CN213476647U - Construction hanging basket suspension device for steel structure gallery bridge - Google Patents

Construction hanging basket suspension device for steel structure gallery bridge Download PDF

Info

Publication number
CN213476647U
CN213476647U CN202022143997.XU CN202022143997U CN213476647U CN 213476647 U CN213476647 U CN 213476647U CN 202022143997 U CN202022143997 U CN 202022143997U CN 213476647 U CN213476647 U CN 213476647U
Authority
CN
China
Prior art keywords
bridge
hanging
basket body
sliding
flower basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022143997.XU
Other languages
Chinese (zh)
Inventor
黎钢
刘源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Lianxing Construction Engineering Co ltd
Original Assignee
Sichuan Lianxing Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Lianxing Construction Engineering Co ltd filed Critical Sichuan Lianxing Construction Engineering Co ltd
Priority to CN202022143997.XU priority Critical patent/CN213476647U/en
Application granted granted Critical
Publication of CN213476647U publication Critical patent/CN213476647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction hanging flower basket linkage for steel construction gallery bridge, it includes the hanging flower basket body, the hanging flower basket body hangs on the bridge, connect through hanging the subassembly between hanging flower basket body and the bridge, it includes the crossbeam to hang the subassembly, the both ends of crossbeam all are provided with the connecting piece with this body coupling of hanging flower basket, the both ends of crossbeam all are provided with a plurality of first gyro wheels, the top of bridge is provided with many guide rails, the length direction of guide rail is mutually perpendicular with the length direction of crossbeam, first gyro wheel and guide rail sliding fit, be provided with the butt piece on the hanging flower basket body, be provided with the second gyro wheel on the butt piece, the second gyro wheel can roll in the bottom of bridge. This application has the effect of being convenient for remove hanging flower basket body.

Description

Construction hanging basket suspension device for steel structure gallery bridge
Technical Field
The application relates to the field of bridge construction equipment, in particular to a construction hanging basket suspension device for a steel structure gallery bridge.
Background
With the continuous change of times and the rapid speed of the traffic industry, a bridge is an essential item in traffic construction, the bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass, a gallery bridge is also one type of bridge, and a construction hanging basket is a common construction device in the construction of the gallery bridge.
The current chinese patent with an authorization publication number CN206143647U discloses a hanging basket device for bridge construction, which has the key points of the technical scheme: including the hanging flower basket main part, the hanging flower basket main part comprises the left branch vaulting pole and the right branch vaulting pole that vertical parallel and level set up each other and the footboard of fixed connection between left branch vaulting pole and right branch vaulting pole, the inboard horizontal fixedly connected with strengthening mechanism of left branch vaulting pole and right branch vaulting pole, strengthening mechanism comprises the pole setting and the reinforcement muscle that last base bar and lower base bar and interval set up between last base bar and lower base bar of mutual horizontal parallel and level.
In view of the above-mentioned related art, the inventor believes that there is a drawback in that the basket device body is fixed to the bridge and it is inconvenient to move the basket body.
SUMMERY OF THE UTILITY MODEL
In order to facilitate removing the hanging flower basket body, this application provides a construction hanging flower basket linkage for steel construction gallery bridge.
The application provides a construction hanging flower basket linkage for steel construction gallery bridge adopts following technical scheme:
the utility model provides a construction hanging flower basket linkage for steel construction gallery bridge, includes the hanging flower basket body, the hanging flower basket body hangs on the bridge, connect through hanging the subassembly between hanging flower basket body and the bridge, it includes the crossbeam to hang the subassembly, the both ends of crossbeam all are provided with the connecting piece with this body coupling of hanging flower basket, the both ends of crossbeam all are provided with a plurality of first gyro wheels, the top of bridge is provided with many guide rails, the length direction of guide rail is mutually perpendicular with the length direction of crossbeam, first gyro wheel and guide rail sliding fit, be provided with the butt piece on the hanging flower basket body, be provided with the second gyro wheel on the butt piece, the second gyro wheel can roll in the bottom of bridge.
By adopting the technical scheme, the two ends of the cross beam are respectively provided with the first rollers, the cross beam can roll on the bridge while the first rollers can provide a supporting effect for the cross beam, and the position of the hanging basket body on the bridge can be changed by the movement of the cross beam relative to the bridge, so that the hanging basket is convenient for workers to use; the both ends of butt piece respectively with the top of hanging flower basket body and the bottom butt of bridge, the butt piece can provide the reaction force that comes from the bridge for the hanging flower basket body, make the hanging flower basket body be difficult for taking place to rock, when removing the hanging flower basket body, the second gyro wheel on the butt piece can roll in the bottom of bridge, the butt piece can always with the bottom butt of bridge in the removal in-process of hanging flower basket body, make the hanging flower basket body also difficult the emergence of taking place to rock at the removal in-process, the advantage of being convenient for remove the hanging flower basket body has.
Preferably, the through grooves are formed in the two ends of the cross beam, a plurality of connecting shafts are arranged in the through grooves in a rotating mode, the length direction of each connecting shaft is consistent with the length direction of the cross beam, and the inner rings of the first idler wheels are in interference fit with the connecting shafts respectively.
Through adopting above-mentioned technical scheme, the logical groove that sets up at the crossbeam both ends provides the position of placing for first gyro wheel, many connecting axles rotate to set up in first logical groove, the both ends of connecting axle respectively with the both ends butt that leads to the groove, first gyro wheel is fixed to be established on the connecting axle, the length direction of connecting axle is unanimous with the length direction of crossbeam makes the length direction of the roll direction perpendicular to crossbeam of first gyro wheel, when the crossbeam moves on the bridge, a plurality of first gyro wheels can roll on the bridge, thereby reduce the frictional force between crossbeam and the bridge when the crossbeam removes, be convenient for remove the crossbeam.
Preferably, the connecting piece includes two capstans, two all around being equipped with the connecting cable wire on the capstan winch, the one end that the capstan winch was kept away from to the connecting cable wire is provided with the couple, be provided with on the hanging flower basket body with couple complex link, the both ends of crossbeam all are provided with the biax motor, two the axis of rotation of capstan winch respectively with two output shaft fixed connection of biax motor.
By adopting the technical scheme, the construction hanging basket is fixed on the cross beam through the plurality of connecting steel cables, the plurality of connecting steel cables are respectively wound on the plurality of winches, and after the double-shaft motor is started, the two output shafts of the double-shaft motor rotate to drive the winches to rotate, so that the winches can tighten or release the connecting steel cables, and the distance between the hanging basket body and the bridge is increased or reduced; the connecting steel cable is connected with the hanging ring through the hook, and the hook is not easy to fall off due to the gravity of the hanging basket body during normal work, so that the connecting steel cable can be conveniently detached from the hanging basket body when the hanging basket body is placed on the ground; have the effect of being convenient for adjust the distance between hanging flower basket body and the bridge, and be convenient for install the hanging flower basket body.
Preferably, the butt piece includes the bearing post, the vertical setting of bearing post is at the upper surface of hanging flower basket body, it is provided with the slip post to slide in the bearing post, the second gyro wheel rotates the top that sets up at the slip post, still be provided with the mounting on the slip post.
Through adopting above-mentioned technical scheme, the bottom of accepting the post and the bottom fixed connection of hanging flower basket body, when the post that slides upwards slides along vertical direction in accepting the post, the second gyro wheel on the slip post can with the bottom butt of bridge, when the staff passes through the distance between biax motor adjustment bridge and the hanging flower basket body, the slip post can slide in accepting the post, make the butt piece can be adapted to the distance between hanging flower basket body and the bridge, the both ends of butt post all the time with bridge and hanging flower basket body butt, thereby reduce rocking of hanging flower basket body, the application range of butt piece has been increased, it is more convenient during the use.
Preferably, accept post cavity setting, the fixed a plurality of sliders that are provided with on the slip post, many spouts have been seted up on the inside wall of accepting the post, slider and spout sliding fit, still be provided with the pneumatic cylinder in the accepting the post, the piston rod extending direction of pneumatic cylinder is unanimous with the slip direction of slip post, the piston rod of pneumatic cylinder and the bottom fixed connection of slip post.
By adopting the technical scheme, the sliding groove is formed in the inner side wall of the bearing column, when the sliding column slides in the bearing column, the sliding block also slides in the sliding groove, and the sliding block can provide a guiding effect for the sliding column; the piston rod of pneumatic cylinder and the bottom fixed connection of slip post need adjust the slip post when accepting the position on the post, can adjust through the pneumatic cylinder, have convenient to use, reduce staff intensity of labour's effect.
Preferably, the mounting includes two fixed plates, two the fixed plate all laminates with the bridge bottom, two all articulated connecting plates that are provided with on the fixed plate, the one end that the fixed plate was kept away from to the connecting plate is articulated to be set up on the sliding column.
Through adopting above-mentioned technical scheme, two fixed plates pass through the articulated setting of connecting plate on the slide bar, when the connecting plate rotated to be parallel with the slide bar, the fixed plate that sets up at the connecting plate tip can laminate with the bottom of bridge, two fixed plates can replace second gyro wheel and bridge butt this moment, when fixed hanging flower basket body, two fixed plates can laminate with the bottom of bridge for have bigger area of contact between butt spare and the bridge, thereby let the butt between butt spare and the bridge more stable.
Preferably, be provided with square card strip on the sliding column, two when the connecting plate rotated to be close to the sliding column, square card strip can be with two connecting plates restriction in square card strip.
Through adopting above-mentioned technical scheme, when the bottom butt of two fixed plates and bridge, can use square card strip to fix two connecting plates for two connecting plates can not rotate again, thereby make the laminating that the fixed plate can be more stable in the bottom of bridge, further reinforcing the stability of butt between butt piece and the bridge.
Preferably, a crawling ladder is fixedly arranged on one side of the hanging basket body, and a protection net is arranged on the crawling ladder.
Through adopting above-mentioned technical scheme, the staff can be through the cat ladder from the bridge to the hanging flower basket body on to construct, the protection network that sets up on the cat ladder can protect the staff to a certain extent, sets up the cat ladder and is convenient for the staff and goes up and down the hanging flower basket body.
In summary, the present application includes at least one of the following beneficial technical effects:
1. according to the hanging basket body, the first idler wheel is arranged on the cross beam, the second idler wheel is arranged on the abutting piece, and the first idler wheel and the second idler wheel can roll at the top and the bottom of the bridge respectively, so that the hanging basket body is not prone to shaking in the moving process, and the hanging basket body is convenient to move;
2. the plurality of winches are arranged on the cross beam, the winches are connected with the hanging basket body through the plurality of connecting steel cables, and the connecting steel cables are connected with the hanging basket body through the hooks and the hanging rings, so that the effect of conveniently adjusting the distance between the hanging basket body and the bridge is achieved;
3. this application is through setting up two fixed plates on the butt piece, when fixed hanging flower basket body, two fixed plates can laminate with the bottom of bridge for have bigger area of contact between butt piece and the bridge, thereby let the butt between butt piece and the bridge more stable.
Drawings
FIG. 1 is a schematic block diagram of one embodiment of the present invention;
FIG. 2 is a schematic structural view of a beam according to one embodiment of the present application;
FIG. 3 is an enlarged schematic view of portion A of FIG. 2;
FIG. 4 is a schematic view of a connection structure of a cross beam and a basket body according to one embodiment of the present application;
FIG. 5 is a schematic view of the abutment of one embodiment of the present application;
FIG. 6 is a schematic cross-sectional view of an abutment member according to an embodiment of the present application.
Description of reference numerals: 1. a bridge; 11. a guide rail; 2. a basket body; 21. hanging a ring; 22. climbing a ladder; 23. a protection net; 24. a guardrail; 3. a suspension assembly; 31. a cross beam; 311. a first roller; 312. a through groove; 313. a connecting shaft; 32. a connecting member; 321. a winch; 322. connecting a steel cable; 3221. hooking; 323. a double-shaft motor; 4. an abutting member; 41. a second roller; 42. a support post; 421. a cavity; 422. a chute; 423. a hydraulic cylinder; 43. a sliding post; 431. a slider; 432. a square clamping strip; 5. a fixing member; 51. a fixing plate; 52. a connecting plate.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
The embodiment of the application discloses a construction hanging flower basket linkage for steel construction gallery bridge. Referring to fig. 1, a construction hanging flower basket linkage for steel construction gallery bridge, including hanging flower basket body 2, hanging flower basket body 2 hangs the upper surface at bridge 1, connect through hanging subassembly 3 between hanging flower basket body 2 and the bridge 1, it can dismantle the setting on hanging flower basket body 2 to hang subassembly 3, can be convenient install or dismantle hanging flower basket body 2 on bridge 1, one side of hanging flower basket body 2 is the fixed cat ladder 22 that is provided with still, be provided with protecting wire net 23 on the cat ladder 22, the staff can enter into in hanging flower basket body 2 from bridge 1 through cat ladder 22, make things convenient for the staff to construct, still be provided with guardrail 24 on the hanging flower basket body 2, guardrail 24 and protecting wire net 23 homoenergetic enough protect the staff, prevent to a certain extent that the staff from falling from cat ladder 22 or hanging flower basket body 2.
Referring to fig. 2 and 3, the suspension assembly 3 includes a cross beam 31, the cross beam 31 is placed on the upper surface of the bridge 1 and can provide a supporting function for the basket body 2, through grooves 312 are respectively formed at two ends of the cross beam 31, a plurality of connecting shafts 313 are rotatably arranged in the through grooves 312, and the length directions of the connecting shafts 313 are consistent with the length direction of the cross beam 31; a plurality of first rollers 311 are further arranged in the through groove 312, inner rings of the plurality of first rollers 311 are in interference fit with the plurality of connecting shafts 313 respectively, and the rolling direction of the plurality of first rollers 311 is the same as the length direction of the bridge 1, and is perpendicular to the length direction of the cross beam 31; the top of the bridge 1 is provided with a plurality of guide rails 11, the first rollers 311 are in sliding fit with the guide rails 11, the first rollers 311 roll in the guide rails 11, and the guide rails 11 provide a guiding function for the rollers, so that the first rollers 311 can slide on a preset route and are not easy to deviate; the hanging basket body 2 is provided with the abutting piece 4, and the abutting piece 4 can abut against the hanging basket body 2 and the bridge 1 tightly, so that the hanging basket body 2 is not easy to shake under the bridge 1; the abutting pieces 4 are provided with second rollers 41, when the cross beam 31 moves, the second rollers 41 roll at the bottom of the bridge 1, the cross beam 31 can be moved without canceling the fixing effect of the abutting pieces 4, so that the abutting pieces 4 can fix the hanging basket body 2 to a certain extent in the moving process of the hanging basket body 2, and the hanging basket body 2 is not prone to shaking.
Referring to fig. 1 and 4, the two ends of the beam 31 are provided with connecting pieces 32 connected with the basket body 2, the connecting pieces 32 belong to a part of the suspension assembly 3, the connecting pieces 32 comprise two winches 321, each of the two winches 321 is wound with a connecting steel cable 322, and the connecting steel cable 322 can connect the beam 31 and the basket body 2; a hook 3221 is arranged at one end, far away from the winch 321, of the connecting steel cable 322, a hanging ring 21 matched with the hook 3221 is arranged on the hanging basket body 2, after the hook 3221 on the connecting steel cable 322 is hung on the hanging ring 21 on the hanging basket body 2, connection between the hook 3221 and the hanging ring 21 is not easy to loosen due to the gravity action of the hanging basket body 2, and the hanging hook 3221 and the hanging ring 21 are arranged to facilitate the hanging basket disassembly during construction; the both ends of crossbeam 31 all are provided with double-shaft motor 323, and the axis of rotation of two winches 321 is respectively with two output shaft fixed connection of double-shaft motor 323, and after double-shaft motor 323 started, two output shafts of double-shaft motor 323 were driving the axis of rotation of two winches 321 respectively and were taking place to rotate to tighten up or let out and connect cable wire 322, with promote or put down hanging flower basket body 2, have convenient to use, reduce staff intensity of labour's effect.
Referring to fig. 5 and 6, the abutting part 4 includes a receiving column 42, the receiving column 42 is vertically disposed on the upper surface of the basket body 2, a cavity 421 is formed in the receiving column 42, a sliding column 43 is disposed in the cavity 421, a plurality of sliding blocks 431 are fixedly disposed on the sliding column 43, a plurality of sliding grooves 422 are formed in the inner side wall of the receiving column 42, the sliding blocks 431 are in sliding fit with the sliding grooves 422, when the sliding blocks 431 slide in the sliding grooves 422, a guiding effect is provided for the sliding column 43, the second roller 41 is rotatably disposed at the top end of the sliding column 43, and the second roller 41 can roll at the bottom of the bridge 1; still be provided with pneumatic cylinder 423 in the socket post 42, the piston rod extending direction of pneumatic cylinder 423 is unanimous with the slip direction of slip post 43, the piston rod of pneumatic cylinder 423 and the bottom fixed connection of slip post 43, when pneumatic cylinder 423 during operation, the piston rod of pneumatic cylinder 423 stretches out, upwards jack-up slip post 43 can make the bottom butt of second gyro wheel 41 and bridge 1 to form reaction force, support tight hanging flower basket body 2, when crossbeam 31 removed, hanging flower basket body 2 was difficult for taking place great rocking.
Referring to fig. 5, the fixing member 5 is further arranged on the sliding column 43, the fixing member 5 includes two fixing plates 51, both the two fixing plates 51 are attached to the bottom of the bridge 1, when the two fixing plates 51 are attached to the bottom of the bridge 1, the second roller 41 cannot contact with the bottom of the bridge 1, so that the fixing effect of the abutting member 4 is more obvious, and when the hanging basket body 2 does not need to be moved, the two fixing plates 51 can increase the contact area between the abutting member 4 and the bridge 1, so that the fixing structure is more stable; the two fixed plates 51 are respectively provided with a connecting plate 52 in a hinged manner, one end of the connecting plate 52, which is far away from the fixed plates 51, is hinged to the sliding column 43, and two ends of the connecting plate 52 are respectively hinged to the fixed plates 51 and the sliding column 43, when the fixed plates 51 are used, the fixed plates 51 can be rotated to the top end of the second roller 41 through the connecting plate 52, so that the two fixed plates 51 cover the second roller 41, the second roller 41 cannot be contacted with the bottom of the bridge 1, and when the fixed plates 51 are not required to be fixed, the fixed plates 51 can be rotated to two sides of the sliding column 43 through the connecting plate 52, so that the second roller 41 can roll at the bottom; be provided with square card strip 432 on the sliding column 43, when two connecting plates 52 rotated to being close to sliding column 43, square card strip 432 can be with two connecting plates 52 restriction in square card strip 432 for two connecting plates 52 can not take place to rotate, thereby lets the connection structure of fixed plate 51 and bridge 1 bottom more stable.
The implementation principle of the construction hanging basket suspension device for the steel structure gallery bridge is as follows: the worker enters the hanging basket body 2 through the ladder stand 22, when the hanging basket body 2 needs to be moved, firstly, the square clamping strips 432 slide down from the two connecting plates 52, then the connecting plates 52 are rotated, so that the fixing plates 51 are not attached to the bottom of the bridge 1, then the hydraulic cylinders 423 are started, the hydraulic cylinders 423 push the sliding columns 43, so that the second rollers 41 can be attached to the bottom of the bridge 1, and the hanging basket has the advantage that the hanging basket body 2 is not prone to shaking when the hanging basket body 2 is moved; then drag crossbeam 31 at the top of bridge 1 for a plurality of first gyro wheels 311 on crossbeam 31 can roll in guide rail 11, thereby is taking turns the position of hanging flower basket body 2 on bridge 1 and is changed, has the advantage of being convenient for remove hanging flower basket body 2 on bridge 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a construction hanging flower basket linkage for steel construction gallery bridge, includes hanging flower basket body (2), hanging flower basket body (2) hang on bridge (1), connect its characterized in that through hanging subassembly (3) between hanging flower basket body (2) and bridge (1): the hanging component (3) comprises a cross beam (31), connecting pieces (32) connected with the hanging basket body (2) are arranged at two ends of the cross beam (31), a plurality of first rollers (311) are arranged at two ends of the cross beam (31), a plurality of guide rails (11) are arranged at the top of the bridge (1), the length direction of the guide rails (11) is perpendicular to the length direction of the cross beam (31), the first rollers (311) are in sliding fit with the guide rails (11), abutting pieces (4) are arranged on the hanging basket body (2), second rollers (41) are arranged on the abutting pieces (4), and the second rollers (41) can roll at the bottom of the bridge (1).
2. A construction basket suspension device for steel structure bridge according to claim 1, characterized in that: through groove (312) have all been seted up at the both ends of crossbeam (31), it is provided with many connecting axles (313) to lead to the internal rotation of groove (312), many the length direction of connecting axle (313) is unanimous with the length direction of crossbeam (31), and is a plurality of the inner circle of first gyro wheel (311) respectively with many connecting axles (313) interference fit.
3. A construction basket suspension device for steel structure bridge according to claim 2, characterized in that: connecting piece (32) include two capstan winch (321), two all around being equipped with connection cable wire (322) on capstan winch (321), the one end that connection cable wire (322) kept away from capstan winch (321) is provided with couple (3221), be provided with on hanging flower basket body (2) with couple (3221) complex link (21), the both ends of crossbeam (31) all are provided with biax motor (323), two the axis of rotation of capstan winch (321) respectively with two output shaft fixed connection of biax motor (323).
4. A construction basket suspension device for steel structure bridge according to claim 1, characterized in that: the supporting part (4) comprises a supporting column (42), the supporting column (42) is vertically arranged on the upper surface of the hanging basket body (2), a sliding column (43) is arranged in the supporting column (42) in a sliding mode, the second roller (41) is rotatably arranged at the top end of the sliding column (43), and a fixing part (5) is further arranged on the sliding column (43).
5. A construction basket suspension device for steel structure corridor bridge according to claim 4, characterized in that: the hollow bearing column (42) is arranged, a plurality of sliding blocks (431) are fixedly arranged on the sliding column (43), a plurality of sliding grooves (422) are formed in the inner side wall of the bearing column (42), the sliding blocks (431) are in sliding fit with the sliding grooves (422), a hydraulic cylinder (423) is further arranged in the bearing column (42), the extension direction of a piston rod of the hydraulic cylinder (423) is consistent with the sliding direction of the sliding column (43), and the piston rod of the hydraulic cylinder (423) is fixedly connected with the bottom end of the sliding column (43).
6. A construction basket suspension device for steel structure corridor bridge according to claim 4, characterized in that: the fixing piece (5) comprises two fixing plates (51), the two fixing plates (51) are attached to the bottom of the bridge (1), the two fixing plates (51) are hinged to form a connecting plate (52), and one end, away from the fixing plates (51), of the connecting plate (52) is hinged to the sliding column (43).
7. A construction basket suspension device for steel structure corridor bridge according to claim 6, characterized in that: the sliding column (43) is provided with square clamping strips (432), when the two connecting plates (52) rotate to be close to the sliding column (43), the square clamping strips (432) can limit the two connecting plates (52) in the square clamping strips (432).
8. A construction basket suspension device for steel structure bridge according to claim 1, characterized in that: a ladder (22) is fixedly arranged on one side of the hanging basket body (2), and a protection net (23) is arranged on the ladder (22).
CN202022143997.XU 2020-09-27 2020-09-27 Construction hanging basket suspension device for steel structure gallery bridge Active CN213476647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022143997.XU CN213476647U (en) 2020-09-27 2020-09-27 Construction hanging basket suspension device for steel structure gallery bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022143997.XU CN213476647U (en) 2020-09-27 2020-09-27 Construction hanging basket suspension device for steel structure gallery bridge

Publications (1)

Publication Number Publication Date
CN213476647U true CN213476647U (en) 2021-06-18

Family

ID=76363132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022143997.XU Active CN213476647U (en) 2020-09-27 2020-09-27 Construction hanging basket suspension device for steel structure gallery bridge

Country Status (1)

Country Link
CN (1) CN213476647U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565018A (en) * 2021-09-07 2021-10-29 曾普 Bridge construction operation platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565018A (en) * 2021-09-07 2021-10-29 曾普 Bridge construction operation platform

Similar Documents

Publication Publication Date Title
CN106522832B (en) Vertical raising drilling machine
CN109231021B (en) High stability gantry crane with adjustable landing leg
CN111747354B (en) Hydropower station large-gradient runner overhaul operation equipment and use method
CN213476647U (en) Construction hanging basket suspension device for steel structure gallery bridge
CN112850511A (en) Hoisting method adopting portable crane
CN206784172U (en) Overpass anti-collision wall formwork hoisting conveyance
JPH01223204A (en) Bridge girder replacement method and device thereof
CN218201897U (en) Sliding and hoisting construction device
CN2235961Y (en) Lifter
CN213417588U (en) Bridge bottom surface construction platform
CN206667047U (en) Bridge inspection vehicle
CN209854554U (en) Supplementary car of installing and removing of template
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN2871634Y (en) Bridge maintaining equipment
CN213173735U (en) Deep foundation pit tool type suspension berm
CN217149922U (en) A closed can fix and remove and hang basket for construction of bridge railing outside
CN217707610U (en) Aluminum bar pouring auxiliary device
CN213326415U (en) Single-beam hoisting equipment
CN218261678U (en) Tower top limited space large cantilever hoisting falsework
CN217438708U (en) Bridge side construction operation trolley capable of being operated by one person
CN216194118U (en) Hanging basket structure for bridge construction
CN214575553U (en) Construction suspension type scaffold capable of moving transversely
CN219690327U (en) Bridge side construction equipment platform
CN215289734U (en) Auxiliary hanging bracket for bridge and culvert construction
CN218988622U (en) Lifting equipment for drilling tool at drilling well site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant