CN108729730A CN201811008634.6A CN201811008634A CN108729730A CN 108729730 A CN108729730 A CN 108729730A CN 201811008634 A CN201811008634 A CN 201811008634A CN 108729730 A CN108729730 A CN 108729730A
Authority
CN
China
Prior art keywords
arm
cross
lines road
loop lines
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811008634.6A
Other languages
Chinese (zh)
Inventor
沈巍巍
朱永平
胡建民
崔龙跃
尚艳军
杨磊
杨晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201811008634.6A priority Critical patent/CN108729730A/en
Publication of CN108729730A publication Critical patent/CN108729730A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Abstract

The present invention provides a kind of anchor supports of limit for height area double-circuit line, including cross-arm and two steel tower principal posts;The lower end of steel tower principal post is connect with basis, and cross-arm is horizontally set on the top of two steel tower principal posts, and the both ends of cross-arm are located at the both sides of steel tower principal post, and I loop lines road is symmetricly set on II loop lines road on cross-arm;Multiple wire jumper hanging points are provided with below cross-arm, the V-type jumper string in I loop lines road and II loop lines road is symmetrically suspended on the lower section of cross-arm.The lower section of cross-arm is also arranged at intervals with multiple conducting wire hanging points, and the three-phase conducting wire in I loop lines road and II loop lines road is connect with conducting wire hanging point respectively, and multiple ground wire hanging points are arranged at intervals with above cross-arm, and the ground wire in I loop lines road and II loop lines road is connect with ground wire hanging point respectively.Tower of the present invention can effectively reduce double back line pole tower height, meet limit for height requirement to the greatest extent, while avoiding and increasing line corridor width, effectively reduce engineering construction difficulty, have apparent economic results in society.

Description

A kind of anchor support of limit for height area double-circuit line
Technical field
The present invention relates to transmission line construction fields, and in particular to a kind of limit for height area double-circuit line gate anchor support.
Background technology
In recent years, with the continuous propulsion of power grid construction, it is smooth that line corridor problem increasingly becomes influence line project The crucial factor of propulsion.It spreads all over the place in areas, power circuits such as the crowded location of line corridor, surrounding cities, often will appear The case where two lines road path intersects or even line route need to pass through from the location of limited high request.With two lines road path It is general that two ways is got over to solve the problems, such as that line route intersects using leap or brill in previous engineering for intersection.Across side Formula is commonly used in the fact that built line voltage distribution grade is relatively low, tower height is relatively low, and span line voltage class is higher.Bore the mode of getting over It is higher ranked to be commonly used in built line voltage distribution, bores and gets over the fact that line voltage distribution grade is relatively low.For surrounding city and line Road corridor congested area, new route generally requires to bore the circuit of more built higher voltage grade, because of built arc sag The limitation of height, line route are often restricted by more position is bored, and certain difficulty is brought to engineering construction.
In domestic previous engineering, anchor support is got over for the brill of double-circuit line and generally uses two single circuit designs, single loop line The wine glass-shaped Deethanizer design that road gate anchor support generally uses three-phase conducting wire horizontally arranged.This method is needed common-tower double-return road point At two single loop construction, and the width of corridor that two single back lines occupy can increase much than original double loop, at itself In the case that path is very crowded, it is also necessary to find two single back lines brill get over position certainly will be more difficult;Meanwhile three The wine glass-shaped anchor support weight of the horizontally arranged design of phase conductor is larger, and engineering cost is relatively high.These factors both increase work Cheng Jianshe difficulty.
Invention content
It is an object of the invention to the problems in for the above-mentioned prior art, provide a kind of limit for height area double-circuit line gate Anchor support can not only solve the problems, such as the tower height occurred when multiple-circuit on same tower bores more other voltage class circuits, additionally it is possible to Used in the engineering of other limited high requests (such as:Airport etc.), having reduces tower height, saves corridor, reduce cost, save money The advantages that source and environmental protection.
The present invention is to be achieved through the following technical solutions:
A kind of anchor support of limit for height area double-circuit line, including cross-arm and two steel tower principal posts;The lower end of steel tower principal post with Basis connection, cross-arm are horizontally set on the top of two steel tower principal posts, and the both ends of cross-arm are located at the both sides of steel tower principal post, I loop lines Road is symmetricly set on II loop lines road on cross-arm;
Multiple wire jumper hanging points are provided with below cross-arm, the V-type jumper string in I loop lines road and II loop lines road is symmetrically suspended on The lower section of the lower section of cross-arm, cross-arm is also arranged at intervals with multiple conducting wire hanging points, the three-phase conducting wire in I loop lines road and II loop lines road point It is not connect with conducting wire hanging point, multiple ground wire hanging points is arranged at intervals with above cross-arm, the ground wire in I loop lines road and II loop lines road point It is not connect with ground wire hanging point.
Preferably, the cross-arm includes the middle part cross-arm being located on same axis and two cantilever cross-arms;Middle part cross-arm Both ends are connect with the top of two steel tower principal posts respectively, and two cantilever cross-arms are connect with the outside of a steel tower principal post respectively.
Preferably, a wire jumper hanging point is respectively set in the both ends of the bottom of the cantilever cross-arm and middle part, middle part cross-arm A wire jumper hanging point is respectively set in the both ends and middle part of bottom, and two V-type wire jumpers are hung on three wire jumper hanging points of cantilever cross-arm It goes here and there, two V-type jumper strings is hung on three wire jumper hanging points of middle part cross-arm.
Preferably, six V-type jumper strings along anchor support center symmetric setting, and be located at same level height.
Preferably, the bottom of cantilever cross-arm is also arranged at intervals with two conducting wire hanging points, and the bottom of middle part cross-arm is along center pair Claim to be arranged there are two conducting wire hanging point, the triple line in every loop line road, wherein a phase is connect with the conducting wire hanging point of middle part cross-arm, remaining Two-phase is connect with two conducting wire hanging points of cantilever cross-arm respectively.
Preferably, the top of the cross-arm is symmetrical arranged there are four earth wire rack, and four ground wires in double-circuit line are set respectively It sets and is connect with earth wire rack.
Preferably, it is provided with hanger at the top of the earth wire rack, which is ground wire hanging point, ground wire and ground wire hanging point Connection.
Preferably, the steel tower principal post includes the right cylinder for becoming slope principal post and being arranged on end, becomes lower end and the base of slope principal post Plinth connects, and the top of cross-arm and right cylinder connects.
Compared with prior art, the present invention has technique effect beneficial below:
The limit for height area double-circuit line gate anchor support, double-circuit line is symmetrical and horizontally disposed in anchor support both sides, it returns Three-phase conducting wire in circuit uses horizontally arranged arrangement, wire jumper to hang on same cross-arm with conducting wire and be located at sustained height, be not necessarily to Jumper wire rack is separately set again, effectively reduces shaft tower height, meets limit for height requirement to greatest extent, it is same with traditional drum type or umbellate form Tower two circuit tower is compared, and is had a clear superiority in terms of reducing tower height, while being avoided and being increased line corridor width, further effectively Engineering construction difficulty is reduced, has the advantages that save corridor, save the duration.
Secondly as six phase conductors are all made of horizontally arranged, side wire spacing is larger, is difficult to using two traditional ground wires Meet code requirement, therefore four ground wires are set on double back line pole tower, lightning protection requirement can be met, meet design specification requirement.
Description of the drawings
Fig. 1 is limited high regional double-circuit line gate anchor support layout drawing;
Fig. 2 is the distribution map of conducting wire hanging point, ground wire hanging point and wire jumper hanging point.
In figure:1- becomes slope principal post;2- right cylinders;Cross-arm in the middle part of 3-;4- cantilever cross-arms;5- triangle cross-arms;6- earth wire racks;8- First wire jumper hanger;9- the second wire jumper hangers;12-A1 conducting wire hanging points;13-B1 conducting wire hanging points;14-C1 conducting wire hanging points;15- ground wires Hanging point.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, described to be explanation of the invention rather than limit It is fixed.
As indicated with 1, a kind of limit for height area double-circuit line gate anchor support, which is symmetrical structure to figure, including two It is used to support the steel tower principal post of the component of steel tower load, steel tower principal post includes becoming slope principal post 1 and right cylinder 2, and the setting of right cylinder 2 is becoming slope The top horizontal of the upper end of principal post 1, steel tower principal post is provided with a cross-arm.
Cross-arm includes middle part cross-arm 3 and two cantilever cross-arms 4, and middle part cross-arm 3 is located between two steel tower principal posts, and middle part is horizontal The both ends of load 3 are connect with the top of two right cylinders 2 respectively, and two cantilever cross-arms are located at the outside of two steel tower principal posts, and two A cantilever cross-arm is connect with the outside at the top of right cylinder 2 respectively, and it is straight that middle part cross-arm 3 and two cantilever cross-arms 4 are located at uniform level On line.
The lower section of middle part cross-arm 3 is arranged the second wire jumper hanger 9, and the both ends of middle part cross-arm 3 are respectively arranged with wire jumper hanging point, and second Wire jumper hanger 9 hangs " V " type jumper string respectively with an adjacent wire jumper hanging point.
The first wire jumper hanger 8 is arranged in 4 lower section of cantilever cross-arm, and for hanging jumper string, 4 end set of cantilever cross-arm has triangle Shape cross-arm 5, the limb for connecting outermost V-type jumper string, one wire jumper hanging point of end set of triangle cross-arm 5, cantilever The binding site setting of cross-arm 4 and right cylinder hangs a V-type there are one wire jumper hanging point on the wire jumper hanging point and the first wire jumper hanger 8 Jumper string hangs a V-type jumper string on the first wire jumper hanger 8 and triangle cross-arm 5 on wire jumper hanging point.
The lower section of cross-arm is symmetrical arranged two return wire hanging points, the three-phase conducting wire for connecting two circuits, each to return Road includes three conducting wire hanging points, and the first circuit includes A1 conducting wire hanging points 12, B1 conducting wire hanging points 13 and C1 conducting wire hanging points 14;First time Road includes A2 conducting wire hanging points, B2 conducting wire hanging points and C2 conducting wire hanging points.
A1 conducting wire hanging points 12 and A2 conducting wire hanging points are symmetricly set on the lower section of middle part cross-arm 3, and B1 conducting wire hanging points 13 and C1 are led The lower section of a cantilever cross-arm 4 is arranged in line hanging point 14, and B2 conducting wire hanging points and C2 conducting wire hanging points are arranged under another cantilever cross-arm 4 Side.
The top of cross-arm is symmetrical arranged along the vertical centre of anchor support there are four earth wire rack 6, the top of two steel tower right cylinders 2 An earth wire rack 6 is respectively set, an earth wire rack 6 is respectively set in the top of two cantilever cross-arms 4;The upper end of earth wire rack 6 is provided with convex Platform, the boss are ground wire hanging point 15, and earth wire rack 6 is obliquely installed, and ground wire hanging point is beak-like.
Referring to Fig. 2, I loop lines road and II loop lines road are symmetrically arranged in anchor support center line both sides.
A1, B1, C1 three-phase conducting wire in I loop lines road is horizontally disposed at the sustained height of cross-arm lower section, is led respectively with A1 Line hanging point 12, B1 conducting wire hanging points 13 and C1 conducting wire hanging points 14 connect;The horizontal cloth of A2, B2, C2 three-phase conducting wire in II loop lines road It is placed in below cross-arm at sustained height, is connect respectively with A2 conducting wire hanging points, B2 conducting wire hanging points and C2 conducting wire hanging points.
Four ground wires are connected on the ground wire hanging point of four earth wire racks 6.
Since I loop lines road and II loop lines road are symmetrical arranged, it is described as follows by taking the three-phase wire jumper in I loop lines road as an example below: The left limb of V-type jumper string of A1 and the right limb of V-type jumper string of A2 are connected at the second wire jumper hanger 9, and the right limb of V-type jumper string of A1 connects It is connected at middle part cross-arm 3 and the wire jumper hanging point of steel tower principal post intersection;
The left limb of V-type wire jumper of B1 is connected to cantilever cross-arm 4 and steel tower principal post intersection, the V of V-type the wire jumper right limb and C1 of B1 The left limb of type jumper string is connected to the first wire jumper hanger, and the right limb of V-type jumper string of C1 is connected to the wire jumper extension of triangle cross arm end Point on.
The anchor support uses double post design, and to be symmetrically arranged, monnolithic case is in gate;I loop lines road and II loop lines Road is to be symmetrically arranged with steel tower center;Three-phase conducting wire in I loop lines road and II loop lines road is all made of horizontally disposed, jumper string It is designed using V-type string, V-type jumper string is in horizontally arranged arrangement, and the wire jumper on two loop line roads is with the symmetrical arrangement in steel tower center; Since conducting wire is in horizontally arranged, this tower is arranged four lightning protection ground wires, ground wire hanging point respectively symmetrically position.
Anchor support include principal post 1 with the changes slope that connect of basis and the right cylinder 2 that is connect with cross-arm, cross-arm two phase conductors of setting with Wire jumper hanging point, cross-arm middle part setting wire jumper hanger are used as V-type jumper string side hanging point;Cantilever cross-arm 4 bears two phase conductors and two The lower section setting wire jumper hanger of a wire jumper, cantilever cross-arm is used as wire jumper V string side hanging points;In 4 end set triangle of arm cross-arm Cross-arm 5, for bearing V-type jumper string side hanging point;One earth wire rack 6 is set above steel tower principal post, and end is used as ground in beak-like Line hanging point.
The height of exhaling of the limit for height area double-circuit line gate anchor support is referred to as 17000mm, and steel tower total height is 21500mm, The centre distance of two steel tower principal posts is 16900mm, and the distance of cross-arm to ground is 17000mm.
All advantageous effects compared with prior art:
First, the limit for height area double-circuit line gate anchor support, two loop lines are symmetrically arranged in steel tower two using horizontally arranged Side has a clear superiority compared with traditional drum type or umbellate form common-tower double-return steel tower in terms of reducing tower height.Simultaneously with previous scheme It compares, width of corridor can be effectively reduced, reduce engineering construction difficulty.
Meanwhile horizontally arranged arrangement is used per the three-phase conducting wire in loop line, wire jumper and conducting wire hang on same cross-arm, same Highly, it no longer needs to that jumper wire rack is separately arranged, further effectively reduces shaft tower height, meet requirement for height to greatest extent.
Secondly as six phase conductors are all made of horizontally arranged, side wire spacing is larger, is difficult to using two traditional ground wires Meet code requirement.Therefore, four ground wires are arranged in the present invention on double back line pole tower, can meet lightning protection requirement, meet design rule Model requirement.
Tower of the present invention can effectively reduce double back line pole tower height, meet limit for height requirement to the greatest extent, avoid simultaneously Increase line corridor width effectively reduces engineering construction difficulty, has apparent economic results in society.The present invention has construction Rationally, form is simple, the advantages that reducing tower height, saving corridor, economize on resources, can lower engineering construction difficulty, save corridor, The advantages that saving the duration, can generate prodigious economic results in society, be with a wide range of applications.
The above content is merely illustrative of the invention's technical idea, and protection scope of the present invention cannot be limited with this, every to press According to technological thought proposed by the present invention, any change done on the basis of technical solution each falls within claims of the present invention Protection domain within.

Claims (8)

1. a kind of anchor support of limit for height area double-circuit line, which is characterized in that including cross-arm and two steel tower principal posts;Steel tower principal post Lower end with basis connect, cross-arm is horizontally set on the top of two steel tower principal posts, and the both ends of cross-arm are located at the two of steel tower principal post Side, I loop lines road are symmetricly set on II loop lines road on cross-arm;
Multiple wire jumper hanging points are provided with below cross-arm, the V-type jumper string in I loop lines road and II loop lines road is symmetrically suspended on cross-arm Lower section, the lower section of cross-arm is also arranged at intervals with multiple conducting wire hanging points, the three-phase conducting wire in I loop lines road and II loop lines road respectively with Conducting wire hanging point connects, and is arranged at intervals with multiple ground wire hanging points above cross-arm, the ground wire in I loop lines road and II loop lines road respectively with Ground wire hanging point connects.
2. the anchor support of a kind of limit for height area double-circuit line according to claim 1, which is characterized in that the cross-arm includes position In on same axis middle part cross-arm (3) and two cantilever cross-arms (4);The both ends of middle part cross-arm (3) respectively with two steel tower masters The top of column connects, and two cantilever cross-arms (4) connect with the outside of a steel tower principal post respectively.
3. the anchor support of a kind of limit for height area double-circuit line according to claim 2, which is characterized in that the cantilever cross-arm (4) a wire jumper hanging point is respectively set in the both ends and middle part of bottom, and the both ends and middle part of the bottom of middle part cross-arm are respectively set One wire jumper hanging point hangs two V-type jumper strings, three wire jumpers of middle part cross-arm on three wire jumper hanging points of cantilever cross-arm (4) Two V-type jumper strings are hung on hanging point.
4. the anchor support of a kind of limit for height area double-circuit line according to claim 3, which is characterized in that six V-type jumper strings Along the center symmetric setting of anchor support, and it is located at same level height.
5. the anchor support of a kind of limit for height area double-circuit line according to claim 2, which is characterized in that cantilever cross-arm (4) Bottom is also arranged at intervals with two conducting wire hanging points, the bottom of middle part cross-arm along center symmetric setting there are two conducting wire hanging point, every time Triple line in circuit, wherein a phase is connect with the conducting wire hanging point of middle part cross-arm, remaining two-phase respectively with cantilever cross-arm (4) two A conducting wire hanging point connection.
6. the anchor support of a kind of limit for height area double-circuit line according to claim 2, which is characterized in that the top of the cross-arm It is symmetrical arranged there are four earth wire rack (6), four ground wires in double-circuit line are separately positioned on to be connect with earth wire rack (6).
7. the anchor support of a kind of limit for height area double-circuit line according to claim 6, which is characterized in that the earth wire rack (6) Top be provided with hanger, which is ground wire hanging point, and ground wire connect with ground wire hanging point.
8. the anchor support of a kind of limit for height area double-circuit line according to claim 1, which is characterized in that the steel tower principal post packet The right cylinder (2) for becoming slope principal post (1) and being arranged on end is included, the lower end for becoming slope principal post (1) is connect with basis, cross-arm and right cylinder (2) Top connection.
CN201811008634.6A 2018-08-29 2018-08-29 A kind of anchor support of limit for height area double-circuit line Pending CN108729730A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811008634.6A CN108729730A (en) 2018-08-29 2018-08-29 A kind of anchor support of limit for height area double-circuit line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811008634.6A CN108729730A (en) 2018-08-29 2018-08-29 A kind of anchor support of limit for height area double-circuit line

Publications (1)

Publication Number Publication Date
CN108729730A true CN108729730A (en) 2018-11-02

Family

ID=63941686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811008634.6A Pending CN108729730A (en) 2018-08-29 2018-08-29 A kind of anchor support of limit for height area double-circuit line

Country Status (1)

Country Link
CN (1) CN108729730A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386158A (en) * 2018-11-28 2019-02-26 中国电力工程顾问集团西北电力设计院有限公司 A kind of big corner single loop gate brill more tower for scissors crossing
CN109469400A (en) * 2018-12-14 2019-03-15 贵阳电力设计院有限公司 Double Loop Steel Tower that is a kind of while solving to bore more and cross over demand
CN110616940A (en) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 Bird beak structure and method of ground wire bracket of extra-high voltage direct current transmission iron tower
US11429014B2 (en) * 2018-11-26 2022-08-30 Changxing Potek Electronics Technology Co., Ltd. Laser animation projection device and a control method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB567852A (en) * 1943-06-23 1945-03-06 William Frederick Bowling Improvements in overhead transmission line supports
CN201146360Y (en) * 2008-01-18 2008-11-05 北京国电华北电力工程有限公司 Door type anchor tower for test line segment
CN201433591Y (en) * 2008-12-30 2010-03-31 国家电网公司 Door type tangent tower
CN203669459U (en) * 2013-11-22 2014-06-25 国家电网公司 Alternating current and extra-high voltage tangent tower in heavy ice area
CN203669464U (en) * 2013-11-22 2014-06-25 国家电网公司 Alternating current and extra-high voltage tensioning-resisting tower in heavy ice area
CN204983867U (en) * 2015-09-21 2016-01-20 中国电力工程顾问集团东北电力设计院有限公司 Two return circuits of formula of turning over strain insulator tower on wire jumper
CN207469872U (en) * 2017-11-17 2018-06-08 四川电力设计咨询有限责任公司 Around anchor support on the horizontally arranged wire jumper of common-tower double-return
CN207620484U (en) * 2017-12-08 2018-07-17 中国能源建设集团甘肃省电力设计院有限公司 A kind of UHV transmission line suitable for Hexi Corridor Region, which bores, gets over tower
CN209114954U (en) * 2018-08-29 2019-07-16 中国电力工程顾问集团西北电力设计院有限公司 A kind of anchor support of limit for height area double-circuit line

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB567852A (en) * 1943-06-23 1945-03-06 William Frederick Bowling Improvements in overhead transmission line supports
CN201146360Y (en) * 2008-01-18 2008-11-05 北京国电华北电力工程有限公司 Door type anchor tower for test line segment
CN201433591Y (en) * 2008-12-30 2010-03-31 国家电网公司 Door type tangent tower
CN203669459U (en) * 2013-11-22 2014-06-25 国家电网公司 Alternating current and extra-high voltage tangent tower in heavy ice area
CN203669464U (en) * 2013-11-22 2014-06-25 国家电网公司 Alternating current and extra-high voltage tensioning-resisting tower in heavy ice area
CN204983867U (en) * 2015-09-21 2016-01-20 中国电力工程顾问集团东北电力设计院有限公司 Two return circuits of formula of turning over strain insulator tower on wire jumper
CN207469872U (en) * 2017-11-17 2018-06-08 四川电力设计咨询有限责任公司 Around anchor support on the horizontally arranged wire jumper of common-tower double-return
CN207620484U (en) * 2017-12-08 2018-07-17 中国能源建设集团甘肃省电力设计院有限公司 A kind of UHV transmission line suitable for Hexi Corridor Region, which bores, gets over tower
CN209114954U (en) * 2018-08-29 2019-07-16 中国电力工程顾问集团西北电力设计院有限公司 A kind of anchor support of limit for height area double-circuit line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11429014B2 (en) * 2018-11-26 2022-08-30 Changxing Potek Electronics Technology Co., Ltd. Laser animation projection device and a control method thereof
CN109386158A (en) * 2018-11-28 2019-02-26 中国电力工程顾问集团西北电力设计院有限公司 A kind of big corner single loop gate brill more tower for scissors crossing
CN109386158B (en) * 2018-11-28 2024-02-06 中国电力工程顾问集团西北电力设计院有限公司 Large-corner single-loop gate-type drilling tower for crossing
CN109469400A (en) * 2018-12-14 2019-03-15 贵阳电力设计院有限公司 Double Loop Steel Tower that is a kind of while solving to bore more and cross over demand
CN110616940A (en) * 2019-10-25 2019-12-27 中国电建集团贵州电力设计研究院有限公司 Bird beak structure and method of ground wire bracket of extra-high voltage direct current transmission iron tower

Similar Documents

Publication Publication Date Title
CN108729730A (en) A kind of anchor support of limit for height area double-circuit line
CN206016402U (en) Tape cable platform directly draws following formula double back cable terminal steel pipe pole
CN109386158A (en) A kind of big corner single loop gate brill more tower for scissors crossing
CN106150177B (en) A kind of terminal anchor support for double-layer frame outlet
CN205509438U (en) Device is down drawn at four loop cable terminals
CN209114954U (en) A kind of anchor support of limit for height area double-circuit line
CN102005712B (en) Strain corner tower with horizontal winding and jumping wire jumper for two-loop compact power transmission line
CN108756428A (en) It is a kind of to be used to make somebody a mere figurehead the bearing platform type narrow base tower under double-circuit line cable T joint draws
CN206272192U (en) A kind of new 330kV power distribution equipments in high altitude localities
CN201635469U (en) 500 kV compact type transmission line straight small angle tower
CN201406865Y (en) 66KV overhead transmission line double-circuit horizontal crossing tower
CN207847235U (en) No ground pole DC transmission line line pole tower
CN102561783A (en) 500kV vertical-arrangement symmetrical double-circuit compact tangent tower
CN110453959A (en) A kind of double loop, which is bored, gets over steel pipe pole and transmission system
CN205046915U (en) Adopt two sides in two return circuits of V style of calligraphy combination cluster to cut -off steel pipe shaft tower
CN105155910B (en) A kind of single loop that string is combined using V-shape cut-offs steel pipe tower
CN206128807U (en) Four return circuit steel pipe towers are thoughtlessly pressed to wild goose wing type
CN109441195A (en) Single loop wears across integral type transmission tower
CN208473424U (en) A kind of bearing platform type narrow base tower for making somebody a mere figurehead under double-circuit line cable T joint draws
CN205046931U (en) Steel pipe shaft tower is cut -off to two sides in two return circuits that adopt triangle -shaped cross arm to arrange
CN205583618U (en) Single loop distribution overhead line junction pole and wiring structure thereof
CN108005458A (en) Singly cut-off π sections towers in double loop
CN209277659U (en) A kind of big corner single loop gate brill more tower for scissors crossing
CN207620483U (en) The standard trolley and line-hanging structure of double back overhead transmission line double back single-sided arrangement
CN110374390A (en) A kind of 500 kilovolts of " non-" font conversion anchor supports for being arranged vertically double-loop compact

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination