CN105114048B - A kind of staged fracturing of horizontal well single-well injection-production oil production method - Google Patents

A kind of staged fracturing of horizontal well single-well injection-production oil production method Download PDF

Info

Publication number
CN105114048B
CN105114048B CN201510506961.4A CN201510506961A CN105114048B CN 105114048 B CN105114048 B CN 105114048B CN 201510506961 A CN201510506961 A CN 201510506961A CN 105114048 B CN105114048 B CN 105114048B
Authority
CN
China
Prior art keywords
crack
injection
oil
liquid passage
horizontal well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510506961.4A
Other languages
Chinese (zh)
Other versions
CN105114048A (en
Inventor
李宾飞
李兆敏
叶金桥
李松岩
鹿腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201510506961.4A priority Critical patent/CN105114048B/en
Priority to PCT/CN2015/087878 priority patent/WO2017028322A1/en
Publication of CN105114048A publication Critical patent/CN105114048A/en
Application granted granted Critical
Publication of CN105114048B publication Critical patent/CN105114048B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of staged fracturing of horizontal well single-well injection-production oil production method, pass through staged fracturing of horizontal well, the a plurality of fracturing fracture perpendicular to horizontal wellbore is produced in oil reservoir different parts, choose a wherein crack and be used as fluid infusion channel, the crack of both sides adjacent thereto produces passage as crude oil, and displacement crude oil is located at middle crack to both sides flow in fracture along described;Packing technology is segmented with reference to double tube, this crack is insulated with two adjacent cracks in horizontal well, fluid injects from intermediate cracking, displacement crude oil is to both sides adjacent slits, it flow to horizontal wellbore, production fluid is along another oil pipe passage output pit shaft, so as to form segmentation single-well injection-production system in same level well.

Description

A kind of staged fracturing of horizontal well single-well injection-production oil production method
Technical field
The present invention relates to a kind of staged fracturing of horizontal well single-well injection-production oil production method, belong to the technology neck of Oilfield Development Engineering Domain.
Technical background
Growing with global economy, the world rapidly increases to the demand of oil, by eighties of last century to routine After the large-scale exploitation of oily resource, the newly increased recoverable reserves of high-quality crude are difficult to meet growing consumption, and the shape Condition is especially prominent in China.In this context, low-permeability oil deposit and nontraditional reservoir particularly compact oil reservoir are increasingly becoming me The emphasis of state's future oil and gas development.
Low-permeability oil deposit refers to that the porosity of oil reservoir is low, venturi is small, penetrating power poor (permeability is below 50 millidarcies), Production capacity is low, it usually needs carry out the oil reservoir that reservoir improvement could be produced normally.Fine and close oil refers to absorption or free state preservation Being born from storage certainly, continuously dividing in rich organic matter and the extremely low dark shales of permeability, argillaceous siltstoue and sand streak system The oil accumulation of cloth, its permeability is general below 1 millidarcy.
The development scheme that low-permeability oil deposit is commonly used at present is favorably with the exploitation of stratum elastic energy exhaustion formula, waterflooding extraction, note Gas exploitation etc.;Compact oil reservoir is mainly the exploitation of exhaustion formula at present, and it is mode the most feasible that gas injection, which improves its recovery ratio,.Utilize ground Layer elastic energy exhaustion formula exploitation, due to no energy supplement, recovery ratio is extremely low.By supplementing stratum to oil-bearing stratum flooding or gas injection Energy, using water or gas from injection well to extraction well displacement crude oil, be the effective ways for improving oil recovery factor.Larger Under the conditions of well spacing, simultaneously because low-permeability oil deposit permeability is relatively low, difficult water injection is caused, water injection pressure is high, can not usually built Found normal injection-production relation.After fracturing reform, injection fluid is often along crack channelling, it is difficult to enter perpendicular to crack side To oil reservoir.The effective ways of drop low injection pressure, raising water drive or gas drive effect are to reduce well spacing.But by drilling cost control System, the well spacing between injection well and extraction well unconfined can not reduce.For compact oil reservoir, gas injection pressure mistake is equally existed Height, the problem of gas injection is difficult.
Term is explained:
Staged fracturing of horizontal well:Instrument is separated by underground, horizontal well is divided into some sections, carried out respectively for each section Pressure break, forms the reservoir reconstruction technique of man-made fracture at each section.
The content of the invention
For existing technical problem, the present invention provides a kind of staged fracturing of horizontal well single-well injection-production oil production method.This hair Bright not only reduction water filling, steam injection pressure, and improve LOW PERMEABILITY RESERVOIR and compact oil reservoir development degree.
Summary of the invention:
The present invention produces a plurality of pressure break perpendicular to horizontal wellbore by staged fracturing of horizontal well, in oil reservoir different parts and split Seam, chooses a wherein crack as fluid infusion channel, the crack of both sides adjacent thereto is used as crude oil extraction passage, displacement Crude oil is located at middle crack to both sides flow in fracture along described;Packing technology is segmented with reference to double tube, by this in horizontal well Crack is insulated with two adjacent cracks, and fluid injects along an oil pipe passage from intermediate cracking, displacement crude oil to both sides Adjacent slits, flow to horizontal wellbore, and production fluid divides along another oil pipe passage output pit shaft so as to be formed in same level well Section single-well injection-production system.
Technical scheme is as follows:
A kind of staged fracturing of horizontal well single-well injection-production oil production method, including:
1) to horizontal well pit shaft staged fracturing:Form a plurality of radial direction fracturing fracture perpendicular to horizontal well pit shaft;
2) three adjacent cracks are chosen in the crack:Positioned at middle for target injection crack;Positioned at the mesh The crack into crack both sides is marked, and extraction crack I and extraction crack II respectively are along injection liquid injection direction;
3) double-deck concentric oil tubes or parallel double tube are installed in the sleeve pipe in horizontal well pit shaft:By the sky in described sleeve pipe Between be divided into Produced Liquid passage I, injection liquid passage and Produced Liquid passage II;The double-deck concentric oil tubes include outer tube and are set in Region in inner tube in outer tube, said inner tube is Produced Liquid passage II, and the region between the outer tube and inner tube is injection liquid Passage, the region between the outer tube and sleeve pipe is Produced Liquid passage I;An oil pipe in the parallel double tube is injection liquid Passage, another oil pipe is Produced Liquid passage II, and the region between the parallel double tube and sleeve pipe is Produced Liquid passage I;Institute Injection channel end is stated to set for closing;
4) the injection liquid passage is connected with target injection crack;By the Produced Liquid passage I and the extraction Crack I is connected;The Produced Liquid passage II is connected with the extraction crack II;
5) displacement of reservoir oil agent enters target injection crack along the injection liquid passage, and penetrates into oil reservoir, to the target Inject crack both sides displacement crude oil and enter the extraction crack I and extraction crack II, finally along the Produced Liquid passage I and extraction Liquid passage II is produced.
According to currently preferred, in the end of the double-deck concentric oil tubes or parallel double tube:Its described injection liquid leads to The endcapped in road is set, and its described Produced Liquid passage II end is connected with the extraction crack II;The injection liquid passage is set The sieve tube segment relative with target injection crack is equipped with, is connected with target injection crack, forms injection flow-guiding channel;Institute Produced Liquid passage I is stated to connect with the extraction crack I.
According to currently preferred, in the step 1) select suitably to carry out the hypotonic of horizontal well pit shaft staged fracturing before Or compact oil reservoir.It is preferred that, the core intersection is more than 10m.
According to currently preferred, the step 1) in, the horizontal well pit shaft is along stratum minimum horizontal principal stress side To what is be drilled to, the horizontal well pit shaft is located at oil reservoir middle and lower part.It is preferred that, Horizontal Well tube length degree is more than 100 meters, it is desirable to exploit Oil reservoir position is free of edge-bottom water.Because edge-bottom water is likely to be partially formed water cone in horizontal well pit shaft or causes quick water logging, make Into big volume production water, therefore it is required that the oil reservoir is free of edge-bottom water;Horizontal well pit shaft along stratum minimum horizontal principal stress direction be for Subsequent implementation staged fracturing is can form the radial fissure perpendicular to horizontal well pit shaft.
According to currently preferred, the step 1) in, the horizontal well wellbore section is adopted to give full play to same layer note Advantage, per segment length scope 30m-150m.According to reservoir physical property, horizontal well pit shaft is divided into some sections, segmentation carries out pressure break.
According to currently preferred, the step 5) in, displacement of reservoir oil agent is persistently injected, when crude output drops to economic production When amount is following, three adjacent cracks are reselected as one group of note newly and adopt crack, i.e. repeat step 2)-step 5), until The crude oil of whole Crack Controls of the horizontal well pit shaft is exploited.
According to currently preferred, the displacement of reservoir oil is that note adopts liquid or note gas production body with agent.
The present invention has the advantages that:
1st, with by injection well, compared with producing well crude oil extraction, fluid infusion pressure of the present invention is not by well spacing shadow Ring, crack interval can be determined according to reservoir physical property, be easy to control injection production pressure difference and displacement intensity.
2nd, compared with being developed using stratum elastic energy exhaustion formula, the present invention supplements stratum energy by injecting fluid, together When displacement crude oil extraction, oil recovery factor is greatly improved.
3rd, the present invention is in the opening well and making production stage, due to the presence of fracturing fracture, area of passage increase, injection fluid and crude oil Flow resistance be greatly lowered, significantly reduce fluid infusion pressure, improve the fluid ability of crude oil, while drainage area Increase, improves hypotonic, compact oil reservoir crude output and development effectiveness.
4th, the present invention can be reached by single port horizontal well pit shaft while injection fluid and the dual-use function of oil recovery, slow down Restriction of the oil well quantity to oilfield stimulation, so as to greatly reduce oil field development cost.
5th, the present invention adopts the combination and exploitation paragraph by paragraph in crack by note, oil well can be controlled into oil to greatest extent The crude oil extraction of layer, oil recovery factor is high.
Brief description of the drawings:
Fig. 1 adopts principle schematic for double-deck concentric oil tubes note of the present invention;
In Fig. 1,1- oil reservoirs border;2- sleeve pipes;The outer tube of 3- bilayer concentric oil tubes;The inner tube of 4- bilayer concentric oil tubes;5- The flow direction of 1- fluids;The flow direction of 5-2- crude oil;6- sieve tube segments;7- oil reservoirs;8- straight wells section;9- fracturing fractures a is (selected For extraction crack II);10- fracturing fractures b (is chosen as target injection crack);11- fracturing fractures c (is chosen as producing crack I); 12- fracturing fractures d;13- fracturing fractures e;14- fracturing fractures f;15- packers;16- packers;17- packers.
Fig. 2 is that note of the double-deck concentric oil tubes of the present invention after conversion note adopts crack adopts principle schematic;
In Fig. 2,1- oil reservoirs border;2- sleeve pipes;The outer tube of 3- bilayer concentric oil tubes;The inner tube of 4- bilayer concentric oil tubes;5- The flow direction of 1- fluids;The flow direction of 5-2- crude oil;6- sieve tube segments;7- oil reservoirs;8- straight wells section;9- fracturing fractures a;10- Fracturing fracture b;11- fracturing fractures c;12- fracturing fractures d (is chosen as producing crack II);13- fracturing fractures e (is chosen as target Inject crack);14- fracturing fractures f (is chosen as producing crack I);15- packers;16- packers;17- packers.
Fig. 3 adopts principle schematic for parallel double tube note of the present invention;
In Fig. 3,1- oil reservoirs border;2- sleeve pipes;A pipes in the parallel double tubes of 3-1-;B pipes in the parallel double tubes of 4-1-; The flow direction of 5-1- fluids;The flow direction of 5-2- crude oil;6- sieve tube segments;7- oil reservoirs;8- straight wells section;9- fracturing fracture a (quilts Elect extraction crack II as);10- fracturing fractures b (is chosen as target injection crack);11- fracturing fractures c (is chosen as producing crack I);12- fracturing fractures d;13- fracturing fractures e;14- fracturing fractures f;15- packers;18- is used for the plug closed.
Fig. 4 is that note of the parallel double tube of the present invention after conversion note adopts crack adopts principle schematic;
In Fig. 4,1- oil reservoirs border;2- sleeve pipes;The A pipes of the parallel double tubes of 3-1-;The B pipes of the parallel double tubes of 4-1-;5-1- The flow direction of fluid;The flow direction of 5-2- crude oil;6- sieve tube segments;7- oil reservoirs;8- straight wells section;9- fracturing fractures a;10- is pressed Crack b;11- fracturing fractures c;12- fracturing fractures d (is chosen as producing crack II);13- fracturing fractures e (is chosen as target note Enter crack);14- fracturing fractures f (is chosen as producing crack I);15- packers;18- is used for the plug closed.
Embodiment:
The present invention is described in detail with reference to embodiment and Figure of description, but not limited to this.
As Figure 1-4.
Embodiment 1,
A kind of staged fracturing of horizontal well single-well injection-production oil production method, including:
1) to horizontal well pit shaft staged fracturing:Form a plurality of radial direction fracturing fracture perpendicular to horizontal well pit shaft;
2) three adjacent cracks are chosen in the crack:Positioned at middle for target injection crack;Positioned at the mesh The crack into crack both sides is marked, and extraction crack I and extraction crack II respectively are along injection liquid injection direction;Such as Fig. 1 Shown, selection fracturing fracture a 9 is that extraction crack II, selection fracturing fracture b 10 are target injection crack, selection fracturing fracture c 11 be extraction crack I;
3) double-deck concentric oil tubes or parallel double tube are installed in the sleeve pipe in horizontal well pit shaft:By in described sleeve pipe 2 Space is divided into Produced Liquid passage I, injection liquid passage and Produced Liquid passage II;As shown in Figure 1, 2, the double-deck concentric oil tubes bag It is Produced Liquid passage II, the outer tube 3 and inner tube 4 to include the region in outer tube 3 and the inner tube 4 being set in outer tube, said inner tube 4 Between region for injection liquid passage, region between the outer tube 4 and sleeve pipe 2 is Produced Liquid passage I;As shown in Figure 3,4, institute It is to inject liquid passage to state an oil pipe in parallel double tube, the A pipes 3-1 of as parallel double tube, and another oil pipe is extraction Liquid passage II, the B pipes 4-1 of as parallel double tube, the region between the parallel double tube and sleeve pipe 2 are Produced Liquid passage I; The injection channel end is set for closing:In the present embodiment, in the double-deck concentric oil tubes, injection channel end is packer 16, in the parallel double tube, injection channel end is the plug 18 for closing;
4) the injection liquid passage is connected with target injection crack;By the Produced Liquid passage I and the extraction Crack I is connected;The Produced Liquid passage II is connected with the extraction crack II;
5) displacement of reservoir oil agent enters target injection crack along the injection liquid passage, and penetrates into oil reservoir, to the target Inject crack both sides displacement crude oil and enter the extraction crack I and extraction crack II, finally along the Produced Liquid passage I and extraction Liquid passage II is produced.
In the end of the double-deck concentric oil tubes or parallel double tube:The endcapped of its injection liquid passage is set, Its described Produced Liquid passage II end is connected with the extraction crack II;The injection liquid passage is provided with to be injected with the target The relative sieve tube segment in crack, connects with target injection crack, forms injection flow-guiding channel;The Produced Liquid passage I and institute State extraction crack I connections.
Embodiment 2,
A kind of staged fracturing of horizontal well single-well injection-production oil production method as described in Example 1, its difference is, the step 5) in, fluid is persistently injected, when crude output drops to below economic flow rate, three adjacent cracks are reselected as one The new note of group adopts crack, i.e. repeat step 2)-step 5), the original of whole Crack Controls until having exploited the horizontal well pit shaft Oil.As shown in Fig. 2 it is target injection crack, selection that selection fracturing fracture d 12, which is extraction crack II, selection fracturing fracture e 13, Fracturing fracture f 14 is extraction crack I.
Embodiment 3,
A kind of staged fracturing of horizontal well single-well injection-production oil production method as described in embodiment 1-2, in the step 1) before Selection suitably carries out the hypotonic or compact oil reservoir of horizontal well pit shaft staged fracturing, herein preferred LOW PERMEABILITY RESERVOIR, its milli of permeability 15 Darcy, 20 meters of core intersection, oil reservoir is free of edge-bottom water.
The step 1) in, the horizontal well pit shaft is drilled to along stratum minimum horizontal principal stress direction, the level Well shaft is located at oil reservoir middle and lower part.Preferred levels well shaft length is 600 meters herein, it is desirable to exploit oil reservoir position without side bottom Water.Because edge-bottom water is likely to be partially formed water cone in horizontal well pit shaft or causes quick water logging, big volume production water is caused, therefore will The oil reservoir is asked to be free of edge-bottom water;Horizontal well pit shaft is for subsequent implementation staged fracturing along stratum minimum horizontal principal stress direction It is that can form the radial fissure perpendicular to horizontal well pit shaft.The horizontal well pit shaft is divided into 6 sections, herein preferably per segment length 100m.According to reservoir physical property, horizontal well pit shaft is divided into some sections, segmentation carries out pressure break.Development scheme described herein is water filling Exploitation.
Embodiment 4,
A kind of staged fracturing of horizontal well single-well injection-production oil production method as described in embodiment 1-3, in the step 1) before Selection suitably carries out the hypotonic or compact oil reservoir of horizontal well pit shaft staged fracturing, herein preferred compact oil reservoir, its milli of permeability 0.1 Darcy, 50 meters of core intersection, oil reservoir is free of edge-bottom water.
The step 1) in, the horizontal well pit shaft is drilled to along stratum minimum horizontal principal stress direction, the level Well shaft is located in the middle part of oil reservoir.Preferred levels well shaft length is 1000 meters herein, and horizontal well pit shaft is divided into 20 sections, divided Section pressure break, per segment length 50m, forms 20 radial direction fracturing fractures perpendicular to horizontal well pit shaft.It is described herein injection fluid be CO2

Claims (7)

1. a kind of staged fracturing of horizontal well single-well injection-production oil production method, it is characterised in that the oil production method includes:
1) to horizontal well pit shaft staged fracturing:Form a plurality of radial direction fracturing fracture perpendicular to horizontal well pit shaft;
2) three adjacent cracks are chosen in the crack:Positioned at middle for target injection crack;Positioned at target note Enter the crack on crack both sides, and extraction crack I and extraction crack II respectively are along injection liquid injection direction;
3) double-deck concentric oil tubes or parallel double tube are installed in the sleeve pipe in horizontal well pit shaft:By the space in described sleeve pipe point It is divided into Produced Liquid passage I, injection liquid passage and Produced Liquid passage II;The double-deck concentric oil tubes include outer tube and are set in outer tube Region in interior inner tube, said inner tube is Produced Liquid passage II, and the region between the outer tube and inner tube is injection liquid passage, Region between the outer tube and sleeve pipe is Produced Liquid passage I;An oil pipe in the parallel double tube is injection liquid passage, Another oil pipe is Produced Liquid passage II, and the region between the parallel double tube and sleeve pipe is Produced Liquid passage I;The injection Channel end is set for closing;
4) the injection liquid passage is connected with target injection crack;By the Produced Liquid passage I and the extraction crack I Connection;The Produced Liquid passage II is connected with the extraction crack II;
5) displacement of reservoir oil agent enters target injection crack along the injection liquid passage, and penetrates into oil reservoir, is injected to the target Displacement crude oil in crack both sides enters the extraction crack I and extraction crack II, finally logical along the Produced Liquid passage I and Produced Liquid Road II is produced;
In the end of the double-deck concentric oil tubes or parallel double tube:The endcapped of its injection liquid passage is set, its institute Produced Liquid passage II ends are stated to connect with the extraction crack II;The injection liquid passage is provided with injects crack with the target Relative sieve tube segment, connects with target injection crack, forms injection flow-guiding channel;The Produced Liquid passage I is adopted with described Go out crack I connections.
2. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 1, it is characterised in that described Step 1) select suitably to carry out the hypotonic or compact oil reservoir of horizontal well pit shaft staged fracturing before.
3. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 2, it is characterised in that the step It is rapid 1) in, the horizontal well pit shaft is drilled to along stratum minimum horizontal principal stress direction, the horizontal well pit shaft be located at oil reservoir Middle and lower part.
4. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 3, it is characterised in that horizontal well Pit shaft length is more than 100 meters, it is desirable to exploit oil reservoir position without edge-bottom water.
5. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 4, it is characterised in that the step It is rapid 1) in, by the horizontal well wellbore section, per segment length scope 30m-150m.
6. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 1, it is characterised in that the step It is rapid 5) in, persistently inject displacement of reservoir oil agent, when crude output drops to below economic flow rate, reselect three adjacent cracks Crack, i.e. repeat step 2 are adopted as one group of note newly)-step 5), until the whole cracks for having exploited the horizontal well pit shaft are controlled The crude oil of system.
7. a kind of staged fracturing of horizontal well single-well injection-production oil production method according to claim 1, it is characterised in that the drive Oil is that note adopts liquid or note gas production body with agent.
CN201510506961.4A 2015-08-17 2015-08-17 A kind of staged fracturing of horizontal well single-well injection-production oil production method Active CN105114048B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510506961.4A CN105114048B (en) 2015-08-17 2015-08-17 A kind of staged fracturing of horizontal well single-well injection-production oil production method
PCT/CN2015/087878 WO2017028322A1 (en) 2015-08-17 2015-08-23 Horizontal well staged fracturing oil production method by injection and production in same well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510506961.4A CN105114048B (en) 2015-08-17 2015-08-17 A kind of staged fracturing of horizontal well single-well injection-production oil production method

Publications (2)

Publication Number Publication Date
CN105114048A CN105114048A (en) 2015-12-02
CN105114048B true CN105114048B (en) 2017-10-13

Family

ID=54662134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510506961.4A Active CN105114048B (en) 2015-08-17 2015-08-17 A kind of staged fracturing of horizontal well single-well injection-production oil production method

Country Status (2)

Country Link
CN (1) CN105114048B (en)
WO (1) WO2017028322A1 (en)

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587300B (en) * 2015-12-31 2019-10-11 中国石油天然气股份有限公司 Oil recovery method for horizontal well
CN105422057A (en) * 2015-12-31 2016-03-23 中国石油天然气股份有限公司 Oil extraction method for ultra-low permeability oil reservoir or compact oil reservoir
CN105545272B (en) * 2015-12-31 2018-06-01 中国石油天然气股份有限公司 Oil extraction method for ultra-low permeability water-sensitive reservoir/compact reservoir
CN105715240B (en) * 2016-03-31 2018-07-17 中国石油大学(北京) It is spaced water injection oil extraction method between multistage fracturing horizontal well seam
CN105696997B (en) * 2016-03-31 2018-07-17 中国石油大学(北京) It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam
CN105863569A (en) * 2016-04-14 2016-08-17 中国石油大学(华东) Single-well fracture gravity self-circulation dry-hot-rock geotherm mining method
CN105840146A (en) * 2016-04-14 2016-08-10 中国石油大学(华东) Method for self-circulation exploitation of geothermal energy of hot dry rock with multilateral well and volume fracturing technologies
CN105756634B (en) * 2016-04-22 2018-07-17 中国石油大学(北京) It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam
CN105822276B (en) * 2016-04-22 2018-07-17 中国石油大学(北京) Interval while water injection oil extraction method between multistage fracturing horizontal well seam
CN106194131B (en) * 2016-07-18 2018-08-21 中国石油大学(北京) It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method
CN106246150B (en) * 2016-09-18 2018-06-01 中国石油天然气股份有限公司 Oil field fracturing transformation method
CN106401551B (en) * 2016-10-21 2018-03-13 中国石油大学(北京) A kind of staged fracturing of horizontal well or synchronous pressure break experimental system for simulating
CN106761606B (en) * 2017-02-14 2019-03-15 中国石油大学(北京) The asynchronous note CO of different well of symmetrical cloth seam2Oil production method
CN106761612B (en) * 2017-02-14 2019-03-15 中国石油大学(北京) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN106761611A (en) * 2017-02-14 2017-05-31 中国石油大学(北京) Double pressure break horizontal well cyclic water stimulation oil production methods of zip mode cloth seam
CN107269255B (en) * 2017-07-03 2020-05-19 中国石油大学(北京) Method and device for exploiting compact oil through inter-cluster oil displacement
CN107524429A (en) * 2017-07-10 2017-12-29 中国石油集团长城钻探工程有限公司 A kind of individual well multilayer while injection-production technical tubing string
CN108316910B (en) * 2017-09-20 2024-04-26 中国石油大学(北京) Well pattern structure for gas-driven development of deep block-shaped fractured reservoir and development method
CN108457629A (en) * 2018-02-02 2018-08-28 中国石油大学(华东) A kind of method that CO_2 stimulation turns the fine and close oil of drive exploitation
CN110735618B (en) * 2018-07-19 2024-06-25 中国石油天然气股份有限公司 Oil extraction and water injection pipe column
CN109025940B (en) * 2018-08-06 2019-12-20 中国石油大学(华东) CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method
CN109709266A (en) * 2018-12-03 2019-05-03 中国石油集团川庆钻探工程有限公司 Vertical well multilayer oil reservoir flow simulation experiment device and method
CN109653715A (en) * 2018-12-29 2019-04-19 中国石油天然气股份有限公司 Horizontal well section staggered displacement and imbibition oil displacement injection-production tubular column and method
CN110242264B (en) * 2019-07-11 2024-04-30 安东柏林石油科技(北京)有限公司 Packing method and well completion structure for same-well injection and production
CN110617046B (en) * 2019-10-17 2021-07-30 中国石油大学(华东) Shaft device for horizontal well multistage staged fracturing physical simulation experiment
CN112990629B (en) * 2019-12-17 2024-03-29 中国石油化工股份有限公司 Unconventional oil and gas reservoir exploitation method and unconventional oil and gas reservoir exploitation system
CN111852429A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Segmented acid fracturing method for carbonate gas reservoir open hole horizontal well
CN111946310A (en) * 2020-08-27 2020-11-17 中国石油天然气股份有限公司 Self-driving well for self-injection and self-production in same well layer and production method
CN111946299B (en) * 2020-08-27 2023-06-02 中国石油天然气股份有限公司 Downhole fluid separation self-driving well for same-well and same-layer self injection and production method
CN111963120B (en) * 2020-08-27 2023-04-25 中国石油天然气股份有限公司 Downhole fluid separation self-driving well for same-well and same-layer self injection and production method
CN111963119B (en) * 2020-08-27 2023-04-25 中国石油天然气股份有限公司 Underground fluid separation self-driven well for same-well multilayer self-injection and production method
CN111946300B (en) * 2020-08-27 2023-04-25 中国石油天然气股份有限公司 Same-well same-layer multi-lateral self-injection and production underground fluid separation self-driving well and production method
US11346195B2 (en) 2020-09-15 2022-05-31 Saudi Arabian Oil Company Concurrent fluid injection and hydrocarbon production from a hydraulically fractured horizontal well
CN112240193B (en) * 2020-11-17 2022-05-31 东北石油大学 Multistage oil-water separation and same-well injection-production device in horizontal shaft
CN112240194B (en) * 2020-11-17 2022-07-19 东北石油大学 Multi-stage oil-water separation and same-well injection-production method in horizontal shaft
CN112878996A (en) * 2021-01-29 2021-06-01 中国石油天然气集团有限公司 Method for judging and identifying fracture channeling of fractured horizontal well
CN115075786B (en) * 2021-03-11 2023-09-26 中国石油天然气股份有限公司 High-temperature high-pressure water injection well segmented wheel injection tool, system and method
CN113187449B (en) * 2021-04-30 2023-01-13 刘刚 Exploitation method and pipe column for natural gas hydrate
CN115961926A (en) * 2021-10-08 2023-04-14 中国石油天然气股份有限公司 Compact reservoir pressure injection and flooding extraction integrated reservoir transformation method
CN113846968A (en) * 2021-10-12 2021-12-28 中国地质科学院勘探技术研究所 Lateral drilling branch well heat taking device and method suitable for hot dry rock development
CN114575804A (en) * 2022-02-09 2022-06-03 中海油能源发展股份有限公司 Multi-layer pipe column capable of being used for underground layering, quality-based and partial-pressure injection
CN114837621B (en) * 2022-03-28 2023-06-23 贵州省油气勘查开发工程研究院 Deep coal bed gas abandoned well and long stop well production method
CN115217454A (en) * 2022-05-30 2022-10-21 中国石油化工股份有限公司 Exploitation method of shallow heavy oil reservoir near denudation surface
CN115324542B (en) * 2022-07-14 2023-06-09 中国石油大学(北京) Method and system for oil extraction by water injection between multiple well seams of horizontal well of low-permeability tight oil reservoir

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201225134Y (en) * 2008-06-18 2009-04-22 韩继超 Oil extraction apparatus of horizontal oil well
CN101520119A (en) * 2009-04-10 2009-09-02 李恒清 Concentric double layer oil pipe
CN201372734Y (en) * 2008-04-28 2009-12-30 新疆石油管理局采油工艺研究院 Concentric oil pipe device
CN201671607U (en) * 2010-04-16 2010-12-15 中国石油天然气股份有限公司 Concentric double-tube separate injection pipe column for ground water distribution of highly-deviated well
CN202914058U (en) * 2012-08-15 2013-05-01 中国石油天然气股份有限公司 Concentric double-oil-pipe steam distribution injection process pipe column of SAGD steam injection well

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7066264B2 (en) * 2003-01-13 2006-06-27 Schlumberger Technology Corp. Method and apparatus for treating a subterranean formation
CN102953716A (en) * 2011-08-19 2013-03-06 中国石油天然气集团公司 Parallel double-tube separate layer water injection string
CN202544824U (en) * 2012-03-27 2012-11-21 中国海洋石油总公司 Concentric double-pipe hierarchical injection pipe column
CN103362487A (en) * 2012-03-29 2013-10-23 中国石油天然气股份有限公司 Staged fracturing method for low-permeability reservoir horizontal well
CN203175503U (en) * 2012-11-06 2013-09-04 中国石油化工股份有限公司 Tubular column for safety production in fluid producing and injecting process through one well of offshore oilfield
CN103184859B (en) * 2013-03-18 2015-09-09 中国石油天然气股份有限公司 Exploitation device and method for injection and production in same well
CA2820742A1 (en) * 2013-07-04 2013-09-20 IOR Canada Ltd. Improved hydrocarbon recovery process exploiting multiple induced fractures
CN104314546B (en) * 2014-09-23 2017-06-06 中国石油天然气股份有限公司 Staged fracturing well completion pipe string in horizontal well casing and staged fracturing process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201372734Y (en) * 2008-04-28 2009-12-30 新疆石油管理局采油工艺研究院 Concentric oil pipe device
CN201225134Y (en) * 2008-06-18 2009-04-22 韩继超 Oil extraction apparatus of horizontal oil well
CN101520119A (en) * 2009-04-10 2009-09-02 李恒清 Concentric double layer oil pipe
CN201671607U (en) * 2010-04-16 2010-12-15 中国石油天然气股份有限公司 Concentric double-tube separate injection pipe column for ground water distribution of highly-deviated well
CN202914058U (en) * 2012-08-15 2013-05-01 中国石油天然气股份有限公司 Concentric double-oil-pipe steam distribution injection process pipe column of SAGD steam injection well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
海上油田同井注采一体化技术研究与应用;李贵川;《断块油气田》;20120531;第19卷(第3期);386-388 *

Also Published As

Publication number Publication date
WO2017028322A1 (en) 2017-02-23
CN105114048A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105114048B (en) A kind of staged fracturing of horizontal well single-well injection-production oil production method
CN103883293B (en) Hydraulic jet radial drilling and fracturing integrating method
CN106194131B (en) It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method
CN102747997B (en) Thick oil reservoir steam assisted gravity drainage later-stage fire flooding conversion exploitation method
CN101255788B (en) Thermochemistry auxiliary reinforced steam flooding method
CN109209306B (en) Horizontal well CO injection for ultra-low permeability tight oil reservoir2Asynchronous throughput energy supplementing method
CN103174403B (en) Gravity and steam flooding combined mining method for thick-layer interlayer-containing common heavy oil reservoir
CN105696997B (en) It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam
CN106761606B (en) The asynchronous note CO of different well of symmetrical cloth seam2Oil production method
CN103939071B (en) Horizontal well steam flooding well pattern structure and steam flooding method
CN104234677B (en) Method for improving condensate recovery ratio of condensate gas reservoir through gas injection vertical displacement
CN106761612B (en) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN102518415B (en) Steam assisted gravity drainage method for fractured single horizontal well
CN108708700A (en) Method for improving application effect of SAGD technology in heterogeneous reservoir
CN109779582A (en) A kind of method that hydrocarbon compound in in-situ extraction oil shale is heated in underground
CN105756634A (en) Method for achieving interval waterflood swallowing-spitting oil exploitation among multi-stage fractured horizontal well cracks
CN106437642A (en) Injection-production asynchronous mining method for horizontal well of fractured reservoir
US20190242225A1 (en) Method for extracting tight oil by converting carbon dioxide huffing-puffing to carbon dioxide flooding
CN103321618A (en) Oil shale in-situ mining method
CN105822276A (en) Inter-crack space synchronous water injection-oil extraction method of multistage fracturing horizontal well
CN104265258A (en) Fracture-assisted combustion of oil in-situ stimulation thickened oil exploiting method
CN105041282B (en) Hypotonic horizontal wells in heavy oil reservoir staged fracturing cyclic steam stimulation method in one kind
CN109025940B (en) CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method
CN104265254A (en) Oil production technological method for multi-stage plug injection of oil-soluble viscosity reducer and liquid CO2 in deep super-heavy oil
CN104975826A (en) Method for improving recovery ratio of super heavy oil reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant