GB2354852B
(en)
*
|
1999-10-01 |
2001-11-28 |
Schlumberger Holdings |
Method for updating an earth model using measurements gathered during borehole construction
|
US6826486B1
(en)
|
2000-02-11 |
2004-11-30 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
|
AU2001247576A1
(en)
*
|
2000-03-17 |
2001-10-03 |
Optim, L.L.C. |
Optimization apparatus, system, and method of use doing business
|
US20020026253A1
(en)
*
|
2000-06-02 |
2002-02-28 |
Rajan Jebu Jacob |
Speech processing apparatus
|
US7072833B2
(en)
*
|
2000-06-02 |
2006-07-04 |
Canon Kabushiki Kaisha |
Speech processing system
|
US7035790B2
(en)
*
|
2000-06-02 |
2006-04-25 |
Canon Kabushiki Kaisha |
Speech processing system
|
US7010483B2
(en)
*
|
2000-06-02 |
2006-03-07 |
Canon Kabushiki Kaisha |
Speech processing system
|
US6954745B2
(en)
*
|
2000-06-02 |
2005-10-11 |
Canon Kabushiki Kaisha |
Signal processing system
|
US7003439B2
(en)
*
|
2001-01-30 |
2006-02-21 |
Schlumberger Technology Corporation |
Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
|
US7526413B2
(en)
*
|
2001-01-31 |
2009-04-28 |
Exxonmobil Upstream Research Company |
Volumetric laminated sand analysis
|
FR2823877B1
(fr)
*
|
2001-04-19 |
2004-12-24 |
Inst Francais Du Petrole |
Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
|
US6581198B1
(en)
*
|
2001-06-13 |
2003-06-17 |
Cadence Design Systems, Inc. |
Method and arrangement for extracting capacitance in integrated circuits having non Manhattan wiring
|
US7103524B1
(en)
|
2001-08-28 |
2006-09-05 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model using Bayesian inference implemented with the Hybrid Monte Carlo method
|
US6892366B1
(en)
*
|
2001-08-28 |
2005-05-10 |
Cadence Design Systems, Inc. |
Method and apparatus for performing extraction using a model trained with Bayesian inference via a Monte Carlo method
|
US7051293B1
(en)
|
2001-08-28 |
2006-05-23 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model
|
GB0125713D0
(en)
|
2001-10-26 |
2001-12-19 |
Statoil Asa |
Method of combining spatial models
|
US6961914B1
(en)
|
2002-01-31 |
2005-11-01 |
Cadence Design Systems, Inc. |
Method and apparatus for selecting input points to train a machine learning model for extraction
|
FR2837947B1
(fr)
*
|
2002-04-02 |
2004-05-28 |
Inst Francais Du Petrole |
Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique
|
AU2003234322A1
(en)
*
|
2002-04-10 |
2004-03-29 |
Schlumberger Technology Corporation |
Method, apparatus and system for pore pressure prediction in presence of dipping formations
|
US7899657B2
(en)
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
MXPA04003024A
(es)
*
|
2003-04-03 |
2004-10-06 |
Schlumberger Technology Bv |
Metodos y aparato para predecir presiones de poro y fractura de una formacion subsuperficial.
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
US20050004969A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
System for information exchange for integration of multiple data sources
|
US20050004833A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
Method and system for integrated uncertainty analysis
|
WO2005008379A2
(en)
*
|
2003-07-03 |
2005-01-27 |
Reaction Design |
Method and system for integrated uncertainty analysis
|
US7286214B2
(en)
*
|
2003-08-25 |
2007-10-23 |
University Of South Florida |
Method and program product for determining a radiance field in an optical environment
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
GB2410550B8
(en)
*
|
2003-12-04 |
2008-10-01 |
Schlumberger Holdings |
Fluids chain-of-custody
|
US7379819B2
(en)
*
|
2003-12-04 |
2008-05-27 |
Schlumberger Technology Corporation |
Reservoir sample chain-of-custody
|
US7359844B2
(en)
|
2004-01-20 |
2008-04-15 |
Saudi Arabian Oil Company |
Real time earth model for collaborative geosteering
|
US20050171700A1
(en)
*
|
2004-01-30 |
2005-08-04 |
Chroma Energy, Inc. |
Device and system for calculating 3D seismic classification features and process for geoprospecting material seams
|
CA2543801C
(en)
*
|
2004-01-30 |
2014-03-04 |
Exxonmobil Upstream Research Company |
Reservoir model building methods
|
US7783462B2
(en)
*
|
2004-01-30 |
2010-08-24 |
Exxonmobil Upstream Research Co. |
Reservoir evaluation methods
|
US7054750B2
(en)
*
|
2004-03-04 |
2006-05-30 |
Halliburton Energy Services, Inc. |
Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole
|
CN1299127C
(zh)
*
|
2004-03-26 |
2007-02-07 |
中国石油天然气集团公司 |
地震观测系统优化设计的层状介质双聚焦方法及其应用
|
CA2579011C
(en)
*
|
2004-07-07 |
2014-04-08 |
Exxonmobil Upstream Research Company |
Predicting sand-grain composition and sand texture
|
AU2005330698B2
(en)
*
|
2004-07-07 |
2010-01-07 |
Exxonmobil Upstream Research Company |
Bayesian network applications to geology and geophysics
|
US20060025969A1
(en)
*
|
2004-07-30 |
2006-02-02 |
Conocophillips Company |
Method for converting a geologic panel into a simulator format
|
FR2874706B1
(fr)
|
2004-08-30 |
2006-12-01 |
Inst Francais Du Petrole |
Methode de modelisation de la production d'un gisement petrolier
|
EP1812811A2
(en)
*
|
2004-11-18 |
2007-08-01 |
ExxonMobil Upstream Research Company |
Method for quantification and mitigation for dip-induced azimuthal avo
|
US8209202B2
(en)
|
2005-04-29 |
2012-06-26 |
Landmark Graphics Corporation |
Analysis of multiple assets in view of uncertainties
|
FR2886740B1
(fr)
*
|
2005-06-03 |
2007-09-28 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
|
US8301425B2
(en)
|
2005-07-27 |
2012-10-30 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
BRPI0613857B1
(pt)
*
|
2005-07-27 |
2018-05-22 |
Exxonmobil Upstream Research Company |
Método e aparelho associado com a produção de hidrocarbonetos
|
US20090216508A1
(en)
*
|
2005-07-27 |
2009-08-27 |
Bruce A Dale |
Well Modeling Associated With Extraction of Hydrocarbons From Subsurface Formations
|
GB0524134D0
(en)
*
|
2005-11-26 |
2006-01-04 |
Univ Edinburgh |
Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
|
US7366616B2
(en)
*
|
2006-01-13 |
2008-04-29 |
Schlumberger Technology Corporation |
Computer-based method for while-drilling modeling and visualization of layered subterranean earth formations
|
US7486589B2
(en)
|
2006-02-09 |
2009-02-03 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting the hydrocarbon production of a well location
|
CN101681394B
(zh)
|
2006-09-28 |
2012-11-21 |
埃克森美孚上游研究公司 |
来自并发地球物理源的数据的迭代反演
|
EP2118738A4
(en)
*
|
2006-12-28 |
2014-07-02 |
Chevron Usa Inc |
METHOD, SYSTEM AND DEVICE FOR STORING HISTORIC COMPARISON PROGRAMS AND PREDICTION RELATING TO HYDROCARBON PITCHING RESERVOIR ROCKS USING APPROXIMATIONS FOR RESEMBLY FUNCTIONS
|
US7467044B2
(en)
*
|
2007-01-15 |
2008-12-16 |
Chevron U.S.A. Inc |
Method and system for assessing exploration prospect risk and uncertainty
|
US7636275B2
(en)
*
|
2007-02-06 |
2009-12-22 |
Conocophillips Company |
Direct time lapse inversion of seismic data
|
US7529624B2
(en)
*
|
2007-02-21 |
2009-05-05 |
Geomechanics International, Inc. |
Method and apparatus for remote characterization of faults in the vicinity of boreholes
|
WO2009029135A1
(en)
*
|
2007-08-24 |
2009-03-05 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
MX2010005116A
(es)
*
|
2007-11-10 |
2010-09-09 |
Landmark Graphics Corp |
Sistemas y metodos para automatizacion, adaptacion e integracion del flujo de trabajo.
|
US7886844B2
(en)
*
|
2007-11-12 |
2011-02-15 |
Schlumberger Technology Corporation |
Borehole survey method and apparatus
|
GB0722469D0
(en)
*
|
2007-11-16 |
2007-12-27 |
Statoil Asa |
Forming a geological model
|
FR2923855B1
(fr)
*
|
2007-11-21 |
2009-12-11 |
Inst Francais Du Petrole |
Methode pour optimiser la trajectoire d'un forage par mise a jour d'une interpretation structurale.
|
US8547783B2
(en)
*
|
2007-12-12 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method and apparatus for evaluating submarine formations
|
US9638830B2
(en)
|
2007-12-14 |
2017-05-02 |
Westerngeco L.L.C. |
Optimizing drilling operations using petrotechnical data
|
US8417497B2
(en)
*
|
2008-01-18 |
2013-04-09 |
Westerngeco L.L.C. |
Updating a model of a subterranean structure using decomposition
|
US7869955B2
(en)
|
2008-01-30 |
2011-01-11 |
Chevron U.S.A. Inc. |
Subsurface prediction method and system
|
KR101535407B1
(ko)
*
|
2008-03-21 |
2015-07-09 |
엑손모빌 업스트림 리서치 캄파니 |
지구물리 데이터의 역산에 대한 효율적인 방법
|
US8793111B2
(en)
*
|
2009-01-20 |
2014-07-29 |
Schlumberger Technology Corporation |
Automated field development planning
|
US8527248B2
(en)
*
|
2008-04-18 |
2013-09-03 |
Westerngeco L.L.C. |
System and method for performing an adaptive drilling operation
|
EP2291790B1
(en)
*
|
2008-05-05 |
2020-04-29 |
Exxonmobil Upstream Research Company |
Modeling dynamic geological systems by visualizing and narrowing a parameter space
|
US8527203B2
(en)
|
2008-05-27 |
2013-09-03 |
Schlumberger Technology Corporation |
Method for selecting well measurements
|
GB2474157B
(en)
*
|
2008-07-01 |
2012-10-17 |
Schlumberger Holdings |
Effective hydrocarbon reservoir exploration decision making
|
SG193173A1
(en)
*
|
2008-08-11 |
2013-09-30 |
Exxonmobil Upstream Res Co |
Estimation of soil properties using waveforms of seismic surface waves
|
BRPI0914510B1
(pt)
|
2008-10-14 |
2019-07-16 |
Prad Research And Development Limited |
Métodos para automatizar ou parcialmente automatizar a otimização de uma operação de perfuração automatizada ou parcialmente automatizada, sistema para automatizar ouparcialmente automatizar um processo, método para operar um equipamento de perfuração automatizado, método para controlar um processo automatizado para perfurar um furo de poço, e sistema de controle de perfuração
|
AU2009311619B2
(en)
*
|
2008-11-06 |
2015-10-01 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
CN102246060B
(zh)
*
|
2008-12-16 |
2014-07-30 |
埃克森美孚上游研究公司 |
用于优化油气层开发和管理的系统和方法
|
US8370121B2
(en)
*
|
2008-12-18 |
2013-02-05 |
Exxonmobil Upstream Research Company |
Sediment transport by fully developed turbulent flows
|
EA201170931A1
(ru)
|
2009-01-13 |
2012-01-30 |
Эксонмобил Апстрим Рисерч Компани |
Оптимизация планов эксплуатации скважины
|
GB0905261D0
(en)
*
|
2009-03-27 |
2009-05-13 |
Geco Technology Bv |
Processing seismic data
|
US20100257004A1
(en)
*
|
2009-04-01 |
2010-10-07 |
Chervon U.S.A. Inc. |
Method and system for conducting geologic basin analysis
|
US8341984B2
(en)
*
|
2009-05-27 |
2013-01-01 |
Westerngeco L.L.C. |
Estimating velocities with uncertainty
|
US8494827B2
(en)
*
|
2009-09-25 |
2013-07-23 |
Exxonmobil Upstream Research Company |
Method of predicting natural fractures and damage in a subsurface region
|
NO20101371A1
(no)
*
|
2009-10-05 |
2011-04-06 |
Logined Bv |
Fremgangsmate, system og apparat for modellering av usikkerhet i produksjonssystemnettverk
|
US8234073B2
(en)
*
|
2009-10-23 |
2012-07-31 |
Chevron U.S.A. Inc. |
System and method for estimating geological architecture of a geologic volume
|
US20110098996A1
(en)
*
|
2009-10-26 |
2011-04-28 |
David Nichols |
Sifting Models of a Subsurface Structure
|
US8930170B2
(en)
*
|
2009-11-18 |
2015-01-06 |
Conocophillips Company |
Attribute importance measure for parametric multivariate modeling
|
EP3450679A1
(en)
|
2009-11-30 |
2019-03-06 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
AU2011213261B2
(en)
*
|
2010-02-02 |
2015-04-02 |
Conocophillips Company |
Multilevel percolation aggregation solver for petroleum reservoir simulations
|
EP2531694B1
(en)
|
2010-02-03 |
2018-06-06 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
US8537638B2
(en)
*
|
2010-02-10 |
2013-09-17 |
Exxonmobil Upstream Research Company |
Methods for subsurface parameter estimation in full wavefield inversion and reverse-time migration
|
EP2534605B1
(en)
|
2010-02-12 |
2020-06-17 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
AU2010347724B2
(en)
|
2010-03-12 |
2016-06-23 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
US8223587B2
(en)
*
|
2010-03-29 |
2012-07-17 |
Exxonmobil Upstream Research Company |
Full wavefield inversion using time varying filters
|
EP2564309A4
(en)
|
2010-04-30 |
2017-12-20 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
US8694299B2
(en)
|
2010-05-07 |
2014-04-08 |
Exxonmobil Upstream Research Company |
Artifact reduction in iterative inversion of geophysical data
|
US8756042B2
(en)
|
2010-05-19 |
2014-06-17 |
Exxonmobile Upstream Research Company |
Method and system for checkpointing during simulations
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
EP2599023B1
(en)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
EP2599032A4
(en)
|
2010-07-29 |
2018-01-17 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
US8767508B2
(en)
|
2010-08-18 |
2014-07-01 |
Exxonmobil Upstream Research Company |
Using seismic P and S arrivals to determine shallow velocity structure
|
US8855986B2
(en)
|
2010-09-03 |
2014-10-07 |
Chevron U.S.A. Inc. |
Iterative method and system to construct robust proxy models for reservoir simulation
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
EP2622457A4
(en)
|
2010-09-27 |
2018-02-21 |
Exxonmobil Upstream Research Company |
Simultaneous source encoding and source separation as a practical solution for full wavefield inversion
|
US8437998B2
(en)
|
2010-09-27 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Hybrid method for full waveform inversion using simultaneous and sequential source method
|
WO2012071090A1
(en)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
US8688381B2
(en)
|
2010-12-01 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Simultaneous source inversion for marine streamer data with cross-correlation objective function
|
WO2012082122A1
(en)
*
|
2010-12-16 |
2012-06-21 |
Landmark Graphics Corporation |
Method and system of plotting correlated data
|
GB201022128D0
(en)
|
2010-12-31 |
2011-02-02 |
Foster Findlay Ass Ltd |
Active contour segmentation
|
BR112013016699A2
(pt)
|
2011-01-13 |
2016-10-04 |
Landmark Graphics Corp |
método, sistema de computador, e, meio legível por computador
|
EP2668641B1
(en)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
US9146330B2
(en)
*
|
2011-03-29 |
2015-09-29 |
Westerngeco L.L.C. |
Selecting a survey setting for characterizing a target structure
|
RU2577387C2
(ru)
|
2011-03-30 |
2016-03-20 |
Эксонмобил Апстрим Рисерч Компани |
Скорость сходимости инверсии полного волнового поля при использовании формирования спектра
|
CN103460074B
(zh)
|
2011-03-31 |
2016-09-28 |
埃克森美孚上游研究公司 |
全波场反演中小波估计和多次波预测的方法
|
US8902221B2
(en)
*
|
2011-06-10 |
2014-12-02 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
US8749549B2
(en)
*
|
2011-06-10 |
2014-06-10 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
US9846256B2
(en)
|
2011-08-09 |
2017-12-19 |
Schlumberger Technology Corporation |
Interactive display of results obtained from the inversion of logging data
|
US8694262B2
(en)
*
|
2011-08-15 |
2014-04-08 |
Chevron U.S.A. Inc. |
System and method for subsurface characterization including uncertainty estimation
|
CA2839277C
(en)
|
2011-09-02 |
2018-02-27 |
Exxonmobil Upstream Research Company |
Using projection onto convex sets to constrain full-wavefield inversion
|
US9489176B2
(en)
|
2011-09-15 |
2016-11-08 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
|
BR112014009734A2
(pt)
*
|
2011-10-20 |
2017-04-18 |
Prad Res & Dev Ltd |
método para controlar equipamentos de recuperação de hidrocarbonetos de um reservatório
|
US20130223187A1
(en)
*
|
2011-11-11 |
2013-08-29 |
International Geophysical Company, Inc. |
Geological Structure Contour Modeling and Imaging
|
US9176930B2
(en)
*
|
2011-11-29 |
2015-11-03 |
Exxonmobil Upstream Research Company |
Methods for approximating hessian times vector operation in full wavefield inversion
|
US10030499B2
(en)
*
|
2011-12-06 |
2018-07-24 |
Bp Corporation North America Inc. |
Geological monitoring console
|
WO2013133912A1
(en)
|
2012-03-08 |
2013-09-12 |
Exxonmobil Upstream Research Company |
Orthogonal source and receiver encoding
|
WO2013148900A1
(en)
*
|
2012-03-28 |
2013-10-03 |
Geco Technology B.V. |
Providing an objective function based on variation in predicted data
|
US20130261981A1
(en)
*
|
2012-04-03 |
2013-10-03 |
Westerngeco L.L.C. |
Covariance estimation using sparse wavelet representation
|
WO2013169429A1
(en)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Canvas control for 3d data volume processing
|
NO342738B1
(no)
*
|
2012-12-06 |
2018-08-06 |
Roxar Software Solutions As |
Fremgangsmåte og et system for å presentere seismisk informasjon
|
US20130341093A1
(en)
*
|
2012-06-21 |
2013-12-26 |
Stuart Inglis Jardine |
Drilling risk avoidance
|
WO2014025354A1
(en)
|
2012-08-10 |
2014-02-13 |
Halliburton Energy Services, Inc. |
Methods and systems for borehole image forward modeling of formation properties
|
EP2901363A4
(en)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
ERROR REMOVAL IN GEOLOGICAL MODELS
|
CN102937724B
(zh)
*
|
2012-11-20 |
2016-06-08 |
中国神华能源股份有限公司 |
一种露天煤矿采场底部岩层的探测方法
|
EP2926170A4
(en)
|
2012-11-28 |
2016-07-13 |
Exxonmobil Upstream Res Co |
Q-Tomography with Seismic Reflection Data
|
NO20121473A1
(no)
*
|
2012-12-06 |
2014-06-09 |
Roxar Software Solutions As |
System for modellering av geologiske strukturer
|
US9575205B2
(en)
*
|
2013-01-17 |
2017-02-21 |
Pgs Geophysical As |
Uncertainty-based frequency-selected inversion of electromagnetic geophysical data
|
BR112015021666B1
(pt)
*
|
2013-03-05 |
2021-01-26 |
Technological Resources Pty. Limited |
método implantado por computador para atualizar uma estimativa para uma propriedade de material de um volume e sistema de computador para atualizar uma estimativa para uma propriedade de material de um volume
|
US20140257700A1
(en)
*
|
2013-03-08 |
2014-09-11 |
The Government Of The United States Of America, As Represented By The Secretary Of The Navy |
System and method for estimating uncertainty for geophysical gridding routines lacking inherent uncertainty estimation
|
WO2014173436A1
(en)
*
|
2013-04-22 |
2014-10-30 |
Statoil Petroleum As |
Improvements in determining sub-surface temperature
|
AU2014268976B2
(en)
|
2013-05-24 |
2016-12-22 |
Exxonmobil Upstream Research Company |
Multi-parameter inversion through offset dependent elastic FWI
|
US9746577B2
(en)
|
2013-06-03 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Uncertainty estimation of subsurface resistivity solutions
|
US10459117B2
(en)
|
2013-06-03 |
2019-10-29 |
Exxonmobil Upstream Research Company |
Extended subspace method for cross-talk mitigation in multi-parameter inversion
|
US10584570B2
(en)
|
2013-06-10 |
2020-03-10 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
US9702998B2
(en)
|
2013-07-08 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Full-wavefield inversion of primaries and multiples in marine environment
|
MX2016000888A
(es)
|
2013-08-23 |
2016-07-15 |
Landmark Graphics Corp |
Actualizacion local de modelo geocelular 3d.
|
EP3036566B1
(en)
|
2013-08-23 |
2018-04-04 |
Exxonmobil Upstream Research Company |
Simultaneous sourcing during both seismic acquisition and seismic inversion
|
US10036818B2
(en)
|
2013-09-06 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Accelerating full wavefield inversion with nonstationary point-spread functions
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
US10400570B2
(en)
*
|
2013-11-13 |
2019-09-03 |
Schlumberger Technology Corporation |
Automatic wellbore condition indicator and manager
|
US9910189B2
(en)
|
2014-04-09 |
2018-03-06 |
Exxonmobil Upstream Research Company |
Method for fast line search in frequency domain FWI
|
EP3140675A1
(en)
|
2014-05-09 |
2017-03-15 |
Exxonmobil Upstream Research Company |
Efficient line search methods for multi-parameter full wavefield inversion
|
US10185046B2
(en)
|
2014-06-09 |
2019-01-22 |
Exxonmobil Upstream Research Company |
Method for temporal dispersion correction for seismic simulation, RTM and FWI
|
MX362753B
(es)
|
2014-06-17 |
2019-02-07 |
Exxonmobil Upstream Res Co |
Inversion rapida de campo de ondas completo viscoacustico y viscoelastico.
|
GB2528130A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method of constraining an inversion in the characterisation of the evolution of a subsurface volume
|
GB2528129A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume
|
US10838092B2
(en)
|
2014-07-24 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Estimating multiple subsurface parameters by cascaded inversion of wavefield components
|
CA2948667A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
US10422899B2
(en)
|
2014-07-30 |
2019-09-24 |
Exxonmobil Upstream Research Company |
Harmonic encoding for FWI
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
US10386511B2
(en)
|
2014-10-03 |
2019-08-20 |
Exxonmobil Upstream Research Company |
Seismic survey design using full wavefield inversion
|
EP3210050A1
(en)
|
2014-10-20 |
2017-08-30 |
Exxonmobil Upstream Research Company |
Velocity tomography using property scans
|
GB2547843A
(en)
*
|
2014-10-27 |
2017-08-30 |
Cgg Services Sa |
Multi-vintage energy mapping
|
US11598195B2
(en)
|
2014-10-27 |
2023-03-07 |
Baker Hughes, A Ge Company, Llc |
Statistical approach to incorporate uncertainties of parameters in simulation results and stability analysis for earth drilling
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
WO2016070073A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
EP3213125A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
EP3234659A1
(en)
|
2014-12-18 |
2017-10-25 |
Exxonmobil Upstream Research Company |
Scalable scheduling of parallel iterative seismic jobs
|
US10190406B2
(en)
*
|
2014-12-23 |
2019-01-29 |
Baker Hughes, A Ge Company, Llc |
Formation fracturing potential using surrounding pore pressures
|
US10379244B2
(en)
|
2015-01-06 |
2019-08-13 |
Total S.A. |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume over a time period
|
US10520618B2
(en)
|
2015-02-04 |
2019-12-31 |
ExxohnMobil Upstream Research Company |
Poynting vector minimal reflection boundary conditions
|
US10317546B2
(en)
|
2015-02-13 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Efficient and stable absorbing boundary condition in finite-difference calculations
|
KR20170118185A
(ko)
|
2015-02-17 |
2017-10-24 |
엑손모빌 업스트림 리서치 캄파니 |
다중반사파 없는 데이터 세트를 생성하는 다단식 전 파동장 역산 프로세스
|
SG11201708665VA
(en)
|
2015-06-04 |
2017-12-28 |
Exxonmobil Upstream Res Co |
Method for generating multiple free seismic images
|
US10838093B2
(en)
|
2015-07-02 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
|
MX2018002797A
(es)
|
2015-10-02 |
2018-04-13 |
Exxonmobil Upstream Res Co |
Inversion completa de campo de ondas q-compensado.
|
US20170103144A1
(en)
*
|
2015-10-08 |
2017-04-13 |
Schlumbeger Technology Corporation |
Well trajectory adjustment
|
CN108139498B
(zh)
|
2015-10-15 |
2019-12-03 |
埃克森美孚上游研究公司 |
具有振幅保持的fwi模型域角度叠加
|
FR3043227A1
(no)
*
|
2015-11-04 |
2017-05-05 |
Services Petroliers Schlumberger |
|
CN105653808A
(zh)
*
|
2016-01-05 |
2016-06-08 |
成都阳光铝制品有限公司 |
一种基于蒙特卡洛的规定塑性延伸强度不确定度评定方法
|
US10768324B2
(en)
|
2016-05-19 |
2020-09-08 |
Exxonmobil Upstream Research Company |
Method to predict pore pressure and seal integrity using full wavefield inversion
|
US10605937B2
(en)
*
|
2016-05-26 |
2020-03-31 |
Cgg Services Sas |
Device and method for smart picking surface waves dispersion curves
|
GB2556621B
(en)
*
|
2016-09-30 |
2020-03-25 |
Equinor Energy As |
Improved structural modelling
|
EP3526628B1
(en)
|
2016-10-14 |
2022-03-23 |
Services Pétroliers Schlumberger |
Geologic structural model generation
|
CA3043231C
(en)
|
2016-12-23 |
2022-06-14 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
WO2018217875A1
(en)
|
2017-05-23 |
2018-11-29 |
Schlumberger Technology Corporation |
Analogue facilitated seismic data interpretation system
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
US11421523B2
(en)
|
2017-06-27 |
2022-08-23 |
Schlumberger Technology Corporation |
Real-time well construction process inference through probabilistic data fusion
|
CN110412530B
(zh)
*
|
2018-04-27 |
2021-09-17 |
深圳市优必选科技有限公司 |
一种识别充电桩的方法、装置及机器人
|
US10557345B2
(en)
|
2018-05-21 |
2020-02-11 |
Saudi Arabian Oil Company |
Systems and methods to predict and inhibit broken-out drilling-induced fractures in hydrocarbon wells
|
US10753203B2
(en)
|
2018-07-10 |
2020-08-25 |
Saudi Arabian Oil Company |
Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells
|
RU2718137C1
(ru)
*
|
2018-12-05 |
2020-03-30 |
Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") |
Способ оценки параметра затухания волнового поля для определения углеводородного насыщения пласта в межскважинном пространстве при построении геологической модели
|
EP3877955A4
(en)
|
2019-02-05 |
2022-07-20 |
Motive Drilling Technologies, Inc. |
BORE HOLE INDICATOR
|
RU2720859C1
(ru)
*
|
2019-05-29 |
2020-05-13 |
Общество с ограниченной ответственностью "Газпром добыча Кузнецк" |
Способ выбора конструкции горизонтальной метаноугольной скважины
|
EP3990949A4
(en)
*
|
2019-06-28 |
2023-07-26 |
Services Pétroliers Schlumberger |
FIELD DATA ACQUISITION AND VIRTUAL TRAINING SYSTEM
|
CN110322563B
(zh)
*
|
2019-07-09 |
2020-11-10 |
吉林大学 |
构建地质模型的补充钻孔选址方法及系统
|
US20220335185A1
(en)
*
|
2019-09-04 |
2022-10-20 |
Schlumberger Technology Corporation |
Autonomous operations in oil and gas fields
|
US11348218B2
(en)
*
|
2020-03-30 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Hybrid interpretation approach for borehole imaging
|
US11572785B2
(en)
|
2021-01-26 |
2023-02-07 |
Saudi Arabian Oil Company |
Drilling uncertainty real time updates for accurate well placement
|
WO2022228701A1
(en)
*
|
2021-04-30 |
2022-11-03 |
Zed Depth Exploration Data Gmbh |
Geophysical data-space mining using a trans-dimensional algorithm
|
CN114137612A
(zh)
*
|
2021-11-30 |
2022-03-04 |
沈阳建筑大学 |
一种考虑谱型相关性的竖向地震动的条件均值谱生成方法
|
WO2023214196A1
(en)
*
|
2022-05-02 |
2023-11-09 |
Abu Dhabi National Oil Company |
Method and system for exploiting a subterranean reservoir
|