CN103195402B - A kind of system and method for staged fracturing of coal bed gas well - Google Patents
A kind of system and method for staged fracturing of coal bed gas well Download PDFInfo
- Publication number
- CN103195402B CN103195402B CN201310127809.6A CN201310127809A CN103195402B CN 103195402 B CN103195402 B CN 103195402B CN 201310127809 A CN201310127809 A CN 201310127809A CN 103195402 B CN103195402 B CN 103195402B
- Authority
- CN
- China
- Prior art keywords
- fracturing
- casing
- ball
- section
- nipple
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开煤层气井的分段压裂系统和方法,系统包括:套管短节、压裂装置、投球器和封隔球,各套管短节与煤层气井的生产套管连接,分别位于两段压裂段之间,安装有套管短节的生产套管在钻井完成后被下入井内进行固井;投球器与煤层气井中采油树的上部连接,按距离投球器由近到远的顺序,各个套管短节的内径依次减小;压裂装置,用于按距离投球器由远到近的顺序对各段压裂段进行压裂,在将一段压裂段压裂完成,并对待压裂的下一段压裂段进行完射孔后,注入压裂液,将由投球器投入的封隔球送到该完成压裂的压裂段的靠近投球器一侧的套管短节处,封堵该套管短节,封隔球与套管短节相匹配。本发明能够取得了缩短施工周期,降低成本的有益效果。
The invention discloses a segmented fracturing system and method for a coalbed gas well. The system includes: a casing nipple, a fracturing device, a ball thrower and a packing ball. Between the fracturing sections of the fracturing section, the production casing installed with the casing nipple is lowered into the well for cementing after the drilling is completed; the ball feeder is connected to the upper part of the Christmas tree in the coalbed methane well, and the ball feeder is arranged from near to far according to the distance Sequentially, the inner diameter of each casing pup joint decreases in turn; the fracturing device is used to fracturing each fracturing section in the order from far to near to the ball launcher, and after the fracturing of one fracturing section is completed, and After the next fracturing section to be fractured is perforated, the fracturing fluid is injected, and the packing ball dropped by the ball feeder is sent to the casing nipple near the ball feeder side of the completed fracturing section , to seal off the casing sub-section, and the packing ball matches the casing sub-section. The invention can achieve the beneficial effects of shortening the construction period and reducing the cost.
Description
技术领域technical field
本发明涉及煤层气井压裂领域,特别涉及煤层气井的分段压裂的系统和方法。The invention relates to the field of fracturing of coalbed gas wells, in particular to a system and method for staged fracturing of coalbed gas wells.
背景技术Background technique
煤层气储层具有低孔、低渗的特点,一般需要压裂改造才能获得较好的气产量。其中,煤层气开采可以使用煤层气直井、煤层气定向井、煤层气水平井等多种的开发方式。Coalbed methane reservoirs are characterized by low porosity and low permeability, and generally require fracturing to obtain better gas production. Among them, coalbed methane mining can use various development methods such as coalbed methane vertical wells, coalbed methane directional wells, and coalbed methane horizontal wells.
现有技术中,套管完井的煤层气水平井在钻完井技术方面已基本成熟,若有成熟的与之配套的压裂增产技术,则套管完井加压裂的方式可以大大推动煤层气开发,但在其分段压裂方面还存在一些技术问题。其中,压裂是对常规油气田层或非常规油气层一种常用的改造方法,目的是提高近井地带的渗透能力从而提高产能。In the existing technology, the drilling and completion technology of coalbed methane horizontal wells completed with casing is basically mature. If there is a mature fracturing stimulation technology matching it, the method of casing completion and fracturing can greatly promote CBM development, but there are still some technical problems in its staged fracturing. Among them, fracturing is a commonly used stimulation method for conventional oil and gas fields or unconventional oil and gas layers, the purpose of which is to improve the permeability of the near-wellbore area and thus increase the productivity.
现有技术中,采用水力喷射射孔和压裂技术,虽然压裂施工进度较快,但管柱被砂卡的风险高,易耽误施工进度,造成高的修井费用,后期管柱的处理费用也较高。In the prior art, hydraulic jet perforation and fracturing technology are adopted. Although the fracturing construction progress is fast, the risk of the pipe string being stuck by sand is high, which easily delays the construction progress, resulting in high workover costs. The cost is also higher.
现有技术中,采用速钻桥塞分段压裂技术,需要分级点火完成一趟作业座封桥塞及射孔两道工序,压裂完所有的层段后需要采用专用的工具对桥塞进行钻磨,使得施工工艺复杂、周期长,而且采用速钻桥塞的分段压裂技术,其工艺复杂、施工费用高。In the prior art, using the rapid drilling bridge plug staged fracturing technology, staged ignition is required to complete the two processes of plug sealing and perforation of the operation seat. After fracturing all layers, special tools are required to repair the bridge plug Drilling and grinding make the construction process complicated and the period is long, and the staged fracturing technology of rapid drilling bridge plug is adopted, the process is complicated and the construction cost is high.
发明内容Contents of the invention
本发明提供了煤层气井的分段压裂的系统和方法,以解决施工风险大、工艺复杂、施工成本高的问题。The invention provides a system and method for staged fracturing of a coal bed gas well to solve the problems of high construction risk, complex process and high construction cost.
本发明公开了一种煤层气井的分段压裂系统,所述系统包括:套管短节、压裂装置、投球器和封隔球,The invention discloses a staged fracturing system for a coalbed methane well. The system includes: a casing nipple, a fracturing device, a ball thrower and a packing ball.
各套管短节与煤层气井的生产套管连接,分别位于两段压裂段或压裂层之间,安装有套管短节的生产套管在钻井完成后被下入井内进行固井;Each casing nipple is connected to the production casing of the coalbed methane well, and is respectively located between the two fracturing sections or fracturing layers. The production casing installed with the casing nipple is lowered into the well for cementing after the drilling is completed;
投球器与煤层气井中采油树的上部连接,采油树的下部与生产套管连接,按距离投球器由近到远的顺序,各个套管短节的内径依次减小;The ball launcher is connected to the upper part of the Christmas tree in the coalbed methane well, and the lower part of the Christmas tree is connected to the production casing. The inner diameter of each casing nipple decreases in order from the closest to the farthest from the ball launcher;
压裂装置,用于按距离投球器由远到近的顺序对各段压裂段或压裂层进行压裂,在将一段压裂段或压裂层压裂完成,并对待压裂的下一段压裂段或压裂层进行完射孔后,向生产套管中注入压裂液,将由投球器投入的封隔球送到该完成压裂的压裂段或压裂层靠近投球器一侧的套管短节处,封堵该套管短节,所述封隔球与所述套管短节相匹配。The fracturing device is used to fracturing each fracturing section or fracturing layer in the order from farthest to the ball launcher. After a fracturing section or fracturing layer is perforated, the fracturing fluid is injected into the production casing, and the packing ball dropped by the ball feeder is sent to the completed fracturing section or fracturing layer near the ball feeder. At the short joint of the casing on the side, the short joint of the casing is blocked, and the packing ball is matched with the short joint of the casing.
其中,所述套管短节包括:外套和内套,Wherein, the casing nipple includes: an outer sleeve and an inner sleeve,
各个套管短节的外套规格相同,外套的强度大于生产套管的强度;The jacket specifications of each casing pup joint are the same, and the strength of the jacket is greater than that of the production casing;
各个套管短节的内套的外径相同,内套与外套丝扣连接并固定;The outer diameters of the inner sleeves of each casing pup joint are the same, and the inner sleeves are connected and fixed with the outer sleeve with threads;
各个套管短节的内套的内径,按距离投球器由近到远的顺序依次减小。The inner diameters of the inner sleeves of the pup joints of the bushings decrease in order from the closest to the farthest from the pitcher.
其中,所述内套所用材料为复合材料。Wherein, the material used in the inner sleeve is a composite material.
其中,两个相邻套管短节的内套的内直径相差7mm至8mm间的任意值。Wherein, the inner diameters of the inner sleeves of the two adjacent casing pup joints differ by any value between 7mm and 8mm.
其中,所述封隔球的直径比相匹配的套管短节的内直径大3.5mm至4mm间的任意值。Wherein, the diameter of the packing ball is any value between 3.5 mm and 4 mm larger than the inner diameter of the matched casing sub-section.
其中,所述封隔球所用材料为复合橡胶材料,耐压差强度大于40MPa。Wherein, the material used for the packing ball is a composite rubber material, and the pressure difference strength is greater than 40MPa.
其中,当生产套管为5寸半套管时,压裂段或压裂层的数量为2至7中任意值;Among them, when the production casing is a 5.5-inch casing, the number of fracturing sections or fracturing layers is any value from 2 to 7;
和/或,and / or,
当生产套管为7寸半套管时,压裂段或压裂层的数量为2至10中任意值。When the production casing is a 7.5-inch casing, the number of fracturing stages or layers is any value from 2 to 10.
本发明还公开了一种煤层气井的分段压裂方法,所述方法包括:The invention also discloses a segmented fracturing method for a coalbed methane well, said method comprising:
将各套管短节与煤层气井的生产套管连接,各套管短节分别位于两段压裂段或压裂层之间,钻井完成后,将生产套管下入井内进行固井,将煤层气井中采油树的下部与生产套管连接,将投球器与采油树的上部连接;按距离投球器由近到远的顺序,各个套管短节的内径依次减小;Connect each casing nipple with the production casing of the coalbed methane well. Each casing nipple is located between the two fracturing sections or fracturing layers. After the drilling is completed, the production casing is lowered into the well for cementing. The lower part of the Christmas tree in the coalbed methane well is connected with the production casing, and the ball feeder is connected with the upper part of the Christmas tree; the inner diameters of each casing pup joint decrease in order from the closest to the farthest from the ball feeder;
通过压裂装置按距离投球器由远到近的顺序对各段压裂段或压裂层进行压裂,在将一段压裂段或压裂层压裂完成,并对待压裂的下一段压裂段或压裂层进行完射孔后,投球器投入封隔球,向生产套管中注入压裂液,将封隔球送到该完成压裂的压裂段或压裂层靠近投球器一侧的套管短节处,封堵该套管短节,所述封隔球与所述套管短节相匹配。Use the fracturing device to fracturing each fracturing section or fracturing layer in order from far to near to the ball launcher. After fracturing one fracturing section or fracturing layer, the next stage to be fractured will be fractured. After perforating the fracture section or fracturing layer, the ball feeder puts the packing ball into the production casing, injects the fracturing fluid, and sends the packing ball to the completed fracturing section or fracturing layer close to the ball feeder At the short joint of the casing on one side, the short joint of the casing is blocked, and the packing ball is matched with the short joint of the casing.
其中,所述套管短节包括:外套和内套,Wherein, the casing nipple includes: an outer sleeve and an inner sleeve,
各个套管短节的外套规格相同,外套的强度大于生产套管的强度;The jacket specifications of each casing pup joint are the same, and the strength of the jacket is greater than that of the production casing;
各个套管短节的内套的外径相同,内套与外套丝扣连接并固定;The outer diameters of the inner sleeves of each casing pup joint are the same, and the inner sleeves are connected and fixed with the outer sleeve with threads;
各个套管短节的内套的内径,按距离投球器由近到远的顺序依次减小。The inner diameters of the inner sleeves of the pup joints of the bushings decrease in order from the closest to the farthest from the pitcher.
其中,两个相邻套管短节的内套的内直径相差7mm至8mm间的任意值,Among them, the difference between the inner diameters of the inner sleeves of two adjacent casing pup joints is any value between 7mm and 8mm,
和/或,and / or,
所述封隔球的直径比相匹配的套管短节的内直径大3.5mm至4mm间的任意值。The diameter of the packing ball is any value between 3.5 mm and 4 mm larger than the inner diameter of the matched casing nipple.
本发明的有益效果是:通过使用多个相互匹配的套管短节和封隔球,在将一段压裂段或压裂层压裂完成,并对待压裂的下一段压裂段或压裂层进行完射孔后,注入对下一段压裂段或压裂层进行压裂的压裂液,并通过压裂液将由投球器投入的封隔球送到该完成压裂的压裂段或压裂层的套管短节处,封堵该套管短节;仅需在将煤层气井的生产套管中安装套管短节,完成一段压裂后,在对下一段进行压裂时,使用进行压裂的压裂液将封隔球送入套管短节进行封堵,便可以实现分段压裂,满足煤层气压裂施工中大排量的需要。并且,采用该技术方案,无需增加复杂施工操作,安全可靠、快捷地实现分段压裂,同时可以避免不必要的修井,取得了缩短施工周期,降低成本的有益效果。The beneficial effect of the present invention is: by using a plurality of matched casing nipples and packing balls, after a fracturing segment or fracturing layer is fractured, the next segment of fracturing segment or fracturing layer to be fractured is completed. After the layer is perforated, the fracturing fluid for fracturing the next fracturing stage or layer is injected, and the packing ball dropped by the ball feeder is sent to the fracturing stage or layer that has completed fracturing through the fracturing fluid. At the casing nipple of the fracturing layer, plug the casing nipple; it is only necessary to install the casing nipple in the production casing of the coalbed methane well. After completing one section of fracturing, when fracturing the next section, Using the fracturing fluid for fracturing, the packing ball is sent into the casing sub-joint for plugging, and segmental fracturing can be realized to meet the needs of large displacement in coalbed gas fracturing construction. Moreover, the adoption of this technical solution does not need to add complicated construction operations, safely, reliably, and quickly realizes staged fracturing, and at the same time avoids unnecessary workover, and achieves the beneficial effects of shortening the construction period and reducing costs.
附图说明Description of drawings
图1为本发明一实施例的煤层气水平井的分段压裂的系统的结构图;Fig. 1 is the structural diagram of the staged fracturing system of the coalbed methane horizontal well of an embodiment of the present invention;
图2为本发明一实施例的套管短节的剖面图;Fig. 2 is a cross-sectional view of a casing nipple according to an embodiment of the present invention;
图3为本发明一实施例的煤层气直井的分段压裂的系统的结构图;Fig. 3 is a structural diagram of the staged fracturing system of a coalbed methane vertical well according to an embodiment of the present invention;
图4为本发明一实施例的煤层气定向井的分段压裂的系统的结构图;Fig. 4 is a structural diagram of the staged fracturing system of the coalbed methane directional well according to an embodiment of the present invention;
图5为本发明一实施例的煤层气井的分段压裂的方法的流程图。Fig. 5 is a flow chart of a method for staged fracturing of a coalbed methane well according to an embodiment of the present invention.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明实施方式作进一步地详细描述。In order to make the object, technical solution and advantages of the present invention clearer, the implementation manner of the present invention will be further described in detail below in conjunction with the accompanying drawings.
参见图1,为一实施例的煤层气水平井的分段压裂的系统的结构图。Referring to Fig. 1 , it is a structural diagram of a system for staged fracturing of a coalbed methane horizontal well according to an embodiment.
系统包括:套管短节200、压裂装置、投球器100和封隔球。为使结构图简洁便于说明,在图1中未示出压裂装置和封隔球。其中,压裂装置为本领域常用装置,在本实施例中,可以为任何通过压裂液对煤层进行压裂的装置,在此没有特别限制。The system includes: a casing sub 200, a fracturing device, a ball launcher 100, and a packing ball. In order to make the structural diagram concise and easy to explain, the fracturing device and the packing ball are not shown in Fig. 1 . Wherein, the fracturing device is a commonly used device in the field. In this embodiment, it can be any device for fracturing the coal seam with fracturing fluid, and there is no special limitation here.
在本实施例中,具有6个套管短节200,分别为第一级套管短节200a、第二级套管短节200b、第三级套管短节200c、第四级套管短节200d、第五级套管短节200e、第六级套管短节200f。本实施例中压裂段的数量为7。此处,仅为本实施例中的举例说明,当生产套管为5寸半套管时,压裂段的数量为2至7中任意值;当生产套管为7寸半套管时,压裂段的数量为2至10中任意值。In this embodiment, there are six casing nipples 200, namely, the first-level casing nipple 200a, the second-level casing nipple 200b, the third-level casing nipple 200c, and the fourth-level casing nipple. Section 200d, the fifth-level casing pup joint 200e, and the sixth-level casing pup joint 200f. The number of fracturing stages in this embodiment is 7. Here, it is only an example in this embodiment. When the production casing is a 5.5-inch casing, the number of fracturing sections is any value from 2 to 7; when the production casing is a 7.5-inch casing, The number of fracturing stages can be anywhere from 2 to 10.
各套管短节200与煤层气井的生产套管300连接,分别位于两段压裂段或压裂层之间。在水平井中,如图1所示,分段压裂的各段对应为压裂段,在直井或定向井中,如图3或图4所示,分段压裂的各段对应为压裂层。各段压裂段的长度或压裂层的高度依分段压裂的要求而定。Each casing nipple 200 is connected with the production casing 300 of the coalbed methane well, and is respectively located between two fracturing stages or fracturing layers. In a horizontal well, as shown in Figure 1, each stage of staged fracturing corresponds to a fracturing stage; in a vertical or directional well, as shown in Figure 3 or 4, each stage of staged fracturing corresponds to a fracturing stage layer. The length of each fracturing section or the height of the fracturing layer depends on the requirements of the staged fracturing.
安装有套管短节200的生产套管300在钻井完成后被下入井内进行固井。投球器100与煤层气井中采油树400的上部连接,采油树400的下部与生产套管300连接,按距离投球器100由近到远的顺序,各个套管短节200的内径依次减小。The production casing 300 installed with the casing nipple 200 is lowered into the well for cementing after the drilling is completed. The ball feeder 100 is connected to the upper part of the christmas tree 400 in the coalbed methane well, and the lower part of the oil tree 400 is connected to the production casing 300. The inner diameters of the casing nipples 200 decrease in order from the closest to the farthest from the ball feeder 100.
参见图2,为本发明一实施例的套管短节的结构图。套管短节200包括外套210和内套220。各个套管短节200的外套210规格相同,外套210的强度大于生产套管300的强度。各个套管短节200的内套220的外径相同,内套220与外套210丝扣连接并固定。各个套管短节200的内套220的内径,按距离投球器100由近到远的顺序依次减小。两个相邻套管短节200的内套220的内直径相差8mm,即由第六级套管短节200f至第一级套管短节200a,内套的内直径依次减少8mm。内套220所用材料为复合材料,以便于实现钻磨。Referring to FIG. 2 , it is a structural diagram of a casing nipple according to an embodiment of the present invention. The casing nipple 200 includes an outer sleeve 210 and an inner sleeve 220 . The casing 210 of each casing pup joint 200 has the same specification, and the strength of the casing 210 is greater than that of the production casing 300 . The outer diameters of the inner sleeves 220 of each casing pup joint 200 are the same, and the inner sleeves 220 are connected and fixed to the outer sleeves 210 with screws. The inner diameters of the inner casings 220 of the casing pup joints 200 decrease in order from the closest to the farthest from the ball launcher 100 . The inner diameters of the inner sleeves 220 of two adjacent casing nipples 200 differ by 8mm, that is, from the sixth casing nipple 200f to the first casing nipple 200a, the inner diameters of the inner casings decrease by 8mm sequentially. The material used for the inner sleeve 220 is a composite material, so as to realize drilling and grinding.
在本实施例中采用如图2所示的套管短节。套管短节200与套管丝扣连接,图2中左侧圈出部分2001与套管公扣直接连接,右侧圈出部份2002与双公套管短节200的一端连接,另一端与下部的生产套管300连接。In this embodiment, the casing nipple as shown in Fig. 2 is adopted. The casing nipple 200 is connected with the casing thread, the part 2001 circled on the left in Fig. It is connected with the production casing 300 at the lower part.
压裂装置,用于按距离投球器100由远到近的顺序对各段压裂段进行压裂,在将一段压裂段压裂完成,并对待压裂的下一段压裂段进行完射孔后,通过注入少量压裂液,将由投球器100投入的封隔球送到该完成压裂的压裂段的套管短节200处,封堵该套管短节200,所述封隔球与所述套管短节200相匹配。其中,封隔球的直径比相匹配的套管短节200的内直径大4mm。封隔球所用材料为复合橡胶材料,耐压差强度大于40MPa。The fracturing device is used to perform fracturing on each fracturing section in the order of distance from the ball launcher 100 from far to near. After the hole is drilled, a small amount of fracturing fluid is injected, and the packing ball dropped by the ball feeder 100 is sent to the casing nipple 200 of the fracturing section that has been fractured, so as to seal the casing nipple 200, and the packing The ball fits the casing nipple 200 . Wherein, the diameter of the packing ball is 4 mm larger than the inner diameter of the matched casing nipple 200 . The material used for the isolation ball is a composite rubber material, and the pressure difference strength is greater than 40MPa.
在本实施例中压裂装置可以为任何通过压裂液对煤层进行压裂的装置。例如,压裂装置包括:压裂车组、地面高压管线、井口装置,以及配备的射孔枪。压裂车组包括:压裂主机车、混砂车、仪表车。In this embodiment, the fracturing device may be any device for fracturing the coal seam through fracturing fluid. For example, a fracturing device includes: a fracturing train unit, a surface high-pressure pipeline, a wellhead device, and an equipped perforating gun. The fracturing vehicle group includes: main fracturing vehicle, sand mixing vehicle, and instrument vehicle.
在如图1所示的系统中,在生产套管300下入到井内进行固井后,采用油管传输射孔,例如连续油管或电缆加爬行器,将射孔枪输送到需要压裂的第一段压裂段进行射孔,提出射孔枪,对第一段压裂段进行压裂。具体压裂过程为,压裂车组将压裂液体以高于地层吸收能力的排量注入地层,使地层岩石破裂形成裂缝,然后用携砂液携带支撑剂进入到裂缝中,压裂后裂缝闭合,支撑剂停留在裂缝起到支撑作用,从而形成较高导流能力裂缝有利于油气的流动。In the system shown in Fig. 1, after the production casing 300 is lowered into the well for cementing, the perforation is transported by tubing, such as coiled tubing or cable plus crawler, to transport the perforating gun to the first fracturing area. The first fracturing section is perforated, and the perforating gun is raised to perform fracturing on the first fracturing section. The specific fracturing process is that the fracturing crew injects fracturing fluid into the formation at a displacement higher than the absorption capacity of the formation to break the formation rocks and form fractures, and then use the sand-carrying fluid to carry proppant into the fractures, and the fractures after fracturing When closed, the proppant stays in the fractures to play a supporting role, thus forming fractures with high conductivity, which is conducive to the flow of oil and gas.
对第一段压裂段进行压裂后,采用电缆泵送方式将射孔枪送入到第二段压裂段进行射孔,提出射孔枪。注入压裂液将由投球器100投入的封隔球泵送到第一级套管短节200a,进而封堵压裂的第一段压裂段,继续注入压裂液对第二段压裂段进行压裂。其中,投球器100所投的封隔球为与第一级套管短节200a相匹配的封隔球,该封隔球直径比第一级套管短节200a的内直径大4mm。压裂液压裂完成后,用携砂液携带支撑剂进入到裂缝中,压裂后裂缝闭合,支撑剂停留在裂缝起到支撑作用。After fracturing the first fracturing stage, the perforating gun is sent to the second fracturing stage for perforation by means of cable pumping, and the perforating gun is lifted out. Inject the fracturing fluid to pump the packing ball put in by the ball feeder 100 to the first-stage casing nipple 200a, and then seal the first fracturing section of the fracturing, and continue to inject fracturing fluid to the second fracturing section. Perform fracking. Wherein, the packing ball thrown by the ball thrower 100 is a packing ball matched with the first-stage casing sub-joint 200a, and the diameter of the packing-off ball is 4mm larger than the inner diameter of the first-stage casing sub-joint 200a. After the fracturing hydraulic fracturing is completed, the proppant is carried into the fracture with the sand-carrying fluid, and the fracture is closed after fracturing, and the proppant stays in the fracture to play a supporting role.
采用电缆泵送方式将射孔枪送入到第三段压裂段进行射孔,提出射孔枪。注入压裂液,将由投球器100投入的封隔球泵送到第二级套管短节200b,进而封堵压裂的第二段压裂段,继续注入压裂液对第三段压裂段进行压裂。其中,投球器100所投的封隔球为与第二级套管短节200b相匹配的封隔球,该封隔球直径比第二级套管短节200b的内直径大4mm。压裂液压裂完成后,用携砂液携带支撑剂进入到裂缝中,压裂后裂缝闭合,支撑剂停留在裂缝起到支撑作用。The perforating gun is sent to the third fracturing section for perforation by means of cable pumping, and the perforating gun is lifted out. Inject the fracturing fluid, pump the packing ball put in by the ball feeder 100 to the second-stage casing nipple 200b, and then seal the second fracturing stage of fracturing, and continue to inject fracturing fluid to the third stage of fracturing section undergoes fracturing. Wherein, the packing ball thrown by the ball thrower 100 is a packing ball matched with the second-stage casing sub-joint 200b, and the diameter of the packing ball is 4mm larger than the inner diameter of the second-stage casing sub-joint 200b. After the fracturing hydraulic fracturing is completed, the proppant is carried into the fracture with the sand-carrying fluid, and the fracture is closed after fracturing, and the proppant stays in the fracture to play a supporting role.
重复上述操作,直到第六级套管短节200f被封隔球封堵,并且第七段压裂段被压裂。The above operations are repeated until the casing sub-joint 200f of the sixth stage is blocked by the packing ball, and the fracturing stage of the seventh stage is fractured.
本发明中系统除可用于煤层气水平井外还可以用于煤层气直井和煤层气定向井。The system in the present invention can be used in coalbed methane vertical wells and coalbed methane directional wells in addition to coalbed methane horizontal wells.
参见图3,为本发明一实施例的煤层气直井的分段压裂的系统的结构图。在本实施例中,具有2个套管短节200,分别为第一级套管短节200a、第二级套管短节200b。本实施例中,煤层气井为直井,压裂层的数量为3。系统中所包含装置以及装置间连接关系与上述水平井实施例没有差别。为使结构图简洁便于说明,在图3中未示出压裂装置和封隔球,图中黑色方块部分代表煤层。Referring to FIG. 3 , it is a structural diagram of a system for staged fracturing of vertical coalbed methane wells according to an embodiment of the present invention. In this embodiment, there are two casing sub-joints 200, namely, the first-level casing sub-joint 200a and the second-level casing sub-joint 200b. In this embodiment, the coalbed methane well is a vertical well, and the number of fractured layers is three. The devices included in the system and the connections between the devices are the same as those of the above-mentioned horizontal well embodiment. In order to make the structural diagram concise and easy to explain, the fracturing device and packing ball are not shown in Fig. 3, and the black square part in the figure represents the coal seam.
参见图4,为本发明一实施例的煤层气定向井的分段压裂的系统的结构图。在本实施例中,具有2个套管短节200,分别为第一级套管短节200a、第二级套管短节200b。本实施例中,煤层气井为定向井,压裂层的数量为3。系统中所包含装置以及各个装置间连接关系与上述水平井实施例没有差别。为使结构图简洁便于说明,在图4中未示出压裂装置和封隔球,图中黑色方块部分代表煤层。Referring to FIG. 4 , it is a structural diagram of a staged fracturing system for a coalbed methane directional well according to an embodiment of the present invention. In this embodiment, there are two casing sub-joints 200, namely, the first-level casing sub-joint 200a and the second-level casing sub-joint 200b. In this example, the coalbed methane well is a directional well, and the number of fractured layers is three. The devices included in the system and the connections among the devices are not different from the above-mentioned horizontal well embodiment. In order to make the structural diagram concise and easy to explain, the fracturing device and packing ball are not shown in Fig. 4, and the black square part in the figure represents the coal seam.
本发明还提供了一种煤层气井的分段压裂方法,所述方法包括如下步骤。The present invention also provides a staged fracturing method for a coalbed gas well, and the method includes the following steps.
步骤S510,将各套管短节与煤层气井的生产套管连接,各套管短节分别位于两段压裂段或压裂层之间,钻井完成后,将生产套管下入井内进行固井,将煤层气井中采油树的下部与生产套管连接,将投球器与采油树的上部连接。其中,按距离投球器由近到远的顺序,各个套管短节的内径依次减小。Step S510, connecting each casing nipple with the production casing of the coalbed methane well, each casing nipple is respectively located between the two fracturing stages or fracturing layers, and after the drilling is completed, the production casing is lowered into the well for solidification. Well, connect the lower part of the Christmas tree in the coalbed methane well with the production casing, and connect the ball launcher with the upper part of the Christmas tree. Wherein, according to the sequence from near to far away from the pitcher, the inner diameters of the casing nipples decrease successively.
步骤S520,通过压裂装置按距离投球器由远到近的顺序对各段压裂段或压裂层进行压裂,在将一段压裂段或压裂层压裂完成,并对待压裂的下一段压裂段或压裂层进行完射孔后,投球器投入封隔球,向生产套管中注入压裂液,将封隔球送到该完成压裂的压裂段或压裂层靠近投球器一侧的套管短节处,封堵该套管短节。Step S520, use the fracturing device to perform fracturing on each fracturing segment or fracturing layer in the order from far to near to the ball launcher, and after fracturing a fracturing segment or fracturing layer is completed, and After the next fracturing stage or fracturing layer is perforated, the ball feeder puts the packing ball into the production casing, injects the fracturing fluid, and sends the packing ball to the fracturing stage or fracturing layer that has been fractured. Plug the casing nipple near the side of the pitcher.
所述封隔球与所述套管短节相匹配。The packing ball is matched with the casing nipple.
该方法适用于煤层气水平井、煤层气直井、以及煤层气定向井。在水平井中,如图1所示,分段压裂的各段对应为压裂段,在直井或定向井中,如图3或图4所示,分段压裂的各段对应为压裂层。各段压裂段的长度或压裂层的高度依分段压裂的要求而定。The method is applicable to coalbed methane horizontal wells, coalbed methane vertical wells, and coalbed methane directional wells. In a horizontal well, as shown in Figure 1, each stage of staged fracturing corresponds to a fracturing stage; in a vertical or directional well, as shown in Figure 3 or 4, each stage of staged fracturing corresponds to a fracturing stage layer. The length of each fracturing section or the height of the fracturing layer depends on the requirements of the staged fracturing.
进一步地,所述套管短节包括:外套和内套,Further, the sleeve sub-joint includes: an outer sleeve and an inner sleeve,
各个套管短节的外套规格相同,外套的强度大于生产套管的强度;The jacket specifications of each casing pup joint are the same, and the strength of the jacket is greater than that of the production casing;
各个套管短节的内套的外径相同,内套与外套丝扣连接并固定;The outer diameters of the inner sleeves of each casing pup joint are the same, and the inner sleeves are connected and fixed with the outer sleeve with threads;
各个套管短节的内套的内径,按距离投球器由近到远的顺序依次减小。The inner diameters of the inner sleeves of the pup joints of the bushings decrease in order from the closest to the farthest from the pitcher.
进一步地,两个相邻套管短节的内套的内直径相差7mm至8mm间任意值。Further, the inner diameters of the inner sleeves of two adjacent casing sub-joints differ by any value between 7mm and 8mm.
进一步地,所述封隔球的直径比相匹配的套管短节的内直径大3.5mm至4mm间任意值。Further, the diameter of the packing ball is larger than the inner diameter of the matched casing sub-section by any value between 3.5mm and 4mm.
进一步地,所述内套所用材料为复合材料。Further, the material used for the inner sleeve is a composite material.
进一步地,所述封隔球所用材料为复合橡胶材料,耐压差强度大于40MPa。Further, the material used for the packing ball is a composite rubber material, and the pressure difference strength is greater than 40MPa.
进一步地,当生产套管为5寸半套管时,压裂段或压裂层的数量为2至7中任意值;Further, when the production casing is a 5.5-inch casing, the number of fracturing sections or fracturing layers is any value from 2 to 7;
进一步地,当生产套管为7寸半套管时,压裂段或压裂层的数量为2至10中任意值。Further, when the production casing is a 7.5-inch casing, the number of fracturing sections or fracturing layers is any value from 2 to 10.
以上所述仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内所作的任何修改、等同替换、改进等,均包含在本发明的保护范围内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention are included in the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310127809.6A CN103195402B (en) | 2013-04-12 | 2013-04-12 | A kind of system and method for staged fracturing of coal bed gas well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310127809.6A CN103195402B (en) | 2013-04-12 | 2013-04-12 | A kind of system and method for staged fracturing of coal bed gas well |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103195402A CN103195402A (en) | 2013-07-10 |
| CN103195402B true CN103195402B (en) | 2015-12-09 |
Family
ID=48718201
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310127809.6A Active CN103195402B (en) | 2013-04-12 | 2013-04-12 | A kind of system and method for staged fracturing of coal bed gas well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103195402B (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104420835B (en) * | 2013-08-23 | 2017-08-04 | 中国石油天然气股份有限公司 | Multi-cluster perforation fracturing completion string and construction method |
| CN104453792A (en) * | 2014-07-04 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Coal seam mining method and structure |
| CN110318674B (en) * | 2019-06-13 | 2020-10-23 | 太原理工大学 | A method for cracking and outburst prevention of roadway roof |
| CN110821415A (en) * | 2019-12-03 | 2020-02-21 | 中石化石油工程技术服务有限公司 | A combined casing pup joint for well cementing and method for well cementing |
| CN113153253B (en) * | 2020-01-07 | 2022-08-30 | 中国石油天然气股份有限公司 | Horizontal well composite fracturing method |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2282061Y (en) * | 1996-12-03 | 1998-05-20 | 大庆石油管理局采油工艺研究所 | Under well packer device capable of substituting packer |
| CN101105121A (en) * | 2007-07-27 | 2008-01-16 | 大庆油田有限责任公司 | Horizontal well machinery staged fracturing tool string |
| AU2008349610A1 (en) * | 2008-01-31 | 2009-08-06 | Schlumberger Technology B.V. | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
| CN201714364U (en) * | 2010-07-02 | 2011-01-19 | 中国石油集团川庆钻探工程有限公司 | Staged fracturing and acidizing tool string for open hole completion of horizontal wells |
| CN102562019A (en) * | 2011-12-13 | 2012-07-11 | 中国石油集团川庆钻探工程有限公司井下作业公司 | Sand jet perforation annular mechanical packing multilayer fracturing tool pipe column and modification process |
| CN102606110A (en) * | 2012-02-24 | 2012-07-25 | 中国石油大学(北京) | Composite sliding sleeve, fracturing device and method for increasing well fracturing layer section |
| CN102619495A (en) * | 2012-04-19 | 2012-08-01 | 河北耐森特橡塑制品有限公司 | Multi-section delaminated fracturing tool string for vertical shaft immovable pipe column |
| CN202596589U (en) * | 2012-04-13 | 2012-12-12 | 中国石油天然气股份有限公司 | Casing Sliding Sleeve Completion Separation Modification Technology String |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7490669B2 (en) * | 2005-05-06 | 2009-02-17 | Bj Services Company | Multi-zone, single trip well completion system and methods of use |
-
2013
- 2013-04-12 CN CN201310127809.6A patent/CN103195402B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2282061Y (en) * | 1996-12-03 | 1998-05-20 | 大庆石油管理局采油工艺研究所 | Under well packer device capable of substituting packer |
| CN101105121A (en) * | 2007-07-27 | 2008-01-16 | 大庆油田有限责任公司 | Horizontal well machinery staged fracturing tool string |
| AU2008349610A1 (en) * | 2008-01-31 | 2009-08-06 | Schlumberger Technology B.V. | Method of hydraulic fracturing of horizontal wells, resulting in increased production |
| CN201714364U (en) * | 2010-07-02 | 2011-01-19 | 中国石油集团川庆钻探工程有限公司 | Staged fracturing and acidizing tool string for open hole completion of horizontal wells |
| CN102562019A (en) * | 2011-12-13 | 2012-07-11 | 中国石油集团川庆钻探工程有限公司井下作业公司 | Sand jet perforation annular mechanical packing multilayer fracturing tool pipe column and modification process |
| CN102606110A (en) * | 2012-02-24 | 2012-07-25 | 中国石油大学(北京) | Composite sliding sleeve, fracturing device and method for increasing well fracturing layer section |
| CN202596589U (en) * | 2012-04-13 | 2012-12-12 | 中国石油天然气股份有限公司 | Casing Sliding Sleeve Completion Separation Modification Technology String |
| CN102619495A (en) * | 2012-04-19 | 2012-08-01 | 河北耐森特橡塑制品有限公司 | Multi-section delaminated fracturing tool string for vertical shaft immovable pipe column |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103195402A (en) | 2013-07-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104695927B (en) | An integrated method for fracturing and completion of combined coiled tubing and production tubing strings | |
| CN103883293B (en) | Hydraulic jet radial drilling and fracturing integrating method | |
| CN104373103B (en) | A temporary plugging and repeated fracturing pipe string in old well fractures capable of large displacement construction and its method | |
| CN205225215U (en) | A mining device for layered mining of two sets of oil layers | |
| CN203394483U (en) | A Thin Layer Heavy Oil Planar Steam Flooding Injection Production System | |
| CN105507865A (en) | Re-fracturing method for oil, gas and water wells | |
| CN203321474U (en) | Multi-stage fracturing strings for horizontal wells in gas fields with hydraulic sandblasting clustering and multi-stage fracturing strings | |
| CN110295879A (en) | A kind of staged fracturing horizontal well in segments period note adopts dual string | |
| CN109267983B (en) | Horizontal well repeated fracturing device and method based on open hole preset pipe string well completion | |
| CN105822253A (en) | Casing sliding sleeve and hydraulic bridge plug combined completion string and rapid fracturing method | |
| CN105952378A (en) | Tree-shape structure well drilling and completion and yield increasing method | |
| CN103195402A (en) | Staged fracturing system and staged fracturing method of coal-bed gas well | |
| CN204532234U (en) | Combined completion string of casing sliding sleeve and hydraulic bridge plug | |
| CN104879110A (en) | Combined technology of cluster perforation and stage fracturing | |
| CN104481488A (en) | A control method for annular space pressure of vertical well coiled tubing sand packing partial pressure | |
| CN106761642B (en) | Vertical well fixed-point multistage fracturing method and application | |
| CN106593387B (en) | Method for realizing staged multi-cluster fracturing of horizontal well | |
| CN204082116U (en) | Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string | |
| CN104196512B (en) | Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process | |
| CN103362470B (en) | Oil/gas Well annular mechanical packing packer | |
| CN112431579B (en) | In-line fracturing device and method for sidetracking and small-bore wells | |
| CN201554371U (en) | A horizontal well completion string | |
| CN102852504A (en) | Multi-layer fracturing tool string for vertical well without moving string | |
| CN204371286U (en) | A temporary plugging refracturing string in old well fractures that can be constructed with large displacement | |
| CN205297515U (en) | A hydraulic jet fracturing device driven by coiled tubing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |