CN201400500Y - Special-shaped high-rise building construction with multi-functional elevator with platform - Google Patents

Special-shaped high-rise building construction with multi-functional elevator with platform Download PDF

Info

Publication number
CN201400500Y
CN201400500Y CN2009203015639U CN200920301563U CN201400500Y CN 201400500 Y CN201400500 Y CN 201400500Y CN 2009203015639 U CN2009203015639 U CN 2009203015639U CN 200920301563 U CN200920301563 U CN 200920301563U CN 201400500 Y CN201400500 Y CN 201400500Y
Authority
CN
China
Prior art keywords
platform
bearing frame
guide rail
special
shaped high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203015639U
Other languages
Chinese (zh)
Inventor
王东红
李志国
李秀辉
田国承
卢宏伟
李育平
杨国栋
吴臻
何劝云
田学坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Building Research CABR
Langfang Kaibo Construction Machinery Technology Co Ltd
Original Assignee
China Academy of Building Research CABR
Langfang Kaibo Construction Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Building Research CABR, Langfang Kaibo Construction Machinery Technology Co Ltd filed Critical China Academy of Building Research CABR
Priority to CN2009203015639U priority Critical patent/CN201400500Y/en
Application granted granted Critical
Publication of CN201400500Y publication Critical patent/CN201400500Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

一种异型高耸建筑施工用带平台式多功能升降机,包括由驱动电机滑动连接于塔架两侧的双笼轿厢,所述塔架的中部纵向连接梯形的导轨架,导轨架上滑动连接导向承重架,导向承重架的主体是一个双肢三角形架体,其下部的水平梁与施工平台固定连接,导向承重架顶部内侧铰接的挂钩与导轨架之横梁挂接,导向承重架顶部外侧的两块挂接板分别连接至少两根拉杆,拉杆的下端分别与施工平台的近端和远端悬挂连接,导向承重架的上下两端分别连接一对导向滚轮,每对导向滚轮夹持滚动连接一根导轨。本实用新型实现了施工平台的可变长度,施工平台的高度可随时升降而只需将导向轨道循环接高即可实现。本实用新型尤其适用于结构体型变化的高耸建筑的施工及水平竖向运输。

Figure 200920301563

A platform-type multifunctional elevator for special-shaped high-rise building construction, including double-cage cars that are slidably connected to both sides of the tower by a drive motor. Load-bearing frame, the main body of the guiding load-bearing frame is a double-legged triangular frame, the horizontal beam at the lower part is fixedly connected with the construction platform, the hook hinged on the inside of the top of the guiding load-bearing frame is connected with the crossbeam of the guide rail frame, and the two outer sides of the top of the guiding load-bearing frame The two articulated plates are respectively connected to at least two pull rods, the lower ends of the pull rods are respectively suspended and connected to the near end and the far end of the construction platform; root rails. The utility model realizes the variable length of the construction platform, and the height of the construction platform can be raised and lowered at any time, which can be realized only by cyclically connecting the guide rail. The utility model is especially suitable for the construction and horizontal and vertical transportation of towering buildings with varying structural shapes.

Figure 200920301563

Description

Special-shaped high-rise buildings construction is with being with platform-type multi-functional elevator
Technical field
The utility model relates to a kind of industry and civilian special-shaped high-rise buildings preparation of construction, and particularly a kind of usefulness is turned over modeling method and carried out chimney construction equipment.
Background technology
In existing operating technique, the vertical transportation of workmen, construction material and apparatus mainly realizes by elevator or pylon, the constructing operation of horizontal direction and transportation are mainly by setting up scaffold, erection construction platform on scaffold, the high-rise buildings of such form of construction work structure build irregularity is because highly bigger, and the structure build changes, and the length of required operation platform also needs to change with the structure build, so scaffold to set up difficulty bigger, safety also can't guarantee.
The utility model content
In order to realize level and the vertical transportation of workmen and building materials in the construction of special-shaped safely and efficiently high-rise buildings, the utility model provides a kind of special-shaped high-rise buildings construction with being with platform-type multi-functional elevator, by elevator is connected with operation platform, realized that operation platform need not to set up efficient vertical moving under the situation of scaffold, simultaneously, operation platform is made up of detouchable Vierendeel girder lattice, and the length of operation platform can change according to the variation of building shape.
The technical scheme that its technical matters that solves the utility model adopts is: this special-shaped high-rise buildings construction comprises the two cage cars that are slidingly connected to the pylon both sides by drive motor with being with platform-type multi-functional elevator, it is characterized in that:
The middle part of described pylon vertically connects trapezoidal guide rail bracket, sliding block joint guiding bearing frame on the guide rail bracket, the main body of guiding bearing frame is a two limb triangle support body, the horizontal beam of its underpart is captiveed joint with operation platform, guiding bearing frame inside top pivotally attached hook articulates with the crossbeam of guide rail bracket, two hanging plates of guiding bearing frame top outer connect at least two pull bars respectively, the lower end of pull bar hangs with far-end with the near-end of operation platform respectively and is connected, the two ends up and down of guiding bearing frame connect a pair of guide roller respectively, and every pair of guide roller clamping is rolled and connected a guide rail;
Operation platform becomes platform framework by sectional cube standard knot bolt together, and the end face of platform framework connects the platform bed board, connects protection railing around the platform framework, and the both sides of platform framework are fixedly connected with fastener hole and pin hole.
Described platform bed board can be embossed steel plate, and by bolted connection, platform bed board end steel plate is welded with the arc that Open Side Down and colludes between two block plates, and the platform bed board rides on the platform framework by the arc hook.
Described guide rail bracket is at least two joints, bolt together between per two joint guide rail brackets, and there is locating dowel pin the junction, and hypomere guide rail bracket is installed to top guide track end after removing, and circulation connects height.
Can be welded with hanging point beam and following hanging point beam between two limbs of described guiding bearing frame.
Described operation platform can be established actuating device separately or be driven by the drive motor of two cage cars.
Connect diagonal brace between the levels girder steel of described platform framework.
Described cube standard knot can be formed by connecting by shaped steel, and the transverse beam sheet is fixed on two longitudinal beam inboards by fastener.
Described shaped steel can be channel-section steel, steel pipe, H shaped steel, I-beam section.
The beneficial effects of the utility model are as follows:
Special-shaped high-rise buildings construction described in the utility model is with being with platform-type multi-functional elevator, realized the variable-length of operation platform, the height of operation platform lifting at any time and only need that the guide track circulation is connect height and can realize, operation platform links to each other with spider owing to an end in addition, one end is suspended on the guide rail bearing frame by pull bar again, so can carry the operation platform of certain load, solve the vertical and horizontal highly effective and safe transportation of workmen, overlength material, cement concrete etc.; In addition, operation platform can be provided with independent actuating device, also can promote by the cage direct drive of elevator, so mutually noninterfere between operation platform and the multi-functional elevator, independent operating separately, the realization level is transported and vertical combination of transporting flexibly, improves the degree of utilization of construction machinery and equipment greatly.
The utility model can be widely used in workmen, the construction material of high-rise buildings, the transportation and the constructing operation of preparation of construction, and the construction and the level that are particularly useful for the high-rise buildings that the structure build changes are vertically transported.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of operation platform;
Fig. 3 is that operation platform is connected elevational schematic view with multi-functional elevator;
Fig. 4 is the plan structure scheme drawing of Fig. 3.
Fig. 5 is the structural representation of guiding bearing frame;
Fig. 6 is Fig. 5 left view;
Fig. 7 is Fig. 6 A-A generalized section;
Fig. 8 is that operation platform is connected plan sketch with multi-functional elevator;
Fig. 9 is Fig. 8 B-B generalized section;
Figure 10 is the enlarged drawing at Fig. 9 I place;
Figure 11 is the platform framework elevational schematic view;
Figure 12 is the platform framework birds-eye view;
Figure 13 is the platform framework cross-sectional view.
Reference numeral: hanging point beam, 6-guide rail bracket, 6.1-guide rail, 7-drive motor under 1-operation platform, 1.1-bolt, 1.2 platform frameworks, 1.3 platform bed boards, 1.4-protection railing, 1.5-fastener hole, 1.6-pin hole, 1.7-diagonal brace, the two cage cars of 2-, 3-pull bar, 4-pylon, 5-guiding bearing frame, 5.1-horizontal beam, 5.2-hook, 5.3-hanging plate, 5.4-guide roller, the last hanging point beam of 5.5-, the 5.6-.
The specific embodiment
Embodiment is referring to shown in Fig. 1-4, this special-shaped high-rise buildings construction is with being with platform-type multi-functional elevator, comprise the two cage cars 2 that are slidingly connected to pylon 4 both sides by drive motor 7, the middle part of described pylon 4 vertically connects trapezoidal guide rail bracket 6, guide rail bracket 6 is at least two joints, bolt together between per two joint guide rail brackets, and there is locating dowel pin the junction, hypomere guide rail bracket is installed to top guide track end after removing, and circulation connects height.Shown in Figure 51 0, sliding block joint guiding bearing frame 5 on the guide rail bracket 6, the main body of guiding bearing frame 5 is two limb triangle support bodys, the horizontal beam 5.1 of its underpart is captiveed joint with operation platform 1, guiding bearing frame 5 inside top pivotallys attached hook 5.2 articulates with the crossbeam of guide rail bracket 6, two hanging plates 5.3 of guiding bearing frame 5 top outer connect at least two pull bars 3 respectively, the lower end of pull bar hangs with far-end with the near-end of operation platform 1 respectively and is connected, the two ends up and down of guiding bearing frame 5 connect a pair of guide roller 5.4 respectively, every pair of guide roller 5.4 clampings are rolled and are connected a guide rail 6.1, are welded with hanging point beam 5.5 and following hanging point beam 5.6 between two limbs of guiding bearing frame 5.
Shown in Figure 111 3, operation platform 1 connects into platform framework 1.2 by sectional cube standard knot with bolt 1.1, and described cube standard knot is formed by connecting by shaped steel, and the transverse beam sheet is fixed on two longitudinal beam inboards by fastener.Shaped steel can be channel-section steel, steel pipe, H shaped steel, I-beam section.The end face of platform framework connects platform bed board 1.3, and described platform bed board 1.3 is an embossed steel plate, and by bolted connection, platform bed board end steel plate is welded with the arc that Open Side Down and colludes between two block plates, and the platform bed board rides on the platform framework 1.2 by the arc hook.Connect protection railing 1.4 around the platform framework, the both sides of platform framework 1.2 are fixedly connected with fastener hole 1.5 and pin hole 1.6.Connect diagonal brace 1.7 between the levels girder steel of platform framework.Described operation platform 1 is established actuating device separately or is driven by the drive motor of two cage cars.
Working process of the present utility model:
1, the use of operation platform
(1) the formal use of operation platform should be carried out loading experiment gradually before, affirmation in construction under the maximum load (the every side of designing requirement is not more than 1000kg, and load is not more than 200kg on the every bed board) this body structure of platform do not have permanent deformation, weld seam does not have cracking, the guide rail zero slip connects non-loosening.
(2) platform is worked as anterior layer construction when using, and should note: guarantee that material does not have to overstock on the platform and stack that with clearly, load is uniform as far as possible, does not take vigorous exercise, and stops when long with last.
2, the lifting of operation platform and track connects height
(1) finish when anterior layer construction, the adjustment of following one deck template support finishes and will promote operation platform.Will guarantee there is not additional load on the platform before promoting, all between buildings such as operation platform and spider are connected certain releasing.There are enough guide rail spaces guiding bearing frame top.Cross bar hangs up properly steel rope at guiding bearing frame middle part, the lifting pressure pin is passed steel rope to be put on two cage car roof, two cage cars slowly promote with inspection speed, open the hook on the guiding bearing frame, rise to behind the suitable height with hook guiding bearing frame secure fixation to the transverse tube of guide rail, recover being connected and checking reliability of platform and spider.
(2) platform has three sections guide rails, in the middle of the following guide roller of guiding bearing frame rises between one section guide rail bottom two attachment points the time, can pull down next section guide rail, and above being installed to, circulation connects height.
(3) because along with the increase of construction height, elevator and construction spider flat-bed be apart from shortening, will corresponding shortening platform, and platform shortens each one meter length, and platform framework and the platform bed board removed foremost before promoting get final product.Operation platform is applicable to that the guide rail bracket cross section is the multi-functional elevator of 650mm * 650mm, also can be suitable for the multi-functional elevator that the guide rail bracket cross section is 800 * 800mm.

Claims (8)

1. a special-shaped high-rise buildings construction comprises the two cage cars (2) that are slidingly connected to pylon (4) both sides by drive motor (7) with being with platform-type multi-functional elevator, it is characterized in that:
The middle part of described pylon (4) vertically connects trapezoidal guide rail bracket (6), guide rail bracket (6) is gone up sliding block joint guiding bearing frame (5), the main body of guiding bearing frame (5) is a two limb triangle support body, the horizontal beam of its underpart (5.1) is captiveed joint with operation platform (1), guiding bearing frame (5) inside top pivotally attached hook (5.2) articulates with the crossbeam of guide rail bracket (6), two hanging plates (5.3) of guiding bearing frame (5) top outer connect at least two pull bars (3) respectively, the lower end of pull bar hangs with far-end with the near-end of operation platform (1) respectively and is connected, the two ends up and down of guiding bearing frame (5) connect a pair of guide roller (5.4) respectively, and every pair of guide roller (5.4) clamping is rolled and connected a guide rail (6.1);
Operation platform (1) connects into platform framework (1.2) by sectional cube standard knot with bolt (1.1), the end face of platform framework connects platform bed board (1.3), connect protection railing (1.4) around the platform framework, the both sides of platform framework (1.2) are fixedly connected with fastener hole (1.5) and pin hole (1.6).
2. special-shaped high-rise buildings construction according to claim 1 is with being with platform-type multi-functional elevator, it is characterized in that: described platform bed board (1.3) is an embossed steel plate, pass through bolted connection between two block plates, platform bed board end steel plate is welded with the arc that Open Side Down and colludes, and the platform bed board rides on the platform framework (1.2) by the arc hook.
3. special-shaped high-rise buildings construction according to claim 1 is with being with platform-type multi-functional elevator, it is characterized in that: described guide rail bracket (6) is at least two joints, bolt together between per two joint guide rail brackets, there is locating dowel pin the junction, hypomere guide rail bracket is installed to top guide track end after removing, and circulation connects height.
4. special-shaped high-rise buildings construction according to claim 1 is characterized in that: be welded with hanging point beam (5.5) and following hanging point beam (5.6) between two limbs of described guiding bearing frame (5) with being with platform-type multi-functional elevator.
5. special-shaped high-rise buildings construction according to claim 1 is characterized in that with being with platform-type multi-functional elevator: described operation platform (1) is established actuating device separately or by the drive motor driving of two cage cars.
6. special-shaped high-rise buildings construction according to claim 5 is characterized in that: connect diagonal brace (1.7) between the levels girder steel of described platform framework with being with platform-type multi-functional elevator.
7. special-shaped high-rise buildings construction according to claim 5 is with being with platform-type multi-functional elevator, and it is characterized in that: described cube standard knot is formed by connecting by shaped steel, and the transverse beam sheet is fixed on two longitudinal beam inboards by fastener.
8. special-shaped high-rise buildings construction according to claim 7 is with being with platform-type multi-functional elevator, and it is characterized in that: described shaped steel is channel-section steel, steel pipe, H shaped steel, I-beam section.
CN2009203015639U 2009-03-24 2009-03-24 Special-shaped high-rise building construction with multi-functional elevator with platform Expired - Lifetime CN201400500Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203015639U CN201400500Y (en) 2009-03-24 2009-03-24 Special-shaped high-rise building construction with multi-functional elevator with platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203015639U CN201400500Y (en) 2009-03-24 2009-03-24 Special-shaped high-rise building construction with multi-functional elevator with platform

Publications (1)

Publication Number Publication Date
CN201400500Y true CN201400500Y (en) 2010-02-10

Family

ID=41660297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203015639U Expired - Lifetime CN201400500Y (en) 2009-03-24 2009-03-24 Special-shaped high-rise building construction with multi-functional elevator with platform

Country Status (1)

Country Link
CN (1) CN201400500Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103086232A (en) * 2013-01-30 2013-05-08 中国建筑科学研究院建筑机械化研究分院 Multifunctional construction hoist for cargoes
CN103291210A (en) * 2012-02-23 2013-09-11 陕西鑫隆石油设备有限公司 Gate-type double-tower gear-driven drilling machine
CN103303772A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Ultra-long wall attaching device of construction lift
CN103863919A (en) * 2012-12-13 2014-06-18 株式会社日立制作所 Load support beam holding device of elevator
CN103950811A (en) * 2014-04-29 2014-07-30 上海建工四建集团有限公司 People and cargo elevator mounting structure of complicated external building structure and mounting method thereof
CN103979383A (en) * 2014-04-29 2014-08-13 山东腾飞建设机械工程有限公司 Multi-layer lifting platform for building construction
CN106437180A (en) * 2016-12-08 2017-02-22 天力博达科技有限公司 Climbing type material platform
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof
CN107902567A (en) * 2017-12-14 2018-04-13 天津京龙工程机械有限公司 A kind of new elevator system for depending on tower crane
CN118206015A (en) * 2024-04-18 2024-06-18 济南四建集团机械设备有限责任公司 Single-cage construction lifting wing type opening and closing attachment operation platform for bridge tower construction

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291210A (en) * 2012-02-23 2013-09-11 陕西鑫隆石油设备有限公司 Gate-type double-tower gear-driven drilling machine
CN103863919A (en) * 2012-12-13 2014-06-18 株式会社日立制作所 Load support beam holding device of elevator
CN103863919B (en) * 2012-12-13 2016-03-30 株式会社日立制作所 the load bearing beam holding device of elevator
CN103086232B (en) * 2013-01-30 2015-06-03 中国建筑科学研究院建筑机械化研究分院 Multifunctional construction hoist for cargoes
CN103086232A (en) * 2013-01-30 2013-05-08 中国建筑科学研究院建筑机械化研究分院 Multifunctional construction hoist for cargoes
CN103303772A (en) * 2013-06-19 2013-09-18 泰兴市第一建筑安装工程有限公司 Ultra-long wall attaching device of construction lift
CN103950811A (en) * 2014-04-29 2014-07-30 上海建工四建集团有限公司 People and cargo elevator mounting structure of complicated external building structure and mounting method thereof
CN103979383A (en) * 2014-04-29 2014-08-13 山东腾飞建设机械工程有限公司 Multi-layer lifting platform for building construction
CN106437180A (en) * 2016-12-08 2017-02-22 天力博达科技有限公司 Climbing type material platform
CN107119912A (en) * 2017-06-26 2017-09-01 中国建筑第四工程局有限公司 A kind of construction elevator operating platform structure and preparation method thereof
CN107119912B (en) * 2017-06-26 2023-10-17 中国建筑第四工程局有限公司 Construction elevator operation platform structure and manufacturing method thereof
CN107902567A (en) * 2017-12-14 2018-04-13 天津京龙工程机械有限公司 A kind of new elevator system for depending on tower crane
CN118206015A (en) * 2024-04-18 2024-06-18 济南四建集团机械设备有限责任公司 Single-cage construction lifting wing type opening and closing attachment operation platform for bridge tower construction
CN118206015B (en) * 2024-04-18 2024-11-05 济南四建集团机械设备有限责任公司 Single-cage construction lifting wing type opening and closing attachment operation platform for bridge tower construction

Similar Documents

Publication Publication Date Title
CN201400500Y (en) Special-shaped high-rise building construction with multi-functional elevator with platform
CN101117791B (en) Combined mobile formwork base with special-shaped steel box and orthotropic plate bottom formwork and its construction method
CN105625195B (en) Wave forms steel web SCC engineering methods movable hanging basket and its construction method
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN104929373B (en) Large span Square Steel Tubes Truss and its accumulation slippage construction method
CN201512345U (en) Multifunctional integrated lifting frame
CN204552781U (en) A kind of suspension type anchor cable construction chassis voluntarily
CN101514586A (en) Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof
CN107761571A (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN101736703B (en) 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN113789948A (en) A large-span roofed atrium side wall slide rail hanging basket and its construction method
CN207903788U (en) A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device
CN112482317A (en) Door slot second-stage concrete self-climbing slip form pouring system and construction method
CN214573768U (en) A self-climbing slipform pouring system for the second-stage concrete pouring of the door slot
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN105544406B (en) Bailey beam is sliding to remove device and its method for dismounting
CN207498835U (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system
CN101294369B (en) Method and device for hanging and transferring bracket of movable mould frame
CN207405485U (en) A kind of intelligence system for bridge machinery
CN106400700A (en) Double-line cantilever type bridge formation machine
CN111455854A (en) Semi-automatic protective scaffolding and erection method for the construction of viaducts across railways
CN214577048U (en) Be applied to reinforced (rfd) assembled scaffold frame of tunnel sleeve lining
CN115125856A (en) Multifunctional bridge fabrication machine
CN219710948U (en) Push-pull platform device for wall attachment position of climbing tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100210