WO2009096805A8 - Method of hydraulic fracturing of horizontal wells, resulting in increased production - Google Patents
Method of hydraulic fracturing of horizontal wells, resulting in increased production Download PDFInfo
- Publication number
- WO2009096805A8 WO2009096805A8 PCT/RU2008/000051 RU2008000051W WO2009096805A8 WO 2009096805 A8 WO2009096805 A8 WO 2009096805A8 RU 2008000051 W RU2008000051 W RU 2008000051W WO 2009096805 A8 WO2009096805 A8 WO 2009096805A8
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- hydraulic fracturing
- resulting
- increased production
- horizontal wells
- wells
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
Abstract
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRPI0821335-6A BRPI0821335A2 (en) | 2008-01-31 | 2008-01-31 | Horizontal Well Hydraulic Fracturing Method for Increasing Hydrocabinet Productivity |
CA2711773A CA2711773C (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
EA201070909A EA016864B1 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
CN200880125456.3A CN101952544B (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
PCT/RU2008/000051 WO2009096805A1 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
AU2008349610A AU2008349610B2 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
EP08793994.8A EP2235320A4 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/RU2008/000051 WO2009096805A1 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2009096805A1 WO2009096805A1 (en) | 2009-08-06 |
WO2009096805A8 true WO2009096805A8 (en) | 2015-05-14 |
Family
ID=40913003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/RU2008/000051 WO2009096805A1 (en) | 2008-01-31 | 2008-01-31 | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP2235320A4 (en) |
CN (1) | CN101952544B (en) |
AU (1) | AU2008349610B2 (en) |
BR (1) | BRPI0821335A2 (en) |
CA (1) | CA2711773C (en) |
EA (1) | EA016864B1 (en) |
WO (1) | WO2009096805A1 (en) |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9447673B2 (en) | 2010-05-17 | 2016-09-20 | Schlumberger Technology Corporation | Methods for providing proppant slugs in fracturing treatments |
CN102155208B (en) * | 2011-03-01 | 2013-04-10 | 西南石油大学 | Method for improving effective paving of propping agents in large and thick reservoir |
US9863230B2 (en) | 2011-06-15 | 2018-01-09 | Schlumberger Technology Corporation | Heterogeneous proppant placement in a fracture with removable extrametrical material fill |
WO2012178026A2 (en) * | 2011-06-24 | 2012-12-27 | Board Of Regents, The University Of Texas System | Method for determining spacing of hydraulic fractures in a rock formation |
PL408174A1 (en) | 2011-07-11 | 2014-12-22 | Schlumberger Technology B.V. | System and method for carrying out the well stimulation operations |
US8967262B2 (en) * | 2011-09-14 | 2015-03-03 | Baker Hughes Incorporated | Method for determining fracture spacing and well fracturing using the method |
IN2014CN03363A (en) * | 2011-10-12 | 2015-07-03 | Prad Res & Dev Ltd | |
CN102364041B (en) * | 2011-10-26 | 2014-03-26 | 王胜存 | Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture |
US10267131B2 (en) | 2012-08-13 | 2019-04-23 | Schlumberger Technology Corporation | Competition between transverse and axial hydraulic fractures in horizontal well |
US9784085B2 (en) | 2012-09-10 | 2017-10-10 | Schlumberger Technology Corporation | Method for transverse fracturing of a subterranean formation |
CN103087699B (en) * | 2012-12-27 | 2015-05-20 | 中国石油化工股份有限公司 | Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent |
RU2516626C1 (en) * | 2013-02-04 | 2014-05-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Hydraulic fracturing method for oil or gas deposit |
CN103195402B (en) * | 2013-04-12 | 2015-12-09 | 中联煤层气国家工程研究中心有限责任公司 | A kind of system and method for staged fracturing of coal bed gas well |
US9896923B2 (en) | 2013-05-28 | 2018-02-20 | Schlumberger Technology Corporation | Synchronizing pulses in heterogeneous fracturing placement |
CA2820742A1 (en) * | 2013-07-04 | 2013-09-20 | IOR Canada Ltd. | Improved hydrocarbon recovery process exploiting multiple induced fractures |
CN103306659B (en) * | 2013-07-04 | 2016-05-18 | 中国石油大学(华东) | A kind of fracturing technology of realizing superelevation flow conductivity |
US10221667B2 (en) | 2013-12-13 | 2019-03-05 | Schlumberger Technology Corporation | Laser cutting with convex deflector |
WO2015089458A1 (en) | 2013-12-13 | 2015-06-18 | Schlumberger Canada Limited | Creating radial slots in a wellbore |
CA2935543A1 (en) * | 2014-01-17 | 2015-07-23 | Schlumberger Canada Limited | System and methodology for well treatment |
WO2016003303A1 (en) | 2014-06-30 | 2016-01-07 | Шлюмберже Канада Лимитед | Method for planning production and injection wells |
RU2551571C1 (en) * | 2014-09-10 | 2015-05-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method to develop oil pool |
WO2016069977A1 (en) | 2014-10-30 | 2016-05-06 | Schlumberger Canada Limited | Creating radial slots in a subterranean formation |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
CN105386746A (en) * | 2015-11-18 | 2016-03-09 | 中国石油天然气股份有限公司 | Horizontal well hydraulic fracturing perforation method |
RU2616052C1 (en) * | 2016-05-05 | 2017-04-12 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method development of shaly carbonate oil pays |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11466549B2 (en) | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
WO2019014160A1 (en) | 2017-07-10 | 2019-01-17 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
WO2019014161A1 (en) | 2017-07-10 | 2019-01-17 | Schlumberger Technology Corporation | Controlled release of hose |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4078609A (en) * | 1977-03-28 | 1978-03-14 | The Dow Chemical Company | Method of fracturing a subterranean formation |
RU2153064C1 (en) * | 2000-01-11 | 2000-07-20 | Акционерное общество "Татнефть" | Oil-pool development method |
US6776235B1 (en) * | 2002-07-23 | 2004-08-17 | Schlumberger Technology Corporation | Hydraulic fracturing method |
-
2008
- 2008-01-31 AU AU2008349610A patent/AU2008349610B2/en not_active Ceased
- 2008-01-31 CN CN200880125456.3A patent/CN101952544B/en not_active Expired - Fee Related
- 2008-01-31 WO PCT/RU2008/000051 patent/WO2009096805A1/en active Application Filing
- 2008-01-31 EP EP08793994.8A patent/EP2235320A4/en not_active Withdrawn
- 2008-01-31 BR BRPI0821335-6A patent/BRPI0821335A2/en not_active IP Right Cessation
- 2008-01-31 CA CA2711773A patent/CA2711773C/en not_active Expired - Fee Related
- 2008-01-31 EA EA201070909A patent/EA016864B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
AU2008349610B2 (en) | 2012-04-12 |
EA016864B1 (en) | 2012-08-30 |
EP2235320A1 (en) | 2010-10-06 |
BRPI0821335A2 (en) | 2015-06-16 |
AU2008349610A1 (en) | 2009-08-06 |
EA201070909A1 (en) | 2011-08-30 |
WO2009096805A1 (en) | 2009-08-06 |
CN101952544A (en) | 2011-01-19 |
EP2235320A4 (en) | 2016-03-23 |
CA2711773C (en) | 2013-03-19 |
CA2711773A1 (en) | 2009-08-06 |
CN101952544B (en) | 2013-09-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009096805A8 (en) | Method of hydraulic fracturing of horizontal wells, resulting in increased production | |
WO2009032924A3 (en) | Method and system for increasing production of a reservoir using lateral wells | |
MX2010003218A (en) | Method for completing tight oil and gas reservoirs. | |
WO2011010113A3 (en) | Method for inducing fracture complexity in hydraulically fractured horizontal well completions | |
EA200970177A1 (en) | COMPOSITION AND METHOD OF OBTAINING PROPPANTS | |
WO2012058027A3 (en) | Method and system for fracturing a formation | |
EG26526A (en) | Method and compositions for fracturing subterranean formations | |
WO2009150402A3 (en) | Method of enhancing treatment fluid placement in shale, clay, and/or coal bed formations | |
MX2015012373A (en) | Hydraulic fracturing with exothermic reaction. | |
WO2015048021A3 (en) | Method of optimizing conductivity in a hydraulic fracturing operation | |
MX365203B (en) | A method of increasing efficiency in a hydraulic fracturing operation. | |
MY156991A (en) | Micro-crosslinked gels and associated methods | |
MX348816B (en) | Methods for providing proppant slugs in fracturing treatments. | |
IN2012DN05062A (en) | ||
GB2535346A (en) | Methods for enhancing propped fracture conductivity | |
JO2670B1 (en) | Enhanced shale oil production by in situ heating using hydraulically fractured producing wells | |
EA200701665A1 (en) | COMPOSITION AND METHOD OF OBTAINING PROPPANTS | |
PL2589640T3 (en) | Foamed gel systems for fracturing subterranean formations, and methods for making and using same | |
EP2179132A4 (en) | A method to enhance proppant conductivity from hydraulically fractured wells | |
MX2009009745A (en) | High strength ceramic elements and methods for making and using the same. | |
WO2008051299A3 (en) | Systems and processes for use in treating subsurface formations | |
GB2467402B (en) | Electric submersible pump, tubing and method for borehole production | |
EP2324196A4 (en) | Hydraulic fracturing proppants | |
WO2009108742A3 (en) | Apparatus and methods for setting one or more packers in a well bore | |
WO2007109281A3 (en) | Proppants made from filled polymers for use during oil and gas production and associated processes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200880125456.3 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08793994 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2008349610 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 3648/DELNP/2010 Country of ref document: IN |
|
ENP | Entry into the national phase |
Ref document number: 2008349610 Country of ref document: AU Date of ref document: 20080131 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2010/006439 Country of ref document: MX |
|
REEP | Request for entry into the european phase |
Ref document number: 2008793994 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2008793994 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2711773 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: DZP2010000465 Country of ref document: DZ |
|
WWE | Wipo information: entry into national phase |
Ref document number: 10088956 Country of ref document: CO |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 201070909 Country of ref document: EA |
|
ENP | Entry into the national phase |
Ref document number: PI0821335 Country of ref document: BR Kind code of ref document: A2 Effective date: 20100621 |