PE20142198A1 - MOVABLE STRUCTURE ADAPTED TO SUPPORT A FORMWORK OF A NEW SECTION OF BRIDGE UNDER CANVAS - Google Patents
MOVABLE STRUCTURE ADAPTED TO SUPPORT A FORMWORK OF A NEW SECTION OF BRIDGE UNDER CANVASInfo
- Publication number
- PE20142198A1 PE20142198A1 PE2014001259A PE2014001259A PE20142198A1 PE 20142198 A1 PE20142198 A1 PE 20142198A1 PE 2014001259 A PE2014001259 A PE 2014001259A PE 2014001259 A PE2014001259 A PE 2014001259A PE 20142198 A1 PE20142198 A1 PE 20142198A1
- Authority
- PE
- Peru
- Prior art keywords
- section
- support
- formwork
- bridge
- movable structure
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
QUE COMPRENDE: UNA ESTRUCTURA DESPLAZABLE ADAPTADA PARA SOPORTAR EN VOLADIZO UN ENCOFRADO DE UN TRAMO NUEVO DE PUENTE QUE PRESENTA AL MENOS DOS ALMAS Y UN SOLADO, QUE INCLUYELA ESTRUCTURA DESPLAZABLE AL MENOS DOS CONJUNTOS SOPORTE QUE COMPRENDEN UNA PARTE CENTRAL APOYADA EN UN TRAMO DE PUENTE CONSTRUIDO, UNA PRIMERA PARTE DISPUESTA FIJADA AL TRAMO DE PUENTE CONSTRUIDO, Y UNA SEGUNDA PARTE QUE SE EXTIENDE EN VOLADIZO DESDE LA PARTE CENTRAL HACIA EL TRAMO NUEVO DE PUENTE, UN ARRIOSTRAMIENTO DELANTERO ACOPLADO TRANSVERSALMENTE A LA SEGUNDA PARTE, Y UNAS VIGAS TRANSVERSALES DISPUESTAS SUSTANCIALMENTE TRANSVERSALES AL ENCOFRADO, ADAPTADAS PARA SOPORTAR DICHO ENCOFRADO DISPONIENDOSE SUSPENDIDAS AL ARRIOSTRAMIENTO DELANTERO. LA ESTRUCTURA COMPRENDE AL MENOS DOS TIRANTES PRINCIPALES CADA UNO DE LOS CUALES SE DISPONE ALINEADO RESPECTIVAMENTE CON EL EXTREMO SUPERIOR DEL ALMA CORRESPONDIENTE Y ACOPLA AL CONJUNTO SOPORTE LA VIGA TRANSVERSAL QUE SOPORTA EL SOLDADOWHAT IT INCLUDES: A MOVABLE STRUCTURE ADAPTED TO SUPPORT IN A CANTILEVERED FORMWORK OF A NEW SECTION OF BRIDGE THAT PRESENTS AT LEAST TWO CORES AND A SOLE, INCLUDING AT LEAST TWO BRIDGE SUPPORT ASSEMBLIES INCLUDING A CENTRAL PART OF BRIDGE CONSTRUCTION , A FIRST ARRANGED SECTION FIXED TO THE BUILT SECTION OF BRIDGE, AND A SECOND SECTION THAT EXTENDS IN A CANTILEVER FROM THE CENTRAL SECTION TOWARDS THE NEW BRIDGE SECTION, A FRONT BRACING TRANSVERSEALLY COUPLED TO THE SECOND SECTION, AND A SINGLE TRANSVERSE CROSS BEAMS FORMWORK, ADAPTED TO SUPPORT SUCH FORMWORK, DISPOSING TO BE SUSPENDED TO THE FRONT BRACING. THE STRUCTURE INCLUDES AT LEAST TWO MAIN BRACES, EACH OF WHICH IS ARRANGED IN RESPECTIVELY ALIGNED WITH THE UPPER END OF THE CORRESPONDING CORE AND ATTACHES TO THE SUPPORT ASSEMBLY THE TRANSVERSE BEAM SUPPORTING THE SOLDIER
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201230505A ES2424774B1 (en) | 2012-04-02 | 2012-04-02 | Movable structure adapted to support a formwork of a new bridge section in cantilever |
Publications (1)
Publication Number | Publication Date |
---|---|
PE20142198A1 true PE20142198A1 (en) | 2014-12-29 |
Family
ID=47827183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PE2014001259A PE20142198A1 (en) | 2012-04-02 | 2013-02-28 | MOVABLE STRUCTURE ADAPTED TO SUPPORT A FORMWORK OF A NEW SECTION OF BRIDGE UNDER CANVAS |
Country Status (6)
Country | Link |
---|---|
BR (1) | BR112014017051B1 (en) |
CO (1) | CO7020889A2 (en) |
ES (1) | ES2424774B1 (en) |
MX (1) | MX2014011952A (en) |
PE (1) | PE20142198A1 (en) |
WO (1) | WO2013149771A1 (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2435505B1 (en) * | 2011-11-30 | 2014-09-23 | Rubrica Ingenieria Y Arquitectura, S.L. | WORK FOR EXECUTION OF WORKS |
MX341007B (en) | 2013-01-17 | 2016-08-03 | Rubrica Ingenieria Y Arquitectura Sl | Self-launching falsework for platforms in ports. |
ES1132730Y (en) | 2014-10-27 | 2015-02-03 | Rubrica Ingenieria Y Arquitectura Sl | CART FOR THE CONSTRUCTION OF A BOARD OF UNPUENT IN PROGRESSIVE PROGRESS |
CN105714683A (en) * | 2016-02-23 | 2016-06-29 | 中国水利水电第十一工程局有限公司 | Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames |
JP6549499B2 (en) * | 2016-02-25 | 2019-07-24 | 鹿島建設株式会社 | Mobile vehicle and construction method of structure |
CN105696473A (en) * | 2016-04-12 | 2016-06-22 | 中建二局第二建筑工程有限公司 | Hanging basket single-side assembling and sliding system and hanging basket single-side assembling and sliding method |
CN106906750B (en) * | 2017-03-24 | 2019-01-25 | 中建三局基础设施工程有限公司 | Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method |
CN107988922B (en) * | 2018-03-07 | 2020-01-10 | 山东博远重工有限公司 | Hanging basket trolley with improved structure of bottom support protective cross beam lifting lug |
CN108999095A (en) * | 2018-09-28 | 2018-12-14 | 广东博昊实业集团有限公司 | A kind of more truss-like supper wide type hanging basket for bridge construction |
CN109778720B (en) * | 2019-03-18 | 2020-11-06 | 浙江兴土桥梁专用装备制造有限公司 | Bridge construction method based on cradle construction |
DE102019203959A1 (en) | 2019-03-22 | 2020-09-24 | Hünnebeck GmbH | Structural system for the manufacture of structures |
CN109914244B (en) * | 2019-04-26 | 2023-12-05 | 四川路桥华东建设有限责任公司 | Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof |
CN110453612B (en) * | 2019-07-25 | 2021-05-14 | 广东腾盛模架科技有限公司 | Protection device of hanging flower basket is used in road bridge construction |
WO2021064259A1 (en) * | 2019-10-04 | 2021-04-08 | Rubrica Ingenieria Y Arquitectura, S.L. | Successive cantilever carriage |
CN113882281B (en) * | 2021-11-16 | 2023-04-07 | 中国建筑第四工程局有限公司 | Hanging basket walking system for bridge cantilever construction and operation method |
CN117532624B (en) * | 2024-01-10 | 2024-03-26 | 南京东奇智能制造研究院有限公司 | Automatic positioning and aligning method and system for guardrail plate installation |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1910197B1 (en) * | 1969-02-28 | 1970-04-23 | Dyckerhoff & Widmann Ag | Process for the production of longer structures, in particular bridge structures, in sections in front of the building and in front of the building in order to carry out the method |
DE2607805C3 (en) * | 1976-02-26 | 1979-05-31 | Dyckerhoff & Widmann Ag, 8000 Muenchen | Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete |
NO150289C (en) * | 1982-06-01 | 1984-09-19 | Oestlandske Spennbetong As | DEVICE FOR SECTIONAL CASTING OF TENSIONED CONCRETE BRIDGES AFTER THE FRONT BUILDING METHOD |
JP3038163B2 (en) * | 1997-04-28 | 2000-05-08 | 株式会社ピー・エス | Overhang work equipment |
DE102007047438B4 (en) | 2007-10-04 | 2022-11-24 | Doka Gmbh | Formwork arrangement for the cantilever construction of bridges |
CN101586330B (en) * | 2008-05-22 | 2011-01-26 | 中铁十一局集团第一工程有限公司 | Receding construction method of cradle of continuous girder bridge made of prestressing concrete |
WO2010118773A1 (en) * | 2009-04-15 | 2010-10-21 | Vsl International Ag | Overhead form traveller and method |
-
2012
- 2012-04-02 ES ES201230505A patent/ES2424774B1/en active Active
-
2013
- 2013-02-28 WO PCT/EP2013/054020 patent/WO2013149771A1/en active Application Filing
- 2013-02-28 PE PE2014001259A patent/PE20142198A1/en active IP Right Grant
- 2013-02-28 MX MX2014011952A patent/MX2014011952A/en active IP Right Grant
- 2013-02-28 BR BR112014017051-7A patent/BR112014017051B1/en active IP Right Grant
-
2014
- 2014-07-24 CO CO14161411A patent/CO7020889A2/en unknown
Also Published As
Publication number | Publication date |
---|---|
ES2424774A1 (en) | 2013-10-08 |
ES2424774B1 (en) | 2014-07-30 |
MX2014011952A (en) | 2014-12-08 |
BR112014017051B1 (en) | 2021-09-21 |
WO2013149771A1 (en) | 2013-10-10 |
CO7020889A2 (en) | 2014-08-11 |
BR112014017051A8 (en) | 2017-07-04 |
BR112014017051A2 (en) | 2017-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PE20142198A1 (en) | MOVABLE STRUCTURE ADAPTED TO SUPPORT A FORMWORK OF A NEW SECTION OF BRIDGE UNDER CANVAS | |
CL2016003362A1 (en) | Method, use and joining device between prefabricated reinforced concrete beams and pillars with dry joint, comprises a first group of joining reinforcements arranged on a first piano and parallel to each other, first coupling means with the pillars; a plurality of anchor plates arranged defining a frame; and second coupling means between the threaded ends. closed | |
ES2514117B1 (en) | Support pillar for modular structure, beam intended to rest on such pillars and structure comprising said pillars and beams | |
CL2016000674A1 (en) | Semi-submersible platform to support a wind turbine comprising a base, at least three lower beams that extend radially from the base, vertical columns at each end of the lower beams and upper beams that join a central column with the upper end of the lower beams. | |
NZ705364A (en) | Formwork support element | |
CL2016003361A1 (en) | Process, use and joining device between two precast reinforced concrete pillars, comprising a first and second cover, parallel to each other; a plurality of through holes and in position coinciding with each other; two transverse souls and stiffener reinforcements that are arranged perpendicular to the covers; and device with connection means between the ends of the reinforcements. | |
MY174714A (en) | Mobile crane | |
CL2014000272A1 (en) | A joint connection structure of the frame of a building, comprises a column assembly that includes a column and a pair of posters, a full-length beam assembly with upper and lower flanges and a terminal part received between the posters, and a connection member operatively fixed by welding to at least one of said flanges; a prefabricated column assembly, and a beam assembly. | |
CL2014001797A1 (en) | A restricted buckling brace comprising a core member, core moderator member sections having a rectangular cross section, a jacket member comprising reinforced fiber polymers to wrap around the core moderator member sections and the core member | |
PE20150511A1 (en) | QUICK ASSEMBLY NODAL CONSTRUCTION SYSTEM FOR LOADING STRUCTURES, CONSTRUCTIONS AND MULTI-PURPOSE USE ARTIFACTS | |
ES2421785T3 (en) | Frame-shaped armor | |
UY37022A (en) | WEIGHING BAR SET | |
PH12014501591A1 (en) | Movable centring for port platforms | |
PE20121035A1 (en) | SCAFFOLDING SYSTEM INCLUDING A SCAFFOLDING ELEMENT AND PROCEDURE FOR ASSEMBLING A SCAFFOLDING SYSTEM | |
PE20160701A1 (en) | SUPPORT CROSS MEMBER OF A WORK PLATFORM | |
CL2012002760A1 (en) | Shelf support frame adapted to be placed on a pair of transverse shelf beams, comprising two bars with a U-profile and a plurality of bars with a C-profile that have tabs connected to the central souls of the bars with a U-profile; a set of a scaffolding shelf that has vertical columns interconnected by transverse beams and a support frame. | |
ES2529133T3 (en) | Vehicle lift | |
RU2012127983A (en) | DEVICE FOR STRENGTHENING FLOORS WITH WOODEN BEAMS | |
ES2435730B1 (en) | DISPLACER-ELEVATOR OF LARGE LOADS. | |
ES2421058R1 (en) | BIPEDESTATION CRANE FOR PEOPLE WITH REDUCED MOBILITY CONDITIONS. | |
CN203247922U (en) | Communication iron tower with inclined bottom bracing column mechanism | |
PE20180787A1 (en) | CLAMP FOR THE COUPLING OF SUPPORTS IN BEAMS, SUPPORT THAT INCORPORATES IT AND ASSEMBLY PROCEDURE | |
WO2009093835A3 (en) | Lifting frame for a crane using a truss member | |
ES2584456R1 (en) | Construction system | |
Jin et al. | Safety analysis of high and long-span structure formwork supporting system of fastener-style steel pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant, registration |