MX2012000836A - Metodo para inducir complejidad de fractura en terminacion de pozos horizontales fracturados hidraulicamente. - Google Patents
Metodo para inducir complejidad de fractura en terminacion de pozos horizontales fracturados hidraulicamente.Info
- Publication number
- MX2012000836A MX2012000836A MX2012000836A MX2012000836A MX2012000836A MX 2012000836 A MX2012000836 A MX 2012000836A MX 2012000836 A MX2012000836 A MX 2012000836A MX 2012000836 A MX2012000836 A MX 2012000836A MX 2012000836 A MX2012000836 A MX 2012000836A
- Authority
- MX
- Mexico
- Prior art keywords
- fracturing interval
- horizontal well
- fracture complexity
- well completions
- hydraulically fractured
- Prior art date
Links
- 230000001939 inductive effect Effects 0.000 title abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 4
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Control Of Turbines (AREA)
- Measuring Or Testing Involving Enzymes Or Micro-Organisms (AREA)
- Earth Drilling (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Un método para inducir complejidad de fractura dentro de un intervalo de fracturación de una formación subterránea (102) que comprende caracterizar la formación subterránea, definir una dimensión de alteración de anisotropía de esfuerzos, proporcionar un aparato de servicio de pozos (106) configurado para alterar la anisotropía de esfuerzos del intervalo de fracturación de la formación subterránea, alterar la anisotropía de esfuerzos dentro del intervalo de fracturación, e introducir una fractura (150) en el intervalo de fracturación en el que la anisotropía de esfuerzos ha sido alterada. Un método de servicio de una formación subterránea que comprende introducir una fractura en un primer intervalo de fracturación (2), e introducir una fractura en un tercer intervalo de fracturación (6), en donde el primer intervalo de fracturación y el tercer intervalo de fracturación son sustancialmente adyacentes a un segundo intervalo de fracturación (4) en el que se va a alterar la anisotropía de esfuerzos.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US22849409P | 2009-07-24 | 2009-07-24 | |
US24345309P | 2009-09-17 | 2009-09-17 | |
US12/566,467 US8439116B2 (en) | 2009-07-24 | 2009-09-24 | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
PCT/GB2010/001407 WO2011010113A2 (en) | 2009-07-24 | 2010-07-23 | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2012000836A true MX2012000836A (es) | 2012-02-28 |
Family
ID=43496281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2012000836A MX2012000836A (es) | 2009-07-24 | 2010-07-23 | Metodo para inducir complejidad de fractura en terminacion de pozos horizontales fracturados hidraulicamente. |
Country Status (8)
Country | Link |
---|---|
US (4) | US8439116B2 (es) |
EP (1) | EP2456952B1 (es) |
AR (1) | AR078081A1 (es) |
AU (1) | AU2010274726B2 (es) |
CA (1) | CA2768279C (es) |
MX (1) | MX2012000836A (es) |
PL (1) | PL2456952T3 (es) |
WO (1) | WO2011010113A2 (es) |
Families Citing this family (84)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8066059B2 (en) | 2005-03-12 | 2011-11-29 | Thru Tubing Solutions, Inc. | Methods and devices for one trip plugging and perforating of oil and gas wells |
US9135475B2 (en) | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US9228425B2 (en) | 2007-01-29 | 2016-01-05 | Schlumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US9796918B2 (en) | 2013-01-30 | 2017-10-24 | Halliburton Energy Services, Inc. | Wellbore servicing fluids and methods of making and using same |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US9109423B2 (en) | 2009-08-18 | 2015-08-18 | Halliburton Energy Services, Inc. | Apparatus for autonomous downhole fluid selection with pathway dependent resistance system |
AU2011241875B2 (en) * | 2010-04-12 | 2015-09-17 | Schlumberger Technology B.V. | Automatic stage design of hydraulic fracture treatments using fracture height and in-situ stress |
US8708050B2 (en) | 2010-04-29 | 2014-04-29 | Halliburton Energy Services, Inc. | Method and apparatus for controlling fluid flow using movable flow diverter assembly |
US20110284214A1 (en) * | 2010-05-19 | 2011-11-24 | Ayoub Joseph A | Methods and tools for multiple fracture placement along a wellbore |
US8448700B2 (en) * | 2010-08-03 | 2013-05-28 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
US9638003B2 (en) | 2010-10-15 | 2017-05-02 | Schlumberger Technology Corporation | Sleeve valve |
US9371715B2 (en) | 2010-10-15 | 2016-06-21 | Schlumberger Technology Corporation | Downhole extending ports |
US20120199353A1 (en) * | 2011-02-07 | 2012-08-09 | Brent Daniel Fermaniuk | Wellbore injection system |
US10031024B2 (en) * | 2011-04-07 | 2018-07-24 | Gas Sensing Technology Corp. | Evaluating hydrologic reservoir constraint in coal seams and shale formations |
MY164163A (en) | 2011-04-08 | 2017-11-30 | Halliburton Energy Services Inc | Method and apparatus for controlling fluid flow in an autonomous valve using a sticky switch |
US8967262B2 (en) * | 2011-09-14 | 2015-03-03 | Baker Hughes Incorporated | Method for determining fracture spacing and well fracturing using the method |
WO2013040709A1 (en) | 2011-09-19 | 2013-03-28 | Steelhaus Technologies, Inc. | Axially compressed and radially pressed seal |
AU2011378270B2 (en) | 2011-09-27 | 2016-03-17 | Halliburton Energy Services, Inc. | Wellbore flow control devices comprising coupled flow regulating assemblies and methods for use thereof |
US8596366B2 (en) | 2011-09-27 | 2013-12-03 | Halliburton Energy Services, Inc. | Wellbore flow control devices comprising coupled flow regulating assemblies and methods for use thereof |
US8800652B2 (en) * | 2011-10-09 | 2014-08-12 | Saudi Arabian Oil Company | Method for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well |
US9140102B2 (en) | 2011-10-09 | 2015-09-22 | Saudi Arabian Oil Company | System for real-time monitoring and transmitting hydraulic fracture seismic events to surface using the pilot hole of the treatment well as the monitoring well |
EP2773842A4 (en) | 2011-10-31 | 2015-08-19 | Halliburton Energy Services Inc | AUTONOMOUS FLOW REGULATION DEVICE COMPRISING A PLATE FORMING VALVE FOR SELECTING FLUID IN WELL BOTTOM |
MY167551A (en) | 2011-10-31 | 2018-09-14 | Halliburton Energy Services Inc | Autonomous fluid control device having a reciprocating valve for downhole fluid selection |
US9238953B2 (en) | 2011-11-08 | 2016-01-19 | Schlumberger Technology Corporation | Completion method for stimulation of multiple intervals |
US9228422B2 (en) | 2012-01-30 | 2016-01-05 | Thru Tubing Solutions, Inc. | Limited depth abrasive jet cutter |
US9016388B2 (en) * | 2012-02-03 | 2015-04-28 | Baker Hughes Incorporated | Wiper plug elements and methods of stimulating a wellbore environment |
US8826980B2 (en) | 2012-03-29 | 2014-09-09 | Halliburton Energy Services, Inc. | Activation-indicating wellbore stimulation assemblies and methods of using the same |
US8967249B2 (en) * | 2012-04-13 | 2015-03-03 | Schlumberger Technology Corporation | Reservoir and completion quality assessment in unconventional (shale gas) wells without logs or core |
US9650851B2 (en) | 2012-06-18 | 2017-05-16 | Schlumberger Technology Corporation | Autonomous untethered well object |
US9394774B2 (en) | 2012-08-20 | 2016-07-19 | Texas Tech University System | Methods and devices for hydraulic fracturing design and optimization: a modification to zipper frac |
EP2877673A4 (en) | 2012-08-28 | 2016-10-26 | Halliburton Energy Services Inc | MAGNETIC KEY FOR OPERATING A MULTI-POSITION WELL BACKGROUND TOOL |
US9784085B2 (en) * | 2012-09-10 | 2017-10-10 | Schlumberger Technology Corporation | Method for transverse fracturing of a subterranean formation |
MX2015004346A (es) * | 2012-10-04 | 2015-10-09 | Univ Texas Tech System | Metodo para mejorar la propagacion de fracturas en formaciones subterraneas. |
US9404349B2 (en) | 2012-10-22 | 2016-08-02 | Halliburton Energy Services, Inc. | Autonomous fluid control system having a fluid diode |
US20140144634A1 (en) * | 2012-11-28 | 2014-05-29 | Halliburton Energy Services, Inc. | Methods of Enhancing the Fracture Conductivity of Multiple Interval Fractures in Subterranean Formations Propped with Cement Packs |
US9695654B2 (en) | 2012-12-03 | 2017-07-04 | Halliburton Energy Services, Inc. | Wellhead flowback control system and method |
US9127526B2 (en) | 2012-12-03 | 2015-09-08 | Halliburton Energy Services, Inc. | Fast pressure protection system and method |
US9273549B2 (en) | 2013-01-24 | 2016-03-01 | Halliburton Energy Services, Inc. | Systems and methods for remote actuation of a downhole tool |
US9068439B2 (en) | 2013-02-19 | 2015-06-30 | Halliburton Energy Services, Inc. | Systems and methods of positive indication of actuation of a downhole tool |
US9494025B2 (en) | 2013-03-01 | 2016-11-15 | Vincent Artus | Control fracturing in unconventional reservoirs |
WO2014153314A1 (en) * | 2013-03-18 | 2014-09-25 | Schlumberger Canada Limited | Sleeve valve |
US9631468B2 (en) | 2013-09-03 | 2017-04-25 | Schlumberger Technology Corporation | Well treatment |
CN103527163B (zh) * | 2013-09-24 | 2016-02-17 | 西南石油大学 | 一种致密储层水平井体积压裂工艺 |
US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
WO2015089458A1 (en) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Creating radial slots in a wellbore |
CA3223992A1 (en) * | 2013-12-18 | 2015-06-25 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
US9382792B2 (en) | 2014-04-29 | 2016-07-05 | Baker Hughes Incorporated | Coiled tubing downhole tool |
CA2854523C (en) * | 2014-06-18 | 2021-03-09 | Yanguang Yuan | Bottom-up gravity-assisted pressure drive |
US10132147B2 (en) * | 2014-07-02 | 2018-11-20 | Weatherford Technology Holdings, Llc | System and method for modeling and design of pulse fracturing networks |
US10196888B2 (en) | 2014-10-01 | 2019-02-05 | Baker Hughes, A Ge Company, Llc | Placement and uses of lateral assisting wellbores and/or kick-off wellbores |
EP3212884B1 (en) | 2014-10-30 | 2021-03-03 | Services Petroliers Schlumberger | Method of creating radial slots in a subterranean formation |
CA2927973C (en) | 2015-04-24 | 2024-01-16 | Ncs Multistage Inc. | Plug-actuated flow control member |
US20160341002A1 (en) * | 2015-05-22 | 2016-11-24 | Baker Hughes Incorporated | Plug-actuated sub |
US10215014B2 (en) | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
US10954763B2 (en) | 2016-11-10 | 2021-03-23 | Halliburton Energy Services, Inc. | Method and system for distribution of a proppant |
CA3045297C (en) | 2016-11-29 | 2023-08-15 | Conocophillips Company | Engineered stress state with multi-well completions |
WO2018102271A1 (en) | 2016-11-29 | 2018-06-07 | Conocophillips Company | Methods for shut-in pressure escalation analysis |
US10677024B2 (en) | 2017-03-01 | 2020-06-09 | Thru Tubing Solutions, Inc. | Abrasive perforator with fluid bypass |
CA2997822C (en) | 2017-03-08 | 2024-01-02 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
US10738600B2 (en) * | 2017-05-19 | 2020-08-11 | Baker Hughes, A Ge Company, Llc | One run reservoir evaluation and stimulation while drilling |
CA3012203A1 (en) | 2017-07-24 | 2019-01-24 | Reveal Energy Services, Inc. | Dynamically modeling a hydraulic fracture |
US10612370B2 (en) * | 2017-08-01 | 2020-04-07 | Saudi Arabian Oil Company | Open smart completion |
CA3020545A1 (en) | 2017-10-13 | 2019-04-13 | Uti Limited Partnership | Completions for inducing fracture network complexity |
US10851643B2 (en) | 2017-11-02 | 2020-12-01 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
CN111601948B (zh) * | 2017-11-21 | 2023-06-13 | Sc 资产有限公司 | 具有球致动的可扩张密封和/或压力增强的可径向扩张花键的夹头 |
US10584559B2 (en) | 2017-11-21 | 2020-03-10 | Sc Asset Corporation | Collet with ball-actuated expandable seal and/or pressure augmented radially expandable splines |
US10267120B1 (en) | 2017-12-19 | 2019-04-23 | Halliburton Energy Services, Inc. | Formation interface assembly (FIA) |
US11732179B2 (en) | 2018-04-03 | 2023-08-22 | Schlumberger Technology Corporation | Proppant-fiber schedule for far field diversion |
CA3099731A1 (en) | 2018-05-09 | 2019-11-14 | Conocophillips Company | Ubiquitous real-time fracture monitoring |
CN108952700B (zh) * | 2018-08-21 | 2022-03-25 | 西南石油大学 | 一种各向异性地层井壁破裂压力确定方法 |
US11459884B2 (en) | 2019-08-22 | 2022-10-04 | Saudi Arabian Oil Company | Measuring horizontal stress in an underground formation |
US11821308B2 (en) | 2019-11-27 | 2023-11-21 | Saudi Arabian Oil Company | Discrimination between subsurface formation natural fractures and stress induced tensile fractures based on borehole images |
US11326448B2 (en) | 2019-12-04 | 2022-05-10 | Saudi Arabian Oil Company | Pressure testing systems for subterranean rock formations |
CA3155410A1 (en) | 2020-07-20 | 2022-02-20 | Reveal Energy Services, Inc. | Determining fracture driven interactions between wellbores |
US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
US11649702B2 (en) | 2020-12-03 | 2023-05-16 | Saudi Arabian Oil Company | Wellbore shaped perforation assembly |
US11619127B1 (en) | 2021-12-06 | 2023-04-04 | Saudi Arabian Oil Company | Wellhead acoustic insulation to monitor hydraulic fracturing |
CN114444414B (zh) * | 2022-01-26 | 2022-08-26 | 北京科技大学 | 一种确定致密储层中多段压裂水平井最大裂缝间距的方法 |
US11697759B1 (en) | 2022-03-03 | 2023-07-11 | Halliburton Energy Services, Inc. | Inducing subterranean formation complexity |
Family Cites Families (149)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2050970A (en) * | 1935-08-06 | 1936-08-11 | Eastman Oil Well Survey Co | Open hole bridger and support |
US2312018A (en) | 1939-08-19 | 1943-02-23 | Fred G Beckman | Method of and means for cleaning wells |
US2703316A (en) | 1951-06-05 | 1955-03-01 | Du Pont | Polymers of high melting lactide |
US2753940A (en) | 1953-05-11 | 1956-07-10 | Exxon Research Engineering Co | Method and apparatus for fracturing a subsurface formation |
US3912692A (en) | 1973-05-03 | 1975-10-14 | American Cyanamid Co | Process for polymerizing a substantially pure glycolide composition |
US4005750A (en) | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
US4312406A (en) | 1980-02-20 | 1982-01-26 | The Dow Chemical Company | Device and method for shifting a port collar sleeve |
US4387769A (en) | 1981-08-10 | 1983-06-14 | Exxon Production Research Co. | Method for reducing the permeability of subterranean formations |
US4509598A (en) | 1983-03-25 | 1985-04-09 | The Dow Chemical Company | Fracturing fluids containing bouyant inorganic diverting agent and method of use in hydraulic fracturing of subterranean formations |
US4515214A (en) | 1983-09-09 | 1985-05-07 | Mobil Oil Corporation | Method for controlling the vertical growth of hydraulic fractures |
US4590995A (en) | 1985-03-26 | 1986-05-27 | Halliburton Company | Retrievable straddle packer |
US4687061A (en) | 1986-12-08 | 1987-08-18 | Mobil Oil Corporation | Stimulation of earth formations surrounding a deviated wellbore by sequential hydraulic fracturing |
US6323307B1 (en) | 1988-08-08 | 2001-11-27 | Cargill Dow Polymers, Llc | Degradation control of environmentally degradable disposable materials |
US5216050A (en) | 1988-08-08 | 1993-06-01 | Biopak Technology, Ltd. | Blends of polyactic acid |
US4869322A (en) | 1988-10-07 | 1989-09-26 | Mobil Oil Corporation | Sequential hydraulic fracturing of a subsurface formation |
US4887670A (en) | 1989-04-05 | 1989-12-19 | Halliburton Company | Controlling fracture growth |
US4949788A (en) * | 1989-11-08 | 1990-08-21 | Halliburton Company | Well completions using casing valves |
US5074360A (en) | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
US5111881A (en) | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5241475A (en) | 1990-10-26 | 1993-08-31 | Halliburton Company | Method of evaluating fluid loss in subsurface fracturing operations |
US5145004A (en) | 1991-03-12 | 1992-09-08 | Atlantic Richfield Company | Multiple gravel pack well completions |
US5318123A (en) | 1992-06-11 | 1994-06-07 | Halliburton Company | Method for optimizing hydraulic fracturing through control of perforation orientation |
US5361856A (en) | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5482116A (en) | 1993-12-10 | 1996-01-09 | Mobil Oil Corporation | Wellbore guided hydraulic fracturing |
US5533571A (en) | 1994-05-27 | 1996-07-09 | Halliburton Company | Surface switchable down-jet/side-jet apparatus |
US5499678A (en) | 1994-08-02 | 1996-03-19 | Halliburton Company | Coplanar angular jetting head for well perforating |
US5431225A (en) | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
US5595245A (en) | 1995-08-04 | 1997-01-21 | Scott, Iii; George L. | Systems of injecting phenolic resin activator during subsurface fracture stimulation for enhanced oil recovery |
US6047773A (en) | 1996-08-09 | 2000-04-11 | Halliburton Energy Services, Inc. | Apparatus and methods for stimulating a subterranean well |
US5765642A (en) | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US6283210B1 (en) | 1999-09-01 | 2001-09-04 | Halliburton Energy Services, Inc. | Proactive conformance for oil or gas wells |
US6474419B2 (en) | 1999-10-04 | 2002-11-05 | Halliburton Energy Services, Inc. | Packer with equalizing valve and method of use |
US6394184B2 (en) | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US6401815B1 (en) | 2000-03-10 | 2002-06-11 | Halliburton Energy Services, Inc. | Apparatus and method for connecting casing to lateral casing using thermoset plastic molding |
DZ3387A1 (fr) | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
US6439310B1 (en) | 2000-09-15 | 2002-08-27 | Scott, Iii George L. | Real-time reservoir fracturing process |
OA13131A (en) | 2000-09-20 | 2006-12-13 | Sofitech Nv | Method for gravel packing open holes fracturing pressure. |
US20020177955A1 (en) | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US6565129B2 (en) | 2001-06-21 | 2003-05-20 | Halliburton Energy Services, Inc. | Quick connect system and method for fluid devices |
US6719054B2 (en) | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US6938690B2 (en) | 2001-09-28 | 2005-09-06 | Halliburton Energy Services, Inc. | Downhole tool and method for fracturing a subterranean well formation |
US6662874B2 (en) | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6725933B2 (en) | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6907936B2 (en) | 2001-11-19 | 2005-06-21 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7096954B2 (en) | 2001-12-31 | 2006-08-29 | Schlumberger Technology Corporation | Method and apparatus for placement of multiple fractures in open hole wells |
US7108067B2 (en) | 2002-08-21 | 2006-09-19 | Packers Plus Energy Services Inc. | Method and apparatus for wellbore fluid treatment |
US7100688B2 (en) | 2002-09-20 | 2006-09-05 | Halliburton Energy Services, Inc. | Fracture monitoring using pressure-frequency analysis |
US7108064B2 (en) | 2002-10-10 | 2006-09-19 | Weatherford/Lamb, Inc. | Milling tool insert and method of use |
US6805199B2 (en) | 2002-10-17 | 2004-10-19 | Halliburton Energy Services, Inc. | Process and system for effective and accurate foam cement generation and placement |
US6837523B2 (en) | 2002-12-05 | 2005-01-04 | Halliburton Energy Services, Inc. | Piping with integral force absorbing restraining system |
US7032671B2 (en) * | 2002-12-12 | 2006-04-25 | Integrated Petroleum Technologies, Inc. | Method for increasing fracture penetration into target formation |
US20040231845A1 (en) | 2003-05-15 | 2004-11-25 | Cooke Claude E. | Applications of degradable polymers in wells |
US7044220B2 (en) | 2003-06-27 | 2006-05-16 | Halliburton Energy Services, Inc. | Compositions and methods for improving proppant pack permeability and fracture conductivity in a subterranean well |
US7066265B2 (en) | 2003-09-24 | 2006-06-27 | Halliburton Energy Services, Inc. | System and method of production enhancement and completion of a well |
US20050087336A1 (en) | 2003-10-24 | 2005-04-28 | Surjaatmadja Jim B. | Orbital downhole separator |
US7445045B2 (en) | 2003-12-04 | 2008-11-04 | Halliburton Energy Services, Inc. | Method of optimizing production of gas from vertical wells in coal seams |
US8126689B2 (en) | 2003-12-04 | 2012-02-28 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7225869B2 (en) | 2004-03-24 | 2007-06-05 | Halliburton Energy Services, Inc. | Methods of isolating hydrajet stimulated zones |
US7150327B2 (en) | 2004-04-07 | 2006-12-19 | Halliburton Energy Services, Inc. | Workover unit and method of utilizing same |
US7234529B2 (en) | 2004-04-07 | 2007-06-26 | Halliburton Energy Services, Inc. | Flow switchable check valve and method |
US7503404B2 (en) | 2004-04-14 | 2009-03-17 | Halliburton Energy Services, Inc, | Methods of well stimulation during drilling operations |
US20080060810A9 (en) | 2004-05-25 | 2008-03-13 | Halliburton Energy Services, Inc. | Methods for treating a subterranean formation with a curable composition using a jetting tool |
US7159660B2 (en) | 2004-05-28 | 2007-01-09 | Halliburton Energy Services, Inc. | Hydrajet perforation and fracturing tool |
US7287592B2 (en) | 2004-06-11 | 2007-10-30 | Halliburton Energy Services, Inc. | Limited entry multiple fracture and frac-pack placement in liner completions using liner fracturing tool |
US7273313B2 (en) | 2004-06-17 | 2007-09-25 | Halliburton Energy Services, Inc. | Mixing device for mixing bulk and liquid material |
US7243723B2 (en) | 2004-06-18 | 2007-07-17 | Halliburton Energy Services, Inc. | System and method for fracturing and gravel packing a borehole |
US7370701B2 (en) | 2004-06-30 | 2008-05-13 | Halliburton Energy Services, Inc. | Wellbore completion design to naturally separate water and solids from oil and gas |
US7429332B2 (en) | 2004-06-30 | 2008-09-30 | Halliburton Energy Services, Inc. | Separating constituents of a fluid mixture |
US7090153B2 (en) | 2004-07-29 | 2006-08-15 | Halliburton Energy Services, Inc. | Flow conditioning system and method for fluid jetting tools |
US7775278B2 (en) | 2004-09-01 | 2010-08-17 | Schlumberger Technology Corporation | Degradable material assisted diversion or isolation |
US7281580B2 (en) | 2004-09-09 | 2007-10-16 | Halliburton Energy Services, Inc. | High porosity fractures and methods of creating high porosity fractures |
US20060070740A1 (en) | 2004-10-05 | 2006-04-06 | Surjaatmadja Jim B | System and method for fracturing a hydrocarbon producing formation |
US20060086507A1 (en) | 2004-10-26 | 2006-04-27 | Halliburton Energy Services, Inc. | Wellbore cleanout tool and method |
US7543635B2 (en) | 2004-11-12 | 2009-06-09 | Halliburton Energy Services, Inc. | Fracture characterization using reservoir monitoring devices |
US7237612B2 (en) | 2004-11-17 | 2007-07-03 | Halliburton Energy Services, Inc. | Methods of initiating a fracture tip screenout |
US7281581B2 (en) | 2004-12-01 | 2007-10-16 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7325608B2 (en) | 2004-12-01 | 2008-02-05 | Halliburton Energy Services, Inc. | Methods of hydraulic fracturing and of propping fractures in subterranean formations |
US7228908B2 (en) | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7273099B2 (en) | 2004-12-03 | 2007-09-25 | Halliburton Energy Services, Inc. | Methods of stimulating a subterranean formation comprising multiple production intervals |
US7398825B2 (en) | 2004-12-03 | 2008-07-15 | Halliburton Energy Services, Inc. | Methods of controlling sand and water production in subterranean zones |
US7387165B2 (en) | 2004-12-14 | 2008-06-17 | Schlumberger Technology Corporation | System for completing multiple well intervals |
US7322417B2 (en) | 2004-12-14 | 2008-01-29 | Schlumberger Technology Corporation | Technique and apparatus for completing multiple zones |
US7506689B2 (en) | 2005-02-22 | 2009-03-24 | Halliburton Energy Services, Inc. | Fracturing fluids comprising degradable diverting agents and methods of use in subterranean formations |
US7278486B2 (en) | 2005-03-04 | 2007-10-09 | Halliburton Energy Services, Inc. | Fracturing method providing simultaneous flow back |
US7318473B2 (en) | 2005-03-07 | 2008-01-15 | Halliburton Energy Services, Inc. | Methods relating to maintaining the structural integrity of deviated well bores |
US7478020B2 (en) | 2005-03-07 | 2009-01-13 | M-I Llc | Apparatus for slurry and operation design in cuttings re-injection |
US7926571B2 (en) | 2005-03-15 | 2011-04-19 | Raymond A. Hofman | Cemented open hole selective fracing system |
US7595281B2 (en) | 2005-05-18 | 2009-09-29 | Halliburton Energy Services, Inc. | Methods to increase recovery of treatment fluid following stimulation of a subterranean formation comprising in situ fluorocarbon coated particles |
US7431090B2 (en) | 2005-06-22 | 2008-10-07 | Halliburton Energy Services, Inc. | Methods and apparatus for multiple fracturing of subterranean formations |
US7296625B2 (en) | 2005-08-02 | 2007-11-20 | Halliburton Energy Services, Inc. | Methods of forming packs in a plurality of perforations in a casing of a wellbore |
US7343975B2 (en) | 2005-09-06 | 2008-03-18 | Halliburton Energy Services, Inc. | Method for stimulating a well |
US7905284B2 (en) | 2005-09-07 | 2011-03-15 | Halliburton Energy Services, Inc. | Fracturing/gravel packing tool system with dual flow capabilities |
WO2007035745A2 (en) | 2005-09-19 | 2007-03-29 | Pioneer Natural Resources Usa Inc | Well treatment device, method, and system |
US7946340B2 (en) | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
US7711487B2 (en) | 2006-10-10 | 2010-05-04 | Halliburton Energy Services, Inc. | Methods for maximizing second fracture length |
US7740072B2 (en) | 2006-10-10 | 2010-06-22 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
US7647964B2 (en) | 2005-12-19 | 2010-01-19 | Fairmount Minerals, Ltd. | Degradable ball sealers and methods for use in well treatment |
US7472746B2 (en) | 2006-03-31 | 2009-01-06 | Halliburton Energy Services, Inc. | Packer apparatus with annular check valve |
US7337844B2 (en) | 2006-05-09 | 2008-03-04 | Halliburton Energy Services, Inc. | Perforating and fracturing |
US20070261851A1 (en) | 2006-05-09 | 2007-11-15 | Halliburton Energy Services, Inc. | Window casing |
US7575062B2 (en) | 2006-06-09 | 2009-08-18 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US7478676B2 (en) | 2006-06-09 | 2009-01-20 | Halliburton Energy Services, Inc. | Methods and devices for treating multiple-interval well bores |
US20070284106A1 (en) | 2006-06-12 | 2007-12-13 | Kalman Mark D | Method and apparatus for well drilling and completion |
US20080000637A1 (en) | 2006-06-29 | 2008-01-03 | Halliburton Energy Services, Inc. | Downhole flow-back control for oil and gas wells by controlling fluid entry |
US7520327B2 (en) | 2006-07-20 | 2009-04-21 | Halliburton Energy Services, Inc. | Methods and materials for subterranean fluid forming barriers in materials surrounding wells |
US8540027B2 (en) | 2006-08-31 | 2013-09-24 | Geodynamics, Inc. | Method and apparatus for selective down hole fluid communication |
US7571766B2 (en) | 2006-09-29 | 2009-08-11 | Halliburton Energy Services, Inc. | Methods of fracturing a subterranean formation using a jetting tool and a viscoelastic surfactant fluid to minimize formation damage |
US7581590B2 (en) | 2006-12-08 | 2009-09-01 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable channelant fill |
US20080135248A1 (en) | 2006-12-11 | 2008-06-12 | Halliburton Energy Service, Inc. | Method and apparatus for completing and fluid treating a wellbore |
BRPI0720941B1 (pt) | 2007-01-25 | 2018-02-06 | Welldynamics, Inc. | Sistema de poço, método para estimular de maneira seletiva uma formação subterrânea, e, válvula de revestimento para utilização em uma coluna tubular em um poço subterrâneo |
US7617871B2 (en) | 2007-01-29 | 2009-11-17 | Halliburton Energy Services, Inc. | Hydrajet bottomhole completion tool and process |
US20080202764A1 (en) | 2007-02-22 | 2008-08-28 | Halliburton Energy Services, Inc. | Consumable downhole tools |
US7681645B2 (en) | 2007-03-01 | 2010-03-23 | Bj Services Company | System and method for stimulating multiple production zones in a wellbore |
US7870907B2 (en) | 2007-03-08 | 2011-01-18 | Weatherford/Lamb, Inc. | Debris protection for sliding sleeve |
US7841396B2 (en) | 2007-05-14 | 2010-11-30 | Halliburton Energy Services Inc. | Hydrajet tool for ultra high erosive environment |
US7580796B2 (en) | 2007-07-31 | 2009-08-25 | Halliburton Energy Services, Inc. | Methods and systems for evaluating and treating previously-fractured subterranean formations |
US7673673B2 (en) | 2007-08-03 | 2010-03-09 | Halliburton Energy Services, Inc. | Apparatus for isolating a jet forming aperture in a well bore servicing tool |
US7971646B2 (en) | 2007-08-16 | 2011-07-05 | Baker Hughes Incorporated | Multi-position valve for fracturing and sand control and associated completion methods |
US7703510B2 (en) | 2007-08-27 | 2010-04-27 | Baker Hughes Incorporated | Interventionless multi-position frac tool |
US20090062157A1 (en) | 2007-08-30 | 2009-03-05 | Halliburton Energy Services, Inc. | Methods and compositions related to the degradation of degradable polymers involving dehydrated salts and other associated methods |
US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
US7726403B2 (en) | 2007-10-26 | 2010-06-01 | Halliburton Energy Services, Inc. | Apparatus and method for ratcheting stimulation tool |
US8079933B2 (en) | 2007-11-04 | 2011-12-20 | GM Global Technology Operations LLC | Method and apparatus to control engine torque to peak main pressure for a hybrid powertrain system |
US20090125280A1 (en) | 2007-11-13 | 2009-05-14 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7849924B2 (en) | 2007-11-27 | 2010-12-14 | Halliburton Energy Services Inc. | Method and apparatus for moving a high pressure fluid aperture in a well bore servicing tool |
US7950461B2 (en) | 2007-11-30 | 2011-05-31 | Welldynamics, Inc. | Screened valve system for selective well stimulation and control |
US7690427B2 (en) | 2008-03-07 | 2010-04-06 | Halliburton Energy Services, Inc. | Sand plugs and placing sand plugs in highly deviated wells |
US8096358B2 (en) | 2008-03-27 | 2012-01-17 | Halliburton Energy Services, Inc. | Method of perforating for effective sand plug placement in horizontal wells |
US7730951B2 (en) | 2008-05-15 | 2010-06-08 | Halliburton Energy Services, Inc. | Methods of initiating intersecting fractures using explosive and cryogenic means |
US9260921B2 (en) | 2008-05-20 | 2016-02-16 | Halliburton Energy Services, Inc. | System and methods for constructing and fracture stimulating multiple ultra-short radius laterals from a parent well |
US20090308588A1 (en) | 2008-06-16 | 2009-12-17 | Halliburton Energy Services, Inc. | Method and Apparatus for Exposing a Servicing Apparatus to Multiple Formation Zones |
US20100000727A1 (en) | 2008-07-01 | 2010-01-07 | Halliburton Energy Services, Inc. | Apparatus and method for inflow control |
US8960292B2 (en) | 2008-08-22 | 2015-02-24 | Halliburton Energy Services, Inc. | High rate stimulation method for deep, large bore completions |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US7775285B2 (en) | 2008-11-19 | 2010-08-17 | Halliburton Energy Services, Inc. | Apparatus and method for servicing a wellbore |
US8074715B2 (en) | 2009-01-15 | 2011-12-13 | Halliburton Energy Services, Inc. | Methods of setting particulate plugs in horizontal well bores using low-rate slurries |
US8887803B2 (en) | 2012-04-09 | 2014-11-18 | Halliburton Energy Services, Inc. | Multi-interval wellbore treatment method |
US8631872B2 (en) | 2009-09-24 | 2014-01-21 | Halliburton Energy Services, Inc. | Complex fracturing using a straddle packer in a horizontal wellbore |
US9016376B2 (en) | 2012-08-06 | 2015-04-28 | Halliburton Energy Services, Inc. | Method and wellbore servicing apparatus for production completion of an oil and gas well |
US7882894B2 (en) | 2009-02-20 | 2011-02-08 | Halliburton Energy Services, Inc. | Methods for completing and stimulating a well bore |
US20110028358A1 (en) | 2009-07-30 | 2011-02-03 | Welton Thomas D | Methods of Fluid Loss Control and Fluid Diversion in Subterranean Formations |
US8104535B2 (en) | 2009-08-20 | 2012-01-31 | Halliburton Energy Services, Inc. | Method of improving waterflood performance using barrier fractures and inflow control devices |
US8104539B2 (en) | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8061426B2 (en) | 2009-12-16 | 2011-11-22 | Halliburton Energy Services Inc. | System and method for lateral wellbore entry, debris removal, and wellbore cleaning |
US8267172B2 (en) | 2010-02-10 | 2012-09-18 | Halliburton Energy Services Inc. | System and method for determining position within a wellbore |
US8210257B2 (en) | 2010-03-01 | 2012-07-03 | Halliburton Energy Services Inc. | Fracturing a stress-altered subterranean formation |
US8307904B2 (en) | 2010-05-04 | 2012-11-13 | Halliburton Energy Services, Inc. | System and method for maintaining position of a wellbore servicing device within a wellbore |
US20110284214A1 (en) | 2010-05-19 | 2011-11-24 | Ayoub Joseph A | Methods and tools for multiple fracture placement along a wellbore |
US9022115B2 (en) | 2010-11-11 | 2015-05-05 | Gas Technology Institute | Method and apparatus for wellbore perforation |
-
2009
- 2009-09-24 US US12/566,467 patent/US8439116B2/en active Active
-
2010
- 2010-07-23 CA CA2768279A patent/CA2768279C/en active Active
- 2010-07-23 MX MX2012000836A patent/MX2012000836A/es active IP Right Grant
- 2010-07-23 AU AU2010274726A patent/AU2010274726B2/en active Active
- 2010-07-23 AR ARP100102686A patent/AR078081A1/es active IP Right Grant
- 2010-07-23 PL PL10739662T patent/PL2456952T3/pl unknown
- 2010-07-23 WO PCT/GB2010/001407 patent/WO2011010113A2/en active Application Filing
- 2010-07-23 EP EP10739662.4A patent/EP2456952B1/en not_active Not-in-force
-
2012
- 2012-02-23 US US13/403,423 patent/US20120152550A1/en not_active Abandoned
-
2013
- 2013-05-13 US US13/892,710 patent/US8733444B2/en active Active
- 2013-12-13 US US14/106,323 patent/US8960296B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
US20130240211A1 (en) | 2013-09-19 |
CA2768279A1 (en) | 2011-01-27 |
AU2010274726B2 (en) | 2014-11-20 |
US8960296B2 (en) | 2015-02-24 |
EP2456952A2 (en) | 2012-05-30 |
PL2456952T3 (pl) | 2014-09-30 |
US8733444B2 (en) | 2014-05-27 |
CA2768279C (en) | 2014-07-15 |
US8439116B2 (en) | 2013-05-14 |
WO2011010113A2 (en) | 2011-01-27 |
EP2456952B1 (en) | 2014-04-16 |
US20120152550A1 (en) | 2012-06-21 |
US20110017458A1 (en) | 2011-01-27 |
WO2011010113A3 (en) | 2011-05-05 |
AU2010274726A1 (en) | 2012-02-02 |
AR078081A1 (es) | 2011-10-12 |
US20140096968A1 (en) | 2014-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2012000836A (es) | Metodo para inducir complejidad de fractura en terminacion de pozos horizontales fracturados hidraulicamente. | |
WO2010092352A3 (en) | Method and apparatus for multi-zone stimulation | |
WO2009096805A8 (en) | Method of hydraulic fracturing of horizontal wells, resulting in increased production | |
WO2009032937A3 (en) | Method and system for increasing production of a reservoir | |
MX2015012373A (es) | La fracturacion hidraulica con reaccion exotermica. | |
MX348816B (es) | Métodos para proporcionar barros de agentes de soporte en tratamientos de fracturación. | |
MX2009009328A (es) | Aparato y metodo de fracturacion. | |
WO2009032924A3 (en) | Method and system for increasing production of a reservoir using lateral wells | |
MX361400B (es) | Micro apuntalantes para estimulacion de campo lejano. | |
MX343560B (es) | Metodos y dispositivos para la fracturacion hidraulica y optimizacion: una modificacion a la fracturacion tipo cremallera. | |
BR112012018599A2 (pt) | método para produzir um propante, propante, nétodo para propagar fraturas de formação subterrânea aberta, método para tratar uma zona de produção subterrânea penetrada por um furo de poço, método para produzir um composto vitrocerâmico, material, composto vitrocerâmico e matriz | |
PL2235321T3 (pl) | Stymulowanie przez szczelinowanie podczas wiercenia | |
MX2010003218A (es) | Metodo para completar depositos de petroleo y gas hermeticos. | |
JO2670B1 (en) | Improved shale oil production through in situ heating using hydraulic shatter production wells | |
WO2011013056A3 (en) | Methods and apparatus for multilateral multistage stimulation of a well | |
MX2014001301A (es) | Método para la fracturación de múltiples zonas dentro de un pozo. | |
GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
MX358433B (es) | Métodos para iniciar nuevas fracturas en un pozo de sondeo completado que tiene fracturas existentes ahí presentes. | |
EG26640A (en) | A special method of hydraulic fracturing of an underground formation | |
MX2015000378A (es) | Monitoreo y caracterizacion de fracturas. | |
TN2010000043A1 (en) | System, method and apparatus for acid fracturing with scale inhibitor protection | |
WO2012054139A3 (en) | Methods for establishing a subsurface fracture network | |
WO2005071219A3 (en) | Methods and compositions for reducing the production of water and stimulating hydrocarbon production from a subterranean formation | |
GB2520189A (en) | Treating a subterranean formation with a mortar slurry | |
DK2069607T3 (da) | Fremgangsmåder og systemer til borehulsstimulering ved brug af flervinklet frakturering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant or registration |