KR20230135339A - Eco double soil retaining panel for easy collection - Google Patents
Eco double soil retaining panel for easy collection Download PDFInfo
- Publication number
- KR20230135339A KR20230135339A KR1020220032666A KR20220032666A KR20230135339A KR 20230135339 A KR20230135339 A KR 20230135339A KR 1020220032666 A KR1020220032666 A KR 1020220032666A KR 20220032666 A KR20220032666 A KR 20220032666A KR 20230135339 A KR20230135339 A KR 20230135339A
- Authority
- KR
- South Korea
- Prior art keywords
- earth
- plates
- plate
- slide
- sliding
- Prior art date
Links
- 239000002689 soil Substances 0.000 title claims abstract description 28
- 238000009434 installation Methods 0.000 claims abstract description 24
- 238000010276 construction Methods 0.000 claims abstract description 20
- 239000000463 material Substances 0.000 claims abstract description 17
- 238000011084 recovery Methods 0.000 claims abstract description 17
- 238000000034 method Methods 0.000 claims description 10
- 239000003673 groundwater Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 230000007797 corrosion Effects 0.000 abstract description 5
- 238000005260 corrosion Methods 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 239000012779 reinforcing material Substances 0.000 description 4
- 239000002023 wood Substances 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0051—Including fibers
- E02D2300/0054—Including fibers made from plastic
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
본 발명은 회수가 용이한 친환경 이중 토류판 설치구조로서, 횡방향으로 서로 이격되면서 설치되는 H형상의 파일들; 상기 파일들의 사이에 상하 방향으로 슬라이딩 삽입되어 상하 방향으로 다층으로 적층 설치되는 토류판들; 상기 토류판들의 배면에 접하여 설치되고 배면의 토사에 접하는 것으로 상기 토류판보다 두께가 얇은 슬라이드판들;을 포함하고, 상기 토류판들은 상기 슬라이드판들로 인하여 배면에 토사에 부착되지 아니함으로써 용이하게 회수가 가능한 것을 특징으로 한다.
본 발명에 의하면, 토류판의 재질과 구조를 개선함으로써, 토류판의 부식이 방지되고, 토류판의 회수가 용이하며, 재사용 가능하여 시공비용이 절약되고 환경친화적이다. The present invention is an eco-friendly double earth plate installation structure that is easy to recover, comprising H-shaped piles installed while being spaced apart from each other in the horizontal direction; Earth plates are slidably inserted in the vertical direction between the piles and installed in multiple layers in the vertical direction; Includes slide plates that are installed in contact with the back of the earth plates and are in contact with the soil on the back and are thinner than the soil plates, wherein the earth plates are not attached to the soil on the back due to the slide plates and can be easily recovered. It is characterized by
According to the present invention, by improving the material and structure of the earth plate, corrosion of the earth plate is prevented, recovery of the earth plate is easy, and it can be reused, saving construction costs and being environmentally friendly.
Description
본 발명은 회수가 용이한 친환경 이중 토류판 설치구조 및 그 시공방법에 관한 것으로, 구체적으로는 토류판을 이중으로 구성함으로써 사용한 후 회수하여 재사용이 가능한 회수가 용이한 친환경 이중 토류판 설치구조 및 그 시공방법에 관한 발명이다.The present invention relates to an eco-friendly double earth plate installation structure that is easy to recover and its construction method. Specifically, it relates to an eco-friendly double earth plate installation structure that is easy to recover and its construction method. Specifically, it relates to an eco-friendly double earth plate installation structure that is easy to recover and can be recovered and reused after use by composing the earth plate in a double layer and its construction method. It is an invention about
일반적으로 건설현장의 지하공사에 있어서 흙을 파내는 경우 주위의 토사가 붕괴되는 것을 방지하기 위하여, 통상 H형상의 파일들을 설치하고 이 파일들의 사이에 다단으로 토류판들을 설치하는 흙막이 공사가 선행된다. 이후 공사가 완료되면 토류판들과 파일들을 회수하고 파낸 흙을 되묻게 된다.In general, in order to prevent the surrounding soil from collapsing when digging out soil during underground work at a construction site, earth retaining work is usually preceded by installing H-shaped piles and installing earth plates in multiple stages between these piles. After construction is completed, the earthen plates and piles are recovered and the excavated soil is reburied.
종래기술의 경우 토류판으로 주로 목재를 사용하는데, 오랜 공사기간 동안 지하에 설치된 토류판은 토압 등에 의해 변형될 뿐 아니라 토사와 지하수에 노출되어 훼손됨으로써, 재활용이 어렵고 따라서 새로운 토류판을 사용함에 따른 시공비용이 증가하는 문제점이 있다.In the case of conventional technology, wood is mainly used as earth plates. Earth plates installed underground during a long construction period are not only deformed by earth pressure, etc., but also damaged by exposure to soil and groundwater, making recycling difficult and resulting in construction costs associated with using new earth plates. There is a growing problem.
또한, 토류판을 재활용하거나 폐기하기 위해 회수하고자 하는 경우 토류판의 배면에 작용하는 큰 토압과 장시간 경과로 인한 토사와의 부착 등으로 토류판을 회수하는 작업이 용이하지 아니한 문제점이 있다.In addition, when recovering the earthen plate for recycling or disposal, there is a problem in that it is not easy to recover the earthen plate due to the large earth pressure acting on the back of the earthen plate and adhesion to the soil and sand due to the passage of a long time.
또한, 토류판을 회수하여 폐기하는 경우 폐기 비용이 적지 아니하고, 회수하여 재사용하고자 하는 경우 회수된 토류판을 건조시키고 보수하거나 보관함에 따른 관리비용도 적지않는 문제점이 있다.In addition, when recovering and disposing of earthen plates, the disposal cost is not small, and when recovering and reusing the earthen plates, there is a problem of considerable management costs due to drying, repairing, or storing the recovered earthen plates.
이러한 종래기술의 한 예로 대한민국 등록실용신안공보 등록번호 20-0437825, '철거가 용이한 토류판'이 개시되어 있다(도 1a, 도 1b 참조). 이 종래기술은 "상호 간에 일정 거리를 두고 지면에 세워지는 지주(1)들의 사이에 다단으로 적층되는 강재 토류판에 있어서, 상기 강재 토류판은 전면판, 배면판, 상기 전면판과 배면판들 사이의 둘레부에 결합되는 상하 좌우 연결판으로 이루어진 본체(10)와; 상기 전면판의 전면의 좌우 양측 단부 및 상면에 각각 결합되는 지수패드(20, 30)와; 상기 전면판의 전면의 좌우 양측에 각각 설치되어 상기 본체를 상기 지주에 고정하는 록킹수단(40)과; 상기 본체의 설치시 상하부 본체들의 것과 서로 연통되도록 상기 본체에 각각 형성되며 내부를 통해 인상용 와이어(3)가 삽입되는 하나 이상의 인상용 홀(50)을 포함하고, 상기 인상용 홀은 곡선형으로 형성되어 상기 본체의 배면판의 배면에 결합되는 인상유도판(51)에 의해 형성된 것을 특징으로 하는 철거가 용이한 강재 토류판(청구범위 참조)"이다. As an example of this prior art, Korea Registered Utility Model Publication No. 20-0437825, 'Easy to Remove Earthen Plate' is disclosed (see FIGS. 1A and 1B). This prior art refers to "a steel earth plate stacked in multiple stages between supports (1) erected on the ground at a certain distance from each other, wherein the steel earth plate has a front plate, a back plate, and a space between the front plate and the back plate. A main body (10) consisting of upper, lower, left, and right connection plates coupled to the peripheral portion; water stop pads (20, 30) coupled to the left and right ends and upper surface of the front of the front panel, respectively; and Locking means 40, which are respectively installed to secure the main body to the support, and one or more each formed on the main body so as to communicate with the upper and lower main bodies when the main body is installed, into which a lifting wire 3 is inserted. A steel earth plate that is easy to remove, comprising a
상기 종래기술은, 강재를 소재로 하여 강도를 증대함으로써 외력에 의한 파손을 막고 다수개를 한 번에 철거할 수 있도록 한 철거가 용이한 강재 토류판을 제공하려는데 그 목적이 있다. The purpose of the prior art is to provide a steel earth plate that is easy to remove by using steel as a material to increase strength, thereby preventing damage from external forces and allowing multiple pieces to be removed at once.
그러나, 상기 종래기술은 인상용 와이어(3)를 이용하여 다수개를 한 번에 철거하고자 하나 흙막이의 깊이가 깊은 경우 토류판의 배면에 작용하는 큰 토압과 장시간 경과로 인한 토사와의 부착 등으로 인하여 토류판을 상측으로 철거하는 작업이 용이하지 아니한 문제점이 있다.However, the above prior art attempts to remove multiple pieces at once using a lifting wire (3), but when the depth of the retaining layer is deep, the large earth pressure acting on the back of the earth plate and the adhesion to the earth and sand due to the elapse of a long time, etc. There is a problem in that it is not easy to remove the earthen plate to the upper side.
또한, 상기 종래기술은 인상용 와이어(3)가 토류판 본체(10)의 배면에 구비된 인상용 홀(50)에 삽입됨으로써 상측으로 철거시 하중이 편중되고 그에 따라 토류판 본체(10)가 기울어져 지주와의 마찰력이 증가할 뿐 아니라 배면의 토사와의 마찰력이 증가하여 상측으로의 철거가 용이하지 아니한 문제점이 있다.In addition, in the prior art, the lifting wire 3 is inserted into the
본 발명은 상기와 같은 문제점들을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 토류판의 재질과 구조를 개선함으로써, 토류판의 부식이 방지되고, 토류판의 회수가 용이하며, 재사용 가능하여 시공비용이 절약되고 환경친화적인 회수가 용이한 친환경 이중 토류판 설치구조 및 그 시공방법을 제공함에 있다.The present invention was created to solve the above problems. The purpose of the present invention is to improve the material and structure of the earth plate, thereby preventing corrosion of the earth plate, making it easy to recover the earth plate, and saving construction costs by making it reusable. The goal is to provide an eco-friendly double earth plate installation structure and construction method that is environmentally friendly and easy to recover.
본 발명 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조는, 횡방향으로 서로 이격되면서 설치되는 H형상의 파일들; 상기 파일들의 사이에 상하 방향으로 슬라이딩 삽입되어 상하 방향으로 다층으로 적층 설치되는 토류판들; 상기 토류판들의 배면에 접하여 설치되고 배면의 토사에 접하는 것으로 상기 토류판보다 두께가 얇은 슬라이드판들;을 포함하고, 상기 토류판들은 상기 슬라이드판들로 인하여 배면에 토사에 부착되지 아니하고, 상기 슬라이드판들과는 분리된 것을 특징으로 할 수 있다.The eco-friendly double earth plate installation structure that is easy to recover according to an example of the present invention includes H-shaped piles installed while being spaced apart from each other in the horizontal direction; Earth plates are slidably inserted in the vertical direction between the piles and installed in multiple layers in the vertical direction; Slide plates installed in contact with the back of the earth plates and in contact with the soil on the back and having a thickness thinner than the soil on the back, wherein the earth plates are not attached to the soil on the back due to the slide plates and are separated from the slide plates. It can be characterized as being
상기 토류판들은 상기 배면의 토사에 부착된 슬라이드판들과 슬라이딩함으로써 용이하게 상측으로 슬라이딩 회수되고, 상기 슬라이드판들은 잔류하여 전면 방향으로 회수되거나, 잔류한 상태로 매설되거나, 또는 상기 토류판들의 상측으로 슬라이딩 회수에 이어 상측으로 회수되는 것을 특징으로 할 수 있다.The earth plates are easily recovered by sliding upward by sliding with slide plates attached to the earth and sand on the back, and the slide plates remain and are recovered toward the front, buried in their remaining state, or sliding upwards on the earth earth plates. It may be characterized as being recovered upward following recovery.
상기 토류판들과 상기 슬라이드판들의 사이에는 마찰저감재가 도포되는 것을 특징으로 할 수 있다.A friction reducing material may be applied between the earth plates and the slide plates.
상기 토류판들과 슬라이드판들의 접촉면의 일측면 또는 양측면에는 요홈으로 형성되어 상기 마찰저감재가 보유될 수 있는 보유홈을 포함하는 것을 특징으로 할 수 있다.One side or both sides of the contact surfaces of the earth plates and the slide plates may include a retaining groove formed as a groove to hold the friction reducing material.
상기 보유홈은 가로 방향으로 길게 형성거나, 또는 격자형의 점 형상으로 형성될 수 있다.The holding groove may be formed long in the horizontal direction or may be formed in a grid-like dot shape.
상기 토류판의 배면에 상기 슬라이드판이 삽입 설치되는 슬라이드판요홈을 포함하는 것을 특징으로 할 수 있다.It may be characterized by including a slide plate groove into which the slide plate is inserted and installed on the rear surface of the earth plate.
상기 슬라이드판요홈의 양측에는 상기 슬라이트판의 양 단부를 덮는 단부덮개를 더 포함할 수 있다.Both sides of the slide plate groove may further include end covers that cover both ends of the slide plate.
상기 토류판과 상기 슬라이드판을 결합하는 결속구를 더 포함하고, 상기 결속구는 상기 토류판의 전면에서 제거할 수 있는 것을 특징으로 할 수 있다.It may further include a fastener for coupling the earth plate and the slide plate, and the fastener may be removable from the front of the earth plate.
상기 결속구는 상기 토류판과 상기 슬라이드판을 관통하여 설치되는 본체, 상기 본체의 전단부에서 절곡되어 상기 토류판의 전면에 설치되는 손잡이, 상기 본체의 후단부에서 절곡되어 상기 슬라이트판의 배변에 설치되는 고정부를 포함하고, 상기 결속구는 상기 손잡이를 이용하여 전면 방향으로 강재 인출할 때 상기 고정부는 펼쳐져 인출되는 것을 특징으로 할 수 있다.The binding tool includes a main body installed through the earth plate and the slide plate, a handle bent at the front end of the main body and installed on the front of the earth plate, and a handle bent at the rear end of the main body and installed on the side of the slide plate. It may include a fixing part, and the fastening tool may be characterized in that when the steel material is pulled out in the front direction using the handle, the fixing part is unfolded and pulled out.
상기 토류판들과 상기 슬라이드판들은 높이가 서로 상이하거나 또는 서로 어긋나게 설치되어 상기 토류판들 상호간의 이음부분과 상기 슬라이드판들 상호간의 이음부분의 위치가 상이함으로써, 배면의 토사나 지하수가 상기 토류판들의 전면 방향으로의 누출이 억제되는 것을 특징으로 할 수 있다.The earth plates and the slide plates are installed at different heights or offset from each other, so that the joints between the earth plates and the joints between the slide plates are located at different positions, so that soil or groundwater on the backside flows to the front of the earth plates. It may be characterized in that leakage in one direction is suppressed.
본 발명의 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조 시공방법은, 횡방향으로 서로 이격되게 H형상의 파일들을 설치하는 단계; 상기 파일들의 사이에 토류판과 상기 토류판의 배면에 설치되고 상기 토류판보다 두께가 얇은 슬라이드판을 상하 방향으로 슬라이딩 삽입하여 상하 방향으로 다층으로 적층 설치하는 단계; 상기 토류판들을 상기 슬라이드판들과 슬라이딩되게 하면서 상측으로 슬라이딩 회수하고, 상기 슬라이드판들은 잔류하여 전면 방향으로 회수하거나, 잔류한 상태로 매설하거나, 또는 상기 토류판들의 상측으로 슬라이딩 회수에 이어 상측으로 회수하는 단계;를 포함하는 것을 특징으로 할 수 있다.The method of constructing an eco-friendly double earth plate installation structure that is easy to recover according to an example of the present invention includes the steps of installing H-shaped piles spaced apart from each other in the horizontal direction; A step of inserting an earth plate between the piles and a slide plate installed on the back of the earth plate and having a thinner thickness than the earth plate by sliding it in the vertical direction and installing them in a multi-layer manner in the vertical direction; The earth plates are recovered by sliding upward while sliding with the slide plates, and the slide plates remain and are recovered toward the front, buried in a remaining state, or recovered by sliding upwards to the top of the earth plates and then recovered upward. It may be characterized as including a step;
상기 토류판들의 상측으로 슬라이딩 회수는, 상기 토류판들의 하측을 지지하는 브라켓과 상기 브라켓의 하측을 지지하는 유압잭을 이용하고, 상기 브라켓과 유압잭을 이용하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 브라켓과 유압잭을 일정 높이 상측으로 이동 거치하고, 상기 브라켓과 유압잭을 이용하여 상기 토류판들을 다시 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복하는 것을 특징으로 할 수 있다.To recover the earth plates by sliding them upward, a bracket supporting the lower side of the earth plates and a hydraulic jack supporting a lower side of the bracket are used, and the brackets and hydraulic jacks are used to slide and raise the earth plates upward to a certain height, and the brackets It may be characterized by repeating the process of moving and holding the hydraulic jack upward to a certain height, and sliding and raising the earth plates again upward to a certain height using the bracket and the hydraulic jack.
상기 브라켓은 상기 토류판들의 하측을 지지하는 앵커판, 상기 앵커판에서 상측으로 연장되어 상기 토류판들의 전면에 위치하는 수직판, 상기 수직판에서 수평으로 연장되는 수평판을 포함하고, 상기 유압잭은 상기 브라켓의 수평판 하측을 지지하는 것을 특징으로 할 수 있다.The bracket includes an anchor plate supporting the lower sides of the earth plates, a vertical plate extending upward from the anchor plate and positioned in front of the earth plates, and a horizontal plate extending horizontally from the vertical plate, and the hydraulic jack is connected to the bracket. It may be characterized by supporting the lower side of the horizontal plate.
상기 브라켓은 상기 수평판에서 하측으로 연장되어 상기 유압잭의 전면에 위치하는 고정판을 더 포함하는 것을 특징으로 할 수 있다.The bracket may further include a fixing plate extending downward from the horizontal plate and positioned in front of the hydraulic jack.
상기 토류판들의 상측으로 슬라이딩 회수는, 상기 토류판들을 상하로 관통하는 관통공, 상기 관통공을 통해 상기 토류판들을 상하로 연결하는 와이어, 상기 토류판들의 상측에 설치되고 상기 와이어에 연결되는 인상장치를 이용하고, 상기 인상장치를 이용하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 상측으로 인상된 상측의 하나 이상의 토류판을 제거하고, 상기 인상장치를 다시 상기 와이어에 연결하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복하는 것을 특징으로 할 수 있다.The upward sliding recovery of the earth plates uses a through hole penetrating the earth plates up and down, a wire connecting the earth plates up and down through the through hole, and a pulling device installed on the upper side of the earth plates and connected to the wire. , using the lifting device to slide and raise the earth plates upward to a certain height, remove one or more upper earth plates pulled upward, and connect the lifting device to the wire again to slide the earth plates upward to a certain height. It may be characterized by repeating the raising process.
본 발명에 의하면, 토류판의 재질과 구조를 개선함으로써, 토류판의 부식이 방지되고, 토류판의 회수가 용이하며, 재사용 가능하여 시공비용이 절약되고 환경친화적이다.According to the present invention, by improving the material and structure of the earth plate, corrosion of the earth plate is prevented, recovery of the earth plate is easy, and it can be reused, saving construction costs and being environmentally friendly.
도 1a, 1b는 종래기술의 도면
도 2a는 본 발명의 일례에 따른 토류판의 사시도
도 2b는 본 발명의 일례에 따른 토류판의 다른 예의 사시도
도 3은 본 발명의 일례에 따른 토류판의 분해 사시도
도 3은 본 발명의 일례에 따른 토류판의 분해 단면도
도 4는 본 발명의 일례에 따른 토류판에 결속구가 설치된 모습을 보여주는 도면
도 5는 본 발명의 일례에 따른 토류판이 설치된 모습의 사시도
도 6은 본 발명의 일례에 따른 토류판이 설치된 모습의 평면도
도 7은 본 발명의 일례에 따른 토류판이 설치된 모습의 단면도
도 8, 도 9는 본 발명의 일례에 따른 토류판을 유압잭으로 슬라이딩 인출하는 모습을 보여주는 단면도
도 10, 도 11은 본 발명의 일례에 따른 토류판을 와이어를 이용하여 슬라이딩 인출하는 모습을 보여주는 평면도 및 사시도1A and 1B are drawings of the prior art
Figure 2a is a perspective view of an earthen plate according to an example of the present invention
Figure 2b is a perspective view of another example of an earthen plate according to an example of the present invention.
Figure 3 is an exploded perspective view of an earth plate according to an example of the present invention
Figure 3 is an exploded cross-sectional view of an earth plate according to an example of the present invention
Figure 4 is a view showing a binding device installed on an earthen plate according to an example of the present invention.
Figure 5 is a perspective view of an earthen plate installed according to an example of the present invention.
Figure 6 is a plan view of the earth plate installed according to an example of the present invention
Figure 7 is a cross-sectional view of the earth plate installed according to an example of the present invention
Figures 8 and 9 are cross-sectional views showing sliding and pulling out an earthen plate using a hydraulic jack according to an example of the present invention.
10 and 11 are plan and perspective views showing sliding and pulling out an earthen plate using a wire according to an example of the present invention.
이하, 본 발명의 일부 실시 예들을 예시적인 도면을 통해 상세하게 설명한다. 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있다. 또한, 본 발명의 실시 예를 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 실시 예에 대한 이해를 방해한다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, some embodiments of the present invention will be described in detail through illustrative drawings. In adding reference numerals to components in each drawing, the same components are given the same reference numerals as much as possible even if they are shown in different drawings. Additionally, when describing embodiments of the present invention, if detailed descriptions of related known configurations or functions are judged to impede understanding of the embodiments of the present invention, the detailed descriptions will be omitted.
또한, 본 발명의 실시 예의 구성 요소를 설명하는 데 있어서, 제 1, 제 2, A, B, (a), (b) 등의 용어를 사용할 수 있다. 이러한 용어는 그 구성 요소를 다른 구성 요소와 구별하기 위한 것일 뿐, 그 용어에 의해 해당 구성 요소의 본질이나 차례 또는 순서 등이 한정되지 않는다. 어떤 구성 요소가 다른 구성요소에 "연결", "결합" 또는 "접속"된다고 기재된 경우, 그 구성 요소는 그 다른 구성요소에 직접적으로 연결되거나 접속될 수 있지만, 각 구성 요소 사이에 또 다른 구성요소가 "연결", "결합" 또는 "접속"될 수도 있다.Additionally, when describing the components of an embodiment of the present invention, terms such as first, second, A, B, (a), and (b) may be used. These terms are only used to distinguish the component from other components, and the nature, sequence, or order of the component is not limited by the term. When a component is described as being “connected,” “coupled,” or “connected” to another component, that component can be connected or connected directly to that other component, but there is no need for another component between each component. may be “connected,” “joined,” or “connected.”
이하, 도면을 참조하여 본 발명의 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조 및 그 시공방법을 설명한다.Hereinafter, an eco-friendly double earth plate installation structure that is easy to recover and its construction method according to an example of the present invention will be described with reference to the drawings.
도 2a는 본 발명의 일례에 따른 토류판의 사시도이고, 도 2b는 본 발명의 일례에 따른 토류판의 다른 예의 사시도이고, 도 3은 본 발명의 일례에 따른 토류판의 분해 사시도이고, 도 3은 본 발명의 일례에 따른 토류판의 분해 단면도이고, 도 4는 본 발명의 일례에 따른 토류판에 결속구가 설치된 모습을 보여주는 도면이고, 도 5는 본 발명의 일례에 따른 토류판이 설치된 모습의 사시도이고, 도 6은 본 발명의 일례에 따른 토류판이 설치된 모습의 평면도이고, 도 7은 본 발명의 일례에 따른 토류판이 설치된 모습의 단면도이고, 도 8, 도 9는 본 발명의 일례에 따른 토류판을 유압잭으로 슬라이딩 인출하는 모습을 보여주는 단면도이고, 도 10, 도 11은 본 발명의 일례에 따른 토류판을 와이어를 이용하여 슬라이딩 인출하는 모습을 보여주는 평면도 및 사시도이다.Figure 2a is a perspective view of an earth plate according to an example of the present invention, Figure 2b is a perspective view of another example of an earth plate according to an example of the present invention, Figure 3 is an exploded perspective view of an earth plate according to an example of the present invention, and Figure 3 is an exploded perspective view of an earth plate according to an example of the present invention. It is an exploded cross-sectional view of an earth plate according to an example of, Figure 4 is a view showing a binding device installed on an earth plate according to an example of the present invention, Figure 5 is a perspective view of an earth plate installed according to an example of the present invention, and Figure 6 is a plan view of the earth plate installed according to an example of the present invention, Figure 7 is a cross-sectional view of the earth plate installed according to an example of the present invention, and Figures 8 and 9 show the earth plate according to an example of the present invention being slid out using a hydraulic jack. It is a cross-sectional view showing the operation, and Figures 10 and 11 are a plan view and a perspective view showing the earth plate being slid out using a wire according to an example of the present invention.
도 2 내지 7을 참조하면, 본 발명의 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조는, 횡방향으로 서로 이격되면서 설치되는 H형상의 파일(10)들; 상기 파일(10)들의 사이에 상하 방향으로 슬라이딩 삽입되어 상하 방향으로 다층으로 적층 설치되는 토류판(20)들; 상기 토류판(20)들의 배면에 접하여 설치되고 배면의 토사에 접하는 것으로 상기 토류판(20)보다 두께가 얇은 슬라이드판(30)들;을 포함할 수 있다.Referring to Figures 2 to 7, the eco-friendly double earth plate installation structure that is easy to recover according to an example of the present invention includes H-shaped
상기 파일(10)은 웨브와 상기 웨브의 전후에 결합된 한 쌍의 플렌지를 포함하는 H형상의 강재일 수 있다. 즉, 파일(10)은 H빔이 사용될 수 있다.The
상기 토류판(20)들은 사각형 형상으로 형성되고, 상기 파일(10)들의 사이에서 양측 파일(10)의 플렌지에 걸려 설치됨으로서, 배면의 토압을 지지할 수 있다. 토류판(20)들은 상하 방향으로 서로 접하면서 연속 설치될 수 있다. 토류판(20)의 재질은 플라스틱으로 형성될 수 있다. 플라스틱으로 형성된 토류판(20)의 내부에는 강재 등의 보강재가 삽입될 수 있다. 보강재는 속이 비거나 찬 봉, 평판, 관통공들이 형성된 평판, 파형판, 관통공들이 형성된 파형판 등일 수 있다. 관통공이 형성되거나 파형 형상의 보강재는 플라스틱과의 결합력이 증대되어 반복 사용에도 플라스틱과 보강재의 분리가 방지되어 토류판(20)의 훼손이 방지될 수 있다. 토류판(20)은 내부가 빈 형상으로 형성될 수 있다. 예컨데 토류판(20)의 상하로 구멍이 형성될 수 있다. 토류판(20)의 내부가 빈 형상으로 형성되는 경우 토류판(20)의 무게가 가벼워 설치 및 인출 등의 작업이 용이하고, 재료가 절약되어 비용이 줄어들 수 있다. 토류판(20)은 양 단부가 확장된 형상일 수 있다. 양 단부를 확장하는 경우 재료를 절약하면서도 토류판(20)의 휨강성이 증대될 수 있다. 또한, 확장부를 이용하여 자연스레 후술하는 슬라이드판요홈(22)이 형성되게 할 수 있다. 플라스틱으로 형성된 토류판(20)은 장시간 토사나 지하수에 노출되더라도 부식이 방지되고, 지하수를 흡수하지 아니하여 무게가 가볍고, 무게가 가벼워 회수가 용이하고, 부식되지 아니하여 재사용이 가능하며, 재사용 가능하여 시공비용이 절약되고, 환경오염을 줄일 수 있고 친환경적이다. 필요시 토류판(20)은 목재, 강재 등으로 형성될 수 있다. 목재, 강재 등의 경우 부식을 방지하는 처리가 필요할 수 있다. The
상기 슬라이드판(30)은 상기 토류판(20)의 배면에 접하여 설치되고, 토류판(20)보다 두께가 얇으며, 대략 토류판(20)의 배면 전체를 덮을 수 있도록 형성될 수 있다. 슬라이드판(30)은 알류미늄판일 수 있다. 슬라이드판(30)은 알류미늄판 외 플라스틱판이나, 강판, 목재판 등으로 형성될 수 있다. 슬라이드판(30)은 전면의 토류판(20)과 부착되지 아니하고 잘 슬라이딩 되는 것이 바람직하다. The
토류판(20)들은 상기 슬라이드판(30)들로 인하여 배면에 토사에 부착되지 아니함으로써, 상측으로 용이하게 슬라이딩 회수가 가능할 수 있다. 즉, 지하에 장시간 설치되는 경우 토사에 부착될 수 있는데, 슬라이드판(30)으로 인하여 토류판(20)은 토사와 분리됨으로써, 상측으로 용이하게 슬라이딩 회수 가능할 수 있다.The
슬라이드판(30)은 얇게 형성되어 토류판(20)을 배면의 토사와 분리함으로써 토류판(20)을 용이하게 회수 가능하게 하고, 토압은 주로 토류판(20)에 의해 지지할 수 있다.The
슬라이드판(30)들은 토류판(20)들이 상측으로 슬라이딩 회수될 때 잔류하여 전면 방향으로 회수되거나, 잔류한 상태로 지하에 매설되거나, 또는 상기 토류판(20)들의 상측으로 슬라이딩 회수에 이어 상측으로 회수될 수 있다. 토류판(20)들이 상측으로 슬라이딩 회수 됨에 따라 전면 방향으로 여유 공간이 형성되어, 슬라이드판(30)들은 전면 방향으로 쉽게 회수되거나, 회수가 불필요한 경우 그대로 지하에 매설 처리하거나, 또는, 토류판(20)들이 상측으로 슬라이딩 회수된 후 또는 회수에 이어서 슬라이드판(30)들도 상측으로 슬라이딩 회수할 수 있다. 슬라이드판(30)들의 상측으로의 회수는 와이어(60)를 이용하여 상측으로 인출 회수할 수 있다.The
상기 토류판(20)들의 상측으로의 슬라이딩 회수 작업는 상측에서 수행하거나 하측에서 수행할 수 있다. 하측에서의 수행은 토류판(20)의 하측을 지지하는 브라켓(40)과 상기 브라켓(40)의 하측을 지지하는 유압잭(50)을 이용하여 수행할 수 있다.The sliding recovery operation to the upper side of the
상기 브라켓(40)은 토류판(20)들의 하측을 지지하는 앵커판(42), 상기 앵커판(42)에서 상측으로 연장되어 상기 토류판(20)들의 전면에 위치하는 수직판(44), 상기 수직판(44)에서 수평으로 연장되는 수평판(46)을 포함할 수 있다. 유압잭(50)은 상기 브라켓(40)의 수평판(46) 하측을 지지할 수 있다. 회수 작업은 유압잭(50)을 이용하여 토류판(20)들을 상측으로 일정 높이 슬라이딩 상승시킨 후, 유압잭(50)과 브라켓(40)을 상측으로 이동 거치한 후 다시 토류판(20)들을 상측으로 일정 높이 슬라이딩 상승시키는 작업을 반복 하여 수행할 수 있다. 상측에서는 상승한 토류판(20)을 회수할 수 있다. 유압잭(50)과 브라켓(40)을 상측으로 이동 거치시 유압잭(50)의 하측에 토사를 투입할 수 있다.The
상기 유압잭(50)의 하측에는 지지판(부호 미정, 도 8, 9 참조)을 설치할 수 있다. 지지판은 강판 등으로 형성되고, 유압잭(50)이 지반속으로 침하하는 것을 방지할 수 있다.A support plate (unspecified symbol, see Figures 8 and 9) can be installed on the lower side of the
상기 브라켓(40)은 수평판(46)에서 하측으로 연장되어 상기 유압잭(50)의 전면에 위치하는 고정판(48)을 더 포함할 수 있다. 고정판(48)은 유압잭(50)의 전면에 위치함으로써, 유압잭(50)이 브라켓(40)으로부터 이탈되는 것을 방지할 수 있다.The
상기 토류판(20)들의 회수 작업은 상측에서 와이어(60)와 인장장치를 이용하여 수행할 수 있다. 즉, 상기 토류판(20)들을 상하로 관통하는 관통공, 상기 관통공을 통해 상기 토류판(20)들을 상하로 연결하는 와이어(60), 상기 토류판(20)들의 상측 즉, 지상에 설치되고 상기 와이어(60)에 연결되는 인상장치를 포함하여 수행할 수 있다. 관통공은 토류판(20)의 중심 양측에 형성될 수 있다. 관통공은 토류판(20)의 양측에 하나씩 형성하거나, 또는 양측에 두개씩 형성할 수 있다. 관통공의 형성과 와이어(60)의 설치는 토류판(20)의 설치 깊이 등을 고려하여 선택할 수 있다. 와이어(60)는 토류판(20)의 관통공들을 통해 하측에서 상측까지 연결될 수 있다. The recovery work of the
상기 인상장치로 와이어(60)를 상측으로 인상하여 토류판(20)들은 상측으로 일정 높이 슬라이딩 인상한 후 상측의 토류판(20)을 제거하고, 다시 인상장치를 이용하여 와이어(60)를 인상하는 작업을 반복하여 수행할 수 있다. 인장상치는 상측에 유압잭(50)을 설치하거나 크레인 등의 다른 인상장치들이 사용될 수 있다.The operation of lifting the
전술한 바와 같이, 슬라이드판(30)들은 상하로 연결하는 제2와이어(미도시)를 더 포함하고, 상기 슬라이트판들은 상기 제2와이어에 의해 상측으로 회수될 수 있다. 슬라이드판(30)들은 얇게 형성될 수 있어 와이어(60)는 슬라이드판(30)의 배면에 결합될 수 있다. 이를 위해 슬라이드판(30)들의 배면에 와이어(60)가 고정장치 등으로 결합되거나, 또는 와이어(60)가 관통하는 고리가 형성되거나, 와이어(60)가 통과하는 U형상의 포켓이 형성될 수 있다. 어느 경우이든 슬라이드판(30)들 각각이 와이어(60)와 결합되는 것이 바람직하다. 또한, 슬라이드판(30)들을 상하로 관통하는 제2관통공들이 형성될 수 있다. 제2관통공은 슬라이드판(30)의 중심 양측에 형성될 수 있다. 이 경우 제2와이어는 제2관통공들을 관통하여 상하로 설치될 수 있다.As described above, the
상기 토류판(20)들과 상기 슬라이드판(30)들의 사이에는 그리스(grease) 등의 마찰저감재가 도포될 수 있다. 이는 토류판(20)이 슬라이드판(30)에 잘 슬라이딩되게 함으로써 상측으로의 회수를 용이하게 할 수 있다.A friction reducing material such as grease may be applied between the
또한, 상기 마찰저감재가 쉽게 흘러내지지 않게 하기 위해 상기 토류판(20)들과 슬라이드판(30)들의 접촉면의 일측면 또는 양측면에는 요홈 형상의 상기 마찰저감재가 보유될 수 있는 보유홈(미도시)을 포함할 수 있다. 보유홈은 가로 방향으로 길게 요홈으로 형성되거나, 또는 격자형으로 배치되는 점 형상의 요홈으로 형성될 수 있다. 이 보유홈은 마찰저감재가 흘러내리지 않고 잔류함으로써 공사 완료후 토류판(20)의 슬라이딩시 잘 슬라이딩되게 할 수 있다.In addition, in order to prevent the friction reducing material from easily flowing out, one or both sides of the contact surfaces of the
상기 토류판(20)의 배면에는 상기 슬라이드판(30)이 삽입 설치되는 슬라이드판요홈(22)을 포함할 수 있다. 즉, 토류판(20)의 배면에 함몰 형성되는 슬라이드판요홈(22)을 포함함으로써, 슬라이드판(30)은 토류판(20)에서 배면 방향으로 돌출되지 않게 설치될 수 있다. 이 슬라이드판요홈(22)은 토류판(20)과 슬라이드판(30)의 설치 과정에 슬라이드판(30)이 토류판(20)에서 어긋나거나 이탈되지 않게 할 수 있다.The rear surface of the
상기 슬라이드판요홈(22)의 양측에는 상기 슬라이트판의 양 단부를 덮는 단부덮개(24)를 더 포함할 수 있다. 단부덮개(24)는 슬라이드판(30)이 더욱 안정적으로 토류판(20)에 잘 설치되어 있게 할 수 있다.Both sides of the
상기 토류판(20)과 상기 슬라이드판(30)을 결합하는 결속구(70)를 더 포함할 수 있다. 결속구(70)는 하부 양측 또는 상하부 양측에 설치될 수 있다. 결속구(70)는 토류판(20)에 결합된 슬라이드판(30)을 하측으로 삽입할 때 상호 분리되지 않게 할 수 있다. 즉, 슬라이드판(30)이 결합된 토류판(20)들을 상측에서 하측으로 슬라이딩 설치할 때 슬라이드판(30)이 토류판(20)의 배면에 안정적으로 결합되어 있게 할 수 있다. It may further include a binding
결속구(70)는 상기 토류판(20)의 전면에서 제거할 수 있게 형성되는 것이 바람직하다. 결속구(70)는 상기 토류판(20)과 상기 슬라이드판(30)을 관통하여 설치되는 바 형상의 본체(72), 상기 본체(72)의 전단부에 구비되는 손잡이(74), 상기 본체(72)의 후단부에서 절곡되어 상기 슬라이트판의 배변에 설치되는 고정부(76)를 포함할 수 있다. 상기 손잡이(74)는 절곡되어 상기 토류판(20)의 전면에 설치되는 형상이거나, 원형의 고리 형상일 수 있다. 상기 손잡이(74)와 고정부(76)는 슬라이드판(30)이 토류판(20)에 안정적으로 고정되게 할 수 있다. 상기 결속구(70)는 전면의 손잡이(74)를 이용하여 전면 방향으로 강재 인출할 때 고정부(76)는 펼쳐져 인출됨으로써 슬라이드판(30)과 토류판(20)이 분리되게 할 수 있다.The binding
결속구(70)의 다른 실시예로 슬라이드판(30)의 배면에 구비되는 너트, 토류판(20)의 전면에서 상기 너트에 체결되는 볼트로 구성될 수 있다. 너트는 슬라이드판(30)의 배면에 용접 등으로 고정되거나, 너트의 회전을 방지하는 요홈이 형성됨으로써, 토류판(20)의 전면에서 볼트머리를 회전시켜 볼트를 쉽게 제거할 수 있다. 지하 공사가 완료된 후 토류판(20)을 회수하고자 하는 경우, 결속구(70)들을 먼저 전면에서 제거하고, 토류판(20)들을 상측으로 슬라이딩 회수할 수 있다.Another embodiment of the
상기 토류판(20)들과 상기 슬라이드판(30)들은 높이가 서로 상이하거나 또는 서로 어긋나게 설치되어 상기 토류판(20)들 상호간의 이음부분과 상기 슬라이드판(30)들 상호간의 이음부분의 위치가 상이하게 할 수 있다. 이는 배면의 토사나 지하수가 상기 토류판(20)들의 전면 방향으로의 누출이 억제되게 할 수 있다.The
이하, 본 발명의 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조 시공방법을 설명한다. 전술한 설명에서 설명된 구성에 대한 설명은 생략될 수 있다.Hereinafter, a method of constructing an eco-friendly double earth plate installation structure that is easy to recover according to an example of the present invention will be described. Descriptions of the configurations described in the foregoing description may be omitted.
도 8 내지 11을 참조하면, 본 발명의 일례에 따른 회수가 용이한 친환경 이중 토류판 설치구조 시공방법은, 횡방향으로 서로 이격되게 H형상의 파일(10)들을 설치하는 단계; 상기 파일(10)들의 사이에 토류판(20)과 상기 토류판(20)의 배면에 설치되고 상기 토류판(20)보다 두께가 얇은 슬라이드판(30)을 상하 방향으로 슬라이딩 삽입하여 상하 방향으로 다층으로 적층 설치하는 단계; 상기 토류판(20)들을 상기 슬라이드판(30)들과 슬라이딩되게 하면서 상측으로 슬라이딩 회수하고, 상기 슬라이드판(30)들은 잔류하여 전면 방향으로 회수하거나, 잔류한 상태로 매설하거나, 또는 상기 토류판(20)들의 상측으로 슬라이딩 회수에 이어 상측으로 회수하는 단계;를 포함할 수 있다.Referring to Figures 8 to 11, the method of constructing an eco-friendly double earth plate installation structure that is easy to recover according to an example of the present invention includes the steps of installing H-shaped
먼저, 파일(10)들을 설치하는 단계를 수행한다. 파일(10)은 항타기를 이용하여 항타하거나 천공기로 천공한 후 삽입할 수 있다. 파일(10)은 토류판(20)의 폭을 고려하여 횡방향으로 서로 이격되게 설치할 수 있다. 파일(10)의 이격은 토류판(20)이 양 파일(10)의 플렌지에 걸리는 정도로 할 수 있다.First, the step of installing
다음으로, 토류판(20)과 슬라이드판(30)을 상하 방향으로 적층 설치하는 단계를 수행한다. 이를 위해 슬라이드판(30)을 토류판(20) 배면에 결속구(70)로 결합할 수 있다. 또한, 파일(10)들의 전면과 파일(10)들의 사이를 굴착하면서, 슬라이드판(30)이 결합된 토류판(20)들을 하측으로 슬라이딩 삽입하고, 다시 굴착하고 삽입하는 과정을 반복할 수 있다. 이때 파일(10)들의 전면에는 띠장이 설치되고, 띠장의 전면에는 버팀보 등이 설치될 수 있다. Next, the step of installing the
다음으로, 설계심도까지 굴착과 슬라이드판(30) 및 토류판(20)의 설치가 완료되면 지하 공사를 수행할 수 있다.Next, once excavation to the design depth and installation of the
다음으로, 지하 공사가 완료되면, 토류판(20)과 슬라이드판(30)의 회수 단계를 수행한다. 먼저, 결속구(70)들을 해체하고, 토류판(20)들을 상측으로 슬라이딩 회수하고, 상기 슬라이드판(30)들은 전면 방향으로 회수하거나, 잔류한 상태로 매설하거나, 또는 상기 토류판(20)들의 상측으로 슬라이딩 회수에 이어 상측으로 회수할 수 있다. 토류판(20)들의 슬라이딩 회수 작업은 하측에서 수행하거나, 상측에서 수행할 수 있다.Next, when the underground construction is completed, the recovery step of the
하측에서 수행하는 경우, 토류판(20)들의 하측을 지지하는 브라켓(40)과 브라켓(40)의 하측을 지지하는 유압잭(50)을 이용할 수 있다. 즉, 브라켓(40)과 유압잭(50)을 이용하여 상기 토류판(20)들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 브라켓(40)과 유압잭(50)을 일정 높이 상측으로 이동 거치하고, 상기 브라켓(40)과 유압잭(50)을 이용하여 상기 토류판(20)들을 다시 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복할 수 있다. 상기 슬라이드판(30)을 전면 방향으로 회수는 경우, 토류판(20)을 상측으로 일정 높이 슬라이딩 인상한 후 노출된 슬라이드판(30)을 전면 방향으로 회수할 수 있다. 이후 굴착부를 흙으로 되메울 수 있다.When performing from the lower side, the
상기 브라켓(40)은 상기 토류판(20)들의 하측을 지지하는 앵커판(42), 상기 앵커판(42)에서 상측으로 연장되어 상기 토류판(20)들의 전면에 위치하는 수직판(44), 상기 수직판(44)에서 수평으로 연장되는 수평판(46)을 포함하고, 상기 유압잭(50)은 상기 브라켓(40)의 수평판(46) 하측을 지지할 수 있다. 또한, 상기 브라켓(40)은 상기 수평판(46)에서 하측으로 연장되어 상기 유압잭(50)의 전면에 위치하는 고정판(48)을 더 포함할 수 있다.The
상측에서 수행하는 경우, 상기 토류판(20)들을 상하로 관통하는 관통공, 상기 관통공을 통해 상기 토류판(20)들을 상하로 연결하는 와이어(60), 상기 토류판(20)들의 상측 즉, 지상에 설치되고 상기 와이어(60)에 연결되는 인상장치를 이용할 수 있다. When performed from the top, a through hole penetrates the
즉, 인상장치를 이용하여 상기 토류판(20)들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 상측으로 인상된 상측의 하나 이상의 토류판(20)을 제거하고, 상기 인상장치를 다시 상기 와이어(60)에 연결하여 상기 토류판(20)들을 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복할 수 있다. 이후 굴착부를 흙으로 되메울 수 있다.That is, the
이상에서, 본 발명의 실시 예를 구성하는 모든 구성 요소들이 하나로 결합하거나 결합하여 동작하는 것으로 설명되었다고 해서, 본 발명이 반드시 이러한 실시 예에 한정되는 것은 아니다. 즉, 본 발명의 목적 범위 안에서라면, 그 모든 구성 요소들이 하나 이상으로 선택적으로 결합하여 구성되거나 동작할 수도 있다. 또한, 이상에서 기재된 "포함하다", "구성하다" 또는 "가지다" 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재할 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 한다. 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.In the above, just because all the components constituting the embodiment of the present invention have been described as being combined or operated in combination, the present invention is not necessarily limited to this embodiment. That is, within the scope of the purpose of the present invention, all of the components may be configured or operated by selectively combining one or more of them. In addition, terms such as “include,” “comprise,” or “have” described above mean that the corresponding component may be present, unless specifically stated to the contrary, and thus do not exclude other components. Rather, it should be interpreted as being able to include other components. All terms, including technical or scientific terms, unless otherwise defined, have the same meaning as generally understood by a person of ordinary skill in the technical field to which the present invention pertains. Commonly used terms, such as terms defined in a dictionary, should be interpreted as consistent with the contextual meaning of the related technology, and should not be interpreted in an idealized or overly formal sense unless explicitly defined in the present invention.
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시 예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시 예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely an illustrative explanation of the technical idea of the present invention, and various modifications and variations will be possible to those skilled in the art without departing from the essential characteristics of the present invention. Accordingly, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention, but rather to explain it, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be interpreted in accordance with the claims below, and all technical ideas within the equivalent scope should be construed as being included in the scope of rights of the present invention.
10: 파일
20: 토류판
22: 슬라이드판요홈
24: 단부덮개
30: 슬라이드판
40: 브라켓
42: 앵커판
44: 수직판
46: 수평판
48: 고정판
50: 유압잭
60: 와이어
70: 결속구
72: 본체
74: 손잡이
76: 고정부10: File
20: Earth plate
22: Slide panel groove
24: End cover
30: Slide board
40: bracket
42: anchor plate
44: Vertical plate
46: horizontal plate
48: fixing plate
50: Hydraulic jack
60: wire
70: Binding sphere
72: body
74: handle
76: Fixing part
Claims (9)
상기 파일들의 사이에 상하 방향으로 슬라이딩 삽입되어 상하 방향으로 다층으로 적층 설치되는 토류판들;
상기 토류판들의 배면에 접하여 설치되고 배면의 토사에 접하는 것으로 상기 토류판보다 두께가 얇은 슬라이드판들;을 포함하고,
상기 토류판들은 상기 슬라이드판들로 인하여 배면에 토사에 부착되지 아니하고, 상기 슬라이드판들과는 분리된 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조.H-shaped piles installed while being spaced apart from each other in the horizontal direction;
Earth plates are slidably inserted in the vertical direction between the piles and installed in multiple layers in the vertical direction;
Includes slide plates that are installed in contact with the back of the earth plate and are in contact with the soil on the back and are thinner than the earth plate,
An eco-friendly double earth plate installation structure that is easy to recover, characterized in that the earth plates are not attached to the soil on the back due to the slide plates and are separated from the slide plates.
상기 토류판들은 상기 배면의 토사에 부착된 슬라이드판들과 슬라이딩함으로써 용이하게 상측으로 슬라이딩 회수되고, 상기 슬라이드판들은 잔류하여 전면 방향으로 회수되거나, 잔류한 상태로 매설되거나, 또는 상기 토류판들의 상측으로 슬라이딩 회수에 이어 상측으로 회수되는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조.In claim 1,
The earth plates are easily recovered by sliding upward by sliding with slide plates attached to the earth and sand on the back, and the slide plates remain and are recovered toward the front, buried in their remaining state, or sliding upwards on the earth earth plates. An eco-friendly double earth plate installation structure that is easy to recover, characterized by recovery to the upper side following recovery.
상기 토류판들과 상기 슬라이드판들의 사이에는 마찰저감재가 도포되는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조.In claim 1,
An eco-friendly double earth plate installation structure that is easy to recover, characterized in that a friction reducing material is applied between the earth plates and the slide plates.
상기 토류판의 배면에 상기 슬라이드판이 삽입 설치되는 슬라이드판요홈을 포함하는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조In claim 1,
An eco-friendly double earth plate installation structure that is easy to recover, comprising a slide plate groove into which the slide plate is inserted and installed on the back of the earth plate.
상기 토류판과 상기 슬라이드판을 결합하는 결속구를 더 포함하고,
상기 결속구는 상기 토류판의 전면에서 제거할 수 있는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조.In claim 1,
It further includes a binding tool that couples the earth plate and the slide plate,
An eco-friendly double earth plate installation structure that is easy to recover, characterized in that the binding device can be removed from the front of the earth plate.
상기 토류판들과 상기 슬라이드판들은 높이가 서로 상이하거나 또는 서로 어긋나게 설치되어 상기 토류판들 상호간의 이음부분과 상기 슬라이드판들 상호간의 이음부분의 위치가 상이함으로써, 배면의 토사나 지하수가 상기 토류판들의 전면 방향으로의 누출이 억제되는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조.In claim 1,
The earth plates and the slide plates are installed at different heights or offset from each other, so that the joints between the earth plates and the joints between the slide plates are located at different positions, so that soil or groundwater on the backside flows to the front of the earth plates. An eco-friendly double earth plate installation structure that is easy to recover and is characterized by suppressing leakage in any direction.
상기 파일들의 사이에 토류판과 상기 토류판의 배면에 설치되고 상기 토류판보다 두께가 얇은 슬라이드판을 상하 방향으로 슬라이딩 삽입하여 상하 방향으로 다층으로 적층 설치하는 단계;
상기 토류판들을 상기 슬라이드판들과 슬라이딩되게 하면서 상측으로 슬라이딩 회수하고, 상기 슬라이드판들은 잔류하여 전면 방향으로 회수하거나, 잔류한 상태로 매설하거나, 또는 상기 토류판들의 상측으로 슬라이딩 회수에 이어 상측으로 회수하는 단계;를 포함하는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조 시공방법.Installing H-shaped piles spaced apart from each other in the horizontal direction;
A step of inserting an earth plate between the piles and a slide plate installed on the back of the earth plate and having a thinner thickness than the earth plate by sliding it in the vertical direction and installing them in a multi-layer manner in the vertical direction;
The earth plates are recovered by sliding upward while sliding with the slide plates, and the slide plates remain and are recovered toward the front, buried in a remaining state, or recovered by sliding upwards to the top of the earth plates and then recovered upward. An eco-friendly double earth plate installation structure construction method that is easy to recover, comprising: a step;
상기 토류판들의 상측으로 슬라이딩 회수는,
상기 토류판들의 하측을 지지하는 브라켓과 상기 브라켓의 하측을 지지하는 유압잭을 이용하고,
상기 브라켓과 유압잭을 이용하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 브라켓과 유압잭을 일정 높이 상측으로 이동 거치하고, 상기 브라켓과 유압잭을 이용하여 상기 토류판들을 다시 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복하는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조 시공방법.In claim 7,
Sliding recovery to the upper side of the earth plates,
Using a bracket supporting the lower side of the earth plates and a hydraulic jack supporting the lower side of the bracket,
A process of sliding and raising the earth plates upward to a certain height using the bracket and hydraulic jack, moving and holding the bracket and hydraulic jack upward to a certain height, and sliding and raising the earth plates again upward to a certain height using the bracket and hydraulic jack. An eco-friendly double earth plate installation structure construction method that is easy to recover, characterized by repeating.
상기 토류판들의 상측으로 슬라이딩 회수는,
상기 토류판들을 상하로 관통하는 관통공, 상기 관통공을 통해 상기 토류판들을 상하로 연결하는 와이어, 상기 토류판들의 상측에 설치되고 상기 와이어에 연결되는 인상장치를 이용하고,
상기 인상장치를 이용하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하고, 상기 상측으로 인상된 상측의 하나 이상의 토류판을 제거하고, 상기 인상장치를 다시 상기 와이어에 연결하여 상기 토류판들을 일정 높이 상측으로 슬라이딩 인상하는 과정을 반복하는 것을 특징으로 하는 회수가 용이한 친환경 이중 토류판 설치구조 시공방법.In claim 7,
Sliding recovery to the upper side of the earth plates,
Using a through hole that penetrates the earth plates up and down, a wire connecting the earth plates up and down through the through hole, and a pulling device installed on the upper side of the earth plates and connected to the wire,
Sliding and lifting the earth plates upward to a certain height using the lifting device, removing one or more earth plates on the upper side pulled upward, and connecting the lifting device to the wire again to slide and raise the earth plates upward to a certain height. An eco-friendly double earth plate installation structure construction method that is easy to recover, characterized by repeating the process.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220032666A KR102592160B1 (en) | 2022-03-16 | 2022-03-16 | Eco double soil retaining panel for easy collection |
KR1020230128109A KR20230144986A (en) | 2022-03-16 | 2023-09-25 | Eeasily recoverable double earth plate installation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220032666A KR102592160B1 (en) | 2022-03-16 | 2022-03-16 | Eco double soil retaining panel for easy collection |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020230128109A Division KR20230144986A (en) | 2022-03-16 | 2023-09-25 | Eeasily recoverable double earth plate installation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20230135339A true KR20230135339A (en) | 2023-09-25 |
KR102592160B1 KR102592160B1 (en) | 2023-10-24 |
Family
ID=88190677
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020220032666A KR102592160B1 (en) | 2022-03-16 | 2022-03-16 | Eco double soil retaining panel for easy collection |
KR1020230128109A KR20230144986A (en) | 2022-03-16 | 2023-09-25 | Eeasily recoverable double earth plate installation structure |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020230128109A KR20230144986A (en) | 2022-03-16 | 2023-09-25 | Eeasily recoverable double earth plate installation structure |
Country Status (1)
Country | Link |
---|---|
KR (2) | KR102592160B1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200214388Y1 (en) * | 2000-08-17 | 2001-02-15 | 주식회사우정종합건축사무소 | Earth plate with reinforcing member |
KR200328605Y1 (en) * | 2003-07-07 | 2003-09-29 | 박노일 | Temporary wall for construction site and its installation method |
KR20070046378A (en) * | 2005-10-31 | 2007-05-03 | 윤은중 | Temporary retaining wall structure for water works |
KR200437825Y1 (en) | 2007-04-10 | 2008-01-03 | 주식회사 다우컨설턴트 | A retaining panel easy removal |
KR102309753B1 (en) * | 2021-03-12 | 2021-10-07 | 최경철 | Steel plate wall order structure and construction method |
-
2022
- 2022-03-16 KR KR1020220032666A patent/KR102592160B1/en active IP Right Grant
-
2023
- 2023-09-25 KR KR1020230128109A patent/KR20230144986A/en active Search and Examination
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200214388Y1 (en) * | 2000-08-17 | 2001-02-15 | 주식회사우정종합건축사무소 | Earth plate with reinforcing member |
KR200328605Y1 (en) * | 2003-07-07 | 2003-09-29 | 박노일 | Temporary wall for construction site and its installation method |
KR20070046378A (en) * | 2005-10-31 | 2007-05-03 | 윤은중 | Temporary retaining wall structure for water works |
KR200437825Y1 (en) | 2007-04-10 | 2008-01-03 | 주식회사 다우컨설턴트 | A retaining panel easy removal |
KR102309753B1 (en) * | 2021-03-12 | 2021-10-07 | 최경철 | Steel plate wall order structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
KR20230144986A (en) | 2023-10-17 |
KR102592160B1 (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100884289B1 (en) | Composite type steel temporary construction and construction method thereof | |
CN113322990B (en) | Construction method of lock catch steel pipe pile cofferdam suitable for thin-covering-layer hard riverbed | |
CN113614315A (en) | Method of constructing a structure | |
KR20160057198A (en) | Apparatus and Method of Scouring of Foundation | |
CN110670603B (en) | Assembled type long-strip foundation pit supporting device and method | |
EP3225746B1 (en) | A bearing structure | |
KR101300785B1 (en) | Retaining wall made from reinforced plastic | |
JP5351125B2 (en) | Open shield machine start method of open shield method | |
KR101474338B1 (en) | Furlable earth retaining structure for provisional facilities and construction method thereof | |
KR102592160B1 (en) | Eco double soil retaining panel for easy collection | |
KR102195203B1 (en) | Soil blocking method using horizontal Strut and slope Strut | |
KR20190110269A (en) | Temporary soil retaining plate recovery unit and it''s recovery methods | |
JP4111445B2 (en) | Basic settlement settlement method using sandbag | |
CN105951863A (en) | Construction device of active assembling type open caisson and construction method using same | |
CN115977111A (en) | Environment-friendly foundation pit supporting structure with double rows of steel sheet piles of inclined front and straight back and construction method | |
JP6710999B2 (en) | Temporary receiving method for existing structures | |
CN211523223U (en) | Rectangular shape foundation ditch supporting device of assembled | |
KR100567853B1 (en) | Structure for retaining wall | |
CN112832252A (en) | Deep foundation pit supporting construction method with large height difference of two sides | |
JP2017197910A (en) | Construction method of earth retaining wall structure, and earth retaining wall structure | |
KR101218825B1 (en) | Method of land-side protection wall using bracing | |
JP4993132B2 (en) | Foundation reinforcement method for existing structures | |
JP5639213B2 (en) | Open shield method | |
KR102143188B1 (en) | Temporary apparatus using pile and temporary facilities system | |
JP4146250B2 (en) | Open caisson bottom plate construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GRNT | Written decision to grant |