KR20160104821A - Bolt for fixing scaffold and installation structure of scaffold - Google Patents
Bolt for fixing scaffold and installation structure of scaffold Download PDFInfo
- Publication number
- KR20160104821A KR20160104821A KR1020150027394A KR20150027394A KR20160104821A KR 20160104821 A KR20160104821 A KR 20160104821A KR 1020150027394 A KR1020150027394 A KR 1020150027394A KR 20150027394 A KR20150027394 A KR 20150027394A KR 20160104821 A KR20160104821 A KR 20160104821A
- Authority
- KR
- South Korea
- Prior art keywords
- bolt
- threaded portion
- body portion
- hole
- fixing
- Prior art date
Links
- 238000009434 installation Methods 0.000 title claims abstract description 10
- 238000000034 method Methods 0.000 claims description 9
- 238000000926 separation method Methods 0.000 claims description 2
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 210000002784 stomach Anatomy 0.000 description 3
- 230000014509 gene expression Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 238000010422 painting Methods 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 229920001661 Chitosan Polymers 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B35/00—Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
- F16B35/04—Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws with specially-shaped head or shaft in order to fix the bolt on or in an object
- F16B35/041—Specially-shaped shafts
-
- B63B9/00—
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/28—Clips or connections for securing boards
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connection Of Plates (AREA)
Abstract
Description
본 발명은 족장 고정용 볼트 및 족장 설치 구조에 관한 것이다. BACKGROUND OF THE INVENTION 1. Field of the Invention [0002] The present invention relates to a bolt fixing bolt and a chief installation structure.
일반적으로 대형 선박을 제조하기 위해서는 선체 내부의 취부 작업, 용접 작업 및 도장 작업 등이 수행되며, 이러한 작업의 편의를 위해 족장을 가설하고 해체하는 작업이 빈번하게 발생된다.Generally, in order to manufacture a large-sized ship, mounting work, welding work and painting work are carried out inside the hull. In order to facilitate such work, a chief is often installed and dismantled.
예를 들어 선체내부 도장작업을 위한 족장 설치 시, 도장작업이 필요한 위치의 아래쪽에서 위쪽으로 파이프를 로프 등으로 연결하여 가설물을 만들고 그 위에서 족장을 탑재하거나, 양측벽 부근에 가설물을 설치하고 이를 기초로 데크(deck)의 하면(下面) 쪽으로 연결하여 족장을 설치한다.For example, when a patriarch is installed to paint the inside of a hull, a pipe is routed from the lower part to the upper part where painting is required, so that a scaffold is formed, a chief is placed thereon, a scaffold is installed near the both sides of the scaffold, The deck is connected to the underside of the deck so that the patriarch is installed.
이러한 족장 설치를 위한 가설물 설치/해체작업은 많은 작업공정과 인력을 요구하며 작업과정에서 페인트 손상, 고소작업에 따른 안전사고 등을 유발하게 된다.The installation / dismantling of scaffolds for the installation of chiefs requires a lot of work processes and manpower, causing paint damage in the course of work, and safety accidents due to complaints.
도 1은 종래기술의 족장 설치구조를 도시한 도면이다. 참고로, 도 1의 (b)는 한국공개특허 제2012-0054251호(족장 설치구조)의 도 2를 나타낸 것이다. BRIEF DESCRIPTION OF THE DRAWINGS Fig. For reference, FIG. 1 (b) shows FIG. 2 of Korean Laid-Open Patent Application No. 2012-0054251 (patriarchal installation structure).
도 1의 (a)에 도시된 바와 같이, 작업 외벽(10)에 고정용 피스(20)가 용접되어 있고, 고정용 피스(20)를 이용하여 족장 지지대(30)가 고정된다. 족장 지지대(30)가 설치되면, 그 상부에 족장판(도시되지 않음)을 설치하여 작업자가 통행할 수 있는 작업 통로가 확보된다.As shown in Fig. 1 (a), a
도 1의 (b)에 도시된 바와 같이, 족장 지지대(30)는 일자형 볼트(40) 및 너트(41)에 의해 고정용 피스(20)에 체결되어 고정된다. 1 (b), the
따라서, 설치된 족장의 해체를 위해서는 작업 외벽(10)에 용접된 고정용 피스(20)에서 족장 지지대(30)를 해체하여야 한다. 족장 지지대(30)의 해체를 위해, 작업자는 족장지지대(30)의 끝에 줄을 묶어 두고 족장지지대(30)와 고정용 피스(20) 사이를 고정하고 있는 일자형 볼트(40) 및 너트(41)를 분리시킨다.Therefore, in order to dismantle the installed patriarchy, the
이때, 너트(41)는 현장에서 회수되나 일자형 볼트(40)는 여전히 족장 지지대(30)에 끼워진 상태로 유지되고, 작업자가 안전 지역으로 이탈한 후 족장 지지대(30)와 연결된 줄을 당겨 족장 지지대(30)를 고정용 피스(20)로부터 해체시키게 된다.At this time, the
이 경우, 줄에 묶여져 있는 족장 지지대(30)는 수거될 수 있으나, 일자형 볼트(40)는 바닥으로 떨어지게 된다. 이처럼, 일자형 볼트(40)가 작업장 바닥으로 떨어지게 되면 바닥면의 도장 품질에 영향을 미치게 되며, 일자형 볼트(40)의 망실로 인한 자재구입 비용이 증가하게 된다. 그리고 분리된 일자형 볼트(40)가 작업장 바닥으로 떨어지는 경우, 하부의 작업장에서 작업 중인 작업자의 안전을 위협하는 문제점도 있었다.In this case, the rope support 30 that is bound to the line can be collected, but the
또한, 종래기술은 족장지지대(30)와 고정용 피스(20) 사이를 고정하고 있는 일자형 볼트(40) 및 너트(41)를 분리한 후, 작업자가 안전 지역으로 이동하는 도중에 일자형 볼트(40)가 분리되어 족장 지지대(30)와 함께 작업자가 추락할 수 있는 문제점도 있었다. The conventional technique has a problem in that after removing the
또한 종래기술은 족장 지지대(30)와 고정용 피스(20)를 고정하기 위해 일자형 볼트(40)를 체결하는 경우, 일자형 볼트(40)가 분리될 우려가 있어 작업자가 한 손으로는 일자형 볼트(40)를 잡은 상태에서 다른 손으로 너트(41)를 끼워야 하는 작업상의 불편함도 있었다.Further, when the
본 발명은 족장 지지대 철거시 볼트가 족장 지지대 및 고정용 피스에 삽입된 상태로 안정적 유지됨으로써 안전 지대로 이동하는 작업자의 안전을 도모할 수 있는 족장 고정용 볼트 및 족장 설치 구조를 제공하기 위한 것이다.The present invention is to provide a bolt fixing bolt and a chief installation structure for securing the safety of an operator moving to a safety zone by holding the bolts stably inserted into the support unit and the fixing member during the removal of the support unit.
본 발명은 족장 지지대의 해체시 원거리에서 볼트의 안전한 분리 및 회수가 용이해져, 바닥면의 도장 품질 저하 및 볼트의 망실로 인한 자재구입 비용이 증가를 방지할 수 있는 족장 고정용 볼트 및 족장 설치 구조를 제공하기 위한 것이다.The present invention relates to a bolt fastening bolt and a chieftain mounting structure for preventing detachment and recovery of a bolt from a remote place at the time of dismantling a patriarchal support, .
본 발명은 족장 지지대와 고정용 피스를 삽입 관통하는 복수의 관통공에 하나의 볼트가 동시에 삽입 유지됨으로써 작업자가 한 손으로 너트를 체결할 수 있어 작업상의 편의를 도모하고 작업 속도를 향상시킬 수 있는 족장 고정용 볼트 및 족장 설치 구조를 제공하기 위한 것이다.The present invention is characterized in that one bolt is simultaneously inserted and held in a plurality of through holes through which a foot support and a fixing piece are inserted so that an operator can fasten the nut with one hand, A bolt fixing bolt and a chief installation structure.
본 발명의 이외의 목적들은 하기의 설명을 통해 쉽게 이해될 수 있을 것이다.Other objects of the present invention will become readily apparent from the following description.
본 발명의 일 측면에 따르면, 족장 고정용 볼트로서, 막대 형상의 몸체부, 제1 나사산부와 제2 나사산부가 상기 몸체부의 양 단부로부터 각각 수직하게 연장되어 "ㄷ"자 형상을 가지는, 족장 고정용 볼트가 제공된다.According to one aspect of the present invention there is provided a bolt fixing bolt comprising a rod-shaped body portion, a first threaded portion and a second threaded portion extending vertically from both ends of the body portion, respectively, and having a " Bolts are provided.
상기 제1 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제1 관통 홀이 형성되고, 상기 제2 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제2 관통 홀이 형성되며, 상기 제1 관통홀과 상기 제2 관통 홀을 모두 통과하도록 와이어가 삽입되고, 상기 제1 나사산부의 단부측과 상기 제2 나사산부의 단부측에 각각 위치하는 상기 와이어의 양 단부에는 자석이 각각 부착될 수 있다.The first threaded portion has a first through hole continuously extending in the longitudinal direction and extending to the outer surface of the body portion. A second through hole is formed in the second threaded portion continuously in the longitudinal direction to extend to the outer surface of the body portion. A wire is inserted so as to pass through both the first through hole and the second through hole, and at both ends of the wire positioned at the end side of the first thread portion and the end side of the second thread portion, Respectively.
상기 몸체부의 외측 표면의 일측에는 고리가 부착될 수 있다.A hook may be attached to one side of the outer surface of the body portion.
본 발명의 다른 측면에 따르면, 족장 설치 구조로서, 작업 외벽에 형성된 고정용 피스에 족장 지지대가 족장 고정용 볼트 및 너트로 결합되되, 상기 족장 고정용 볼트는 막대 형상의 몸체부, 제1 나사산부와 제2 나사산부가 상기 몸체부의 양 단부로부터 각각 수직하게 연장되어 "ㄷ"자 형상을 가지고, 상기 제1 나사산부와 상기 제2 나사산부는 상기 고정용 피스와 상기 족장 지지대를 연통하도록 위치된 복수의 관통공들에 동시에 삽입되는, 족장 설치 구조가 제공된다.According to another aspect of the present invention, there is provided a foot length attachment structure, wherein a foot support is coupled to a fixing piece formed on an outer wall of a work, by a bolt and a nut for fixing the foot, wherein the bolt fixing bolt includes a bar- And the second threaded portion extends vertically from both ends of the body portion and has a " C "shape, and the first threaded portion and the second threaded portion have a plurality of And a stern mounting structure is provided which is inserted into the through holes at the same time.
상기 제1 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제1 관통 홀이 형성되고, 상기 제2 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제2 관통 홀이 형성되며, 상기 제1 관통홀과 상기 제2 관통 홀을 모두 통과하도록 와이어가 삽입되고, 상기 제1 나사산부의 단부측과 상기 제2 나사산부의 단부측에 각각 위치하는 상기 와이어의 양 단부에는 자석이 각각 부착될 수 있다.The first threaded portion has a first through hole continuously extending in the longitudinal direction and extending to the outer surface of the body portion. A second through hole is formed in the second threaded portion continuously in the longitudinal direction to extend to the outer surface of the body portion. A wire is inserted so as to pass through both the first through hole and the second through hole, and at both ends of the wire positioned at the end side of the first thread portion and the end side of the second thread portion, Respectively.
상기 와이어의 양 단부에 각각 부착된 자석은 상기 고정용 피스와 상기 족장 지지대의 분리를 위해 상기 너트가 해체된 이후 자착(磁着)될 수 있다.The magnets attached to both ends of the wire may be magnetized after the nut is disassembled for separation of the fixing piece and the chair support.
상기 족장 고정용 볼트는 상기 와이어의 일측에 후크를 걸고 당김으로서 회수될 수 있다.The bolt fixing bolts can be recovered by pulling and pulling a hook on one side of the wire.
상기 몸체부의 외측 표면의 일측에는 후크를 걸고 당김으로서 회수하기 위한 고리가 부착될 수 있다.One side of the outer surface of the body portion may be provided with a hook for hooking and collecting by pulling.
전술한 것 외의 다른 측면, 특징, 이점이 이하의 도면, 특허청구범위 및 발명의 상세한 설명으로부터 명확해질 것이다.Other aspects, features, and advantages will become apparent from the following drawings, claims, and detailed description of the invention.
본 발명의 실시예에 따르면, 족장 지지대 철거시 볼트가 족장 지지대 및 고정용 피스에 삽입된 상태로 유지됨으로써 안전 지대로 이동하는 작업자의 안전을 도모할 수 있는 효과가 있다.According to the embodiment of the present invention, the bolts are held in the state of being inserted into the support rods and the fixing pieces during the removal of the support rosters, so that the safety of workers moving to the safety zones can be improved.
또한 족장 지지대의 해체시 원거리에서 볼트의 안전한 분리 및 회수가 용이해져, 바닥면의 도장 품질 저하 및 볼트의 망실로 인한 자재구입 비용이 증가를 방지할 수 있는 효과도 있다.Also, it is possible to safely separate and recover the bolts from a remote place at the time of disassembly of the patriarchal support, and it is possible to prevent an increase in the cost of purchasing the material due to the deterioration of the coating quality of the bottom surface and the loss of the bolt.
또한 족장 지지대와 고정용 피스를 삽입 관통하는 복수의 관통공에 하나의 볼트가 동시에 삽입 유지됨으로써 작업자가 한 손으로 너트를 체결할 수 있어 작업상의 편의를 도모하고 작업 속도를 향상시킬 수 있는 효과도 있다.Also, since one bolt is simultaneously inserted and held in a plurality of through holes through which the chair support and the fixing piece are inserted, the operator can tighten the nut with one hand, thereby improving the work efficiency and improving the working speed have.
도 1은 종래기술의 족장 설치구조를 도시한 도면.
도 2는 본 발명의 일 실시예에 따른 족장 설치 구조를 나타낸 도면.
도 3은 본 발명의 일 실시예에 따른 족장 고정용 볼트를 나타낸 도면.
도 4는 본 발명의 일 실시예에 따른 족장 해체 과정을 나타낸 도면.
도 5는 본 발명의 다른 실시예에 따른 족장 고정용 볼트를 나타낸 도면.BRIEF DESCRIPTION OF THE DRAWINGS Fig.
FIG. 2 is a view showing a structure for installing a chieftain according to an embodiment of the present invention; FIG.
FIG. 3 is a view illustrating a bolt for fixing a chock according to an embodiment of the present invention. FIG.
FIG. 4 illustrates a chitosan disassembly process according to an embodiment of the present invention. FIG.
5 is a view showing a bolt for fixing a chock according to another embodiment of the present invention.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail. It is to be understood, however, that the invention is not to be limited to the specific embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention.
어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. It is to be understood that when an element is referred to as being "connected" or "connected" to another element, it may be directly connected or connected to the other element, . On the other hand, when an element is referred to as being "directly connected" or "directly connected" to another element, it should be understood that there are no other elements in between.
제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.The terms first, second, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another.
본 명세서에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 명세서에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise. In this specification, the terms "comprises" or "having" and the like refer to the presence of stated features, integers, steps, operations, elements, components, or combinations thereof, But do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.
또한, 각 도면을 참조하여 설명하는 실시예의 구성 요소가 해당 실시예에만 제한적으로 적용되는 것은 아니며, 본 발명의 기술적 사상이 유지되는 범위 내에서 다른 실시예에 포함되도록 구현될 수 있으며, 또한 별도의 설명이 생략될지라도 복수의 실시예가 통합된 하나의 실시예로 다시 구현될 수도 있음은 당연하다.It is to be understood that the components of the embodiments described with reference to the drawings are not limited to the embodiments and may be embodied in other embodiments without departing from the spirit of the invention. It is to be understood that although the description is omitted, multiple embodiments may be implemented again in one integrated embodiment.
또한, 첨부 도면을 참조하여 설명함에 있어, 도면 부호에 관계없이 동일한 구성 요소는 동일하거나 관련된 참조부호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Reference will now be made in detail to the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the like elements throughout. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail.
도 2는 본 발명의 일 실시예에 따른 족장 설치 구조를 나타낸 도면이고, 도 3은 본 발명의 일 실시예에 따른 족장 고정용 볼트를 나타낸 도면이다.FIG. 2 is a view showing a structure for installing a stomach according to an embodiment of the present invention, and FIG. 3 is a view illustrating a bolt for fixing a stomach according to an embodiment of the present invention.
도 2에 도시된 바와 같이, 족장 지지대(30)의 고정을 위해, 우선 족장판(도시되지 않음)을 하부에서 지지하는 족장 지지대(30)가 선체 표면의 일측에 용접되어 부착된 고정용 피스(20)에 밀착된다.As shown in Fig. 2, in order to fix the
이때, 족장 지지대(30)와 고정용 피스(20)에 각각 대응되도록 형성된 관통공들(290, 295)이 상호 연통되도록 족장 지지대(30)와 고정용 피스(20)가 밀착되고, 족장 고정용 볼트(210)에 구비된 복수의 나사부들(220, 225)이 동시에 각각 대응되는 복수의 관통공들(290, 295)에 관통 삽입된다.At this time, the
족장 고정용 볼트(210)의 나사부(220, 225)가 관통 삽입되기 위한 관통공들(290, 295)의 직경은 족장 고정용 볼트(210)의 나사부들(220, 225)의 직경보다는 상대적으로 크고, 대응되는 관통공들(290, 295)에 각각 관통 삽입된 나사부들(220, 225)의 단부 측에서 체결될 너트(41)의 직경보다 작게 형성됨은 당연하다. 또한 너트(41)와 체결될 수 있도록 하기 위해 나사부들(220, 225) 각각의 길이가 관통공들(290, 295)이 연통되도록 밀착된 족장 지지대(30)와 고정용 피스(20)의 폭보다 길게 형성될 수 있음도 당연하다.The diameters of the through
본 실시예에 따른 족장 고정용 볼트(210)는 도 2 및 도 3에 도시된 바와 같이, 몸체부(215)와 몸체부(215)의 양 단부에서 각각 몸체부(215)에 수직하고 상호간에는 평행하도록 연장된 제1 나사부(220)와 제2 나사부(225)가 형성된 "ㄷ"자 형상의 볼트이다. 제1 나사부(220)와 제2 나사부(225)의 일 영역에는 너트(41)와 체결되기 위한 나사산이 형성된다.As shown in FIGS. 2 and 3, the
제1 나사부(220)의 내측에는 제1 나사부(220)의 길이 방향으로 연속되는 제1 관통 홀(310)이 형성되고, 제1 관통 홀(310)은 몸체부(215)의 외측 표면까지 연장되도록 형성된다. 또한, 제2 나사부(225)의 내측에도 제2 나사부(225)의 길이 방향으로 연속되는 제2 관통 홀(320)이 형성되며, 제2 관통 홀(320)도 몸체부(215)의 외측 표면까지 연장되도록 형성된다.A first through
와이어(230)는 제1 관통 홀(310)과 제2 관통 홀(320)을 모두 관통하도록 구비되고, 제1 및 제2 나사부(220, 225)의 각 단부 측에 위치된 와이어(230)의 양 단부에는 제1 및 제2 관통 홀(310, 320)의 직경보다 상대적으로 큰 직경을 가지되 너트(41)가 체결될 수 있도록 제1 및 제2 나사부(220, 225)의 직경보다는 상대적으로 작은 직경을 가지는 제1 자석(240)와 제2 자석(245)이 각각 부착된다. The
양 단부에 각각 부착된 제1 및 제2 자석(240, 245)에 의해 와이어(230)는 제1 및 제2 관통 홀(310, 320)을 통과하도록 삽입된 상태로 유지될 수 있다. 여기서, 제1 자석(240)과 제2 자석(245)은 상호간에 인력(引力)을 발생시키는 극성을 가지도록 선정된다.The
전술한 바와 같이, 몸체부(215)에서 수직하게 연장된 제1 및 제2 나사부(220, 225)가 족장 지지대(30)와 고정용 피스(20)에 연통되도록 배치된 대응되는 관통공들(290, 295)에 동시에 각각 삽입되고, 삽입되어 노출된 제1 및 제2 나사부(220, 225)의 단부 측에 너트(41)가 각각 체결됨으로써 족장 지지대(30)가 고정용 피스(20)에 안정적으로 고정될 수 있다. 이때, 몸체부(215)의 내측 표면이 고정용 피스(20)의 표면에 밀착되어 유지될 때까지 너트(41)가 조여지게 될 것이다. The first and second threaded
또한, 제1 및 제2 나사부(220, 225)의 단부 측에 너트(41)를 체결함에 있어, 복수의 나사부(220, 225)가 복수의 관통공(290, 295)에 동시에 삽입되어 안정적으로 지지되기 때문에, 작업자는 족장 고정용 볼트(210)를 잡을 필요 없이 한 손만으로도 너트(41)의 체결이 가능한 장점도 있다.The plurality of threaded
도 4는 본 발명의 일 실시예에 따른 족장 해체 과정을 나타낸 도면이다.4 is a view illustrating a process of disassembling a chieftain according to an embodiment of the present invention.
족장 지지대(30)를 고정용 피스(20)로부터 해체하기 위해, 도 4의 (a)에 도시된 바와 같이, 작업자는 우선 족장 고정용 볼트(210)의 제1 및 제2 나사부(220, 225)의 단부측에 각각 체결된 너트(41)를 해체한다. 이때, 족장 지지대(30)의 안정적 회수를 위해 족장 지지대(30)의 일 측에 로프를 묶는 작업이 선행될 수 있다.As shown in FIG. 4 (a), in order to disassemble the
이후, 작업자는 족장 지지대(30)를 고정용 피스(20)로부터 해체시키기 위해 안전 지역으로 이탈하여야 한다. Thereafter, the operator must leave the safety zone in order to disassociate the
그러나, 작업자는 안전 지역으로 이탈하기 전에, 족장 지지대(30)가 고정용 피스(20)에 임시적으로 체결 유지되도록 하는 족장 고정용 볼트(210)가 보다 안정적으로 유지될 수 있도록 하기 위해(즉, 볼트의 탈락 가능성을 최소화하기 위해), 작업자는 와이어(230)의 양 단부에 각각 고정된 제1 자석(240)과 제2 자석(245)을 자착(磁着)시킨다(도 4의 (b) 참조).However, in order for the
즉, 본 실시예에 따른 족장 고정용 볼트(210)는 복수의 관통공(290, 295)에 동시에 삽입되는 복수의 나사부(220, 225)를 구비하고 있어, 너트(41)가 해체된 상태에서도 작업자의 안전을 유지하기 위한 구조적 안정성을 확보할 수 있을 것이나, 족장 고정용 볼트(210)에 관통 삽입된 와이어(230)의 양 단부에 각각 부착된 제1 및 제2 자석(240, 245)이 자력에 의해 체결되도록 함으로써 보다 큰 구조적 안정성을 확보할 수 있는 장점이 있다. That is, the
이후, 안전 지역으로 이동한 작업자는 후크 등을 이용하여 와어어(230)의 일 측을 걸어 당김으로써, 족장 고정용 볼트(210)의 제1 및 제2 나사부(220, 225)가 대응되는 관통공들(290, 295)로부터 이탈되도록 하여 족장 고정용 볼트(210)를 안정적으로 회수할 수 있다.The worker who has moved to the safe area then hooks one side of the
도 5는 본 발명의 다른 실시예에 따른 족장 고정용 볼트를 나타낸 도면이다.FIG. 5 is a view illustrating a bolt for fixing a chock according to another embodiment of the present invention.
도 5에 도시된 족장 고정용 볼트(210)는 앞서 도 2 내지 4를 참조하여 설명한 족장 고정용 볼트(210)와 달리 족장 고정용 볼트(210)를 관통하여 배치되는 와이어(230)가 구비되지 않고, 몸체부(215)의 일측에 후크 등을 이용하여 족장 고정용 볼트(210)를 분리 및 회수하기 위한 고리(510)가 형성되는 차이점을 가진다.5, a
상기에서는 본 발명의 실시예를 참조하여 설명하였지만, 해당 기술 분야에서 통상의 지식을 가진 자라면 하기의 특허청구범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It will be understood that the present invention can be changed.
10 : 작업 외벽
20 : 고정용 피스
30 : 족장 지지대
40 : 일자형 볼트
41 : 너트
210 : 족장 고정용 볼트
220, 225 : 나사부
230 : 와이어
240, 245 : 자석
290, 295 : 관통공
310, 320 : 관통 홀
510 : 고리10: Working outer wall 20: Fixing piece
30: chief support 40: straight bolt
41: nut 210: bolt fixing bolt
220, 225: thread portion 230: wire
240, 245:
310, 320: through hole 510: ring
Claims (8)
막대 형상의 몸체부, 제1 나사산부와 제2 나사산부가 상기 몸체부의 양 단부로부터 각각 수직하게 연장되어 "ㄷ"자 형상을 가지는, 족장 고정용 볼트.As a bolt fixing bolt,
Wherein the rod-shaped body portion, the first threaded portion and the second threaded portion extend perpendicularly from both ends of the body portion and have a " C "shape.
상기 제1 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제1 관통 홀이 형성되고,
상기 제2 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제2 관통 홀이 형성되며,
상기 제1 관통홀과 상기 제2 관통 홀을 모두 통과하도록 와이어가 삽입되고,
상기 제1 나사산부의 단부측과 상기 제2 나사산부의 단부측에 각각 위치하는 상기 와이어의 양 단부에는 자석이 각각 부착되는, 족장 고정용 볼트.The method according to claim 1,
The first threaded portion is formed with a first through hole continuing in the longitudinal direction to the outer surface of the body portion,
And a second through hole continuous to the outer surface of the body portion in the longitudinal direction is formed inside the second threaded portion,
A wire is inserted to pass through both the first through hole and the second through hole,
Wherein magnets are respectively attached to both ends of the wire positioned at the end of the first threaded portion and the end of the second threaded portion, respectively.
상기 몸체부의 외측 표면의 일측에는 고리가 부착되는, 족장 고정용 볼트.The method according to claim 1,
And a ring is attached to one side of the outer surface of the body portion.
작업 외벽에 형성된 고정용 피스에 족장 지지대가 족장 고정용 볼트 및 너트로 결합되되,
상기 족장 고정용 볼트는 막대 형상의 몸체부, 제1 나사산부와 제2 나사산부가 상기 몸체부의 양 단부로부터 각각 수직하게 연장되어 "ㄷ"자 형상을 가지고,
상기 제1 나사산부와 상기 제2 나사산부는 상기 고정용 피스와 상기 족장 지지대를 연통하도록 위치된 복수의 관통공들에 동시에 삽입되는, 족장 설치 구조.As a patriotic installation structure,
A chuck support is attached to a fastening piece formed on the outer wall of the work by a chuck fixing bolt and a nut,
Wherein the bolt fixing bolt has a rod-like body portion, a first screw portion and a second screw portion extending vertically from both ends of the body portion and having a " C "shape,
Wherein the first threaded portion and the second threaded portion are simultaneously inserted into a plurality of through holes positioned so as to communicate the fixing piece and the footstep supporter.
상기 제1 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제1 관통 홀이 형성되고,
상기 제2 나사산부의 내측에는 길이 방향으로 연속되어 상기 몸체부의 외측 표면까지 이어지는 제2 관통 홀이 형성되며,
상기 제1 관통홀과 상기 제2 관통 홀을 모두 통과하도록 와이어가 삽입되고,
상기 제1 나사산부의 단부측과 상기 제2 나사산부의 단부측에 각각 위치하는 상기 와이어의 양 단부에는 자석이 각각 부착되는, 족장 설치 구조.5. The method of claim 4,
The first threaded portion is formed with a first through hole continuing in the longitudinal direction to the outer surface of the body portion,
And a second through hole continuous to the outer surface of the body portion in the longitudinal direction is formed inside the second threaded portion,
A wire is inserted to pass through both the first through hole and the second through hole,
And magnets are respectively attached to both ends of the wire positioned on the end side of the first threaded portion and the end side of the second threaded portion, respectively.
상기 와이어의 양 단부에 각각 부착된 자석은 상기 고정용 피스와 상기 족장 지지대의 분리를 위해 상기 너트가 해체된 이후 자착(磁着)되는, 족장 설치 구조.6. The method of claim 5,
Wherein the magnets attached to both ends of the wire are magnetized after the nut is disassembled for separation of the fixing piece and the chief support.
상기 족장 고정용 볼트는 상기 와이어의 일측에 후크를 걸고 당김으로서 회수되는, 족장 설치 구조.The method according to claim 6,
Wherein the chiefling bolt is withdrawn by pulling a hook on one side of the wire.
상기 몸체부의 외측 표면의 일측에는 후크를 걸고 당김으로서 회수하기 위한 고리가 부착되는, 족장 설치 구조.5. The method of claim 4,
Wherein a hook is attached to one side of the outer surface of the body portion and a ring is attached for withdrawing by pulling a hook.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150027394A KR101680772B1 (en) | 2015-02-26 | 2015-02-26 | Bolt for fixing scaffold and installation structure of scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020150027394A KR101680772B1 (en) | 2015-02-26 | 2015-02-26 | Bolt for fixing scaffold and installation structure of scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20160104821A true KR20160104821A (en) | 2016-09-06 |
KR101680772B1 KR101680772B1 (en) | 2016-11-30 |
Family
ID=56945762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020150027394A KR101680772B1 (en) | 2015-02-26 | 2015-02-26 | Bolt for fixing scaffold and installation structure of scaffold |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101680772B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200068462A (en) * | 2018-12-05 | 2020-06-15 | 정우돈 | Connector for installing scaffolding |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101954834B1 (en) * | 2018-07-25 | 2019-03-06 | 목포대학교산학협력단 | Out-of-plane bending test apparatus of connecting bracket vise-type and That test method |
KR101942942B1 (en) | 2018-07-25 | 2019-01-28 | 목포대학교산학협력단 | Out-of-plane bending test equipment of Welded connection bracket and That test method |
KR101954827B1 (en) * | 2018-07-27 | 2019-03-06 | 목포대학교산학협력단 | Out-of-plane bending test device for support plate and that's testing method |
KR101954832B1 (en) * | 2018-07-27 | 2019-03-06 | 목포대학교산학협력단 | Out-of-plane bending test equipment of composite type connection bracket and that test method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120054251A (en) | 2010-11-19 | 2012-05-30 | 삼성중공업 주식회사 | Installation structure of scaffold |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101359392B1 (en) | 2012-05-15 | 2014-02-10 | 현대중공업 주식회사 | A U-bolt |
-
2015
- 2015-02-26 KR KR1020150027394A patent/KR101680772B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120054251A (en) | 2010-11-19 | 2012-05-30 | 삼성중공업 주식회사 | Installation structure of scaffold |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200068462A (en) * | 2018-12-05 | 2020-06-15 | 정우돈 | Connector for installing scaffolding |
Also Published As
Publication number | Publication date |
---|---|
KR101680772B1 (en) | 2016-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101680772B1 (en) | Bolt for fixing scaffold and installation structure of scaffold | |
CN110026947B (en) | Tool for fastening bolt of angle steel flange air pipe and using method thereof | |
US10570630B2 (en) | Suspended scaffolding structure and connector therefor | |
KR20140002354U (en) | Scaffold fixing apparatus for ship | |
KR101257779B1 (en) | Install device of safety-net for construction | |
CN201737615U (en) | Simple and dismountable triangular hanging tool | |
KR102640124B1 (en) | Scaffolding piece | |
JP5730674B2 (en) | Steel tower maintenance work | |
JP2009041194A (en) | Temporary scaffold for pile | |
JP2015074910A (en) | Mounting structure and mounting method of canopy for vertical shaft | |
JP6689073B2 (en) | Scaffolding board fixing device | |
JP3795407B2 (en) | Installation method of work scaffold and supporting jig used therefor | |
KR200467302Y1 (en) | Safety guard rail pole | |
CN217974077U (en) | A assembled mounting platform for bridge rigidity jib | |
CN104631849B (en) | A kind of stair face limit construction protection railing and installation method | |
KR20120054251A (en) | Installation structure of scaffold | |
JP5452355B2 (en) | How to remove and install elevator counterweight through-bolts | |
JP2017206878A (en) | Clamp removal device and clamp removal method | |
KR100924522B1 (en) | Hull block edge clamp | |
CN213449792U (en) | Overwater operation protection system | |
KR101548884B1 (en) | Apparatus for preventing loose of connecting tool | |
KR101498956B1 (en) | Scaffolding clamp | |
CN220223238U (en) | Hanging bar device | |
KR20140005427U (en) | Bolt fixing apparatus and installation structure for scaffold comprising the same | |
JP7240959B2 (en) | Hanging jig and steel tower dismantling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |