JPH0460061A - Roof lift-up construction method - Google Patents
Roof lift-up construction methodInfo
- Publication number
- JPH0460061A JPH0460061A JP16940990A JP16940990A JPH0460061A JP H0460061 A JPH0460061 A JP H0460061A JP 16940990 A JP16940990 A JP 16940990A JP 16940990 A JP16940990 A JP 16940990A JP H0460061 A JPH0460061 A JP H0460061A
- Authority
- JP
- Japan
- Prior art keywords
- roof
- pantograph
- pantographs
- lift
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims description 19
- 238000009434 installation Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【発明の詳細な説明】
「産業上の利用分野」
本発明は、地上で大空間構造物の屋根架橋を組立て、屋
根材等を取付けた後、所定の位置迄持ち上げる屋根リフ
トアップ工法に関する。DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" The present invention relates to a roof lift-up method for assembling a roof bridge of a large-space structure on the ground, attaching roofing materials, etc., and then lifting the bridge to a predetermined position.
「従来の技術」
従来、大空間構造物の屋根を組立てる場合には、所定の
高さ位置に順次、該当する部材単品を上架する施工方法
が主流を占めていた。しかし、このような従来の工法は
、作業の大部分が高所で行われるた狛、作業が困難で作
業能率が低い上に危険が多く工期も長くかかるが、高所
で組立て作業を行なうとび職の技能は一般的に低下して
きており、また高所作業に要求される仮設安全対策はよ
り厳しくなってきていること、また大型のクレーンを使
用しなければならないため、その輸送費や稼動費は膨大
なものとなり、更にトラッククレーンはもちろんのこと
、クライミングクレーンを用いる場合にも、構造物の外
側に設置しなければならず、クレーン据付のためのかな
り広い余分なスペースとクレーン設備のための基礎工事
または地盤の養生を要するのであるが、はとんどの現場
は、周囲に建物が密集していることが多いことなどによ
り、材料の搬入、取扱い、足場の確保などが難かしくな
っできている等の事情から、大型クレーンを必要とせず
、作業が地上、若しくは低所で行い得て安全性が高く、
かつ作業が能率的で工期の短縮を図れるところの地上近
くで屋根を組み立てたものを所定の高さ位置にリフトア
ップする施行方法が指向されるに至っている。"Prior Art" Conventionally, when assembling the roof of a large space structure, the mainstream construction method was to sequentially erect individual members at predetermined height positions. However, with conventional construction methods, most of the work is done at high places, which is difficult, has low work efficiency, is dangerous, and takes a long time; skills are generally declining, temporary safety measures required for work at height have become more stringent, and larger cranes have to be used, reducing transport and operating costs. Furthermore, if a climbing crane is used, let alone a truck crane, it must be installed outside the structure, requiring a considerable amount of extra space for the crane installation and a foundation for the crane equipment. Construction work or ground curing is required, but most construction sites are often surrounded by buildings, making it difficult to transport materials, handle them, and secure scaffolding. For these reasons, there is no need for a large crane, and the work can be done on the ground or at a low location, making it highly safe.
At the same time, a method of construction in which the roof is assembled near the ground and is lifted up to a predetermined height has become more and more efficient and can shorten the construction period.
この工法の場合屋根を持ち上げるため、仮設ブラケット
より仮設ロッド等で吊り下げ、これに仕込んだセンター
ホールジヤツキにより屋根を吊り上げる方法が一般的で
ある。In order to lift the roof with this construction method, the roof is generally suspended from temporary brackets using temporary rods, and a center hole jack attached to the rods is used to lift the roof.
「発明が解決しようとする課題」
従来のリフトアップ工法にあっては、吊上げに際しては
、仮設ロッド等に組付けられた屋根にねじれ変形が生じ
ることのないように高さ不均等を小さく抑えねばならな
いが、このた杓に、複数台の油圧ジヤツキによる平坦状
態での同時上昇による高さ制御、上昇速度制御等を行な
っており、そのため上昇速度は遅く、揚重設備費も高価
となり、しかも施工期間が長く、上昇施工に関するノウ
ハウも必要で特定の建設業者にのみ可能である、という
欠点を有していた。また、この工法では、柱。``Problem to be solved by the invention'' In the conventional lift-up method, when lifting, it is necessary to keep the uneven height to a minimum so as not to cause torsional deformation of the roof attached to temporary rods, etc. However, in order to do this, multiple hydraulic jacks are used to simultaneously raise the lift in a flat state to control the height and speed of the lift, which results in a slow rate of rise, high lifting equipment costs, and construction costs. It has the disadvantage that it takes a long time, requires know-how regarding elevated construction, and can only be performed by specific construction companies. Also, in this construction method, pillars.
壁躯体の構築済みが仮設ロッドの設置並びに上架された
屋根の盛替えのうえから前提となるが、仮設足場、仮設
ロッド等の仮設材の設置、撤去を要し、工程が煩わしい
。It is a prerequisite that the wall frame has already been constructed, after installing the temporary rods and replacing the roof that has been elevated, but this requires the installation and removal of temporary materials such as temporary scaffolding and temporary rods, making the process cumbersome.
本発明は、リフト作業が迅速になし得るうえ、仮設材の
設置、撤去が不要となって作業能率の大巾アップが期し
得る屋根リフトアップ工法を提供することを目的として
いる。It is an object of the present invention to provide a roof lift-up construction method that allows quick lifting work and eliminates the need for installing and removing temporary materials, thereby greatly increasing work efficiency.
「課題を解決するための手段」
上記目的を達成するために、本発明の屋根リフトアップ
工法においては、屋根周辺部には油圧式パンタグラフを
所定数設置し、かつ、屋根部材ジヨイント部には仮設サ
ポートを組んで、屋根架構の組立て並びに屋根材等の仕
上材の取付けを地上で行ない、しかる後、屋根を該パン
タグラフの伸延で所定の高さまでリフトアップしたとこ
ろで該パンタグラフを仮定着させておき、当該仮定着の
パンタグラフのリンクアームを足場兼構造材として利用
しつつ、該パンタグラフを本定着させる柱。"Means for Solving the Problems" In order to achieve the above object, in the roof lift-up method of the present invention, a predetermined number of hydraulic pantographs are installed around the roof, and temporary pantographs are installed at the roof member joints. Assembling supports, assembling the roof frame and installing finishing materials such as roofing materials on the ground, then lifting the roof to a predetermined height by extending the pantograph, and then temporarily attaching the pantograph, A pillar on which the temporarily attached pantograph is permanently attached while using the link arm of the temporarily attached pantograph as a scaffolding and structural material.
壁の躯体構築、観客席の構築を行なうとしたものである
。The plan was to construct the framework of the wall and the seats for the audience.
「作用」
上記のように構成された本発明の工法によるならば、地
上で組立ての屋根は、その周辺部を支持しているパンタ
グラフを油圧シリンダーを作動させ伸延することでリフ
トアップ出来る。``Operation'' According to the construction method of the present invention configured as described above, a roof assembled on the ground can be lifted up by activating a hydraulic cylinder and extending the pantograph that supports the periphery of the roof.
屋根はパンタグラフ上端に搭載されていて自由度があり
、かつ、油圧力を利用するので、リフトアップ作業はス
ムーズになし得る。リフトアップを完了したパンタグラ
フを仮定着させるとサポートであると共に柱、壁、観客
席構築用の足場兼構造材となる。該柱、壁にパンタグラ
フの格点を定着させることにより、パンタグラフは本定
着され構造体となる。つまり、従来リフトアップ材は撤
去を前提の仮設材であったものが、本発明では、そのま
ま構造体に組込まれて撤去不要となる合理性を奏する。The roof is mounted on the top of the pantograph, giving it a degree of freedom, and since hydraulic pressure is used, lifting can be done smoothly. Once the pantograph has been lifted up, it will act as a support and also serve as a scaffolding and structural material for constructing pillars, walls, and audience seats. By fixing the points of the pantograph on the pillars and walls, the pantograph is permanently fixed and becomes a structure. In other words, conventional lift-up materials are temporary materials that must be removed, but in the present invention, they can be incorporated into the structure as is, making removal unnecessary.
「実施例j
実施例について図面を参照して説明すると、第1図にお
いて、現場敷地1上の屋根2周辺部相当部には垂直昇降
装置の油圧式パンタグラフ3.・・・を所定の数だけ設
置すると共に屋根部材2a、・・・のジヨイント部相当
部には仮設サポート4.・・・を組み、これ等に支持さ
せながら屋根2の地上組みを行なう。``Example j'' To explain the example with reference to the drawings, in Fig. 1, a predetermined number of hydraulic pantographs 3, which are vertical lifting devices, are installed in an area corresponding to the periphery of the roof 2 on the site site 1. At the same time as installing the roof members 2a, temporary supports 4, etc. are installed at the joint portions of the roof members 2a, and the roof 2 is assembled on the ground while being supported by these.
しかる後、第2図に示す如くパンタグラフ3゜・・・の
伸延で屋根2を所定の高さにまでリフトアップし、次い
で、パンタグラフ3のリンクアーム3a。Thereafter, as shown in FIG. 2, the roof 2 is lifted up to a predetermined height by extension of the pantograph 3°, and then the link arm 3a of the pantograph 3 is lifted up.
・・・のリンク動を拘束する部材9を付加設して仮定着
させる。. . . A member 9 for restraining the link movement is additionally installed and temporarily attached.
尚、パンタグラフ3としては、図示例の如く、上、下リ
ンク格点に油圧シリンダー5.6を配備したものが、伸
延勤がスムーズで好適である。As for the pantograph 3, one in which hydraulic cylinders 5 and 6 are provided at the upper and lower link points, as shown in the illustrated example, is suitable for smooth extension work.
次いで、第3図に示す如く、仮定着のパンタグラフ3は
、柱、壁の躯体8構築足場となると共に傾斜姿勢のリン
クアーム3aは最適な観客席7の構造枠となるので、こ
れを利用して、柱、壁の躯体8並びに観客席7を構築す
る。この際、該躯体8に対してパンタグラフ3の格点を
一体的に固定させるごとで本定着する。これにより、パ
ンタグラフ3は構造体となる。Next, as shown in Fig. 3, the temporarily attached pantograph 3 will serve as a scaffold for constructing the pillar and wall frame 8, and the tilted link arm 3a will serve as the optimal structural frame for the audience seats 7, so use this. Then, the pillars, wall frame 8, and audience seats 7 are constructed. At this time, the final fixing is performed by integrally fixing the points of the pantograph 3 to the frame 8. Thereby, the pantograph 3 becomes a structure.
「発明の効果」
本発明は、以上説明したように構成されているので、以
下に記載されるような効果を奏する。"Effects of the Invention" Since the present invention is configured as described above, it produces the effects described below.
(1)油圧力を利用するため、スムースな運転ができ安
全性が向上する。(1) Since hydraulic pressure is used, smooth operation is possible and safety is improved.
(2)リフトアップ日数が1日で完了する。(2) Lift-up can be completed in one day.
(3)工期が従来比約70%短縮となる。(3) Construction period will be reduced by approximately 70% compared to conventional methods.
(4)屋根を支持する柱、壁躯体の構築が前提とならな
い屋根地上絵であるので、仮設材、揚重設備が大巾に簡
便化される。(4) Since the roof geoglyph does not require the construction of columns and wall structures to support the roof, temporary materials and lifting equipment are greatly simplified.
(5)垂直昇降装置が撤去されることなくリフトアップ
後は足場、構築枠、しいては構築体化するという合理性
により、大巾な能率化が期し得る。(5) Great efficiency can be expected due to the rationality of using scaffolding, construction frames, and even structures after lifting up without removing the vertical lifting device.
(6)リフトアップ手法を実に広汎な業者にまで拡大し
て可能ならしめることができ、業界に寄与することが大
きい。(6) The lift-up method can be extended to a wide range of businesses and made possible, making a great contribution to the industry.
第1図〜第3図は本発明工法の手順説明図である。
1・・・現場敷地、 2・・屋根、 2a・・・屋根部
材、3・・・油圧式パンタグラフ、3a・・・リンクア
ーム、9・・・部材、 4・・・仮設サポート、 5.
6・、・油圧シリンダー 7・・・観客席、8・・・
躯体。
ズ余り勿1 to 3 are explanatory diagrams of the procedure of the construction method of the present invention. 1... Site site, 2... Roof, 2a... Roof member, 3... Hydraulic pantograph, 3a... Link arm, 9... Member, 4... Temporary support, 5.
6. Hydraulic cylinder 7... Spectator seats, 8...
skeleton. No need for too much
Claims (1)
し、かつ、屋根部材ジョイント部には仮設サポートを組
んで、屋根架構の組立て並びに屋根材等の仕上材の取付
けを地上で行ない、しかる後、屋根を該パンタグラフの
伸延で所定の高さまでリフトアップしたところで該パン
タグラフを仮定着させておき、当該仮定着のパンタグラ
フのリンクアームを足場兼構造材として利用しつつ該パ
ンタグラフを本定着させる柱、壁の躯体構築、観客席の
構築を行なうとしたことを特徴とする屋根リフトアップ
工法。(1) A predetermined number of hydraulic pantographs will be installed around the roof, temporary supports will be erected at the joints of the roof members, and the assembly of the roof frame and the installation of finishing materials such as roofing materials will be carried out on the ground. After that, when the roof is lifted up to a predetermined height by extension of the pantograph, the pantograph is temporarily attached, and the link arm of the temporarily attached pantograph is used as a scaffold and a structural member, and a pillar is used to permanently fix the pantograph. , a roof lift-up construction method characterized by constructing a wall frame and spectator seats.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16940990A JP2779258B2 (en) | 1990-06-27 | 1990-06-27 | Roof lift-up method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16940990A JP2779258B2 (en) | 1990-06-27 | 1990-06-27 | Roof lift-up method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0460061A true JPH0460061A (en) | 1992-02-26 |
JP2779258B2 JP2779258B2 (en) | 1998-07-23 |
Family
ID=15886066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16940990A Expired - Fee Related JP2779258B2 (en) | 1990-06-27 | 1990-06-27 | Roof lift-up method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2779258B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0762873A (en) * | 1993-08-27 | 1995-03-07 | Satoyuki Uchiumi | Method and apparatus for constructing roof |
US10077572B1 (en) * | 2017-04-19 | 2018-09-18 | Hmt, Llc | Systems and methods for lifting and positioning a roof for installation on a storage tank |
-
1990
- 1990-06-27 JP JP16940990A patent/JP2779258B2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0762873A (en) * | 1993-08-27 | 1995-03-07 | Satoyuki Uchiumi | Method and apparatus for constructing roof |
US10077572B1 (en) * | 2017-04-19 | 2018-09-18 | Hmt, Llc | Systems and methods for lifting and positioning a roof for installation on a storage tank |
Also Published As
Publication number | Publication date |
---|---|
JP2779258B2 (en) | 1998-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2928948B2 (en) | Construction method of large span roof | |
JP2001173098A (en) | Mobile frame trestle for constructing dome-like roof and construction method | |
JPH0460061A (en) | Roof lift-up construction method | |
JPH0571225A (en) | Temporarily set roof of complete weather type | |
JP2579715B2 (en) | External tower crane | |
JPH04161566A (en) | Constructing apparatus for large space building | |
JPH05133016A (en) | Peripheral supporting self-rising type building engineering method | |
JPH0718743A (en) | Construction method for large span domelike roof | |
CN220285354U (en) | Backup plate device for bistable steel structure installation | |
JP3328790B2 (en) | High-rise building assembly method | |
JPH03125755A (en) | Constructing method for cylindrical multistoried structure | |
JP2776140B2 (en) | Temporary beam assembly equipment for building construction | |
JP2876991B2 (en) | Steel frame method for high-rise buildings | |
JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
JPH0782799A (en) | Method and apparatus for erecting towerlike structure | |
JPH04146372A (en) | How to construct the frame | |
JP3002054U (en) | Tower crane with multiple main columns as tower mast | |
JP2572642B2 (en) | Scaffolding disassembly method | |
JPH0539637A (en) | Construction method for domed roof and heavy hoist therefor | |
JPS5996358A (en) | Construction method of steel structure roof or upper floor | |
JPH0447072A (en) | Construction method for multistory building and its device | |
JPH0460038A (en) | Constructing method of large span dome roof | |
CN117287045A (en) | Starting cross-air butt joint installation method for plane net rack in narrow space | |
CN117188597A (en) | Steel frame internal arch structure and flexible back-pull relay hoisting construction method thereof | |
JP2002371711A (en) | How to build a building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |