MX2016004408A - Sistemas y metodos para optimizar operaciones de perforacion mediante el modelado de recortes transitorios y datos en tiempo real. - Google Patents
Sistemas y metodos para optimizar operaciones de perforacion mediante el modelado de recortes transitorios y datos en tiempo real.Info
- Publication number
- MX2016004408A MX2016004408A MX2016004408A MX2016004408A MX2016004408A MX 2016004408 A MX2016004408 A MX 2016004408A MX 2016004408 A MX2016004408 A MX 2016004408A MX 2016004408 A MX2016004408 A MX 2016004408A MX 2016004408 A MX2016004408 A MX 2016004408A
- Authority
- MX
- Mexico
- Prior art keywords
- real
- time data
- wellbore
- drilling
- methods
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title abstract 7
- 238000005520 cutting process Methods 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 3
- 230000001052 transient effect Effects 0.000 title abstract 2
- 230000015572 biosynthetic process Effects 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 1
- 230000000149 penetrating effect Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/02—Automatic control of the tool feed
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/02—Automatic control of the tool feed
- E21B44/04—Automatic control of the tool feed in response to the torque of the drive ; Measuring drilling torque
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/02—Automatic control of the tool feed
- E21B44/06—Automatic control of the tool feed in response to the flow or pressure of the motive fluid of the drive
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B45/00—Measuring the drilling time or rate of penetration
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/024—Determining slope or direction of devices in the borehole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/003—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Mechanical Engineering (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Physics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Algebra (AREA)
- Pure & Applied Mathematics (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- Analytical Chemistry (AREA)
- Chemical & Material Sciences (AREA)
- Earth Drilling (AREA)
- Operations Research (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Los sistemas y métodos para optimizar los resultados de perforación pueden basarse en, entre otras cosas, (1) datos en tiempo real recabados durante la perforación, (2) una distribución de recortes modelada en forma transitoria en el pozo y, opcionalmente, (3) un cambio teórico de uno o más parámetros operativos. En algunos casos, los métodos pueden incluir perforar un pozo que penetra una formación subterránea al tiempo que se hace circular un fluido de perforación; recabar datos en tiempo real respecto a la perforación; calcular una distribución de recortes en el pozo con base en los datos en tiempo real con un modelo transitorio; calcular un perfil de densidad de circulación equivalente en el pozo con base en (1) datos en tiempo real recabados durante la perforación, (2) una distribución de recortes modelada en forma transitoria en el pozo y, opcionalmente, (3) un cambio teórico, y cambiar al menos un parámetro operativo con base en una comparación del perfil de densidad de circulación equivalente con un gradiente fractura de la formación subterránea.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2013/069581 WO2015072962A1 (en) | 2013-11-12 | 2013-11-12 | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2016004408A true MX2016004408A (es) | 2016-10-31 |
Family
ID=53057752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2016004408A MX2016004408A (es) | 2013-11-12 | 2013-11-12 | Sistemas y metodos para optimizar operaciones de perforacion mediante el modelado de recortes transitorios y datos en tiempo real. |
Country Status (7)
Country | Link |
---|---|
US (1) | US9567836B2 (es) |
AR (1) | AR098231A1 (es) |
AU (1) | AU2013405232B2 (es) |
CA (1) | CA2926918C (es) |
GB (1) | GB2534734B (es) |
MX (1) | MX2016004408A (es) |
WO (1) | WO2015072962A1 (es) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2013405232B2 (en) | 2013-11-12 | 2016-11-10 | Halliburton Energy Services, Inc. | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data |
CA2940100C (en) * | 2014-02-21 | 2020-05-26 | Groundmetrics, Inc. | Method for mapping the propagation of earth fractures |
WO2017011585A1 (en) | 2015-07-13 | 2017-01-19 | Halliburton Energy Services, Inc. | Coordinated control for mud circulation optimization |
WO2017180124A1 (en) * | 2016-04-14 | 2017-10-19 | Landmark Graphics Corporation | Parameter based roadmap generation for downhole operations |
EP3443198A4 (en) * | 2016-04-15 | 2020-02-19 | Landmark Graphics Corporation | OPTIMIZATION AND REAL-TIME VISUALIZATION OF PARAMETERS FOR DRILLING OPERATIONS |
GB2555137B (en) * | 2016-10-21 | 2021-06-30 | Schlumberger Technology Bv | Method and system for determining depths of drill cuttings |
MX2019006674A (es) * | 2016-12-07 | 2019-08-26 | Safekick Americas Llc | Perforacion automatizada basada en modelos. |
MX2019004571A (es) | 2016-12-19 | 2019-08-21 | Halliburton Energy Services Inc | Uso de materiales con memoria de forma en fluidos de servicio de pozos. |
WO2018236373A1 (en) * | 2017-06-21 | 2018-12-27 | Halliburton Energy Services, Inc. | PREDICTION OF SIZE AND CUTTING FORM GENERATED BY A THREAD |
US20190093468A1 (en) * | 2017-09-27 | 2019-03-28 | Schlumberger Technology Corporation | Real time measurement of mud properties for optimization of drilling parameters |
GB2593230B (en) * | 2017-11-29 | 2022-05-25 | Halliburton Energy Services Inc | Drilling with cuttings density calibration |
US10781682B2 (en) | 2018-04-17 | 2020-09-22 | Saudi Arabian Oil Company | Systems and methods for optimizing rate of penetration in drilling operations |
US11346211B2 (en) | 2018-06-22 | 2022-05-31 | Halliburton Energy Services, Inc. | Systems and methods for conducting a well intervention operation |
US10871762B2 (en) * | 2019-03-07 | 2020-12-22 | Saudi Arabian Oil Company | Real time analysis of fluid properties for drilling control |
US10989046B2 (en) * | 2019-05-15 | 2021-04-27 | Saudi Arabian Oil Company | Real-time equivalent circulating density of drilling fluid |
US11428099B2 (en) | 2019-05-15 | 2022-08-30 | Saudi Arabian Oil Company | Automated real-time drilling fluid density |
US11280190B2 (en) * | 2019-10-30 | 2022-03-22 | Baker Hughes Oilfield Operations Llc | Estimation of a downhole fluid property distribution |
GB2605077B (en) * | 2019-11-11 | 2024-02-28 | Baker Hughes Oilfield Operations Llc | Holistic approach to hole cleaning for use in subsurface formation exploration |
CN111982764B (zh) * | 2020-08-20 | 2021-03-26 | 西南石油大学 | 一种基于岩屑粒径分布的井下故障分析处理方法及装置 |
US12044124B2 (en) * | 2021-02-05 | 2024-07-23 | Saudi Arabian Oil Company | Method and system for real-time hole cleaning using a graphical user interface and user selections |
GB2624324A (en) * | 2021-06-30 | 2024-05-15 | Baker Hughes Oilfield Operations Llc | System and method for measuring downhole mud flow density |
US11655690B2 (en) | 2021-08-20 | 2023-05-23 | Saudi Arabian Oil Company | Borehole cleaning monitoring and advisory system |
US12037857B2 (en) | 2021-11-30 | 2024-07-16 | Saudi Arabian Oil Company | Method and system for determining hole cleaning efficiency based on wellbore segment lengths |
CN114645703B (zh) * | 2021-12-24 | 2024-06-25 | 中国石油天然气集团有限公司 | 一种用于模拟井筒工程建设的计算系统 |
CN115584941B (zh) * | 2022-11-03 | 2024-05-28 | 中国石油天然气集团有限公司 | 一种数字化井场钻井液管理系统 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5455780A (en) | 1991-10-03 | 1995-10-03 | Halliburton Company | Method of tracking material in a well |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US6662884B2 (en) * | 2001-11-29 | 2003-12-16 | Halliburton Energy Services, Inc. | Method for determining sweep efficiency for removing cuttings from a borehole |
US6952127B2 (en) * | 2003-11-21 | 2005-10-04 | Micron Technology, Inc. | Digital phase mixers with enhanced speed |
BRPI0511293A (pt) * | 2004-05-21 | 2007-12-04 | Halliburton Energy Serv Inc | método para medir uma propriedade de formação |
US7453768B2 (en) | 2004-09-01 | 2008-11-18 | Hall David R | High-speed, downhole, cross well measurement system |
US7249636B2 (en) | 2004-12-09 | 2007-07-31 | Schlumberger Technology Corporation | System and method for communicating along a wellbore |
US20070107938A1 (en) | 2005-11-17 | 2007-05-17 | Halliburton Energy Services, Inc. | Multiple receiver sub-array apparatus, systems, and methods |
US7606666B2 (en) * | 2007-01-29 | 2009-10-20 | Schlumberger Technology Corporation | System and method for performing oilfield drilling operations using visualization techniques |
US8316936B2 (en) | 2007-04-02 | 2012-11-27 | Halliburton Energy Services Inc. | Use of micro-electro-mechanical systems (MEMS) in well treatments |
US20090033516A1 (en) | 2007-08-02 | 2009-02-05 | Schlumberger Technology Corporation | Instrumented wellbore tools and methods |
US8818779B2 (en) * | 2009-12-21 | 2014-08-26 | Baker Hughes Incorporated | System and methods for real-time wellbore stability service |
US8527249B2 (en) | 2010-02-23 | 2013-09-03 | Halliburton Energy Services, Inc. | System and method for optimizing drilling speed |
US9686021B2 (en) | 2011-03-30 | 2017-06-20 | Schlumberger Technology Corporation | Wireless network discovery and path optimization algorithm and system |
US9255473B2 (en) * | 2012-05-07 | 2016-02-09 | Halliburton Energy Services, Inc. | Methods and systems for real-time monitoring and processing of wellbore data |
AU2013405232B2 (en) | 2013-11-12 | 2016-11-10 | Halliburton Energy Services, Inc. | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data |
-
2013
- 2013-11-12 AU AU2013405232A patent/AU2013405232B2/en not_active Ceased
- 2013-11-12 GB GB1605927.1A patent/GB2534734B/en active Active
- 2013-11-12 MX MX2016004408A patent/MX2016004408A/es unknown
- 2013-11-12 WO PCT/US2013/069581 patent/WO2015072962A1/en active Application Filing
- 2013-11-12 CA CA2926918A patent/CA2926918C/en not_active Expired - Fee Related
- 2013-11-12 US US14/381,280 patent/US9567836B2/en active Active
-
2014
- 2014-10-29 AR ARP140104060A patent/AR098231A1/es active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
GB2534734A (en) | 2016-08-03 |
GB2534734B (en) | 2020-07-08 |
CA2926918C (en) | 2018-07-17 |
AU2013405232B2 (en) | 2016-11-10 |
AU2013405232A1 (en) | 2016-04-28 |
US20160245048A1 (en) | 2016-08-25 |
AR098231A1 (es) | 2016-05-18 |
CA2926918A1 (en) | 2015-05-21 |
US9567836B2 (en) | 2017-02-14 |
WO2015072962A1 (en) | 2015-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2534734A (en) | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data | |
MX2016005898A (es) | Modelado de interaccion de fracturas hidraulicas en redes de fracturas complejas. | |
EA201290816A1 (ru) | Система и способ оптимизации скорости бурения | |
MY179810A (en) | Zero equivalent circulating density drilling method | |
MY177769A (en) | Method to detect drilling dysfunctions | |
EP2848964A3 (en) | Combining downhole fluid analysis and petroleum systems modeling | |
GB2544699A (en) | Methods and systems for modeling an advanced 3-dimensional bottomhole assembly | |
GB2537489A (en) | Real-time risk prediction during drilling operations | |
GB2547155A (en) | Formation characteristics determination apparatus, methods, and systems | |
MX367584B (es) | Método de calibración de la geometría de fractura a los eventos microsísmicos. | |
WO2012096826A3 (en) | Flow profile modeling for wells | |
GB2534729A (en) | Real-time risk prediction during drilling operations | |
MX2008010963A (es) | Metodo y sistema de planificacion de pozo. | |
GB2503136A (en) | Method of minimizing wellbore instability | |
SA518391607B1 (ar) | طرق لاختيار نموذج أرضي من مجموعة نماذج أرضية | |
NO20171642A1 (en) | Condition based maintenance program based on life-stress acceleration model and cumulative damage model | |
WO2014018414A3 (en) | Stratigraphic modeling using production data density profiles | |
GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
GB2543674A (en) | Shape-based modeling of interactions between downhole drilling tools and rock formation | |
GB2534709A (en) | Engineered LCM design to manage subterranean formation stresses for arresting drilling fluid losses | |
GB2564737A8 (en) | Systems and method for evaluating a formation using a statistical distribution of formation data | |
MX2013010240A (es) | Metodo y sistema para perforar ramales en yacimientos de esquistos. | |
SA518400405B1 (ar) | طرق وأنظمة لتحسين عملية حفر على أساس قياسات تكوين متعددة | |
GB2569481A (en) | Drilling geomechanics salt creep monitoring | |
GB2545292A (en) | Planning drilling operations using models and rig market databases |