KR20010111537A - Self climbing net - Google Patents

Self climbing net Download PDF

Info

Publication number
KR20010111537A
KR20010111537A KR1020000032159A KR20000032159A KR20010111537A KR 20010111537 A KR20010111537 A KR 20010111537A KR 1020000032159 A KR1020000032159 A KR 1020000032159A KR 20000032159 A KR20000032159 A KR 20000032159A KR 20010111537 A KR20010111537 A KR 20010111537A
Authority
KR
South Korea
Prior art keywords
guide
guide rail
slab
fixed
fence
Prior art date
Application number
KR1020000032159A
Other languages
Korean (ko)
Inventor
유재상
Original Assignee
주식회사 대종건영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 대종건영 filed Critical 주식회사 대종건영
Priority to KR1020000032159A priority Critical patent/KR20010111537A/en
Publication of KR20010111537A publication Critical patent/KR20010111537A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3247Storey high safety barrier hung from the facade and sliding up from level to level as work progresses

Abstract

본 발명은 시공하는 건축물의 외벽에 설치되어 작업자, 건설자재, 공구 또는 분진 등의 이물질 낙하와 비산 및 소음을 방지함으로써 안전사고와 환경오염을 방지하고 콘크리트양생을 위한 동력기보온효과를 얻기위한 것으로, 특히 제작과 조립공수 및 구성부품의 단순, 최소화에 의해 원가절감을 적극적으로 구현할 수 있게된 건축공사용 안전펜스에 관한 것이다.The present invention is to be installed on the outer wall of the building to prevent the falling of objects, scattering and noise of workers, construction materials, tools or dust, etc. to prevent safety accidents and environmental pollution, and to obtain the power plant insulation effect for concrete curing, In particular, the present invention relates to a safety fence for construction engineers, who can actively realize cost reduction by manufacturing and assembling labor and by simplifying and minimizing components.

이를위해 본발명에서는 상단외측에 낙하방지망을 선택적으로 구비한 펜스프레임과, 상기 펜스프레임의 내면양측에 수직으로 고정설치되고 그 내측에는 건축물의 슬라브 간격에 맞추어 걸림훅을 구비한 안내레일과, 상기 안내레일을 위치고정 또는 승강이동을 안내하기 위해 슬라브의 선단에 착탈가능하게 고정설치되는 안내수단과, 상기 안내레일을 승강이동 시키도록 슬라브의 내측에 착탈가능하게 고정설치되는 하나 이상의 동력원과, 상기 슬라브의 선단에 착탈가능하게 고정 설치되어 안내레일과 동력원 사이에 연결된 와이어를 안내하는 가이드롤러로 구성하였다.To this end, in the present invention, a fence frame having a drop prevention net selectively provided on the outer side of the top, and vertically fixed to both sides of the inner surface of the fence frame and the guide rail provided with a locking hook in accordance with the slab spacing of the building, and the Guide means detachably fixed to the front end of the slab for guiding the fixed position or the lifting movement of the guide rail, one or more power sources detachably fixed to the inner side of the slab to move the guide rail up and down; Removably fixed to the front end of the slab was composed of a guide roller for guiding the wire connected between the guide rail and the power source.

Description

건축공사용 안전펜스{SELF CLIMBING NET}Safety fence for construction worker {SELF CLIMBING NET}

본 발명은 건축공사용 안전펜스, 더욱 상세히는 시공하는 건축물의 외벽에 설치되어 작업자, 건설자재, 공구 또는 분진 등의 이물질 낙하와 비산을 방지함으로써 안전사고와 환경오염을 방지하기 위한 것으로, 특히 제작과 조립공수 및 구성부품의 단순, 최소화에 의해 원가절감을 적극적으로 구현할 수 있게된 건축공사용 안전펜스에 관한 것이다.The present invention is to prevent safety accidents and environmental pollution by preventing the falling and scattering of foreign objects such as workers, construction materials, tools or dust is installed on the safety fence of building construction, more specifically, the building to be constructed, The present invention relates to a safety fence for construction engineers who can actively realize cost reduction by simple and minimization of assembly labor and components.

종래에도 건축물의 시공현장에서 안전사고와 환경오염의 방지를 위해 다양한 기구적구성 및 형태의 안전펜스가 제시, 사용되고 있음은 주지와 같으며, 그 대표적 구성이 국내 공개특허 공보 제 98-33583 호의 건축공사용 안전펜스에 제시되어 있다.It is well known that safety fences of various mechanical configurations and forms have been proposed and used in the construction site of a building to prevent safety accidents and environmental pollution, and the representative construction thereof is described in Korean Patent Application Publication No. 98-33583. It is presented in the construction safety fence.

도시하지 않았으나 상기 안전펜스는 건축물의 외벽부에 수직으로 부착되는 유도용 레일과, 상기 레일을 타고 이동되는 롤러에 의해 독립적으로 승강이동되는 펜스프레임과, 상기 펜스프레임에 탑재되어 이들을 승강연동시키는 승강수단과, 상기 펜스프레임에 설치되는 텐트와, 상기 텐트를 보강하여주는 네트로 구성되어 있으며, 상기 승강수단은 동력원과 스풀, 로프 또는 동력원과 랙,피니언으로 이루어진 구성 예들이 제시되어 있다.Although not shown, the safety fence is an induction rail vertically attached to the outer wall of the building, a fence frame that is independently lifted and moved by a roller that is moved on the rail, and a lift that is mounted on the fence frame to lift and interlock them. A means, a tent installed in the fence frame, and a net for reinforcing the tent, the lifting means is a configuration example consisting of a power source and spool, a rope or a power source and a rack, pinion.

이러한 구성의 종래 안전펜스는 승강수단의 작동에 의해 유도용 레일 또는 펜스프레임이 선택적으로 승강할 수 있게되어 건축물의 공사진행에 따라 안전펜스를 층단위로 승강시킬 수 있게되며, 따라서 안전사고와 환경오염을 효과적으로 방지하고 있다.The conventional safety fence of such a configuration can be selectively lifted by the induction rail or fence frame by the operation of the lifting means it is possible to raise and lower the safety fence in units of floors according to the construction process of the building, thus safety accidents and environment It effectively prevents contamination.

그런데, 상기한 종래 안전펜스는 구성이 복잡하여 제작과 조립 및 유지보수에 많은 인력과 경비지출이 요구된다는 문제점이 지적되고 있다.However, it is pointed out that the conventional safety fence is complicated in configuration and requires a lot of manpower and expense for manufacturing, assembly and maintenance.

즉, 하나의 건축물에는 그 둘레에 많은 안전펜스가 분할 설치되어야 하는데, 종래에는 각 안전펜스에 동력원과 스풀 및 로프 또는 동력원과 랙 및 피니언을 구비해야 하므로 구성부품이 과대히 많아질 수밖에 없으며, 이외에도 승강에 필요한 레일과 롤러 등도 각각 별도로 구비해야 함은 물론 각각 별도로 상부이동하게 되므로 제작원가의 상승과 유지보수의 어려움으로 인해 공사비 상승과 작업지연등의 근본원인을 제공하게 되었다.In other words, one safety fence should be divided around the building. In the related art, each safety fence must be provided with a power source and a spool and a rope or a power source and a rack and pinion. The rails and rollers necessary for the elevating should be separately provided as well as moved upwards separately, thereby providing the root cause of the increase in construction cost and work delay due to the difficulty in the rise of the manufacturing cost and the maintenance.

본 발명은 상기한 문제점들을 감안하여 안전펜스의 구성을 단순, 최소화함으로써 제작과 조립공수 및 원가절감을 적극적으로 구현하고, 유지보수의 용이함과 고장발생율의 최소화에 의해 공사기간 단축을 도모할 수 있는 건축공사용 안전펜스를 제공함에 그 목적이 있다.The present invention actively implements manufacturing and assembly labor and cost reduction by simplifying and minimizing the configuration of the safety fence in view of the above problems, and can shorten the construction period by minimizing the maintenance rate and the failure rate. The purpose is to provide a safety fence for construction engineers.

상기 목적을 효과적으로 달성하기 위하여 본 발명에서는 낙하방지망을 구비한 펜스프레임에 안내레일을 고정 설치하여 건축물의 슬라브에 구비되는 안내수단에 의해 위치고정 또는 승강이동 가능하게 하고, 펜스프레임의 승강이동시에는 슬라브에 선택 고정설치되는 동력원에 의해 필요위치로 승강이동 되도록 하며, 특히안전펜스의 상승시에 최하층에 설치된 안내수단을 최성부로 이동설치하여 재사용하도록 하였다.In order to effectively achieve the above object in the present invention, the guide rail is fixedly installed on the fence frame provided with a drop preventing net, and the position is fixed or lifted by guide means provided on the slab of the building. In order to move up and down to the required position by the power source to be fixed fixedly installed, in particular, when the safety fence ascends, the guide means installed on the lowermost floor is moved to the top part for reuse.

도 1은 본 발명에 의한 안전펜스의 전체개략구성도.1 is a schematic configuration diagram of a safety fence according to the present invention.

도 2는 본 발명을 구성하는 안내레일과 안내수단의 부분측단면도.Figure 2 is a partial side cross-sectional view of the guide rail and the guide means constituting the present invention.

도 3은 본 발명을 구성하는 안내레일과 안내수단의 사시도.Figure 3 is a perspective view of the guide rail and the guide means constituting the present invention.

도 4는 본 발명을 구성하는 안내레일과 안내수단의 평면도.Figure 4 is a plan view of the guide rail and the guide means constituting the present invention.

도 5A는 본 발명 안전펜스의 상승 대기상태 측면도.Figure 5A is a side view of the rising standby state of the safety fence of the present invention.

도 5B는 본 발명 안전펜스의 상승 진행상태 측면도.Figure 5B is a side elevation view of the safety fence of the present invention.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of drawings

1 : 낙하방지망 2 : 펜스프레임1: Drop prevention network 2: Fence frame

3 : 안내레일 4 : 안내수단3: guide rail 4: guide means

5 : 동력원 6 : 와이어5: power source 6: wire

7 : 가이드롤러 31 : 걸림훅7: guide roller 31: hook hook

43 : 안내박스 44 ; 고정링43: Information box 44; Retaining ring

45 : 지지핀 46 : 지지틀45: support pin 46: support frame

47 : 안내롤러 F : 안전펜스47: guide roller F: safety fence

S : 슬라브S: Slavic

이하에서 상기 본 발명의 양호한 실시예를 첨부도면에 의해 상세히 설명한다.Hereinafter, a preferred embodiment of the present invention will be described in detail by the accompanying drawings.

도 1은 본 발명 안전펜스(F)의 전체구성을 나타낸 것으로, 낙하방지망(1)을 구비한 펜스프레임(2)과, 상기 펜스프레임(2)의 양측에 수직으로 고정 설치된 안내레일(3)과, 상기 안내레일(3)을 위치고정 또는 승강이동을 안내하기 위해 건축물의 슬라브(S) 선단에 착탈가능하게 고정 설치되는 안내수단(4)과, 상기 안내레일(3)을 승강이동 시키도록 슬라브(S)의 내측에 착탈가능하게 고정 설치되는 동력원(5)과, 상기 슬라브(S)의 선단에 착탈가능하게 고정 설치되어 안내레일(3)과 동력원(5)사이에 연결된 와이어(6)를 안내하는 가이드롤러(7)로 구성된다.Figure 1 shows the overall configuration of the safety fence (F) of the present invention, a fence frame (2) having a drop prevention net (1), and guide rails (3) vertically fixed to both sides of the fence frame (2) And, guide means (4) which is detachably fixed to the front end of the slab (S) of the building to guide the position fixing or lifting movement of the guide rail (3), and to move the guide rail (3) A power source 5 detachably fixed to the inner side of the slab S and a wire 6 detachably fixed to the front end of the slab S and connected between the guide rail 3 and the power source 5. It consists of a guide roller (7) to guide the.

상기 펜스프레임(2)은 소정규격의 단위체로 구성되어 안내레일(3)에 볼트체결고정되며, 그 상부에는 낙하방지망(1)이 현수설치되어 낙하물에 의한 안전사고를 방지할 수 있도록 구성된다.The fence frame (2) is composed of a unit of a predetermined standard bolt fastening to the guide rail (3), the drop prevention net (1) is installed on the top of the suspension structure is configured to prevent accidents caused by falling objects.

또한 상기 펜스프레임(2)에는 텐트와 네트 및 텐버클등으로 구성되는 공지의 부재들이 선택 설치되어 건축물을 외부와 차폐시킬 수 있게 된다.In addition, the fence frame (2) is a well-known member consisting of a tent, a net, and a tent buckle is installed to be able to shield the building from the outside.

도 2는 상기 안내레일(3)과 안내수단(4)의 연결상태를 나타낸 부분측단면도로서, 도 3에서는 그 연결상태를 사시도로 나타내었고, 도 4에서는 평면도로 나타내었다.Figure 2 is a partial side cross-sectional view showing a connection state of the guide rail 3 and the guide means 4, in Figure 3 is shown in perspective view, Figure 4 is shown in plan view.

상기 안내레일(3)은 통상의 H빔(H-Beam)으로서 건축물의 높이를 감안하여The guide rail 3 is a conventional H beam (H-Beam) in consideration of the height of the building

4∼5개층의 높이로 구성되며, 건축물의 슬라브(S) 간격에 맞추어 걸림훅(31)이 구비된다.It consists of the height of 4-5 floors, and the hook hook 31 is provided according to the space | interval of the slab S of a building.

상기 안내수단(4)은, 슬라브(S)에 앵커볼트(41)로 체결 고정되는 체결부(42)를 구비한 안내박스(43)와, 상기 걸림훅(31)이 걸림고정 되도록 안내박스(43)내에 힌지고정설치된 고정링(44)과, 상기 고정링(44)의 하향회동을 제한하도록 안내박스(43)에 관통설치된 지지핀(45)과, 상기 안내박스(43)의 외면 양측에 고정설치된 지지틀(46)과, 상기 지지틀(46)내에 축설치되어 안내레일(3)의 양단을 안내 지지하는 안내롤러(47)로 구성된다.The guide means 4 is a guide box 43 having a fastening portion 42 fastened to the slab (S) by an anchor bolt 41 and a guide box to secure the locking hook (31) ( 43, a fixing ring 44 hingedly fixed within the support ring, a support pin 45 installed through the guide box 43 so as to restrict the downward rotation of the fixing ring 44, and both sides of the outer surface of the guide box 43. It is composed of a support frame 46 fixedly installed, and a guide roller 47 axially installed in the support frame 46 to guide and support both ends of the guide rail 3.

또한 상기 지지틀(46)의 선단과 안내레일(3)의 서로 대응하는 위치에는 견고한 위치고정상태의 유지를 위해 고정축(48)이 관통 설치된다.In addition, the front end of the support frame 46 and the guide rail (3) corresponding to each other in the position fixed to the fixed shaft 48 is installed to maintain a fixed position.

상기 펜스프레임(2)을 포함하는 안내레일(3)을 승강시키는 동력원(5)은 도 4에서와 같이 슬라브(S)의 내측에 고정 설치되고, 동력원(5)에 의해 권취되는 와이어(6)의 끝단은 안내레일(3)의 아일릿(32)에 걸어 고정되며, 상기 안내수단(4)의 일측에는 와이어(6)를 안내하는 가이드롤러(7)가 슬라브(S)에 고정 설치된다.Power source 5 for elevating the guide rail 3 including the fence frame (2) is fixed to the inside of the slab (S) as shown in Figure 4, the wire 6 wound by the power source (5) The end of the guide rail 3 is fixed to the eyelet 32, the guide roller 7 for guiding the wire 6 on one side of the guide means 4 is fixed to the slab (S).

이와 같은 구성의 본 발명 안전펜스(F)는 설치시에 우선, 안내레일(3)을 슬라브(S)에 맞추어 수직으로 입설한 상태에서 각층의 슬라브(S)선단에 안내수단(4)을 설치하여 안내레일(3)의 설치를 완료하게 되는데, 상기 안내수단(4)은 그 양측의 고정부(42)를 슬라브(S)에 앵커볼트(41)로 체결시키게 되므로 견고한 고정상태의 유지가 가능하다.In the present invention, the safety fence (F) of the configuration as described above, at the time of installation, the guide rail (3) is installed in the vertically aligned state in accordance with the slab (S), the guide means (4) is installed at the tip of the slab (S) of each floor. By completing the installation of the guide rail (3), the guide means (4) is fastened to the slab (S) by the anchor bolt 41 to the fixing portion 42 of both sides is possible to maintain a solid fixed state Do.

또한 입설된 안내레일(3)의 사이에는 필요너비 및 높이의 단위체로 구성된 펜스프레임(2)들을 체결 고정시키게 되며, 이러한 상태에서 건축물의 지층공사를 진행하게 된다.In addition, between the guide rails 3, the fence frame (2) consisting of the unit of the required width and height is fastened and fixed, and in this state proceeds to the construction of the building.

이때, 펜스프레임(2)을 포함한 안내레일(3)의 유동 및 전복우려는 근본적으로 배제되는 바, 이는 펜스프레임(2)이 안내레일(3)에 체결고정되고, 안내레일(3)은 안내수단(4)에 의해 견고히 걸림 고정되어 있음에 기인한다.At this time, the flow and overturning of the guide rail 3 including the fence frame 2 is essentially excluded, which is fixed to the guide frame 3 is fastened to the guide rail 3, the guide rail 3 is guided This is because the fastening is securely held by the means 4.

즉, 위치 고정된 상태에서 안내레일(3)의 걸림훅(31)은 도 2에서와 같이 안내수단(4)의 고정링(44)에 걸림 고정된 상태를 유지하여 도면상 좌우방향이동(전복)이 방지되며, 이와 동시에 안내레일(3)의 양측을 도 4에서와 같이 안내롤러(47)가 지지하게 되므로 견고한 설치상태를 유지하게 된다.That is, in the fixed position, the locking hook 31 of the guide rail 3 maintains the locked state to the fixing ring 44 of the guide means 4 as shown in FIG. ) Is prevented and at the same time the guide roller 47 is supported by both sides of the guide rail (3) to maintain a solid installation state.

또한, 상기한 고정설치상태에서는 와이어(6)를 포함하는 동력원(5)과 상기 와이어(6)를 안내하는 가이드롤러(7)는 설치하지 않은 상태이다.In the fixed installation state, the power source 5 including the wire 6 and the guide roller 7 for guiding the wire 6 are not installed.

한편, 건축물의 시공이 진행되어 본 발명 안전펜스(F)를 상향이동 시켜야 할 경우에는 우선, 슬라브(S)의 내측 필요위치에 동력원(5)을 설치하게 된다.On the other hand, when the construction of the building is in progress to move the safety fence (F) of the present invention, first, the power source 5 is installed in the required position inside the slab (S).

상기 동력원(5)의 설치는 슬라브(S)에 앵커볼트를 설치하여 체결 고정시키게 된다.The installation of the power source 5 is fixed to the anchor by installing an anchor bolt on the slab (S).

이러한 상태에서 작업자는 동력원(5)으로부터 인축시킨 와이어(6)의 끝단을 안내레일(3)에 구비된 아일릿(32)에 걸어주게되며, 상기 와이어(6)의 원활한 안내를 위해 도 5A에서와 같이 안내수단(4)의 일측에 가이드롤러(7)를 고정설치하게되며, 그 설치방식은 동력원(5)과 동일하다.In this state, the worker hangs the end of the wire 6 condensed from the power source 5 to the eyelet 32 provided in the guide rail 3, as shown in FIG. 5A for smooth guidance of the wire 6. As described above, the guide roller 7 is fixedly installed at one side of the guide means 4, and the installation method is the same as that of the power source 5.

이후, 동력원(5)을 기동시켜 와이어(6)를 권취시키면, 와이어(6)의 끝단은 상향이동하게되며, 이에 따라 안내레일(3)은 안내수단(4)의 안내롤러(47)를 따라 상향 이동하게 된다.Thereafter, when the power source 5 is started to wind the wire 6, the end of the wire 6 is moved upward, and thus the guide rail 3 follows the guide roller 47 of the guide means 4. Will move upward.

이 경우에 안내레일(3)과 지지틀(46)에 관통 설치된 고정축(48)을 분리시켜야 함은 물론이다.In this case, it is a matter of course to separate the fixed shaft 48 installed through the guide rail 3 and the support frame 46.

상기한 안내레일(3)의 상승시에 그 걸림훅(31)은 안내수단(4)의 고정링(44)으로부터 분리되며, 상승이 진행되어 안내레일(3)이 필요높이만큼 상승한 상태에서는 안내레일(3)을 위치고정시켜야 하는데, 이를 위해 안내레일(3)의 걸림훅(31)이 도 5B에서와 같이 안내수단(4)의 고정링(44)을 밀고 그 상부에 위치한 상태에서 동력원(5)의 기동을 정지시키게 된다.When the guide rail 3 is raised, the hook 31 is separated from the fixing ring 44 of the guide means 4, and in the state where the guide rail 3 is raised by the required height, the guide rail is raised. (3) must be fixed, and for this purpose, the engaging hook 31 of the guide rail 3 pushes the fixing ring 44 of the guide means 4 as shown in FIG. ) Will be stopped.

이때, 걸림훅(31)이 고정링(44)을 밀고 그 상부에 위치할 수 있는 것은 안내박스(43)에 고정링(44)을 힌지고정시킴으로써 가능하게 되며, 걸림훅(31)에 의해 상향 회동된 고정링(44)은 걸림훅(31)이 통과(상승)하고 난 후 자중에 의해 원위치 복귀되어 지지핀(45)에 의해 더 이상의 하강회동이 방지된 걸림대기상태로 유지된다.At this time, the locking hook 31 can push the fixing ring 44 and be located at the upper part thereof by enabling the fixing ring 44 to be hinged to the guide box 43 and upwardly by the locking hook 31. The fixed ring 44 rotated is returned to its original position by its own weight after the locking hook 31 passes (rising), and is maintained in the holding standby state in which further downward rotation is prevented by the support pin 45.

따라서 작업자는 동력원(5)을 역회전시켜 와이어(6)를 풀어줌으로써 안내레일(3)의 걸림훅(31)이 안내수단(4)의 고정링(44)에 걸림 고정되도록 하고, 지지틀(46)과 안내레일(3) 사이에 고정축(48)을 끼워줌으로써 안전펜스(F)의 승강이동을 완료하게 된다.Therefore, the operator reverses the power source 5 to release the wire 6 so that the hook 31 of the guide rail 3 is fixed to the fixing ring 44 of the guide means 4, and the support frame ( The fitting movement of the safety fence F is completed by fitting the fixed shaft 48 between the 46 and the guide rail 3.

여기에서, 상기 안내레일(3)은 조립된 펜스프레임(2)의 양측에 통상 2개로구성되므로 가이드롤러(7)도 안내레일(3)의 갯수에 맞추어 구성함이 바람직하며, 동력원(5)의 경우에는 하나로 구성하거나 필요에 따라 복수개로 구성할 수 있음은 물론이다.Here, the guide rail (3) is usually composed of two on both sides of the assembled fence frame (2), the guide roller 7 is also preferably configured to match the number of the guide rail (3), the power source (5) In the case of course, it can be configured as one or a plurality of if necessary.

다만, 하나의 동력원(5)을 사용한 경우 두개 이상의 와이어(6)를 합쳐서 권취시켜야 하므로 동력원(5)의 구성이 복잡해질 수 있음을 감안하여야 하며, 두개의 동력원(5)을 사용할 경우에는 이들을 전기, 회로적으로 연결하여 동시에 기동 또는 정지하도록 구성함으로써 안전펜스(F)의 승강시 언밸런스로 인한 작동불량 및 고장발생을 방지함이 바람직하다.However, when one power source 5 is used, two or more wires 6 must be wound together to take up the configuration of the power source 5, which may be complicated, and when two power sources 5 are used, In addition, it is preferable to prevent the malfunction and failure caused by unbalance during the lifting and lowering of the safety fence (F) by configuring the circuit connection to start or stop at the same time.

이상의 설명에서와 같이 본 발명은 펜스프레임(2)에 안내레일(3)이 고정설치되어 그 전체가 하나 이상의 동력원(5)에 의해 승강하게 되므로 전체적인 구성의 단순, 최소화와 함께 원가절감을 적극적으로 구현할 수 있고, 가이드롤러(7)와 동력원(5)을 극히 용이하게 분해조립할 수 있으므로 작업성 향상과 공기단축을 도모할 수 있는 등의 효과가 있다.As described above, in the present invention, since the guide rail 3 is fixedly installed on the fence frame 2 and the whole thereof is elevated by one or more power sources 5, the overall structure is actively reduced in cost with simplicity and minimization. It can be implemented, and since the guide roller 7 and the power source 5 can be easily disassembled and assembled, there is an effect such as to improve workability and shorten the air.

Claims (2)

상단외측에 낙하방지망을 선택적으로 구비한 펜스프레임과,Fence frame equipped with a drop prevention net on the outside of the top, 상기 펜스프레임의 내면양측에 수직으로 고정설치되고 그 내측에는 건축물의 슬라브 간격에 맞추어 걸림훅을 구비한 안내레일과,A guide rail fixedly installed at both sides of the inner side of the fence frame and provided with a locking hook in accordance with the slab spacing of the building; 상기 안내레일을 위치고정 또는 승강이동을 안내하기 위해 슬라브의 선단에 착탈가능하게 고정설치되는 안내수단과,Guide means detachably fixed to the front end of the slab for guiding the fixed position or the lifting movement of the guide rail; 상기 안내레일을 승강이동 시키도록 슬라브의 내측에 착탈가능하게 고정설치되는 하나 이상의 동력원과,At least one power source detachably fixed to the inside of the slab to move the guide rail up and down; 상기 슬라브의 선단에 착탈가능하게 고정 설치되어 안내레일과 동력원 사이에 연결된 와이어를 안내하는 가이드롤러로 구성된 것을 특징으로 하는 건축공사용 안전펜스,Construction fence safety fence, characterized in that consisting of a guide roller that is detachably fixed to the front end of the slab to guide the wire connected between the guide rail and the power source, 제 1 항에 있어서,The method of claim 1, 상기 안내수단이, 슬라브에 앵커볼트로 체결되는 체결부를 구비한 안내박스와, 안내레일의 고정훅이 걸림 고정되도록 안내박스내에 힌지고정설치된 고정링과, 상기 고정링의 하향회동을 제한하여 수평을 유지하도록 안내박스에 관통 설치된 지지핀과, 상기 안내박스의 외면전방에 고정 설치된 지지틀과, 상기 지지틀 내에 축설치되어 아내레일의 양단을 안내 지지하는 안내롤로 구성된 것을 특징으로 하는 건축공사용 안전펜스.The guide means, a guide box having a fastening portion fastened to the slab by the anchor bolt, a fixing ring hinged and fixed in the guide box so that the fixing hook of the guide rail is locked, and horizontally limited by limiting the downward rotation of the fixing ring Safety fence for construction workers comprising a support pin installed through the guide box to maintain, a support frame fixed to the front of the outer surface of the guide box, the guide roll is installed in the support frame to guide both ends of the wife rail .
KR1020000032159A 2000-06-12 2000-06-12 Self climbing net KR20010111537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000032159A KR20010111537A (en) 2000-06-12 2000-06-12 Self climbing net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000032159A KR20010111537A (en) 2000-06-12 2000-06-12 Self climbing net

Publications (1)

Publication Number Publication Date
KR20010111537A true KR20010111537A (en) 2001-12-19

Family

ID=45931550

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000032159A KR20010111537A (en) 2000-06-12 2000-06-12 Self climbing net

Country Status (1)

Country Link
KR (1) KR20010111537A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100707545B1 (en) * 2005-06-29 2007-04-13 페리 게엠베하 Moveable support for a climbing bracket of a climbing form
KR100967177B1 (en) * 2008-03-17 2010-07-27 (주)재경건설 The safety fence for construction work
KR101051819B1 (en) * 2008-10-28 2011-07-25 (주)재경건설 Removable temporary fence
WO2017188886A1 (en) 2016-04-28 2017-11-02 Brunekberg Systems Ab Movable weather protection arrangement for a building
CN108612328A (en) * 2018-05-11 2018-10-02 中建钢构江苏有限公司 Single layer adhesion type chooses protective device and its construction method outside can climbing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310438A (en) * 1994-05-18 1995-11-28 Nippon Kasetsu Kk Curing frame unit
KR19980033583A (en) * 1997-11-27 1998-07-25 노희상 Safety fence for building construction
KR20010055450A (en) * 1999-12-10 2001-07-04 박윤업 Anti dust apparatus for construction works
KR20010094164A (en) * 2000-04-04 2001-10-31 춘 수 오 Dust protector for construction works

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310438A (en) * 1994-05-18 1995-11-28 Nippon Kasetsu Kk Curing frame unit
KR19980033583A (en) * 1997-11-27 1998-07-25 노희상 Safety fence for building construction
KR20010055450A (en) * 1999-12-10 2001-07-04 박윤업 Anti dust apparatus for construction works
KR20010094164A (en) * 2000-04-04 2001-10-31 춘 수 오 Dust protector for construction works

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100707545B1 (en) * 2005-06-29 2007-04-13 페리 게엠베하 Moveable support for a climbing bracket of a climbing form
KR100967177B1 (en) * 2008-03-17 2010-07-27 (주)재경건설 The safety fence for construction work
KR101051819B1 (en) * 2008-10-28 2011-07-25 (주)재경건설 Removable temporary fence
WO2017188886A1 (en) 2016-04-28 2017-11-02 Brunekberg Systems Ab Movable weather protection arrangement for a building
EP3475502A4 (en) * 2016-04-28 2020-03-18 Brunkeberg Systems AB Movable weather protection arrangement for a building
CN108612328A (en) * 2018-05-11 2018-10-02 中建钢构江苏有限公司 Single layer adhesion type chooses protective device and its construction method outside can climbing

Similar Documents

Publication Publication Date Title
US4231148A (en) Elevator erection method
EP2394006B1 (en) Construction system and method for multi-floor buildings
JPH04505040A (en) building construction system
KR102466049B1 (en) Gondola for tower maintenance work
KR20010111537A (en) Self climbing net
KR102599944B1 (en) Overhead moving type gondola apparatus
KR200430674Y1 (en) High place working gondola in building
KR100583785B1 (en) Construction-material lift being installed at the outside of the construction-structure
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
JP2002339570A (en) Method for constructing building and building
KR200445362Y1 (en) Lower support of the safety netting device
KR102655505B1 (en) Extendable and variable gondola
KR102629570B1 (en) Elevator for vertical slip form construction and vertical construction device combined with the elevator
JP3920527B2 (en) Elevator for construction
KR200445361Y1 (en) Lower support of the safety netting device
KR102454050B1 (en) Building material transport device
KR200444755Y1 (en) Upper supporter of safety net
KR102376067B1 (en) Safety cage and construction method for the core
KR200495147Y1 (en) A prefabricated high-place workable
CN210857952U (en) Novel attached lifting scaffold
KR200267717Y1 (en) Lifter for construction of a pier
KR200444758Y1 (en) Upper supporter of safety net
KR100442082B1 (en) Stepped light tower
KR100508125B1 (en) A safety way equipment for a tower crane and installing methods thereof
KR101031313B1 (en) The construction workbench for an elevator infrastructure establishment

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E601 Decision to refuse application