CN114197329B - Main girder erection method - Google Patents

Main girder erection method Download PDF

Info

Publication number
CN114197329B
CN114197329B CN202111539831.2A CN202111539831A CN114197329B CN 114197329 B CN114197329 B CN 114197329B CN 202111539831 A CN202111539831 A CN 202111539831A CN 114197329 B CN114197329 B CN 114197329B
Authority
CN
China
Prior art keywords
section
girder
beam section
sliding
transfer device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111539831.2A
Other languages
Chinese (zh)
Other versions
CN114197329A (en
Inventor
张皎
肖向荣
李友清
张敬弦
马水英
陈小龙
冯志杰
刘军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202111539831.2A priority Critical patent/CN114197329B/en
Publication of CN114197329A publication Critical patent/CN114197329A/en
Application granted granted Critical
Publication of CN114197329B publication Critical patent/CN114197329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a girder erection method, which is characterized by comprising the following steps: vertically lifting the beam section to be installed from the root of the cable tower to the position right below the installed beam section; translating the front of the installed beam segment of the beam Duan Zhi to be installed along the forward bridge using a linear translation device; lifting the beam section end to be installed, and butt-jointing and splicing the beam section to be installed and the front end of the installed beam section; and after resetting the linear transfer device, sequentially translating other beam sections to be installed until the main beam splicing is completed. The girder section is integrally installed in the erection method, the installation speed is improved, the girder line shape is easy to ensure, and the bridge deck construction quality is high.

Description

Main girder erection method
Technical Field
The invention relates to the technical field of bridge construction, in particular to a girder erection method.
Background
In the bridge construction process, the conditions such as topography, navigation or existing property units under the field are limited under the bridge, and the girder segments do not have direct vertical lifting installation conditions, so that the construction of the girder is difficult. The existing construction process for splicing the cantilever of the bridge deck crane generally adopts the construction process, but the construction method requires that the girder steel structure is an orthotropic girder steel, the orthotropic girder steel is generally composed of main longitudinal beams, cross beams, small longitudinal beams and other components, and all the components are transported to the bridge deck crane to be spliced one by one, so that the splicing speed of the construction method is slower, and the girder line shape is not easy to guarantee.
Disclosure of Invention
The invention aims to provide a girder erection method capable of improving girder erection construction speed and guaranteeing girder line type.
In order to achieve the above object, the present invention provides the following technical solutions:
a girder erection method comprises the following steps:
vertically lifting the beam section to be installed from the root of the cable tower to the position right below the installed beam section;
translating the front of the installed beam segment of the beam Duan Zhi to be installed along the forward bridge using a linear translation device;
lifting the beam section to be installed, and butt-jointing and splicing the beam section to be installed and the front end of the installed beam section;
and after resetting the linear transfer device, sequentially translating other beam sections to be installed until the main beam splicing is completed.
Further, before translating the to-be-installed beam Duan Zhi in the forward bridge direction with the linear translation device, the installed beam Duan Qianfang includes the steps of:
and connecting the two ends of the beam Duan Kuandu to be installed with two C-shaped beams of the linear transfer device, which are respectively installed at the two ends of the installed beam Duan Kuandu.
Further, when translating the front of the installed beam segment of the beam Duan Zhi to be installed in the forward bridge direction using a linear translation device, the method comprises the steps of:
driving the C-shaped beam to move to the front end of the installed beam section along the installed beam section by means of the sliding beam in the linear transfer device, and enabling the front end of the sliding beam to extend to the front of the installed beam section;
releasing the connection between the C-shaped beam and the sliding beam;
the C-shaped beam is driven to drive the beam section to be installed to move to the front end position of the sliding beam along the sliding beam.
Further, after the sliding beam in the linear transfer device is used for driving the C-shaped beam to move to the front end of the installed beam section along the installed beam section, and the front end of the sliding beam extends to the front of the installed beam section, the method further comprises the following steps:
the front end of the sliding beam is fixed with the bridge deck crane by means of the hanging belt.
Further, when resetting the linear transfer device, the method comprises the following steps:
the C-shaped beam is fixed with the sliding beam after moving from the front end position of the sliding beam to the rear end position of the sliding beam;
the skid beam is moved along the installed beam section to an initial position.
Further, when the sliding beam in the linear transfer device drives the C-shaped beam to move to the front end of the installed beam section along the installed beam section, and the front end of the sliding beam extends to the front of the installed beam section, the anti-top wheel on the inner side of the C-shaped beam is kept in abutting connection with the side wall of the installed beam section.
Further, after lifting the beam section to be installed and butt-jointing and splicing the beam section to be installed and the front end of the installed beam section, the method further comprises the following steps:
installing corresponding stay cables on the assembled beam sections;
and tensioning construction is carried out on the stay cable.
Further, before the beam section to be installed is lifted vertically from the root of the rope tower to directly below the installed beam section, the method comprises the following steps:
and adopting one section of beam section to be installed as a reference section, and matching and assembling to form the other section of beam section to be installed.
Further, when a section of the beam section to be installed is adopted as a reference section, and another section of the beam section to be installed is formed by matching and assembling, the method comprises the following steps:
the N beam sections are adopted as reference sections, and are sequentially matched and spliced along the same installation direction to form an N+1 beam section and an N+2 beam section;
removing the connection between the N beam section and the N+1 beam section;
and taking the N+1 beam section as a reference section, and repeatedly executing the steps until the required assembly of the beam section to be installed is completed.
Further, before the beam section to be installed is lifted vertically from the root of the rope tower to directly below the installed beam section, the method comprises the following steps:
the door crane is arranged at the position of the installed beam section close to the cable tower, the bridge deck crane is arranged at the front end position of the installed beam section, and the slideway for the linear transfer device to move is arranged between the door crane and the bridge deck crane.
Compared with the prior art, the scheme of the invention has the following advantages:
1. in the girder erection method, the girder segments to be installed are lifted by means of the gantry crane, the girder segments to be installed are transferred to the lower part of the Duan Qian end of the installed girder by the linear transfer device, and are lifted and installed by the bridge deck crane.
2. In the girder erection method, the girder segments are subjected to segment matching in advance before the girder Duan Qi to be installed is hung, so that the assembly precision is high, the girder linearity is ensured, and the bridge construction quality is improved.
Additional aspects and advantages of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention.
Drawings
The foregoing and/or additional aspects and advantages of the invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings, in which:
FIG. 1 is a front view of a girder erection construction system of a large-span cable-stayed bridge in an embodiment of the present invention;
FIG. 2 is a schematic view of a door crane lifting a girder section to be installed in a girder erection construction system of a large-span cable-stayed bridge according to an embodiment of the present invention;
FIG. 3 is a schematic view of a door hanger lifting a beam section to be installed in an embodiment of the present invention;
FIG. 4 is a schematic illustration of a skid beam transferring a beam section to be installed to an end position of an installed beam Duan Qian in accordance with one embodiment of the invention;
FIG. 5 is a schematic view of a C-beam transferring a beam section to be installed to below a deck crane in one embodiment of the invention;
FIG. 6 is a schematic illustration of a bridge deck crane lifting a beam section to be installed in accordance with one embodiment of the present invention;
FIG. 7 is a side view of a main girder erection construction system of a large-span cable-stayed bridge according to an embodiment of the present invention;
FIG. 8 is a flowchart of a method for erecting a main beam according to an embodiment of the present invention;
FIG. 9 is a second flowchart of a method for erecting a main beam according to an embodiment of the present invention;
fig. 10 is a schematic diagram of a girder erection process in an embodiment of the present invention.
Detailed Description
Embodiments of the present invention are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative only and are not to be construed as limiting the invention.
As shown in fig. 1 to 7, the present invention provides a girder erection construction system 1 for a cable-stayed bridge with a large span, which comprises a first lifting device, a slideway (not shown in the drawings), a linear transfer device and a second lifting device, wherein the first lifting device is used for lifting a girder section 2 to be installed to the position of the linear transfer device, the slideway is used for providing a moving guide for the linear transfer device, the linear transfer device is used for transferring the girder section 2 to be installed from the first lifting device to the position of the second lifting device, and the second lifting device is used for being installed at the front end position of the girder section 3 to be installed and can lift the girder section 2 to be installed to a specified height to splice with the girder section 3 to be installed.
The beam section 2 to be installed is lifted by the first lifting device, then is transferred to the lower part of the front end position of the installed beam section 3 by the linear transfer device, and is lifted by the second lifting device, and the beam section can be assembled in advance and then lifted for installation by adopting the construction system, so that parts are not required to be transferred to a bridge deck for assembly, the main beam installation difficulty is reduced, the main beam linearity is ensured, and the construction speed is also accelerated. The construction system is suitable for girder systems needing pre-assembly, such as orthotropic girder systems, steel box girders, superposed girder systems and the like.
In this embodiment, the first lifting device is a gantry crane 11, the gantry crane 11 is installed at a beam section adjacent to the main tower area, the second lifting device is a bridge deck crane 12, the bridge deck crane 12 is installed at the front end position of the installed beam section 3, the front end part of the bridge deck crane 12 extends to the front of the installed beam section 3, and after each installation procedure of one beam section 2 to be installed is completed, the bridge deck crane 12 moves forward to the foremost end of the installed beam section 3.
Further, the linear transfer device comprises a slide 13 and a support frame 14, the slide 13 and the support frame 14 are connected with each other, the slide 13 is arranged above the installed beam section 3 and can slide along a slideway, and the support frame 14 is arranged below the installed beam section 3 and can be connected with the beam section 2 to be installed.
In this embodiment, the sliding beam 13 and the supporting frame 14 are detachably connected, preferably, the supporting frame 14 is slidably adjustable relative to the sliding beam 13 along the length direction of the sliding beam 13, and the length ratio of the sliding beam 13 to the supporting frame 14 is not less than two times.
When the linear transfer device transfers the beam section 2 to be installed, the support frame 14 is relatively fixed with the rear end of the sliding beam 13, the sliding beam 13 slides to the front end of the installed beam section 3 along the slideway relative to the installed beam section 3, the front end of the sliding beam 13 extends to the front of the installed beam section 3, the extending length of the sliding beam 13 is larger than the length of the support frame 14, the fixing structure between the support frame 14 and the sliding beam 13 is released, the support frame 14 slides to the extending part of the sliding beam 13 along the sliding beam 13, and the beam section 2 to be installed is not blocked by the installed beam section 3 in the vertical direction, so that the beam section 2 to be installed is conveniently lifted to be installed at the same horizontal height as the installed beam section 3. Through such structure setting, utilize the integrated configuration of slide beam 13 and support frame 14, carry out two sections horizontal transfer processes to the roof beam section 2 that wait to install, in the in-process that slide beam 13 stretches out to the roof beam section 3 place ahead that has been installed, support frame 14 and wait to install roof beam section 2 do not outwards stretch out, and when slide beam 13 stretches out and after fixed relatively with the roof beam section 3 that has been installed, the support frame 14 will wait to install roof beam section 2 outwards stretch out again, this process has improved slide beam 13 and support frame 14 greatly and has been in the stability of transferring the in-process of waiting to install roof beam section 2, thereby the security in the work progress has been promoted. In this embodiment, the length ratio of the sliding beam 13 to the supporting frame 14 is not less than twice, so that the sliding beam 13 can have a sufficient connection length with the installed beam section 3 in the extending process, and the connection stability of the sliding beam 13 and the installed beam section 3 can be ensured.
Further, the second hoisting means is provided with a sling 121 for providing traction for the skid beam 13 when the skid beam 13 is extended in front of the installed beam section 3. Through setting up suspender 121, can pull slide beam 13 when slide beam 13 outwards stretches out, avoid slide beam 13 front end local atress too big and take place to bend the deformation, promote the security of roof beam Duan Pinjie in-process.
In this embodiment, the linear transfer device includes at least one pair of sliding beams 13 and at least one pair of supporting frames 14, the sliding beams 13 and the supporting frames 14 are installed in a one-to-one correspondence, the pair of sliding beams 13 are respectively used for being installed at two ends of the installed beam section 3 in the width direction, and the pair of supporting frames 14 are used for fixing the same beam section 2 to be installed. In this embodiment, the linear transfer device includes a pair of slide beams 13 and a pair of support frames 14, and one slide beam 13 and one support frame 14 are respectively disposed on each side of the beam section. The stability of the beam section 2 to be installed in the transferring process is improved by connecting the two sides of the beam section 2 to be installed through the pair of sliding beams 13 and the pair of supporting frames 14.
Further, the supporting frame 14 includes at least two supporting bars 141, and a connecting bar 142 is connected between two adjacent supporting bars 141, and the supporting bars 141 are used for connecting with the beam section 2 to be installed and the sliding beam 13. The structure can reduce the use of materials, reduce the overall weight, has higher structural strength, can bear the weight of the beam section 2 to be installed, and ensures the stability of the beam section 2 to be installed in the transferring process.
Further, the supporting frame 14 is a C-shaped beam, the top of the supporting bar 141 is bent towards the side close to the sliding beam 13 to form an upper bending portion 1411, the upper bending portion 1411 is hung on the sliding beam 13, and the upper bending portion 1411 can slide along the length direction of the sliding beam 13 relative to the sliding beam 13. In this embodiment, the C-beam and the slide beam 13 are detachably connected to each other, the C-beam can be temporarily locked with the slide beam 13 by means of a fastener, and the C-beam can slide with respect to the slide beam 13 after unlocking. The fastening members may be screws, and the locking positions of the C-beam and the slide beam 13 are preferably arranged at two ends of the slide beam 13 in the length direction, and a locking structure is arranged at each of the two ends of the slide beam 13. In one embodiment, bolt holes may be provided at the ends of the skid beams 13, and fasteners may be used to temporarily lock and secure the C-beams to the skid beams 13.
The bottom of the supporting bar 141 is bent towards the side close to the sliding beam 13 to form a lower bending part 1412, and the lower bending part 1412 is used for connecting with the beam section 2 to be installed. That is, the upper and lower ends of the supporting bar 141 are respectively bent toward the adjacent beams Duan Yice, so that the supporting frame 14 has a C-shaped structure as a whole.
Through such setting, support frame 14 wholly is C type structure, on the one hand, and the upper bending part 1411 at support frame 14 top can hang and place on the slide beam 13, and on the top surface of slide beam 13 is applyed to the gravity of support frame 14, and support frame 14 and slide beam 13's connection reliability is higher, and support frame 14 and slide beam 13 are difficult for taking place the separation, and the construction safety is higher. The lower bending part 1412 at the bottom of the supporting frame 14 can be conveniently connected with the side surface of the beam section 2 to be installed, so that the assembling difficulty is reduced.
Further, the side of the support frame 14 near the sliding beam 13 is provided with a counter top wheel 143 which can be abutted with the side wall of the installed beam section 3. The two support brackets 14 on the beam Duan Liangce may have only one of the counter-top wheels 143, or the counter-top wheels 143 may be provided on both support brackets 14.
By mounting the anti-top wheel 143 on the inner side of the support frame 14, the anti-top wheel 143 is kept in abutment with the mounted beam section 3, so that the sliding beam 13 and the support frame 14 are not easy to shake in the sliding process, and the process of transferring the beam section 2 to be mounted is more stable.
Further, the bridge deck crane 12 includes a hanger 122, a crane hanger 123 and a driving mechanism (not shown in the figure), the crane hanger 123 is mounted at the front end of the hanger 122, the driving mechanism preferably adopts a hydraulic pump station, the hydraulic pump station is used for providing power for lifting and lowering the crane hanger 123, the crane hanger 123 is used for lifting and lowering the beam section 2 to be mounted, the front end portion of the hanger 122 can extend to the front of the mounted beam section 3, so that the crane hanger 123 is suspended in front of the mounted beam section 3 and lifts and lowers the beam section 2 to be mounted, the rear end of the hanger 122 is mounted above the mounted beam section 3, the hanger 122 can slide linearly on the mounted beam section 3, the hanger 122 can share one slide with the slide beam 13, or the hanger 122 and the slide beam 13 can use one slide independently. When hanger 122 is used with one skid alone, after each splice is completed with one beam section, the skid behind deck crane 12 can be removed and installed in front of deck crane 12 and deck crane 2 moved to the forward most position of installed beam section 3.
The invention also provides a girder erection method, which is shown in fig. 8 to 10, and comprises the following steps:
constructing a main tower, an auxiliary pier 4 and a transition pier 5, wherein a preset height is reserved between the top of the auxiliary pier 4 and the main girder;
building a tower area beam section at the main tower;
installing the main girder erection construction system on a tower section girder section;
the single beam section 2 to be installed is horizontally transferred to the front end of the installed beam section 3 for installation after being integrally lifted;
repeating the previous step until the main beam is spliced to the auxiliary pier 4;
carrying out height connection construction on the auxiliary piers 4 to enable the auxiliary piers 4 to be connected with the main beams;
the step of horizontally transferring the single beam section 2 to be installed to the front end of the installed beam section 3 for installation after the whole body of the beam section 2 to be installed is repeatedly executed until the main span is closed.
After the main tower, the auxiliary piers 4 and the transition piers 5 are built, a tower area beam section is built at the position of the main tower, the beam section 2 to be installed is lifted from the lower part of the tower area beam section and then horizontally transferred to the front end of the installed beam section 3 for splicing until the main beam is closed, the beam section is integrally installed in the construction method, the splicing precision is high, the main beam line shape is easy to ensure, the bridge construction quality is high, and the construction speed is faster.
Further, when building a tower section beam section at the main tower, the method comprises the following steps:
constructing an initial beam section at the main tower;
constructing tower area brackets 6 on the initial beams Duan Xiafang;
splicing the tower area brackets 6 to form a tower area beam section;
installing stay ropes 7 on the tower section beam section and tensioning the stay ropes 7;
and removing the tower area bracket 6.
Preferably, after the initial beam section is set up at the main tower, a bridge deck is installed on the initial beam section, and a wet joint is poured.
Further, after removing the tower section support 6, the method further comprises the following steps:
a bridge deck crane 12, a C-shaped beam, a sliding beam 13, a door hanger 11 and a slideway are arranged on the beam section of the tower area;
the beam section 2 to be installed is transported under the gantry crane 11 beside the cable tower 8. Further, when the single beam section 2 to be installed is horizontally transferred to the front end of the installed beam section 3 for installation after being lifted integrally, the method comprises the following steps:
vertically lifting the beam section 2 to be installed from the root of the cable tower 8 to the position right below the installed beam section 3;
translating the beam section 2 to be installed to the front of the installed beam section 3 along the forward bridge by using a linear transfer device;
lifting the beam section 2 to be installed, and butt-jointing and splicing the beam section 2 to be installed and the front end of the installed beam section 3;
resetting the linear transfer device.
In this embodiment, the gantry crane 11 is installed beside the cable tower 8, and is used for vertically lifting the beam section 2 to be installed from the root of the cable tower 8 to the position right below the installed beam section 3, and the bridge deck crane 12 is installed at the front end position of the installed beam section 3, and is used for lifting the beam section 2 to be installed to enable the beam section 2 to be installed to be spliced with the installed beam section 3 in a butt joint manner.
By arranging the gantry crane 11 beside the cable tower 8, the stability of the supporting structure of the area beside the cable tower 8 is higher, and the safety of the gantry crane 11 is higher when the girder section is lifted; moreover, as the gantry crane 11 is required to bear the load in the vertical direction for a long time at the position of the gantry crane 11 when the beam section is lifted, the gantry crane 11 is arranged beside the cable tower 8, the cantilever length of the area beside the cable tower 8 is smaller, and the bridge can be prevented from being deformed to a greater extent due to the influence of the process of lifting the beam section.
In this embodiment, the installation process of the beam section 2 to be installed is as follows: the beam section 2 to be installed, which is positioned below the gantry crane 11, is lifted up to a position which is at a certain height from the beam section in the tower area through a lifting appliance on the gantry crane 11, then is connected with a linear transfer device, the gantry crane 11 is loosened to be connected with the beam section 2 to be installed, the beam section 2 to be installed is transferred to a bridge deck crane 12 through the linear transfer device to be installed, the front end part of the bridge deck crane 12 extends outwards, and a falling clamp is used for being connected with the beam section 2 to be installed, and the beam section 2 to be installed is lifted up and spliced with the beam section 3 to be installed.
By adopting the construction method, the beam section 2 to be installed is integrally lifted, integrally transferred and integrally assembled, instead of the construction mode of assembling one by one after conveying the parts, the difficulty of overhead splicing operation is reduced, the installation precision of the beam section is also facilitated to be improved, and the construction method is not only suitable for splicing steel box girders, but also suitable for splicing orthotropic steel girders, and has higher applicability. In addition, the integral assembly has the advantage of ensuring the line type of the main beam and improves the construction quality.
Further, before translating the beam section 2 to be installed in forward bridge direction to the front of the installed beam section 3 by means of a linear transfer device, the method comprises the following steps:
and connecting the two ends of the beam section 2 to be installed in the width direction with two C-shaped beams which are respectively installed at the two ends of the installed beam section 3 in the width direction in the linear transfer device.
In this embodiment, two C-beams are adopted to connect with two ends of the beam section 2 to be installed in the width direction, the suspension structure formed by the two C-beams can stably transfer the beam section 2 to be installed, the influence of the installed beam section 3 is avoided, the structural requirement on the beam section 2 to be installed is low, the connection with the C-beams can be realized only by arranging connection structures on two sides of the beam section 2 to be installed, the assembly is simple, and the construction efficiency is high.
Further, when translating the beam section 2 to be installed to the front of the installed beam section 3 in the forward bridge direction using a linear transfer device, the method comprises the following steps:
the sliding beam 13 in the linear transfer device is used for driving the C-shaped beam to move to the front end of the installed beam section 3 along the installed beam section 3, and the front end of the sliding beam 13 extends to the front of the installed beam section 3;
releasing the connection between the C-shaped beam and the sliding beam 13;
the C-shaped beam is driven to drive the beam section 2 to be installed to move to the front end position of the sliding beam 13 along the sliding beam 13.
Further, after the sliding beam 13 in the linear transfer device is used to drive the C-shaped beam to move along the installed beam section 3 to the front end of the installed beam section 3, and the front end of the sliding beam 13 extends to the front of the installed beam section 3, the method further comprises the following steps: the front end of the skid beam 13 is fixed to the deck crane 12 by means of a sling 121.
In this embodiment, during the horizontal transfer of the beam section 2 to be installed, the C-beam is first kept temporarily fixed at the rear end of the slide beam 13, the C-beam and the slide beam 13 may be temporarily locked and fixed by fastening bolts, the C-beam and the slide beam 13 are jointly moved to the front end position, and then fixed to the front end of the slide beam 13 by the hanging strip 121, and at the same time, the slide beam 13 is relatively fixed to the installed beam section 3, and then the connection between the C-beam and the slide beam 13 is released, so that the C-beam slides along the slide beam 13 to the front end until the beam section 2 to be installed is not blocked in the vertical direction. By the construction mode, the stability of the beam section 2 to be installed in the transferring process can be greatly improved, the structures of the sliding beam 13 and the C-shaped beam are not easy to damage, and the construction safety is higher.
Further, when resetting the linear transfer device, the method comprises the following steps:
the C-shaped beam is fixed with the sliding beam 13 after moving from the front end position of the sliding beam 13 to the rear end position of the sliding beam 13;
