KR960031732A - Parallel construction method of ground and basement frame of building structure - Google Patents
Parallel construction method of ground and basement frame of building structure Download PDFInfo
- Publication number
- KR960031732A KR960031732A KR1019950003110A KR19950003110A KR960031732A KR 960031732 A KR960031732 A KR 960031732A KR 1019950003110 A KR1019950003110 A KR 1019950003110A KR 19950003110 A KR19950003110 A KR 19950003110A KR 960031732 A KR960031732 A KR 960031732A
- Authority
- KR
- South Korea
- Prior art keywords
- floor
- construction
- ground
- frame
- basement
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
본 발명은 건축 구조물의 골조 시공방법에 관한 것으로, 소정의 지하층과 지상층으로 된 건축구조물의 골조를 철골철근콘크리트 구조로 시공함에 있어서, 지하토공사를 완료한 후 철골 및 데크 플레이트(deck plate) 공사를 적어도 지상 2층 정도 이상까지 진행하고, 또한 골조공사를 적어도 지하층 1개층 정도를 완료한 시점에서, 진행중인 철골 및 데크 플레이트(deck plate) 공사 또는 지하층의 골조공사를 계속 동일한 방식으로 상부층으로 진행해 나가는 한편, 지상층의 골조공사도 지상 1층 기둥부터 순차적으로 동시에 병행 추진함으로써, 골조공사 공기를 단축시켜 줄 뿐만 아니라 자원가동 효율을 증대시켜 주는 것이다.The present invention relates to a frame construction method of a building structure, in the construction of the frame of the building structure of the predetermined basement and the ground layer in the steel reinforced concrete structure, after the underground earthwork is completed the steel and deck plate (deck plate) construction At least two floors above ground and at least one basement level are completed, the ongoing construction of the steel and deck plate construction or the basement is carried out to the upper floor in the same way. In addition, the construction of the ground floor frame is also carried out simultaneously in order from the ground floor pillars, which not only shortens the frame construction air but also increases the efficiency of resource operation.
Description
본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.
제1도 (가)는 본 발명에 따른 공법의 개략적인 공정도, (나)는 본 발명에 따른 공법의 공정단계별 시공상태도, 제2도 (가)는 공중가설 작업대의 설치상태를 도시한 평면도, (나)는 공중가설 작업대의 단면도, (다)는 공중가설 작업대가 설치된 공사현장의 현장사진, 제3도 (가)는 보조철근의 설치상태를 나타낸 사진, (나)는 1층기둥 하부거푸집(8) 설치상태를 나타낸 사진, (다)는 철근 및 거푸집 설치가 완료된 상태의 1층기둥 하부의 종단면도, (라)는 철근 및 거푸집 설치가 완료된 상태의 1층기둥 하부의 실제 시공상태의 사진, 제4도 (가)는 본 발명에 따른 공법의 골조공사 진행단계도, (나)는 본 발명의 시공방법에 따라 시공중인 건물의 현장전경을 나타낸 사진, 제5도 (가)는 종래의 순타공법의 개략적인 공정도, (나)는 종래의 순타공법의 공정단계별 시공상태도, 제6도 (가)는 종래의 역타공법의 개략적인 공정도, (나)는 종래의 역타공법의 공정단계별 시공상태도이다.1 (a) is a schematic process diagram of the construction method according to the present invention, (b) is a construction state for each process step of the construction method according to the present invention, Figure 2 (a) shows the installation state of a public work platform Floor plan, (b) is a cross-sectional view of a construction work platform, (c) is a photograph of a construction site where a construction work is installed, Figure 3 (a) is a photograph showing the installation status of auxiliary reinforcing bars, and Photo showing the installation status of the lower formwork (8), (C) is a longitudinal cross-sectional view of the lower part of the first-floor column after the installation of reinforcing bars and formwork is completed. Photo of the state, FIG. 4 (a) is a progress diagram of the construction process of the construction method according to the present invention, (b) is a photograph showing the field view of the building under construction according to the construction method of the present invention, FIG. 5 (a) Is a schematic process chart of the conventional netting method, (b) the construction by each process step of the conventional netting method Attitude, Figure 6 (a) is a schematic step of the conventional method backhand, (b) is a step of step-by-step construction of the state diagram of a prior art method backhand.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950003110A KR0150304B1 (en) | 1995-02-18 | 1995-02-18 | A method of simultaneously constructing frameworks for floors and basements of a building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019950003110A KR0150304B1 (en) | 1995-02-18 | 1995-02-18 | A method of simultaneously constructing frameworks for floors and basements of a building |
Publications (2)
Publication Number | Publication Date |
---|---|
KR960031732A true KR960031732A (en) | 1996-09-17 |
KR0150304B1 KR0150304B1 (en) | 1998-10-15 |
Family
ID=19408348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019950003110A KR0150304B1 (en) | 1995-02-18 | 1995-02-18 | A method of simultaneously constructing frameworks for floors and basements of a building |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR0150304B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101247638B1 (en) * | 2011-07-26 | 2013-04-01 | 삼성물산 주식회사 | Complex Frame System for Building and Building Construction Method Using the Same |
KR101395196B1 (en) * | 2012-11-29 | 2014-05-16 | 삼성물산 주식회사 | Fast-up method for construction duration reduction of high-rise buildings with transfer floor |
KR102320104B1 (en) | 2017-12-20 | 2021-11-02 | 양경옥 | Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project |
-
1995
- 1995-02-18 KR KR1019950003110A patent/KR0150304B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR0150304B1 (en) | 1998-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH1150480A (en) | Rebuilding method of building | |
CN111218983A (en) | Lattice formula structure concrete frame house | |
KR960031732A (en) | Parallel construction method of ground and basement frame of building structure | |
JPH10331272A (en) | Construction method of building frame constituted of reinforced concrete column, core wall, uppermost wall beam, and slab | |
JPH05156707A (en) | Construction method of framework reinforced concrete construction | |
JPH08253947A (en) | Installation method for form-support in reverse placing method of concrete | |
KR950032934A (en) | Construction method of high-rise building | |
JP2817591B2 (en) | Construction method of steel reinforced concrete building | |
JP3338240B2 (en) | Construction method for reinforced concrete structures | |
JP2894217B2 (en) | Building structural frame | |
JP3105044B2 (en) | How to build a unit building | |
JPH0447737B2 (en) | ||
JPH06136773A (en) | Underground floor construction method | |
KR100442548B1 (en) | The simultaneous construction method of building having mixed structure of reinforced concrete construction and steel framed reinforced concrete structure | |
JPH0949264A (en) | Constructing method for reinforced concrete framework and structure, and member therefor | |
JP2001032376A (en) | Floor slab frame and construction method for skeleton | |
JPH06136821A (en) | Construction method for steel frame reinforced concrete structure | |
JPS6351529A (en) | Construction of reinforced concrete underground beam and slab | |
KR200369485Y1 (en) | a deck supportframe | |
SU1638277A1 (en) | Building | |
JPH07150579A (en) | Floor construction method in inversely driving construction method | |
JP2000017727A (en) | Skelton constructing method of steel frame and reinforced concrete | |
JPH07207798A (en) | Floor construction method using prestress concrete plate as beam side form | |
JPH0447073A (en) | Method of adding story to low building | |
HU207369B (en) | Method for reinforcing ceilings particularly glass- respectively slag-concrete ceilings of decreased load capacity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130604 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20140514 Year of fee payment: 17 |
|
EXPY | Expiration of term |