RO112205B1 - Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces - Google Patents

Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces Download PDF

Info

Publication number
RO112205B1
RO112205B1 RO9500907A RO9500907A RO112205B1 RO 112205 B1 RO112205 B1 RO 112205B1 RO 9500907 A RO9500907 A RO 9500907A RO 9500907 A RO9500907 A RO 9500907A RO 112205 B1 RO112205 B1 RO 112205B1
Authority
RO
Romania
Prior art keywords
recovery
ores
rich
exploitation
cemented
Prior art date
Application number
RO9500907A
Other languages
Romanian (ro)
Inventor
Adalbert Kruk
Constantin Salajan
Stefan Kruk
Nicolae Cosma
Mihai Bogdan
Eduard Tamasan
Mihai Marina
Vasile Marchis
Gheorghe Petcu
Original Assignee
Sc Inst De Cercetari Si Proiec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sc Inst De Cercetari Si Proiec filed Critical Sc Inst De Cercetari Si Proiec
Priority to RO9500907A priority Critical patent/RO112205B1/en
Publication of RO112205B1 publication Critical patent/RO112205B1/en

Links

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

Metoda de exploatare pentru recuperarea minereurilor cimentate și a rambleurilor bogate din abataje vechi este destinată recuperării materialului util înmagazinat într-o cameră de abataj dezafectată. Exploatarea se face în subetaje în sens ascendent, realizându-se, pentru împușcare, niște găuri de lungime medie (7), perforate din niște galerii direcționale de pregătire (5), amplasate în culcușul zăcămintului, găurile (7) fiind susținute cu ancore tubulare și împușcându-se controlat numai porțiunea de gaură care este perforată în masa de minereu.The exploitation method for recovery of cement ores and a the rich abundance of old abbey is intended for the recovery of useful material Stored in a slaughterhouse dilapidated. Exploitation is done in substrates in ascendant sense, realizing, for shot, some medium length holes (7), perforated in some directional galleries training (5) located in the sleeping couch the holes (7) being supported by the tubular anchors and shot controlled only the portion of the hole that is perforated in the ore mass.

Description

Invenția se referă la o metodă de exploatare pentru recuperarea minereurilor cimentate și a rambleurilor bogate din abataje vechi, destinată recuperării materialului util înmagazinat într-o cameră de abataj dezafectată.The invention relates to a method of exploitation for the recovery of cemented ores and rich fillings from old abattoirs, intended to recover the useful material stored in a decommissioned abatement room.

Este cunoscută o metodă de exploatare cu înmagazinare prin camere de minare din galerii de subetaj, care constă în săparea unor galerii de transport și ale orizontului de sfărâmare, apoi săparea unor camere de sfărâmare care comunică prin străpungeri scurte cu galeriile orizontului de sfărâmare. în continuare se sapă niște suitori de abataj în care se amplasează camerele de minare. La terminarea acestor lucrări tavanul panoului se surpă în felii datorită încărcăturilor de exploziv așezate în camerele de minare. Această metodă prezintă dezavantajul că masivul de minereu se poate surpa spontan, ceea ce pune în pericol siguranța lucrătorilor aflați în galerii, totodată consumurile de manoperă și materiale fiind relativ mari.It is known a method of exploitation with storage through mining chambers from underfloor galleries, which consists of digging transport galleries and the crushing horizon, then excavating some crushing chambers that communicate through short penetrations with the galleries of the crushing horizon. further excavation trackers are excavated in which the mining chambers are located. At the end of these works the panel ceiling is slipped into slices due to the explosive charges placed in the mining rooms. This method has the disadvantage that the ore mass can spontaneously surge, which endangers the safety of workers in the galleries, while the labor and material consumption is relatively high.

Problema tehnică pe care o rezolvă invenția de față constă în aceea că recuperarea minereului util se realizează prin împușcare, activitatea desfășurându-se în imediata apropiere a abatajului vechi, în același timp cu evacuarea materialului.The technical problem solved by the present invention consists in the fact that the recovery of the useful ore is accomplished by shooting, the activity being carried out in the immediate vicinity of the old slaughterhouse, at the same time with the evacuation of the material.

Metoda, conform invenției, înlătură dezavantajele soluției tehnice cunoscute, prin aceea că exploatarea se face în subetaje în sens ascendent, realizându-se pentru împușcare niște găuri de lungime medie, perforate din niște galerii direcționale de pregătire amplasate în culcușul zăcământului, găurile fiind susținute cu ancore tubulare și împușcându-se controlat numai porțiunea de gaură care este perforată în masa de minereu.The method, according to the invention, removes the disadvantages of the known technical solution, in that the exploitation is done in sub-sections in an ascending direction, being made for shooting medium-length holes, perforated from directional training galleries located in the bunk bed, the holes being supported. tubular anchors and by shooting only the portion of the hole that is perforated in the ore mass is controlled.

Invenția prezintă următoarele avantaje:The invention has the following advantages:

- se mărește siguranța în exploatare;- increased operational safety;

- se reduc consumurile de manoperă și materiale;- labor and material consumption is reduced;

- se reduc costurile de exploatare.- the operating costs are reduced.

Se dă, în continuare, un exemplu de realizare a invenției, în legătură și cu figurile 1....4, care reprezintă:The following is an example of an embodiment of the invention, in connection with FIGS. 1 to 4, which represents:

- fig.1, o secțiune laterală prin panoul de exploatat;- Fig. 1, a side section through the operating panel;

-fig.2, o secțiune longitudinală prin panoul de minereu;-fig.2, a longitudinal section through the ore panel;

- fig.3, o secțiune transversală a fig- 1;3 is a cross section of FIG. 1;

- fig.4, un detaliu reprezentând schema de perforare.FIG. 4 is a detail showing the perforation pattern.

Pentru aplicarea metodei se sapă o galerie direcțională de bază 1 și una de cap 2, apoi un suitor 3, niște galerii transversale de legătură 4, niște galerii direcționale de perforare 5 și niște breșe de evacuare 6.For the application of the method, a basic directional gallery 1 and a head 2, then a follower 3, some transverse connecting galleries 4, some directional drilling galleries 5 and some drainage vents 6 are dug.

Susținerea lucrărilor și distanța lucrărilor direcționale sunt stabilite în funcție de starea rocilor din culcușul abatajului.The support of the works and the distance of the directional works are established according to the condition of the rocks in the abutment bed.

După executarea lucrărilor de pregătire necesare, se va trece la perforarea unor găuri de lungime medie 7 din galeriile de pregătire 5, operație prezentată în fig.4.After the necessary preparatory work has been carried out, the holes of medium length 7 in the preparation galleries 5 will be drilled, the operation presented in fig.4.

După perforarea găurilor se trece la susținerea acestora cu ancore tubulare. Găurile vor fi încărcate cu exploziv numai pe porțiunea care străbate zona mineralizată, restul găurii fiind burată.After drilling the holes, proceed to support them with tubular anchors. The holes will be loaded with explosive only on the portion that crosses the mineralized area, the rest of the hole being filled.

Pușcarea va fi dirijată spre golul inferior, existent.The shot will be directed to the lower, existing void.

Numărul de evantaie care se împușcă deodată se stabilește în funcție de gradul de cimentare a minereului și de starea rocilor din culcuș.The number of fans that are shot at once is determined by the degree of cementation of the ore and the condition of the rocks in the rock.

Evacuarea minereului se va face la baza blocului de exploatare, cu mașini de încărcare cu cupă sau siloz,, accesul la minereu fiind asigurat de breșele de legătură 6. Cu ajutorul mașinilor de încărcat, minereul se încarcă în vagoneții plasați pe galeria direcțională de bază 1.The evacuation of the ore will be done at the base of the operating block, with loading machines with bucket or silo, the access to the ore being ensured by the connecting breaches 6. With the help of the loading machines, the ore is loaded in the wagons placed on the basic directional gallery 1 .

Fazele de perforare și evacuare se vor suprapune.The drilling and evacuation phases will overlap.

Aerisirea frontului la nivelul galeriilor de perforare se va face mecanic, prin galeriile transversale de legătură 4, suitorul 3 și galeria de cap 2.The ventilation of the front at the level of the drilling galleries will be done mechanically, through the transverse connecting galleries 4, the track 3 and the head gallery 2.

Lucrarea se poate realiza în condițiile în care camera de abataj s-a golitThe work can be done under conditions where the slaughterhouse has been emptied

RO 112205 Bl la un sfert din înălțime. De asemenea, se consideră că galeriile de cap și de bază sunt inutilizabile și că susținerea din galeria de bază și pilierii artificiale s-au distrus. Totodată, este necesar ca lățimea fostului 5 abataj să fie de cca. 2 m, grosimea stratului de minereu cimentat să fie cuprinsă între 1 și 5 m, la o înclinare de peste 50°.RO 112205 Bl at a quarter of a height. It is also considered that the head and base galleries are unusable and that the support in the base gallery and the artificial pillars have been destroyed. At the same time, it is necessary that the width of the former 5 abatement should be approx. 2 m, the thickness of the cemented ore layer to be between 1 and 5 m, at an inclination of more than 50 °.

Claims (1)

Revendicare 10Claim 10 Metodă de exploatare pentru recuperarea minereurilor cimentate și a rambleurilor bogate din abataje vechi, caracterizată prin aceea că exploatarea se face în subetaje în sens ascendent, realizându-se pentru împușcare niște găuri de lungime medie (7J, perforate din niște galerii direcționale de pregătire (5] amplasate în culcușul zăcământului, găurile (7) fiind susținute cu ancore tubulare și împușcându-se controlat numai porțiunea de gaură care este perforată în masa de minereu.Method of exploitation for the recovery of cemented ores and rich fillings from old abattoirs, characterized in that the exploitation is done in sub-sections in ascending direction, being made for shooting some holes of medium length (7J, perforated from some directional galleries of preparation (5 ] located in the bed of the deposit, the holes (7) being supported with tubular anchors and only the portion of hole that is perforated in the ore mass is controlled. Președintele comisiei de examinare : ing. Gruia Dan Examinator ; ing. Rușianu Irina (si) Int.CI? Ε 21 C 41/22*Chairman of the Examination Committee: Eng. Gruia Dan Examiner; ing. Rușianu Irina (si) Int.CI? Ε 21 C 41/22 *
RO9500907A 1995-05-12 1995-05-12 Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces RO112205B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RO9500907A RO112205B1 (en) 1995-05-12 1995-05-12 Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RO9500907A RO112205B1 (en) 1995-05-12 1995-05-12 Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces

Publications (1)

Publication Number Publication Date
RO112205B1 true RO112205B1 (en) 1997-06-30

Family

ID=20102154

Family Applications (1)

Application Number Title Priority Date Filing Date
RO9500907A RO112205B1 (en) 1995-05-12 1995-05-12 Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces

Country Status (1)

Country Link
RO (1) RO112205B1 (en)

Similar Documents

Publication Publication Date Title
AU669916B2 (en) Undercut excavation method
PL194753B1 (en) Underground mining method
US3917346A (en) Method of blasting a subterranean deposit
CN1982649A (en) Mining method
CN109026005A (en) A kind of comprehensive mechanization falls mine stripping method
US4266826A (en) In-situ recovery of constituents from fragmented ore
CN111997611B (en) Steeply inclined ore body inclination raise sublevel mining method
RO112205B1 (en) Exploitation method for cemented ores recovery and of the rich embankments from old coal-faces
RU2286457C1 (en) Pillar removal method
RU2122634C1 (en) Method of mining thick steeply dipping coal seam by horizontal layers
RU2095570C1 (en) Method for development of steep ore bodies
SU1266988A1 (en) Method of working pillars
RU2083828C1 (en) Method for development of flat potassium seams in chambers
SU1789691A1 (en) Method for layer mining of thick coal seam
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
RU99104691A (en) METHOD FOR PREVENTING EARTHQUAKES IN POTASSIUM MINES
RU97105521A (en) METHOD FOR DEVELOPING A POWERFUL STEEL COAL COAL LAYER BY HORIZONTAL LAYERS
SU1751347A1 (en) Method of securing development workings
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
RU2238407C1 (en) Method for combined extraction of mineral resources deposits
RU2029087C1 (en) Method for mining of thick steeply dipping coal seams
RU2151293C1 (en) Method of difficult-to-cave roof control in mining of coal seams by powered mining set
RU2003105478A (en) METHOD FOR STRUCTURING HALOCAMERS
SU1672106A1 (en) Method of protection of mine workings
SU883441A1 (en) Pillar excavating method