KR970062198A - Girder construction method of bridge - Google Patents

Girder construction method of bridge Download PDF

Info

Publication number
KR970062198A
KR970062198A KR1019970003451A KR19970003451A KR970062198A KR 970062198 A KR970062198 A KR 970062198A KR 1019970003451 A KR1019970003451 A KR 1019970003451A KR 19970003451 A KR19970003451 A KR 19970003451A KR 970062198 A KR970062198 A KR 970062198A
Authority
KR
South Korea
Prior art keywords
girder
new
wire
construction
temporary
Prior art date
Application number
KR1019970003451A
Other languages
Korean (ko)
Other versions
KR100475688B1 (en
Inventor
데츠오 가타야마
Original Assignee
다다 가츠히코
가와다 고교 가부시키가이샤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 다다 가츠히코, 가와다 고교 가부시키가이샤 filed Critical 다다 가츠히코
Publication of KR970062198A publication Critical patent/KR970062198A/en
Application granted granted Critical
Publication of KR100475688B1 publication Critical patent/KR100475688B1/en

Links

Abstract

목적purpose

교량의 거어더 가설에 있어서, 지리적 조건등의 이유에 의하여 하천부지 및 유수부에 가설라인에 따른 거어더의 이동용 통로를 설치할 수 없는 경우에, 가설필 기설 거어더에 따라 이동하는 운반대차에 의하여 신설 거어더를 가설 필 선두 기설 거어더의 바로 아래까지 이송한 후, 이 신설거어더를 가설 필 선두 기설 거어더의 선단에 접속할 수 있는 가설공급을 제공한다.In the girder construction of the bridge, if the passage for moving the girder along the construction line cannot be installed in the river site and the flowing water due to the geographic conditions, etc., the transport cart moves along the temporary girder. After the new girder is transferred to the bottom of the temporary girder, the new girder is provided with a temporary supply for connecting the new girder to the leading end of the temporary girder.

구성Configuration

가설중의 선두 기설 거어더(3a)상에 선단(16)이 해당 선두 기설 거어더(3a)보다도 전방으로 돌출하는 가설용 데릭(7)을 배치하고, 신설거어더(6)를, 가설필기설 거어더(3)에 따라 이동하는 운반대차(5)의 운반와이어(9)에 의하여 선두 기설 거어더(3a)의 바로위까지 매달아 내려 이동한 후, 가설용데릭(7)의 선단에서 매달아 내린 이설와이어(17)의 하단을 신설 거어더(6)의 상면에 접속하고 상기 운반와이어(9) 그렇지 않으면 이설와이어(17)의 어느 한쪽의 와이어의 길이를 조절하여, 해당 전후 위치의 양와이어에 의한 거어더의 매달아 내림하중을 옮겨 바꾸는 것으로, 신설거어더(6)를 상기 선두 기설거어더(3a)보다도 전방의 가설지점 바로 아래로 이동한다.On the leading existing girder 3a under construction, the tip 16 projects a temporary derrick 7 that projects forward than the leading existing girder 3a, and puts the new girder 6 on a temporary basis. It hangs down to the top of the leading existing girder 3a by the transport wire 9 of the transport trolley 5 moving along the girder 3, and then hung from the tip of the temporary derrick 7 The lower end of the relocated wire 17 is connected to the upper surface of the newly formed girder 6, and the length of one of the wires of the carrying wire 9 or the relocated wire 17 is adjusted, so that both wires in the corresponding front and rear positions are adjusted. The new girder 6 is moved directly below the construction point ahead of the first existing girder 3a by changing the hanging load of the girder.

Description

교량의 거어더 가설공법Girder construction method of bridge

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.

제1도는 본 발명에 관한 제1실시예의 거어더 가설공법을 도시하는 부분측면도.1 is a partial side view showing the girder construction method of the first embodiment according to the present invention.

제2도는 같은 전체측면도.2 is the same overall side view.

제3도는 같은 전체평면도.3 is the same overall plan view.

제4도는 제2도의 C-C선 부분에 있어서 단면도.4 is a sectional view taken along the line C-C in FIG.

제5도는 제1도와 같은 부분의 평면도.5 is a plan view of the same part as FIG.

