PL78635B2 - - Google Patents

Download PDF

Info

Publication number
PL78635B2
PL78635B2 PL158624A PL15862472A PL78635B2 PL 78635 B2 PL78635 B2 PL 78635B2 PL 158624 A PL158624 A PL 158624A PL 15862472 A PL15862472 A PL 15862472A PL 78635 B2 PL78635 B2 PL 78635B2
Authority
PL
Poland
Prior art keywords
parallel
spag
mkp
mining
miners
Prior art date
Application number
PL158624A
Other languages
Polish (pl)
Inventor
Krasiczynski Kazimierz
Original Assignee
Kombinat Górniczohutniczy Miedzi %Zaklady Badawcze I Projektowe Miedzi „Cuprum"
Filing date
Publication date
Application filed by Kombinat Górniczohutniczy Miedzi %Zaklady Badawcze I Projektowe Miedzi „Cuprum" filed Critical Kombinat Górniczohutniczy Miedzi %Zaklady Badawcze I Projektowe Miedzi „Cuprum"
Publication of PL78635B2 publication Critical patent/PL78635B2/pl

Links

Description

Pierwszenstwo: Zgloszenie ogloszono: 01.06.1973 Opis patentowy opublikowano: 30.09.1975 78635 KI. $d,15/00 MKP E21f 15/00 CZYTELNIA n Liiwij Twórcawynalazku: Kazimierz Krasiczynski Uprawniony z patentu tymczasowego: Kombinat Górniczo-Hutniczy Miedzi % Zaklady Badawcze i Projektowe Miedzi „Cuprum", Wroclaw (Polska) Sposób wybierania zlóz grubych, zalegajacych pod zwiezlym stropem przy zastosowaniu podsadzki plynnej Przedmiotem wynalazku jest sposób wybierania zlóz grubych o miazszosci powyzej 5 m, zalegajacych pod zwiezlym stropem, który zabezpiecza sie obudowa kotwiowa. Likwidacja wybranej przestrzeni odbywa sie przy uzyciu podsadzki plynnej lub utwardzonej.Znane sposoby wybierania grubych zlóz z podsadzka stosuje sie wtedy, gdy istnieje koniecznosc ochrony stropu lub powierzchni, lub wtedy, gdy stosowanie systemów zawalowych powoduje nadmierne zubazanie kopa¬ liny wskutek mieszania sie z nia skal plonych, ulegajacych zawalowi.Znane sposoby komorowo-filarowe, komorowe czy zabierkowe powoduja znaczne straty zloza. Z kolei scianowy system wybierania warstwami z podsadzka plynna o niewielkich stratach zlozowych wymaga wykona¬ nia wielu wyrobisk chodnikowych, odstawiania urobku przenosnikami zgrzeblowymi, oraz duzego i nienajlepiej wykorzystywanego frontu robót eksploatacyjnych. Poza tym piasek zalegajacy w spagu warstw wyzszych zubaza urobek i uniemozliwia zastosowanie ciezszego sprzetu.Celem wynalazku jest wydajne wybieranie zlóz o miazszosci powyzej 5 m z niewielkimi stratami i zubo¬ zeniem. Cel ten osiagnieto w wyniku opracowania nowego sposobu wybierania zloza..Zgodnie z wynalazkiem sposób ten polega na uzyskiwaniu wydobycia z wyrobisk eksploatacyjnych sklada¬ jacych sie z ubierek górnych oraz ubierek dolnych, przy czym dla uzyskania urobku otwory strzalowe wierci sie równolegle do czola ubierki górnej oraz skarpy ubierki dolnej, zas dostep do wymienionych ubierek uzyskuje sie z wyrobisk korytarzowych wykonanych pod stropem i po spagu zloza, przy czym wyrobiska te sa równolegle i naprzemianlegle.Taki sposób wybierania pozwala na prowadzenie eksploatacji na cala miazszosc zloza przy niewielkiej powierzchni odkrytego stropu. Poza tym uzyskuje sie niskie straty eksploatacyjne zblizone do strat w warstwo¬ wych systemach scianowych z podsadzka plynna, zas zubozenie jest mniejsze niz w tych systemach przy wyso¬ kiej wydajnosci i wydobyciu jak w znanych systemach komorowo-filarowych lub komorowych.Wynalazek jest blizej pokazany na rysunku, na którym fig. 1 przedstawia czesc pola eksploatacyjnego w przekroju poziomym, fig. 2 i 3 sa przekrojami pionowymi tej czesci pola eskploatacyjnego, zas figury 4 i 5 przedstawiaja sytuacje w wyrobiskach eksploatacyjnych w róznych stadiach procesu wydobywczego.2 78635 Jak pokazano na fig. 1-3, przygotowanie do eksploatacji polega na podziale zloza na filary 1 o szerokosci równej odleglosci miedzy pochylniami 2 prowadzonymi po spagu 12 zloza i pochylniami 3 prowadzonymi pod stropem 15 zloza.Pochylnie 3 lacza sie bezposrednio z dwoma chodnikami 4 oraz z chodnikiem odstawczym 6 przy pomocy krótkich pochylni 5, zas pochylnie 2 lacza sie z chodnikiem odstawczym 6 oraz z chodnikiem wodnym 7.Dlugosc fdarów 1 ograniczona jest chodnikami 4 i 6 oraz chodnikiem 7, w którym znajduje sie wygrodzo¬ ny chodnik wodny 8.Jak pokazano na fig. 4 i fig. 5 eksploatacja przebiega nastepujaco: Po odwierceniu, zaladowaniu i odstrzele¬ niu z pochylni 3 otworów 9 równoleglych do czola 10 ubierki górnej 22 urobek 11 stacza sie na spag 12 ubierki dolnej 13. Po obrywce stropu i ociosów, spag 14 ubierki górnej 22 nalezy w razie potrzeby oczyscic spychaczem.Kotwienie stropu 15 odbywa sie ze spagu 14 ubierki górnej 22 bezposrednio po obrywce i ewentualnym oczysz¬ czeniu spagu 14. Po okotwieniu stropu 15 odsuwa sie od skarpy 17 obudowe podporowa 18, zabezpieczajaca przed zniszczeniem odcinek pochylni 2 w poblizu skarpy 17 w czasie odpalania otworów 16, oraz usuwa sie kotwy 19. Nastepnie wierci sie i odstrzeliwuje otwory 16 w spagu 14 ubierki górnej 22 równolegle do skarpy 17.Po wybraniu urobku 20 ze spagu 12 tamuje sie i podsadza wyeksploatowana przestrzen. Woda podsadzkowa odprowadzana jest lutniami 21 do wygrodzonego chodnika wodnego 8. PLPriority: Application announced: June 1, 1973 Patent description was published: September 30, 1975 78635 KI. $ d, 15/00 MKP E21f 15/00 READING ROOM n Liiwij Creator of the invention: Kazimierz Krasiczynski Authorized by the temporary patent: Kombinat Górniczo-Hutniczy Miedzi% Zakład Badawcze i Projektowe Miedzi "Cuprum", Wroclaw (Poland) Method of selecting thick deposits, lying under a long The subject of the invention is a method of selecting thick beds with a thickness of more than 5 m, lying under a concise ceiling, which is secured by the anchor casing. Liquidation of a selected space is carried out using a liquid or hardened backfill. when there is a need to protect the roof or surface, or when the use of collapsing systems causes excessive depletion of the mine due to the mixing of crops, collapsing scales with it. Known methods of chamber and pillar, chamber or entrainment cause significant deposit losses. wall layered picking system with liquid proppant over them large bed losses require the performance of many pits, the removal of the excavated material with card conveyors, and a large and not well-used front of the exploitation works. In addition, sand deposited at the bottom of the upper layers impoverishes the spoil and prevents the use of heavier equipment. The object of the invention is to efficiently select beds with a thickness of more than 5 m with little loss and impoverishment. This aim was achieved by developing a new method of mining the deposit. According to the invention, this method consists in obtaining extraction from mining pits consisting of upper and lower dressings, while to obtain the excavated material, the shot holes are drilled parallel to the face of the upper cloth and the slope of the bottom dressing, and access to the above-mentioned dressings is obtained from the corridor workings made under the ceiling and along the bottom of the deposit, while these excavations are parallel and alternately. In addition, low operational losses are obtained, similar to those in layered wall systems with liquid proppant, and the depletion is lower than in these systems with high efficiency and extraction as in the known chamber-pillar or chamber systems. Fig. 1 shows a part of the mining field in a horizontal section, Fig. 2 and 3 are vertical sections of this part of the mining field, while Figures 4 and 5 show situations in the mining excavations at different stages of the mining process. 2 78635 As shown in Fig. 1-3, preparation for exploitation consists in the division of the deposit into pillars 1 with a width equal to the distance between the ramps 2 led along the bottom of the bed 12 and the ramps 3 led under the ceiling 15 of the bed. Ramps 3 connects directly with two pavements 4 and a holding walkway 6 by means of short ramps 5, ramps 2 connect with the holding walkway 6 and the walkway the waterway 7. The length of the fdars 1 is limited by the pavements 4 and 6 and the pavement 7 in which there is a fenced-off waterway 8. As shown in Fig. 4 and Fig. 5, the operation is as follows: After drilling, loading and shooting from ramps 3 holes 9 parallel to the forehead 10 of the upper cloth 22, the excavated material 11 rolls onto the spag 12 of the lower cloth 13. After the edge of the ceiling and the sides, the spag 14 of the upper cloth 22 should be cleaned with a bulldozer, if necessary. 22 directly after the cutting and possible cleaning of the spag 14. After the roof 15 is anchored, the support casing 18 is moved away from the slope 17, protecting the section of the ramp 2 near the slope 17 against damage during the firing of the holes 16, and the anchors 19 are removed. and shoots openings 16 in spag 14 of the upper cover 22 parallel to the slope 17. After selecting the spoil 20 from spag 12, it is dammed and the exploited space is filled. The backfill water is discharged via lutes 21 to the fenced-off waterway 8. PL

Claims (1)

1. Zastrzezenie patentowe Sposób wybierania grubych zlóz o miazszosci powyzej 5 m, znamienny tym, ze wydobycie uzyskuje sie z wyrobisk eksploatacyjnych skladajacych sie z ubierek górnych (22) oraz ubierek dolnych (13), przy czym dla uzyskania urobku otwory strzalowe (9) i (16) wierci sie równolegle do czola (10) ubierki górnej (22) oraz równolegle do skarpy (17) ubierki dolnej (13), zas dostep do wymienionych ubierek uzyskuje sie z wyrobisk korytarzowych wykonanych pod stropem (15) i po spagu (12) zloza, przy czym wyrobiska te sa równolegla i naprzemianlegle.Kl.Sd, 15/00 7863S MKP E2lf 15/00KI. 5d, 15/00 "78635 MKP E21f 15/00 Fig 4 Fig 5 W -%s ci ido .\M p^c;; l»*'« !i*< Prac. Poligraf. UP PRL Zam. 155/75 Naklad 120 + 18 CenalOzl, PL1. Patent claim A method of extracting thick beds with a thickness of more than 5 m, characterized in that the extraction is obtained from mining pits consisting of upper miners (22) and lower miners (13), and to obtain the excavated material, the holes (9) and (16) is drilled parallel to the forehead (10) of the upper garment (22) and parallel to the slope (17) of the lower garment (13), and access to these garments is obtained from the corridor workings under the ceiling (15) and along the spag (12) ) a deposit, the pits being parallel and alternatingly.Kl.Sd, 15/00 7863S MKP E2lf 15 / 00KI. 5d, 15/00 "78635 MKP E21f 15/00 Fig 4 Fig 5 W -% s ci ido. \ M p ^ c ;; l» * '«! I * <Printed by PRL Order 155/75 Mintage 120 + 18 CenalOzl, PL
PL158624A 1972-11-04 PL78635B2 (en)

Publications (1)

Publication Number Publication Date
PL78635B2 true PL78635B2 (en) 1975-06-30

Family

ID=

Similar Documents

Publication Publication Date Title
RU2150581C1 (en) Method of storing and storage of saline rocks in permafrost regions
PL78635B2 (en)
RU2632606C1 (en) Method for depreservation steeply inclined nonactive sidewalls
SU1008450A1 (en) Method for open-pit working of gently sloping mineral deposits
SU1745944A1 (en) Drainage method for goaf floor rock
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
PL82871B2 (en)
SU1532703A1 (en) Method of strip mining of salt deposits
SU1745943A1 (en) Dumping method at working flat seams
SU1104274A1 (en) Method of working ore reserves behind controur in quarry near-edge areas
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
SU1388505A1 (en) Method of producing counter-seepage screen of hydraulic fill structures in wintertime with varying water level within filling area
PL150826B1 (en) Method of mining very thick ore deposits
PL152779B1 (en) A method for mining thick deposits
RU2021513C1 (en) Method for combined mining of deep-seated deposits with rocks of different hardness
PL150884B1 (en) A flooring and caving method of liquidating empty mines space in an underground mine
PL118532B1 (en) Method of exploiting steep deposit of minerals in particular of bariteazom baritovykh mestorozhdenijj
RU2557173C1 (en) Adit construction method
PL112995B2 (en) Method of layer-by-layer exploitation of a thick metal ore deposit
SU889859A1 (en) Method of constructing underwater tunnel
PL169319B1 (en) A method of backfilling a selected space in the underground mining of useful minerals, especially copper ores
SU894198A1 (en) Method of working thick ore bodies
PL88886B1 (en)
PL75372B2 (en)
PL77446B2 (en)