CN207919363U - A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system - Google Patents

A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system Download PDF

Info

Publication number
CN207919363U
CN207919363U CN201721820329.8U CN201721820329U CN207919363U CN 207919363 U CN207919363 U CN 207919363U CN 201721820329 U CN201721820329 U CN 201721820329U CN 207919363 U CN207919363 U CN 207919363U
Authority
CN
China
Prior art keywords
arch rib
sides
bridge
low level
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721820329.8U
Other languages
Chinese (zh)
Inventor
周文
冯朝军
张启桥
代勋山
陈成杰
吕文熙
张应红
郭俊雅
施建
董继林
李俊霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Bridge Engineering Co Ltd
Original Assignee
China Railway Guangzhou Engineering Group Co Ltd CRECGZ
CRECGZ Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guangzhou Engineering Group Co Ltd CRECGZ, CRECGZ Bridge Engineering Co Ltd filed Critical China Railway Guangzhou Engineering Group Co Ltd CRECGZ
Priority to CN201721820329.8U priority Critical patent/CN207919363U/en
Application granted granted Critical
Publication of CN207919363U publication Critical patent/CN207919363U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of Filled Steel Tubular Arch Bridge low level assembly lifting systems,Including temporary trestle bridge,Arch rib mounting bracket in temporary trestle bridge both sides is set,And the arch rib lifting bracket above temporary trestle bridge,It further include the promotion pylon for being separately positioned on temporary trestle bridge both sides,Both sides are connected between promoting tower top by pressure tower cable,Both sides promote tower top and the fixed cable hinged with earth anchor are also respectively connected,Both sides promote tower top and are also associated with the promotion cable being connected with the middle span arch rib of lower section,Middle span arch rib uses low level mounting means by arch rib lifting bracket,End bay section arch rib carries out installation in situ by arch rib mounting bracket,Middle span arch rib is overall increased into precalculated position by promoting pylon again,Carry out closure construction,The difficulty of construction of bridge arch rib can be significantly reduced,And,Middle span arch rib is whole promoted,Construction period can be shortened,It is guaranteed but also middle span arch rib closes up precision with end bay section arch rib.

Description

A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
Technical field
The present invention relates to technical field of bridge construction, more particularly to a kind of Filled Steel Tubular Arch Bridge low level assembly is promoted System.
Background technology
Currently, existing Filled Steel Tubular Arch Bridge installation mainly has Support Method, cable hoisting cantilever method, rotator construction The modes such as method.(1) Support Method is suitable for the arch bridge of small across footpath, usually not high from the ground in arch rib, and anhydrous under bridge or water level is not deep, The preferable situation of execution conditions uses.This method be exactly first by the assembled good holder of the arching line style of steel tube arch rib at bridge location, Segmented welding arching in place on holder.Advantage is that arch rib section length is little, is not necessarily to Large-scale Hoisting equipment, and arch rib line style is easy Control.(2) erection with cableway is suitable for crossing over mountain valley, and long-span steel pipe arch bridge on great rivers, the method is hung using cable crane Dress ability, arch rib is segmented prefabricated, is respectively symmetrically lifted from arch springing to span centre, one section is often installed, using steel wire rope or steel strand wires It carries out on Inclined cable-stayed pylon, the live pre-splicing place of arch rib installation settings.The method advantage is the assembly of no holder, but installation period Longer, construction precision is more difficult to control.(3) the construction by swing scope of application is similar with cable crane installation, is divided into flat turn, vertical transfer and group Rotating manner is closed, arch rib is generally divided into two symmetrical half across utilizing actual landform or bridge in bridge construction scene both sides respectively Arch rib mounting bracket is first carried out on axis, then starts assembled arch rib, and turntable or flexural pivot are set at arch springing and turn arch rib level Extremely or vertically design position is gone to carry out closing up mode.
For above-mentioned arch rib installation method, there are associated disadvantages:(1) Support Method is not suitable for the arch bridge of Long span and applies Work is also not suitable for the Arch Bridge Construction for having water or deep water under bridge.(2) cable hoisting cantilever method is not suitable for plains region or foundation Bad flat country, while arch rib assembly axis precision controlling is difficult, construction safety control will since cable crane installation one Directly continueing to arch rib, installation is complete, and construction safety construction risk is high.(3) construction by swing need install rotation system, button tower, after Anchorage and assembling support etc. need the ground in larger assembled place and suitable rear anchorage construction, rotator construction security risk It is high.
Invention content
Technical problem to be solved by the invention is to provide a kind of short construction period, safe and reliable CFST Arch Bridges Arch rib low level assembly lifting system.
Used technical solution to solve above-mentioned technical problem:A kind of Filled Steel Tubular Arch Bridge low level assembly promotion System, including temporary trestle bridge, arch rib mounting bracket in temporary trestle bridge both sides is set, and the arch rib above temporary trestle bridge carries Ascending branch frame, further includes the promotion pylon for being separately positioned on temporary trestle bridge both sides, is promoted described in both sides and passes through pressure between tower top Tower cable is connected, and tower top is promoted described in both sides, the fixed cable hinged with earth anchor is also respectively connected, the arch rib is promoted Holder support has the middle span arch rib that live low level assembly is formed by welding, the arch rib mounting bracket support to have live in situ assembled The end bay section arch rib being formed by welding, tower top is promoted described in both sides is also associated with and carried with what the middle span arch rib of lower section was connected Rise cable.
Further, it is connected by tensioning cable between middle two side bottom of span arch rib.
Advantageous effect:In this Filled Steel Tubular Arch Bridge low level assembly lifting system, middle span arch rib is carried by arch rib Ascending branch frame uses low level mounting means, end bay section arch rib to carry out installation in situ by arch rib mounting bracket, then by promoting pylon Middle span arch rib is overall increased into precalculated position, carries out closure construction, the construction that can significantly reduce bridge arch rib is difficult Degree can shorten construction period moreover, middle span arch rib is whole promotion, but also middle span arch rib is closed with end bay section arch rib Hold together precision to be guaranteed.
Description of the drawings
The present invention is described further with reference to the accompanying drawings and examples;
Fig. 1 is the structural schematic diagram of the embodiment of the present invention.
Specific implementation mode
Referring to Fig.1, a kind of Filled Steel Tubular Arch Bridge low level assembly lifting system of the utility model, including temporary trestle bridge 10, arch rib mounting bracket 20 in 10 both sides of temporary trestle bridge, and the arch rib lifting bracket 30 above temporary trestle bridge are set.Its In, temporary trestle bridge 10 is installed the operating platform as arch rib lifting bracket 30, while being also to facilitate dealing construction personnel and vehicle logical Row.20 support of arch rib mounting bracket has the end bay section arch rib 40 that live assembly in situ is formed by welding, 30 support of arch rib lifting bracket There are the middle span arch rib 50 that live low level assembly is formed by welding, middle span arch rib 50 to form one by multiple stage arch rib in-site installations Body, arch rib mounting bracket 20 are that middle span arch rib 50 provides support.
It is arranged in 10 both sides of temporary trestle bridge and promotes pylon 60, by pressing 61 phase of tower cable between 60 top of both sides promotion pylon Even, both sides promote 60 top of pylon and the fixed cable 62 hinged with earth anchor are also respectively connected, and both sides promote 60 top of pylon also It is connected with the promotion cable 63 being connected with the middle span arch rib 50 of lower section, after installation is complete for the middle span arch rib 50 of lower section, The whole of span arch rib 50 during cable 63 carries out that promoted by promoting pylon 60 is promoted, after being promoted to precalculated position, end bay section Arch rib 40 carries out closure construction operation with middle span arch rib 50.
Preferably, being connected by tensioning cable 51 between 50 liang of side bottoms of middle span arch rib, tensioning cable 51 is in Span arch rib 50 promotes situation and gradually applies inside horizontal pull to reduce change of arch costal shape.
The utility model has the following advantages relative to traditional arch rib mounting means:Middle span arch rib 50 is pacified using low level Dress, then whole promoted carry out closing up job execution with end bay section arch rib 40, and the construction that can significantly reduce bridge arch rib is difficult Degree can shorten construction period moreover, middle span arch rib is whole promotion, but also middle span arch rib is closed with end bay section arch rib Hold together precision to be guaranteed.
In addition, span arch rib 50 in being installed by 30 low level of arch rib lifting bracket, it is easier to control arch rib installation line style, greatly Big raising construction and installation precision and welding quality, live arch rib Installation Elevation and plan-position deviation are satisfied by concrete filled steel tube concrete Construction inspection rules requirement, while eliminating large-tonnage loop wheel machine and marching into the arena and the expense of large-tonnage trestle.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned embodiment party Formula, the technical field those of ordinary skill within the scope of knowledge, can also be before not departing from present inventive concept Put that various changes can be made.

Claims (2)

1. a kind of Filled Steel Tubular Arch Bridge low level assembly lifting system, it is characterised in that:Facing including temporary trestle bridge, setting When trestle both sides arch rib mounting bracket, and the arch rib lifting bracket above temporary trestle bridge further includes being separately positioned on to face When trestle both sides promotion pylon, promoted described in both sides between tower top by pressing tower cable to be connected, tower promoted described in both sides The fixed cable hinged with earth anchor is also respectively connected in top of the trellis, and the arch rib lifting bracket support has live low level assembly to weld The middle span arch rib constituted, the arch rib mounting bracket support have the end bay section arch rib that live assembly in situ is formed by welding, both sides The promotion tower top is also associated with the promotion cable being connected with the middle span arch rib of lower section.
2. Filled Steel Tubular Arch Bridge low level assembly lifting system according to claim 1, it is characterised in that:In described It is connected by tensioning cable between two side bottom of span arch rib.
CN201721820329.8U 2017-12-21 2017-12-21 A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system Active CN207919363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721820329.8U CN207919363U (en) 2017-12-21 2017-12-21 A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721820329.8U CN207919363U (en) 2017-12-21 2017-12-21 A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system

Publications (1)

Publication Number Publication Date
CN207919363U true CN207919363U (en) 2018-09-28

Family

ID=63607488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721820329.8U Active CN207919363U (en) 2017-12-21 2017-12-21 A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system

Country Status (1)

Country Link
CN (1) CN207919363U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162205A (en) * 2018-10-25 2019-01-08 中交武汉港湾工程设计研究院有限公司 A kind of arch rib closure segment mounting structure and installation method
CN109914266A (en) * 2019-04-17 2019-06-21 中交路桥建设有限公司 A kind of Large Steel pipeline overhead lifting vertical shift and promote construction method of installation
CN110093846A (en) * 2019-05-28 2019-08-06 同济大学建筑设计研究院(集团)有限公司 Upright steel arch cable-stayed bridge and its manufacturing method
CN110777667A (en) * 2019-11-14 2020-02-11 中铁八局集团有限公司 Hoisting method for preventing deformation of steel pipe arch
CN111535203A (en) * 2020-05-13 2020-08-14 四川省公路规划勘察设计研究院有限公司 Arch bridge turning construction method under steep slope terrain condition
CN112195799A (en) * 2020-09-05 2021-01-08 中交第四公路工程局有限公司 Lifting closure construction method for arch rib of arch bridge
CN112281685A (en) * 2020-10-23 2021-01-29 广州文船重工有限公司 Lifting construction method of steel arch structure

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162205A (en) * 2018-10-25 2019-01-08 中交武汉港湾工程设计研究院有限公司 A kind of arch rib closure segment mounting structure and installation method
CN109162205B (en) * 2018-10-25 2023-12-12 中交武汉港湾工程设计研究院有限公司 Arch rib folding section mounting structure and mounting method
CN109914266A (en) * 2019-04-17 2019-06-21 中交路桥建设有限公司 A kind of Large Steel pipeline overhead lifting vertical shift and promote construction method of installation
CN109914266B (en) * 2019-04-17 2020-07-10 中交路桥建设有限公司 Construction method for longitudinally moving and lifting installation of large steel pipe arch
CN110093846A (en) * 2019-05-28 2019-08-06 同济大学建筑设计研究院(集团)有限公司 Upright steel arch cable-stayed bridge and its manufacturing method
CN110777667A (en) * 2019-11-14 2020-02-11 中铁八局集团有限公司 Hoisting method for preventing deformation of steel pipe arch
CN111535203A (en) * 2020-05-13 2020-08-14 四川省公路规划勘察设计研究院有限公司 Arch bridge turning construction method under steep slope terrain condition
CN111535203B (en) * 2020-05-13 2022-01-25 四川省公路规划勘察设计研究院有限公司 Arch bridge turning construction method under steep slope terrain condition
CN112195799A (en) * 2020-09-05 2021-01-08 中交第四公路工程局有限公司 Lifting closure construction method for arch rib of arch bridge
CN112281685A (en) * 2020-10-23 2021-01-29 广州文船重工有限公司 Lifting construction method of steel arch structure

Similar Documents

Publication Publication Date Title
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN104612058B (en) A kind of construction method of buckstay flexible arch bridge
CN109972517A (en) A kind of construction method of steel reinforced concrete bondbeam cable-stayed bridge main-beam
CN101864737B (en) Secondary vertical rotating construction method for arch rib of long-span steel arch bridge
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN108374347A (en) A kind of high-speed railway large span cable-carried arch bridge steel lagging jack buckling and hanging system construction method
CN105839537B (en) Construction method for hoisting stiffening girder of suspension bridge by adopting girdle-carrying traveling of deck erection gantry
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN108774948A (en) A kind of segment free cantilever erection pier cap beam and its assembling method
CN103643637B (en) Original position construction method for lifting whole after the first vertical transfer of Long-Span Concrete Filled Steel Tubular Arch Bridges
CN101446074B (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN108252220A (en) A kind of construction method of super-large span stiff skeleton
CN104727227A (en) Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge
CN110468734A (en) Steel lagging jack pushing tow system and steel lagging jack push construction method
CN104314013B (en) Two Cantilever Construction Methods of a kind of pole asymmetrical array beam
CN206189270U (en) Integral pulling and track set stay knot structure
CN205063056U (en) Anticorrosion structure of node is hung futilely to assembly type structure outer wall
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN206376178U (en) A kind of steel reinforced concrete beam rigid framed structure arch bridge
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN108385535B (en) Construction method for closure section of bridge rigid frame
CN106120573A (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN106968178B (en) Construction method for main beam of cable-stayed suspension bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant