JP2607384B2 - Scaffold assembly and disassembly methods - Google Patents

Scaffold assembly and disassembly methods

Info

Publication number
JP2607384B2
JP2607384B2 JP26484088A JP26484088A JP2607384B2 JP 2607384 B2 JP2607384 B2 JP 2607384B2 JP 26484088 A JP26484088 A JP 26484088A JP 26484088 A JP26484088 A JP 26484088A JP 2607384 B2 JP2607384 B2 JP 2607384B2
Authority
JP
Japan
Prior art keywords
scaffold
frame
guide wire
ground
scaffold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP26484088A
Other languages
Japanese (ja)
Other versions
JPH02112558A (en
Inventor
繁 大槻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Bisoh Co Ltd
Original Assignee
Nihon Bisoh Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Bisoh Co Ltd filed Critical Nihon Bisoh Co Ltd
Priority to JP26484088A priority Critical patent/JP2607384B2/en
Publication of JPH02112558A publication Critical patent/JPH02112558A/en
Application granted granted Critical
Publication of JP2607384B2 publication Critical patent/JP2607384B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、建築物や他の構造物などの構築や補修に
ともなう高所作業に用いるわく組足場の組立及び解体方
法の改良に関し、安全性及び作業性の向上を企図したも
のである。
The present invention relates to an improvement in a method of assembling and disassembling a framed scaffold used for high-altitude work associated with construction and repair of buildings and other structures, and relates to a method for improving safety. It is intended to improve workability and workability.

[従来の技術] ビル、船舶、発電所、タンク、煙突、橋梁などの構造
物にあっては、構築や補習などのため外壁等に沿って作
業用の足場を構築しなければならない場合も多い。
[Related Art] In structures such as buildings, ships, power plants, tanks, chimneys, and bridges, it is often necessary to construct a working scaffold along an outer wall or the like for construction or supplementary training. .

従来、このような足場の構築は、門形の足場枠(建わ
く)を地面上に立設してこれらを斜材(交さ筋かい)で
補強するとともに上部に上板(布わく)を載せること
を、横方向及び上方向に繰り返して所定の高さまで構築
するようにしており、組立時には、作業位置が次第に高
くなる一方、解体時には、最上部から順次解体しなけれ
ばならず、組立や荷揚などの高所作業による危険があ
り、墜落事故などの発生の恐れも多い。
Conventionally, such a scaffold was constructed by erection of a gate-shaped scaffold frame (building) on the ground, reinforcing these with diagonal materials (crossing braces), and mounting an upper plate (cloth) on the upper part. The loading is repeated in the horizontal and upward directions to build up to a predetermined height. At the time of assembling, the working position gradually increases, while at the time of disassembly, the work must be sequentially dismantled from the top, There is a danger of working at heights such as unloading, and there is a high possibility that a crash will occur.

そこで、これら足場枠の組立及び解体を地上で出来る
ようにした工法が提案されており、クレーン等を用いて
吊上げながら下側に連結したり、下側から解体すること
が考えられている。
Therefore, a construction method has been proposed in which these scaffold frames can be assembled and dismantled on the ground, and they are considered to be connected to the lower side while being lifted using a crane or the like, or to be dismantled from the lower side.

[発明が解決しようとする課題] ところが、吊上げながら組み立てたり、解体する場合
には、揺れる状態で各足場枠を上下に連結したり、連結
を解除したりしなければならず、特に複数の足場枠を横
方向に並べた形で組み立てや解体の能率向上を図ろうと
すると、たくさんの連結部を一度に連結しなければなら
ず、揺れた状態では一層大変な作業になってしまうとい
う問題がある。
[Problems to be Solved by the Invention] However, when assembling or disassembling while lifting, each scaffold frame must be vertically connected or disconnected in a swinging state, and in particular, a plurality of scaffolds are required. When trying to improve the efficiency of assembling and dismantling by arranging the frames in the horizontal direction, many connecting parts must be connected at once, and there is a problem that it becomes more difficult work in a shaking state .

また、たくさんの連結部を一度に連結しようとする
と、クレーン等による位置合せのための昇降操作が非常
に複雑となって時間もかかり、実際の作業においては、
足場枠の組立及び解体の作業能率の向上が図れていない
という問題がある。
Also, if many connecting parts are to be connected at once, the lifting operation for positioning with a crane or the like becomes very complicated and takes time, and in actual work,
There is a problem that work efficiency of assembling and disassembling the scaffold frame has not been improved.

さらに、クレーンを用いる場合には、足場の設置スペ
ースのほかにクレーンの設置スペースや動作スペースが
必要になるという問題がある。
Furthermore, when a crane is used, there is a problem that a crane installation space and an operation space are required in addition to the scaffold installation space.

この発明は、かかる従来技術の問題点に鑑みてなされ
たもので、揺れを防止しながら安全かつ短時間で簡単に
組み立てたり、解体することができ、クレーンの設置ス
ペース等を必要としない足場の組立方法及び解体方法を
提供しようとするものである。
The present invention has been made in view of the problems of the related art, and it is possible to easily assemble or disassemble safely and in a short time while preventing shaking, and to provide a scaffold that does not require a crane installation space or the like. It is intended to provide an assembling method and a disassembling method.

[課題を解決するための手段] 上記課題を解決するためこの発明の足場の組立方法
は、足場を設置する構造物の最上部から、組み立てる足
場枠の平面形状に対応して枠組みされ足場枠を吊り上げ
る複数台の巻上装置が搭載されるとともに下面に足場枠
を上下に連結し得る伸縮式連結部材を設けたフレームを
吊り下げる一方、前記構造物の上方と地上との間に各段
の足場枠の転倒防止用のガイドワイヤを張設した後、地
上で前段の足場枠を組み立ててガイドワイヤに摺動可能
に連結し、この前段の足場枠を前記フレームに搭載した
前記巻上装置を介して一段の足場枠の高さより上方に吊
上げ、次いで次段の足場枠を地上で組み立ててガイドワ
イヤに摺動可能に連結し、前段の足場枠を前記ガイドワ
イヤに沿って下降させ、前段もしくは次段の足場枠の連
結部の前記伸縮式連結部材を嵌合して仮連結した後、さ
らに前段の足場枠を下降して本連結することを繰り返す
ようにしたことを特徴とするものである。
[Means for Solving the Problems] In order to solve the above problems, the scaffold assembling method according to the present invention includes a scaffold frame that is framed from the top of a structure on which the scaffold is installed, in accordance with the planar shape of the scaffold frame to be assembled. While suspending a frame provided with a plurality of hoisting devices for lifting and provided with a telescopic connecting member capable of vertically connecting a scaffold frame to a lower surface, a scaffold of each step is provided between above the structure and the ground. After stretching the guide wire for preventing the frame from overturning, assemble the scaffold frame of the previous stage on the ground and slidably connect it to the guide wire, via the hoisting device mounted on the frame with the scaffold frame of the preceding stage. And lift it above the height of the first scaffold frame, then assemble the next scaffold frame on the ground and slidably connect it to the guide wire, lower the previous scaffold frame along the guide wire, Step feet After fitting and telescopically connecting the telescopic connecting members of the connecting portion of the field frame, repeating the step of lowering the scaffold frame at the preceding stage and making the final connection is repeated.

また、この発明の足場の解体方法は、複数段の足場枠
が連結された足場の上方の構造物から、解体する足場枠
の平面形状に対応して枠組みされた足場枠を吊り上げる
複数台の巻上装置が搭載されるとともに下面に足場枠を
上下に連結し得る伸縮式連結部材を設けたフレームを吊
り下げる一方、各段の足場枠が摺動可能な転倒防止用の
ガイドワイヤを足場上方の前記構造物と地上との間に張
設した後、下段の足場枠とその上段の足場枠との連結を
解除し、次いで連結を解除した部分より上側の足場全体
を前記フレームに搭載した巻上装置を介して吊上げて下
段の足場枠とガイドワイヤとの連結を外すとともに、こ
の下段の足場枠を解体することを繰り返すようにしたこ
とを特徴とするものである。
Further, the scaffold disassembly method of the present invention includes a plurality of windings for lifting a scaffold frame that is framed in accordance with the planar shape of the scaffold frame to be dismantled from a structure above the scaffold to which the plurality of scaffold frames are connected. While suspending the frame provided with the upper device and provided with a telescopic connecting member capable of vertically connecting the scaffold frame to the lower surface, the guide wire for preventing the overturn of the scaffold frame of each step is slidable. After being stretched between the structure and the ground, the connection between the lower scaffold frame and the upper scaffold frame is released, and then the entire scaffold above the disconnected portion is mounted on the frame. The apparatus is characterized in that the lower scaffold frame and the guide wire are disconnected from each other by being lifted via the device, and the lower scaffold frame is repeatedly dismantled.

[作用] このような足場の組立方法によれば、地上において各
段の足場枠を組み立て、これを構造物の最上部から吊り
下げたフレームを介して巻上装置で吊上げるようにし、
予め足場の最上部と地上との間に張ってあるガイドワイ
ヤに各段の足場枠を摺動可能に連結するようにしてお
り、ガイドワイヤによって揺れを防止しながら足場の設
置スペースだけで作業ができるようにしている。
[Operation] According to such a method of assembling a scaffold, scaffold frames of respective steps are assembled on the ground, and are hoisted by a hoisting device via a frame suspended from the top of the structure.
Each stage scaffold frame is slidably connected to a guide wire stretched in advance between the top of the scaffold and the ground, so that work can be performed only in the installation space of the scaffold while preventing shaking with the guide wire. I can do it.

そして、次段の足場枠の連結に際しては、伸縮式の連
結部材を用い、この部分を伸縮させることで上下方向や
左右方向の位置合せに誤差があっても簡単に仮連結がで
きるようにしており、仮連結後に本連結を行なって昇降
操作を簡単化し、組立作業の能率向上を図るようにして
いる。
When connecting the scaffolding frame of the next stage, a telescopic connection member is used, and by temporarily expanding and contracting this portion, temporary connection can be easily performed even if there is an error in the vertical or horizontal alignment. In addition, after the temporary connection, the actual connection is performed to simplify the lifting operation, thereby improving the efficiency of the assembling work.

また、この足場の解体方法によれば、足場の最上部と
地上との間に張ったガイドワイヤに摺動可能に各段の足
場枠を連結しておき、揺れを防止した状態で、構造物の
上方から吊り下げたフレームを介して吊上げながら、地
上で解体作業を行うようにしており、足場の設置スペー
スだけで安全かつ高能率で解体できるようにしている。
Further, according to this scaffold disassembly method, the scaffold frames of each step are slidably connected to a guide wire stretched between the uppermost portion of the scaffold and the ground so that the structure is prevented from shaking. It is designed to be dismantled on the ground while being lifted through a frame suspended from above, so that it can be safely and efficiently dismantled using only the installation space for the scaffold.

[実施例] 以下、この発明の一実施例を図面に基づき詳細に説明
する。
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

第1図〜第3図はこの発明の足場の組立方法及び解体
方法の一実施例にかかる各工程の説明図であり、第1図
から第3図に向かっては組立工程を、第3図から第1図
に向かっては解体工程をそれぞれ示している。
FIG. 1 to FIG. 3 are explanatory views of each step according to an embodiment of the method of assembling and disassembling the scaffold according to the present invention. FIG. 1 to FIG. 1 to FIG. 1 show the disassembly process.

(A) まず、足場の組立方法について、既設の建物の
外側に構築する場合で説明する。
(A) First, a method of assembling a scaffold will be described in a case where the scaffold is constructed outside an existing building.

(1)組立作業前の準備として、第1図に示すように、
建物1のパラペット2部分に先端部にシーブ3aを備えた
シーブ支持部材3,3とガイドワイヤ4用のワイヤ支持部
材5,5とを取付け、シーブ支持部材3,3を組立てる足場の
幅方向の中間部に配置するとともに、ワイヤ支持部材5,
5を組立てる足場の幅方向の僅かに外側に位置するよう
に配置し、それぞれの支持部材3,5の先端部が建物1の
パラペット2の外側に突き出すようにしておく。
(1) As preparation before the assembly work, as shown in FIG.
A sheave support member 3,3 having a sheave 3a at a tip and a wire support member 5,5 for a guide wire 4 are attached to a parapet 2 portion of the building 1, and a scaffold for assembling the sheave support member 3,3 in the width direction is attached. Placed in the middle, the wire support member 5,
5 is arranged so as to be located slightly outside in the width direction of the scaffold to be assembled, and the front ends of the support members 3 and 5 project out of the parapet 2 of the building 1.

一方、組立てる足場の平面形状に対応して枠組みした
吊上げ用のフレーム6を用意しておく。
On the other hand, a lifting frame 6 framed in accordance with the planar shape of the scaffold to be assembled is prepared.

このフレーム6には、足場枠7の配置に合わせて足場
枠7同志の連結部7aと同一の伸縮式連結部材8が設けら
れている。この伸縮式連結部材8の構造は、第4図に示
すように、連結部材8の軸方向に直線状の上下溝8aが形
成され、その両端部に円周方向に突き出すように円形の
固定溝8bが形成されており、これらの上下溝8a及び固定
溝8b内を移動可能な固定ピン8cがフレーム6から突き出
している足場枠7の連結部7aの外筒と同一構成の連結筒
6aを貫通して固定されている。
The frame 6 is provided with the same telescopic connecting member 8 as the connecting portion 7a of the scaffolding frames 7 in accordance with the arrangement of the scaffolding frames 7. As shown in FIG. 4, the structure of the telescopic connecting member 8 is such that linear upper and lower grooves 8a are formed in the axial direction of the connecting member 8, and circular fixing grooves are formed at both ends thereof so as to protrude in the circumferential direction. A connecting cylinder having the same configuration as the outer cylinder of the connecting portion 7a of the scaffolding frame 7 in which the upper and lower grooves 8a and the fixing pins 8c movable in the fixing grooves 8b protrude from the frame 6 are formed.
It is fixed through 6a.

したがって、第5図に示すように、連結部材8をフレ
ーム6の連結筒6a内で回転することで上下溝8aと固定溝
8bとの間の回転移動ができるとともに、上下溝8a内で上
下移動することもでき、これによって連結部材8の伸縮
と、二つの固定溝8bによる突出量の調整とを行なうこと
ができるようになっている。
Therefore, as shown in FIG. 5, by rotating the connecting member 8 in the connecting cylinder 6a of the frame 6, the upper and lower grooves 8a and the fixing grooves 8a are fixed.
8b, and can also be moved up and down in the vertical groove 8a so that the expansion and contraction of the connecting member 8 and the adjustment of the amount of protrusion by the two fixing grooves 8b can be performed. Has become.

そして、このようなフレーム6は、シーブ支持部材3,
3のシーブ3aに巻き掛けられた吊りワイヤ9を介して吊
り下げられるようになっており、吊りワイヤ9の一端部
が足場吊上げ用のフレーム6に搭載した巻上装置として
のワインダ10を介してワイヤ巻取リール11に接続され、
他端部がフレーム6に固定され、ワインダ10によって吊
りワイヤ9を巻き取ったり、巻き戻したりすることで、
フレーム6が昇降できるようになっている。
And such a frame 6 is provided with a sheave support member 3,
3 is suspended via a suspending wire 9 wound around the sheave 3a. One end of the suspending wire 9 is passed through a winder 10 as a hoisting device mounted on a frame 6 for lifting a scaffold. Connected to the wire take-up reel 11,
The other end is fixed to the frame 6, and the hanging wire 9 is wound up or rewound by the winder 10.
The frame 6 can be moved up and down.

また、ワイヤ支持部材5,5を介して下端部を地上のジ
ャッキプレート12等に固定したガイドワイヤ4の上端部
が建物1の屋上部分に固定されており、ある程度の張力
を付与して張った状態とされるとともに、フレーム6と
の間は摺動可能とされ、フレーム6の揺れを防止するよ
うになっている。
Further, the upper end of the guide wire 4 whose lower end is fixed to the jack plate 12 on the ground via the wire supporting members 5, 5 is fixed to the roof of the building 1, and is stretched by applying a certain amount of tension. In addition to the state, the frame 6 is slidable with the frame 6 to prevent the frame 6 from swinging.

(2)こうして準備が完了した後、第1図に示すよう
に、地上に設置したジャッキプレート12上に足場枠7を
立設し、斜材13で補強するとともに、上板14を載せて第
1段目の足場枠7を構築する。
(2) After the preparation is completed, as shown in FIG. 1, the scaffold frame 7 is erected on the jack plate 12 installed on the ground, reinforced with the diagonal members 13, and the upper plate 14 is placed thereon. The first-stage scaffold frame 7 is constructed.

これら足場枠7の上部には、伸縮式連結部材8との連
結を行う連結部7aを構成する外筒7b部分に接続ピン8d用
の貫通孔7cが形成されており、下部には、伸縮式連結部
材8が設けられている。
In the upper part of the scaffold frame 7, a through hole 7c for a connecting pin 8d is formed in a part of an outer cylinder 7b constituting a connecting part 7a for connecting with the telescopic connecting member 8, and in the lower part, a telescopic type is provided. A connecting member 8 is provided.

そして、第1段目の足場枠7の両側にワイヤガイド15
を取付けて足場枠7がガイドワイヤ4に沿って摺動可能
になるようにし、吊上げ時の揺れを防止する。
Then, wire guides 15 are provided on both sides of the first-stage scaffold frame 7.
Is attached so that the scaffold frame 7 can slide along the guide wire 4 to prevent swinging during lifting.

(3)こののち、フレーム6をワインダ10を操作するこ
とによって下降させ、伸縮式連結部材8によって第1段
目の足場枠7と連結する。
(3) Thereafter, the frame 6 is lowered by operating the winder 10, and is connected to the first-stage scaffold frame 7 by the telescopic connecting member 8.

この連結操作は、第5図に示すように、まず、フレー
ム6の伸縮式連結部材8を固定ピン8cを下側の固定溝8b
内に位置させて僅かに突き出した状態としておき、地上
の足場枠7とわずかな隙間(伸縮式連結部材8の伸縮代
(上下溝8aの長さ)より小さい隙間)を開けた状態のと
ころまで下降する。
As shown in FIG. 5, the connecting operation is performed by first connecting the extendable connecting member 8 of the frame 6 with the fixing pin 8c to the lower fixing groove 8b.
To a state in which a slight gap (a gap smaller than the expansion allowance (length of the upper and lower grooves 8a) of the extendable connecting member 8) from the ground scaffolding frame 7 is opened. Descend.

この状態で、伸縮式連結部材8を回転して下側の固定
溝8bから上下溝8aを経て上側の固定溝8b内に固定ピン8c
が位置するように突出し、足場枠7の外筒7bに挿入し、
仮結合状態とする。
In this state, the telescopic connecting member 8 is rotated, and the fixing pin 8c is inserted into the upper fixing groove 8b from the lower fixing groove 8b via the upper and lower grooves 8a.
And insert it into the outer cylinder 7b of the scaffolding frame 7,
A temporary connection state is set.

こうして全ての連結部6a,7aが仮結合状態となった
後、さらにフレーム6を降下して完全に伸縮式連結部材
8を足場枠7の外筒7bに挿入し、接続ピン8dを貫通孔7c
にいれ、完全に固定する。
After all the connecting portions 6a, 7a are in the temporarily connected state, the frame 6 is further lowered to completely insert the telescopic connecting member 8 into the outer cylinder 7b of the scaffolding frame 7, and the connection pin 8d is inserted into the through hole 7c.
And fix it completely.

このような仮結合と本結合とに別けて連結すること
で、ワインダ10によるフレーム6の下降だけで連結部6
a,7aの挿入をはかるように、位置を正確に合せする必要
がなく、伸縮式連結部材8の伸縮代の範囲で上下の位置
合せをするだけで良く、左右の揺れもガイドワイヤ4に
よって防止されるので、簡単に多数の連結部7aの連結が
できるのである。
By separately connecting such a temporary connection and a permanent connection, the connection portion 6 can be formed only by lowering the frame 6 by the winder 10.
There is no need to precisely adjust the position so that the insertion of the a and 7a can be performed, and only the upper and lower positions need to be adjusted within the range of the expansion and contraction allowance of the telescopic connecting member 8, and the left and right sway is prevented by the guide wire 4. Therefore, many connecting portions 7a can be easily connected.

(4)次に、第2図に示すように、フレーム6に本結合
された足場枠7を1段の足場枠7より高い位置まで吊り
上げた状態に保持し、再び地上のジャッキプレート12上
で次段(2段目)の足場枠7を組立てる。
(4) Next, as shown in FIG. 2, the scaffolding frame 7 permanently connected to the frame 6 is held in a state of being lifted to a position higher than the one-stage scaffolding frame 7, and is again held on the jack plate 12 on the ground. The next stage (second stage) of the scaffolding frame 7 is assembled.

組立完了後、ワイヤガイド15を取り付けて足場枠7を
ガイドワイヤ4に沿って昇降できるようにし、フレーム
6に吊上げられている足場枠7を降下させ、両足場枠7,
7を連結する。この場合の連結方法は、フレーム6と足
場枠7の連結の場合と同様に、仮結合と本結合とに別け
て行なうようにして位置合せを容易とする。
After the assembly is completed, the wire guide 15 is attached so that the scaffolding frame 7 can be moved up and down along the guide wire 4, and the scaffolding frame 7 suspended on the frame 6 is lowered.
Connect 7 In this case, as in the case of the connection between the frame 6 and the scaffolding frame 7, the temporary connection and the permanent connection are performed separately to facilitate the alignment.

(5)こうして第3図に示すように、第3段目の足場枠
7を地上で組立てるなど、組立と吊上げを繰り返して必
要な段数の足場枠7をフレーム6の下側に連結した後、
ジャッキプレート12上に載置する。
(5) Thus, as shown in FIG. 3, after assembling the third-stage scaffold frame 7 on the ground and assembling and lifting, the required number of steps of the scaffold frame 7 are connected to the lower side of the frame 6, and
Place on jack plate 12.

そして、必要箇所に壁つなぎを設けて建物1と連結
し、足場の構築が完了する。
Then, a wall tether is provided at a necessary place and connected to the building 1 to complete the construction of the scaffold.

さらに、必要に応じて、吊上げ用ワイヤ9を外した
り、ガイドワイヤ4を取り外すようにするが、転倒防止
や解体作業のためそのままにしておくようにしても良
い。
Further, the lifting wire 9 or the guide wire 4 may be removed as necessary, but may be left as it is for prevention of overturning and dismantling work.

また、建物1への入口などを設ける必要がある場合に
は、一部分の足場枠7を吊上げ状態のときや完全に下ろ
した後、取り外すようにして形成するようにしたり、足
場全体を吊上げ状態としたまま設置しておく場合には、
最下段の足場枠を設けること無く、建物1などに固定す
るようにして形成する。
Further, when it is necessary to provide an entrance to the building 1, for example, a part of the scaffolding frame 7 may be formed in a suspended state or after being completely lowered and then removed, or the entire scaffold may be in a suspended state. If you leave it installed,
It is formed so as to be fixed to the building 1 or the like without providing the lowermost scaffold frame.

(B) 足場の解体方法については、組立の場合と逆の
工程にしたがって行われるので、詳細な説明は省略す
る。
(B) The method of dismantling the scaffold is performed according to the steps reverse to those in the case of assembling, and therefore detailed description is omitted.

この解体においても、フレーム6を設置するととも
に、ガイドワイヤ4及びワイヤガイド15を用いて揺れを
防止する。
Also in this disassembly, the frame 6 is installed and the guide wire 4 and the wire guide 15 are used to prevent shaking.

また、足場枠7,7同志の連結部7a及び足場枠7とフレ
ーム6との連結部6a,7aに伸縮式連結部材8が用いられ
ているので、解体を簡単に行うことができる。
Moreover, since the telescopic connecting members 8 are used for the connecting portions 7a of the scaffold frames 7 and 7 and the connecting portions 6a and 7a of the scaffold frame 7 and the frame 6, disassembly can be easily performed.

このような足場の組立て及び解体方法によれば、ほと
んどの作業を地上で行うことができ、危険な高所作業が
なくなり作業の安全性が向上する。
According to the method of assembling and disassembling the scaffold, most of the work can be performed on the ground, and dangerous work at a high place is eliminated, and the safety of the work is improved.

また、地上での作業であるため、作業能率が向上す
る。
In addition, since the work is performed on the ground, work efficiency is improved.

さらに、従来の足場枠に対して伸縮式連結部材を装着
するだけで簡単に用いることができ、変更を極力抑える
ことができる。また、巻上装置が搭載されたフレームを
構造物の最上部から吊り下げて足場を設置すべき上方に
配置するので、足場の設置スペースがあれば簡単に足場
を組み立てたり、解体することができる。
Furthermore, the conventional scaffold frame can be easily used simply by attaching the telescopic connecting member, and the change can be suppressed as much as possible. In addition, since the frame on which the hoisting device is mounted is suspended from the top of the structure and placed above where the scaffold should be installed, the scaffold can be easily assembled or disassembled if there is space for installing the scaffold. .

なお、連結のための伸縮式連結部材は図示例のものに
限らず、伸縮と固定ができる構造であれば良く、任意の
機構を用いることができる。
The extendable connecting member for connection is not limited to the one shown in the figure, but may be any structure as long as it can expand and contract and can be fixed.

さらに、ガイドワイヤの本数は2本に限らず、足場の
構築高さや気象条件などによって適宜選定すれば良い。
Furthermore, the number of guide wires is not limited to two, and may be appropriately selected depending on the construction height of the scaffold, weather conditions, and the like.

また、巻上装置の設置個数についても同様に吊上げ荷
重などによって適宜選定すれば良い。
Similarly, the number of hoisting devices to be installed may be appropriately selected according to the lifting load and the like.

さらに、組立及び解体を1段ずつ行うこと無く、複数
段ずつ行なうようにしても良い。
Further, the assembling and disassembly may not be performed one by one, but may be performed in a plurality of stages.

[発明の効果] 以上、一実施例とともに具体的に説明したようにこの
発明の足場の組立方法によれば、地上において各段の足
場枠を組み立て、これを構造物の最上部から吊り下げた
フレームを介して巻上装置で吊上げるようにし、予め足
場の最上部と地上との間に張ってあるガイドワイヤに各
段の足場枠を摺動可能に連結するようにしたので、ガイ
ドワイヤによって揺れを防止しながら足場の設置スペー
スだけで作業ができるとともに、全ての作業を地上で行
うことができ、安全である。
[Effects of the Invention] As described above in detail with one embodiment, according to the method of assembling a scaffold of the present invention, scaffold frames of each step are assembled on the ground and suspended from the top of the structure. The hoist was lifted by a hoisting device via a frame, and the scaffold frames of each stage were slidably connected to a guide wire stretched in advance between the top of the scaffold and the ground. Work can be done only in the installation space of the scaffold while preventing shaking, and all work can be performed on the ground, which is safe.

そして、次段の足場枠の連結に際しては、伸縮式の連
結部材を用い、この部分を伸縮させることで上下方向や
左右方向の位置合せに誤差があっても簡単に仮連結がで
きるようにしており、仮連結後に本連結を行なって昇降
操作を簡単化し、組立作業の能率向上を図ることができ
る。
When connecting the scaffolding frame of the next stage, a telescopic connection member is used, and by temporarily expanding and contracting this portion, temporary connection can be easily performed even if there is an error in the vertical or horizontal alignment. In addition, the main connection is performed after the temporary connection, so that the lifting operation can be simplified, and the efficiency of the assembling operation can be improved.

また、この発明の足場の解体方法によれば、足場の最
上部と地上との間に張ったガイドワイヤに摺動可能に各
段の足場枠を連結しておくようにしたので、揺れを防止
した状態で、構造物の上方から吊り下げたフレームを介
して吊り上げながら、地上で解体作業を行なうことがで
き、足場の設置スペースだけで安全かつ高能率で解体が
できる。
Further, according to the scaffold disassembly method of the present invention, the scaffold frames of each step are slidably connected to the guide wire extending between the uppermost portion of the scaffold and the ground, thereby preventing shaking. In this state, the dismantling work can be performed on the ground while being lifted through the frame suspended from above the structure, and the dismantling can be performed safely and efficiently with only the installation space of the scaffold.

【図面の簡単な説明】[Brief description of the drawings]

第1図〜第3図はこの発明の足場の組立方法及び解体方
法の一実施例にかかる各工程の説明図であり、第1図か
ら第3図に向かっては組立工程を、第3図から第1図に
向かっては解体工程をそれぞれ示している。第4図は連
結部を抽出した断面図、第5図は連結方法の説明図であ
る。 1:建物、2:パラペット、3:シーブ支持部材、4:ガイドワ
イヤ、5:ワイヤ支持部材、6:フレーム、7:足場枠(建わ
く)、8:伸縮式連結部材、:吊りワイヤ、10:ワインダ
(巻取装置)、11:巻取リール、12:ジャッキプレート、
13:斜材(交さ筋かい)、14:上板(布わく)、15:ワイ
ヤガイド。
FIG. 1 to FIG. 3 are explanatory views of each step according to an embodiment of the method of assembling and disassembling the scaffold according to the present invention. FIG. 1 to FIG. 1 to FIG. 1 show the disassembly process. FIG. 4 is a cross-sectional view in which a connecting portion is extracted, and FIG. 5 is an explanatory diagram of a connecting method. 1: Building, 2: Parapet, 3: Sheave support member, 4: Guide wire, 5: Wire support member, 6: Frame, 7: Scaffolding frame (built), 8: Telescopic connecting member, Hanging wire, 10 : Winder (winding device), 11: winding reel, 12: jack plate,
13: Diagonal material (crossed braid), 14: Upper plate (cloth), 15: Wire guide.

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】足場を設置する構造物の最上部から、組み
立てる足場枠の平面形状に対応して枠組みされ足場枠を
吊り上げる複数台の巻上装置が搭載されるとともに下面
に足場枠を上下に連結し得る伸縮式連結部材を設けたフ
レームを吊り下げる一方、前記構造物の上方と地上との
間に各段の足場枠の転倒防止用のガイドワイヤを張設し
た後、地上で前段の足場枠を組み立ててガイドワイヤに
摺動可能に連結し、この前段の足場枠を前記フレームに
搭載した前記巻上装置を介して一段の足場枠の高さより
上方に吊上げ、次いで次段の足場枠を地上で組み立てて
ガイドワイヤに摺動可能に連結し、前段の足場枠を前記
ガイドワイヤに沿って下降させ、前段もしくは次段の足
場枠の連結部の前記伸縮式連結部材を嵌合して仮連結し
た後、さらに前段の足場枠を下降して本連結することを
繰り返すようにしたことを特徴とする足場の組立方法。
1. A plurality of hoisting devices which are framed from the top of a structure on which a scaffold is to be installed and which lift the scaffold frame and which are framed in accordance with the planar shape of the scaffold frame to be assembled, are mounted on the lower surface of the scaffold frame. While suspending a frame provided with an extendable connecting member that can be connected, a guide wire for preventing a fall of a scaffold frame of each stage is stretched between above the structure and the ground, and then, a scaffold of a front stage on the ground is provided. Assemble the frame and slidably connect it to the guide wire, lift the previous scaffold frame above the height of the first scaffold frame via the hoisting device mounted on the frame, and then move the next scaffold frame Assembled on the ground, slidably connected to a guide wire, lowered the previous scaffold frame along the guide wire, and fitted the telescopic connection member of the connection portion of the previous or next scaffold frame to temporarily After connecting, Method of assembling a scaffold, characterized in that to repeat that this connection by lowering the scaffolding frame.
【請求項2】複数段の足場枠が連結された足場の上方の
構造物から、解体する足場枠の平面形状に対応して枠組
みされ足場枠を吊り上げる複数台の巻上装置が搭載され
るとともに下面に足場枠を上下に連結し得る伸縮式連結
部材を設けたフレームを吊り下げる一方、各段の足場枠
が摺動可能な転倒防止用のガイドワイヤを足場上方の前
記構造物と地上との間に張設した後、下段の足場枠とそ
の上段の足場枠との連結を解除し、次いで連結を解除し
た部分より上側の足場全体を前記フレームに搭載した巻
上装置を介して吊上げて下段の足場枠とガイドワイヤと
の連結を外すとともに、この下段の足場枠を解体するこ
とを繰り返すようにしたことを特徴とする足場の解体方
法。
2. A plurality of hoisting devices, which are framed in accordance with the planar shape of the scaffold frame to be dismantled from the structure above the scaffold to which a plurality of stages of scaffold frames are connected, and lift the scaffold frame, While suspending a frame provided with a telescopic connecting member capable of vertically connecting a scaffold frame to a lower surface, a guide wire for preventing a fall in which each stage scaffold frame is slidable is provided between the structure above the scaffold and the ground. After being stretched in between, the connection between the lower scaffolding frame and the upper scaffolding frame is released, and then the entire scaffold above the part where the connection is released is lifted through a hoisting device mounted on the frame, and the lower scaffolding frame is lifted. Disconnecting the connection between the scaffold frame and the guide wire and disassembling the lower scaffold frame.
JP26484088A 1988-10-20 1988-10-20 Scaffold assembly and disassembly methods Expired - Lifetime JP2607384B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26484088A JP2607384B2 (en) 1988-10-20 1988-10-20 Scaffold assembly and disassembly methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26484088A JP2607384B2 (en) 1988-10-20 1988-10-20 Scaffold assembly and disassembly methods

Publications (2)

Publication Number Publication Date
JPH02112558A JPH02112558A (en) 1990-04-25
JP2607384B2 true JP2607384B2 (en) 1997-05-07

Family

ID=17408942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26484088A Expired - Lifetime JP2607384B2 (en) 1988-10-20 1988-10-20 Scaffold assembly and disassembly methods

Country Status (1)

Country Link
JP (1) JP2607384B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW574629B (en) * 1997-02-28 2004-02-01 Shinetsu Chemical Co Polystyrene derivative chemically amplified positive resist compositions, and patterning method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6168971A (en) * 1984-09-08 1986-04-09 株式会社竹中工務店 Assembling and disassembling of frame scaffold

Also Published As

Publication number Publication date
JPH02112558A (en) 1990-04-25

Similar Documents

Publication Publication Date Title
KR20110112228A (en) Method of building a hybrid tower for a wind generator
US20130263549A1 (en) Safety screen system for steel erection work
JP2010133084A (en) Method of constructing hollow high structure
JPH06101274A (en) Method of constructing roof of cable dome
JP2607384B2 (en) Scaffold assembly and disassembly methods
JP2927320B2 (en) How to assemble a large hanging boiler
CN215564411U (en) Sliding construction device for high-rise cylindrical building
JPH0571225A (en) Temporarily set roof of complete weather type
JP2572642B2 (en) Scaffolding disassembly method
JP5535719B2 (en) Simple assembly type derrick
JP3028071B2 (en) Top removal method and scaffold for removal work of ultra-high tubular structure
JP3182710B2 (en) Outer sheath and method of refilling it
JP3218523B2 (en) Dismantling method of frame of outer curing coating
JPH09195497A (en) Elevatable scaffold
JPH08100517A (en) Vertically movable scaffold
JP2000145126A (en) Demolishing unit for tower body and its demolishing method
JP4785013B2 (en) Tower crane and floor climbing system
JP4352219B2 (en) Crane equipment
JPH0718743A (en) Construction method for large span domelike roof
JP7245098B2 (en) Relocation method of mast guide device for tower assembly work
JP3532161B2 (en) Tower construction machine and tower construction method
JPS6168971A (en) Assembling and disassembling of frame scaffold
JP3128178B2 (en) How to build a tent frame
JP7281936B2 (en) Elevating method of derrick device for assembly work of steel tower
JP2770111B2 (en) Method of crossing girder material of scaffolding stage into furnace and girder material device