|
CN109826081A
(zh)
|
|
一种隧道内大型溶洞、暗河拱跨结构及施工方法
|
|
PL108210B1
(pl)
|
|
Obudowa kroczaca do zastosowania w grubych pokladamobile lining for use in thick coal beds ch wegla
|
|
PL66051B1
(enExample)
|
|
|
|
PL149218B1
(en)
|
|
Method of filling mined-out longwall workings and filling stopping therefor
|
|
RU65062U1
(ru)
|
|
Грунтовая плотина
|
|
ES391873A1
(es)
|
|
Procedimiento y unidad constructiva para la entibacion de tuneles y galerias.
|
|
RU1795109C
(ru)
|
|
Подвижно-ограждающа крепь
|
|
CN209687510U
(zh)
|
|
充填采矿接顶回填支撑装置
|
|
PL145796B1
(en)
|
|
Method of filling cavities left afetr mining out thick ore strata deposited beneath strong roof rocks
|
|
Matchett, JM* & Pringle
|
|
Excavation through saturated decomposed granite by multiple headings with vacuum drainage |
|
SU403860A1
(ru)
|
|
Железобетонный анкер
|
|
PL62666B1
(enExample)
|
|
|
|
US3646769A
(en)
|
|
Mine roof support
|
|
PL126301B1
(en)
|
|
Hydraulic roof support unit with displaceable filling dam
|
|
PL54781B1
(enExample)
|
|
|
|
Moiseev
|
|
Earth and Rock-fill Dams: Basis of Their Design and Construction |
|
Bayly
|
|
Feeding Wellington's taps |
|
SU918200A1
(ru)
|
|
Концева станци скребкового конвейера
|
|
PL44820B1
(enExample)
|
|
|
|
PL158723B1
(pl)
|
|
Sposób i zestaw hydraulicznej obudowy górniczej do przestawiania tamy podsadzkowej PL
|
|
DE1262947B
(de)
|
|
Verfahren zum Verfuellen eines stillgelegten Schachtes
|
|
PL149535B1
(pl)
|
|
Segmentowa powtarzalna tama podsadzkowa, zwłaszcza dla wyrobisk o dużych wysokościach
|
|
Matchett et al.
|
|
Excavation through saturated decomposed granite by multiple headings with vacuum drainage |
|
PL126695B2
(en)
|
|
Loading chamber disposed above an output surge bin
|
|
Xiang et al.
|
|
Sliding stability of foundation rock with shear zones |