CN206359894U - Naked rock geology combined type cast-in-place box beam bracket system in a kind of water - Google Patents
Naked rock geology combined type cast-in-place box beam bracket system in a kind of water Download PDFInfo
- Publication number
- CN206359894U CN206359894U CN201621231967.1U CN201621231967U CN206359894U CN 206359894 U CN206359894 U CN 206359894U CN 201621231967 U CN201621231967 U CN 201621231967U CN 206359894 U CN206359894 U CN 206359894U
- Authority
- CN
- China
- Prior art keywords
- bracket
- steel
- pipe pile
- combined type
- spandrel girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to naked rock geology combined type cast-in-place box beam bracket system in a kind of water.It includes the bottom stress steel-pipe pile, middle Bailey bracket combination beam, the part of top continuous brackets three being sequentially connected.The Bailey bracket combination beam includes stake top bracket, spandrel girder, Bailey bracket, shellfish thunder flower stand, distribution beam;Wherein:The Bailey bracket, shellfish thunder flower stand are connected between spandrel girder and distribution beam, and the spandrel girder is connected by bracket with stress steel-pipe pile, connection continuous brackets above the distribution beam.Steel-pipe pile support and continuous brackets are applied in combination the utility model, and the box beam load that continuous brackets are carried is transferred into infrastructure steel-pipe pile by Bailey bracket combination beam.
Description
Technical field
The utility model is related to combined type cast-in-place box beam bracket, naked rock geology combined type cast-in-situ box girder in particularly a kind of water
Mounting system.
Background technology
It is most of to use prefabricated, cantilever or incremental launching construction technique across river, the cross a river water stage casing access bridge concrete box girder more, still
It is connected more with ramp bridge as municipal bridge feature constantly strengthens, bridge deck width constantly increases, and behind approach span river.Without logical
Section in the water that boat is required, cast-in-situ box girder is compared with other forms(Especially cantilever and incremental launching construction technique)It is more economical practical.For
Above-mentioned needs are met, access bridge section box beam is designed frequently with variable cross-section cast-in-situ box girder.
Construction of cast-in-situ box-beam technique is very ripe, and box beam bracket typically uses steel-pipe pile support or continuous brackets.
But in the naked rock geology construction in water stage casing, basis of the conventional full framing without stabilization, and it is larger by water currents, easily occur
Entirety is toppled or damaged or destroyed by flood.Though conventional steel pipe support is avoided that the deficiency of full framing, waterborne to set up that support is long in time limit, high-altitude
Operating risk is high, steel pipe support is set up quality and is difficult to control to.When being constructed on ephemeral stream, support is set up, in demolishing process
Marine equipment is influenceed the cycle long by flood season, it is difficult to continuous construction.
Utility model content
The purpose of this utility model is to provide naked rock geology combined type cast-in-place box beam bracket system in a kind of water, main solution
Steel-pipe pile support and continuous brackets are applied in combination technical problem present in certainly above-mentioned prior art, the utility model, lead to
Cross Bailey bracket combination beam and the box beam load that continuous brackets are carried is transferred to infrastructure steel-pipe pile.
To achieve the above object, the technical solution of the utility model is:
Naked rock geology combined type cast-in-place box beam bracket system in a kind of water, it is characterised in that:It includes being sequentially connected down
Portion's stress steel-pipe pile, middle Bailey bracket combination beam, the part of top continuous brackets three.
Naked rock geology combined type cast-in-place box beam bracket system in described water, it is characterised in that:The Bailey bracket combination beam bag
Include stake top bracket, spandrel girder, Bailey bracket, shellfish thunder flower stand, distribution beam;Wherein:The Bailey bracket, shellfish thunder flower stand be connected to spandrel girder with
Between distribution beam, the spandrel girder is connected by bracket with stress steel-pipe pile, connection continuous brackets above the distribution beam.
Naked rock geology combined type cast-in-place box beam bracket system in described water, it is characterised in that:The spandrel girder uses H types
Steel, the distribution beam uses I-steel.
By above-mentioned technical proposal, the utility model has the following advantages that:
1. Integral Steel pile tube support is compared, modular support top uses continuous brackets form, substantially reduced existing
Pour box beam bracket and set up the time, reduce high-altitude working safety risk waterborne, reduce support quality control difficulty.
2. infrastructure uses naked rock geology pile method construction technology, and the basic stress for efficiently solving continuous brackets is steady
Qualitative question, by means of planting pile driving construction platform, after the completion of bracket basis construction, is converted to land construction by over-water construction, subtracts
Small construction of cast-in-situ box-beam risk and difficulty of construction.
When 3. being constructed on ephemeral stream, steel-pipe pile bracket basis can be with degree of safety flood, it is ensured that superstructure box beam connects
Continuous construction.And superstructure full framing is installed and Demolition Construction is not influenceed by flood season, is conducive to box beam to work continuously.
4. as municipal administration is constantly built across river, river bridge, wide cut variable cross-section cast-in-situ box girder gradually increases, the full hall of superstructure
Formula rack form is more flexible and convenient in box girder with variable cross section model sheetinstallat, it is easier to meet bridge appearance quality requirement.
Brief description of the drawings
Fig. 1 is positive structure schematic of the present utility model.
Fig. 2 is side structure schematic diagram of the present utility model.
Fig. 3 is spandrel girder supporting construction schematic diagram in the utility model.
Embodiment
Fig. 1-3 are referred to, the utility model discloses naked rock geology combined type cast-in-place box beam bracket system in a kind of water.Such as
Shown in figure:It includes the bottom stress steel-pipe pile 1, middle Bailey bracket combination beam 2, top continuous brackets 3 three being sequentially connected
Point.The mounting system both sides have cushion cap 9, the cushion cap 9 respectively with middle Bailey bracket combination beam 2, top continuous brackets 3 it is outer
Side is connected.
The Bailey bracket combination beam 2 includes stake top bracket 4, spandrel girder 8, Bailey bracket 5, shellfish thunder flower stand 6, distribution beam 7;Wherein:
The Bailey bracket 5, shellfish thunder flower stand 6 are connected between spandrel girder 8 and distribution beam 7, and the spandrel girder 8 passes through bracket 4 and stress steel-pipe pile 1
Connection, the top of the distribution beam 7 connection continuous brackets 3.
The spandrel girder 8 uses H profile steel, and the distribution beam 7 uses I-steel.
Specifically used method of the present utility model is as follows:
1. processing and fabricating bottom stress steel-pipe pile 1, stake top bracket 4, spandrel girder 8, distribution beam 7.
2. spelling Bailey bracket 5, shellfish thunder flower stand 6 is installed.
3. the material of continuous brackets 3 prepares(Full framing, diagonal brace steel pipe, fastener, jacking etc.).
3. according to sequence of construction, the basis of bottom stress steel-pipe pile 1 of constructing successively, then on pile driving construction platform is planted using hanging
Car install in the middle of Bailey bracket combination beam 2, then set up above superstructure continuous brackets 3.Middle Bailey bracket combination beam 2 is installed
When, first in stake top fluting welding bracket 4, then spandrel girder 8, Bailey bracket 5, shellfish thunder flower stand 6, distribution beam 7 are installed successively.
The utility model is in the naked rock geology construction cast-in-situ box girder in water stage casing, and combined type cast-in-place box beam bracket system will be upper
Portion's structure box beam load is transferred to infrastructure by continuous brackets, steel pipe pile foundation can be effectively ensured the rim of a bowl bracket basis by
Power stability problem.Superstructure continuous brackets form, greatly shortens support and sets up the time, reduces work high above the ground difficulty,
It is more flexible and convenient during box girder with variable cross section model sheetinstallat, it is easier to meet bridge appearance quality requirement.
It is only preferred embodiment of the present utility model in summary, not for limiting implementation model of the present utility model
Enclose.The equivalent changes and modifications that i.e. all contents according to present utility model application the scope of the claims are made, all should be of the present utility model
Technology category.
Claims (2)
1. naked rock geology combined type cast-in-place box beam bracket system in a kind of water, it is characterised in that:It includes the bottom being sequentially connected
Stress steel-pipe pile(1), middle Bailey bracket combination beam(2), top continuous brackets(3)Three parts;The Bailey bracket combination beam(2)Bag
Include stake top bracket(4), spandrel girder(8), Bailey bracket(5), shellfish thunder flower stand(6), distribution beam(7);Wherein:The Bailey bracket(5), Bei Lei
Flower stand(6)It is connected to spandrel girder(8)With distribution beam(7)Between, the spandrel girder(8)Pass through bracket(4)With stress steel-pipe pile(1)Even
Connect, the distribution beam(7)Top connects continuous brackets(3).
2. naked rock geology combined type cast-in-place box beam bracket system in water according to claim 1, it is characterised in that:The load-bearing
Beam(8)Using H profile steel, the distribution beam(7)Using I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621231967.1U CN206359894U (en) | 2016-11-17 | 2016-11-17 | Naked rock geology combined type cast-in-place box beam bracket system in a kind of water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621231967.1U CN206359894U (en) | 2016-11-17 | 2016-11-17 | Naked rock geology combined type cast-in-place box beam bracket system in a kind of water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206359894U true CN206359894U (en) | 2017-07-28 |
Family
ID=59372913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621231967.1U Active CN206359894U (en) | 2016-11-17 | 2016-11-17 | Naked rock geology combined type cast-in-place box beam bracket system in a kind of water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206359894U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914851A (en) * | 2019-03-12 | 2019-06-21 | 中交路桥建设有限公司 | A kind of assembled bracket for being mounted at the top of steel-pipe pile |
CN110804948A (en) * | 2019-10-31 | 2020-02-18 | 安徽省路港工程有限责任公司 | Construction method of steel pipe pile bailey truss foundation full-space bracket system |
-
2016
- 2016-11-17 CN CN201621231967.1U patent/CN206359894U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109914851A (en) * | 2019-03-12 | 2019-06-21 | 中交路桥建设有限公司 | A kind of assembled bracket for being mounted at the top of steel-pipe pile |
CN109914851B (en) * | 2019-03-12 | 2023-11-17 | 中交路桥建设有限公司 | Assembled bracket for being mounted at top of steel pipe pile |
CN110804948A (en) * | 2019-10-31 | 2020-02-18 | 安徽省路港工程有限责任公司 | Construction method of steel pipe pile bailey truss foundation full-space bracket system |
CN110804948B (en) * | 2019-10-31 | 2021-05-11 | 安徽省路港工程有限责任公司 | Construction method of steel pipe pile bailey truss foundation full-space bracket system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205205635U (en) | Stride footpath bailey frame steel suspension bridge structure greatly | |
CN102425117B (en) | Construction method for non-cantilever sections of sidespans of multiplex continuous beam or steel-constructed beam | |
CN106522101B (en) | A kind of construction method of cable-stayed bridge overlength cordless beam section | |
CN101418543A (en) | Self-anchored rope-suspension bridge inclined drawing construction method | |
CN105839536A (en) | Construction method of cable-stayed bridge pylon | |
CN102561191A (en) | Integral lifting system and construction method for arch bridge ribs | |
CN101392501A (en) | Erection method for wide span steel box bridge | |
CN109457615A (en) | A kind of construction method of installation of abnormity bowstring arch bridge arch ring | |
CN101446074B (en) | Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge | |
CN105648914B (en) | Construction method of middle-and-small-scale steel truss tied-arch bridge | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN106988229A (en) | A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method | |
CN206359894U (en) | Naked rock geology combined type cast-in-place box beam bracket system in a kind of water | |
CN107881924A (en) | A kind of bent cap support | |
CN101289836A (en) | Auxiliary erection method of horizontal cable of steel truss arched bridge | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN202380403U (en) | Integral hoisting system of arch rib of arch bridge | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN110016871A (en) | A kind of construction method suitable for over-height pier large span curve bridge | |
CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
CN110685227B (en) | Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method | |
CN115748513A (en) | Construction method of ultra-small high-span-ratio all-welded steel truss girder bridge based on cantilever aerial work platform | |
CN210216415U (en) | Positioning device for bridge pile foundation steel casing in deepwater and rapid stream area | |
CN205804178U (en) | Scalable without holder device for the liftable of bridge coping construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |