CN206359894U - Naked rock geology combined type cast-in-place box beam bracket system in a kind of water - Google Patents

Naked rock geology combined type cast-in-place box beam bracket system in a kind of water Download PDF

Info

Publication number
CN206359894U
CN206359894U CN201621231967.1U CN201621231967U CN206359894U CN 206359894 U CN206359894 U CN 206359894U CN 201621231967 U CN201621231967 U CN 201621231967U CN 206359894 U CN206359894 U CN 206359894U
Authority
CN
China
Prior art keywords
bracket
steel
pipe pile
combined type
spandrel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621231967.1U
Other languages
Chinese (zh)
Inventor
张海龙
辜力武
裴剑铃
曾越
杨军宏
沈翔
黄钊
曹浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201621231967.1U priority Critical patent/CN206359894U/en
Application granted granted Critical
Publication of CN206359894U publication Critical patent/CN206359894U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to naked rock geology combined type cast-in-place box beam bracket system in a kind of water.It includes the bottom stress steel-pipe pile, middle Bailey bracket combination beam, the part of top continuous brackets three being sequentially connected.The Bailey bracket combination beam includes stake top bracket, spandrel girder, Bailey bracket, shellfish thunder flower stand, distribution beam;Wherein:The Bailey bracket, shellfish thunder flower stand are connected between spandrel girder and distribution beam, and the spandrel girder is connected by bracket with stress steel-pipe pile, connection continuous brackets above the distribution beam.Steel-pipe pile support and continuous brackets are applied in combination the utility model, and the box beam load that continuous brackets are carried is transferred into infrastructure steel-pipe pile by Bailey bracket combination beam.

Description

Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
Technical field
The utility model is related to combined type cast-in-place box beam bracket, naked rock geology combined type cast-in-situ box girder in particularly a kind of water Mounting system.
Background technology
It is most of to use prefabricated, cantilever or incremental launching construction technique across river, the cross a river water stage casing access bridge concrete box girder more, still It is connected more with ramp bridge as municipal bridge feature constantly strengthens, bridge deck width constantly increases, and behind approach span river.Without logical Section in the water that boat is required, cast-in-situ box girder is compared with other forms(Especially cantilever and incremental launching construction technique)It is more economical practical.For Above-mentioned needs are met, access bridge section box beam is designed frequently with variable cross-section cast-in-situ box girder.
Construction of cast-in-situ box-beam technique is very ripe, and box beam bracket typically uses steel-pipe pile support or continuous brackets. But in the naked rock geology construction in water stage casing, basis of the conventional full framing without stabilization, and it is larger by water currents, easily occur Entirety is toppled or damaged or destroyed by flood.Though conventional steel pipe support is avoided that the deficiency of full framing, waterborne to set up that support is long in time limit, high-altitude Operating risk is high, steel pipe support is set up quality and is difficult to control to.When being constructed on ephemeral stream, support is set up, in demolishing process Marine equipment is influenceed the cycle long by flood season, it is difficult to continuous construction.
Utility model content
The purpose of this utility model is to provide naked rock geology combined type cast-in-place box beam bracket system in a kind of water, main solution Steel-pipe pile support and continuous brackets are applied in combination technical problem present in certainly above-mentioned prior art, the utility model, lead to Cross Bailey bracket combination beam and the box beam load that continuous brackets are carried is transferred to infrastructure steel-pipe pile.
To achieve the above object, the technical solution of the utility model is:
Naked rock geology combined type cast-in-place box beam bracket system in a kind of water, it is characterised in that:It includes being sequentially connected down Portion's stress steel-pipe pile, middle Bailey bracket combination beam, the part of top continuous brackets three.
Naked rock geology combined type cast-in-place box beam bracket system in described water, it is characterised in that:The Bailey bracket combination beam bag Include stake top bracket, spandrel girder, Bailey bracket, shellfish thunder flower stand, distribution beam;Wherein:The Bailey bracket, shellfish thunder flower stand be connected to spandrel girder with Between distribution beam, the spandrel girder is connected by bracket with stress steel-pipe pile, connection continuous brackets above the distribution beam.
Naked rock geology combined type cast-in-place box beam bracket system in described water, it is characterised in that:The spandrel girder uses H types Steel, the distribution beam uses I-steel.
By above-mentioned technical proposal, the utility model has the following advantages that:
1. Integral Steel pile tube support is compared, modular support top uses continuous brackets form, substantially reduced existing Pour box beam bracket and set up the time, reduce high-altitude working safety risk waterborne, reduce support quality control difficulty.
2. infrastructure uses naked rock geology pile method construction technology, and the basic stress for efficiently solving continuous brackets is steady Qualitative question, by means of planting pile driving construction platform, after the completion of bracket basis construction, is converted to land construction by over-water construction, subtracts Small construction of cast-in-situ box-beam risk and difficulty of construction.
When 3. being constructed on ephemeral stream, steel-pipe pile bracket basis can be with degree of safety flood, it is ensured that superstructure box beam connects Continuous construction.And superstructure full framing is installed and Demolition Construction is not influenceed by flood season, is conducive to box beam to work continuously.
4. as municipal administration is constantly built across river, river bridge, wide cut variable cross-section cast-in-situ box girder gradually increases, the full hall of superstructure Formula rack form is more flexible and convenient in box girder with variable cross section model sheetinstallat, it is easier to meet bridge appearance quality requirement.
Brief description of the drawings
Fig. 1 is positive structure schematic of the present utility model.
Fig. 2 is side structure schematic diagram of the present utility model.
Fig. 3 is spandrel girder supporting construction schematic diagram in the utility model.
Embodiment
Fig. 1-3 are referred to, the utility model discloses naked rock geology combined type cast-in-place box beam bracket system in a kind of water.Such as Shown in figure:It includes the bottom stress steel-pipe pile 1, middle Bailey bracket combination beam 2, top continuous brackets 3 three being sequentially connected Point.The mounting system both sides have cushion cap 9, the cushion cap 9 respectively with middle Bailey bracket combination beam 2, top continuous brackets 3 it is outer Side is connected.
The Bailey bracket combination beam 2 includes stake top bracket 4, spandrel girder 8, Bailey bracket 5, shellfish thunder flower stand 6, distribution beam 7;Wherein: The Bailey bracket 5, shellfish thunder flower stand 6 are connected between spandrel girder 8 and distribution beam 7, and the spandrel girder 8 passes through bracket 4 and stress steel-pipe pile 1 Connection, the top of the distribution beam 7 connection continuous brackets 3.
The spandrel girder 8 uses H profile steel, and the distribution beam 7 uses I-steel.
Specifically used method of the present utility model is as follows:
1. processing and fabricating bottom stress steel-pipe pile 1, stake top bracket 4, spandrel girder 8, distribution beam 7.
2. spelling Bailey bracket 5, shellfish thunder flower stand 6 is installed.
3. the material of continuous brackets 3 prepares(Full framing, diagonal brace steel pipe, fastener, jacking etc.).
3. according to sequence of construction, the basis of bottom stress steel-pipe pile 1 of constructing successively, then on pile driving construction platform is planted using hanging Car install in the middle of Bailey bracket combination beam 2, then set up above superstructure continuous brackets 3.Middle Bailey bracket combination beam 2 is installed When, first in stake top fluting welding bracket 4, then spandrel girder 8, Bailey bracket 5, shellfish thunder flower stand 6, distribution beam 7 are installed successively.
The utility model is in the naked rock geology construction cast-in-situ box girder in water stage casing, and combined type cast-in-place box beam bracket system will be upper Portion's structure box beam load is transferred to infrastructure by continuous brackets, steel pipe pile foundation can be effectively ensured the rim of a bowl bracket basis by Power stability problem.Superstructure continuous brackets form, greatly shortens support and sets up the time, reduces work high above the ground difficulty, It is more flexible and convenient during box girder with variable cross section model sheetinstallat, it is easier to meet bridge appearance quality requirement.
It is only preferred embodiment of the present utility model in summary, not for limiting implementation model of the present utility model Enclose.The equivalent changes and modifications that i.e. all contents according to present utility model application the scope of the claims are made, all should be of the present utility model Technology category.

Claims (2)

1. naked rock geology combined type cast-in-place box beam bracket system in a kind of water, it is characterised in that:It includes the bottom being sequentially connected Stress steel-pipe pile(1), middle Bailey bracket combination beam(2), top continuous brackets(3)Three parts;The Bailey bracket combination beam(2)Bag Include stake top bracket(4), spandrel girder(8), Bailey bracket(5), shellfish thunder flower stand(6), distribution beam(7);Wherein:The Bailey bracket(5), Bei Lei Flower stand(6)It is connected to spandrel girder(8)With distribution beam(7)Between, the spandrel girder(8)Pass through bracket(4)With stress steel-pipe pile(1)Even Connect, the distribution beam(7)Top connects continuous brackets(3).
2. naked rock geology combined type cast-in-place box beam bracket system in water according to claim 1, it is characterised in that:The load-bearing Beam(8)Using H profile steel, the distribution beam(7)Using I-steel.
CN201621231967.1U 2016-11-17 2016-11-17 Naked rock geology combined type cast-in-place box beam bracket system in a kind of water Active CN206359894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621231967.1U CN206359894U (en) 2016-11-17 2016-11-17 Naked rock geology combined type cast-in-place box beam bracket system in a kind of water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621231967.1U CN206359894U (en) 2016-11-17 2016-11-17 Naked rock geology combined type cast-in-place box beam bracket system in a kind of water

Publications (1)

Publication Number Publication Date
CN206359894U true CN206359894U (en) 2017-07-28

Family

ID=59372913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621231967.1U Active CN206359894U (en) 2016-11-17 2016-11-17 Naked rock geology combined type cast-in-place box beam bracket system in a kind of water

Country Status (1)

Country Link
CN (1) CN206359894U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914851A (en) * 2019-03-12 2019-06-21 中交路桥建设有限公司 A kind of assembled bracket for being mounted at the top of steel-pipe pile
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914851A (en) * 2019-03-12 2019-06-21 中交路桥建设有限公司 A kind of assembled bracket for being mounted at the top of steel-pipe pile
CN109914851B (en) * 2019-03-12 2023-11-17 中交路桥建设有限公司 Assembled bracket for being mounted at top of steel pipe pile
CN110804948A (en) * 2019-10-31 2020-02-18 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system
CN110804948B (en) * 2019-10-31 2021-05-11 安徽省路港工程有限责任公司 Construction method of steel pipe pile bailey truss foundation full-space bracket system

Similar Documents

Publication Publication Date Title
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN102425117B (en) Construction method for non-cantilever sections of sidespans of multiplex continuous beam or steel-constructed beam
CN106522101B (en) A kind of construction method of cable-stayed bridge overlength cordless beam section
CN101418543A (en) Self-anchored rope-suspension bridge inclined drawing construction method
CN105839536A (en) Construction method of cable-stayed bridge pylon
CN102561191A (en) Integral lifting system and construction method for arch bridge ribs
CN101392501A (en) Erection method for wide span steel box bridge
CN109457615A (en) A kind of construction method of installation of abnormity bowstring arch bridge arch ring
CN101446074B (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN105648914B (en) Construction method of middle-and-small-scale steel truss tied-arch bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN206359894U (en) Naked rock geology combined type cast-in-place box beam bracket system in a kind of water
CN107881924A (en) A kind of bent cap support
CN101289836A (en) Auxiliary erection method of horizontal cable of steel truss arched bridge
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN202380403U (en) Integral hoisting system of arch rib of arch bridge
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN110016871A (en) A kind of construction method suitable for over-height pier large span curve bridge
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN110685227B (en) Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method
CN115748513A (en) Construction method of ultra-small high-span-ratio all-welded steel truss girder bridge based on cantilever aerial work platform
CN210216415U (en) Positioning device for bridge pile foundation steel casing in deepwater and rapid stream area
CN205804178U (en) Scalable without holder device for the liftable of bridge coping construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant