CN104631849B - A kind of stair face limit construction protection railing and installation method - Google Patents

A kind of stair face limit construction protection railing and installation method Download PDF

Info

Publication number
CN104631849B
CN104631849B CN201510084261.0A CN201510084261A CN104631849B CN 104631849 B CN104631849 B CN 104631849B CN 201510084261 A CN201510084261 A CN 201510084261A CN 104631849 B CN104631849 B CN 104631849B
Authority
CN
China
Prior art keywords
vertical rod
stair
elbow
cross tube
sheer pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510084261.0A
Other languages
Chinese (zh)
Other versions
CN104631849A (en
Inventor
刘辉
文润友
肖云
张勤
陈伟恒
陈利平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201510084261.0A priority Critical patent/CN104631849B/en
Publication of CN104631849A publication Critical patent/CN104631849A/en
Application granted granted Critical
Publication of CN104631849B publication Critical patent/CN104631849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of stair and face limit construction protection railing and installation method, guard rail includes that tree root faces limit vertical rod spaced apart, the cross tube being placed in all vertical rod tops along stair and is connected to the sheer pole in the middle part of all vertical rods, cross tube includes straight cross bar and is connected to the elbow of straight crossbar end, elbow grafting or be socketed in the end of straight cross bar, both superposition section are tightened by bolts.Construction protection railing is decomposed into vertical rod, straight transverse tube, elbow, four parts of band steel by the present invention, is bolted connection, is convenient to mount and dismount between various piece;The most this knockdown construction protection railing various piece can use batch production to make, and can avoid the waste caused because material blocks;Additionally elbow is bolted in the end of straight cross bar, unclamps bolt and the angle of elbow can carry out free regulation, and owing to elbow part uses telescopic joint so that whole cross tube has certain length adjustability, it is possible to adapt to the stair of different length.

Description

A kind of stair face limit construction protection railing and installation method
Technical field
The present invention relates to a kind of construction guard rail, particularly relate to a kind of stair and face limit construction protection railing and the installation method of guard rail.
Background technology
In construction, carrying out operation be required for carrying out security protection facing deathtrap, limit, with prevention work, personnel fall from eminence, cause workman's casualty accident and unnecessary loss.
Generally, facing bound defence rail is field fabrication, measures and faces limit size, then has taken steel pipe material, then scene is welded, owing to various limit situations of facing are different, face bound defence rail size the most different, after using at one, dismounting also cannot recycle after coming, and remove with gas welding when removing, waste material, waste man-hour;Meanwhile, the angle of weld ell can not freely regulate, and is unsuitable for reusing, and only re-starts regulation after cutting, even if some railing can freely regulate angle, but complicated structure, cost is high, mounting or dismounting inconvenience;It addition, the length of stair is irregular, the guard rail for the stair of different length needs individually to be fabricated separately, and thus easily causes the waste caused because material blocks.
Summary of the invention
For the deficiencies in the prior art, the invention aims to solve that stair in prior art face limit construction protection railing mounting or dismounting inconvenience, the angle of corner elbow can not freely regulate, railing length is non-adjustable and does not adapt to the defects such as the stair of different length, and provide a kind of be convenient to mount and dismount, the angle of corner elbow can freely regulate, the stair with certain length adjustability face limit construction protection railing and installation method.
In order to solve above-mentioned technical problem, present invention employs following technical scheme:
A kind of stair face limit construction protection railing, face limit vertical rod spaced apart, the cross tube being placed in all vertical rod tops including tree root along stair and be connected to the sheer pole in the middle part of all vertical rods, described cross tube includes straight cross bar and is connected to the elbow of straight crossbar end, described elbow grafting or be socketed in the end of straight cross bar, and both superposition section are tightened by bolts fixing.
Preferably, the top of described vertical rod is provided with clip, described clip is made up of top half and the latter half, the latter half is connected to the top of vertical rod, the side of top half is rotatably coupled on the latter half, and the opposite side of top half is connected on the lower half by screw bolt and nut thus is fixedly clamped by cross tube.
Preferably, the top of described vertical rod has upwardly extending first fixed plate, and the bottom of the latter half of described clip has the second fixed plate downwardly extended, and is coupled together by screw bolt and nut between described first fixed plate and the second fixed plate.
Preferably, described sheer pole is band steel, and sheer pole is bolted in all vertical rods.
Preferably, described cross tube is parallel with sheer pole.
Preferably, the bottom of described vertical rod is provided with base, and described base is fixed on stair by swell fixture.
The stair of the present invention face the advantage of limit construction protection railing and are:
Construction protection railing is decomposed into four parts by the present invention: vertical rod, cross tube (straight cross bar and elbow), sheer pole (band steel), is bolted connection, is convenient to mount and dismount between various piece;Meanwhile, for the railing that scene is welded compared by this knockdown guard rail, each several part can use batch production to make, and can avoid the waste caused because material blocks, and this knockdown guard rail also has the advantage conveniently leased.
The cross tube of the present invention is made up of straight cross bar and elbow two parts, and elbow is bolted the end at straight cross bar, and owing to elbow uses separately positioned, unclamping bolt can carry out free regulation to the angle of elbow.
Using telescopic joint between straight cross bar and the elbow of the present invention, unclamping bolt can be adjusted the length of both intersection, thus makes whole cross tube have certain length adjustability, it is possible to adapt to the stair of different length.
A kind of stair face the construction method of limit construction protection railing, comprise the steps:
1) vertical rod is installed: first determine the installation site of each vertical rod, then hole in installation site according to bolt hole reserved on vertical rod base, cleaning eye sediment, vertical rod is in place, expansion bolt is installed, fastening expansion bolt, is fixed on the base of vertical rod installation site, and makes vertical rod firm without rocking;
2) cross tube is installed: first according to the length of stair, selecting the straight cross bar of appropriate length, then by elbow grafting or the end that is socketed in straight cross bar, both superposition section are tightened by bolts fixing, obtain the cross tube with elbow, finally cross tube is fixed on the top of all vertical rods;
3) sheer pole is installed: select adaptive sheer pole according to the spacing of vertical rod, sheer pole is fixed on bolt the middle part of all vertical rods.
Preferably, construction method also comprises the steps: 4) brushing: carry out cleaning rust cleaning to installing the staircase protective handrail fixed, and at the external coating paint of staircase protective handrail.
Stair of the present invention face the installation method advantage of limit construction protection railing and are:
This method is for the railing that scene is welded, material can be greatly saved, reduce cost, remarkable in economical benefits, and the installation method relative to traditional defense railing, this method technique is simpler, and mounting or dismounting are more convenient, and safety is higher, cost is less expensive, and can reuse, preferably achieve from studying to the conversion applied, meet building industry to tool, standardized development trend.
Accompanying drawing explanation
Fig. 1 is the mounting structure schematic diagram that stair of the present invention face limit construction protection railing.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
See Fig. 1, a kind of stair face limit construction protection railing, face limit vertical rod spaced apart 1, the cross tube 2 being arranged on all vertical rod 1 tops obliquely along stair including several and are connected to the sheer pole 3 in the middle part of all vertical rods 1, cross tube 2 includes straight transverse tube and is plugged on the elbow 4 of straight transverse tube end, and the superposition section of both grafting is tightened by bolts.The elbow 4 of the present invention uses separately positioned, and being connected by of elbow 4 is telescopic joint, and bolt is locked, and so the advantage of design is elbow 4 connecting portion simple in construction, and convenient disassembly, unclamping bolt can freely can regulate the angle of elbow;Meanwhile, unclamp bolt and can also regulate the length of elbow 4 and straight transverse tube superposition section, make whole cross tube 2 have certain length adjustability, make guard rail can adapt to the stair of different length.
Fix to carry out cross tube 2 installing, the top of vertical rod 1 is provided with clip 5, clip 5 is made up of top half and the latter half, the latter half is connected to the top of vertical rod 1, the side of top half is rotatably coupled on the latter half, and the opposite side of top half is connected on the lower half by screw bolt and nut thus is fixedly clamped by cross tube 2.The latter half of the clip 5 of the present embodiment is connected to the top of vertical rod 1, concrete structure can be that the top of vertical rod 1 has upwardly extending first fixed plate, the bottom of clip 5 the latter half has the second fixed plate downwardly extended, there is in first fixed plate and the second fixed plate the most corresponding bolt hole, be connected by screw bolt and nut fixing between the first fixed plate with the second fixed plate.
The sheer pole 3 of the present invention can select round steel, square steel or band steel, band steel selected by the sheer pole 3 of the present embodiment, it is bolted the middle part in all vertical rods 1, when specifically installing, first hole on sheer pole 3 according to the spacing of vertical rod 1, the most again at the nut of the corresponding size of the middle part of every vertical rod 1 welding, by bolt, band steel is fixedly connected on the nut in the middle part of all vertical rods 1 the most again.For more specification of constructing, cross tube 2 and sheer pole 3 preferably keeping parallelism.
Being provided with base 11 bottom the vertical rod 1 of the present invention, base 11 is fixed on stair by swell fixture.Base 11 can be the arbitrary shape such as square, circular, the base 11 of the present embodiment is designed to square, hole on four angles of base 11, during installation, first the installation site of vertical rod is determined, then hole on stair according to hole reserved on vertical rod base, by swell fixture, base 11 is fixed on stair the most again.
Construction protection railing is decomposed into vertical rod 1 by the present invention, cross tube 2(is made up of straight transverse tube and elbow), sheer pole (band steel) several part, be bolted connection between various piece, be convenient to mount and dismount;Meanwhile, for the railing that scene is welded compared by this knockdown guard rail, each several part can use batch production to make, and can avoid the waste caused because material blocks, it addition, this knockdown guard rail also has the advantage conveniently leased.
A kind of stair face the construction method of limit construction protection railing, comprise the steps:
1) vertical rod is installed: install each vertical rod 1 successively, when vertical rod 1 is installed, first determine the installation site of vertical rod 1, then hole in each installation site according to bolt hole reserved on vertical rod base 11, and cleaning eye sediment, finally make vertical rod in place, installing expansion bolt, fasten expansion bolt, the base 11 of vertical rod 1 is fixed on installation site by expansion bolt, completing the installation to vertical rod 1, the vertical rod 1 that installation requirement fixes is firm without rocking.
2) cross tube is installed: first according to the length of stair, selects the straight transverse tube of appropriate length, and the length of straight transverse tube is preferably 200mm less than the length of stair;Then elbow 4 is plugged on the end of straight transverse tube, both intersection are tightened by bolts, obtain complete cross tube 2, finally cross tube 2 is installed to the top of all vertical rods 1, during installation, can arrange clip 5 at the top of vertical rod 1, the latter half of clip 5 is bolted the top in vertical rod 1, between the top half of clip 5 and the latter half, side is rotating connection, and cross tube 2 is clamped by opposite side by screw bolt and nut connection.
3) sheer pole is installed: the spacing being first depending on upper and lower two vertical rods 1 selects adaptive sheer pole 3, make the length spacing equal to upper and lower two vertical rods 1 of sheer pole 3, then with bolt, sheer pole 3 is fixed on the middle part of all vertical rods 1, makes sheer pole 3 parallel with cross tube 2.During installation, first can hole on sheer pole 3 according to the spacing of adjacent two vertical rods 1, the most again at the middle part welded nut of every vertical rod 1, with by bolt, sheer pole 3 is fixedly connected on the nut in the middle part of every vertical rod 1 the most again.
Causing its safety to be affected because of corrosion in order to avoid stair face limit construction protection railing, the present invention can also carry out cleaning rust cleaning to installing the staircase protective handrail fixed, and at the external coating paint of staircase protective handrail.
In order to meet construction safety requirement, the vertical rod 1 of the present invention can use the external diameter meeting national standard (vertical masonry joint electrically welded tube GB/T13793) to be Φ 48, wall thickness is the steel pipe of more than 2.8mm, and flexural deformation, corrosion, wall thickness steel pipe the most up to standard is forbidden to use;The straight transverse tube of cross tube 2 can use the external diameter meeting national standard (vertical masonry joint electrically welded tube GB/T13793) be Φ 42mm wall thickness be the steel pipe of more than 2.5mm;Sheer pole 3 can use meet national standard (GB/T9945-2001) band steel thickness be 4.0mm, a width of 20mm;Base 11 uses steel plate after the 10mm meeting national standard, needs smooth and becomes rusty without firecoat;Elbow 4 can use meet the Φ 32 of national standard (vertical masonry joint electrically welded tube GB/T13793), wall thickness is that the steel pipe of 2.8mm is connected with the straight transverse tube of Φ 42, whole elbows are clod wash head.
Finally it should be noted that, above example is only in order to illustrate technical scheme rather than restriction technologies scheme, although the present invention has been described in detail by applicant with reference to preferred embodiment, it will be understood by those within the art that, technical scheme is modified or equivalent by those, without deviating from objective and the scope of the technical program, all should contain in the middle of scope of the presently claimed invention.

Claims (2)

1. stair face the installation method of limit construction protection railing, it is characterized in that, described stair face limit construction protection railing, face limit vertical rod spaced apart, the cross tube being placed in all vertical rod tops including tree root along stair and are connected to the sheer pole in the middle part of all vertical rods;Described cross tube includes straight cross bar and is connected to the elbow of straight crossbar end, described elbow grafting or be socketed in the end of straight cross bar, and both superposition section are tightened by bolts fixing, and adjacent two elbows are separately positioned;Described cross tube is parallel with sheer pole, and described sheer pole is band steel, and sheer pole is bolted in all vertical rods, is provided with base in the bottom of vertical rod, and described base is fixed on stair by swell fixture;The top of described vertical rod is provided with clip, described clip is made up of top half and the latter half, the latter half is connected to the top of vertical rod, the side of top half is rotatably coupled on the latter half, and the opposite side of top half is connected on the lower half by screw bolt and nut thus is fixedly clamped by cross tube;The top of described vertical rod has upwardly extending first fixed plate, and the bottom of the latter half of described clip has the second fixed plate downwardly extended, and is coupled together by screw bolt and nut between described first fixed plate and the second fixed plate;
Described stair face the installation method of limit construction protection railing and comprise the steps:
1) vertical rod is installed: first determine the installation site of each vertical rod, then hole in installation site according to bolt hole reserved on vertical rod base, cleaning eye sediment, vertical rod is in place, expansion bolt is installed, fastening expansion bolt, is fixed on the base of vertical rod installation site, and makes vertical rod firm without rocking;
2) cross tube is installed: first according to the length of stair, selecting the straight cross bar of appropriate length, then by elbow grafting or the end that is socketed in straight cross bar, both superposition section are tightened by bolts fixing, obtain the cross tube with elbow, finally cross tube is fixed on the top of all vertical rods;
3) sheer pole is installed: select adaptive sheer pole according to the spacing of vertical rod, sheer pole is fixed on bolt the middle part of all vertical rods.
2. the installation method of limit construction protection railing is faced according to the stair described in claim 1, it is characterized in that, described installation method also comprises the steps: 4) brushing: carry out cleaning rust cleaning to installing the staircase protective handrail fixed, and at the external coating paint of staircase protective handrail.
CN201510084261.0A 2015-02-16 2015-02-16 A kind of stair face limit construction protection railing and installation method Active CN104631849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510084261.0A CN104631849B (en) 2015-02-16 2015-02-16 A kind of stair face limit construction protection railing and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510084261.0A CN104631849B (en) 2015-02-16 2015-02-16 A kind of stair face limit construction protection railing and installation method

Publications (2)

Publication Number Publication Date
CN104631849A CN104631849A (en) 2015-05-20
CN104631849B true CN104631849B (en) 2016-11-23

Family

ID=53211044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510084261.0A Active CN104631849B (en) 2015-02-16 2015-02-16 A kind of stair face limit construction protection railing and installation method

Country Status (1)

Country Link
CN (1) CN104631849B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723275A (en) * 2019-03-04 2019-05-07 重庆金科建筑设计研究院有限公司 Fast assembled protective fence

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241481Y (en) * 2008-08-11 2009-05-20 中铁建工集团有限公司 Tool type stairs protection guardrail
CN201826459U (en) * 2010-10-25 2011-05-11 陈梅江 Connecting elbow in guardrail connection structure
CN202416893U (en) * 2012-01-11 2012-09-05 中建七局第二建筑有限公司 Staircase protective handrail
CN202706585U (en) * 2012-07-09 2013-01-30 中建五局土木工程有限公司 Stair protection railing
CN202990447U (en) * 2012-12-26 2013-06-12 黑龙江宝宇建设工程有限公司 Constructional engineering tool type stair guard railing
CN203022360U (en) * 2013-01-10 2013-06-26 山西建筑工程(集团)总公司 Combined steel tube staircase guardrail
CN203113654U (en) * 2013-01-31 2013-08-07 重庆正达护栏有限公司 Guardrail corner rotation connecting piece
CN203213629U (en) * 2012-12-18 2013-09-25 中建三局第一建设工程有限责任公司 Self-made circulation bend connecting tool for stair protection at different heights
CN203393930U (en) * 2013-07-23 2014-01-15 中建三局第一建设工程有限责任公司 Stairs guard railing
CN203393929U (en) * 2013-06-27 2014-01-15 广东省第二建筑工程公司 Adjustable temporary protective barrier for stairs
CN103774861A (en) * 2014-01-26 2014-05-07 淮海工学院 Reinforcement method for grid structure rod piece
CN203939202U (en) * 2014-07-04 2014-11-12 陆雪青 A kind of syndeton of Novel stair guardrail
CN204456937U (en) * 2015-02-16 2015-07-08 中冶建工集团有限公司 A kind of stair face limit construction protection railing

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241481Y (en) * 2008-08-11 2009-05-20 中铁建工集团有限公司 Tool type stairs protection guardrail
CN201826459U (en) * 2010-10-25 2011-05-11 陈梅江 Connecting elbow in guardrail connection structure
CN202416893U (en) * 2012-01-11 2012-09-05 中建七局第二建筑有限公司 Staircase protective handrail
CN202706585U (en) * 2012-07-09 2013-01-30 中建五局土木工程有限公司 Stair protection railing
CN203213629U (en) * 2012-12-18 2013-09-25 中建三局第一建设工程有限责任公司 Self-made circulation bend connecting tool for stair protection at different heights
CN202990447U (en) * 2012-12-26 2013-06-12 黑龙江宝宇建设工程有限公司 Constructional engineering tool type stair guard railing
CN203022360U (en) * 2013-01-10 2013-06-26 山西建筑工程(集团)总公司 Combined steel tube staircase guardrail
CN203113654U (en) * 2013-01-31 2013-08-07 重庆正达护栏有限公司 Guardrail corner rotation connecting piece
CN203393929U (en) * 2013-06-27 2014-01-15 广东省第二建筑工程公司 Adjustable temporary protective barrier for stairs
CN203393930U (en) * 2013-07-23 2014-01-15 中建三局第一建设工程有限责任公司 Stairs guard railing
CN103774861A (en) * 2014-01-26 2014-05-07 淮海工学院 Reinforcement method for grid structure rod piece
CN203939202U (en) * 2014-07-04 2014-11-12 陆雪青 A kind of syndeton of Novel stair guardrail
CN204456937U (en) * 2015-02-16 2015-07-08 中冶建工集团有限公司 A kind of stair face limit construction protection railing

Also Published As

Publication number Publication date
CN104631849A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
US11851900B2 (en) Temporary safety railing system and method
CN211622528U (en) Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN205857773U (en) A kind of adjustable length face bound defence rail
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN104631849B (en) A kind of stair face limit construction protection railing and installation method
CN204456937U (en) A kind of stair face limit construction protection railing
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
CN206513098U (en) A kind of apparatus for work for being used to remove towering structure
CN102877640A (en) High-altitude work protection railing
JP5773469B1 (en) Suspended scaffolding
KR101309119B1 (en) Pipe install device for bridges and it's pipe construction methods
CN215715990U (en) C-shaped steel portable butt joint piece
KR100397522B1 (en) a scaffolding
CN203856226U (en) Fixture-type stairway protecting fence
CN206987410U (en) A kind of adjustable guard rail fixed mount
CN205206368U (en) Instrument formula floor protector
CN219059766U (en) Steel construction landing stage railing
KR102431780B1 (en) Protective Wall Temporary Bracket
US20190330862A1 (en) Scaffolding system for use with curvilinear walls and method of use
KR101578763B1 (en) Temporary handrails for stairs
KR100834771B1 (en) Safety handrail for construction
KR200496215Y1 (en) Multipurpose bracket for remodeling work
CN219840363U (en) Fixed disk buckle type scaffold upright post in component
CN214590292U (en) Angle steel stand bracket sectional fixture
CN219138452U (en) Safety net combination device for peripheral protection of high-rise building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant