CN108774948A - A kind of segment free cantilever erection pier cap beam and its assembling method - Google Patents

A kind of segment free cantilever erection pier cap beam and its assembling method Download PDF

Info

Publication number
CN108774948A
CN108774948A CN201810707303.5A CN201810707303A CN108774948A CN 108774948 A CN108774948 A CN 108774948A CN 201810707303 A CN201810707303 A CN 201810707303A CN 108774948 A CN108774948 A CN 108774948A
Authority
CN
China
Prior art keywords
segment
fulcrum
mosaic face
bent cap
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810707303.5A
Other languages
Chinese (zh)
Inventor
卢永成
查义强
李国平
黄巍峰
陈明
朱世峰
陈逸群
卫张震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Investment Construction Development Co Ltd Of Shanghai Highway
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Investment Construction Development Co Ltd Of Shanghai Highway, Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Investment Construction Development Co Ltd Of Shanghai Highway
Priority to CN201810707303.5A priority Critical patent/CN108774948A/en
Publication of CN108774948A publication Critical patent/CN108774948A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of boom segments assembly pier cap beams of suitable live fast and safe construction, it is characterized in that the bent cap is spliced along bent cap length by several preform lid girder segments, joint form between contiguous prefabricated bent cap segment is the vertical splicing seams of corbel type, the bent cap segment of seam both sides sets shear connector, the end coating epoxy adhesive of the preform lid girder segment is glued by epoxy adhesive between contiguous prefabricated segment.The bent cap of this erection method is conducive to promote the miniaturization and lightweight of precast assembly component, reduces the difficulty of transport, lifting, under the conditions of same transporting and hoisting, makes more wide bridge bent caps that precast assembly construction may be used, reduces operating expenses.

Description

A kind of segment free cantilever erection pier cap beam and its assembling method
Technical field
The present invention relates to the structure design technical field of construction of bridge, more particularly to a kind of prefabricated assembled pier cap beam Structure type, specially a kind of segment free cantilever erection pier cap beam and its assembling method.
Background technology
In recent years, prefabricated assembled bridge has been obtained wideling popularize and more and more applied in China.
Prefabricated assembled bridge is shortened the construction period with it, improves efficiency, reduces influence of the construction to present situation traffic, is adapted to modern The many advantages such as change, intensive manufacture development model are received extensive attention and are studied.The bridge prefabrication assembling technique master of early stage It to be directed to superstructure, with the development of urban economy, the raising of city integrated level, to environmental requirement higher, to applying More stringent requirements are proposed for work technical merit, therefore the precast assembly technology of bridge also experienced a hair by top to lower part Exhibition process.
In the pier cap beam structure of bridge lower part, traditional sets up support cast-in-place construction method, and construction safety degree is relatively low, mould The maintenance that pours of plate set up with concrete makes the Cast-in-place Bent Cap occupancy surface road time longer, to the shadow of present situation traffic above-ground Sound is larger, and the advantage of superstructure prefabrication and assembly construction cannot fully demonstrate in the construction of entire engineering, be particularly unsuitable for busy Urban Bridge Construction.
The prefabricated assembled bent cap gradually promoted and applied in recent years is constructed, significantly using prefabrication, field installation process Project progress is accelerated, field operation time is reduced.Without holder quick construction technology, the shadow to site traffic is considerably reduced It rings.The standardized mode of production improves economic benefit, ensure that the quality of production, accelerates construction speed, in addition, due to scene Operation, which substantially reduces, also substantially increases construction safety degree.
But when bridge is wide and bent cap choose arm it is larger when, the length of bent cap and dead weight also increase therewith.Excessive dead weight, no But the lifting construction of bent cap is impacted, also the safety to surface road and bridge in transit and durability cause unfavorable It influences.
So in current precast assembly bent cap design and construction, restricted by Lifting Capacity and traffic condition, for length It spends larger bent cap and often still uses traditional cast-in-place method.Also have in recent years and prefabricated is answered with the cast-in-place practice for being combined bent cap With but if can be that bent cap precast assembly provide a kind of reliable, efficient erection method in structure and technique, being beneficial to subtract Limited bracket is set up and cast in situs, further saves cost, convenient for construction.
Invention content
The object of the present invention is to provide a kind of segment free cantilever erection pier cap beams of suitable live fast and safe construction.It is this The Coping Construction of erection method is convenient, fast, safe, and the scene of avoiding is set up holder and concreting, reduced to scene The influence of traffic so that under existing Lifting Capacity and traffic condition, can realize compared with the wide bent cap of bridge without supporting frame prefabrication assembly Construction.
To achieve the goals above, the technical scheme is that:A kind of segment free cantilever erection pier cap beam, feature exist It is spliced by several preform lid girder segments along bent cap length in the bent cap, the seam shape between contiguous prefabricated bent cap segment Formula is the vertical splicing seams of corbel type, and the bent cap segment of seam both sides sets shear connector.
Further, the end coating epoxy adhesive of the preform lid girder segment passes through ring between contiguous prefabricated segment Oxygen binder is glued.
Further, corresponding reinforcing bar hole is equipped in several described preform lid girder segments, it is described after being spliced into bent cap Reinforcing bar hole connects into continuous deformed bar channel, and installs permanent prestress steel in the deformed bar channel Muscle.
Further, the bent cap is rectangle bent cap or Inverted T beam.
Further, the preform lid girder segment includes fulcrum segment and the boom segments positioned at fulcrum segment both sides, The lower part of central bearing point segment is stretched out, and fulcrum interconnecting piece is formed, and the top surface of the fulcrum interconnecting piece forms horizontal Mosaic face, which connects The lower end surface of socket part forms lower vertical Mosaic face, and fulcrum segment upper end then forms upper vertical Mosaic face;Cantilever section The top of section is stretched out, and forms cantilever connection, the bottom surface of the cantilever connection forms horizontal Mosaic face, the end of the cantilever connection Portion forms lower vertical Mosaic face, and the upper end of boom segments forms upper vertical Mosaic face;In fulcrum segment and cantilever It is also correspondingly provided with several shear connectors on the lower vertical Mosaic face and upper vertical Mosaic face of segment.
It is a further object of the present invention to provide a kind of segment free cantilever erection pier cap beams of suitable live fast and safe construction Assembling method.The Coping Construction of this erection method is convenient, fast, safe, and holder and concreting are set up in the scene of avoiding, Reduce the influence to site traffic so that under existing Lifting Capacity and traffic condition, can realize the nothing compared with the wide bent cap of bridge Supporting frame prefabrication assembling construction.
To achieve the goals above, the technical scheme is that:A kind of segment free cantilever erection pier cap beam assembling method, It is characterized in that the assembling method includes the following steps:
A, preform lid girder segment, bent cap segment is equipped with horizontal Mosaic face and vertical Mosaic face, and is set on vertical Mosaic face It includes fulcrum segment and the boom segments positioned at fulcrum segment both sides to have shear connector, the bent cap segment;
B, the fulcrum segment of installation and column connection;
C, the Mosaic face at fulcrum segment both ends is cleared up, and in splicing brushing epoxy adhesive;
D, the both sides cantilever end segment lifting after-applied interim prestressing force of level in place;
E, cure after-applied permanent prestressing force and remove interim prestressing force for be bonded dose.
Further, in step A, preform lid girder segment is included the following steps using the method for matching prefabricated construction:
Fulcrum segment prefabricated first, fulcrum segment lower part are stretched out, and fulcrum interconnecting piece, the top surface shape of the fulcrum interconnecting piece are formed At horizontal Mosaic face, the end face of the fulcrum interconnecting piece forms lower vertical Mosaic face, and fulcrum segment upper end is then formed The vertical Mosaic face in portion is additionally provided with several shear connectors on lower vertical Mosaic face and upper vertical Mosaic face;
After the completion of fulcrum precast segment, brushed on its horizontal Mosaic face, lower vertical Mosaic face and upper vertical Mosaic face Interleaving agent;
Using the end of the fulcrum segment as template, prefabricated boom segments so that boom segments and fulcrum segment form strict Cooperation;
Boom segments and fulcrum segment are detached, and wash away its end face, the interleaving agent of end face is washed away totally.
The method have the characteristics that:
1, prefabricated bent cap is segmented prefabricated, the weight of prefabricated bent cap is significantly reduced, the difficulty of transport, lifting is reduced, subtracts The light influence to ground road and bridge in transit.Under the conditions of same transporting and hoisting, more wide bridge bent caps is allow to adopt It is constructed with precast assembly, reduces operating expenses.
2, free cantilever erection is constructed, and Mosaic face is glued using epoxy adhesive, and splicing applies interim prestressing force, scene Construction time is short, and site workload is small, without setting up holder, template, reduces the influence to site traffic, also improves Construction safety degree.
3, the vertical piece of corbel type is effectively reduced without the difficulty of construction for supporting vertical piece and wind construction danger, construction letter Single quick, quality is easy to ensure.
Description of the drawings
Fig. 1 is the schematic diagram in free cantilever erection pier cap beam in segment of the present invention assembled stage.
Fig. 2 is free cantilever erection pier cap beam in segment of the present invention into bridge stage cross-sectional view.
Specific implementation mode
The present invention will be described in detail for Figure of description and specific embodiment below according to the present invention.
Figure includes:Fulcrum segment 1, boom segments 2, interim deformed bar 3, permanent deformed bar 4.
As shown, a kind of segment free cantilever erection pier cap beam, it is characterised in that the bent cap is along bent cap length by several A preform lid girder segment is spliced, and the joint form between contiguous prefabricated bent cap segment is the vertical splicing seams of corbel type, described The vertical splicing seams of corbel type include vertical splicing seams and horizontal splicing seams, and the bent cap segment of seam both sides sets shear connector, institute The end coating epoxy adhesive of preform lid girder segment is stated, is glued by epoxy adhesive between contiguous prefabricated segment.
As shown, the preform lid girder segment includes fulcrum segment 1 and the boom segments 2 positioned at fulcrum segment both sides. The lower part of its central bearing point segment is stretched out, and fulcrum interconnecting piece is formed, and the top surface of the fulcrum interconnecting piece forms horizontal Mosaic face, the fulcrum The end face of interconnecting piece forms lower vertical Mosaic face, and fulcrum segment upper end then forms upper vertical Mosaic face, in lower part Several shear connectors are additionally provided on vertical Mosaic face and upper vertical Mosaic face, in the horizontal Mosaic face, lower vertical Mosaic face With upper vertical Mosaic face brushing epoxy adhesive.
The top of boom segments is stretched out, and cantilever connection is formed, and the bottom surface of the cantilever connection forms horizontal Mosaic face, should The end of cantilever connection forms lower vertical Mosaic face, and the upper end of boom segments forms upper vertical Mosaic face.
In order to ensure that its coordinates precision, using the method for matching prefabricated construction when processing, i.e., in fulcrum segment prefabricated first, Fulcrum segment lower part is stretched out, and fulcrum interconnecting piece is formed, and the top surface of the fulcrum interconnecting piece forms horizontal Mosaic face, which connects The end face of socket part forms lower vertical Mosaic face, and fulcrum segment upper end then forms upper vertical Mosaic face, hangs down in lower part It is additionally provided with several shear connectors on straight Mosaic face and upper vertical Mosaic face.After the completion of fulcrum precast segment, its horizontal Mosaic face, Equal brushing interleaving agent on lower vertical Mosaic face and upper vertical Mosaic face, is hanged using the end of the fulcrum segment as template Arm joint section it is prefabricated so that boom segments and fulcrum segment form the cooperation to fit together perfectly.After the completion of boom segments are prefabricated, it will hang Arm joint section and the separation of fulcrum segment, and its end face is washed away, the interleaving agent of end face is washed away totally, is applied when being connected so as to both later stages Brush epoxy adhesive.
Further, corresponding reinforcing bar hole is equipped in several described preform lid girder segments, it is described after being spliced into bent cap Reinforcing bar hole connects into continuous deformed bar channel, and the prestressed reinforcing bar in the deformed bar channel.
Currently used bent cap form has two kinds of rectangle bent cap and Inverted T beam, the light prefabricated assembled of this invention Pier cap beam is adapted to both bent cap forms.
The present invention is along bent cap length precast segment, free cantilever erection.Control each segment focuses on transport and crane capacity certainly Within the scope of, prefabricated construction is matched, it is the vertical splicing seams of corbel type, seam two that Mosaic face, which uses epoxy glue seam, joint form, The segment of side sets shear connector.
When construction, the fulcrum segment being connect with column is installed first, brushing epoxy adhesive after face cleaning to be spliced works as a left side The right boom segments lifting after-applied interim prestressing force of level in place need to be on fulcrum segment and a left side to apply horizontal interim prestressing force The corresponding position of right boom segments installs interim anchor block, and the interim deformed bar 3 of tensioning between corresponding anchor block additional, applies water Flat interim prestressed effect keeps the balance external of boom segments except through external force, and the more of Mosaic face are located at also for that will apply Remaining epoxy adhesive squeezes out.The to be bonded dose of permanent deformed bar of solidification post-stretching 4 is removed interim with applying permanent prestressing force Deformed bar 3 and interim anchor block.
The bent cap of this erection method be conducive to promote precast assembly component miniaturization and lightweight, reduce transport, The difficulty of lifting makes more wide bridge bent caps that precast assembly construction may be used, reduces construction under the conditions of same transporting and hoisting Expense.Free cantilever erection construction eliminates support system, reduces site workload, accelerates construction speed, to traffic above-ground shadow Sound is small, improves construction safety degree.The vertical piece of corbel type is effectively reduced and is applied without the difficulty of construction and wind for supporting vertical piece Work danger, construction is simple is quick, splices precision and reliability is high, quality is easy to ensure.Suitable for currently used bent cap section shape Formula.

Claims (7)

1. a kind of segment free cantilever erection pier cap beam, it is characterised in that the bent cap is along bent cap length by several prefabricated bent cap sections Section is spliced, and the joint form between contiguous prefabricated bent cap segment is the vertical splicing seams of corbel type, the bent cap section of seam both sides Section end face sets shear connector.
2. a kind of segment free cantilever erection pier cap beam as described in claim 1, which is characterized in that the preform lid girder segment End coating epoxy adhesive is glued by epoxy adhesive between contiguous prefabricated segment.
3. a kind of segment free cantilever erection pier cap beam as described in claim 1, which is characterized in that several described prefabricated bent caps Corresponding reinforcing bar hole is equipped in segment, after being spliced into bent cap, the reinforcing bar hole connects into continuous deformed bar channel, And the prestressed reinforcing bar in the deformed bar channel.
4. a kind of segment free cantilever erection pier cap beam as described in claim 1, which is characterized in that the bent cap is rectangle bent cap Or Inverted T beam.
5. a kind of segment free cantilever erection pier cap beam as described in claim 1, which is characterized in that the preform lid girder segment packet Fulcrum segment and the boom segments positioned at fulcrum segment both sides are included, the lower part of central bearing point segment is stretched out, and fulcrum interconnecting piece is formed, The top surface of the fulcrum interconnecting piece forms horizontal Mosaic face, and the lower end surface of the fulcrum interconnecting piece forms lower vertical Mosaic face, branch Point segment upper end then forms upper vertical Mosaic face;The top of boom segments is stretched out, and cantilever connection is formed, which connects The bottom surface of socket part forms horizontal Mosaic face, and the end of the cantilever connection forms lower vertical Mosaic face, and boom segments is upper Portion end forms upper vertical Mosaic face;Lower vertical Mosaic face and upper vertical Mosaic face in fulcrum segment and boom segments On be also correspondingly provided with several shear connectors.
6. a kind of segment free cantilever erection pier cap beam assembling method, it is characterised in that the assembling method includes the following steps:
A, preform lid girder segment, bent cap segment is equipped with horizontal Mosaic face and vertical Mosaic face, and is set on vertical Mosaic face It includes fulcrum segment and the boom segments positioned at fulcrum segment both sides to have shear connector, the bent cap segment;
B, the fulcrum segment of installation and column connection;
C, the Mosaic face at fulcrum segment both ends is cleared up, and in splicing brushing epoxy adhesive;
D, the both sides cantilever end segment lifting after-applied interim prestressing force of level in place;
E, cure after-applied permanent prestressing force and remove interim prestressing force for be bonded dose.
7. a kind of segment free cantilever erection pier cap beam assembling method as described in claim 1, which is characterized in that in step A, Preform lid girder segment is included the following steps using the method for matching prefabricated construction:
Fulcrum segment prefabricated first, fulcrum segment lower part are stretched out, and fulcrum interconnecting piece, the top surface shape of the fulcrum interconnecting piece are formed At horizontal Mosaic face, the end face of the fulcrum interconnecting piece forms lower vertical Mosaic face, and fulcrum segment upper end is then formed The vertical Mosaic face in portion is additionally provided with several shear connectors on lower vertical Mosaic face and upper vertical Mosaic face;
After the completion of fulcrum precast segment, brushed on its horizontal Mosaic face, lower vertical Mosaic face and upper vertical Mosaic face Interleaving agent;
Using the end of the fulcrum segment as template, prefabricated boom segments so that boom segments and fulcrum segment form strict Cooperation;
Boom segments and fulcrum segment are detached, and wash away its end face, the interleaving agent of end face is washed away totally.
CN201810707303.5A 2018-07-02 2018-07-02 A kind of segment free cantilever erection pier cap beam and its assembling method Pending CN108774948A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810707303.5A CN108774948A (en) 2018-07-02 2018-07-02 A kind of segment free cantilever erection pier cap beam and its assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810707303.5A CN108774948A (en) 2018-07-02 2018-07-02 A kind of segment free cantilever erection pier cap beam and its assembling method

Publications (1)

Publication Number Publication Date
CN108774948A true CN108774948A (en) 2018-11-09

Family

ID=64030856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810707303.5A Pending CN108774948A (en) 2018-07-02 2018-07-02 A kind of segment free cantilever erection pier cap beam and its assembling method

Country Status (1)

Country Link
CN (1) CN108774948A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853362A (en) * 2019-03-29 2019-06-07 上海应用技术大学 A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN110258303A (en) * 2019-06-04 2019-09-20 中铁第四勘察设计院集团有限公司 The design method of Straddle type monorail bridge and its T pier with big line spacing T pier
CN110409304A (en) * 2019-07-12 2019-11-05 上海城建市政工程(集团)有限公司 A kind of precast segment bent cap free cantilever erection construction method
CN110565506A (en) * 2019-09-23 2019-12-13 上海市城市建设设计研究总院(集团)有限公司 Segmental prefabricated assembled bent cap and construction method thereof
CN111608084A (en) * 2020-05-29 2020-09-01 中国铁建大桥工程局集团有限公司 Integral prefabrication and assembly construction method for reinforced concrete arch bridge arch ring segments
CN111648247A (en) * 2020-05-29 2020-09-11 中铁建大桥工程局集团第二工程有限公司 Multi-stage assembled capping beam and construction process thereof
CN112431138A (en) * 2020-11-17 2021-03-02 上海市基础工程集团有限公司 Accurate positioning and rapid assembling method for dry-joint cantilever bent cap
CN112695648A (en) * 2020-12-07 2021-04-23 上海建工集团股份有限公司 Bent cap suspension splicing construction system and construction method thereof
CN113638304A (en) * 2021-07-13 2021-11-12 宁波市政工程建设集团股份有限公司 Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN114457702A (en) * 2022-02-21 2022-05-10 中建七局交通建设有限公司 Large cantilever sectional type prefabricated bent cap support-free suspension splicing construction method
CN114673077A (en) * 2022-03-21 2022-06-28 中铁第四勘察设计院集团有限公司 Ultra-high performance concrete gate-type pier structure and construction method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853362A (en) * 2019-03-29 2019-06-07 上海应用技术大学 A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN109853362B (en) * 2019-03-29 2021-02-26 上海应用技术大学 Temporary prestressed anchoring segmented prefabricated capping beam and temporary prestress applying method
CN110258303A (en) * 2019-06-04 2019-09-20 中铁第四勘察设计院集团有限公司 The design method of Straddle type monorail bridge and its T pier with big line spacing T pier
CN110409304B (en) * 2019-07-12 2021-04-02 上海城建市政工程(集团)有限公司 Cantilever assembling construction method for segment prefabricated bent cap
CN110409304A (en) * 2019-07-12 2019-11-05 上海城建市政工程(集团)有限公司 A kind of precast segment bent cap free cantilever erection construction method
CN110565506A (en) * 2019-09-23 2019-12-13 上海市城市建设设计研究总院(集团)有限公司 Segmental prefabricated assembled bent cap and construction method thereof
CN110565506B (en) * 2019-09-23 2024-04-09 上海市城市建设设计研究总院(集团)有限公司 Segmental prefabricated assembled bent cap and construction method thereof
CN111608084A (en) * 2020-05-29 2020-09-01 中国铁建大桥工程局集团有限公司 Integral prefabrication and assembly construction method for reinforced concrete arch bridge arch ring segments
CN111608084B (en) * 2020-05-29 2022-03-29 中国铁建大桥工程局集团有限公司 Integral prefabrication and assembly construction method for reinforced concrete arch bridge arch ring segments
CN111648247A (en) * 2020-05-29 2020-09-11 中铁建大桥工程局集团第二工程有限公司 Multi-stage assembled capping beam and construction process thereof
CN112431138A (en) * 2020-11-17 2021-03-02 上海市基础工程集团有限公司 Accurate positioning and rapid assembling method for dry-joint cantilever bent cap
CN112695648A (en) * 2020-12-07 2021-04-23 上海建工集团股份有限公司 Bent cap suspension splicing construction system and construction method thereof
CN113638304A (en) * 2021-07-13 2021-11-12 宁波市政工程建设集团股份有限公司 Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN113638304B (en) * 2021-07-13 2022-10-25 宁波市政工程建设集团股份有限公司 Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN114457702A (en) * 2022-02-21 2022-05-10 中建七局交通建设有限公司 Large cantilever sectional type prefabricated bent cap support-free suspension splicing construction method
CN114673077A (en) * 2022-03-21 2022-06-28 中铁第四勘察设计院集团有限公司 Ultra-high performance concrete gate-type pier structure and construction method

Similar Documents

Publication Publication Date Title
CN108774948A (en) A kind of segment free cantilever erection pier cap beam and its assembling method
CN109183629B (en) Large cantilever bent cap prefabrication and assembly method
CN103938546B (en) Simply supported non-uniform construction method
CN103938533B (en) The construction method of Simply supported non-uniform structure
CN109457599B (en) Splicing structure of hollow pier and bearing platform and construction method
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN109826090A (en) Assembled fragment bent cap and attaching method thereof
CN105603860A (en) Prefabricated T beam and construction method
JP2008274637A (en) Construction method for continuous viaduct
CN110387826B (en) Segment prefabricated and assembled pier steel member and construction method and application thereof
CN112281633A (en) Back-loading cantilever arm of spine beam bridge and longitudinal joint structure thereof
CN109184189A (en) A kind of diameter Silo conical shell silo roof construction method
CN103194983A (en) Segmental precast assembly method and segmental precast assembly structure for cantilever arm of large capping beam
CN208563093U (en) A kind of segment free cantilever erection pier cap beam
CN102154988A (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN210975503U (en) Large-span prefabricated assembled bent cap and pier stand connection structure
CN211004291U (en) Internal climbing tower crane
CN110093862B (en) Three-working-face bridge girder erection machine capable of realizing longitudinal and transverse assembly and bent cap non-channel segment assembly construction method
CN109591183A (en) A kind of construction technology and precast beam unit of cantilevered shape of a hoof bent cap
CN207749417U (en) A kind of concrete king-post internal model stiff skeleton
CN111749133A (en) Beam-arch combined rigid frame bridge and construction method of bridge pier thereof
CN110761165A (en) Steel web box girder installation system and construction method thereof
CN212316706U (en) Bridge erecting machine
CN213682477U (en) Upper cover structure system applied to track operation line
CN104746434A (en) Closure segment formwork system without dismantling outer formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination