CN108999095A - A kind of more truss-like supper wide type hanging basket for bridge construction - Google Patents

A kind of more truss-like supper wide type hanging basket for bridge construction Download PDF

Info

Publication number
CN108999095A
CN108999095A CN201811136303.0A CN201811136303A CN108999095A CN 108999095 A CN108999095 A CN 108999095A CN 201811136303 A CN201811136303 A CN 201811136303A CN 108999095 A CN108999095 A CN 108999095A
Authority
CN
China
Prior art keywords
transmission
hanging basket
hydraulic
strut
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811136303.0A
Other languages
Chinese (zh)
Inventor
陈玉平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bohao Industrial Group Co Ltd
Original Assignee
Guangdong Bohao Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Bohao Industrial Group Co Ltd filed Critical Guangdong Bohao Industrial Group Co Ltd
Priority to CN201811136303.0A priority Critical patent/CN108999095A/en
Publication of CN108999095A publication Critical patent/CN108999095A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Abstract

The invention discloses a kind of more truss-like supper wide type hanging basket for bridge construction, its structure includes the first bridge construction blue support frame of extension, the second bridge construction blue support frame of extension, foldable construction hanging basket device, first Hanging Basket chassis interior is driven cabinet, second Hanging Basket chassis interior is driven cabinet, third Hanging Basket chassis interior is driven cabinet, the third Hanging Basket chassis interior transmission cabinet is equipped with third hydraulic pressure support column and triggers starter, third hydraulic pressure support column controls transmission device, third support base internal drive electric machine, third material transmission controls transmission device, make equipment carry out using when, the spacing of Hanging Basket can arbitrarily be adjusted, the height of Hanging Basket can be adjusted by shirtsleeve operation simultaneously, improve using flexible, and self-feeding can be passed through while construction, solve the feeding problems of high altitude operation, this hair Bright light and flexible, and adjustable spacing, safety and stability.

Description

A kind of more truss-like supper wide type hanging basket for bridge construction
Technical field
The present invention is a kind of more truss-like supper wide type hanging basket for bridge construction, belongs to hanging basket for bridge construction field.
Background technique
Bridge engineering mainly studies bridge water way survey, determines bridge aerodynamics, considers navigation and line requirements to determine bridge floor Highly, consider that substrate is not washed away or frost heave is to determine embedded depth of foundation, design diversion structure etc.;Bridge style design; Bridge structure design;Bridge construction;Rating bridge;Bridge testing;Bridge maintenance etc..
For Ancient Bridges based on the people, animal that pass through, load-carrying is little, and deck profile grade can be relatively steep, it might even be possible to it is laid with step, from After having railway, by increasing again, the gradient and curve standard requirements of route are again high, and need to build for the load-carrying that bridge is born At the railway network to increase economic benefit, therefore, to cross over bigger deeper rivers, valley, bridge is forced to develop to large span.
As the functional requirement of bridge and the construction technology of bridge is being continuously improved in people, the beam of existing highway bridge Body width up to 30~40m, in bridge construction process, Hanging Basket is the capital equipment in bridge cantilever work, for above-mentioned width Property beam body bridge, often set up Hanging Basket independent of each other in the left width of bridge and the right width of bridge in the prior art, to its respectively into Row construction.
The prior art is in use, because of during the splicing of the left width of bridge and the right width of bridge is closed up, since it is only each other Vertical property, bridge is difficult to ensure good Linear Control, and causes the construction precision of bridge to be declined, while the main couple of Hanging Basket Structure causes the structural stability of Hanging Basket to be difficult to be protected, and is difficult in construction progress, construction safety and cost control It is controlled.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of more truss-like supper wide type bridge constructions to hang Basket, to solve the prior art in use, because of during the splicing of the left width of bridge and the right width of bridge is closed up, since it is only each other Vertical property, bridge is difficult to ensure good Linear Control, and causes the construction precision of bridge to be declined, while the main couple of Hanging Basket Structure causes the structural stability of Hanging Basket to be difficult to be protected, and is difficult in construction progress, construction safety and cost control It is controlled.
To achieve the goals above, the present invention is to realize by the following technical solutions: a kind of more truss-like supper wide types Hanging basket for bridge construction, structure include that the first bridge construction hangs blue support frame, the second bridge construction hangs blue support frame, can It folds construction hanging basket device, the first Hanging Basket chassis interior transmission cabinet, the second Hanging Basket chassis interior and is driven cabinet, third Hanging Basket bottom Seat internal drive cabinet, first bridge construction are connected to foldable construction hanging basket by bolt riveted with the blue support frame of extension and fill Set side, second bridge construction is another with hanging blue support frame by bolt riveted and being connected to foldable construction hanging basket device Side, the foldable construction hanging basket device are connected to the first bridge construction by bolt riveted and hang blue support frame and the second bridge With hanging between blue support frame, the first Hanging Basket chassis interior transmission cabinet is connected to the first hydraulic liter by bolt riveted for construction Descending branch dagger bottom, the second Hanging Basket chassis interior transmission cabinet are connected to the second hydraulic lifting support column by bolt riveted Lower section, the third Hanging Basket chassis interior transmission cabinet support column bottom, first bridge construction by third hydraulic lifting The blue support frame base of the first bridge construction extension, the first hydraulic lifting support column, extension blue support frame bottom are equipped with indigo plant support frame is hung Seat spacing adjusts atmospheric pressure pole, top material transmits fixed cross beam device, third hydraulic lifting support column, first bridge construction It is connected to below the first hydraulic lifting support column with blue support frame base is hung by bolt riveted, the first hydraulic lifting support Column is connected to foldable construction hanging basket device one end by bolt riveted, and the blue support frame base spacing of the extension adjusts atmospheric pressure pole and hangs down It is directly welded in the first bridge construction to hang between blue support frame base and the blue support frame base of the second bridge construction extension, the top Portion's material transmission fixed cross beam device vertical welding is between the fixed truss of the fixed truss in the first top and the second top, and described the Three hydraulic lifting support columns are connected to third Hanging Basket chassis interior by bolt riveted and are driven above cabinet;First bridge is applied Work is climbed pedal, the first bottom traveling wheel with hanging blue support frame base and be equipped with the first bottom, and first bottom pedal that climbs is equal Even first bridge construction that is equidistantly welded in is hung on blue support frame base outer surface, and first bottom traveling wheel passes through bolt riveting Conjunction is connected to the first bridge construction and hangs blue support frame base bottom;The blue support frame base spacing of the extension adjusts atmospheric pressure pole and is equipped with First Hanging Basket support frame gas strut, the first Hanging Basket support frame air pressure mobile jib, the second Hanging Basket support frame gas strut, described first Hanging Basket support frame gas strut vertical welding is used in the first bridge construction and is hung on blue support frame base outer wall, the first Hanging Basket branch Support air pressure mobile jib is by being excessively cooperatively connected in the first Hanging Basket support frame gas strut and the second Hanging Basket support frame gas strut Between, the second Hanging Basket support frame gas strut vertical welding is on the second Hanging Basket chassis interior driver box outer wall;It is described Third hydraulic lifting support column is equipped with the hydraulic mobile jib of third, third hydraulic strut, third top climbing ladder, the third Hydraulic Main Bar is connected to third bridge construction by bolt riveted and hangs blue support frame base upper surface, and the third hydraulic strut passed through Degree is cooperatively connected above the hydraulic mobile jib of third, and climbing ladder vertical welding is in third hydraulic lifting support column side at the top of the third On surface;Second bridge construction is equipped with the second bridge construction with hanging blue support frame base, second hydraulic with blue support frame is hung Support column is gone up and down, second bridge construction is connected to the support of the second hydraulic lifting by bolt riveted with the blue support frame base of extension Below column, the second hydraulic lifting support column by bolt riveted be connected to the second bridge construction hang indigo plant support frame base and Between the fixed truss in second top;Second bridge construction is climbed pedal, the with hanging blue support frame base and be equipped with the second bottom Two bottom traveling wheels, second bottom pedal that climbs uniformly equidistantly are welded in the second bridge construction and hang outside blue support frame base On surface, second bottom traveling wheel is connected to the second bridge construction by bolt riveted and hangs blue support frame base bottom; The second hydraulic lifting support column is equipped with the second hydraulic mobile jib, the second hydraulic strut, the second top climbing ladder, the second top admittedly Determinate truss, the second hydraulic mobile jib are connected to the second bridge construction by bolt riveted and hang blue support frame base upper surface, Second hydraulic strut is by being excessively cooperatively connected above the second hydraulic mobile jib, the second top climbing ladder vertical welding In on the second hydraulic lifting support column side surface, the fixed truss in the second top is connected to the second hydraulic branch by bolt riveted At the top of bar;The foldable construction hanging basket device, which is equipped with, folds strut fixed rotating shaft, Hanging Basket foldable support, the folding strut Fixed rotating shaft is connected between Hanging Basket foldable support by bolt riveted, and the Hanging Basket foldable support is connected by bolt riveted It is connected on foldable construction hanging basket device;The first Hanging Basket chassis interior transmission cabinet is equipped with the triggering of the first hydraulic pressure support column and opens Dynamic device, the first hydraulic pressure support column control transmission device, the first support base internal drive electric machine, first material transmission control Transmission device processed, the first hydraulic pressure support column triggering starter are connected to the first Hanging Basket chassis interior by bolt riveted and pass On motivation chamber interior wall, the first hydraulic pressure support column control transmission device passes through screw thread and the first hydraulic pressure support column triggering starting dress It sets engagement to be connected in same level, the first support base internal drive electric machine is connected to by bolt riveted One Hanging Basket chassis interior is driven in cabinet inner bottom surface, and the first material transmission control transmission device is connected by bolt riveted In on the first Hanging Basket chassis interior driver chamber interior wall;The first support base internal drive electric machine is equipped with the first control Power pack, the first control driving motor, the first control power pack are connected to the first Hanging Basket chassis interior by bolt riveted It is driven in cabinet inner bottom surface, the first control driving motor is connected to above the first control power pack by bolt riveted; The second Hanging Basket chassis interior transmission cabinet is equipped with the second hydraulic pressure support column triggering starter, the control of the second hydraulic pressure support column Transmission device, the second support base internal drive electric machine, second material transmission control transmission device, the second hydraulic branch Dagger triggering starter is connected on the second Hanging Basket chassis interior driver chamber interior wall by bolt riveted, and described second is hydraulic Support column control transmission device is engaged with the second hydraulic pressure support column triggering starter by screw thread and is connected in same level, The second support base internal drive electric machine is connected to the second Hanging Basket chassis interior by bolt riveted and is driven in cabinet On portion bottom surface, the second material transmission control transmission device is connected to the second Hanging Basket chassis interior driver by bolt riveted On chamber interior wall;Second hydraulic pressure support column triggering starter be equipped with the second triggering starting push rod, the second strength reset spring, Second driving gear set kelly fixed supported slab, the second driving gear set kelly, the second triggering starting push rod are connected to second Between strength reset spring and the second Hanging Basket chassis interior transmission cabinet, the second strength reset spring is connected to the second triggering Start between push rod and the second Hanging Basket chassis interior transmission cabinet, the second driving gear set kelly fixed supported slab vertical welding In on the second Hanging Basket chassis interior driver chamber interior wall, the second driving gear set kelly is connected to second by screw thread engagement On driving gear set kelly fixed supported slab;Second hydraulic pressure support column control transmission device is equipped with the second transmission gear wheel, the Two toothed belts, the second drive pinion, the second transmission principal arm bar, the second transmission arm bar, the second hydraulic push transmission branch Bar, the second hydraulic push strut fixed plate, the second hydraulic push piston plate, the second transmission gear wheel is engaged by screw thread to be connected It is connected on the second Hanging Basket chassis interior driver chamber interior wall, the second gear conveyer belt is connected to the second transmission gear wheel and Between two drive pinions, second drive pinion is connected to below the second transmission gear wheel by screw thread engagement, described Second transmission principal arm bar is connected on the second drive pinion side by screw thread engagement, and the second transmission arm bar passes through spiral shell Line engagement is connected between the second transmission principal arm bar and the second hydraulic push transmission strut, the second hydraulic push transmission Strut is fixedly connected on the second Hanging Basket chassis interior driver chamber interior wall by the second hydraulic push strut fixed plate, and described Two hydraulic push strut fixed plates are connected on the second Hanging Basket chassis interior driver chamber interior wall by bolt riveted, and described second Hydraulic push piston plate is connected to the second hydraulic push by bolt riveted and is driven strut top, the second hydraulic push piston Plate is by being excessively cooperatively connected inside the second hydraulic lifting support column;The second support base internal drive electric machine is set There are the second control power pack, the second control driving motor, the second control power pack is connected to the second extension by bolt riveted Basket chassis interior is driven in cabinet inner bottom surface, and the second control driving motor is connected to the second control electricity by bolt riveted Above source capsule;The second material transmission control transmission device is equipped with second material drive pinion, second material gear transmits Band, second material transmission gear wheel, the fixed bracket of the second transmission gear, the second transmission fold strut, the second drive shaft, second Rope twisting shaft, the second material drive pinion are connected to the fixed side face of the second transmission gear by screw thread engagement On, the second material toothed belts are connected between second material drive pinion and second material transmission gear wheel, institute It states second material transmission gear wheel to be connected to below second material drive pinion by screw thread engagement, second transmission gear Fixed bracket is connected on the second Hanging Basket chassis interior driver chamber interior wall by screw thread engagement, and second transmission folds strut It is connected between second material drive pinion and the second drive shaft by screw thread engagement, second drive shaft passes through spiral shell Line engagement is connected to the second transmission and folds between strut and the second rope twisting shaft, and the second rope twisting shaft passes through spiral shell Line engagement is connected on the second Hanging Basket chassis interior driver box outer wall;Third Hanging Basket chassis interior transmission cabinet is equipped with the Three hydraulic pressure support columns trigger starter, third hydraulic pressure support column controls transmission device, third support base internal drive motor Device, third material transmission control transmission device, and the third hydraulic pressure support column triggering starter is connected by bolt riveted In on third Hanging Basket chassis interior driver chamber interior wall, the third hydraulic pressure support column control transmission device passes through screw thread and third The triggering starter engagement of hydraulic pressure support column is connected in same level, the third support base internal drive electric machine It is connected to third Hanging Basket chassis interior by bolt riveted to be driven in cabinet inner bottom surface, the third material transmission control transmission Device is connected on third Hanging Basket chassis interior driver chamber interior wall by bolt riveted;The third hydraulic pressure support column triggering is opened Dynamic device is equipped with third triggering starting push rod, third strength reset spring, third driving gear set kelly fixed supported slab, third and passes Moving gear group kelly, the third triggering starting push rod is connected to third strength reset spring and third Hanging Basket chassis interior is driven Between cabinet, the third strength reset spring is connected to third triggering starting push rod and third Hanging Basket chassis interior is driven cabinet Between, the third driving gear set kelly fixed supported slab vertical welding on third Hanging Basket chassis interior driver chamber interior wall, The third driving gear set kelly is connected on third driving gear set kelly fixed supported slab by screw thread engagement;The third Hydraulic pressure support column controls transmission device and is equipped with third transmission gear wheel, third toothed belts, third drive pinion, third biography The hydraulic push transmission strut of dynamic principal arm bar, third transmission arm bar, third, the hydraulic push strut fixed plate of third, third are hydraulic Piston plate is pushed, the third transmission gear wheel is connected to third Hanging Basket chassis interior driver chamber interior wall by screw thread engagement On, the third toothed belts are connected between third transmission gear wheel and third drive pinion, and the third transmission is small Gear is connected to third by screw thread engagement and is driven below gear wheel, and the third transmission principal arm bar is connected to by screw thread engagement On third drive pinion side, the third transmission arm bar by screw thread engagement be connected to the third be driven principal arm bar with Between the hydraulic push transmission strut of third, the hydraulic push transmission strut of third is solid by the hydraulic push strut fixed plate of third Surely it is connected on third Hanging Basket chassis interior driver chamber interior wall, the hydraulic push strut fixed plate of third passes through bolt riveted It is connected on third Hanging Basket chassis interior driver chamber interior wall, the hydraulic push piston plate of third is connected to by bolt riveted The hydraulic push of third is driven strut top, and the hydraulic push piston plate of third is by being excessively cooperatively connected in third hydraulic lifting Inside support column;The third support base internal drive electric machine is equipped with third control power pack, third control transmission electricity Machine, the third control power pack are connected to third Hanging Basket chassis interior by bolt riveted and are driven in cabinet inner bottom surface, institute Third control driving motor is stated to be connected to above third control power pack by bolt riveted;The third material transmission control passes Dynamic device is equipped with third material drive pinion, third material toothed belts, third material and is driven gear wheel, third driving cog Fixed bracket, third transmission folding strut, third drive shaft, third rope twisting shaft are taken turns, the third material transmission is small Gear is connected in the fixed side face of third transmission gear by screw thread engagement, and the third material toothed belts are connected to Between third material drive pinion and third material transmission gear wheel, the third material transmission gear wheel is engaged by screw thread It is connected to below third material drive pinion, the fixed bracket of the third transmission gear is connected to third by screw thread engagement and hangs On basket chassis interior driver chamber interior wall, third transmission folds strut, and by screw thread engagement to be connected to the transmission of third material small Between gear and third drive shaft, the third drive shaft is connected to third transmission by screw thread engagement and folds strut and the Between three rope twisting shafts, the third rope twisting shaft is connected to third Hanging Basket chassis interior by screw thread engagement and is driven On cabinet outer wall.
Further, the first hydraulic lifting support column is equipped with the first hydraulic mobile jib, the first hydraulic strut, the first top Climbing ladder, the fixed truss in the first top, the first hydraulic mobile jib are connected to the first bridge construction by bolt riveted and hang indigo plant Support frame base upper surface, first hydraulic strut is by being excessively cooperatively connected above the first hydraulic mobile jib, and described first For top climbing ladder vertical welding on the first hydraulic lifting support column side surface, the fixed truss in the first top passes through bolt riveting Conjunction is connected at the top of the first hydraulic strut.
Further, top material transmission fixed cross beam device is equipped with top braces crossbeam, the first fixed chain, the One material transmission pulley, first material transmission rope, the second fixed chain, second material transmission pulley, second material transmission rope Rope, the top braces beam vertical are welded between the fixed truss of the fixed truss in the first top and the second top, and described first Fixing lock chain link is between top braces crossbeam and first material transmission pulley.
Further, the first material transmission pulley is connected to below the first fixed chain by screw thread engagement, described First material transmission rope is connected between the first rope twisting shaft and first material transmission pulley, the described second fixed chain It is connected between top braces crossbeam and second material transmission pulley, the second material transmission pulley is engaged by screw thread to be connected Below the second fixed chain, the second material transmission rope is connected to third rope twisting shaft and second material transmission is slided Between wheel.
Further, the first hydraulic pressure support column triggering starter is equipped with the first triggering starting push rod, the first strength Reset spring, the first driving gear set kelly fixed supported slab, the first driving gear set kelly, the first triggering starting push rod connect It is connected between the first strength reset spring and the first Hanging Basket chassis interior transmission cabinet, the first strength reset spring is connected to Between first triggering starting push rod and the first Hanging Basket chassis interior transmission cabinet, the first driving gear set kelly fixed supported slab For vertical welding on the first Hanging Basket chassis interior driver chamber interior wall, the first driving gear set kelly engages company by screw thread It is connected on the first driving gear set kelly fixed supported slab.
Further, the first hydraulic pressure support column control transmission device is equipped with the first transmission gear wheel, first gear passes Send band, the first drive pinion, the first transmission principal arm bar, the first transmission arm bar, the first hydraulic push transmission strut, the first liquid Pressure push strut fixed plate, the first hydraulic push piston plate, the first transmission gear wheel are connected to first by screw thread engagement On Hanging Basket chassis interior driver chamber interior wall, the first gear conveyer belt is connected to the first transmission gear wheel and the first transmission is small Between gear, first drive pinion is connected to below the first transmission gear wheel by screw thread engagement.
Further, the first transmission principal arm bar is connected on the first drive pinion side by screw thread engagement, institute State the first transmission arm bar by screw thread engagement be connected to the first transmission principal arm bar and the first hydraulic push transmission strut it Between, the first hydraulic push transmission strut is fixedly connected in the first Hanging Basket pedestal by the first hydraulic push strut fixed plate On portion's driver chamber interior wall.
The first hydraulic push strut fixed plate is connected to the first Hanging Basket chassis interior by bolt riveted and is driven cabinet On inner wall, the first hydraulic push piston plate is connected to the first hydraulic push by bolt riveted and is driven strut top, described First hydraulic push piston plate is by being excessively cooperatively connected inside the first hydraulic lifting support column.
Further, the first material transmission control transmission device is equipped with first material drive pinion, first material Toothed belts, first material transmission gear wheel, the fixed bracket of the first transmission gear, the first transmission fold strut, the first transmission Shaft, the first rope twisting shaft, the first material drive pinion are connected to the first transmission gear by screw thread engagement and consolidate On fixed rack side, the first material toothed belts are connected to first material drive pinion and first material is driven canine tooth Between wheel, the first material transmission gear wheel is connected to below first material drive pinion by screw thread engagement.
Further, the fixed bracket of first transmission gear is connected to the first Hanging Basket chassis interior by screw thread engagement and passes On motivation chamber interior wall, first transmission folds strut and is connected to first material drive pinion and the first biography by screw thread engagement Between turn axis, first drive shaft is connected to the first transmission by screw thread engagement and folds strut and the winding turn of the first rope Between axis, the first rope twisting shaft is connected on the first Hanging Basket chassis interior driver box outer wall by screw thread engagement.
Beneficial effect
It is hydraulic by being equipped with one kind first when a kind of more truss-like supper wide type hanging basket for bridge construction of the present invention are worked Support column triggers starter, and the first hydraulic pressure support column triggering starter is equipped with the first triggering and starts push rod, the last the first Power reset spring, the first driving gear set kelly fixed supported slab, the first driving gear set kelly, when the triggering starting of promotion first pushes away When bar, while the first driving gear set kelly also being pushed to tilt, transmission device is controlled to the first hydraulic pressure support column to be detached from Control, make the first hydraulic pressure support column control transmission device work;By being equipped with a kind of first hydraulic pressure support column control biography Dynamic device, the first hydraulic pressure support column control transmission device are equipped with the first transmission gear wheel, first gear conveyer belt, the first biography Dynamic pinion gear, the first transmission principal arm bar, the first transmission arm bar, the first hydraulic push are driven strut, the first hydraulic push strut Fixed plate, the first hydraulic push piston plate, when the first transmission gear wheel drives the rotation of the first drive pinion, the first transmission principal arm It is up and down that bar also drives the first transmission arm bar that the first hydraulic push transmission strut is pushed to carry out, during up and down It drives the first hydraulic push piston plate to carry out piston motion inside the first hydraulic lifting support column, to generate air pressure, pushes First hydraulic strut rises, so that foldable construction hanging basket device also driven to rise;It is transmitted by being equipped with a kind of first material Transmission device is controlled, the first material transmission control transmission device is equipped with first material drive pinion, first material gear Conveyer belt, first material transmission gear wheel, the fixed bracket of the first transmission gear, the first transmission fold strut, the first drive shaft, First rope twisting shaft, first material transmission control transmission dress while the first hydraulic pressure support column controls transmission operation It sets and also works, first material drive pinion rotates under the drive of first material transmission gear wheel, while driving first Transmission folds strut and the rotation of the first drive shaft, and first material is transmitted restrict in the course of rotation by the first rope twisting shaft Rope is wound back and forth, is transmitted on foldable construction hanging basket device so that material is transmitted fixed cross beam device by top material; Fixed cross beam device is transmitted by being equipped with a kind of top material, the top material transmission fixed cross beam device is equipped with top braces Crossbeam, the first fixed chain, first material transmission pulley, first material transmission rope, the second fixed chain, second material transmission Pulley, second material transmit rope, by first material transmit control transmission device cooperation, make first material transmission pulley and Second material transmission pulley easily submits material on foldable construction hanging basket device;By the mutual cooperation of apparatus above, The spacing of Hanging Basket can be arbitrarily adjusted, while the height of Hanging Basket can be adjusted by shirtsleeve operation, improves using flexible, And the feeding problems of high altitude operation can be solved by self-feeding while construction, light and flexible of the present invention, and can To adjust spacing, safety and stability.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of more truss-like supper wide type hanging basket for bridge construction of the present invention.
Fig. 2 is the structural schematic diagram under a kind of more truss-like supper wide type hanging basket for bridge construction working conditions of the present invention.
Fig. 3 is a kind of lateral inner structural schematic diagram of more truss-like supper wide type hanging basket for bridge construction of the present invention.
Fig. 4 is the schematic diagram of internal structure that the first Hanging Basket chassis interior of the invention is driven cabinet.
Fig. 5 is the inner side structural schematic diagram that the first Hanging Basket chassis interior of the invention is driven cabinet.
Fig. 6 is the structural schematic diagram under the first hydraulic pressure support column control transmission device stationary state of the invention.
Fig. 7 is the structural schematic diagram under the first hydraulic pressure support column control transmission operation state of the invention.
Fig. 8 is the structural schematic diagram under first material of the present invention transmission control transmission device stationary state.
Fig. 9 is the structural schematic diagram under first material of the present invention transmission control transmission operation state.
Figure 10 is the schematic diagram of internal structure that the second Hanging Basket chassis interior of the invention is driven cabinet.
Figure 11 is the inner side structural schematic diagram that the second Hanging Basket chassis interior of the invention is driven cabinet.
Figure 12 is the structural schematic diagram under the second hydraulic pressure support column control transmission device stationary state of the invention.
Figure 13 is the structural schematic diagram under the second hydraulic pressure support column control transmission operation state of the invention.
Figure 14 is the structural schematic diagram under second material of the present invention transmission control transmission device stationary state.
Figure 15 is the structural schematic diagram under second material of the present invention transmission control transmission operation state.
Figure 16 is the schematic diagram of internal structure that third Hanging Basket chassis interior of the present invention is driven cabinet.
Figure 17 is the inner side structural schematic diagram that third Hanging Basket chassis interior of the present invention is driven cabinet.
Figure 18 is the structural schematic diagram under third hydraulic pressure support column of the present invention control transmission device stationary state.
Figure 19 is the structural schematic diagram under third hydraulic pressure support column of the present invention control transmission operation state.
Figure 20 is the structural schematic diagram under third material transmission of the present invention control transmission device stationary state.
Figure 21 is the structural schematic diagram under third material transmission of the present invention control transmission operation state.
In figure: the first bridge construction blue support frame -1 of extension, the second bridge construction extension blue support frame -2, foldable construction Hanging basket device -3, the first Hanging Basket chassis interior transmission cabinet -4, the second Hanging Basket chassis interior are driven cabinet -5, third Hanging Basket pedestal Internal drive cabinet -6, the first bridge construction are hydraulic with blue support frame base -10, the first hydraulic lifting support column -11, first is hung Mobile jib -110, the fixed truss -113 in first the -112, first top of top climbing ladder, hangs blue support frame at first hydraulic strut -111 Pedestal spacing adjusts atmospheric pressure pole -12, top material transmits fixed cross beam device -13, top braces crossbeam -130, the first fixing lock Chain -131, first material transmission pulley -132, first material transmission rope -133, the second fixed chain -134, second material pass Pulley -135, second material transmission rope -136, third hydraulic lifting support column -14, the first bottom is sent to climb pedal -100, the One bottom traveling wheel -101, the first Hanging Basket support frame gas strut -120, the first Hanging Basket support frame air pressure mobile jib -121, second are hung The hydraulic mobile jib -140 of basket supporting bracket gas strut -122, third, third hydraulic strut -141, climbing ladder -142 at the top of third, the Two bridge constructions with hang blue support frame base -20, the second hydraulic lifting support column -21, the second bottom are climbed pedal -200, second Bottom traveling wheel -201, the second hydraulic mobile jib -210, the second hydraulic strut -211, second the -212, second top of top climbing ladder Fixed truss -213 folds strut fixed rotating shaft -30, Hanging Basket foldable support -31, the first hydraulic pressure support column triggering starting dress Set the -40, first triggering starting push rod -400, the first strength reset spring -401, the first driving gear set kelly fixed supported slab - 402, the first driving gear set kelly -403, the first hydraulic pressure support column control transmission device -41, first transmission gear wheel -410, First gear conveyer belt -411, the first drive pinion -412, first transmission principal arm bar -413, the first transmission arm bar -414, First hydraulic push transmission strut -415, the first hydraulic push piston plate -417 of hydraulic push strut fixed plate -416, first, the One support base internal drive electric machine -42, first material transmission control transmission device -43, first material drive pinion - 430, first material toothed belts -431, first material transmission gear wheel -432, the fixed bracket -433 of the first transmission gear, the One transmission fold strut -434, the first drive shaft -435, the first rope twisting shaft -436, first control power pack -420, First control driving motor -421, the second hydraulic pressure support column triggering starter -50, the second hydraulic pressure support column control transmission dress Set the -51, second support base internal drive electric machine -52, second material transmission controls transmission device -53, the second triggering is opened Dynamic push rod -500, the second strength reset spring -501, the second driving gear set kelly fixed supported slab -502, the second driving gear set Kelly -503, the second transmission gear wheel -510, second gear conveyer belt -511, the second drive pinion -512, the second transmission master Armed lever -513, second the -514, second hydraulic push of transmission arm bar are driven strut -515, the second hydraulic push strut fixed plate - 516, the second hydraulic push piston plate -517, the second control power pack -520, the second control driving motor -521, second material pass Dynamic pinion gear -530, second material toothed belts -531, second material transmission gear wheel -532, the fixed branch of the second transmission gear Frame -533, the second transmission fold strut -534, the second drive shaft -535, the second rope twisting shaft -536, the hydraulic branch of third Dagger triggers starter -60, third hydraulic pressure support column control transmission device -61, third support base internal drive motor dress Set -62, third material transmission control transmission device -63, third triggering starting push rod -600, third strength reset spring -601, Third driving gear set kelly fixed supported slab -602, third driving gear set kelly -603, third are driven gear wheel -610, third Toothed belts -611, third drive pinion -612, third are driven principal arm bar -613, third transmission arm bar -614, third Hydraulic push is driven strut -615, the hydraulic push strut fixed plate -616 of third, the hydraulic push piston plate -617 of third, third control Power pack -620 processed, third control driving motor -621, third material drive pinion -630, third material toothed belts - 631, the fixed bracket -633 of third material transmission gear wheel -632, third transmission gear, third transmission fold strut -634, third Drive shaft -635, third rope twisting shaft -636.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
Fig. 1-Figure 21 is please referred to, the present invention provides a kind of more truss-like supper wide type hanging basket for bridge construction technical solutions: its Structure is filled including the first bridge construction blue support frame 1 of extension, the blue support frame 2 of the second bridge construction extension, foldable construction hanging basket Set the 3, first Hanging Basket chassis interior transmission cabinet 4, the second Hanging Basket chassis interior transmission cabinet 5, the transmission of third Hanging Basket chassis interior Cabinet 6, first bridge construction are connected to foldable 3 side of construction hanging basket device by bolt riveted with the blue support frame 1 of extension, Second bridge construction is connected to foldable 3 other side of construction hanging basket device by bolt riveted with the blue support frame 2 of extension, described Foldable construction hanging basket device 3 is connected to the first bridge construction by bolt riveted and hangs blue support frame 1 and the second bridge construction With hanging between blue support frame 2, the first Hanging Basket chassis interior transmission cabinet 4 is connected to the first hydraulic lifting by bolt riveted 11 bottom of support column, the second Hanging Basket chassis interior transmission cabinet 5 are connected to the support of the second hydraulic lifting by bolt riveted 21 lower section of column, the third Hanging Basket chassis interior transmission cabinet 6 pass through 14 bottom of third hydraulic lifting support column, first bridge Beam construction, which is used, hangs indigo plant support frame 1 equipped with the first bridge construction blue support frame base 10 of extension, the first hydraulic lifting support column 11, extension Blue support frame base spacing adjusts atmospheric pressure pole 12, top material transmits fixed cross beam device 13, third hydraulic lifting support column 14, First bridge construction is connected to 11 lower section of the first hydraulic lifting support column by bolt riveted with the blue support frame base 10 of extension, The first hydraulic lifting support column 11 is connected to foldable 3 one end of construction hanging basket device, the blue branch of the extension by bolt riveted Support pedestal spacing adjusts 12 vertical welding of atmospheric pressure pole and is applied with the blue support frame base 10 of extension with the second bridge in the first bridge construction For work with hanging between blue support frame base 20, top material transmission 13 vertical welding of fixed cross beam device is fixed in the first top Between truss 113 and the second fixed truss 213 in top, the third hydraulic lifting support column 14 is connected to the by bolt riveted Three Hanging Basket chassis interiors are driven 6 top of cabinet;First bridge construction is equipped with the first bottom with the blue support frame base 10 of extension and climbs Pedal 100, the first bottom traveling wheel 101 are risen, first bottom is climbed, and pedal 100 is uniform to be equidistantly welded in the first bridge construction With hanging on 10 outer surface of blue support frame base, first bottom traveling wheel 101 is connected to the first bridge by bolt riveted and applies Work 10 bottom of the blue support frame base of extension;The blue support frame base spacing of the extension adjusts atmospheric pressure pole 12 and is equipped with the first Hanging Basket support frame Gas strut 120, the first Hanging Basket support frame air pressure mobile jib 121, the second Hanging Basket support frame gas strut 122, first Hanging Basket 120 vertical welding of support frame gas strut is used in the first bridge construction and is hung on 10 outer wall of blue support frame base, first Hanging Basket Support frame air pressure mobile jib 121 is by being excessively cooperatively connected in the first Hanging Basket support frame gas strut 120 and the second Hanging Basket support frame Between gas strut 122,122 vertical welding of the second Hanging Basket support frame gas strut is in the second Hanging Basket chassis interior driver On 5 outer wall of case;The third hydraulic lifting support column 14 is equipped with the hydraulic mobile jib 140 of third, third hydraulic strut 141, third top Portion's climbing ladder 142, the hydraulic mobile jib 140 of third are connected to third bridge construction by bolt riveted and hang blue support frame base 10 upper surfaces, the third hydraulic strut 141 is by being excessively cooperatively connected above the hydraulic mobile jib 140 of third, the third top Climbing ladder 142 vertical welding in portion's is on 14 side surface of third hydraulic lifting support column;Second bridge construction is supported with indigo plant is hung Frame 2 is equipped with the second bridge construction and is used with blue support frame base 20, the second hydraulic lifting support column 21, second bridge construction is hung It hangs blue support frame base 20 and second hydraulic lifting support column, 21 lower section, the second hydraulic lifting branch is connected to by bolt riveted Dagger 21 by bolt riveted be connected to the second bridge construction hang blue support frame base 20 and the second top fixation truss 213 it Between;Second bridge construction is climbed pedal 200, the second bottom traveling wheel with hanging blue support frame base 20 and be equipped with the second bottom 201, second bottom is climbed, and pedal 200 is uniform to be equidistantly welded in 20 outer surface of the blue support frame base of the second bridge construction extension On, second bottom traveling wheel 201 is connected to the second bridge construction by bolt riveted and hangs 20 bottom of blue support frame base; The second hydraulic lifting support column 21 is equipped with the second hydraulic mobile jib 210, the second hydraulic strut 211, the second top climbing ladder 212, the fixed truss 213 in the second top, the second hydraulic mobile jib 210 are connected to the second bridge construction by bolt riveted and hang Blue 20 upper surface of support frame base, second hydraulic strut 211 is by being excessively cooperatively connected on the second hydraulic mobile jib 210 Side, for second top climbing ladder, 212 vertical welding on 21 side surface of the second hydraulic lifting support column, second top is solid Determinate truss 213 is connected to 211 top of the second hydraulic strut by bolt riveted;The foldable construction hanging basket device 3 is equipped with folding Folded strut fixed rotating shaft 30, Hanging Basket foldable support 31, the folding strut fixed rotating shaft 30 are connected to extension by bolt riveted Between basket foldable support 31, the Hanging Basket foldable support 31 is connected to foldable construction hanging basket device 3 by bolt riveted On;The first Hanging Basket chassis interior transmission cabinet 4 is equipped with the first hydraulic pressure support column and triggers starter 40, the first hydraulic pressure support Column controls transmission device 41, the first support base internal drive electric machine 42, first material transmission control transmission device 43, institute It states the first hydraulic pressure support column triggering starter 40 and first Hanging Basket chassis interior transmission 4 inner wall of cabinet is connected to by bolt riveted On, the first hydraulic pressure support column control transmission device 41 triggers starter 40 with the first hydraulic pressure support column by screw thread and engages It is connected in same level, the first support base internal drive electric machine 42 is connected to the first extension by bolt riveted Basket chassis interior is driven in 4 inner bottom surface of cabinet, and the first material transmission control transmission device 43 is connected by bolt riveted In on the first Hanging Basket chassis interior transmission 4 inner wall of cabinet;The first support base internal drive electric machine 42 is equipped with first It controls power pack 420, first and controls driving motor 421, the first control power pack 420 is connected to first by bolt riveted Hanging Basket chassis interior is driven in 4 inner bottom surface of cabinet, and the first control driving motor 421 is connected to first by bolt riveted Control 420 top of power pack;The second Hanging Basket chassis interior transmission cabinet 5 is equipped with the second hydraulic pressure support column and triggers starter 50, the second hydraulic pressure support column control transmission device 51, the second support base internal drive electric machine 52, second material transmission control Transmission device 53 processed, the second hydraulic pressure support column triggering starter 50 are connected in the second Hanging Basket pedestal by bolt riveted Portion is driven on 5 inner wall of cabinet, and the second hydraulic pressure support column control transmission device 51 is touched by screw thread and the second hydraulic pressure support column The hair engagement of starter 50 is connected in same level, and the second support base internal drive electric machine 52 passes through bolt Riveted is connected in the second Hanging Basket chassis interior transmission 5 inner bottom surface of cabinet, the second material transmission control transmission device 53 The second Hanging Basket chassis interior is connected to by bolt riveted to be driven on 5 inner wall of cabinet;The second hydraulic pressure support column triggering starting Device 50 is equipped with the second triggering and starts push rod 500, the second strength reset spring 501, the second driving gear set kelly fixed supported slab 502, the second driving gear set kelly 503, the second triggering starting push rod 500 be connected to the second strength reset spring 501 with Second Hanging Basket chassis interior is driven between cabinet 5, and the second strength reset spring 501 is connected to the second triggering starting push rod 500 and second Hanging Basket chassis interior transmission cabinet 5 between, 502 vertical welding of the second driving gear set kelly fixed supported slab In on the second Hanging Basket chassis interior transmission 5 inner wall of cabinet, the second driving gear set kelly 503 is connected to by screw thread engagement On second driving gear set kelly fixed supported slab 502;The second hydraulic pressure support column control transmission device 51 is equipped with the second transmission Gear wheel 510, second gear conveyer belt 511, the second drive pinion 512, second are driven principal arm bar 513, the second transmission arm The hydraulic push of bar 514, second is driven the hydraulic push strut fixed plate 516 of strut 515, second, the second hydraulic push piston plate 517, the second transmission gear wheel 510 is connected to the second Hanging Basket chassis interior by screw thread engagement and is driven on 5 inner wall of cabinet, institute It states second gear conveyer belt 511 to be connected between the second transmission gear wheel 510 and the second drive pinion 512, described second passes Dynamic pinion gear 512 is connected to 510 lower section of the second transmission gear wheel by screw thread engagement, and the second transmission principal arm bar 513 passes through Screw thread engagement is connected on 512 side of the second drive pinion, and the second transmission arm bar 514 is connected to by screw thread engagement Between the second transmission principal arm bar 513 and the second hydraulic push transmission strut 515, the second hydraulic push is driven strut 515, which are fixedly connected on the second Hanging Basket chassis interior by the second hydraulic push strut fixed plate 516, is driven on 5 inner wall of cabinet, institute The second hydraulic push strut fixed plate 516 is stated to be connected on the second Hanging Basket chassis interior transmission 5 inner wall of cabinet by bolt riveted, The second hydraulic push piston plate 517 is connected to the second hydraulic push by bolt riveted and is driven 515 top of strut, and described the Two hydraulic push piston plates 517 are by being excessively cooperatively connected inside the second hydraulic lifting support column 14;Second support bottom Seat internal drive electric machine 52 is equipped with the second control power pack 520, second and controls driving motor 521, the second control electricity Source capsule 520 is connected to the second Hanging Basket chassis interior by bolt riveted and is driven in 5 inner bottom surface of cabinet, the second control transmission Motor 521 is connected to 520 top of the second control power pack by bolt riveted;The second material transmission control transmission device 53 It is passed equipped with second material drive pinion 530, second material toothed belts 531, second material transmission gear wheel 532, second The fixed transmission of bracket 533, second of moving gear folds strut 534, the second drive shaft 535, the second rope twisting shaft 536, institute It states second material drive pinion 530 to be connected on fixed 533 side of bracket of the second transmission gear by screw thread engagement, described the Two material toothed belts 531 are connected between second material drive pinion 530 and second material transmission gear wheel 532, institute It states second material transmission gear wheel 532 and 530 lower section of second material drive pinion is connected to by screw thread engagement, described second passes The fixed bracket 533 of moving gear is connected to the second Hanging Basket chassis interior by screw thread engagement and is driven on 5 inner wall of cabinet, and described second passes The dynamic strut 534 that folds is connected between second material drive pinion 530 and the second drive shaft 535 by screw thread engagement, institute State the second drive shaft 535 by screw thread engagement be connected to the second transmission fold strut 534 and the second rope twisting shaft 536 it Between, the second rope twisting shaft 536 is connected to the second Hanging Basket chassis interior by screw thread engagement and is driven on 5 outer wall of cabinet; The third Hanging Basket chassis interior transmission cabinet 6 is equipped with third hydraulic pressure support column and triggers starter 60, third hydraulic pressure support column It controls transmission device 61, third support base internal drive electric machine 62, third material transmission and controls transmission device 63, it is described Third hydraulic pressure support column triggers starter 60 and is connected to third Hanging Basket chassis interior transmission 6 inner wall of cabinet by bolt riveted On, the third hydraulic pressure support column control transmission device 61 triggers starter 60 with third hydraulic pressure support column by screw thread and engages It is connected in same level, the third support base internal drive electric machine 62 is connected to third by bolt riveted and hangs Basket chassis interior is driven in 6 inner bottom surface of cabinet, and the third material transmission control transmission device 63 is connected by bolt riveted In on third Hanging Basket chassis interior transmission 6 inner wall of cabinet;The third hydraulic pressure support column triggering starter 60 is touched equipped with third Hair starting push rod 600, third strength reset spring 601, third driving gear set kelly fixed supported slab 602, third transmission gear Group kelly 603, the third triggering starting push rod 600 are connected to third strength reset spring 601 and third Hanging Basket chassis interior It is driven between cabinet 6, the third strength reset spring 601 is connected to third triggering starting push rod 600 and third Hanging Basket pedestal Between internal drive cabinet 6,602 vertical welding of third driving gear set kelly fixed supported slab is in third Hanging Basket chassis interior It is driven on 6 inner wall of cabinet, the third driving gear set kelly 603 is connected to third driving gear set kelly by screw thread engagement On fixed supported slab 602;The third hydraulic pressure support column control transmission device 61 is equipped with third and is driven gear wheel 610, third gear Conveyer belt 611, third drive pinion 612, third are driven principal arm bar 613, third transmission arm bar 614, the hydraulic push of third It is driven strut 615, the hydraulic push strut fixed plate 616 of third, the hydraulic push piston plate 617 of third, the third is driven canine tooth Wheel 610 is connected to third Hanging Basket chassis interior by screw thread engagement and is driven on 6 inner wall of cabinet, the third toothed belts 611 It is connected between third transmission gear wheel 610 and third drive pinion 612, the third drive pinion 612 passes through screw thread Engagement is connected to 610 lower section of third transmission gear wheel, and the third transmission principal arm bar 613 is connected to third by screw thread engagement and passes On dynamic 612 side of pinion gear, the third transmission arm bar 614 is connected to the third by screw thread engagement and is driven principal arm bar Between 613 and the hydraulic push transmission strut 615 of third, the hydraulic push transmission strut 615 of third passes through the hydraulic push of third Strut fixed plate 616 is fixedly connected on third Hanging Basket chassis interior transmission 6 inner wall of cabinet, and the hydraulic push strut of third is solid Fixed board 616 is connected to third Hanging Basket chassis interior by bolt riveted and is driven on 6 inner wall of cabinet, the hydraulic push piston of third Plate 617 is connected to the hydraulic push of third by bolt riveted and is driven 615 top of strut, the hydraulic push piston plate 617 of third By being excessively cooperatively connected inside third hydraulic lifting support column 14;The third support base internal drive electric machine 62 Driving motor 621 is controlled equipped with third control power pack 620, third, the third control power pack 620 is connected by bolt riveted It is connected in third Hanging Basket chassis interior transmission 6 inner bottom surface of cabinet, the third control driving motor 621 is connected by bolt riveted It is connected to 620 top of third control power pack;The third material transmission control transmission device 63 is equipped with third material and is driven small tooth Wheel 630, third material toothed belts 631, third material transmission gear wheel 632, the fixed bracket 633 of third transmission gear, the Three transmissions fold strut 634, third drive shaft 635, third rope twisting shaft 636, the third material drive pinion 630 are connected on fixed 633 side of bracket of third transmission gear by screw thread engagement, the third material toothed belts 631 It is connected between third material drive pinion 630 and third material transmission gear wheel 632, the third material is driven gear wheel 632 are connected to 630 lower section of third material drive pinion by screw thread engagement, and the fixed bracket 633 of the third transmission gear is logical It crosses screw thread engagement to be connected on third Hanging Basket chassis interior transmission 6 inner wall of cabinet, the third transmission folds strut 634 and passes through spiral shell Line engagement is connected between third material drive pinion 630 and third drive shaft 635, and the third drive shaft 635 is logical It crosses screw thread engagement to be connected between third transmission folding strut 634 and third rope twisting shaft 636, the third rope winding Shaft 636 is connected to third Hanging Basket chassis interior by screw thread engagement and is driven on 6 outer wall of cabinet, the first hydraulic lifting support Column 11 is equipped with the first hydraulic mobile jib 110, the first hydraulic strut 111, the first fixed truss in the 112, first top of top climbing ladder 113, the first hydraulic mobile jib 110 is connected to the first bridge construction by bolt riveted and hangs table on blue support frame base 10 Face, first hydraulic strut 111 by being excessively cooperatively connected above the first hydraulic mobile jib 110, climb by first top For terraced 112 vertical weldings on 11 side surface of the first hydraulic lifting support column, the fixed truss 113 in the first top passes through bolt riveting Conjunction is connected to 111 top of the first hydraulic strut, and the top material transmission fixed cross beam device 13 is equipped with top braces crossbeam 130, the first fixed chain 131, first material transmit pulley 132, first material transmission rope 133, second fixes chain 134, Second material transmits pulley 135, second material transmits rope 136, and 130 vertical welding of top braces crossbeam is in the first top Between the fixed truss 213 of fixed truss 113 and the second top, the described first fixed chain 131 is connected to top braces crossbeam 130 Between first material transmission pulley 132, the first material transmission pulley 132 is connected to the first fixing lock by screw thread engagement 131 lower section of chain, the first material transmission rope 133 are connected to the first rope twisting shaft 436 and transmit pulley with first material Between 132, the described second fixed chain 134 is connected between top braces crossbeam 130 and second material transmission pulley 135, institute It states second material transmission pulley 135 and second fixed 134 lower section of chain, the second material transmission rope is connected to by screw thread engagement Rope 136 is connected between third rope twisting shaft 636 and second material transmission pulley 135, the first hydraulic pressure support column touching It is solid equipped with the first triggering starting push rod 400, the first strength reset spring 401, the first driving gear set kelly to send out starter 40 Determine supporting plate 402, the first driving gear set kelly 403, the first triggering starting push rod 400 is connected to the first strength reset spring 401 and first Hanging Basket chassis interior transmission cabinet 4 between, the first strength reset spring 401 be connected to the first triggering starting Between push rod 400 and the first Hanging Basket chassis interior transmission cabinet 4, the first driving gear set kelly fixed supported slab 402 is vertical It is welded on the first Hanging Basket chassis interior transmission 4 inner wall of cabinet, the first driving gear set kelly 403 is engaged by screw thread to be connected It is connected on the first driving gear set kelly fixed supported slab 402, the first hydraulic pressure support column control transmission device 41 is equipped with first Gear wheel 410, first gear conveyer belt 411, the first drive pinion 412, first transmission principal arm bar 413, first is driven to be driven The hydraulic push of branch armed lever 414, first is driven the hydraulic push strut fixed plate 416 of strut 415, first, the first hydraulic push piston Plate 417, the first transmission gear wheel 410 are connected to the first Hanging Basket chassis interior by screw thread engagement and are driven on 4 inner wall of cabinet, The first gear conveyer belt 411 is connected between the first transmission gear wheel 410 and the first drive pinion 412, and described first Drive pinion 412 is connected to 410 lower section of the first transmission gear wheel by screw thread engagement, and the first transmission principal arm bar 413 is logical It crosses screw thread engagement to be connected on 412 side of the first drive pinion, the first transmission arm bar 414 is engaged by screw thread and connected Between the first transmission principal arm bar 413 and the first hydraulic push transmission strut 415, the first hydraulic push is driven strut 415, which are fixedly connected on the first Hanging Basket chassis interior by the first hydraulic push strut fixed plate 416, is driven on 4 inner wall of cabinet, institute The first hydraulic push strut fixed plate 416 is stated to be connected on the first Hanging Basket chassis interior transmission 4 inner wall of cabinet by bolt riveted, The first hydraulic push piston plate 417 is connected to the first hydraulic push by bolt riveted and is driven 415 top of strut, and described the By being excessively cooperatively connected inside the first hydraulic lifting support column 14, the first material passes one hydraulic push piston plate 417 Control transmission device 43 is sent to be equipped with first material drive pinion 430, first material toothed belts 431, first material transmission The fixed transmission of bracket 433, first of gear wheel 432, the first transmission gear folds strut 434, the first drive shaft 435, first rope Rope twisting shaft 436, the first material drive pinion 430 are connected to the fixed bracket of the first transmission gear by screw thread engagement On 433 sides, the first material toothed belts 431 are connected to first material drive pinion 430 and first material is driven Between gear wheel 432, the first material transmission gear wheel 432 is connected to first material drive pinion by screw thread engagement 430 lower sections, the fixed bracket 433 of first transmission gear are connected to the first Hanging Basket chassis interior by screw thread engagement and are driven cabinet On 4 inner walls, first transmission folds strut 434 and is connected to first material drive pinion 430 and first by screw thread engagement Between drive shaft 435, first drive shaft 435 is connected to the first transmission by screw thread engagement and folds strut 434 and the Between one rope twisting shaft 436, the first rope twisting shaft 436 is connected in the first Hanging Basket pedestal by screw thread engagement Portion is driven on 4 outer wall of cabinet.
User can arbitrarily adjust the spacing of Hanging Basket when carrying out bridge construction by this equipment, while by simple Operation can adjust the height of Hanging Basket, improve using flexible, and can be solved by self-feeding while construction The feeding problems of high altitude operation, light and flexible of the present invention, and adjustable spacing, safety and stability.
First strength reset spring of the present invention is that deformation occurs under external force, and after removing external force, spring is just It can restore the spring structure of state.
First material of the present invention transmission pulley is that a periphery has slot, is capable of the steamboat of pivoting, by can be around It can be cried around the simple and mechanical of center axis rotation composed by the fluted disk of central axis rotation and flexible cable across disk Make pulley.
Problems solved by the invention is the prior art in use, because the splicing in the left width of bridge and the right width of bridge was closed up Cheng Zhong, due to its property independent of one another, bridge is difficult to ensure good Linear Control, and cause the construction precision of bridge under Drop, while the main couple structure of Hanging Basket causes the structural stability of Hanging Basket to be difficult to be protected, in construction progress, construction safety, And be difficult to be controlled in cost control, the present invention is combined with each other by above-mentioned component, can arbitrarily adjust Hanging Basket Spacing, while the height of Hanging Basket can be adjusted by shirtsleeve operation, using flexible is improved, and can while construction To solve the feeding problems of high altitude operation, light and flexible of the present invention, and adjustable spacing by self-feeding, safety is steady It is fixed.
In summary: when the first triggering starting push rod material is stainless steel, the first triggering starts the firm of push rod material Property it is most strong, corrosion resistance is best, thus select stainless steel as first triggering starting push rod material be optimal selection.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of more truss-like supper wide type hanging basket for bridge construction, structure include the first bridge construction with hang blue support frame (1), Second bridge construction is driven cabinet with indigo plant support frame (2), foldable construction hanging basket device (3), the first Hanging Basket chassis interior is hung (4), the second Hanging Basket chassis interior transmission cabinet (5), third Hanging Basket chassis interior transmission cabinet (6), first bridge construction Foldable construction hanging basket device (3) side is connected to by bolt riveted with blue support frame (1) is hung, second bridge construction is used It hangs blue support frame (2) and foldable construction hanging basket device (3) other side, the foldable construction hanging basket is connected to by bolt riveted Device (3) is connected to the first bridge construction by bolt riveted and hangs blue support frame (1) and the blue support of the second bridge construction extension Between frame (2), the first Hanging Basket chassis interior transmission cabinet (4) is connected to the first hydraulic lifting support column by bolt riveted (11) bottom, the second Hanging Basket chassis interior transmission cabinet (5) are connected to the second hydraulic lifting support column by bolt riveted (21) lower section, third Hanging Basket chassis interior transmission cabinet (6) pass through third hydraulic lifting support column (14) bottom, feature It is:
First bridge construction is used equipped with the first bridge construction with the blue support frame (1) of extension and hangs indigo plant support frame base (10), first Hydraulic lifting support column (11) hangs blue support frame base spacing adjusting atmospheric pressure pole (12), top material transmission fixed cross beam device (13), third hydraulic lifting support column (14), first bridge construction pass through bolt riveted with blue support frame base (10) is hung It is connected to below the first hydraulic lifting support column (11), the first hydraulic lifting support column (11) is connected to by bolt riveted Foldable construction hanging basket device (3) one end, the blue support frame base spacing of the extension adjust atmospheric pressure pole (12) vertical welding in first Bridge construction is used with the blue support frame base (10) of extension and the second bridge construction and is hung between blue support frame base (20), the headpiece Material transmission fixed cross beam device (13) vertical welding is fixed truss (213) in the first top fixed truss (113) and the second top Between, the third hydraulic lifting support column (14) is connected to third Hanging Basket chassis interior transmission cabinet (6) by bolt riveted Top;
First bridge construction is climbed pedal (100), the first bottom line with hanging blue support frame base (10) and be equipped with the first bottom Wheel (101) is walked, first bottom is climbed, and pedal (100) is uniform to be equidistantly welded in the blue support frame base of the first bridge construction extension (10) on outer surface, first bottom traveling wheel (101) is connected to the first bridge construction by bolt riveted and hangs blue support Frame pedestal (10) bottom;
The blue support frame base spacing of the extension adjusts atmospheric pressure pole (12) and is equipped with the first Hanging Basket support frame gas strut (120), first Hanging Basket support frame air pressure mobile jib (121), the second Hanging Basket support frame gas strut (122), the first Hanging Basket support frame air pressure branch Bar (120) vertical welding is used in the first bridge construction and is hung on blue support frame base (10) outer wall, the first Hanging Basket support frame gas Press mobile jib (121) by being excessively cooperatively connected in the first Hanging Basket support frame gas strut (120) and the second Hanging Basket support frame air pressure Between strut (122), the second Hanging Basket support frame gas strut (122) vertical welding is in the second Hanging Basket chassis interior driver On case (5) outer wall;
The third hydraulic lifting support column (14) is equipped with the hydraulic mobile jib of third (140), third hydraulic strut (141), third top Portion's climbing ladder (142), the hydraulic mobile jib of third (140) are connected to third bridge construction by bolt riveted and hang blue support frame Pedestal (10) upper surface, the third hydraulic strut (141), which passes through, to be excessively cooperatively connected above the hydraulic mobile jib of third (140), Climbing ladder (142) vertical welding is on third hydraulic lifting support column (14) side surface at the top of the third;
Second bridge construction is used equipped with the second bridge construction with the blue support frame (2) of extension and hangs indigo plant support frame base (20), second Hydraulic lifting support column (21), second bridge construction are connected to second by bolt riveted with the blue support frame base (20) of extension Below hydraulic lifting support column (21), the second hydraulic lifting support column (21) is connected to the second bridge by bolt riveted and applies Work is between the blue support frame base (20) of extension and the second top fixed truss (213);
Second bridge construction is climbed pedal (200), the second bottom line with hanging blue support frame base (20) and be equipped with the second bottom Wheel (201) is walked, second bottom is climbed, and pedal (200) is uniform to be equidistantly welded in the blue support frame base of the second bridge construction extension (20) on outer surface, second bottom traveling wheel (201) is connected to the second bridge construction by bolt riveted and hangs blue support Frame pedestal (20) bottom;
The second hydraulic lifting support column (21) is equipped with the second hydraulic mobile jib (210), the second hydraulic strut (211), the second top Portion's climbing ladder (212), the second top are fixed truss (213), and the second hydraulic mobile jib (210) is connected to the by bolt riveted Two bridge constructions with hanging blue support frame base (20) upper surface, second hydraulic strut (211) by be excessively cooperatively connected in Above second hydraulic mobile jib (210), second top climbing ladder (212) vertical welding is in the second hydraulic lifting support column (21) On side surface, second top fixed truss (213) is connected at the top of the second hydraulic strut (211) by bolt riveted;
The foldable construction hanging basket device (3), which is equipped with, folds strut fixed rotating shaft (30), Hanging Basket foldable support (31), described It folds strut fixed rotating shaft (30) to be connected between Hanging Basket foldable support (31) by bolt riveted, the foldable branch of Hanging Basket Bar (31) is connected on foldable construction hanging basket device (3) by bolt riveted;
First Hanging Basket chassis interior transmission cabinet (4) is equipped with the first hydraulic pressure support column and triggers starter (40), the first liquid Support column control transmission device (41), the first support base internal drive electric machine (42), first material transmission control is pressed to pass Dynamic device (43), the first hydraulic pressure support column triggering starter (40) are connected in the first Hanging Basket pedestal by bolt riveted Portion is driven on cabinet (4) inner wall, and the first hydraulic pressure support column control transmission device (41) passes through screw thread and the first hydraulic pressure support Column triggering starter (40) engagement is connected in same level, the first support base internal drive electric machine (42) It is connected to the first Hanging Basket chassis interior by bolt riveted to be driven in cabinet (4) inner bottom surface, the first material transmission control Transmission device (43) is connected to the first Hanging Basket chassis interior by bolt riveted and is driven on cabinet (4) inner wall;
The first support base internal drive electric machine (42) is equipped with the first control power pack (420), the first control transmission Motor (421), first control power pack (420) are connected to the first Hanging Basket chassis interior by bolt riveted and are driven cabinet (4) in inner bottom surface, first control driving motor (421) is connected to the first control power pack (420) by bolt riveted Top;
Second Hanging Basket chassis interior transmission cabinet (5) is equipped with the second hydraulic pressure support column and triggers starter (50), the second liquid Support column control transmission device (51), the second support base internal drive electric machine (52), second material transmission control is pressed to pass Dynamic device (53), the second hydraulic pressure support column triggering starter (50) are connected in the second Hanging Basket pedestal by bolt riveted Portion is driven on cabinet (5) inner wall, and the second hydraulic pressure support column control transmission device (51) passes through screw thread and the second hydraulic pressure support Column triggering starter (50) engagement is connected in same level, the second support base internal drive electric machine (52) It is connected to the second Hanging Basket chassis interior by bolt riveted to be driven in cabinet (5) inner bottom surface, the second material transmission control Transmission device (53) is connected to the second Hanging Basket chassis interior by bolt riveted and is driven on cabinet (5) inner wall;
Second hydraulic pressure support column triggering starter (50) is equipped with the second triggering starting push rod (500), the second strength resets Spring (501), the second driving gear set kelly fixed supported slab (502), the second driving gear set kelly (503), second touching Hair starting push rod (500) is connected between the second strength reset spring (501) and the second Hanging Basket chassis interior transmission cabinet (5), The second strength reset spring (501) is connected to the second triggering starting push rod (500) and the second Hanging Basket chassis interior driver Between case (5), the second driving gear set kelly fixed supported slab (502) vertical welding is in the second Hanging Basket chassis interior driver On case (5) inner wall, the second driving gear set kelly (503) is connected to the second driving gear set kelly by screw thread engagement and consolidates Determine on supporting plate (502);
Second hydraulic pressure support column control transmission device (51) is equipped with the second transmission gear wheel (510), second gear conveyer belt (511), the second drive pinion (512), the second transmission principal arm bar (513), the second transmission arm bar (514), the second hydraulic thrust It send and is driven strut (515), the second hydraulic push strut fixed plate (516), the second hydraulic push piston plate (517), described second Transmission gear wheel (510) is connected to the second Hanging Basket chassis interior by screw thread engagement and is driven on cabinet (5) inner wall, second tooth Wheel conveyer belt (511) is connected between the second transmission gear wheel (510) and the second drive pinion (512), second transmission Pinion gear (512) is connected to below the second transmission gear wheel (510) by screw thread engagement, second transmission principal arm bar (513) It is connected on the second drive pinion (512) side by screw thread engagement, the second transmission arm bar (514) is nibbled by screw thread Conjunction is connected between second transmission principal arm bar (513) and the second hydraulic push transmission strut (515), second hydraulic thrust Transmission strut (515) is sent to be fixedly connected on the transmission of the second Hanging Basket chassis interior by the second hydraulic push strut fixed plate (516) On cabinet (5) inner wall, the second hydraulic push strut fixed plate (516) is connected in the second Hanging Basket pedestal by bolt riveted Portion is driven on cabinet (5) inner wall, and the second hydraulic push piston plate (517) is connected to the second hydraulic push by bolt riveted It is driven strut (515) top, the second hydraulic push piston plate (517) is by being excessively cooperatively connected in the second hydraulic lifting branch Dagger (14) is internal;
The second support base internal drive electric machine (52) is equipped with the second control power pack (520), the second control transmission Motor (521), second control power pack (520) are connected to the second Hanging Basket chassis interior by bolt riveted and are driven cabinet (5) in inner bottom surface, second control driving motor (521) is connected to the second control power pack (520) by bolt riveted Top;
Second material transmission control transmission device (53) is equipped with second material drive pinion (530), second material gear Conveyer belt (531), second material transmission gear wheel (532), the second transmission gear fixed bracket (533), the second transmission fold branch Bar (534), the second drive shaft (535), the second rope twisting shaft (536), the second material drive pinion (530) are logical It crosses screw thread engagement to be connected on fixed bracket (533) side of the second transmission gear, the second material toothed belts (531) are even It is connected between second material drive pinion (530) and second material transmission gear wheel (532), the second material is driven canine tooth Wheel (532) is connected to below second material drive pinion (530) by screw thread engagement, the fixed bracket of second transmission gear (533) it is connected to the second Hanging Basket chassis interior by screw thread engagement to be driven on cabinet (5) inner wall, second transmission folds strut (534) it is connected between second material drive pinion (530) and the second drive shaft (535) by screw thread engagement, described the Two drive shafts (535) are connected to the second transmission by screw thread engagement and fold strut (534) and the second rope twisting shaft (536) Between, the second rope twisting shaft (536) is connected to the second Hanging Basket chassis interior transmission cabinet (5) outside by screw thread engagement On wall;
Third Hanging Basket chassis interior transmission cabinet (6) is equipped with third hydraulic pressure support column and triggers starter (60), third liquid Support column control transmission device (61), third support base internal drive electric machine (62), the control of third material transmission is pressed to pass Dynamic device (63), third hydraulic pressure support column triggering starter (60) are connected in third Hanging Basket pedestal by bolt riveted Portion is driven on cabinet (6) inner wall, and third hydraulic pressure support column control transmission device (61) passes through screw thread and third hydraulic pressure support Column triggering starter (60) engagement is connected in same level, the third support base internal drive electric machine (62) It is connected to third Hanging Basket chassis interior by bolt riveted to be driven in cabinet (6) inner bottom surface, the third material transmission control Transmission device (63) is connected to third Hanging Basket chassis interior by bolt riveted and is driven on cabinet (6) inner wall;
Third hydraulic pressure support column triggering starter (60) is equipped with third triggering starting push rod (600), third strength resets Spring (601), third driving gear set kelly fixed supported slab (602), third driving gear set kelly (603), the third touching Hair starting push rod (600) is connected between third strength reset spring (601) and third Hanging Basket chassis interior transmission cabinet (6), The third strength reset spring (601) is connected to third triggering starting push rod (600) and third Hanging Basket chassis interior driver Between case (6), third driving gear set kelly fixed supported slab (602) vertical welding is in third Hanging Basket chassis interior driver On case (6) inner wall, the third driving gear set kelly (603) is connected to third driving gear set kelly by screw thread engagement and consolidates Determine on supporting plate (602);
Third hydraulic pressure support column control transmission device (61) is equipped with third and is driven gear wheel (610), third toothed belts (611), third drive pinion (612), third are driven principal arm bar (613), third transmission arm bar (614), third hydraulic thrust Send transmission strut (615), the hydraulic push strut fixed plate (616) of third, the hydraulic push piston plate (617) of third, the third Transmission gear wheel (610) is connected to third Hanging Basket chassis interior by screw thread engagement and is driven on cabinet (6) inner wall, the third tooth Wheel conveyer belt (611) is connected between third transmission gear wheel (610) and third drive pinion (612), the third transmission Pinion gear (612) is connected to below third transmission gear wheel (610) by screw thread engagement, and the third is driven principal arm bar (613) It is connected on third drive pinion (612) side by screw thread engagement, the third transmission arm bar (614) is nibbled by screw thread Conjunction is connected between third transmission principal arm bar (613) and hydraulic push transmission strut (615) of third, the third hydraulic thrust Transmission strut (615) is sent to be fixedly connected on the transmission of third Hanging Basket chassis interior by the hydraulic push strut fixed plate (616) of third On cabinet (6) inner wall, the hydraulic push strut fixed plate (616) of third is connected in third Hanging Basket pedestal by bolt riveted Portion is driven on cabinet (6) inner wall, and the hydraulic push piston plate (617) of third is connected to the hydraulic push of third by bolt riveted It is driven strut (615) top, the hydraulic push piston plate (617) of third is by being excessively cooperatively connected in third hydraulic lifting branch Dagger (14) is internal;
The third support base internal drive electric machine (62) is equipped with third control power pack (620), third control transmission Motor (621), third control power pack (620) are connected to third Hanging Basket chassis interior by bolt riveted and are driven cabinet (6) in inner bottom surface, third control driving motor (621) is connected to third control power pack (620) by bolt riveted Top;
Third material transmission control transmission device (63) is equipped with third material drive pinion (630), third material gear Conveyer belt (631), third material transmission gear wheel (632), third transmission gear fixed bracket (633), third transmission fold branch Bar (634), third drive shaft (635), third rope twisting shaft (636), the third material drive pinion (630) are logical It crosses screw thread engagement to be connected on fixed bracket (633) side of third transmission gear, the third material toothed belts (631) are even It is connected between third material drive pinion (630) and third material transmission gear wheel (632), the third material is driven canine tooth Wheel (632) is connected to below third material drive pinion (630) by screw thread engagement, the fixed bracket of the third transmission gear (633) it is connected to third Hanging Basket chassis interior by screw thread engagement to be driven on cabinet (6) inner wall, the third transmission folds strut (634) it is connected between third material drive pinion (630) and third drive shaft (635) by screw thread engagement, described the Three drive shafts (635) are connected to third transmission by screw thread engagement and fold strut (634) and third rope twisting shaft (636) Between, the third rope twisting shaft (636) is connected to third Hanging Basket chassis interior transmission cabinet (6) outside by screw thread engagement On wall.
2. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 1, it is characterised in that: described first Hydraulic lifting support column (11) is equipped with the first hydraulic mobile jib (110), the first hydraulic strut (111), the first top climbing ladder (112), the first top is fixed truss (113), and the first hydraulic mobile jib (110) is connected to the first bridge by bolt riveted and applies For work with blue support frame base (10) upper surface is hung, first hydraulic strut (111) is hydraulic in first by being excessively cooperatively connected Above mobile jib (110), first top climbing ladder (112) vertical welding is in first hydraulic lifting support column (11) side surface On, first top fixed truss (113) is connected at the top of the first hydraulic strut (111) by bolt riveted.
3. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 1, it is characterised in that: the top Material transmission fixed cross beam device (13) is equipped with top braces crossbeam (130), first fixed chain (131), first material transmission Pulley (132), first material transmission rope (133), second fixed chain (134), second material transmit pulley (135), second Material transmission rope (136), top braces crossbeam (130) vertical welding is in the first top fixed truss (113) and second Between top fixed truss (213), described first fixed chain (131) are connected to top braces crossbeam (130) and first material It transmits between pulley (132).
4. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 3, it is characterised in that: described first Material transmission pulley (132) is connected to below first fixed chain (131) by screw thread engagement, and the first material transmits rope (133) it is connected between the first rope twisting shaft (436) and first material transmission pulley (132), the described second fixed chain (134) it is connected between top braces crossbeam (130) and second material transmission pulley (135), the second material transmits pulley (135) it is connected to below second fixed chain (134) by screw thread engagement, second material transmission rope (136) is connected to Between third rope twisting shaft (636) and second material transmission pulley (135).
5. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 1, it is characterised in that: described first Hydraulic pressure support column triggers starter (40) and is equipped with the first triggering starting push rod (400), the first strength reset spring (401), the One driving gear set kelly fixed supported slab (402), the first driving gear set kelly (403), the first triggering starting push rod (400) it is connected between the first strength reset spring (401) and the first Hanging Basket chassis interior transmission cabinet (4), the last the first Power reset spring (401) is connected between the first triggering starting push rod (400) and the first Hanging Basket chassis interior transmission cabinet (4), First driving gear set kelly fixed supported slab (402) vertical welding is driven cabinet (4) inner wall in the first Hanging Basket chassis interior On, the first driving gear set kelly (403) is connected to the first driving gear set kelly fixed supported slab by screw thread engagement (402) on.
6. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 1, it is characterised in that: described first Hydraulic pressure support column controls transmission device (41) and is equipped with the first transmission gear wheel (410), first gear conveyer belt (411), the first biography Dynamic pinion gear (412), the first transmission principal arm bar (413), the first transmission arm bar (414), the first hydraulic push are driven strut (415), the first hydraulic push strut fixed plate (416), the first hydraulic push piston plate (417), the first transmission gear wheel (410) it is connected to the first Hanging Basket chassis interior by screw thread engagement to be driven on cabinet (4) inner wall, the first gear conveyer belt (411) it is connected between the first transmission gear wheel (410) and the first drive pinion (412), first drive pinion (412) it is connected to below the first transmission gear wheel (410) by screw thread engagement.
7. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 6, it is characterised in that: described first Transmission principal arm bar (413) is connected on the first drive pinion (412) side by screw thread engagement, the first transmission arm bar (414) by screw thread engagement be connected to first transmission principal arm bar (413) and the first hydraulic push be driven strut (415) it Between, first hydraulic push transmission strut (415) is fixedly connected on first by the first hydraulic push strut fixed plate (416) Hanging Basket chassis interior is driven on cabinet (4) inner wall.
8. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 6, it is characterised in that: described first Hydraulic push strut fixed plate (416) is connected to the first Hanging Basket chassis interior by bolt riveted and is driven on cabinet (4) inner wall, institute It states the first hydraulic push piston plate (417) and first hydraulic push transmission strut (415) top is connected to by bolt riveted, it is described First hydraulic push piston plate (417) is internal in the first hydraulic lifting support column (14) by being excessively cooperatively connected.
9. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 1, it is characterised in that: described first Material transmission control transmission device (43) be equipped with first material drive pinion (430), first material toothed belts (431), First material is driven gear wheel (432), the first transmission gear fixed bracket (433), the first transmission folding strut (434), first Drive shaft (435), the first rope twisting shaft (436), the first material drive pinion (430) is engaged by screw thread to be connected It is connected on fixed bracket (433) side of the first transmission gear, the first material toothed belts (431) are connected to first material Between drive pinion (430) and first material transmission gear wheel (432), first material transmission gear wheel (432) passes through Screw thread engagement is connected to below first material drive pinion (430).
10. a kind of more truss-like supper wide type hanging basket for bridge construction according to claim 9, it is characterised in that: described One transmission gear fixed bracket (433) is connected to the first Hanging Basket chassis interior by screw thread engagement and is driven on cabinet (4) inner wall, institute It states the first transmission and folds strut (434) and be connected to first material drive pinion (430) by screw thread engagement and be driven with first and turn Between axis (435), first drive shaft (435) is connected to the first transmission by screw thread engagement and folds strut (434) and the Between one rope twisting shaft (436), the first rope twisting shaft (436) is connected to the first Hanging Basket bottom by screw thread engagement On seat internal drive cabinet (4) outer wall.
CN201811136303.0A 2018-09-28 2018-09-28 A kind of more truss-like supper wide type hanging basket for bridge construction Withdrawn CN108999095A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811136303.0A CN108999095A (en) 2018-09-28 2018-09-28 A kind of more truss-like supper wide type hanging basket for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811136303.0A CN108999095A (en) 2018-09-28 2018-09-28 A kind of more truss-like supper wide type hanging basket for bridge construction

Publications (1)

Publication Number Publication Date
CN108999095A true CN108999095A (en) 2018-12-14

Family

ID=64589004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811136303.0A Withdrawn CN108999095A (en) 2018-09-28 2018-09-28 A kind of more truss-like supper wide type hanging basket for bridge construction

Country Status (1)

Country Link
CN (1) CN108999095A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172884A (en) * 2020-01-13 2020-05-19 台州学院 Be applied to support that slides of bridge construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202116990U (en) * 2011-06-14 2012-01-18 乔国华 Hydraulic truss type movable hanging basket for repairing and maintaining bridges
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN103850185A (en) * 2014-02-20 2014-06-11 中交三航局第三工程有限公司 Multi-truss type hanging basket for super-wide type bridge construction
CN105839549A (en) * 2016-05-20 2016-08-10 中国水利水电第十工程局有限公司 Truss type cantilever construction hanging basket
CN107954347A (en) * 2017-11-26 2018-04-24 谢晓燕 A kind of bridge construction in science of bridge building field transports lifting device with material
CN108358051A (en) * 2018-01-25 2018-08-03 庄明忠 One kind can become straddle type gantry automatically

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202116990U (en) * 2011-06-14 2012-01-18 乔国华 Hydraulic truss type movable hanging basket for repairing and maintaining bridges
WO2013149771A1 (en) * 2012-04-02 2013-10-10 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN103850185A (en) * 2014-02-20 2014-06-11 中交三航局第三工程有限公司 Multi-truss type hanging basket for super-wide type bridge construction
CN105839549A (en) * 2016-05-20 2016-08-10 中国水利水电第十工程局有限公司 Truss type cantilever construction hanging basket
CN107954347A (en) * 2017-11-26 2018-04-24 谢晓燕 A kind of bridge construction in science of bridge building field transports lifting device with material
CN108358051A (en) * 2018-01-25 2018-08-03 庄明忠 One kind can become straddle type gantry automatically

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111172884A (en) * 2020-01-13 2020-05-19 台州学院 Be applied to support that slides of bridge construction
CN111172884B (en) * 2020-01-13 2021-07-09 台州学院 Be applied to support that slides of bridge construction

Similar Documents

Publication Publication Date Title
CN114362057B (en) Self-adaptation centre gripping type underground pipe gallery cable laying draw gear
CN205346760U (en) Hoist overhauls uses elevating platform
CN113911906B (en) Bridge gantry crane hanger and application method thereof
CN206278874U (en) A kind of construction Special lifting ladder
CN103306199A (en) Mounting method of bottom width overhaul hanging basket of bridge
CN201411635Y (en) Construction trolley of safety barrier template
CN102040009A (en) Deployable reflecting surface device under traction drive of rope
PL187034B1 (en) Tower
CN108999095A (en) A kind of more truss-like supper wide type hanging basket for bridge construction
CN113622311B (en) Self-climbing safe operation platform for pouring construction of pier column and construction method thereof
CN201801807U (en) Movable temporary bridge vehicle for emergency rescue
CN106703509A (en) Suspension type fence hoisting equipment and hoisting method thereof
CN213417588U (en) Bridge bottom surface construction platform
CN106437126B (en) A kind of console mode hydraulic lifting scaffold guiding bearing and method for dismounting
CN213476647U (en) Construction hanging basket suspension device for steel structure gallery bridge
CN203255939U (en) Universal adjustable type hoist high-place operation platform
CN110182698B (en) Climbing device and self-climbing crane
CN202098988U (en) Crane
CN206707248U (en) A kind of hanging basket for overflow weir
CN207647451U (en) A kind of water conservancy work climbing ladder being easily installed dismounting
CN108547439A (en) A kind of construction overhanging type mobile platform
CN209523179U (en) Multifunctional guide radix saposhnikoviae operating platform
CN219992401U (en) Combined frame with protection function for maintaining offshore platform
CN201037404Y (en) Straight line pumping unit tower support with mine mouth dodging mechanism
CN205472342U (en) Tower jacking device from bottom jacking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181214