US8731888B2
(en)
|
2007-12-19 |
2014-05-20 |
Exxonmobil Upstream Company |
Gamma ray tool response modeling
|
AU2010310816B2
(en)
*
|
2009-10-20 |
2016-01-28 |
Schlumberger Technology B.V. |
Methods for characterization of formations, navigating drill paths, and placing wells in earth boreholes
|
WO2011066021A1
(en)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
GB2476053B
(en)
*
|
2009-12-08 |
2011-11-02 |
Schlumberger Holdings |
Processing of geological data
|
WO2011096964A1
(en)
|
2010-02-03 |
2011-08-11 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
AU2010347724B2
(en)
|
2010-03-12 |
2016-06-23 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
WO2011136861A1
(en)
|
2010-04-30 |
2011-11-03 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
CN102893283B
(zh)
*
|
2010-05-21 |
2016-03-30 |
兰德马克绘图国际公司 |
用于水平井关联及地质导向的系统和方法
|
EP2588952A4
(en)
|
2010-06-29 |
2017-10-04 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
AU2011283196B2
(en)
|
2010-07-29 |
2014-07-31 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
AU2011283190A1
(en)
|
2010-07-29 |
2013-02-07 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
CA2811631C
(en)
*
|
2010-09-17 |
2015-09-08 |
Baker Hughes Incorporated |
Reservoir navigation using magnetic field of dc currents
|
GB2502432B
(en)
|
2010-09-20 |
2018-08-01 |
Exxonmobil Upstream Res Co |
Flexible and adaptive formulations for complex reservoir simulations
|
AU2011332274B2
(en)
|
2010-11-23 |
2017-02-23 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
EP2668641B1
(en)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
US10316624B2
(en)
|
2011-06-14 |
2019-06-11 |
Rei, Inc. |
Method of and system for drilling information management and resource planning
|
US9157279B2
(en)
|
2011-06-14 |
2015-10-13 |
Rei, Inc. |
Method of and system for drilling information management and resource planning
|
US9043154B2
(en)
|
2011-06-21 |
2015-05-26 |
Baker Hughes Incorporated |
Computer-based method for real-time three-dimensional geological model calculation and reservoir navigation
|
CA2840057C
(en)
|
2011-06-21 |
2018-10-30 |
Groundmetrics, Inc. |
System and method to measure or generate an electrical field downhole
|
WO2013039606A1
(en)
|
2011-09-15 |
2013-03-21 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
NL2007656C2
(en)
*
|
2011-10-25 |
2013-05-01 |
Cofely Experts B V |
A method of and a device and an electronic controller for mitigating stick-slip oscillations in borehole equipment.
|
US10450860B2
(en)
|
2011-11-01 |
2019-10-22 |
Schlumberger Technology Corporation |
Integrating reservoir modeling with modeling a perturbation
|
WO2013112466A1
(en)
*
|
2012-01-23 |
2013-08-01 |
Schlumberger Canada Limited |
Method to characterize heterogeneous anisotropic media
|
US9753180B2
(en)
|
2012-03-28 |
2017-09-05 |
Exxonmobil Upstream Research Company |
Method for multiphase flow upscaling
|
EP2834460A2
(en)
|
2012-04-03 |
2015-02-11 |
National Oilwell Varco, L.P. |
Drilling control system
|
CA2883169C
(en)
|
2012-09-28 |
2021-06-15 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
TWI474673B
(zh)
*
|
2012-12-06 |
2015-02-21 |
Inst Information Industry |
工作負載分配裝置及其工作負載分配方法
|
RU2606249C1
(ru)
*
|
2013-01-17 |
2017-01-10 |
Халлибертон Энерджи Сервисез, Инк. |
Система и способ быстрой оценки угла падения формации
|
AU2014278645B2
(en)
|
2013-06-10 |
2016-07-28 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
DE112013007359T5
(de)
*
|
2013-08-23 |
2016-05-25 |
Landmark Graphics Corporation |
Lokales Aktualisieren eines geozellulären 3D-Modells
|
US10006271B2
(en)
|
2013-09-26 |
2018-06-26 |
Harris Corporation |
Method for hydrocarbon recovery with a fractal pattern and related apparatus
|
RU2016107477A
(ru)
*
|
2013-09-30 |
2017-11-03 |
Лэндмарк Графикс Корпорейшн |
Способ и анализ целостной конструкции обсадной колонны для планирования и реального времени
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
WO2015051350A1
(en)
*
|
2013-10-04 |
2015-04-09 |
Schlumberger Canada Limited |
Inversion-based workflow for consistent interpretation of nuclear density images in horizontal wells
|
WO2015053876A1
(en)
|
2013-10-08 |
2015-04-16 |
Exxonmobil Upstream Research Company |
Automatic dip picking from wellbore azimuthal image logs
|
RU2603980C1
(ru)
*
|
2013-10-25 |
2016-12-10 |
Лэндмарк Графикс Корпорейшн |
Прогнозирование риска в реальном времени во время буровых работ
|
US11125912B2
(en)
*
|
2013-11-25 |
2021-09-21 |
Schlumberger Technology Corporation |
Geologic feature splitting
|
EP3099895B1
(en)
*
|
2014-01-27 |
2021-12-29 |
Services Pétroliers Schlumberger |
Workflow for navigation with respect to oil-water contact using deep directional resistivity measurements
|
EP2921641A1
(en)
*
|
2014-03-18 |
2015-09-23 |
Welltec A/S |
A method and apparatus for verifying a well model
|
RU2544938C1
(ru)
*
|
2014-05-21 |
2015-03-20 |
Открытое акционерное общество "Татнефть" им. В.Д. Шашина |
Способ проводки горизонтальной скважины в пласте малой толщины
|
WO2016007893A1
(en)
|
2014-07-11 |
2016-01-14 |
Schlumberger Canada Limited |
Generalized directional measurements and using symmetrized and anti-symmetrized angles to indicate orientation of anisotropy and formation boundaries
|
WO2016018723A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
CA2968217C
(en)
*
|
2014-12-31 |
2019-04-30 |
Halliburton Energy Services, Inc. |
Visualization of look-ahead sensor data for wellbore drilling tools
|
MX2017006923A
(es)
*
|
2014-12-31 |
2017-08-16 |
Halliburton Energy Services Inc |
Mejora de inversion direccionamiento geologico utilizando herramienta electromagnetica de adelante y de alrededor.
|
FR3032532B1
(fr)
*
|
2015-02-05 |
2020-02-28 |
Services Petroliers Schlumberger |
Derivation d'attributs sismiques a partir d'une propriete d'age geologique relatif d'un modele base sur le volume
|
US10509141B2
(en)
*
|
2015-08-17 |
2019-12-17 |
Schlumberger Technology Corporation |
Method and apparatus for determining a fracture aperture in a wellbore
|
US11286763B2
(en)
|
2016-01-25 |
2022-03-29 |
Schlumberger Technology Corporation |
Drilling with information characterizing lateral heterogeneities based on deep directional resistivity measurements
|
CN105740639A
(zh)
*
|
2016-02-19 |
2016-07-06 |
中国石油天然气股份有限公司 |
一种水平井地质三维导向方法
|
US11454102B2
(en)
|
2016-05-11 |
2022-09-27 |
Baker Hughes, LLC |
Methods and systems for optimizing a drilling operation based on multiple formation measurements
|
NL2016859B1
(en)
|
2016-05-30 |
2017-12-11 |
Engie Electroproject B V |
A method of and a device for estimating down hole speed and down hole torque of borehole drilling equipment while drilling, borehole equipment and a computer program product.
|
EP3475529B1
(en)
*
|
2016-06-24 |
2023-07-12 |
Services Pétroliers Schlumberger |
Drilling measurement valuation
|
US10323510B2
(en)
*
|
2016-06-30 |
2019-06-18 |
Schlumberger Technology Corporation |
Downhole sensing for electromagnetic telemetry
|
US11098578B2
(en)
|
2016-09-30 |
2021-08-24 |
Halliburton Energy Services, Inc. |
Quality factors for appraising resistivity LWD inversion performance
|
CA3049367C
(en)
*
|
2017-02-06 |
2021-02-09 |
Halliburton Energy Services, Inc. |
Distance-to-bed-boundary inversion solution pixelation
|
CA3071027A1
(en)
|
2017-08-10 |
2019-02-14 |
Motive Drilling Technologies, Inc. |
Apparatus and methods for automated slide drilling
|
US10830033B2
(en)
|
2017-08-10 |
2020-11-10 |
Motive Drilling Technologies, Inc. |
Apparatus and methods for uninterrupted drilling
|
CN108646290A
(zh)
*
|
2018-03-28 |
2018-10-12 |
中国海洋石油集团有限公司 |
一种基于模型定量补偿的薄层反演方法
|
WO2020046350A1
(en)
*
|
2018-08-30 |
2020-03-05 |
Landmark Graphics Corporation |
Automated production history matching using bayesian optimization
|
US20220082719A1
(en)
*
|
2019-01-17 |
2022-03-17 |
Schlumberger Technology Corporation |
Reservoir performance system
|
US11162356B2
(en)
|
2019-02-05 |
2021-11-02 |
Motive Drilling Technologies, Inc. |
Downhole display
|
EP3942145A4
(en)
|
2019-03-18 |
2022-11-16 |
Magnetic Variation Services, LLC |
ORIENTATING A BOREHOLE USING UNADJUSTED STRATIGRAPHIC HEAT MAP
|
US11946360B2
(en)
|
2019-05-07 |
2024-04-02 |
Magnetic Variation Services, Llc |
Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth
|
US11466556B2
(en)
|
2019-05-17 |
2022-10-11 |
Helmerich & Payne, Inc. |
Stall detection and recovery for mud motors
|
US11348218B2
(en)
|
2020-03-30 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Hybrid interpretation approach for borehole imaging
|
US11885212B2
(en)
|
2021-07-16 |
2024-01-30 |
Helmerich & Payne Technologies, Llc |
Apparatus and methods for controlling drilling
|
CN115434688B
(zh)
*
|
2022-08-16 |
2024-01-30 |
成都捷科思石油天然气技术发展有限公司 |
一种水平井的随钻测井的进钻曲线控制方法
|