Claims (5)

가설중의 기설 거어더에 있어서 선두 기설 거어더상에, 선단이 해당 선두 기설 거어더보다도 전방으로 돌출하는 가설용 데릭을 고정배치하고, 가설되어야 할 신설거어더를 가설필 기설 거어더에 따라 이동하는 운반대차의 운반와이어에 의하여 매달아 내리고, 가설지점의 상기 선두 기설 거어더의 바로 아래까지 이동한 후, 상기 가설용 데릭의 선단에서 매달아 내린 이설와이어의 하단을 상기 신설거어더의 상면에 접속하고, 상기 운반와이어 그렇지 않으면 상기 이설와이어 어느 한쪽의 와이어의 길이를 조절하여, 해당 전후 위치의 양와이어에 의한 거어더의 매달아 내린 하중을 옮겨 바꾸는 것으로 신설거어더를 상기 선두 기설거어더보다도 전방의 가설지점 바로 아래로 이동하고, 이 상태에서 신설거어더를 상방으로 매달아 올려서 선두 기설 거어더에 접속하는 것을 특징으로 하는 교량의 거어더 가설공법.In the existing girder under construction, the leading end girder is fixedly placed on the leading girder, and the new girder to be installed is moved according to the existing girder. It is hung by the transport wire of the transport trolley, moved to just under the leading existing girder at the construction point, and the lower end of the relocation wire hung from the tip of the construction derrick is connected to the upper surface of the new girder, If the carrying wire is otherwise, the length of one of the moving wires is adjusted to change the hanging load of the girder by the two wires in the front and rear positions, and the new girder is placed at the front of the leading girder. Go right below, and in this state, erect the new girder upwards Girders of the bridge hypothesis method comprising connecting more. 제1항에 있어서, 운반대차의 운반와이어에 매달아 내려져서 선두 기설 거어더의 바로 아래까지 이동한 신설거어더에, 가설용 데릭의 선단에서 매달아 내린 소정의 길이의 이설와이어의 하단을 접속하고, 상기 운반와이어의 길이를 감아 늘리는 것으로, 신설거어더의 하중을 상기 이설와이어에 바꾸어 매달면서 해당 신설거어더를 전방의 가설지점 바로 아래로 옮겨 바꾸어서, 신설 거어더를 상방으로 매달아 올리는 것을 특징으로 하는 교량의 거어더 가설공법.The new girder, which is hung on the transport wire of the transport trolley and moved to just below the leading existing girder, is connected to the lower end of the predetermined length of the relocation wire hung from the tip of the temporary derrick, By winding up the length of the carrying wire, by changing the load of the new girder to the relocation wire, the new girder is shifted just below the construction point of the front, and the new girder is suspended upwards Girder construction method of bridge. 제1항 또는 제2항에 있어서, 운반대차의 운반와이어에 매달아 내려져서 선두 기설 거어더의 바로 아래까지 이동한 신설거어더에 가설용 데릭의 선단에서 매달아 내려진 소정의 길이의 이설와이어의 하단을 접속함과 동시에, 신설거어더를 가설지점의 후방에서 아끼는 와이어로 후방으로 잡아당기면서 상기 운반와이어의 길이를 감아늘리는 것으로, 신설거어더의 하중을 상기 이설와이어에 바꾸어 매달면서 해당 신설거어더를 전방의 가설지점 바로 아래로 옮겨 바꾸어서, 신설거어더를 상방으로 매달아 올리는 것을 특징으로 하는 교량의 거어더 가설공법.3. The lower end of the predetermined length of relocation wire hung from the end of the temporary derrick to the new girder, which is hung on the transport wire of the transport cart and moved to just below the leading girder. At the same time as connecting the new girder by pulling the new girder to the rear with a saving wire at the rear of the construction point, and winding the length of the carrying wire, changing the load of the new girder to the new reed wire and hanging the new girder A girder construction method for bridges, characterized in that the new girder is suspended upwards by moving it just below the temporary construction point in front of it. 제1항에 있어서, 운반대차의 운반와이어에 매달려 내려져서 선두 기설 거어더의 바로 아래까지 이동한 신설거어더에, 가설용 데릭의 선단에서 매달아 내린 이설와이어의 하단을 지속하고, 이 이설와이어를 감아올려서 짧게 하는 것으로, 신설거어더의 하중을 상기 이설와이어에 매달아 바꾸면서 해당 신설거어더를 전방의 가설지점 바로 아래로 옮겨 바꾸어서, 신설거어더를 상방으로 매달아 올리는 것을 특징으로 하는 교량의 거어더 가설공법.The new girder, which is suspended from the transport wire of the transport cart and moves to just below the leading existing girder, continues the lower end of the relocation wire hung from the tip of the temporary derrick. Girder hypothesis of bridge, characterized in that the new girder is lifted up and down by changing the new girder just below the construction point of the front while changing the load of the new girder to the relocation wire. Method. 제1항 내지 4항 중의 어느 한 항에 있어서, 운반와이어 그렇지 않으면 상기 이설와이어의 어느 한쪽의 와이어의 길이를 조절하여 해당 전후 위치의 양와이어에 의한 거어더의 매달아내린 하중을 옮겨 바꾸는 것으로 신설거어더를 상기 선두 기설 거어더 보다도 가설 지점 바로 아래로 이동한 후, 신설거어더를 가설용 데릭의 선단의 매달아 올림 케이블에 의하여 상방으로 매달아 올려서, 선부 기설 거어더에 접속하는 것을 특징으로 하는 교량의 거어더 가설공법.5. The transfer wire according to any one of claims 1 to 4, wherein the carrying wire is otherwise changed by changing the hanging load of the girder by both wires in the front and rear positions by adjusting the length of one of the wires of the moving wire. After moving the girder just below the construction point than the first girder, the new girder is hung upwards by the hanging cable of the tip of the construction derrick and connected to the existing girder. Girder construction method. ※ 참고사항 : 최초출원 내용에 의하여 공개하는 것임.※ Note: The disclosure is based on the initial application.
KR1019970003451A 1996-02-16 1997-02-05 Girder erection method of bridge KR100475688B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP8213996A JP2912222B2 (en) 1996-02-16 1996-02-16 Bridge girder construction method
JP96-082139 1996-02-16

Publications (2)

Publication Number Publication Date
KR970062198A true KR970062198A (en) 1997-09-12
KR100475688B1 KR100475688B1 (en) 2005-04-14

Family

ID=13766099

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970003451A KR100475688B1 (en) 1996-02-16 1997-02-05 Girder erection method of bridge

Country Status (4)

Country Link
JP (1) JP2912222B2 (en)
KR (1) KR100475688B1 (en)
CN (1) CN1198018C (en)
TW (1) TW345604B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158817A (en) * 1997-11-26 1999-06-15 Nkk Corp Balancing erection construction for bridge at height and transferable slinging lifting device therefor
JP2001049622A (en) * 1999-08-05 2001-02-20 Vsl Japan Kk Bridge erecting apparatus and bridge erecting method
JP4377506B2 (en) * 2000-02-15 2009-12-02 大成建設株式会社 Bridge erection device and bridge erection method
CN102926332B (en) * 2012-11-09 2014-08-20 武汉二航路桥特种工程有限责任公司 Derrick arrangement of tools for replacing steel arch bridge suspender and replacing method thereof
CN104762882B (en) * 2015-04-16 2016-06-15 天津城建大学 Bridge subsection hanging apparatus and hanging method
CN105220621B (en) * 2015-09-08 2018-06-29 贵州省公路工程集团有限公司 A kind of vertical shift system of steel truss girder segment and vertical shift method
CN105200923B (en) * 2015-09-08 2018-07-13 贵州省公路工程集团有限公司 A kind of steel truss girder cable-stayed bridge steel truss girder segment handling apparatus and its handling method
CN105317008B (en) * 2015-09-08 2018-06-29 贵州省公路工程集团有限公司 A kind of Integral lifting method of steel truss girder cable-stayed bridge steel truss girder segment
CN106192762A (en) * 2016-08-16 2016-12-07 山东省路桥集团有限公司 Steel box girder construction trestle fortune beam, beam body plane swivel, free cantilever erection construction method
JP6793542B2 (en) * 2016-12-26 2020-12-02 株式会社Ihiインフラシステム Floor slab erection method and floor slab erection equipment
JP6902184B2 (en) * 2017-03-01 2021-07-14 株式会社大林組 Work equipment and overhang erection method
CN106958345B (en) * 2017-05-16 2022-08-02 简华炽 Adjustable rigid hanging basket
JP6986892B2 (en) * 2017-08-04 2021-12-22 大成建設株式会社 Cantilever overhang work vehicle removal method
CN109137759B (en) * 2018-09-29 2023-12-19 中铁第四勘察设计院集团有限公司 Precast cantilever assembling method and system for prestressed concrete box girder segment
CN111172882A (en) * 2020-01-13 2020-05-19 中铁二院工程集团有限责任公司 Beam section transportation method for assembling bridge girder cantilever
CN111236077B (en) * 2020-02-13 2021-11-19 中国水利水电第十一工程局有限公司 Unloading construction method for steel box girder
CN111926716A (en) * 2020-08-20 2020-11-13 中交路桥华南工程有限公司 Method for accurately adjusting position of steel box girder by using bridge deck crane
CN112663475A (en) * 2020-12-25 2021-04-16 广西大学 Truss cable-stayed bridge
CN112695645B (en) * 2021-01-06 2022-04-29 中铁大桥局集团有限公司 Method for erecting stiffening beam of large-span suspension bridge
CN114197329B (en) * 2021-12-15 2024-02-06 中交路桥华南工程有限公司 Main girder erection method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5222337A (en) * 1975-08-11 1977-02-19 Hitachi Shipbuilding Eng Co Method of erecting bridge
JPH0678602B2 (en) * 1987-02-25 1994-10-05 株式会社宮地鐵工所 Bridge erection equipment
JP3177904B2 (en) * 1992-10-30 2001-06-18 清水建設株式会社 Mobile work vehicle for PC cable-stayed bridge
JP3440422B2 (en) * 1994-07-29 2003-08-25 清水建設株式会社 Bridge construction method and bridge construction device

Also Published As

Publication number Publication date
JP2912222B2 (en) 1999-06-28
TW345604B (en) 1998-11-21
KR100475688B1 (en) 2005-04-14
JPH09221718A (en) 1997-08-26
CN1198018C (en) 2005-04-20
CN1162669A (en) 1997-10-22

Similar Documents

Publication Publication Date Title
KR970062198A (en) Girder construction method of bridge
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
NO20012497L (en) Stretch-finished floating drill construction for a riser system
NO20032295D0 (en) Device for anchoring a floating structure
ATE355212T1 (en) DEVICE FOR FASTENING A MOVING EQUIPMENT OF A CABLEWAY SYSTEM TO A HANGING ROD
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN108729730A (en) A kind of anchor support of limit for height area double-circuit line
CN107416685B (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN203383135U (en) Floating bridge capable of facilitating bridge construction
ITSV960024A1 (en) SUSPENSION FOR AERIAL ELECTRIFICATION SYSTEM FOR RAILWAY LINES, OR SIMILAR
CN208088137U (en) A kind of novel bridge V structures construction bracket system
CN207813159U (en) A kind of electric power bar of changeable angle of pulling strings
CN108330813B (en) A kind of novel bridge
CN109736352A (en) A kind of overhead pipe fixes device and fixing means with Bailey beam
CN206359894U (en) Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
CN207072757U (en) The system mounting structure of grid beams in length and breadth of half-through tubular arch
CN207619864U (en) Frame lookum
CN212025910U (en) Sidewalk and pipe gallery structure combined with bridge box girder cantilever
CN208074773U (en) A kind of illumination device for bridge easy to repair
CN110374391A (en) A kind of " dry " font conversion anchor support of the mono- circuit compact route of 500kV
CN210178419U (en) Folding colliery is simple and easy platform of hanging for borehole operation
CN205477663U (en) Synchronous lining cutting steel mould trolley of inverted arch
CN218809832U (en) Large-size building material hoisting and fixing structure for bridge engineering
CN203960690U (en) A kind of contraction type inclined shaft connecting bridge
AU7221794A (en) Process and device for moving a travelling scaffolding around bridge piers

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee