完了までに多くの作業者
と相当長時間を要するという問題もある。
Furthermore, there is the problem that the area required to assemble the suspended scaffold on the ground is large, and there is also the problem that it takes many workers and a considerable amount of time to complete the temporary construction.

また、作業に必要な部分だけを養生することができる作
業用吊足場の開発が望まれている。
It is also desired to develop a suspended scaffold for work that can protect only the parts necessary for work.

この発明は、かかる従来技術に鑑みてなされたもので、
吊足場自体に搭載する巻上機などを必要とせず、短時間
に能率良く吊足場を仮設することができる作業用吊足場
の仮設方法を提供しようとするものである。
This invention was made in view of such prior art,
To provide a temporary construction method for a suspended scaffold for work, which can efficiently temporarily construct a suspended scaffold in a short time without requiring a hoisting machine mounted on the suspended scaffold itself.

〔課題を解決するための手段〕[Means to solve the problem]

上記課題を解決するためこの発明の作業用吊足場の仮設
方法は、構造物の側面に沿って昇降及び横移動可能な作
業用ケージを設けるとともに、構造物上部より吊足場用
の索条を吊り下げた後、前記作業用ケージで地上の吊足
場を吊り上げて所定の設置位置に移動し、この吊足場を
前記索条に固定することを繰り返すようにしたことを特
徴とするものである。
In order to solve the above problems, the present invention provides a method for temporarily constructing a suspended scaffold for work, in which a work cage is provided that can be moved up and down and laterally along the side of the structure, and ropes for the suspended scaffold are suspended from the top of the structure. After being lowered, the suspended scaffold on the ground is lifted up by the work cage, moved to a predetermined installation position, and the suspended scaffold is fixed to the cable, which are repeated.

また、この発明の作業用吊足場の仮設方法は、前記作業
用ケージに吊足場用の吊上装置を搭載したことを特徴と
するものである。
Further, the method for temporarily constructing a suspended scaffold for work according to the present invention is characterized in that a lifting device for the suspended scaffold is mounted on the work cage.

さらに、この発明の作業用吊足場の仮設方法は、前記作
業用ケージと前記吊足場とのいずれか一方に収納可能な
吊上げ用フックを設け、いずれか他方に係止用キャッチ
を設けて吊り上げるようにしたことを特徴とするもので
ある。
Further, in the temporary construction method of a suspended scaffold for work according to the present invention, a hoisting hook that can be stored is provided in either one of the work cage or the suspended scaffold, and a locking catch is provided in either one of the cages for lifting the scaffold. It is characterized by the following.

また、この発明の作業用吊足場の仮設方法は、前記吊足
場の前記索条への固定を索条ロック装置を用いて行うよ
うにしたことを特徴とするものである。
Further, the method for temporarily constructing a suspended scaffold for work according to the present invention is characterized in that the suspended scaffold is fixed to the cable using a cable locking device.

さらに、この発明の作業用吊足場の仮設方法は、前記地
上の吊足場を複数枚連結し、これらを水平保持部材で剛
体状にした後、前記作業用ケージで吊り上げるようにし
たことを特徴とするものである。
Further, the method for temporarily constructing a suspended scaffold for work according to the present invention is characterized in that a plurality of the above-mentioned suspended scaffolds on the ground are connected, and after making them into a rigid body with a horizontal holding member, they are hoisted by the above-mentioned cage for work. It is something to do.

また、この発明の作業用吊足場の仮設方法は、構造物の
側面に沿って昇降及び横移動可能な作業用ケージを設け
るとともに、構造物上部より横移動可能な吊足場用の索
条を吊り下げた後、前記作業用ケージで地上の吊足場を
吊り上げて前記索条に固定するとともに、この吊足場を
構造物の側面に設置した横移動用レールに移動可能に設
置したことを特徴とするものである。
Further, in the temporary construction method of a suspended scaffold for work according to the present invention, a work cage that can be raised and lowered and moved laterally along the side of the structure is provided, and ropes for the suspended scaffold that can be moved laterally are hung from the upper part of the structure. After lowering, the suspended scaffold on the ground is lifted up by the work cage and fixed to the cable, and the suspended scaffold is movably installed on a lateral movement rail installed on the side of the structure. It is something.

〔作 用〕[For production]

この作業用吊足場の仮設方法によれば、構造物の側面に
沿って昇降と横移動ができるゴンドラなどの作業用ケー
ジを設けておき、この作業用ケージで地上の吊足場を吊
り上げて所定の位置に移動するようにし、所定位置で予
め吊り下げである索条に固定することを繰り返して吊足
場を仮設するようにしており、吊足場に巻上機を設ける
こと無く、作業用ケージを用いて簡単に仮設できるよう
にしている。
According to this method of temporarily installing a suspended scaffold for work, a work cage such as a gondola that can go up and down and move laterally is provided along the side of the structure, and the suspended scaffold on the ground is hoisted up by this work cage to a predetermined position. The suspended scaffold is temporarily constructed by repeatedly moving it to a certain position and fixing it to a pre-suspended rope at a predetermined position, and instead of installing a hoist on the suspended scaffold, a work cage is used. This allows for easy temporary installation.

また、吊上装置を作業用ケージに取付けるようにして一
層仮設作業を容易にするようにしている。
Furthermore, the lifting device is attached to the work cage to further facilitate temporary construction work.

さらに、吊上げ用フックと係止用キャッチを作業用ケー
ジと吊足場のそれぞれにいずれかを設けるようにし、地
上からの吊上げを特別の操作を必要とせずに簡単にでき
るようにしている。
Furthermore, either a lifting hook or a locking catch is provided on each of the work cage and the lifting scaffold, so that lifting from the ground can be easily performed without requiring special operations.

また、所定位置に吊り上げた吊足場を索条に移載固定す
る場合に索条ロック装置を用いるようにして簡単に固定
できるようにしている。
In addition, when the suspended scaffold that has been lifted to a predetermined position is transferred to and fixed on the cables, a cable locking device is used so that the scaffolding can be easily fixed.

さらに、連結状態の吊足場を水平保持部材を用いて剛体
状にするようにし、連結状態でも吊足場の吊上げを可能
とし、仮設作業の能率の向上を図っている。
Furthermore, the suspended scaffolds in the connected state are made rigid using horizontal holding members, and the suspended scaffolds can be lifted even in the connected state, thereby improving the efficiency of temporary construction work.

また、横移動可能な索条に吊上げた吊足場を横移動レー
ルに移動可能に設置するようにし、作業用ケージととも
に移動させて必要な部分だけの養生ができるようにして
いる。
In addition, the hanging scaffold suspended from horizontally movable cables is movably installed on the horizontally movable rail, so that it can be moved together with the work cage and only the necessary parts can be covered.

〔実施例〕〔Example〕

以下、この発明の実施例を図面を参照しながら詳細に説
明する。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

第1図はこの発明の作業用吊足場の仮設方法の一実施例
にかかる工程図である。
FIG. 1 is a process diagram of an embodiment of a method for temporarily constructing a suspended scaffold for work according to the present invention.

この作業用吊足場の仮設方法の仮設対象は、例えば第7
図に示す養生ネット1の底部分に設けられる吊足場16
であり、仮設に当たっては、構造物3の側面に対して作
業を行うための作業用ケージ4が利用され、例えば第1
図(a)に示すように、2台のゴンドラ4a、4bを利
用して仮設作業を行う。
The temporary construction target of this temporary construction method of suspended scaffolding for work is, for example, the 7th
Hanging scaffolding 16 provided at the bottom of the curing net 1 shown in the figure
For temporary construction, a work cage 4 is used to perform work on the side surface of the structure 3. For example, the first
As shown in Figure (a), temporary construction work is performed using two gondolas 4a and 4b.

(1)まず、仮設作業を行う準備として次の作業が行わ
れる。
(1) First, the following work will be carried out in preparation for the temporary construction work.

作業用ケージ4としてのゴンドラ4a、4bは、例えば
第1図(a)に示すように、上下に昇降されるだけでな
(、仮設の横行装置5によって左右方向にも走行移動す
ることができるものが使用される。
As shown in FIG. 1(a), the gondolas 4a and 4b serving as the work cages 4 can not only be lifted up and down (as shown in FIG. things are used.

このため仮設横行装置5が設置されるが、この仮設横行
装置5は、第7図に示すように、レール支持台6の固定
装置となる支持枠7を備えており、この支持枠7を建物
3の屋上の上端縁に形成されたパラペット3aに挟持固
定し、この固定装置としての支持枠7にレール支持台6
が回動可能かつ固定可能に装着される。
For this purpose, a temporary traversing device 5 is installed, and as shown in FIG. The rail support base 6 is clamped and fixed to a parapet 3a formed on the upper edge of the rooftop of
is rotatably and fixedly mounted.

このレール支持台6には、水平方向に突出すレール支持
部6aの基端部が垂直軸回りに回動可能に装着され、こ
のレール支持部6aの先端部上面に補強板を介して仮設
横行レール8が載置される。
The base end of a rail support part 6a that protrudes in the horizontal direction is attached to this rail support base 6 so as to be rotatable around a vertical axis, and a temporary horizontal support part is attached to the top surface of the top end of the rail support part 6a via a reinforcing plate. A rail 8 is placed.

そして、補強板を貫通して上下方向に形成された取付孔
に連結ピンを入れることで仮設横行レール8を回動でき
るよう取付ける。
Then, by inserting a connecting pin into a mounting hole formed vertically through the reinforcing plate, the temporary transverse rail 8 is mounted so as to be rotatable.

この仮設横行レール8は、断面形状が角ばったC字状と
され、リップみぞ形鋼等で構成されている。
This temporary transverse rail 8 has a square C-shaped cross section and is made of lip groove shaped steel or the like.

このような仮設横行レール8は、その長さに対応して一
定間隔で建物3のバラペット3aに取付けられた支持枠
7およびレール支持台6を介して連結支持され、必要な
走行範囲(例えば建物3を取り巻くよう)に設置される
が、仮設作業を行う場合には、全ての組立を建物3のバ
ラベット3aの内側で行い、レール支持台6及びレール
支持部6aを建物3の外側に振り出すようにして設置す
ることができ、安全に設置することができるようになっ
ている。
Such a temporary transverse rail 8 is connected and supported via a support frame 7 and a rail support stand 6 that are attached to the rosette 3a of the building 3 at regular intervals corresponding to its length, and is supported over a necessary running range (e.g. However, when performing temporary work, all assembly is done inside the bulkhead 3a of the building 3, and the rail support stand 6 and rail support part 6a are moved outside the building 3. It can be installed so that it comes out, and it can be installed safely.

このような仮設横行レール8に沿って走行する2組の横
行トロリー9は、それぞれ従動トロリー9aと駆動トロ
リー9bの2台のトロリーで構成され、それぞれが連結
ロッド9Cで連結されて一体に走行するようになってお
り、従動トロリー9aと駆動トロリー9bには、ゴンド
ラ4a、4bを吊下げるためのフック9dが取付けであ
る。
The two sets of traversing trolleys 9 that run along such temporary traversing rails 8 are each composed of two trolleys, a driven trolley 9a and a driving trolley 9b, and are connected by a connecting rod 9C and run as one. Hooks 9d for hanging the gondolas 4a and 4b are attached to the driven trolley 9a and the driving trolley 9b.

この横行トロリー9の2つのフック9dには、ゴンドラ
用吊ワイヤ10が取付けられ、作業用のゴンドラ4a、
4bが吊下げられるようになっており、ゴンドラ4a、
4b内に搭載した巻取機11によりゴンドラ4a、4b
を昇降するようになっている。
A gondola hanging wire 10 is attached to the two hooks 9d of this traveling trolley 9, and the work gondola 4a,
Gondola 4a,
The gondolas 4a and 4b are
It is designed to be raised and lowered.

したがって、2組のそれぞれのゴンドラ4a。Therefore, two sets of respective gondolas 4a.

4bは横行トロリー9による走行で左右方向に移動でき
るとともに、巻取機11による巻上げ巻戻しで上下方向
にも移動することができる。
4b can be moved in the left-right direction by traveling by the traversing trolley 9, and can also be moved in the vertical direction by winding and rewinding by the winder 11.

さらに、建物3のバラペット3a部分に一定の間隔で取
付けられた支持枠7の先端部と基端部から吊足場2を支
持するための索条としての吊ワイヤ12がそれぞれ吊り
下げられる。
Furthermore, hanging wires 12 as cables for supporting the hanging scaffold 2 are suspended from the tip and base ends of the support frame 7 attached at regular intervals to the rose pet 3a portion of the building 3.

(2)こうして準備が完了した後、2台の横行式のゴン
ドラ4a、4bを用いる吊足場16の仮設作業は、次の
ようにして行われる。
(2) After the preparations are completed in this way, the temporary installation work of the suspended scaffolding 16 using the two transverse gondolas 4a and 4b is carried out as follows.

■ 建物3の吊足場を仮設する地上部分に仮設すべき床
板2を並べ、所定枚数を連結する。
■ Arrange the floorboards 2 to be temporarily installed on the above-ground part of the building 3 where the suspended scaffolding will be temporarily installed, and connect a predetermined number of them.

この床板2の連結は、第2図に示すように、連結用フッ
ク2aと連結用キャッチ2bとを設けておき、ワンタッ
チで連結できるようにしておくことが好ましく、特に吊
り上げ状態での連結作業を容易にするため、少なくとも
連結状態の吊足場16の両端部には、これら連結用フッ
ク2aと連結用キャッチ2bとを設けておくようにする
To connect the floorboards 2, it is preferable to provide a connecting hook 2a and a connecting catch 2b, as shown in FIG. To facilitate this, the connecting hook 2a and the connecting catch 2b are provided at least at both ends of the suspended scaffold 16 in the connected state.

また、連結状態で吊足場16を吊り上げると、連結部か
ら吊足場16が折れ曲がることから、第2図に示すよう
に、長さを調整できるターンバックルを備えた吊部材1
3と2本の斜材14とで剛体状に保持する。
Furthermore, when the suspended scaffolding 16 is lifted up in the connected state, the suspended scaffolding 16 is bent from the connecting part, so as shown in FIG.
3 and two diagonal members 14 to hold it rigidly.

さらに、各床板2には、手摺15などの付属物を予め取
付けるようにする。
Furthermore, accessories such as handrails 15 are attached to each floorboard 2 in advance.

■ こうして1ユニット分の吊足場16が組み立てられ
たところで、2台のゴンドラ4a、4bを下降させ、こ
の吊足場16を吊り上げるようにする。
(2) When one unit of suspended scaffolding 16 is assembled in this way, the two gondolas 4a and 4b are lowered to lift up this suspended scaffolding 16.

この場合の吊足場16の吊り上げは、ゴンドラ4a、4
bの側部に、第3図に示すように、吊上装置として折畳
み式の吊上アーム17を取付けておき、吊部材13の上
端部に形成した吊上突起18を下からすくうようにして
吊り上げる。  、■ 所定の位置まで1ユニット分の
吊足場16を吊り上げたところで、第1図(a)に示す
ように、吊足場用の吊ワイヤ12に固定する。
In this case, the suspension scaffolding 16 is lifted by the gondolas 4a and 4.
As shown in FIG. 3, a foldable lifting arm 17 is attached to the side of b as a lifting device, and the lifting protrusion 18 formed at the upper end of the hanging member 13 is scooped up from below. lift. , (2) Once one unit of the suspended scaffold 16 has been lifted to a predetermined position, it is fixed to the hanging wire 12 for the suspended scaffold, as shown in FIG. 1(a).

この吊ワイヤ12への固定には、第4図に示すように、
吊部材13の上端部に取付けた索条ロック装置19が使
用される。
For fixing to this hanging wire 12, as shown in FIG.
A cable locking device 19 attached to the upper end of the hanging member 13 is used.

この索条ロック装置19は、左右に2つに分解連結され
る支持体19aの一方に固定部材19bが取付けられ、
他方には、ハンドル19cの操作によって移動され、吊
ワイヤ12を挾んで締付けるための移動部材19dが取
付られて構成される。
This cable lock device 19 has a support body 19a that is disassembled and connected into two left and right parts, and a fixing member 19b is attached to one side of the support body 19a.
On the other side, a moving member 19d is attached to which the moving member 19d is moved by operating the handle 19c to clamp and tighten the hanging wire 12.

したがって、吊足場16を所定位置に吊り上げたところ
で、索条ロック装置19の支持体19aを分割し、その
間に吊ワイヤ12を通したのち、支持体19aを連結し
てハンドル19cを操作し、固定部材19bと移動部材
19dとで挾むようにすることで吊ワイヤ12に固定す
ることができる。
Therefore, when the suspended scaffold 16 is lifted to a predetermined position, the support body 19a of the cable locking device 19 is divided, the hanging wire 12 is passed between them, and the support bodies 19a are connected and the handle 19c is operated to fix the suspension. It can be fixed to the hanging wire 12 by sandwiching it between the member 19b and the moving member 19d.

なお、この索条ロック装置19内にガバナ機構を組込み
、吊ワイヤ12に沿って落下するような場合にロック状
態を強固とするようにしても良い。
Note that a governor mechanism may be incorporated into the cable locking device 19 to ensure a strong locked state in the event that the cable falls along the hanging wire 12.

そして、このような索条ロック装置19により、ゴンド
ラ4a、4bから手の届く範囲で吊ワイヤ12への固定
を行なったのち、それぞれのゴンドラ4a、4bを横に
移動して残りの吊ワイヤ12への固定を行う。
Then, after fixing the gondolas 4a and 4b to the hanging wire 12 within reach using the cable locking device 19, each gondola 4a and 4b is moved laterally and the remaining hanging wire 12 is secured to the gondola 4a and 4b. Fix to.

■ この後、斜材14のターンバックルを外し、吊部材
13で吊足場16の水平度を修正して、第1のユニット
の吊足場16の仮設が完了する(第1図(b)参照)。
■ After this, the turnbuckles of the diagonal members 14 are removed and the horizontality of the suspended scaffolding 16 is corrected using the hanging members 13, completing the temporary installation of the suspended scaffolding 16 of the first unit (see Figure 1 (b)) .

■ この第1のユニットの吊足場16の吊ワイヤ12へ
の固定と並行して、あるいは固定完了後、第1の吊足場
16に連結すべき第2のユニットの吊足場16を地上で
連結し、吊部材13及び2本の斜材14で剛体状にして
おく。
■ In parallel with fixing the suspended scaffolding 16 of the first unit to the hanging wire 12, or after the fixing is completed, connect the suspended scaffolding 16 of the second unit to be connected to the first suspended scaffolding 16 on the ground. , a hanging member 13 and two diagonal members 14 are used to form a rigid body.

■ この後、2台のゴンドラ4a、4bを横移動させた
後下降させて第2のユニットである地上の吊足場16を
吊り上げる。
(2) Thereafter, the two gondolas 4a and 4b are moved laterally and then lowered to lift the suspended scaffold 16 on the ground, which is the second unit.

■ そして、所定位置に吊り上げて吊ワイヤ12に索条
ロック装置19で固定した後、第1のユニットの吊足場
16と第2のユニットの吊足場16とを連結用フック2
aと連結用キャッチ2bを噛み合わせて連結する(第1
図(c)参照)。
■ After hoisting it to a predetermined position and fixing it to the hanging wire 12 with the cable locking device 19, the hanging scaffold 16 of the first unit and the hanging scaffold 16 of the second unit are connected to the connecting hook 2.
a and connection catch 2b to connect them (first
(See figure (c)).

■ このような地上での吊足場16の組立て、ゴンドラ
4a、4bによる吊上げ、吊ワイヤ12への固定を順次
繰り返すようにして所定の幅の吊足場16の仮設が完了
する。
(2) Assembling the suspended scaffold 16 on the ground, hoisting it up using the gondolas 4a and 4b, and fixing it to the hanging wire 12 are repeated in sequence to complete the temporary construction of the suspended scaffold 16 of a predetermined width.

■ こうして作業用の吊足場16が仮設された後、構造
物3のバラベット3a部分から吊足場16部分まで養生
ネット1を張り、構造物3の作業壁面全体を覆うように
する。
(2) After the suspended scaffold 16 for work is temporarily installed in this way, the curing net 1 is stretched from the loose bed 3a of the structure 3 to the suspended scaffold 16 so as to cover the entire working wall surface of the structure 3.

このような作業用吊足場の仮設方法によれば、吊足場1
6に昇降用の巻上機を搭載すること無く吊足場16を仮
設することができ、電力の確保や配線の必要がなく、作
業性が良く、コスト低減を図ることができるとともに、
吊足場16上に広い作業空間を確保することができる。
According to such a temporary construction method of suspended scaffolding for work, suspended scaffolding 1
The suspended scaffolding 16 can be temporarily installed without installing a hoisting machine for lifting and lowering the scaffold 16, there is no need to secure electricity or wire, and the workability is good and costs can be reduced.
A wide working space can be secured on the suspended scaffold 16.

また、吊り上げ状態の吊足場16同志の連結を連結用フ
ック2aと連結用キャッチ2bとで行うようにしたので
、仮設作業中に吊足場16上に乗る必要がなく、作業の
安全性も高く、索条ロック装置19で吊りワイヤ12に
固定できるので、短時間に仮設することができる。
In addition, since the suspended scaffolds 16 are connected to each other by the connecting hooks 2a and the connecting catches 2b, there is no need to stand on the suspended scaffolds 16 during temporary construction work, and the work is highly safe. Since it can be fixed to the hanging wire 12 with the cable locking device 19, it can be temporarily installed in a short time.

さらに、複数枚の吊足場16を連結状態で吊り上げても
吊部材13と斜材14とで剛体状にできるので、安全か
つ容易に吊り上げることができる。
Furthermore, even if a plurality of hanging scaffolds 16 are hung in a connected state, the hanging members 13 and the diagonal members 14 can form a rigid body, so that the hanging scaffolds 16 can be lifted safely and easily.

なお、上記実施例では、吊足場16をゴンドラ4a、4
bで上昇させて吊ワイヤ12に固定するようにしたが、
地上での吊足場16の組立を同一場所で行い、ゴンドラ
4a、4bで吊り上げた後、所定の位置に横移動して吊
ワイヤ12に固定するようにすることもでき、地上での
作業スペースの確保が難しい場合に適している。
In the above embodiment, the suspended scaffolding 16 is connected to the gondolas 4a, 4.
b to raise it and fix it to the hanging wire 12, but
It is also possible to assemble the suspended scaffold 16 on the ground in the same place, and after lifting it with the gondolas 4a and 4b, move it laterally to a predetermined position and fix it to the hanging wire 12, which saves work space on the ground. Suitable when it is difficult to secure.

また、吊ワイヤ12への固定後に建物3の側面側の斜材
14を取外すようにすれば、側面への作業性が損なわれ
ることがない。
Moreover, if the diagonal members 14 on the side of the building 3 are removed after being fixed to the hanging wire 12, the workability on the side will not be impaired.

次に、この作業用吊足場の仮設方法の他の実施例につい
て、第5図ないし第6図により説明する。
Next, another embodiment of the method for temporarily constructing a suspended scaffold for work will be described with reference to FIGS. 5 and 6.

これら実施例では、地上の床板2をゴンドラ4a+4b
で簡単に吊り上げることができるようにしており、収納
可能な吊上げ用フック2oと係止用キャッチ21が使用
される。
In these embodiments, the ground floor plate 2 is used as the gondola 4a+4b
A retractable lifting hook 2o and a locking catch 21 are used.

この収納可能な吊上げ用フック20は、例えば第5図に
示すように、その基端部20aがゴンドラ4a、4bの
下部両側にそれぞれ軸支されて回動可能に設けられ、ゴ
ンドラ4a、4bの側面に収納可能となっており、ボー
ルプランジャ20bによって下側に突き出した位置でロ
ックできるようにしである。
As shown in FIG. 5, for example, this retractable lifting hook 20 is rotatably provided with its base end 20a being pivotally supported on both sides of the lower part of the gondolas 4a and 4b. It can be stored on the side, and can be locked in a downwardly protruding position using a ball plunger 20b.

そして、吊上げ用フック2oの中間部は、収納方向とは
直角な方向に回動可能に軸支され、バネ20cによって
それぞれが内側に閉じるように付勢されている。
The intermediate portions of the lifting hooks 2o are pivotally supported so as to be rotatable in a direction perpendicular to the storage direction, and each is urged to close inward by a spring 20c.

一方、係止用キャッチ21は、第5図(a)に示すよう
に、床板2の両側部に取付けられ、逆り時状になってお
り、上側の隔部分が斜めに切り欠れている。
On the other hand, as shown in FIG. 5(a), the locking catches 21 are attached to both sides of the floorboard 2, are in an inverted shape, and have an upper partition cut out diagonally. .

したがって、吊上げ用フック2oを突き出した状態で床
板2の係止用キャッチ21に被せるようにすると、吊上
げ用フック2oがバネ20cに抗して拡がった後、閉じ
られる結果、係止用フック21に吊上げ用フック20が
係止された状態となる。
Therefore, when the lifting hook 2o is placed over the locking catch 21 of the floorboard 2 in a protruding state, the lifting hook 2o expands against the spring 20c and then closes. The lifting hook 20 is in a locked state.

こうして吊り上げた後、所定の位置で吊ワイヤ12に索
条ロック装置19を用いて固定し、次いで、ゴンドラ4
a、4bを下降させて吊上げ用フック20を係止用キャ
ッチ21がら外すことを繰り返して吊足場6の仮設を行
う。
After lifting the gondola 4 in this manner, it is fixed to the hanging wire 12 at a predetermined position using the cable locking device 19, and then the gondola 4
A and 4b are lowered and the lifting hook 20 is removed from the locking catch 21 repeatedly to temporarily construct the hanging scaffold 6.

このようにして吊足場の仮設を行うことで、層簡単に作
業を行うことができる。
By temporarily erecting the suspended scaffold in this way, the work can be carried out easily.

なお、吊上げ用フック20と係止用キャッチ21との取
付位置を、第6図に示すように、逆に配置し、ゴンドラ
4a、4bに係止用キャッチ21を取付け、吊足場2に
吊上げ用フック20を取付けるようにしても良い。
Note that the mounting positions of the lifting hook 20 and the locking catch 21 are reversed as shown in FIG. A hook 20 may also be attached.

次に、第8図及び第9図によりこの発明の他の一実施例
について説明する。
Next, another embodiment of the present invention will be described with reference to FIGS. 8 and 9.

この実施例では、仮設される作業用の吊足場16を作業
用ケージ4としてのゴンドラ(図示例では、ゴンドラを
1台とする場合で説明する。)4aの横移動に合わせて
横に移動できるようにし、第8図に示すように、ゴンド
ラ4aの昇降範囲全体もしくはゴンドラ4aより下の部
分のいずれか必要な部分だけを養生ネット1で養生しよ
うとするものである。
In this embodiment, the suspended scaffold 16 for temporary work can be moved laterally in accordance with the lateral movement of the gondola (in the illustrated example, one gondola is used) 4a serving as the work cage 4. In this way, as shown in FIG. 8, only the necessary part of the entire lifting range of the gondola 4a or the part below the gondola 4a is covered with the covering net 1.

(1)このため吊足場16の仮設前の準備として、第9
図に示すように、構造物3の上部に仮設される仮設横行
レール8に装着される横行トロリー9が4台で構成され
、3台の従動トロリー9aと1台の駆動トロリー9bで
構成され、それぞれが連結ロッド9Cで連結されている
(1) For this reason, in preparation for the temporary construction of suspended scaffolding 16,
As shown in the figure, there are four traversing trolleys 9 attached to a temporary traversing rail 8 temporarily installed on the top of the structure 3, three driven trolleys 9a and one driving trolley 9b. Each is connected by a connecting rod 9C.

一方、ゴンドラ4aの最下降位置より僅かに下側の吊足
場16を仮設する位置に対応して下部仮設横行レール2
2が仮設される。
On the other hand, the lower temporary transverse rail 2 is located slightly below the lowermost position of the gondola 4a, corresponding to the position where the suspended scaffolding 16 is temporarily installed.
2 is tentatively established.

この下部仮設横行レール22は上部仮設横行レール8と
同じように、断面形状が角ばったC字状のリップみぞ形
鋼等で構成されたものが使用され、作業壁面に直接アン
カー23を用いて取付けられる。この下部仮設横行レー
ル22の取付作業はゴンドラ4aを使用できる状態とし
た後、ゴンドラ4a内から取付は作業を行なうようにし
、仮設横行レール8と平行かつほぼ同一の長さ仮設する
ようにする。
Like the upper temporary transverse rail 8, this lower temporary transverse rail 22 is made of lip groove steel or the like with a C-shaped square cross section, and is attached directly to the work wall using anchors 23. It will be done. The lower temporary traverse rail 22 is installed from inside the gondola 4a after the gondola 4a is ready for use, so that it is temporarily installed parallel to and approximately the same length as the temporary traverse rail 8.

そして、外側の2つの従動トロリー9aにそれぞれ吊足
場16吊下用の吊ワイヤ12の上端部が固定され、横移
動できるようになっている。
The upper ends of the hanging wires 12 for suspending the suspended scaffolding 16 are fixed to the two outer driven trolleys 9a, respectively, so that they can be moved laterally.

(2)このような準備が完了した後行われる吊足場16
の仮設は、次のようにして行われる。
(2) Hanging scaffolding 16 to be carried out after such preparations are completed
The hypothesis is made as follows.

■ 建物3の地上部分にゴンドラ4aより横幅が広くな
るよう仮設すべき床板2を1枚ないし複数枚並べ、必要
に応じて連結する。
■ One or more floorboards 2 to be temporarily installed are arranged on the ground part of the building 3 so that the width thereof is wider than that of the gondola 4a, and the floorboards 2 are connected as necessary.

そして、この床板2の建物3側の両側に下部横行レール
22に装着されるローラ24を取付けておく。
Rollers 24 mounted on the lower transverse rail 22 are attached to both sides of the floorboard 2 on the building 3 side.

なお、このローラ24に上部の横行トロリー9と同期し
て走行駆動できる駆動装置を設けるようにしても良い。
Note that this roller 24 may be provided with a drive device capable of running and driving in synchronization with the upper traversing trolley 9.

また、床板2には、吊り上げに必要な、長さを調整でき
るターンバックルを備えた吊部材13と必要な場合、斜
材14を取付けるとともに、手摺15などの付属物を予
め取付けるようにする。
In addition, to the floorboard 2, a hanging member 13 with a turnbuckle whose length can be adjusted and is necessary for lifting, a diagonal member 14 is attached if necessary, and accessories such as a handrail 15 are attached in advance.

■ こうして吊足場16が組み立てられたところで、ゴ
ンドラ4aを下降させ、この吊足場16を吊り上げるよ
うにする。
(2) Once the suspended scaffolding 16 is assembled in this way, the gondola 4a is lowered to lift up the suspended scaffolding 16.

この場合の吊足場16の吊り上げは、例えば第3図で説
明したゴンドラ4aの側部に取付けた吊上装置として折
畳み式の吊上アーム17を用い、下からすくうようにし
て吊り上げる。なお、第5図ないし第6図で説明した吊
上げ用フック20と係止用キャッチ21を用いて吊り上
げるようにしても良い。
In this case, the suspended scaffold 16 is lifted by using the foldable lifting arm 17 as a lifting device attached to the side of the gondola 4a described in FIG. 3, for example, and scooping it up from below. Note that the lifting hook 20 and the locking catch 21 described in FIGS. 5 and 6 may be used for lifting.

■ 所定の位置まで吊足場16を吊り上げたところで、
従動トロリー9aから吊り下げられた吊足場用の吊ワイ
ヤ12に吊部材13の上端部に取付けた索条ロック装置
19を用いて固5定するとともに、この後、吊部材13
のターンバックルで吊足場16の水平度を修正する。
■ After hoisting the suspended scaffold 16 to the predetermined position,
A rope locking device 19 attached to the upper end of the hanging member 13 is used to fix the hanging wire 12 for the hanging scaffold suspended from the driven trolley 9a, and then the hanging member 13 is fixed.
Correct the horizontality of the suspended scaffolding 16 with the turnbuckle.

■ 次いで、床板2の両側のローラ24を下部仮設横行
レール22に装着し、移動可能な吊足場16の仮設が完
了する。
(2) Next, the rollers 24 on both sides of the floorboard 2 are attached to the lower temporary transverse rails 22, and the temporary installation of the movable suspended scaffolding 16 is completed.

■ こうして横移動可能な作業用の吊足場16が仮設さ
れた後、第8図に示すように養生ネット1を張ったり、
第9図に示すように養生ネット1を張り、作業に必要な
一部分の壁面を覆うことができるようにする。
■ After the horizontally movable hanging scaffold 16 for work is temporarily installed, as shown in Fig. 8, the curing net 1 is stretched,
As shown in FIG. 9, a curing net 1 is stretched to cover a portion of the wall surface necessary for the work.

したがって、こうして仮設された作業用吊足場によれば
、第8図に示すように、ゴンドラ4aの幅に相当する建
物の壁面を養生ネット1で覆うだけで、この養生ネット
1をゴンドラ4aの横移動と同期して動かすようにし、
常に作業部分を養生しながら作業ができる。
Therefore, according to the suspension scaffold for work temporarily constructed in this way, as shown in FIG. Make it move in sync with the movement,
You can work while always protecting the work area.

また、ゴンドラ作業に必要な部分を最少限覆うことがで
きるので、使用中の建物1などへの影響を最少限にでき
る。
Further, since the portion necessary for gondola work can be covered to the minimum extent possible, the influence on the building 1 etc. in use can be minimized.

このような作業用吊足場の仮設方法によれば、ゴンドラ
の幅に対応して吊足場を仮設するようにすれば良く、仮
設作業を一層能率良く行うことができる。
According to such a method of temporarily installing a suspended scaffold for work, the suspended scaffold can be temporarily installed in accordance with the width of the gondola, and the temporary construction work can be performed more efficiently.

なお、上記実施例では、作業用ケージをゴンドラで構成
した場合で説明したが、ゴンドラに限らず、昇降機構を
ゴンドラ自体に搭載したものや横行トロリー等地の部分
に搭載したものにも広く適用できるものである。
In addition, in the above embodiment, the case where the work cage is constituted by a gondola has been explained, but it is not limited to gondolas, but can also be widely applied to those in which the elevating mechanism is mounted on the gondola itself, or mounted on the ground part such as a traversing trolley. It is possible.

また、作業対象は建物に限らず、船舶1発電所。In addition, the target of work is not limited to buildings, but also ships and power plants.

タンク、煙突そして橋梁等の構造物の壁面広く適用でき
るものである。
It can be widely applied to the walls of structures such as tanks, chimneys, and bridges.

さらに、この発明の要旨を変更しない範囲で構成要素を
変更するようにしても良いことは言うまでもない。
Furthermore, it goes without saying that the constituent elements may be changed without changing the gist of the invention.

〔発明の効果〕〔Effect of the invention〕

以上、実施例とともに具体的に説明したようにこの発明
の作業用吊足場の仮設方法によれば、構造物の側面に沿
って昇降と横移動ができるゴンドラなどの作業用ケージ
を設けておき、この作業用ケージで地上の吊足場を吊り
上げて所定の位置に移動するようにし、所定位置で予め
吊り下げである索条に固定することを繰り返して吊足場
を仮設するようにしたので、吊足場に巻上機を設けるこ
と無く、作業用ケージを用いて簡単に仮設できる。
As described above in detail with the embodiments, according to the temporary construction method of a suspended scaffold for work according to the present invention, a work cage such as a gondola that can move up and down and move laterally along the side of the structure is provided, This work cage was used to lift a suspended scaffold on the ground, move it to a predetermined position, and then repeatedly fix it to a pre-suspended cable at a predetermined position to temporarily construct a suspended scaffold. It can be easily temporarily installed using a work cage without installing a hoist.

さらに、この作業用吊足場の仮設方法によれば、吊足場
に昇降用の巻上機を搭載すること無く吊足場を仮設する
ことができるので、電力の確保や配線の必要がなく、作
業性が良く、コスト低減を図ることができるとともに、
吊足場上に広い作業空間を確保することができる。
Furthermore, according to this temporary construction method for suspended scaffolding for work, it is possible to temporarily construct a suspended scaffold without installing a lifting machine on the suspended scaffold, so there is no need to secure electricity or wiring, making work easier. It is possible to reduce costs, and
A wide working space can be secured on the suspended scaffold.

また、吊上装置を作業用ケージに取付けるようにして一
層仮設作業を容易にすることができる。
Further, by attaching the lifting device to the work cage, temporary construction work can be made even easier.

さらに、吊上げ用フックと係止用キャッチを作業用ケー
ジと床板のそれぞれにいずれかを設けるようにしており
、これによって、地上からの吊上げを特別の操作を必要
とせずに簡単に仮設作業ができる。
Furthermore, either a lifting hook or a locking catch is provided on each of the work cage and the floorboard, making it easy to perform temporary lifting work from the ground without the need for special operations. .

また、所定位置に吊り上げた吊足場を索条に移載固定す
る場合に索条ロック装置を用いるようにしており、簡単
に固定できる。
In addition, a cable locking device is used when transferring and fixing the suspended scaffold that has been lifted to a predetermined position onto the cable, so that the scaffold can be easily fixed.

さらに、連結状態の吊足場を水平保持部材を用いて剛体
状にするようにしており、連結状態でも吊足場の吊上げ
を可能とし、仮設作業の能率の向上を図ることができる
Furthermore, the suspended scaffolding in the connected state is made into a rigid body using a horizontal holding member, so that the suspended scaffolding can be lifted even in the connected state, and the efficiency of temporary construction work can be improved.

また、横移動可能な索条に吊上げた吊足場を横移動レー
ルに移動可能に設置するようにしたので、作業用ケージ
とともに移動させて必要な部分だけの養生ができる。
In addition, since the suspended scaffold suspended from horizontally movable cables is movably installed on the horizontally movable rail, it can be moved together with the work cage and only the necessary portions can be covered.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明の作業用吊足場の仮設方法にかかり、第
1図はこの発明の作業用吊足場の仮設方法の一実施例に
かかる工程図、第2図及び第3図は作業用ケージでの吊
り上げ状態の説明図、第4図は、索条ロック装置の断面
図、第5図及び第6図はそれぞれ吊足場の吊上装置の他
の実施例の説明図、第7図は仮設完了状態の説明図であ
る。 第8図及び第9図はこの発明の作業用吊足場の仮設方法
の他の一実施例にかかる吊足場を横移動可能とする場合
の仮設完了状態の説明図である。 1・・・養生ネット、2・・・床板、2a・・・連結用
フック、2b・・・連結用キャッチ、3・・・構造物、
3a・・・パラペット、4・・・作業用ケージ、4a、
4b・・・ゴンドラ、5・・・仮設横行装置、6・・・
レール支持台、7・・・支持枠、8・・・仮設横行レー
ル、9・・・横行トロリー 9a・・・従動トロリー、
9b・・・駆動トロリー9c・・・連結ロッド、9d・
・・フック、10・・・ゴンドラ用吊ワイヤ、11・・
・巻取機、12・・・吊ワイヤ、13・・・吊部材、1
4・・・斜材、15・・・手摺、16・・・吊足場、1
7・・・吊上アーム、18・・・吊上突起、19・・・
索条ロック装置、19a・・・支持体、19b・・・固
定部材、19c・・・ハンドル、19d・・・移動部材
、20・・・吊上げ用フック、20a・・・基端部、2
0b・・・ボールプランジャ、20c・・・バネ、21
・・・係止用キャッチ、22・・・下部仮設横行レール
、23・・・アンカー 24・・・ローラ。
The drawings show a method for temporarily constructing a suspended scaffold for work according to the present invention, FIG. 1 is a process diagram of an embodiment of the method for temporarily constructing a suspended scaffold for work according to the present invention, and FIGS. 2 and 3 show a cage for work. 4 is a sectional view of the rope locking device, FIGS. 5 and 6 are explanatory diagrams of other embodiments of the lifting device for the suspended scaffold, and FIG. 7 is the completed temporary installation. It is an explanatory diagram of a state. FIG. 8 and FIG. 9 are explanatory diagrams of a completed state of temporary construction when a suspended scaffold according to another embodiment of the temporary construction method of a suspended scaffold for work according to the present invention is made horizontally movable. DESCRIPTION OF SYMBOLS 1...Curing net, 2...Floor board, 2a...Connection hook, 2b...Connection catch, 3...Structure,
3a...parapet, 4...work cage, 4a,
4b...Gondola, 5...Temporary traverse device, 6...
Rail support stand, 7... Support frame, 8... Temporary traversing rail, 9... Traversing trolley 9a... Driven trolley,
9b... Drive trolley 9c... Connection rod, 9d...
...Hook, 10...Gondola hanging wire, 11...
- Winding machine, 12... Hanging wire, 13... Hanging member, 1
4... Diagonal material, 15... Handrail, 16... Hanging scaffold, 1
7... Lifting arm, 18... Lifting protrusion, 19...
Cable lock device, 19a... Support body, 19b... Fixed member, 19c... Handle, 19d... Moving member, 20... Lifting hook, 20a... Base end portion, 2
0b...Ball plunger, 20c...Spring, 21
... Locking catch, 22 ... Lower temporary transverse rail, 23 ... Anchor 24 ... Roller.

Claims (6)

【特許請求の範囲】[Claims] (1)構造物の側面に沿って昇降及び横移動可能な作業
用ケージを設けるとともに、構造物上部より吊足場用の
索条を吊り下げた後、前記作業用ケージで地上の吊足場
を吊り上げて所定の設置位置に移動し、この吊足場を前
記索条に固定することを繰り返すようにしたことを特徴
とする作業用吊足場の仮設方法。
(1) A work cage that can be raised, lowered, and moved laterally along the side of the structure is provided, and after suspending the rope for the suspended scaffold from the top of the structure, the suspended scaffold on the ground is hoisted with the work cage. 1. A method for temporarily constructing a suspended scaffold for work, comprising repeatedly moving the suspended scaffold to a predetermined installation position and fixing the suspended scaffold to the cable.
(2)前記作業用ケージに吊足場用の吊上装置を搭載し
たことを特徴とする請求項1記載の作業用吊足場の仮設
方法。
(2) The method for temporarily constructing a suspended scaffold for work according to claim 1, characterized in that a lifting device for the suspended scaffold is mounted on the cage for work.
(3)前記作業用ケージと前記吊足場とのいずれか一方
に収納可能な吊上げ用フックを設け、いずれか他方に係
止用キヤッチを設けて吊り上げるようにしたことを特徴
とする請求項1記載の作業用あ足場の仮設方法。
(3) A retractable lifting hook is provided on one of the work cage and the hanging scaffold, and a locking catch is provided on the other for lifting. How to temporarily set up scaffolding for work.
(4)前記吊足場の前記索条への固定を索条ロック装置
を用いて行うようにしたことを特徴とする請求項1ない
し3のいずれかに記載の作業用吊足場の仮設方法。
(4) The method for temporarily constructing a suspended scaffold for work according to any one of claims 1 to 3, wherein the suspended scaffold is fixed to the cable using a cable locking device.
(5)前記地上の吊足場を複数枚連結し、これらを水平
保持部材で剛体状にした後、前記作業用ケージで吊り上
げるようにしたことを特徴とする請求項1ないし4のい
ずれかに記載の作業用吊足場の仮設方法。
(5) A plurality of the suspended scaffolds on the ground are connected together, made into a rigid body by a horizontal holding member, and then lifted by the work cage. A temporary construction method for suspended scaffolding for work.
(6)構造物の側面に沿って昇降及び横移動可能な作業
用ケージを設けるとともに、構造物上部より横移動可能
な吊足場用の索条を吊り下げた後、前記作業用ケージで
地上の吊足場を吊り上げて前記索条に固定するとともに
、この吊足場を構造物の側面に設置した横移動用レール
に移動可能に設置したことを特徴とする作業用吊足場の
仮設方法。
(6) A work cage that can be moved up and down and horizontally along the side of the structure is provided, and after suspending ropes for a suspended scaffold that can be moved laterally from the top of the structure, the work cage is used to A method for temporarily constructing a suspended scaffold for work, characterized in that the suspended scaffold is hoisted and fixed to the cables, and the suspended scaffold is movably installed on a lateral movement rail installed on the side of a structure.
JP1139501A 1989-06-01 1989-06-01 Temporary construction method for work suspension scaffolding Expired - Fee Related JPH0694723B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1139501A JPH0694723B2 (en) 1989-06-01 1989-06-01 Temporary construction method for work suspension scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1139501A JPH0694723B2 (en) 1989-06-01 1989-06-01 Temporary construction method for work suspension scaffolding

Publications (2)

Publication Number Publication Date
JPH035567A true JPH035567A (en) 1991-01-11
JPH0694723B2 JPH0694723B2 (en) 1994-11-24

Family

ID=15246753

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1139501A Expired - Fee Related JPH0694723B2 (en) 1989-06-01 1989-06-01 Temporary construction method for work suspension scaffolding

Country Status (1)

Country Link
JP (1) JPH0694723B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006348691A (en) * 2005-06-20 2006-12-28 Shimizu Corp System for working on exterior wall part of building
TWI464515B (en) * 2010-03-08 2014-12-11 Chane Yu Lai Miniature light projection device
JP2019190263A (en) * 2018-04-21 2019-10-31 有限会社ケンテックシステムズ Work method for building outer surface

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6088759A (en) * 1983-10-18 1985-05-18 日本ビソー株式会社 Construction apparatus of building peripheral wall surface
JPS60144460A (en) * 1983-12-30 1985-07-30 日綜産業株式会社 Scaffold apparatus and its installation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6088759A (en) * 1983-10-18 1985-05-18 日本ビソー株式会社 Construction apparatus of building peripheral wall surface
JPS60144460A (en) * 1983-12-30 1985-07-30 日綜産業株式会社 Scaffold apparatus and its installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006348691A (en) * 2005-06-20 2006-12-28 Shimizu Corp System for working on exterior wall part of building
TWI464515B (en) * 2010-03-08 2014-12-11 Chane Yu Lai Miniature light projection device
JP2019190263A (en) * 2018-04-21 2019-10-31 有限会社ケンテックシステムズ Work method for building outer surface

Also Published As

Publication number Publication date
JPH0694723B2 (en) 1994-11-24

Similar Documents

Publication Publication Date Title
US5417018A (en) Construction apparatus for building and constructing method therewith
US4738335A (en) Scaffolding system for performing a work on an outer wall surface of a building
JP3579816B2 (en) Multipurpose stage for building frame
JP2007138416A (en) Climbing construction method of external protective unit
JPH0754491A (en) Erecting device for exterior curtain wall of building
JPH035567A (en) Temporary installation method for working suspension scaffold
US11578497B1 (en) Barrier members for a building debris containment system
CN216196742U (en) A wallboard installation device for position is striden to height
JPH0530758B2 (en)
JP3822084B2 (en) Construction lifting system for high-rise buildings
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
CN113789725B (en) Suspension bridge construction method and lifting device
JPH08120936A (en) Method and device for constructing multistoried building
JPH0637159Y2 (en) Hanging scaffolding
JP3532161B2 (en) Tower construction machine and tower construction method
JPH0736001Y2 (en) Detachable lifting device
JP2004076525A (en) Temporary stage
KR20010111537A (en) Self climbing net
JPH10152981A (en) Vertically moving scaffold
JP7158304B2 (en) Transport system and installation method
JP2775265B2 (en) Wall moving scaffolding device
SU1196477A1 (en) Suspension mobile scaffold
JP2607384B2 (en) Scaffold assembly and disassembly methods
JP2001140473A (en) Curing apparatus

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071124

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081124

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees