CN102364041B - Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture - Google Patents

Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture Download PDF

Info

Publication number
CN102364041B
CN102364041B CN201110329440.8A CN201110329440A CN102364041B CN 102364041 B CN102364041 B CN 102364041B CN 201110329440 A CN201110329440 A CN 201110329440A CN 102364041 B CN102364041 B CN 102364041B
Authority
CN
China
Prior art keywords
oil
sieve
water
well
water stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110329440.8A
Other languages
Chinese (zh)
Other versions
CN102364041A (en
Inventor
王胜存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110329440.8A priority Critical patent/CN102364041B/en
Publication of CN102364041A publication Critical patent/CN102364041A/en
Priority to PCT/CN2012/083425 priority patent/WO2013060270A1/en
Application granted granted Critical
Publication of CN102364041B publication Critical patent/CN102364041B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • C09K8/80Compositions for reinforcing fractures, e.g. compositions of proppants used to keep the fractures open
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/04Gravelling of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Edible Oils And Fats (AREA)
  • Fats And Perfumes (AREA)

Abstract

The invention discloses an oil extraction method for establishing an oil permeable water stop sieve by filling fusheng sand in a horizontal well fracture, and relates to a new method for petroleum exploitation. The fusheng sand with an oil permeable and water stop function is filled in a horizontal well vertical fracture in the middle of a water injection well row and an oil extraction well row to serve as a supporting agent, so that an oil permeable and water stop sieve is formed in the middle of a water injection well and an oil extraction well, and a petroleum exploitation region is partitioned into a water injection region and an oil extraction region by the oil permeable and water stop sieve. Under the action of injection water pressure, when oil and water mixture passes through the oil permeable and water stop sieve, water is intercepted at the water injection region, and crude oil is then gathered on one side of the oil extraction region of the sieve through the sieve. After all petroleum of the water injection region completely passes through the sieve to enter the oil extraction region, the water injection pressure of the water injection region is abruptly increased, so that the sieve becomes a water permeable sieve, and the permeated water continuously pushes remaining oil at the oil extraction region to enter the oil well. By using the method, most of remaining oil of an oil field can be extracted, so that the petroleum recovery ratio is close to 100 percent.

Description

Fractured horizontal well seam is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve
Technical field
The invention belongs to oil exploitation, particularly a kind of fractured horizontal well seam is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve.
Background technology
Along with a large amount of consumption of oil, oil is as a kind of important derived energy chemical raw material worsening shortages, but because oil reservoir produced water cut is more and more higher, main force's oil field comprehensive water cut such as grand celebration approach 94%, make to also have more than 50% oil of oil in place to exploit under prior art condition, cost of winning is increased year by year.Fracturing technique is to improve the major measure of oil well output, but at high water-cut stage, pressure break easily causes water logging, in order to control the moisture rising of oil field production fluid, by sand film coating technique, make normal sands there is the water surface tension of enhancing and destroy oily capillary function, thereby the Sheng sand that inspires confidence in oily water stop function is arisen at the historic moment.But its saturating oily water stop function selectively under different displacement pressures, show great difference, when displacement pressure is extremely low, water completely can not see through and inspire confidence in Sheng sand, when high displacement pressure, still with large water gaging, can pass through, that is to say the rising along with displacement pressure, its saturating oily water stop function dies down, this also can be verified from its experimental data, in Table one:
Figure 615272DEST_PATH_IMAGE001
At profit, with driving in a hurdle, when displacement pressure is from 0.025 MPa is increased to 0.048 MPa, in efflux, profit volume ratio is changed to 5.8:4.2 by 6:4.This variation explanation, along with the rising of displacement pressure, the saturating oily water stop function that inspires confidence in Sheng sand is reducing.By prior art, moisture for controlling production fluid, inspire confidence in and contain the proppant that sand is used directly as wellfracturing seam, because the immense pressure in oil reservoir in oil recovery process and oil well pump standing valve well-sinking is poor, make a large amount of water be pressed into pit shaft through inspiring confidence in Sheng sand, thereby its saturating oily water stop function is had a greatly reduced quality.
For avoiding inspiring confidence in, contain the sand problem that functional oil reduces that blocks water under high displacement pressure, in the urgent need to setting up a kind of new inspiring confidence in, contain sand application process, to give full play to inspire confidence in, contain sand excellent water stop function under low driving pressure, make water completely can not see through and inspire confidence in Sheng sand.
Summary of the invention
The present invention is intended to overcome the deficiencies in the prior art, and provide a kind of fractured horizontal well seam to fill to inspire confidence in, contains the oil production method that sand is set up oily water stop sieve.
Fractured horizontal well seam of the present invention is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve, the vertical perforation of horizontal well one by one the pressure break between row of water injector and oil recovery well array, in pressure break gap, fill and there is inspiring confidence in of oily water stop function and contain sand and cook proppant, set up saturating oily water stop sieve together and carry out filter oil aqueous mixtures.
As a further improvement on the present invention, the vertical pressure break of described horizontal well be oil reservoir between row of water injector and oil recovery well array by perpendicular to minimally stress direction horizontal well drilling, to carrying out pressure break after its vertical intensive perforation.
As a further improvement on the present invention, described saturating oily water stop sieve is to inject and inspire confidence in Sheng sand in the vertical pressure-break of horizontal well one by one, this saturating oily water stop sieve is separated into water filling district and oil-producing region by ancestral petroleum mining area, under water injection pressure drives, oil water mixture is when by sieve, crude oil sees through sieve and accumulates in oil-producing region one side, and water is trapped within water filling district; The whole oil in water filling district see through sieve and enter after oil-producing region, because do not have crude oil to pass through sieve, water filling district water injection pressure are suddenly raise, and make that sieve is breakdown becomes permeable sieve, see through remaining oil that the water coming continues to promote oil-producing region and drive to oil well and be plucked out of.
As a further improvement on the present invention, oil-producing region Produced Liquid Water-Content Rise to a certain extent after, change note and adopt direction, change former producing well into water injection well again, water injection well changes producing well into, under water injection pressure effect, former oil-producing region most of surplus oil sees through sieve and accumulates in opposite side, treat to pass through sieve without crude oil, when water injection pressure can suddenly raise, cut off water injection well, change producing well into water injection well, horizontal well changes producing well into, the remaining oil that accumulates in sieve side sees through under pressure pressure-break and enters horizontal well, by oily extraction.
Fractured horizontal well of the present invention seam is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve, overcome existing under high driving pressure application inspire confidence in the defect of containing sand, superpower water stop function while giving full play to its low-voltage driving.Manufacturing process according to water injection well displacement of reservoir oil by filling water to producing well extraction, by in the vertical pressure-break of horizontal well between row of water injector and oil recovery well array, fill there is oily water stop function inspire confidence in Sheng sand, set up the sieve that can filter oil water mixture together, sieves is divided into water filling district and oil-producing region by production area.This sieve in process of production poor estimated value of pressure at both sides only has 0.0025MPa, can make full use of to inspire confidence in to contain the strict water stop function that sand has when low-voltage driving, make oil see through the oil-producing region side that sieve accumulates in sieve, and water is trapped within water filling district.Until water filling district, whole remaining oils enter after oil-producing region, and owing to not having crude oil to pass through sieve, water filling district internal pressure can suddenly raise, and makes sieve become permeable sieve, through the oil in the water continuation promotion oil-producing region of sieve, enter producing well.Until oil-producing region Produced Liquid Water-Content Rise after certain altitude, should change former water injection well into producing well, former producing well changes water injection well into, namely former oil-producing region becomes water filling district, original annotation pool changes oil-producing region into, makes former oil-producing region remaining oil oppositely see through the opposite side that sieve accumulates in sieve.And then water injection well is cut off and oil well changes water injection well into and horizontal well changes producing well into, the oil that makes to accumulate in compass screen surface sees through pressure-break and enters horizontal well and be plucked out of under water injection pressure effect.Conversion between this water filling district and oil-producing region, has changed the direction that liquid circulation is sifted out, thereby has realized the effect that sieve moves left and right in oil reservoir, and its both sides remaining oil filters rear extraction the most at last, makes recovery ratio approach 100%.
In fractured horizontal well of the present invention seam, fill to inspire confidence in and contain sand to set up the oil production method of oily water stop sieve reasonable in design, in oil recovery industry, reduce water yield, improved oil production, small investment, high efficiency.
Accompanying drawing explanation
Fig. 1 sets up oily water stop sieve and first stage manufacturing process cross-sectional drawing in oil reservoir;
Fig. 2 sets up oily water stop sieve and second stage manufacturing process cross-sectional drawing in oil reservoir;
Fig. 3 sets up oily water stop sieve and phase III manufacturing process cross-sectional drawing in oil reservoir;
Fig. 4 is the floor map of oily water stop sieve and first stage manufacturing process;
Fig. 5 for perpendicular to level minimally the vertical perforation of stress level section set up Vertical Cracks figure;
Fig. 6 Five-point method pattern located level well northeast~southwest is to layout;
Fig. 7 Five-point method pattern located level well northwest~southeastern direction layout;
Fig. 8 Five-point method pattern located level well North and South direction layout;
Fig. 9 Five-point method pattern located level well east-west direction layout;
In figure: 1, water injection well; 2, horizontal well vertical section; 3, producing well; 4, water filling district; 5, oil-producing region; 6, filter front remaining oil; 7, filter rear remaining oil; 8, horizontal well horizontal segment; 9, saturating oily water stop sieve; 10, former oil-producing region remaining oil; 11, by the oil of horizontal well extraction; 12, vertical stress; 13, vertical fractures; 14, level stress direction minimally; 15, dead well.
The specific embodiment
Fractured horizontal well seam of the present invention is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve, it is characterized in that the vertical perforation of horizontal well one by one pressure break between row of water injector and oil recovery well array, in pressure break gap, fill and there is inspiring confidence in of oily water stop function and contain sand and cook proppant, set up saturating oily water stop sieve together and carry out filter oil aqueous mixtures.
The described vertical pressure break of horizontal well of the present invention be oil reservoir between row of water injector and oil recovery well array by perpendicular to minimally stress direction horizontal well drilling, to carrying out pressure break after its vertical intensive perforation.
Described saturating oily water stop sieve of the present invention is to inject and inspire confidence in Sheng sand in the vertical pressure-break of horizontal well one by one, this saturating oily water stop sieve is separated into water filling district and oil-producing region by ancestral petroleum mining area, under water injection pressure drives, oil water mixture is when by sieve, crude oil sees through sieve and accumulates in oil-producing region one side, and water is trapped within water filling district; The whole oil in water filling district see through sieve and enter after oil-producing region, because do not have crude oil to pass through sieve, water filling district water injection pressure is suddenly raise, make that sieve is breakdown becomes permeable sieve, the remaining oil that sees through the water continuation promotion oil-producing region coming drives to oil well and is plucked out of, as shown in Figure 1.
Oil-producing region Produced Liquid Water-Content Rise to a certain extent after, change note and adopt direction, change former producing well into water injection well again, water injection well changes producing well into, under water injection pressure effect, former oil-producing region most of surplus oil sees through sieve and accumulates in opposite side, treat to pass through sieve without crude oil, when water injection pressure can suddenly raise, as shown in Figure 2, at this moment will cut off in time water injection well, change producing well into water injection well, horizontal well changes producing well into, the remaining oil that accumulates in sieve side sees through under pressure pressure-break and enters horizontal well, by oily extraction, as shown in Figure 3.
The spread shape of saturating oily water stop sieve in oil reservoir is subject to the control of fractured horizontal well seam completely.For making sieve be the vertical guide perpendicular to water (flow) direction in oil reservoir, horizontal well horizontal segment must only carry out vertical upper and lower intensive perforation, and the trend of horizontal segment will be as far as possible minimally stress direction is vertical with the level on stratum, as shown in Figure 5.
While only carrying out vertical perforating and fracturing, gravity fracture opens that to split aspect effect little, can make crack downwards, let droop to extension; Intensive perforation and horizontal segment perpendicular to level minimally stress can make fracture surface perpendicular to water (flow) direction (namely along horizontal segment direction).So just can access our needed fracture shape, inject to inspire confidence in to contain and just obtained the saturating oily water stop sieve wanted after sand.
Most of well pattern is five-spot areal well pattern.For guaranteeing that horizontal well horizontal segment is perpendicular to minimum level stress direction, take Daqing oil field as example, its net horizontal section has four kinds of laying trends to select, refer to Fig. 6~Fig. 9, when wherein north-south and East and West direction are laid, need change Five-point method pattern into line pattern, oblique well spacing does not need to adjust well pattern.The principle of selecting in four kinds of layings is to guarantee that horizontal segment is perpendicular to level stress minimally as far as possible, thereby makes pressure-break meet the requirement of laying compass screen surface.
Concrete large the grade on a small scale of compass screen surface should be definite in conjunction with the geological conditions of there and then, and the length of compass screen surface is general identical with horizontal section length, and domestic current horizontal segment maximum length has reached 2800m; The height of compass screen surface should with single major oil reservoir consistency of thickness, or consistent with multiple zone sandstone gross thickness.
In addition; at peupendicular hole, can be pressed into the area of Vertical Cracks; utilize peupendicular hole vertical setting of types perforation pressure break; also can extrude the fracture surface perpendicular to water (flow) direction; filling also can become the sieve with filtration oil function after inspiring confidence in Sheng sand; technician can be according to local well pattern layout and geological conditions flexible Application, but its core technology is all in this patent protection domain.

Claims (2)

1. fractured horizontal well seam is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve, it is characterized in that the vertical pressure break of horizontal well one by one between row of water injector and oil recovery well array, in pressure break gap, fill and there is inspiring confidence in of oily water stop function and contain sand and cook proppant, set up saturating oily water stop sieve together and carry out filter oil aqueous mixtures; Described saturating oily water stop sieve is to inject and inspire confidence in Sheng sand in the vertical pressure-break of horizontal well one by one, this saturating oily water stop sieve is separated into water filling district and oil-producing region by ancestral petroleum mining area, under water injection pressure drives, oil water mixture is when by sieve, crude oil sees through sieve and accumulates in oil-producing region one side, and water is trapped within water filling district; The whole oil in water filling district see through sieve and enter after oil-producing region, because do not have crude oil to pass through sieve, water filling district water injection pressure are suddenly raise, and make that sieve is breakdown becomes permeable sieve, see through remaining oil that the water coming continues to promote oil-producing region and drive to oil well and be plucked out of.
2. fractured horizontal well seam as claimed in claim 1 is filled to inspire confidence in and is contained the oil production method that sand is set up oily water stop sieve, it is characterized in that the described vertical pressure break of horizontal well is oil reservoir between row of water injector and oil recovery well array by perpendicular to stress direction horizontal well drilling minimally, to carrying out pressure break after its vertical intensive perforation.
CN201110329440.8A 2011-10-26 2011-10-26 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture Expired - Fee Related CN102364041B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110329440.8A CN102364041B (en) 2011-10-26 2011-10-26 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture
PCT/CN2012/083425 WO2013060270A1 (en) 2011-10-26 2012-10-24 Oil extraction method of establishing oil-permeable water-resistant sieve by filling fusheng sand into fracture of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110329440.8A CN102364041B (en) 2011-10-26 2011-10-26 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture

Publications (2)

Publication Number Publication Date
CN102364041A CN102364041A (en) 2012-02-29
CN102364041B true CN102364041B (en) 2014-03-26

Family

ID=45690630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110329440.8A Expired - Fee Related CN102364041B (en) 2011-10-26 2011-10-26 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture

Country Status (2)

Country Link
CN (1) CN102364041B (en)
WO (1) WO2013060270A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364041B (en) * 2011-10-26 2014-03-26 王胜存 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture
CN103045374A (en) * 2012-12-17 2013-04-17 张家港市鸿钻贸易有限公司 Method for refining biodiesel
CN103628848B (en) * 2013-12-02 2016-09-07 中国地质大学(武汉) Multidirectional interlayer displacement in flooding oil production method and system
CN113622888A (en) * 2020-05-06 2021-11-09 中国石油化工股份有限公司 Dry hot rock development method and system for three-dimensional horizontal mining and injection well pattern
CN111927421B (en) * 2020-08-18 2022-07-15 中国石油化工股份有限公司 Repeated fracturing well selection method based on shale gas unstable linear flow theory

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4418755A (en) * 1979-02-14 1983-12-06 Conoco Inc. Methods of inhibiting the flow of water in subterranean formations
CN1614193A (en) * 2004-12-01 2005-05-11 大庆油田有限责任公司 Fracturing method for improving recovering ratio by phase permeability improver
CN101289932A (en) * 2007-04-17 2008-10-22 长江大学 Straight-line parallel flow water injection oil extraction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100467826C (en) * 2005-07-14 2009-03-11 王胜存 Method for extracting residue oil by injecting profile control agent to norizontal well for blocking water injection path of oil reservoir
US7493957B2 (en) * 2005-07-15 2009-02-24 Halliburton Energy Services, Inc. Methods for controlling water and sand production in subterranean wells
CN1991127A (en) * 2005-12-30 2007-07-04 许靖华 Method for improving crude oil recovery efficiency through three-dimensional water injection between horizontal wells having two human crack surfaces
EA016864B1 (en) * 2008-01-31 2012-08-30 Шлюмбергер Текнолоджи Б.В. Method of hydraulic fracturing of horizontal wells, resulting in increased production
CN101586024A (en) * 2008-05-21 2009-11-25 北京仁创科技集团有限公司 Kind of laminated granule for oil extraction, proppant and oil extraction method using the proppant
US20110005752A1 (en) * 2008-08-14 2011-01-13 Baker Hughes Incorporated Water Sensitive Porous Medium to Control Downhole Water Production and Method Therefor
CN102199422B (en) * 2010-03-26 2013-07-10 北京仁创科技集团有限公司 Fracturing propping agent, preparation method thereof, and deep well fracturing method
CN102364041B (en) * 2011-10-26 2014-03-26 王胜存 Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4418755A (en) * 1979-02-14 1983-12-06 Conoco Inc. Methods of inhibiting the flow of water in subterranean formations
CN1614193A (en) * 2004-12-01 2005-05-11 大庆油田有限责任公司 Fracturing method for improving recovering ratio by phase permeability improver
CN101289932A (en) * 2007-04-17 2008-10-22 长江大学 Straight-line parallel flow water injection oil extraction method

Also Published As

Publication number Publication date
CN102364041A (en) 2012-02-29
WO2013060270A1 (en) 2013-05-02

Similar Documents

Publication Publication Date Title
CN102606129B (en) Method and system for thin interbed oilfield development
CN101952544B (en) Method of hydraulic fracturing of horizontal wells, resulting in increased production
CN109113703A (en) A kind of fracturing process of deep layer shale gas " V " type pressure curve
CN107435535B (en) A method of exploitation high dip angle heavy crude reservoir is driven using plane gravity
CN107545088B (en) Normal-pressure shale gas horizontal well volume fracturing method
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN104234677B (en) Method for improving condensate recovery ratio of condensate gas reservoir through gas injection vertical displacement
CN102364041B (en) Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture
CN105888630A (en) Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well
CN103089224A (en) Fracturing method for comprehensively controlling fracture height
CN101818620B (en) Mining method for maximum reservoir contact well
CN106437674A (en) Imitation horizontal well waterflooding well pattern adapting method
CN103089228A (en) Cross-linked acid and sand-carrying acid-fracturing method for ground with argillaceous dolomites
CN109958426A (en) A kind of fracturing process improving deep layer shale gas crack complexity
CN107965305A (en) One kind layering refracturing method
CN102071922B (en) Low permeable oil deposit virtual horizontal well development method
CN109209306A (en) Horizontal well CO injection for ultra-low permeability tight oil reservoir2Asynchronous throughput energy supplementing method
CN105756634A (en) Method for achieving interval waterflood swallowing-spitting oil exploitation among multi-stage fractured horizontal well cracks
CN106321044A (en) Proppant-carrying acid fracturing method for high-temperature ultra-deep carbonate reservoir
CN104389566B (en) A kind of method for judging that gas alters the ease time
CN106651158B (en) Quantitative evaluation method for water injection development effectiveness degree of ultra-low permeability tight reservoir horizontal well
CN110259421B (en) Fractured compact oil reservoir water injection energy supplementing method
CN106437642A (en) Injection-production asynchronous mining method for horizontal well of fractured reservoir
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
CN201763308U (en) Fishbone well type structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326