PL155017B1 - Method of making vertical connection of a vertical shaft with horizontal or slanted headings - Google Patents
Method of making vertical connection of a vertical shaft with horizontal or slanted headingsInfo
- Publication number
- PL155017B1 PL155017B1 PL26542687A PL26542687A PL155017B1 PL 155017 B1 PL155017 B1 PL 155017B1 PL 26542687 A PL26542687 A PL 26542687A PL 26542687 A PL26542687 A PL 26542687A PL 155017 B1 PL155017 B1 PL 155017B1
- Authority
- PL
- Poland
- Prior art keywords
- shaft
- horizontal
- making
- headings
- slanted
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title description 2
- 238000009412 basement excavation Methods 0.000 claims description 8
- 230000003245 working effect Effects 0.000 claims description 6
- 238000000034 method Methods 0.000 claims description 5
- 238000005065 mining Methods 0.000 claims description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 102200124760 rs587777729 Human genes 0.000 description 3
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 238000005272 metallurgy Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Description
RZECZPOSPOLITA OPIS PATENTOWY 155 017RZECZPOSPOLITA PATENT DESCRIPTION 155 017
POLSKAPOLAND
Patent dodatkowy do patentu nr ———Additional patent to patent no. ———
Zgłoszono: 87 04 28 (P. 265426)Reported: 87 04 28 (P. 265426)
Pierwszzństww--·—Priority - · -
Int. Cl.5 E21D 1/00 E21D 9/00 E21D 13/00Int. Cl. 5 E21D 1/00 E21D 9/00 E21D 13/00
URZĄDOFFICE
PATENTOWYPATENT
RPRP
Zgłoszenie ogłoszono: 88 06 09Application announced: 88 06 09
Opis patentowy opublikowano: 1992 04 30 tnuuwPatent description published: 1992 04 30 years
Twórca wynalazku: Zdzisław GromadaInventor of the invention: Zdzisław Gromada
Uprawniony z patentu: Kombinat Górniczo-Hutniczy Miedzi,The holder of the patent: Copper Mining and Metallurgy Combine,
Zakłady Badawcze i Projektowe Miedzi „CUPRUM, Wrocław (Polska)Copper Research and Design Plant "CUPRUM, Wrocław (Poland)
Sposób wykonywania połączenia pionowego szybu górniczego z wyrobiskiem poziomym lub pochyłymMethod of making a vertical connection of a mining shaft with a horizontal or inclined excavation
Wynalazek dotyczy sposobu wykonywania połączenia pionowego szybu górniczego z wyrobiskiem poziomym lub pochyłym.The invention relates to a method for making a vertical connection of a mine shaft with a horizontal or inclined excavation.
Znanym sposobem wykonywania połączenia szybu z wyrobiskiem poziomym lub pochyłym jest wykonywanie wlotów do szybu z takiego wyrobiska z samego szybu, po zatrzymaniu robót związanych z jego głębieniem. Niedogodnością takiego postępowania jest konieczność wstrzymania prac wykonywania właściwej rury szybowej a przez to wydłużenie czasu budowy szybu o czas wykonywania wlotów. Inną niedogodnością jest okoliczność, że wloty, ze zrozumiałych względów organizacyjnych są wykonywane przez wyspecjalizowane brygady szybowe. Wykonywanie wlotów wymaga od nich istotnej zmiany specjalizacji i organizacji robót.A known method of connecting a shaft with a horizontal or inclined excavation is to make the inlets to the shaft from such excavation from the shaft itself, after stopping the works related to its sinking. An inconvenience of this procedure is the necessity to suspend the construction of the proper shaft pipe, and thus extending the construction time of the shaft by the time of inlets. Another disadvantage is the fact that for understandable organizational reasons, the inlets are made by specialized shaft brigades. Making inlets requires them to significantly change their specialization and organization of works.
Innym sposobem wykonywania wlotów do szybu jest wykonywanie ich z zewnątrz szybu, to jest od strony istniejących wyrobisk. Niedogodnością z kolei takiego postępowania jest konieczność zatrzymania pracy w szybie na czas wykonywania odpowiednich zabezpieczeń, to jest specjalnych pomostów i przepierzeń, ograniczenie pracy w szybie podczas złożonej operacji przebijania obudowy szybowej na przykład betonowej, wreszcie ograniczenie lub zatrzymanie pracy w szybie podczas demontażu urządzeń związanych z wykonywaniem wlotu, jak wspomniane wyżej pomosty itp.Another way of making inlets to the shaft is from outside the shaft, i.e. from the side of the existing workings. The inconvenience of such a procedure is the necessity to stop the work in the shaft for the duration of appropriate security measures, i.e. special platforms and partitions, to limit the work in the shaft during the complex operation of piercing the shaft, e.g. concrete housing, and finally to limit or stop the operation in the shaft during the disassembly of devices related to making the inlet, such as the above-mentioned platforms, etc.
Celem wynalazku jest usunięcie lub co najmniej ograniczenie tych niedogodności. Uzyskano to rozwiązaniem według wynalazku, dotyczącego wykonywania połączenia wyrobisk z szybem, które jest realizowane z zewnątrz szybu od strony tych wyrobisk.The present invention aims to remove or at least reduce these disadvantages. This was achieved with the solution according to the invention concerning the connection of the workings with the shaft, which is carried out from the outside of the shaft from the side of these workings.
Zgodnie z wyrobiskiem na odcinku odpowiednio dłuższym od przewidzianej wysokości podszybia wykonuje się szyb w tubingowej obudowie i pod jej osłoną wykonuje się wyłom między istniejącymi wyrobiskami a tubingową obudową oraz obudowuje się podszybie i piwnice po czym wymontowuje się tubingi z szybu w obszarze światła wlotów do szybu.According to the excavation, a shaft is made in the tubing casing on a section that is suitably longer than the planned height of the shaft, and under its cover, a break is made between the existing excavations and the tubing casing, and the shaft and cellars are encased, and the tubings are removed from the shaft in the area of the shaft inlets.
Istota wynalazku jest zilustrowana załączonym rysunkiem, na którym fig. 1 przedstawia przekrój szybu z obudową betonową na odcinku projektowanego połączenia, fig. 2 — stan szybu,The essence of the invention is illustrated by the attached drawing, in which Fig. 1 shows a section of the shaft with a concrete casing along the section of the designed connection, Fig. 2 - the condition of the shaft,
155 017 po wykonaniu podszybia w obudowie betonowej, a fig. 3 — stan szybu i podszybia po zdemontowaniu tubingów ze światła wlotów do szybu.155 017 after making the shaft in the concrete casing, and Fig. 3 - the condition of the shaft and shaft after removing the tubings from the lumen of the shaft inlets.
Zgodnie z wynalazkiem szyb 1 w betonowej obudowie 6 na odcinku odpowiednio dłuższym od zaprojektowanej wysokości podszybia 3 zabezpieczono tubingową obudową 2. Następnie od strony istniejących wyrobisk (nie pokazanych na rysunku) wykonuje się wyłom przyszłego podszybia 3 i jego piwnice 5 oraz ich betonową obudowę 4. Tubingową obudowa 2 stanowi w tej fazie robót osłonę szybu 1.According to the invention, the shaft 1 in the concrete casing 6 is secured with a tubular casing 2 in a section correspondingly longer than the designed height of the pit 3. Then, from the side of the existing workings (not shown in the drawing), the future pit 3 and its cellars 5 and their concrete casing 4 are broken out. At this stage, the tubing lining 2 is the cover of shaft 1.
Po wykonaniu prac związanych z budową podszybia 3 demontuje się tubingi z szybu 1 w obszarze światła wlotów do niego.After completion of the works related to the construction of pit 3, the tubings from shaft 1 in the area of the lumen of its inlets are disassembled.
Rozwiązanie według wynalazku umożliwia głębienie szybu 1 z przerwą tylko na czas wymontowywania tubingów ze światła wlotów do szybu 1. Ponadto pozostawiona częściowo w obszarze podszybia 3 tubingową obudowa 2 stanowi dodatkowe wzmocnienie wykonanego połączenia szybu 1 z wyrobiskami.The solution according to the invention makes it possible to sink the shaft 1 with a break only for the time of removing the tubings from the lumen of the inlets to the shaft 1. Moreover, the tubing 2, partially left in the area of the pit 3, provides additional reinforcement of the connection of the shaft 1 with the workings.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL26542687A PL155017B1 (en) | 1987-04-28 | 1987-04-28 | Method of making vertical connection of a vertical shaft with horizontal or slanted headings |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL26542687A PL155017B1 (en) | 1987-04-28 | 1987-04-28 | Method of making vertical connection of a vertical shaft with horizontal or slanted headings |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| PL265426A1 PL265426A1 (en) | 1988-06-09 |
| PL155017B1 true PL155017B1 (en) | 1991-10-31 |
Family
ID=20036113
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL26542687A PL155017B1 (en) | 1987-04-28 | 1987-04-28 | Method of making vertical connection of a vertical shaft with horizontal or slanted headings |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL155017B1 (en) |
-
1987
- 1987-04-28 PL PL26542687A patent/PL155017B1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| PL265426A1 (en) | 1988-06-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1982649A (en) | Mining method | |
| SU1481402A1 (en) | Method of winning coal at stepped-roof face | |
| SU1343017A1 (en) | Method of working mineral deposits and mobile forms section for performing same | |
| RU1789445C (en) | Method for constructing underground cavities | |
| RU1810549C (en) | Method for hole hydraulic mining of minerals from deeply seated deposits | |
| RU2069756C1 (en) | Method for mining of inclined ore bodies | |
| PL78760B2 (en) | ||
| SU907271A1 (en) | Method of degassing mine fields | |
| Brino et al. | Technical-economical comparison between excavation by D&B and by roadheader in two underground gypsum quarries | |
| SU905470A1 (en) | Method of working thick gently sloping mineral deposits | |
| RU2182227C2 (en) | Method of borehole mining of thick underground | |
| SU815123A1 (en) | Method of driving a vertical working | |
| SU989069A1 (en) | Method of preparing thick seam to excavation | |
| RU35655U1 (en) | Excavation pole | |
| PL185616B1 (en) | Method of supporting a roof of longwall splitting working | |
| PL137053B1 (en) | Method of preparing a longwall-type working for putting it out of exploitation | |
| SU1032187A1 (en) | Method of working neighrour coal seams | |
| PL118532B1 (en) | Method of exploiting steep deposit of minerals in particular of bariteazom baritovykh mestorozhdenijj | |
| RO112205B1 (en) | Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces | |
| PL155022B1 (en) | The method of exploitation with the chamber system of thick deposits, especially of chemical raw materials | |
| PL155020B1 (en) | Method for complete gold removal in sediment field | |
| PL156544B1 (en) | The method of exploitation of sulfur deposits by underground smelting, especially of low porosity deposits | |
| PL84169B1 (en) | ||
| PL78635B2 (en) | ||
| PL159795B1 (en) | Method of making yieldable safety pillars under circumstances of crump hazard |