CN207032062U - Tower with suspended cable available for Large-span Steel Box Beam construction - Google Patents

Tower with suspended cable available for Large-span Steel Box Beam construction Download PDF

Info

Publication number
CN207032062U
CN207032062U CN201720985262.7U CN201720985262U CN207032062U CN 207032062 U CN207032062 U CN 207032062U CN 201720985262 U CN201720985262 U CN 201720985262U CN 207032062 U CN207032062 U CN 207032062U
Authority
CN
China
Prior art keywords
steel box
girder
case
tower
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720985262.7U
Other languages
Chinese (zh)
Inventor
李兴全
支有
朱江川
朱东明
熊秋林
张延辉
蒋新闻
杨灿辉
张丕云
李爱民
高继武
冉明军
梁辉
范桂玲
乐常慈
付杰
朱富
邓俊
浦仕龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jiaotong Highway Construction Sixth Engineering Co., Ltd.
China Railway Jiujiang Bridge Engineering Co Ltd
Original Assignee
Yunnan Referendum Construction Group Sixth Engineering Co Ltd
China Railway Jiujiang Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Referendum Construction Group Sixth Engineering Co Ltd, China Railway Jiujiang Bridge Engineering Co Ltd filed Critical Yunnan Referendum Construction Group Sixth Engineering Co Ltd
Priority to CN201720985262.7U priority Critical patent/CN207032062U/en
Application granted granted Critical
Publication of CN207032062U publication Critical patent/CN207032062U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tower with suspended cable available for Large-span Steel Box Beam construction, belongs to a kind of Large-span Steel Box Beam construction, including pylon column, and the lower end of pylon column is fixed with free bearing, and upper free bearing is arranged on lower free bearing, and lower free bearing is fixed on steel box-girder;The both sides of the pylon column are mounted on anchor case and the case that casts anchor, and the inside of the upper anchor case and the case that casts anchor is respectively and fixedly provided with hoist cable, and the hoist cable is used between pylon column and steel box-girder to be connected.Pass through the erection tower column on steel box-girder, it is attached by the upper anchor case on pylon column with the case that casts anchor by the extended position of hoist cable and steel box-girder, and then play it is fixed in the presence of, avoid being turned under caused by steel box-girder is hanging because of front end during the reach discounting as, steel box-girder is set to remain horizontal when being moved forward from a branch pier base to another branch pier base, even if distance is excessive without therefore Temporary Piers are set between branch pier base, be advantageous to be lifted the convenience of Large-span Steel Box Beam construction.

Description

Tower with suspended cable available for Large-span Steel Box Beam construction
Technical field
A kind of Large-span Steel Box Beam construction is the utility model is related to, in particular, the utility model relates generally to one kind Tower with suspended cable available for Large-span Steel Box Beam construction.
Background technology
Steel box girder incremental launching method construction is so that its construction cost is low, speed of application is fast, construction stationarity is good, construction period controllability By force, in constructing need not in obtain more and more extensive application many advantages, such as traffic under bridge cut-off, be particularly suitable for use in across busy The bridge of traffic route, shipping river.But with the development of Bridges in Our Country cause, due to being influenceed and design form by landform Variation, part steel box girder bridge beam span is larger, across road or river because traffic or geology, hydrologic condition reason can not be set Put Temporary Piers.Bridge linear of this kind of steel box-girder in work progress controls, the reaction of supports controls, steel box-girder itself Stress Control Very high requirement is proposed etc. many aspects.Thus it is necessary for the push construction method of Large-span Steel Box Beam and with being arranged The structure applied further is studied and improved.
Utility model content
One of the purpose of this utility model is to be directed to above-mentioned deficiency, there is provided a kind of to can be used for what Large-span Steel Box Beam was constructed Tower with suspended cable, it is expected that to solve that in Large-span Steel Box Beam work progress Temporary Piers can not be set, cause bridge linear and steel box-girder The technical problems such as itself stress is uncontrollable.
To solve above-mentioned technical problem, the utility model uses following technical scheme:
A kind of tower with suspended cable available for Large-span Steel Box Beam construction provided by the utility model, including pylon column, The lower end of pylon column is fixed with free bearing, and upper free bearing is arranged on lower free bearing, and lower free bearing is fixed on steel box-girder;The pylon The both sides of column are mounted on anchor case and the case that casts anchor, and the inside of the upper anchor case and the case that casts anchor is respectively and fixedly provided with hoist cable, described to hang Rope is used between pylon column and steel box-girder to be connected.
Preferably, further technical scheme is:Bearing beam, the pad are further fixed between the lower free bearing and steel box-girder Beam is welded as a whole with lower free bearing, steel box-girder.
Further technical scheme is:The upper anchor case and the case that casts anchor are multiple, and each upper anchor case and case that casts anchor In be respectively and fixedly provided with hoist cable.
Further technical scheme is:The bottom of the pylon column is also equipped with extending beam, and the extending beam passes through Bearing is arranged on walking beam;The near middle of the extending beam and pylon column is also equipped with overturning-preventing hawser.
Further technical scheme is:The walking beam is perpendicular with steel box-girder in the horizontal plane.
Further technical scheme is:Be also equipped with top removal device on the steel box-girder, the top removal device with it is described The bottom of extending beam is corresponding, and the bottom of the extending beam is additionally provided with the footstock corresponding with the top removal device.
Further technical scheme is:The upper anchor case is connected with the case that casts anchor by respective hoist cable with steel box-girder Connect.
Further technical scheme is:The pylon column is the purlin with more transverse directions, longitudinal direction and skewed horizontal load bar Frame structure.
Compared with prior art, one of the beneficial effects of the utility model are:By the erection tower column on steel box-girder, It is attached, and then is played fixed by the extended position of hoist cable and steel box-girder with the case that casts anchor by the upper anchor case on pylon column Under effect, avoid being turned under discounting as making steel box-girder from one caused by steel box-girder is hanging because of front end during the reach Branch pier base remains horizontal when being moved forward to another branch pier base, even if distance is excessive without therefore setting between branch pier base Temporary Piers, be advantageous to be lifted the convenience of Large-span Steel Box Beam construction, at the same it is provided by the utility model a kind of available for big The tower with suspended cable of span steel box girder construction is simple in construction, and stability is good, suitable in the Large-span Steel Box Beam construction field of all kinds of specifications Used in institute, application is wide.
Brief description of the drawings
Fig. 1 is the structural representation for illustrating the utility model one embodiment;
Fig. 2 is Fig. 1 lateral structure schematic diagram;
In figure, 1 it is pylon column, 2 is upper free bearing, 3 is lower free bearing, 4 is steel box-girder, 5 is upper anchor case, 6 to cast anchor case, 7 It is bearing beam for hoist cable, 8,9 be extending beam, 10 be walking beam, 11 be overturning-preventing hawser, 12 be top removal device, 13 has been footstock.
Embodiment
The utility model is further elaborated below in conjunction with the accompanying drawings.
With reference to shown in figure 1, the proud one embodiment of the utility model is a kind of hanging available for Large-span Steel Box Beam construction Sarasota frame, including pylon column 1, the lower end of the pylon column 1 is fixed with free bearing 2, and upper free bearing 2 need to be arranged on lower free bearing 3 On, lower free bearing 3 is fixed on steel box-girder 4, that is, is placed in the top of steel box-girder 4;What is more important, in the both sides of pylon column 1 It is both needed to install anchor case 5 and two upper anchor casees 5, the both sides of near middle is installed in the case 6 that casts anchor, the i.e. both sides on the top of pylon column 1 Two casees 6 that cast anchor are installed, need to also be in the fixed hoist cable 7 in the inside of upper anchor case 5 and the case 6 that casts anchor, the effect of the hoist cable 7 is by pylon It is connected between column 1 and steel box-girder 4, for being entered by pylon column 1 by hoist cable 7 to the steel box-girder 4 of the both sides of pylon column 1 Row drawing is hung.
In the present embodiment, by the erection tower column 1 on steel box-girder 4, by the upper anchor case 5 on pylon column 1 with Anchor case 6 is attached by the extended position of hoist cable 7 and steel box-girder 4, so play it is fixed in the presence of, avoid steel box-girder 4 from existing It is turned under discounting as making steel box-girder 4 from a branch pier base to another buttress caused by front end is hanging during reach Remain horizontal during seat reach, even if distance is excessive without therefore Temporary Piers are set between branch pier base, be advantageous to be lifted The convenience of Large-span Steel Box Beam construction.
Referring again to shown in Fig. 1, in another embodiment of the present utility model, to make pylon column 1 be arranged on steel box-girder 4 The upper uniformity with stress, can also fix a bearing beam 8 between above-mentioned lower free bearing 3 and steel box-girder 4, also can by bearing beam 8 with Lower free bearing 3, steel box-girder 4 are welded as a whole;So as to further lift the stability that pylon column 1 is arranged on steel box-girder 4.Simultaneously Drawn for raising sling 7 and hang the stability of steel box-girder, can realized by way of increasing the quantity of hoist cable 7, this mode is also more It is easy;With reference to shown in Fig. 2, the upper anchor case 5 on pylon column 1 is specially disposed as multiple, Ran Hou with the case 6 that casts anchor first Each upper anchor case 5 is with being respectively and fixedly provided with hoist cable 7 in the case 6 that casts anchor, and the steel with the both sides diverse location of pylon column 1 respectively of hoist cable 7 Box beam 4 is attached, and then the stability that further lifting steel box-girder 4 moves forward on the whole.
Referring still to shown in Fig. 1, in utility model is used to solve the more preferred one embodiment of technical problem, in order to Prevent pylon column 1 from toppling over after being arranged on steel box-girder, can be on the basis of said structure, in the bottom of pylon column 1 One extending beam 9 is installed, gone out as shown, extending beam 9 is starting point with pylon column 1, is extended to its both sides;And this prolongs Beam 9 also needs to be arranged on walking beam 10 by bearing;So as to each at the both ends of extending beam 9 and the near middle of pylon column 1 One or one group of installation overturning-preventing hawser 11 are installed;And for the convenience of the installation of lifting pylon column 1, above-mentioned walking beam 10 is pacified The angle of dress is to make it perpendicular with steel box-girder 4 in the horizontal plane;, can be in pylon column by the walking beam 10 of foregoing angle During 1 installation, by it from the side of steel box-girder 4, the position at lower free bearing 3 is pushed into along walking beam 10, by the upper of the bottom of pylon column 1 Free bearing 2 is arranged on lower free bearing 3 by bearing pin, and then simplifies the mounting means of pylon column 1.
Further, for ease of adjusting its upper-lower position when pylon column 1 is installed, it is easy to enter upper free bearing 2 and lower free bearing 3 It row alignment, because the weight of pylon column 1 itself is larger, therefore need to typically use outside crane gear to be aided in, and send out A person of good sense considers the limitation of Large-span Steel Box Beam construction site, the top removal device 12 directly installed on steel box-girder 4, top lifting dress Putting 12 can be directly using conventional jack, according to the jack of the weight of pylon column 1 selection dimension.Foregoing top lifting The installation site of device 12 need to be corresponding with the bottom of extending beam 9, and also needs to set and top removal device 12 in the bottom of extending beam 9 Corresponding plays footstock 13, as shown, is preferably respectively mounted a top lifting on the steel box-girder 4 of the lower both sides of free bearing 3 Device 12.
As mentioned here above, as shown in Fig. 2 tower with suspended cable upper anchor case 5 need to be with the case 6 that casts anchor by each in use From hoist cable 7 be connected with steel box-girder 4;And pylon column 1 can use truss structure, i.e., at it more with vertical for ease of removing There is more transverse directions, longitudinal direction and skewed horizontal load bar between post, while being easy to be lifted pylon 1 intensity of column, reduce its own Weight.
Than that described above, it is also necessary to which explanation is " one embodiment ", " another implementation spoken of in this manual Example ", " embodiment " etc., refer to that the specific features, structure or the feature that combine embodiment description are included in the application summary Property description at least one embodiment in.It is not necessarily to refer to same reality that statement of the same race, which occur, in multiple places in the description Apply example.Furthermore, it is understood that when describing a specific features, structure or feature with reference to any embodiment, what is advocated is knot Other embodiment is closed to realize that this feature, structure or feature also fall in the scope of the utility model.
Although reference be made herein to the utility model is described multiple explanatory embodiments of the present utility model, still, It should be understood that those skilled in the art can be designed that a lot of other modifications and embodiment, these modifications and embodiment It will fall within spirit disclosed in the present application and spirit.More specifically, in disclosure, drawings and claims In the range of, a variety of variations and modifications can be carried out to the building block and/or layout of theme combination layout.Except to building block And/or outside the variations and modifications of layout progress, to those skilled in the art, other purposes also will be apparent.

Claims (8)

1. a kind of tower with suspended cable available for Large-span Steel Box Beam construction, including pylon column (1), it is characterised in that:The tower The lower end for erecting post (1) is fixed with free bearing (2), and the upper free bearing (2) is arranged on lower free bearing (3), and the lower free bearing (3) is solid It is scheduled on steel box-girder (4);The both sides of the pylon column (1) are mounted on anchor case (5) and the case (6) that casts anchor, the upper anchor case (5) inside with the case (6) that casts anchor is respectively and fixedly provided with hoist cable (7), the hoist cable (7) be used for by pylon column (1) and steel box-girder (4) it Between be connected.
2. the tower with suspended cable according to claim 1 available for Large-span Steel Box Beam construction, it is characterised in that:The lower hinge Bearing beam (8) is further fixed between seat (3) and steel box-girder (4), the bearing beam (8) is welded as one with lower free bearing (3), steel box-girder (4) Body.
3. the tower with suspended cable according to claim 1 or 2 available for Large-span Steel Box Beam construction, it is characterised in that:It is described Upper anchor case (5) and the case that casts anchor (6) are multiple, and are each respectively and fixedly provided with hoist cable (7) in upper anchor case (5) and the case (6) that casts anchor.
4. the tower with suspended cable according to claim 1 or 2 available for Large-span Steel Box Beam construction, it is characterised in that:It is described The bottom of pylon column (1) is also equipped with extending beam (9), and the extending beam (9) is arranged on walking beam (10) by bearing;Institute The near middle for stating extending beam (9) and pylon column (1) is also equipped with overturning-preventing hawser (11).
5. the tower with suspended cable according to claim 4 available for Large-span Steel Box Beam construction, it is characterised in that:The walking Beam (10) is perpendicular with steel box-girder (4) in the horizontal plane.
6. the tower with suspended cable according to claim 4 available for Large-span Steel Box Beam construction, it is characterised in that:The steel case Top removal device (12) is also equipped with beam (4), the top removal device (12) is corresponding with the bottom of the extending beam (9), described The bottom of extending beam (9) is additionally provided with the footstock (13) corresponding with the top removal device (12).
7. the tower with suspended cable according to claim 1 available for Large-span Steel Box Beam construction, it is characterised in that:The upper anchor Case (5) is connected with the case that casts anchor (6) by respective hoist cable (7) with steel box-girder (4).
8. the tower with suspended cable according to claim 1 available for Large-span Steel Box Beam construction, it is characterised in that:The pylon Column (1) is the truss structure with more transverse directions, longitudinal direction and skewed horizontal load bar.
CN201720985262.7U 2017-08-08 2017-08-08 Tower with suspended cable available for Large-span Steel Box Beam construction Active CN207032062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720985262.7U CN207032062U (en) 2017-08-08 2017-08-08 Tower with suspended cable available for Large-span Steel Box Beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720985262.7U CN207032062U (en) 2017-08-08 2017-08-08 Tower with suspended cable available for Large-span Steel Box Beam construction

Publications (1)

Publication Number Publication Date
CN207032062U true CN207032062U (en) 2018-02-23

Family

ID=61474806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720985262.7U Active CN207032062U (en) 2017-08-08 2017-08-08 Tower with suspended cable available for Large-span Steel Box Beam construction

Country Status (1)

Country Link
CN (1) CN207032062U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904860A (en) * 2019-11-07 2020-03-24 中铁大桥局集团第一工程有限公司 Large-span flexible steel beam pushing construction method based on stay cable assistance
CN113322813A (en) * 2021-04-30 2021-08-31 中铁上海工程局集团第五工程有限公司 Method for solving synchronous pushing of large-span steel concrete composite beam by using cable-stayed tower
CN114808755A (en) * 2022-05-30 2022-07-29 中铁大桥局第七工程有限公司 Continuous steel box girder swivel structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904860A (en) * 2019-11-07 2020-03-24 中铁大桥局集团第一工程有限公司 Large-span flexible steel beam pushing construction method based on stay cable assistance
CN110904860B (en) * 2019-11-07 2022-02-01 中铁大桥局集团第一工程有限公司 Large-span flexible steel beam pushing construction method based on stay cable assistance
CN113322813A (en) * 2021-04-30 2021-08-31 中铁上海工程局集团第五工程有限公司 Method for solving synchronous pushing of large-span steel concrete composite beam by using cable-stayed tower
CN114808755A (en) * 2022-05-30 2022-07-29 中铁大桥局第七工程有限公司 Continuous steel box girder swivel structure and construction method

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN202766975U (en) Novel deck erection crane
CN108374347A (en) A kind of high-speed railway large span cable-carried arch bridge steel lagging jack buckling and hanging system construction method
CN103938552B (en) Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN101117792A (en) Erection method of large-span continuous steel truss arch
CN106958206A (en) Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN106087752A (en) Multispan cable-carried arch bridge construction method
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107190627A (en) Part earth anchored suspension bridge and its construction method
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN109183620A (en) Telescoping bracket, steel box-girder hanging device and hanging method
CN208088097U (en) A kind of three-tower suspension bridge erection of main beam constructing structure
CN111764282B (en) Rigid suspension cable stiffening steel truss bridge construction method based on inclined pull buckling hanging method
CN106381814A (en) Cast-in-cantilever structure of movable crane formwork of zigzag-form steel web continuous box beam and construction method of cast-in-cantilever structure
CN206667079U (en) Basket double-deck button in hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom hangs constructing device
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN207987749U (en) Ride cable-styled erection crane
CN102659027B (en) Variable-span transit method for girder-erecting gantry crane
CN110205948A (en) A kind of expanded letter Bridge Erector and its erection method
CN102251465A (en) Suspension bridge with bearing cable having X-shaped curve
CN206873305U (en) A kind of Long span variable cross-section precast segmental beam assembling construction structure
CN108086168A (en) Ride cable-styled erection crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 650000 5th floor of an office building, phase II, Liu Jiaying District, 101 Anrui Road, Xishan District, Kunming City, Yunnan Province

Co-patentee after: China Railway Jiujiang Bridge Engineering Co., Ltd.

Patentee after: Yunnan Jiaotong Highway Construction Sixth Engineering Co., Ltd.

Address before: 650000 5th floor of an office building, phase II, Liu Jiaying District, 101 Anrui Road, Xishan District, Kunming City, Yunnan Province

Co-patentee before: China Railway Jiujiang Bridge Engineering Co., Ltd.

Patentee before: Yunnan referendum Construction Group Sixth Engineering Co., Ltd.