JPH0718743A - Construction method for large span domelike roof - Google Patents

Construction method for large span domelike roof

Info

Publication number
JPH0718743A
JPH0718743A JP15971293A JP15971293A JPH0718743A JP H0718743 A JPH0718743 A JP H0718743A JP 15971293 A JP15971293 A JP 15971293A JP 15971293 A JP15971293 A JP 15971293A JP H0718743 A JPH0718743 A JP H0718743A
Authority
JP
Japan
Prior art keywords
roof
roof frame
dome
temporary
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15971293A
Other languages
Japanese (ja)
Inventor
Yukihiro Sakuta
幸弘 作田
Keiju Kobayashi
桂樹 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP15971293A priority Critical patent/JPH0718743A/en
Publication of JPH0718743A publication Critical patent/JPH0718743A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To promote construction efficiency of a dome-like roof to shorten a construction period, to reduce the number of bent working platforms to promote work efficiency by reduction of a construction cost and securement of an internal working space, to miniaturize heavy machines used for erecting and raving temporary toss and to reduce the number of heavy machines. CONSTITUTION:A plurality of temporary towers 12 used for suspending a roof frame 13 13 are installed in the area A inside the peripheral surface structural body 11 forming the circumference of a large-scale facility S. In the case of field assembly of the roof frame 13, the roof frame 13 is assembled in a field in a state that the temporary towers 12 pass through the the roof frame 13 vertically. The roof frame 13 assembled in the field is suspended by means of the temporary towers 12 and is constructed on the upper part of the peripheral surface structural body 11. After the temporary towers 12 are removed, penetration sections of the temporary towers 12 of the roof frame 13 are repaired.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば野球やサッカー
などの競技場、あるいはその他のドーム式の屋根を備え
た大規模施設における、そのドーム式屋根を架設する技
術として好適な大スパンドーム屋根の架設方法に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a large-span dome roof suitable as a technique for constructing a dome-type roof in a stadium such as a baseball or soccer field or other large-scale facility having a dome-type roof. Regarding the erection method.

【0002】[0002]

【従来の技術】近年、大規模施設には、大規模な固定ド
ーム式屋根が採用されてきている。この固定ドーム式屋
根の構造形式として、鉄骨トラス構造が広く知られてい
る。この鉄骨トラス構造は、構成鉄骨材を立体トラス状
に接続して比較的良好な構造安定性が得られる複層トラ
スドームと、構成鉄骨材を平面トラス状に接続してなる
単層トラスドームに分類されている。
2. Description of the Related Art In recent years, large-scale fixed dome type roofs have been adopted in large-scale facilities. A steel truss structure is widely known as a structural type of the fixed dome type roof. This steel truss structure consists of a multi-layer truss dome in which the structural steel aggregates are connected in a three-dimensional truss shape and relatively good structural stability is obtained, and a single-layer truss dome in which the structural steel aggregates are connected in a planar truss shape. It is classified.

【0003】ところで、従来において、例えば鉄骨トラ
ス構造形式を採用して固定ドーム式屋根を施工する場
合、屋根架構に必要な大スパンの鉄骨トラスを予め複数
に分割した単位鉄骨トラスとして構成し、これを地組し
た後に大型重機により順次吊り上げつつ、屋根を架設す
べき位置においてそれら単位鉄骨トラスどうしを熔接す
ることにより大スパンの鉄骨トラスを組み上げて屋根架
構を架設するという方法などが採られていた。
By the way, in the prior art, for example, when a fixed dome type roof is constructed by adopting a steel truss structure type, a large span steel truss necessary for a roof frame is preliminarily divided into a plurality of unit steel trusses, After framing the building, a method of constructing a roof frame by constructing a large span steel truss by welding the unit steel trusses at the position where the roof should be erected while sequentially hoisting them with a large heavy machine was adopted. .

【0004】[0004]

【発明が解決しようとする課題】しかしながら、こうし
た従来の大スパンドーム屋根の架設方法では、多数の単
位鉄骨トラスを大型重機で一つ一つ吊り上げて組み上げ
ていく作業となるために工期が長期化し、そのうえ架設
作業の大部分が高所作業となることから作業性も悪いと
いう問題があった。また、ドーム屋根の施工期間中にお
いて、屋根架構を内側から支持するための支保工として
の機能をもつベント構台やジャッキ装置等を相当数必要
とし、しかもこれらはドーム内部全体に設置されるため
に内部作業空間が広くとれないという問題もある。さら
に、このような大スパンとなるドーム屋根を従来工法に
て施工するには、屋根自体が相当な規模と高さになるた
め、その建て方、外しの重機も極めて大型のものが必要
となり、したがってその分、工費も割高になる問題があ
った。
However, in such a conventional method for constructing a large-span dome roof, the work period is prolonged because a large number of unit steel frame trusses are individually lifted and assembled. In addition, most of the erection work is done at high places, so the workability is poor. In addition, during the construction period of the dome roof, a considerable number of vent gantry and jack devices that have the function of supporting work to support the roof frame from the inside are required, and these are installed inside the dome. There is also a problem that the internal work space cannot be taken large. Furthermore, in order to construct a dome roof with such a large span by the conventional construction method, the roof itself will be of a considerable scale and height, so it will be necessary to build and remove heavy equipment that is extremely large. Therefore, there has been a problem that the construction cost is increased accordingly.

【0005】本発明は、以上のような点を考慮してなさ
れたもので、ドーム屋根の施工性を高めて工期の短縮化
を図り、さらにベント構台やジャッキ装置等の使用量を
減らして工費の低減化および内部作業空間の確保による
作業性の向上を図り、しかも建て方、外しのための重機
も小型化および小量化を図ることができる大スパンドー
ム屋根の架設方法を提供しようとするものである。
The present invention has been made in consideration of the above points. The workability of the dome roof is improved to shorten the construction period, and the amount of vent gantry and jack device used is reduced to reduce the construction cost. It is intended to provide a method for constructing a large-span dome roof that can reduce workability and improve workability by securing an internal work space, and can also reduce the size and amount of heavy equipment for construction and removal. Is.

【0006】[0006]

【課題を解決するための手段】請求項1に係る発明は、
大規模施設の周囲を構成する外周構造体の内側領域内で
ドーム式の屋根架構を地組し、この屋根架構全体を吊り
上げて前記外周構造体上に架設する大スパンドーム屋根
の架設方法であって、前記外周構造体の内側領域内に、
前記屋根架構を吊り上げるのに用いる仮設タワーを複数
基設置する工程と、前記屋根架構を地組する際にその屋
根架構を前記仮設タワーが上下に貫通する形態で地組す
る工程と、地組された屋根架構を前記仮設タワーを利用
して吊り上げて前記外周構造体の上部に架設する工程
と、前記仮設タワーを除去した後に屋根架構の前記仮設
タワーの貫通部を補修する工程とを備えたことを特徴と
している。
The invention according to claim 1 is
This is a method of constructing a large-span dome roof in which a dome-type roof frame is erected in the inner area of the outer structure that forms the periphery of a large-scale facility, and the entire roof structure is hoisted and erected on the outer structure. Then, in the inner region of the outer peripheral structure,
A step of installing a plurality of temporary towers used for lifting the roof frame; a step of erecting the roof frame in a form in which the temporary tower vertically penetrates when the roof frame is erected; A step of hoisting the roof frame using the temporary tower and erection on the upper part of the outer peripheral structure; and a step of repairing a penetrating part of the temporary tower of the roof frame after removing the temporary tower. Is characterized by.

【0007】請求項2に係る発明は、請求項1記載の大
スパンドーム屋根の架設方法において、前記屋根架構の
地組工程で予め天井材および屋根外装材等のドーム屋根
に必要な仕上げ材を施しておくことを特徴としている。
According to a second aspect of the present invention, in the method for constructing a large-span dome roof according to the first aspect, a finishing material necessary for a dome roof such as a ceiling material and a roof exterior material is preliminarily used in a grounding step of the roof frame structure. The feature is that it is given.

【0008】[0008]

【作用】請求項1記載の大スパンドーム屋根の架設方法
では、大規模施設の周囲を構成する外周構造体の内側領
域内でドーム式の屋根架構を地組するので、屋根架構を
支持するベント構台やジャッキ等の使用量が必然的に減
少する。また、ベント構台やジャッキ等の数が減ること
により、内部作業空間が広くなって作業性が良くなる。
また、屋根架構を地組する際にその屋根架構を仮設タワ
ーが上下に貫通する形態で地組しておくので、仮設タワ
ーを利用して屋根架構全体を吊り上げることが可能にな
り、これにより屋根架構の架設作業の効率化が図られ
る。
In the method for constructing a large-span dome roof according to claim 1, since the dome type roof frame is erected within the inner region of the outer peripheral structure which constitutes the periphery of the large-scale facility, the vent for supporting the roof frame is constructed. The usage of gantry and jacks will inevitably decrease. Further, since the number of vent gantry, jacks, etc. is reduced, the internal work space is widened and the workability is improved.
Also, when the roof frame is erected, the roof frame is erected so that the temporary tower penetrates vertically, so it is possible to use the temporary tower to lift the entire roof frame. The efficiency of construction work of the frame can be improved.

【0009】請求項2記載の大スパンドーム屋根の架設
方法では、屋根架構の地組工程で予め天井材および屋根
外装材等のドーム屋根に必要な仕上げ材を施しておくの
で、屋根架構を吊り上げて架設するだけでドーム屋根の
大分部分が施工される。また、地上での作業である屋根
架構の地組のときに仕上げ材を施すのでその分、作業性
が向上する。
In the method of constructing a large-span dome roof according to claim 2, since the dome roof such as a ceiling material and a roof exterior material is provided with necessary finishing materials in advance in the process of assembling the roof frame, the roof frame is lifted. Most of the dome roof is constructed just by erection. Further, since the finishing material is applied to the roof frame structure which is a work on the ground, workability is improved accordingly.

【0010】[0010]

【実施例】以下、本発明による大スパンドーム屋根の架
設方法について、添付の図1〜図4に示す実施例に基づ
いて説明する。図1において、符号Sは本発明の架設方
法を適用して施工された大スパンのドーム屋根10を備
えた大規模施設であり、この大規模施設Sは、その周囲
を構成する外周構造体11と、その上に架設された前記
ドーム屋根10とにより内部が大空間として構成されて
いるものである。ここで、前記外周構造体11は、複数
階の高さを有し、全体として数十メートルの高さでいわ
ゆるドーナツ状に構築されたものである。
EXAMPLE A method for constructing a large-span dome roof according to the present invention will be described below with reference to the accompanying examples shown in FIGS. In FIG. 1, reference sign S is a large-scale facility having a large-span dome roof 10 constructed by applying the erection method of the present invention, and the large-scale facility S has an outer peripheral structure 11 forming the periphery thereof. The interior is constructed as a large space by the dome roof 10 erected thereon. Here, the outer peripheral structure 11 has a height of a plurality of stories and is constructed in a so-called donut shape with a height of several tens of meters as a whole.

【0011】次いで、この外周構造体11にドーム屋根
10を架設する方法の具体例について図2ないし図4を
参照して説明する。まず、大規模施設Sの外周構造体1
1を施工した後、あるいは外周構造体11の施工と平行
して、その外周構造体11で囲まれる内側領域Aの地盤
G上に、図2に示すように複数基の仮設タワー12…を
設置する。
Next, a specific example of a method for constructing the dome roof 10 on the outer peripheral structure 11 will be described with reference to FIGS. 2 to 4. First, the outer peripheral structure 1 of the large-scale facility S
After the construction of 1 or in parallel with the construction of the outer peripheral structure 11, a plurality of temporary towers 12 ... Are installed on the ground G in the inner area A surrounded by the outer peripheral structure 11 as shown in FIG. To do.

【0012】この仮設タワー12としては、架設すべき
ドーム屋根10の主体を構成する屋根架構13を吊り上
げることのできる高さとこれに堪えられる十分な強度を
有するもので、実施例では図3に示すように、屋根架構
13の中心Oから放射状に、即ち中心Oから所定の距離
だけ離れた半径Rの円周上に等間隔をおいて6基構築さ
れている。なお、この仮設タワー12は、必要に応じ
て、図示のように地盤Gに杭14を打ち込み、この杭1
4上にこれと一体に基礎15を設けてこの基礎により安
定的に支持しておくようにする。また、この仮設タワー
12は、組立および解体に便利な機能を備えた例えば既
存の油圧ジャッキによりセルフ降下および昇降可能ない
わゆる伸縮タワー形式のものが用いられている。
The temporary tower 12 has such a height that the roof frame 13 which constitutes the main body of the dome roof 10 to be erected can be lifted and has sufficient strength to withstand it, as shown in FIG. 3 in the embodiment. As described above, six groups are constructed radially from the center O of the roof frame 13, that is, at equal intervals on the circumference of the radius R separated from the center O by a predetermined distance. In this temporary tower 12, if necessary, a pile 14 is driven into the ground G as shown in the drawing, and the pile 1
A base 15 is provided integrally with the base 4 so as to be stably supported by the base. The temporary tower 12 is of a so-called telescopic tower type having a convenient function for assembling and disassembling and capable of self-descent and elevating / lowering by an existing hydraulic jack, for example.

【0013】次に、内側領域A内の地盤G上において、
図2中仮想線で示すように、ドーム屋根10の屋根架構
13を地組する。この屋根架構13の構造形式として
は、屋根架構13全体を吊り上げて架設する方法を採用
するため、屋根架構13自体でも良好な構造安定性が得
られるように、実施例では構成鉄骨材を立体トラス状に
接続してなる複層トラスドーム形式の鉄骨トラス構造が
採用されている。
Next, on the ground G in the inner area A,
As shown by a virtual line in FIG. 2, the roof frame 13 of the dome roof 10 is erected. As a structural form of the roof frame 13, a method of hoisting the entire roof frame 13 and erection is adopted. Therefore, in order to obtain good structural stability in the roof frame 13 itself, in the embodiment, the structural truss is made of a three-dimensional truss. A multi-layer truss dome type steel frame truss structure is used.

【0014】なお、この屋根架構13の地組工程におい
ては、地盤G上に既に複数基の仮設タワー12が存在し
ているので、図3に示すように、これらの仮設タワー1
2と屋根架構13とが干渉しないように、屋根架構13
を仮設タワー12が貫通する形態となるように地組す
る。また、この屋根架構13の地組工程において、天井
材や屋根外装材(図示ぜず)等の仕上げ材も施してお
く。ここで、屋根架構13を仮設タワーが貫通する部分
については、天井材や屋根外装材等の仕上げ材を設けて
おくことができないので、開口として残しておく。な
お、屋根架構13の地組工程においては、必要に応じて
仮設タワー12自体を支保工あるいは構台として利用し
てもよい。
Incidentally, in the process of assembling the roof frame structure 13, since a plurality of temporary towers 12 already exist on the ground G, as shown in FIG.
2 so that the roof frame 13 does not interfere with the roof frame 13
Is erected so that the temporary tower 12 penetrates. Further, in the process of assembling the roof frame 13, finishing materials such as ceiling materials and roof exterior materials (not shown) are also applied. Here, since a finishing material such as a ceiling material or a roof exterior material cannot be provided in a portion where the temporary tower penetrates the roof frame 13, it is left as an opening. Incidentally, in the process of assembling the roof frame 13, the temporary tower 12 itself may be used as a support work or a gantry, if necessary.

【0015】屋根架構13の地組工程が完了したら、次
に、各仮設タワー12を利用して屋根架構13を吊り上
げ、外周構造体11と屋根架構13とを接続してその屋
根架構13を外周構造体11の上部に架設する。ここ
で、屋根架構13の吊り上げ方法としては、屋根架構1
3のバランスおよび強度を考慮して、屋根架構13の必
要な節点に対して各仮設タワー12の上部より複数のワ
イヤーロープ16の一端をそれぞれ延ばして結索し、図
示しない巻き上げウインチ等を用いて各ワイヤーロープ
16の他端を巻き込んで吊り上げる方法が採られる。な
お、各ワイヤーロープ16は、それぞれ均等にあるいは
屋根架構13のバランスをとりながら巻き込む必要があ
るので、巻き上げウインチの巻き上げ制御はコンピュー
タ制御によるのが望ましい。
After the process of assembling the roof frame structure 13 is completed, next, the roof frame structure 13 is hoisted by using each temporary tower 12, the outer peripheral structure body 11 and the roof frame structure 13 are connected, and the roof frame structure 13 is surrounded. It is installed above the structure 11. Here, as a method of hoisting the roof frame 13, the roof frame 1
In consideration of the balance and strength of No. 3, one end of each of the plurality of wire ropes 16 is extended from the upper part of each temporary tower 12 to a necessary node of the roof frame 13 and tied, and a hoisting winch or the like (not shown) is used. A method is adopted in which the other end of each wire rope 16 is wound and lifted. Since it is necessary to wind each wire rope 16 evenly or while balancing the roof frame 13, it is desirable that the winding control of the winding winch is performed by computer control.

【0016】このようにして、屋根架構13を架設した
ら、各ワイヤーロープ16を取り外し、次に、各仮設タ
ワー12を一段ずつセルフ降下させつつ解体し、次い
で、屋根架構13の前記仮設タワーが貫通していた部分
の開口部を天井材および屋根外装材等の仕上げ材で補修
して完了とする。なお、仕上げ材による補修工程におい
ては、前記仮設タワー12をセルフ降下させて解体する
際に、仮設タワー12の上端部が屋根架構13を下方へ
抜け出た直後でその仮設タワー12の降下を停止させて
おき、その状態の仮設タワー12を補修工事の際の構台
あるいは足場として利用するようにしてもよい。
After the roof frame 13 has been erected in this way, each wire rope 16 is removed, and then each temporary tower 12 is dismantled while descending by one step, and then the temporary tower of the roof frame 13 is penetrated. The opening of the existing part is repaired with finishing materials such as ceiling materials and roof exterior materials to complete the process. In the repair process using the finishing material, when the temporary tower 12 is lowered by itself and dismantled, the lowering of the temporary tower 12 is stopped immediately after the upper end of the temporary tower 12 has passed through the roof frame 13 downward. Alternatively, the temporary tower 12 in that state may be used as a gantry or scaffold during repair work.

【0017】上記実施例による大スパンドーム屋根の架
設方法によれば、大規模施設Sの周囲を構成する外周構
造体11の内側領域A内の地盤G上でドーム式の屋根架
構13を地組するので、従来のように屋根架構を架設す
るその高所位置で直接組み上げるのに比べて屋根架構1
3を支持するベント構台やジャッキ等の使用量を必然的
に減少させることができる。また、ベント構台やジャッ
キ等の数を減らせることにより、内部作業空間が広くな
って作業性を良くすることができる。また、屋根架構1
3を地組し、そしてその際に屋根架構13を仮設タワー
12が上下に貫通する形態で地組しておくので、仮設タ
ワー12を利用してワイヤーロープ16により屋根架構
13全体を吊り上げることが可能になり、これにより屋
根架構13の架設作業の効率化を図ることできる。さら
に、屋根架構13を地組してから仮設タワーで吊り上げ
て架設する方法としているので、従来に比べて建て方外
しのための重機も小型化および軽量化を図ることができ
る。
According to the method of constructing the large-span dome roof according to the above-mentioned embodiment, the dome type roof frame 13 is erected on the ground G in the inner area A of the outer peripheral structure 11 which constitutes the periphery of the large-scale facility S. As compared with the conventional method of directly assembling the roof frame at the high position where the roof frame is installed, the roof frame 1
It is possible to inevitably reduce the amount of use of the vent gantry, the jack, etc. that support the 3. Further, by reducing the number of vent gantry, jacks, etc., the internal work space becomes wider and the workability can be improved. Also, the roof frame 1
3 is erected, and at that time, the roof frame 13 is erected in a form in which the temporary tower 12 penetrates vertically, so that the entire roof frame 13 can be hoisted by the wire rope 16 using the temporary tower 12. This makes it possible to improve the efficiency of the work for constructing the roof frame 13. Further, since the roof frame 13 is assembled to the ground and then suspended and erected by the temporary tower, it is possible to reduce the size and weight of the heavy machine for removing the building as compared with the conventional method.

【0018】また、屋根架構13の地組工程で予め天井
材および屋根材等のドーム屋根に必要な仕上げ材を施し
ておくので、屋根架構13を吊り上げて架設するだけで
ドーム屋根の大分部分を施工することができ。また、地
上での作業である屋根架構13の地組のときに仕上げ材
を施すので、その分、作業性の向上を図ることができ
る。
In addition, since the necessary finishing materials are applied to the dome roof such as the ceiling material and the roof material in advance in the process of assembling the roof frame 13, most of the dome roof can be installed by simply hoisting the roof frame 13. Can be installed. In addition, since the finishing material is applied to the ground structure of the roof frame 13 which is a work on the ground, the workability can be improved accordingly.

【0019】なお、実施例では、屋根架構13として、
構成鉄骨材を立体トラス状に接続してなる複層トラスド
ーム形式の鉄骨トラス構造とした例を示したが、本発明
では複数基の仮設タワー12を利用してワイヤーロープ
16により吊り上げて架設する方法としているから、例
えば仮設タワー12やワイヤーロープ16の数を適宜増
減してバランス良く吊り上げることができる屋根架構で
あれば、単層トラスドーム形式の鉄骨トラス構造のも
の、あるいはケーブル構造のものなどに対しても適用可
能であることは言うまでもない。
In the embodiment, as the roof frame 13,
Although an example of a multi-layer truss dome type steel truss structure in which constituent steel aggregates are connected in a three-dimensional truss shape has been shown, in the present invention, a plurality of temporary towers 12 are used to hang and erect by a wire rope 16. Since it is a method, for example, if it is a roof structure that can appropriately increase or decrease the number of temporary towers 12 and wire ropes 16 and can be lifted in a well-balanced manner, a single-layer truss dome type steel truss structure, a cable structure, etc. Needless to say, it is also applicable to.

【0020】[0020]

【発明の効果】以上説明したように、本発明における大
スパンドーム屋根の架設方法によれば、下記のような優
れた効果を奏することができる。
As described above, according to the method for constructing the large span dome roof of the present invention, the following excellent effects can be obtained.

【0021】請求項1記載の大スパンドーム屋根の架設
方法においては、大規模施設の周囲を構成する外周構造
体の内側領域内に、屋根架構を吊り上げるのに用いる仮
設タワーを複数基設置する工程と、屋根架構を地組する
際にその屋根架構を前記仮設タワーが上下に貫通する形
態で地組する工程と、地組された屋根架構を前記仮設タ
ワーを利用して吊り上げて前記外周構造体上に架設する
工程と、前記仮設タワーを除去した後に屋根架構の前記
仮設タワーの貫通部を補修する工程とを備えた構成とし
たので、ドーム屋根の施工性を高めて工期の短縮化を図
り、さらにベント構台やジャッキ装置等の使用量を減ら
して工費の低減化および内部作業空間の確保による作業
性の向上を図り、しかも建て方、外しのための重機も小
型化および小量化を図ることができる。
In the method for constructing a large-span dome roof according to claim 1, a step of installing a plurality of temporary towers used for hoisting a roof frame in an inner area of an outer peripheral structure which constitutes a periphery of a large-scale facility. And a step of erecting the roof frame in a form in which the temporary tower penetrates vertically when the roof frame is erected, and the outer peripheral structure is constructed by hoisting the erected roof frame using the temporary tower. Since it has a step of erection on the top and a step of repairing the penetration part of the temporary tower of the roof frame after removing the temporary tower, the workability of the dome roof is improved and the construction period is shortened. In addition, the amount of vent gantry and jack equipment is reduced to reduce the construction cost and improve the workability by securing the internal working space, and the heavy equipment for erection and removal is downsized and downsized. It is possible to achieve.

【0022】請求項2記載の大スパンドーム屋根の架設
方法によれば、屋根架構の地組工程で予め天井材および
屋根材等のドーム屋根に必要な仕上げ材を施しておくの
で、屋根架構を吊り上げて架設するだけでドーム屋根の
大分部分を施工することができ、また、地上での作業で
ある屋根架構の地組のときに仕上げ材を施すので、その
分、作業性の向上を図ることができる。
According to the method for constructing a large-span dome roof according to claim 2, since the necessary finishing materials are applied to the dome roof such as the ceiling material and the roof material in advance in the process of assembling the roof frame, the roof frame is constructed. Most of the dome roof can be constructed simply by hoisting and erection, and finishing materials are applied when constructing the roof frame, which is work on the ground, so workability can be improved accordingly. You can

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例を示す大規模施設の外観図であ
る。
FIG. 1 is an external view of a large-scale facility showing an embodiment of the present invention.

【図2】本発明の架設方法の実施例を示す概略断面図で
ある。
FIG. 2 is a schematic cross-sectional view showing an embodiment of the erection method of the present invention.

【図3】本発明の架設方法の実施例を示す概略平面図で
ある。
FIG. 3 is a schematic plan view showing an embodiment of the erection method of the present invention.

【図4】本発明の架設方法の実施例を示す概略断面図で
ある。
FIG. 4 is a schematic cross-sectional view showing an embodiment of the erection method of the present invention.

【符号の説明】[Explanation of symbols]

S 大規模施設 A 内側領域 G 地盤 10 ドーム屋根 11 外周構造体 12 仮設タワー 13 屋根架構 16 ワイヤーロープ S Large-scale facility A Inner area G Ground 10 Dome roof 11 Peripheral structure 12 Temporary tower 13 Roof frame 16 Wire rope

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 大規模施設の周囲を構成する外周構造体
の内側領域内でドーム式の屋根架構を地組し、この屋根
架構全体を吊り上げて前記外周構造体上に架設する大ス
パンドーム屋根の架設方法であって、前記外周構造体の
内側領域内に、前記屋根架構を吊り上げるのに用いる仮
設タワーを複数基設置する工程と、前記屋根架構を地組
する際にその屋根架構を前記仮設タワーが上下に貫通す
る形態で地組する工程と、地組された屋根架構を前記仮
設タワーを利用して吊り上げて前記外周構造体の上部に
架設する工程と、前記仮設タワーを除去した後に屋根架
構の前記仮設タワーの貫通部を補修する工程とを備えた
ことを特徴とする大スパンドーム屋根の架設方法。
1. A large-span dome roof in which a dome-type roof frame is erected within an inner region of an outer peripheral structure forming the periphery of a large-scale facility, and the entire roof frame is hung to be erected on the outer peripheral structure. A step of installing a plurality of temporary towers used for hoisting the roof frame in the inner region of the outer peripheral structure, and the roof frame when the roof frame is erected. A step of erection in a form in which the tower penetrates vertically, a step of hoisting the erected roof frame using the temporary tower and erection on the upper part of the outer peripheral structure, and a roof after removing the temporary tower And a step of repairing a penetrating portion of the temporary tower of the frame.
【請求項2】 請求項1記載の大スパンドーム屋根の架
設方法において、前記屋根架構の地組工程で予め天井材
および屋根外装材等のドーム屋根に必要な仕上げ材を施
しておくことを特徴とする大スパンドーム屋根の架設方
法。
2. The method for constructing a large-span dome roof according to claim 1, wherein necessary finishing materials are applied to the dome roof such as a ceiling material and a roof exterior material in advance in the process of assembling the roof frame. How to construct a large span dome roof.
JP15971293A 1993-06-29 1993-06-29 Construction method for large span domelike roof Pending JPH0718743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15971293A JPH0718743A (en) 1993-06-29 1993-06-29 Construction method for large span domelike roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15971293A JPH0718743A (en) 1993-06-29 1993-06-29 Construction method for large span domelike roof

Publications (1)

Publication Number Publication Date
JPH0718743A true JPH0718743A (en) 1995-01-20

Family

ID=15699646

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15971293A Pending JPH0718743A (en) 1993-06-29 1993-06-29 Construction method for large span domelike roof

Country Status (1)

Country Link
JP (1) JPH0718743A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10205136A (en) * 1997-01-24 1998-08-04 Takenaka Komuten Co Ltd Construction method of large span building
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system
CN104060843A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Inversion construction method for ultra-large roof system
JP2018115427A (en) * 2017-01-16 2018-07-26 株式会社大林組 Construction method of roof frame
CN110778108A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Construction method of complex space multi-curved surface double-layer oblique crossing concrete grid structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10205136A (en) * 1997-01-24 1998-08-04 Takenaka Komuten Co Ltd Construction method of large span building
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system
CN104060843A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Inversion construction method for ultra-large roof system
JP2018115427A (en) * 2017-01-16 2018-07-26 株式会社大林組 Construction method of roof frame
CN110778108A (en) * 2019-10-30 2020-02-11 中国建筑第八工程局有限公司 Construction method of complex space multi-curved surface double-layer oblique crossing concrete grid structure

Similar Documents

Publication Publication Date Title
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
JPH06272403A (en) Construction method for demolishing building
JP3426339B2 (en) Construction method of large building with dome roof
JPH0718743A (en) Construction method for large span domelike roof
JPH06101274A (en) Method of constructing roof of cable dome
JP2979039B2 (en) Large space building construction equipment
JPH10325182A (en) Construction method of dome-shaped roof
JPH09195497A (en) Elevatable scaffold
JP3073371B2 (en) Tower-like structure erection method and equipment
JP3328790B2 (en) High-rise building assembly method
JP2858891B2 (en) Construction method of large span dome roof
JPH04161565A (en) Construction of large space building
JP2718188B2 (en) Building exterior wall mounting method
JP2876991B2 (en) Steel frame method for high-rise buildings
JPH08120936A (en) Method and device for constructing multistoried building
JPH06101348A (en) Method for constructing tower
JP2671967B2 (en) High-rise building construction method and construction beam assembly equipment
JPH0539637A (en) Construction method for domed roof and heavy hoist therefor
JP3506022B2 (en) How to build a dome roof
JPH1037527A (en) Method for constructing inner and outer cylinder of chimney simultaneously
JPH07259191A (en) All-weather construction method of structure
JPH07150771A (en) Installation structure for frame of cover body for external curing
JP2002371711A (en) Construction method of building
JPH0423709B2 (en)
JPH0460061A (en) Roof lift-up construction method