PL159795B1 - Method of making yieldable safety pillars under circumstances of crump hazard - Google Patents

Method of making yieldable safety pillars under circumstances of crump hazard

Info

Publication number
PL159795B1
PL159795B1 PL27914589A PL27914589A PL159795B1 PL 159795 B1 PL159795 B1 PL 159795B1 PL 27914589 A PL27914589 A PL 27914589A PL 27914589 A PL27914589 A PL 27914589A PL 159795 B1 PL159795 B1 PL 159795B1
Authority
PL
Poland
Prior art keywords
block
blocks
rock
adjacent
bump
Prior art date
Application number
PL27914589A
Other languages
Polish (pl)
Other versions
PL279145A1 (en
Inventor
Wiktor Bladek
Zdzislaw Cieslik
Henryk Cieszkowski
Stanislaw Krajewski
Jerzy Mazur
Stanislaw Siewierski
Adam Switon
Andrzej Wais
Stanislaw Wislowski
Michal Sonneberg
Original Assignee
Gorniczo Hutniczy Miedzi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gorniczo Hutniczy Miedzi filed Critical Gorniczo Hutniczy Miedzi
Priority to PL27914589A priority Critical patent/PL159795B1/en
Publication of PL279145A1 publication Critical patent/PL279145A1/en
Publication of PL159795B1 publication Critical patent/PL159795B1/en

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

A method for obtaining flexibility of support pillars in bump hazard conditions, involving their being split using excavation headings into pillars, characterized in that flexibilityis obtained in separated blocks with uniform rock bump susceptibility and uniform seismicity of adjacent areas of abandoned workings, starting preferably with blocks where the hazard is greatest and proceeding successively to blocks with low bump hazard, by leading a flexibility split from the border line between the blocks to a distance of 150 to 200 m if the bump energetic index for the rock constituting a block Wet > 5 and seismicity of the abandoned headings adjacent to the block As > 10<6> J/ha, 200 to 350 m if the bump energetic index for the rock constituting a block 3 < Wet =< 5 and seismicity of the abandoned headings adjacent to the block As = 10<5> - 10<6> J/ha, and up to 800 m if the bump energetic index for the rock constituting a block Wet =< 3 and seismicity of the abandoned headings adjacent to the block As < 10<5> J/ha, while on the border of the blocks reverse split working to obtain flexibility is conducted, to a distance of up to 80 m from the border line between the blocks.<IMAGE>

Description

Przedmiotem wynalazku jest sposób upoda Wiania fUr^w oporowych w warunkach zagrożenia tąpaniami. Znany sposób upodatnianit fUr^w oporowych w warunkach zagrożenia tąpaniami przedstawiony w polskim opisie patentowym P-259 907 polega na rozcinaniu calizny fUmów oporowych na fHary o wymiarach zabezpieczających ich pracę w fazie w^^r^ym^oścl pozniszczenloweJ prowadząc roboty upodabniające na całą długość filara oporowego od bezpiecznej calizny. Wadą takiego sposobu prowadzenia robót upodatnla.ących w filarze oporowym Jest to, że roboty takie trwają długo prowadząc do osłabienia stropu, zruszenia ociosów 1 wpiętrzanla spągu, co znacznie zwiększa zagrożenie zawałowe i może doprowaddlć do nie wybrania zawalonych parceli filara oporowego. Prowadzenie tym sposobem robót upodabniających w ostatniej fazie przy dochodzeniu do tej części filera oporowego, który Jest otoczony trójetronnle zrobami /najbardziej zagrożony rejon ze względu na tąpani! może spowodować tąpnięcie nieupodatnioneJ części filera oporowego, która spełnia rolę niewybranej i nieupodatntonej resztki złoża znajdującej się w otoczeniu zrobów.The subject of the invention is a method of dropping fire in resistance under conditions of a rock burst hazard. The known method of making the fUr ^ in resistance in conditions of a risk of rock bursts presented in the Polish patent description P-259 907 consists in cutting the entire body of the resistance fUr into fHars with dimensions securing their operation in the post-destruction phase by carrying out simulating works along the entire length a thrust pillar from a safe body The disadvantage of such a way of carrying out the work of the pillar is that such works take a long time, leading to the weakening of the ceiling, disturbance of the sides and the floor of the floor, which significantly increases the risk of a collapse and may lead to failure to select the collapsed plots of the supporting pillar. Conducting similar works in the last phase when reaching the part of the thrust pillar, which is surrounded by goaf three-way / the most endangered area due to rock bursts! may cause the unfusible part of the thrust filler to crack, which acts as the unselected and unfused bed residue in the vicinity of the goaf.

Wady przedstawionego wyżej sposobu upodatniania filerów oporowych usuwa sposób według wynalazku. Istota wynalazku polega na tym, że upodatniroie prowadzi eię w wydzielonych blokach charakteryzujących się jednakową skłonnością skał do tąpań i jednakową aktywnością sejsmiczną przyległych rejonów The wraps p rzedstawionego mentioned method upodatniania filerów O p p p is removed orowych of the invention. Summary of the Invention p olega that upodatniroie p rowadzi EIE in separate blocks, characterized by the same tendency of rock d bumps and uniform seismic p y y ległych regions

159 795 zrobów, poczynając korzystnie od bloków o największym zagrożeniu i przechodząc kolejno do bloków o miiejszym zagrożeniu tąpaniami prowadząc rozcinkę upodatnhjącą od linii granicznej ^między blokami na odległość, która wynosi 150 do 200 m dla wskaźnika energetycznego tąpliwości skał złożowych w bloku W .> 5 i aMywności sejsmicznej przyległych do bloku rejonów zrobów Afl > 10 J/ha, 200 do 350 m <ila wskaźnika energetycznego tąpliwości skał złożowych w Moku 3 ^*5 i aktywności sejsmicznej przyległych do bloku rejonów zrobów kg = 10^ - 10θ J/ha i do 800 m dla wskaźnika ejnergetycznego tąpliwom skał złożowych w Moku We^^3 i aktywności sejsmicznej przyległych do Moku rejonów zrobów Αθ CIO^ J/ha przy czym na granicy bloków wykonuje się wstecznie rozcinkowe roboty upodatniające na odległość do 80 m od linii granicznej pomiędzy blokami.159 795 goaf, starting preferably from the blocks with the highest risk and passing successively D blocks miiejszym danger of rock burst leading rozcinkę upodatnhjącą from the line g ranicznej ^ between the blocks at a distance, which is 150 to 200 m for the indicator energy tąpliwości rock deposit in the block. > 5 and aMywności seismic p y y ległych block regions gobs a fl> 10 J / ha 20 0 d of 350 m <ila ratio of the energy tąpliwo TARGET rock deposit in Moku 3 R * 5 and seismic activity adjacent to the block areas of gobs k = g ^ 10 - 10θ J / ha to 800 m for the Shutdown ejnergetycznego tąpliwom reservoir rocks in Moku W e ^^ 3 and seismic areas adjacent to Moku gobs Αθ CIO ^ J / ha at the block boundary is performed retrospectively rozcinkowe ro b gold upodatniające a distance of 80 m from the line g ranicznej between blocks.

Przedmiot wyna lazku jeat opisany w przykładzle wykonania robót uzdatniających w fibrze oporowym oraz pokazany na rysunltu, Móry przedstawia rzut z góry na upodatniany filar oporowy.Wyn object lazku jeat described in Getting canine d bad embodiment rob yellow background in the water treatment plant and p fibrze resistance produced at rysunltu, Mory shows a Ory g for upodatniany pillar of p orowy.

W filarze oporowym 1 wydzielono blok 2,w Mórym istnieje największe zagrożenie tąpaniami gdyż W. = 6 i aktwnoaó sejsmiczna przy ległych reβ u *7 jonów zrobów wynosi A_ = 10 J/ha, Mok 3,w Mórym zagrożenie tąpa9 niemi jest Jednie, gdyż I . = 4 i aMywność sejsmiczna przyległych rejonów zrobów Afl = 10J J/ha i blok 4, w Mórym zagrożenie tąpaniami Jest małe gdyż W_. * 2,5 i aktywność sejsmiczna przyległych rejonów zrobów Αθ = 104 J/ha. Prowadzenie robót upodatniających rozpoczyna się w Moku 2 wykonując jednoczenie wstecznie ronty upodatniające w Moku 3 na odległość 70 m od granicy między Mokami 2 i 3. Roboty upodatniające w Moku 2 oraz wstecznie wytonywane w bloku 3 polegają na wydzieleniu przy pomocy wyrobisk chodnikowych /pasy i komsi^/1 filarów międzykomorowych o wymiarach ustalanycn indywidualnie dla Mżdego bloku w zależności od budowy i wytrzyrołosci skał złożowych i otaczających złoże, obserwacji wizualnych zachowania się skał otaczaj ących wykonane w bloku wyrotjiska 5 oraz od wielkości osiadania skał stropowych, wypiętrzania skał spągowych i poziomego odkształcania się filrrów 6 wydzielonych wyroMskami 5 w Merunku wyrobisk 5 tak, aby wydzielane upodatnia jąco fitory międzykomorowe ulegały odkształceniom tir/ałym przy zachowaniu ich podporności niedopuszczającej do nadmiernego uginania się skał stropowych powodującego powstawanie zawałów stropu ani nadmiernego wypiętrzania spągu. In one abutment pillar isolated block 2, there is the greatest for Mórym g Ro of up rock burst g d Y of W = 6 and aktwnoaó seismic p y y ległych reβ u * 7 goaf ions is A_ = 10 J / ha, Mok 3 in Mórym risk tąpa9 therewith is the One g dyz I. = 4, and aMywność seismic p y y ległych regions goaf fl = A 1 0 JJ / ha and block 4 in a Mórym g Ro of up rock burst is low g f d y W_. And 2.5 * Getting activity seismic areas ległych goaf Αθ = 10 4 J / ha. Conducting bot ro upodatniających begins Moku 2 simultaneously performing backward ronty upodatniające in Moku 3 7 0 at a distance m from the edge me e Mokami between 2 and 3 works in upodatniające Moku 2 and the back-wytonywane block 3 p olegają to separation by means of the excavation drift / straps and komsi ^ / 1 pillars I Ed zykomorow y ch measuring ustalanycn indium y ally for Mżdego block depending on db u d o y and wytrzyrołosci rock reservoir and surrounding the deposit, visual observations of the behavior of rocks surrounding is learned made in block wyrotjiska 5 and the size TARGET settling caprock y c h uplift rocks are p-reacted y ch and horizontal deformation filrrów 6 separate wyroMskami 5 in Merunku pits 5 so as to radiate upodatnia ciently fitory interventricular undergo deformation tir / ałym while maintaining their podporności preventing excessive bending of the roof rocks, causing the formation of roof collapses or excessive uplift of the floor.

Po zaMóczeniu robót upodatniających w Moku 2 oraz wstecznie wykonywanych robót upodatniających w Ijloku 3 przyatępuje aię do Mntynuowania jednoczenie w Moku 3 i w tiloku 4 robM upodatniającyrt, Móre w bloku 3 prowadzi się od linii granicznej między Mokami 2 i 3 na odległość 300 m, która odpowiada długości tiloku 3. natomiast w boku 4 prowadzi się roboty upodatniające na odległość rt 5°0 m od linii granicznej między blokami 2 i 4After immersion ro Bot upodatniających in Moku 2 and the back-EXEC y wan y ch rob ot upodatniających in Ijloku 3 Getting atępuje aie to Mntynuowania yet in Moku 3 and tiloku 4 robM upodatniającyrt, More in block 3 is carried out from the border line between Mokami 2 and 3 at a distance of 300 m, which corresponds to the length of the third of tiloku while the leg 4 is carried out works at a distance rt upodatniające 5 ° 0 m from the border line between blocks me e 2 and 4

Mzedstawiony w przykładzie wykonania sposób prowadzenia rot uzdatniających umożliwia szyMie ich przeprowadzenie z likwidacją najbardziej zagrożonych rejonów filara oporowego w kolejnoni od rejonów najbardziej za~ grożonych do rejonów o rniiejszyrn zagrożniu umożLiwiając prowadzenie w nastopnej kolejności rortt eksploatacyjnych w fitorze w warunkach bezpiecznych wobec za^orenia tąpaniami.Mzedstawiony in Getting puts the method conducting ro background processing plants allows szyMie them carried out with the liquidation of the most vulnerable areas of the pillar abutment in kolejnoni of areas most of a ~ grożonych to areas of rniiejszyrn zagrożniu allowing the lead nastopnej sequence TARGET rortt operating in fitorze conditions clearance y ^ ch to a orenia rock burst.

159 795159 795

Zakład Wydawnictw UP RP. Nakład 90 egz. Cena 10 000 złDepartment of Publishing of the UP RP. Circulation of 90 copies. Price: PLN 10,000

Claims (1)

Zastrzeżenia patentowePatent claims Sposób upodatniania filarów oporowych w warunkach zagrożenia tąpaniami, polegający na ich rozcinaniu wyrobiskami chodnikowymi na filary, znamienny tym, że upodatnienie prowadzi się w wydzielonych blokach charakteryzujących się Jednakową skłonnością skal do tąpieć i jednakową aktywnością sejsmiczną przyległych rejonów zrobów,poczyna jąc korzystnie od bloków o największym zagrożeniu i przechodząc kolejno do bloków o najmniejszym zagrożeniu tąpaniami, prowadząc rozclnkę upodeaniającą od linii granicznej pomiędzy blokami na odległość, która wynosi 150 do 200 m, dla wskaźnika energetycznego tąpliwości skał złożonych w bloku Wet > 5 i aktywności sejsmicznej przyległych do bloku rejonów zrobów A0 >10°J/ha,The method of pitting retaining pillars in the event of a rock burst hazard, consisting in cutting them into pillars with paving workings, characterized in that the paving is carried out in separate blocks characterized by the same rock tendency to rock bursts and the same seismic activity in the adjacent goaf regions, preferably starting from the blocks with the largest risk and going successively to blocks with the lowest rock burst risk, leading the expansion section from the boundary line between the blocks to a distance of 150 to 200 m, for the rock burst energy index of complex rocks in block Wet> 5 and seismic activity adjacent to the block of goaf regions A 0 > 10 ° J / ha, 200 do 350 m dla wskaźnika energetycznego tąpliwości skał złożonych w bloku 3 < W_+ 5 1 aktywności sejsmicznej przyległych do bloku rejonów zrobów A = 10 - 10 J/ha i do 800 m dla wskaźnika energetycznego tąpli9 wości skał złożowych w bloku Γ, 3 i aktywności sejsmicznej przyległych do bloku rejonów zrobów A0 < 10 J/ha, przy czym na granicy bloków wykonuje się wstecznie rozcinkowe roboty upodatniające na odległość do 80 m od linii granicznej pomiędzy blokami.200 to 350 m for the rock burst energy index of complex rocks in block 3 <W_ + 5 1 of seismic activity of the goaf regions adjacent to the block A = 10 - 10 J / ha and up to 800 m for the rock burst energy index in block Γ, 3 and of seismic activity adjacent to the block of goaf regions A 0 <10 J / ha, while at the block boundary, retrograde expansion works are performed up to 80 m from the boundary line between blocks.
PL27914589A 1989-04-25 1989-04-25 Method of making yieldable safety pillars under circumstances of crump hazard PL159795B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL27914589A PL159795B1 (en) 1989-04-25 1989-04-25 Method of making yieldable safety pillars under circumstances of crump hazard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL27914589A PL159795B1 (en) 1989-04-25 1989-04-25 Method of making yieldable safety pillars under circumstances of crump hazard

Publications (2)

Publication Number Publication Date
PL279145A1 PL279145A1 (en) 1990-02-05
PL159795B1 true PL159795B1 (en) 1993-01-29

Family

ID=20047162

Family Applications (1)

Application Number Title Priority Date Filing Date
PL27914589A PL159795B1 (en) 1989-04-25 1989-04-25 Method of making yieldable safety pillars under circumstances of crump hazard

Country Status (1)

Country Link
PL (1) PL159795B1 (en)

Also Published As

Publication number Publication date
PL279145A1 (en) 1990-02-05

Similar Documents

Publication Publication Date Title
CN105155556B (en) A kind of open-pit slope separate unit rank wedge-shaped indentation flattens domatic construction method
RU2672296C1 (en) Method of developing adjacent of coal seams
CN205532652U (en) Rock cross -cut coal uncovering &#39;s enhancement supporting construction under complex geological condition
RU2384708C2 (en) Removal method of powered mining face complexes
Mangal A study of stability investigation of immediate roof for extraction of thick coal seam in India
Balwierz et al. Experiments on rock deformations produced by underground karst processes
SU899956A1 (en) Method of mining sloping and steep fire-hazardous coal beds
PL44475B1 (en)
SU97852A1 (en) The method of increasing the strength of dyes with oxyazo dyes obtained on the fiber to friction
SU400704A1 (en) COMBINED SYSTEM FOR THE DEVELOPMENT OF POWERFUL RIGHT STRAAMS
RU2490469C2 (en) Method to fix mines supported at mined space border
RU114340U1 (en) BOARD CAREER
RU2568447C1 (en) Development of thick inflammable steeply inclined coal beds
SU92852A1 (en) Metallic overlap for fencing workspace of the cleaning face from the collapsing side rocks
RU2444629C1 (en) Reinforcement method of mine workings with anchor support in rocks prone to soil heaping
SU699182A1 (en) Method of working thick beds
RU2678254C2 (en) Method of preparing blocks of active climatic action for excavation
RU2745908C2 (en) Method for development of a thick flat seam with release of roof coal
RU1795109C (en) Movable shield-type support
SU1051283A1 (en) Method of working coal seam suits under water basins
Koníček et al. Destress blasting for strata separation near protective crosscut pillars–Case study
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU131309A1 (en) The method of strengthening the surface of rock outcrops
Khalikova et al. Monitoring of the stress-strain state during preparatory workings
SU883441A1 (en) Pillar excavating method