separating the sling 121 from the skid beam 13;
the slide beam 13 is moved along the installed beam section 3 to an initial position, in this embodiment the installation position of the gantry crane 11, while ensuring that the C-beam is below the gantry crane 11, facilitating the connection of the next gantry crane 11 with the beam section 2 to be installed when the beam section 2 to be installed is lifted.
Further, after lifting the beam section 2 to be installed and splicing the beam section 2 to be installed and the front end of the installed beam section 3, the method further comprises the following steps:
installing corresponding stay cables 7 on the assembled beam section, and performing first tensioning construction on the stay cables 7; and (5) performing second tensioning construction on the stay cable 7 after installing the bridge deck on the beam section.
Further, before the beam section to be installed is lifted vertically from the root of the rope tower to directly below the installed beam section, the method comprises the following steps: and a section of the beam section 2 to be installed is adopted as a reference section, and the beam section 2 to be installed is formed by matching and assembling.
Preferably, in this embodiment, the N beam sections are adopted as reference sections, and the n+1 beam section and the n+2 beam section are formed by sequentially matching and assembling along the same installation direction, after assembling, the connection between the N beam section and the n+1 beam section is released, the n+1 beam section is adopted as the reference section of the n+2 and the n+3 beam sections, and the above steps are repeatedly executed until the assembling of the beam section 2 to be installed is completed. In other embodiments, N beam segments may be used as reference segments, and one beam segment or more than three beam segments may be formed by matching and assembling.
By the construction method, the whole beam section can be formed on the ground in a matching and assembling mode before the beam section 2 to be installed is lifted, the beam section is matched in advance, the accuracy of the beam section in assembling after lifting is ensured, and the construction efficiency is improved. In addition, in the embodiment, the N beam sections are adopted as the reference sections, the N+1 beam sections and the N+2 beam sections are matched and assembled, compared with one beam section at the matched and assembled position, the alignment of the beams Duan Pinjie can be detected and controlled in advance before hoisting and assembling, the alignment of the main beam after hoisting and installing is ensured, the construction precision is greatly improved, and the construction quality is improved.
Further, after the main span closure, the method further comprises the following steps: removing temporary piers, removing door cranes 11, bridge deck cranes 12, sliding ways, C-shaped beams and sliding beams 13; constructing the bridge deck; the stay cable 7 is adjusted to meet the construction requirements.
The girder construction method provided by the invention comprises the following specific processes:
and (3) completing construction of a bridge foundation and a main tower, wherein the pier body of the auxiliary pier 4 is reserved to a certain height, the construction is not performed, an initial beam section of a temporary tower area is built, an installing support is built on the initial beam Duan Xiafang, a beam section of a corresponding beam Duan Xingcheng tower area is assembled on the installing support, and a wet joint is poured after a bridge deck is installed. And installing stay ropes 7 on the tower section beam section, tensioning, and removing the installation support after tensioning is finished. The girder section 2 to be installed is pre-matched and assembled in an assembling field near the cable tower, and the assembled girder section 2 to be installed is conveyed to the position below the gantry crane 11 beside the cable tower 8. The beam section 2 to be installed is lifted to the position of a C-shaped beam through a gantry crane 11, the sliding beam 13 is moved after being connected with the C-shaped beam to enable the front end of the sliding beam 13 to extend, the sliding beam 13 is fixed with the installed beam section 3, meanwhile, the sliding beam 13 is connected with a bridge deck crane 12 through a hanging strap 121, the front end of the sliding beam 13 in the movement of the beam section 2 to be installed is lifted and spliced and fixed with the installed beam section 3 through the bridge deck crane 12, a stay cable 7 is installed and tensioned, the bridge deck crane 12 is moved forward to the foremost end of the installed beam section 3, the splicing of the beam sections 2 to be installed is repeated until the main beam is spliced to an auxiliary pier 4, the auxiliary pier 4 is subjected to height splicing construction, the main beam is supported by the auxiliary pier 4 until a main span is closed, the construction of the side span is continued until the main span is closed, and the construction of the side span is advanced until the main span is closed. And (3) removing the temporary piers and the assembly platform, constructing the bridge deck, and finally adjusting the stay cable 7, wherein the construction of the main body of the stay cable 7 is completed.
In summary, the scheme of the invention has the following advantages:
1. in the girder erection construction system 1 of the large-span cable-stayed bridge, the girder section 2 to be installed is lifted by the first lifting device and then is transferred to the lower part of the front end position of the installed girder section 3 by the linear transfer device, and is lifted by the second lifting device.
2. In the girder erection method, after a main tower, an auxiliary pier 4 and a transition pier 5 are built, a tower section girder section is built at the position of the main tower, and a girder section 2 to be installed is horizontally transferred to the front end of an installed girder section 3 for splicing after being lifted from the lower part of the tower section girder section until the girder is closed.
3. In the girder erection method, the matched structure of the C-shaped girder and the sliding girder 13 is adopted to stably transport the girder section 2 to be installed, the whole structure is simpler, the installation operation difficulty is low, the girder line shape is easy to ensure, and the bridge construction quality is improved.
4. In the girder erection method, the girder segments are subjected to segment matching in advance before the girder segment 2 to be installed is lifted, so that the assembly precision is high, the girder linearity is ensured, and the bridge construction quality is improved.
The foregoing is only a partial embodiment of the present invention, and it should be noted that it will be apparent to those skilled in the art that modifications and adaptations can be made without departing from the principles of the present invention, and such modifications and adaptations are intended to be comprehended within the scope of the present invention.

Claims (7)

1. The girder erection method is characterized by comprising the following steps of:
a door crane is arranged at the position of the installed beam section close to the cable tower, a bridge deck crane is arranged at the front end position of the installed beam section, and a slideway for the linear transfer device to move is arranged between the door crane and the bridge deck crane;
the beam section to be installed is vertically lifted from the root of the cable tower to the position right below the installed beam section by utilizing the gantry crane;
translating the front of the installed beam segment of the beam Duan Zhi to be installed along the slideway along a bridge direction by using a linear transfer device, comprising: the two ends of the beam Duan Kuandu to be installed are respectively and correspondingly connected with two C-shaped beams which are respectively installed at the two ends of the installed beam Duan Kuandu in the direction in the linear transferring device; driving the C-shaped beam to move to the front end of the installed beam section along the slideway relative to the installed beam section by means of the sliding beam in the linear transfer device, and enabling the front end of the sliding beam to extend to the front of the installed beam section; releasing the connection between the C-shaped beam and the sliding beam; driving the C-shaped beam to drive the beam section to be installed to move to the front end position of the sliding beam along the sliding beam;
lifting the beam section to be installed by utilizing a bridge deck crane, and butt-jointing and splicing the beam section to be installed and the front end of the installed beam section;
and after resetting the linear transfer device, sequentially translating other beam sections to be installed until the main beam splicing is completed.
2. The girder erection method according to claim 1, further comprising the steps of, after moving the C-beam along the installed girder section to the front end of the installed girder section by means of the slide beam in the linear transfer device and extending the front end of the slide beam to the front of the installed girder section:
the front end of the sliding beam is fixed with the bridge deck crane by means of the hanging belt.
3. The girder erection method according to claim 1, wherein when the linear transfer device is reset, comprising the steps of:
the C-shaped beam is fixed with the sliding beam after moving from the front end position of the sliding beam to the rear end position of the sliding beam;
the skid beam is moved along the installed beam section to an initial position.
4. The girder erection method according to claim 1, wherein when the C-beam is moved along the installed girder section to the front end of the installed girder section by means of the slide beam in the linear transfer device and the front end of the slide beam is extended to the front of the installed girder section, the counter-top wheel inside the C-beam is held in abutment with the side wall of the installed girder section.
5. The girder erection method according to claim 1, further comprising, after lifting the girder segment to be installed and butt-assembling the girder segment to be installed with a front end of the installed girder segment, the steps of:
installing corresponding stay cables on the assembled beam sections;
and tensioning construction is carried out on the stay cable.
6. A method of erecting a main girder according to claim 1, characterized in that before vertically lifting the girder segment to be installed from the root of the rope tower to directly below the installed girder segment, it comprises the steps of:
and adopting one section of beam section to be installed as a reference section, and matching and assembling to form the other section of beam section to be installed.
7. The girder erection method according to claim 6, wherein when a section of the girder to be installed is adopted as a reference section, the girder to be installed is assembled in a matching manner to form another section of the girder to be installed, comprising the steps of:
the N beam sections are adopted as reference sections, and are sequentially matched and spliced along the same installation direction to form an N+1 beam section and an N+2 beam section;
removing the connection between the N beam section and the N+1 beam section;
and taking the N+1 beam section as a reference section, and repeatedly executing the steps until the required assembly of the beam section to be installed is completed.
CN202111539831.2A 2021-12-15 2021-12-15 Main girder erection method Active CN114197329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111539831.2A CN114197329B (en) 2021-12-15 2021-12-15 Main girder erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111539831.2A CN114197329B (en) 2021-12-15 2021-12-15 Main girder erection method

Publications (2)

Publication Number Publication Date
CN114197329A CN114197329A (en) 2022-03-18
CN114197329B true CN114197329B (en) 2024-02-06

Family

ID=80654313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111539831.2A Active CN114197329B (en) 2021-12-15 2021-12-15 Main girder erection method

Country Status (1)

Country Link
CN (1) CN114197329B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07331615A (en) * 1994-06-06 1995-12-19 Kawaju Koji Kk Method of developing cable of bridge
CN1162669A (en) * 1996-02-16 1997-10-22 川田工业株式会社 Method for erecting truss of bridge
KR200363059Y1 (en) * 2004-07-05 2004-09-23 휘선건설(주) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
JP2010047905A (en) * 2008-08-19 2010-03-04 Ihi Corp Apparatus and method for cantilever overhanging bridge
CN104195952A (en) * 2014-08-20 2014-12-10 中铁四局集团第二工程有限公司 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN105714690A (en) * 2016-02-03 2016-06-29 中铁一局集团有限公司 Segmental cantilever girder lifter for large span steel and concrete composite beam erection construction
CN106758828A (en) * 2016-12-02 2017-05-31 腾达建设集团股份有限公司 The application process of fixed asymmetric bridge girder cantilever assembly equipment
CN106884384A (en) * 2017-03-01 2017-06-23 贵州桥梁建设集团有限责任公司 A kind of mountain area steel-concrete composite beam cable-stayed bridge erection crane method
WO2020189847A1 (en) * 2019-03-19 2020-09-24 주식회사 제이디 엔지니어링 Method for installing and constructing girder bridge of marine bridge

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07331615A (en) * 1994-06-06 1995-12-19 Kawaju Koji Kk Method of developing cable of bridge
CN1162669A (en) * 1996-02-16 1997-10-22 川田工业株式会社 Method for erecting truss of bridge
KR200363059Y1 (en) * 2004-07-05 2004-09-23 휘선건설(주) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
JP2010047905A (en) * 2008-08-19 2010-03-04 Ihi Corp Apparatus and method for cantilever overhanging bridge
CN104195952A (en) * 2014-08-20 2014-12-10 中铁四局集团第二工程有限公司 Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN105714690A (en) * 2016-02-03 2016-06-29 中铁一局集团有限公司 Segmental cantilever girder lifter for large span steel and concrete composite beam erection construction
CN106758828A (en) * 2016-12-02 2017-05-31 腾达建设集团股份有限公司 The application process of fixed asymmetric bridge girder cantilever assembly equipment
CN106884384A (en) * 2017-03-01 2017-06-23 贵州桥梁建设集团有限责任公司 A kind of mountain area steel-concrete composite beam cable-stayed bridge erection crane method
WO2020189847A1 (en) * 2019-03-19 2020-09-24 주식회사 제이디 엔지니어링 Method for installing and constructing girder bridge of marine bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
桥面吊机在混合梁斜拉桥起始段钢箱梁吊装中的创新应用;张中锋;冯荣华;唐栋梁;;公路交通技术(第03期);第68-71页 *

Also Published As

Publication number Publication date
CN114197329A (en) 2022-03-18

Similar Documents

Publication Publication Date Title
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN201400500Y (en) Multifunctional lifter with platform for abnormal high building construction
CN111172882A (en) Beam section transportation method for assembling bridge girder cantilever
CN110396931A (en) A kind of excessively cable-styled erection crane of center double plane cable stayed bridge and its construction method
CN114232488B (en) Method for erecting main girder of large-span cable-stayed bridge
CN113120771A (en) Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge and construction method
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN114197329B (en) Main girder erection method
CN114232487B (en) Construction system for erecting main girder of large-span cable-stayed bridge
CN110344334A (en) Steel reinforced concrete combined bridge construction method is done using two bridgings of dorsal funciculus formula Bridge Erector
CN110886188A (en) Large-span suspension bridge stiffening beam erecting system and use method thereof
CN216403632U (en) Split type cable carries loop wheel machine
CN216663862U (en) Construction system for erecting main beam of large-span cable-stayed bridge
CN215160350U (en) Self-lifting mechanism for door slot construction device and door slot construction system
CN110080121B (en) Hanging basket uplink system and construction method
CN114057115A (en) Split type cable crane and construction method
CN112681144A (en) Self-climbing type installation method of steel cable tower
CN215558503U (en) Double-side synchronous hoisting equipment suitable for rear cantilever arm of composite-section beam bridge
CN217733799U (en) Steel-concrete composite beam cable-stayed bridge construction system
CN215210565U (en) Rail-turning type full-width prefabricated bridge deck installation equipment
CN211395311U (en) Erection system for stiffening beam of large-span suspension bridge
CN214362906U (en) Self-climbing type installation system of steel cable tower
CN214194169U (en) Large-span steel truss bridge high bolt construction sliding platform
CN217810568U (en) Small-size basket of hanging of concrete cantilever construction usefulness

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant