KR20160008465A - Method for knitting cable pattern, design system of knitted fabric, and storage medium - Google Patents

Method for knitting cable pattern, design system of knitted fabric, and storage medium Download PDF

Info

Publication number
KR20160008465A
KR20160008465A KR1020150097546A KR20150097546A KR20160008465A KR 20160008465 A KR20160008465 A KR 20160008465A KR 1020150097546 A KR1020150097546 A KR 1020150097546A KR 20150097546 A KR20150097546 A KR 20150097546A KR 20160008465 A KR20160008465 A KR 20160008465A
Authority
KR
South Korea
Prior art keywords
knitting
stitch row
stitch
stitches
base portion
Prior art date
Application number
KR1020150097546A
Other languages
Korean (ko)
Other versions
KR101753629B1 (en
Inventor
마나부 유이
다쿠미 마에다
유스케 미야지
Original Assignee
가부시키가이샤 시마세이키 세이사쿠쇼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가부시키가이샤 시마세이키 세이사쿠쇼 filed Critical 가부시키가이샤 시마세이키 세이사쿠쇼
Publication of KR20160008465A publication Critical patent/KR20160008465A/en
Application granted granted Critical
Publication of KR101753629B1 publication Critical patent/KR101753629B1/en

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B7/00Flat-bed knitting machines with independently-movable needles
    • D04B7/24Flat-bed knitting machines with independently-movable needles for producing patterned fabrics
    • D04B7/28Flat-bed knitting machines with independently-movable needles for producing patterned fabrics with stitch patterns
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B1/00Weft knitting processes for the production of fabrics or articles not dependent on the use of particular machines; Fabrics or articles defined by such processes
    • D04B1/10Patterned fabrics or articles
    • D04B1/102Patterned fabrics or articles with stitch pattern
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B15/00Details of, or auxiliary devices incorporated in, weft knitting machines, restricted to machines of this kind
    • D04B15/66Devices for determining or controlling patterns ; Programme-control arrangements
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B15/00Details of, or auxiliary devices incorporated in, weft knitting machines, restricted to machines of this kind
    • D04B15/66Devices for determining or controlling patterns ; Programme-control arrangements
    • D04B15/665Driving-gear for programme or pattern devices
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B15/00Details of, or auxiliary devices incorporated in, weft knitting machines, restricted to machines of this kind
    • D04B15/66Devices for determining or controlling patterns ; Programme-control arrangements
    • D04B15/68Devices for determining or controlling patterns ; Programme-control arrangements characterised by the knitting instruments used
    • D04B15/70Devices for determining or controlling patterns ; Programme-control arrangements characterised by the knitting instruments used in flat-bed knitting machines
    • DTEXTILES; PAPER
    • D04BRAIDING; LACE-MAKING; KNITTING; TRIMMINGS; NON-WOVEN FABRICS
    • D04BKNITTING
    • D04B37/00Auxiliary apparatus or devices for use with knitting machines
    • D04B37/02Auxiliary apparatus or devices for use with knitting machines with weft knitting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Knitting Of Fabric (AREA)
  • Knitting Machines (AREA)
  • Braiding, Manufacturing Of Bobbin-Net Or Lace, And Manufacturing Of Nets By Knotting (AREA)

Abstract

The present invention provides a method for knitting cable patterns with excellent generality. If a section in which first stitch rows (1) and second stitch rows (2) are arranged is a cross section in FB, the following steps from a step α to a step δ are performed. In the step α, other stitch rows (b1, b2, 1) except for the second stitch row (2) are knitted by gradually moving the first stitch row (1) to a base unit in the other side. In the step β, a void is formed within a knitting range of the first stitch row (1). In the step γ, other stitch rows (b1, b2, 2) except for the first stitch row (1) are knitted by separating stitches of the second stitch rows (2) to the void within the cross section of the FB. In the step δ, other stitch rows (b1, b2, 2) except for the first stitch row (1) are knitted while solving a problem that the stitches of the first stitch row (1) and the second stitch row (2) are mixed.

Description

케이블 패턴의 편성방법, 편성포의 디자인 시스템 및 기억매체{METHOD FOR KNITTING CABLE PATTERN, DESIGN SYSTEM OF KNITTED FABRIC, AND STORAGE MEDIUM}TECHNICAL FIELD [0001] The present invention relates to a method of knitting a cable pattern, a design system of a knitted fabric, and a storage medium. [0002] METHOD FOR KNITTING CABLE PATTERN, DESIGN SYSTEM OF KNITTED FABRIC, AND STORAGE MEDIUM [

본 발명은, 케이블 패턴(cable pattern)의 편성방법(編成方法), 케이블 패턴을 편성하기 위한 편성 프로그램(編成 program)을 작성하는 편성포(編成布)의 디자인 시스템(design system) 및 케이블 패턴을 편성하기 위한 편성 프로그램을 기억한 기억매체(記憶媒體)에 관한 것이다.
The present invention relates to a method of knitting a cable pattern, a design system of a knitting fabric for creating a knitting program for knitting a cable pattern, And a storage medium (storage medium) storing a knitting program for knitting.

횡편기(橫編機)를 사용하여 베이스 편성포부(base 編成布部)의 편성폭내에 케이블 패턴을 편성하는 케이블 패턴의 편성방법이 알려져 있다. 케이블 패턴은, 베이스 편성포부의 편성폭내에 늘어선 제1스티치열(第1 stitch列)의 위치와 제2스티치열의 위치를 교체함으로써 편성되는 조직패턴(組織pattern)이다. 예를 들면 특허문헌1에서는, 통모양 편성포의 측단(側端)에 있어서 통모양 편성포의 앞쪽과 뒤쪽에 걸쳐 있는 케이블 패턴을 편성하는 케이블 패턴의 편성방법이 개시되어 있다.There is known a knitting method of a cable pattern for knitting a cable pattern in a knitting width of a base knitted fabric portion by using a weft knitting machine. The cable pattern is a tissue pattern (tissue pattern) knitted by replacing the position of the first stitch row (first stitch row) and the position of the second stitch row arranged in the knitting width of the base knitting needles. For example, Patent Document 1 discloses a method of knitting a cable pattern for knitting a cable pattern that spans the front and back of a tubular knitted fabric at a side end of the tubular knitted fabric.

또한 횡편기에 있어서의 니들베드(needle bed)의 길이방향으로, 일측 베이스부(一側 base部)(베이스 편성포부의 일부), 제1스티치열, 제2스티치열, 타측 베이스부(他側 base部)(베이스 편성포부의 일부)의 순서로 늘어선 상태로부터, 제1스티치열의 위치와 제2스티치열의 위치를 교체할 때에, 래킹(racking)과 트랜스퍼(transfer)를 이용하여 제1스티치열의 위치와 제2스티치열의 위치를 한번에 교체하는 케이블 패턴의 편성방법이나, 양쪽 스티치열을 복수의 군(群)으로 분할하여 각 군을 서서히 이동시킴으로써 제1스티치열의 위치와 제2스티치열의 위치를 단계적으로 교체하는 케이블 패턴의 편성방법이 알려져 있다.
(One side base portion) (a portion of the base knitted fabric portion), the first stitch row, the second stitch row, the other side base portion (the other side the position of the first stitch row and the position of the second stitch row are changed from the state in which the first stitch row and the base stitch row are arranged in the order of the base stitch row, A method of knitting a cable pattern in which the positions of the first stitch row and the second stitch row are exchanged at one time or a method of knitting a cable pattern in which a position of a first stitch row and a position of a second stitch row are stepped up by dividing both stitch rows into a plurality of groups, A method of knitting a cable pattern to be replaced is known.

: 일본국 특허 제3887410호 공보: Japanese Patent No. 3887410

그러나 종래의 케이블 패턴의 편성방법에서는, 케이블 패턴을 구성하는 제1스티치열과 제2스티치열의 스티치의 수(數)나, 케이블 패턴 이외의 베이스 편성포부의 조직에 따라서는 적용할 수 없는 경우가 있다. 예를 들면 각 스티치열의 스티치수가 4개 이상인 경우에, 제1스티치열과 제2스티치열을 한번에 교체하는 케이블 패턴의 편성방법에서는 실 끊어짐의 우려가 있다. 또한 베이스 편성포부에 조직패턴을 형성하는 경우에, 래킹의 차이 등에 의하여 케이블 패턴의 편성과 베이스 편성포부의 조직패턴의 편성을 동시에 할 수 없는 경우가 있다. 이와 같이 종래의 케이블 패턴의 편성방법에는 각각 일장일단(一長一短)이 있어, 편성포를 디자인하는 유저(user)가 필요에 따라 최적의 케이블 패턴의 편성방법을 선택할 필요가 있었다. 이러한 유저의 부담을 경감시키기 위해서, 베이스 편성포부의 조직패턴이나 교차시키는 스티치열의 스티치수에 제한되지 않고 범용적(汎用的)으로 사용할 수 있는 케이블 패턴의 편성방법이 요구되고 있다.However, in the conventional method of knitting a cable pattern, the number of stitches of the first stitch row and the second stitch row constituting the cable pattern and the number of stitches of the base knitting aspirations other than the cable pattern may not be applicable . For example, when the number of stitches in each stitch row is four or more, there is a fear of thread breakage in the method of knitting a cable pattern in which the first stitch row and the second stitch row are replaced at a time. Further, in the case of forming the tissue pattern on the base knitting ambidextension, the knitting of the cable pattern and the knitting of the tissue pattern of the base knitting shoulder can not be performed at the same time due to differences in racking or the like. As described above, the conventional methods of knitting the cable patterns each have a short one and a short length, and a user designing the knitted fabric has to select an optimum cable pattern knitting method according to need. In order to alleviate the burden on such users, there is a demand for a method of knitting a cable pattern which can be used for general purposes without limitation to the number of stitches of the stitch row and the organization pattern of the base knitting needles.

본 발명은 상기 사정을 감안하여 이루어진 것으로서, 그 목적중 하나는 범용성(汎用性)이 우수한 케이블 패턴의 편성방법을 제공하는 것에 있다. 또한 본 발명의 다른 목적은, 상기 범용성이 우수한 케이블 패턴의 편성방법을 횡편기에 실행시키는 편성 프로그램을 작성하는 편성포의 디자인 시스템 및 그 편성 프로그램을 기억한 기억매체를 제공하는 것에 있다.
The present invention has been made in view of the above circumstances, and one of its objects is to provide a method of knitting a cable pattern excellent in versatility. Another object of the present invention is to provide a knitting fabric designing system for creating a knitting program which causes the knitting machine to perform a method of knitting a cable pattern excellent in versatility, and a storage medium storing the knitting program.

본 발명은, 적어도 전후로 대향하는 제1니들베드와 제2니들베드를 구비하는 횡편기를 사용하여 니들베드의 길이방향으로, 일측 베이스부, 제1스티치열, 제2스티치열, 타측 베이스부의 순서로 늘어선 상태로부터, 상기 제1스티치열의 위치와 상기 제2스티치열의 위치를 교체함으로써 편성포에 케이블 패턴을 형성하는 케이블 패턴의 편성방법에 관한 것이다. 이 본 발명의 케이블 패턴의 편성방법에서는, 상기 제1니들베드에 있어서의 상기 제1스티치열과 제2스티치열이 늘어선 영역을 교차영역이라고 했을 때에, 이하의 공정α∼공정δ를 실시한다.The present invention relates to a knitting machine comprising a knitting machine having at least one base portion, a first stitch row, a second stitch row, and a sequence of the other base portion in the longitudinal direction of the needle bed using at least a front knitting machine having a first needle bed and a second needle bed, And a cable pattern is formed on the knitted fabric by replacing the position of the first stitch row with the position of the second stitch row. In the method of knitting a cable pattern according to the present invention, the following steps a to e are carried out when a region in which the first stitch row and the second stitch row in the first needle bed are arranged is referred to as an intersecting region.

[공정α]…상기 제2스티치열을 상기 제2니들베드에 홀딩시킨 상태에서, 상기 제1스티치열을 상기 교차영역에 있어서의 상기 타측 베이스부의 측으로 이동시켜서, 상기 제2스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제1스티치열과 상기 타측 베이스부를 편성하는 것을 적어도 1회 이상 한다.[Process alpha] ... The second stitch row is held on the second needle bed and the first stitch row is moved toward the other base portion in the cross region so as not to knit the second stitch row, And the first stitch row and the other base portion are knitted at least once.

[공정β]…상기 제1스티치열을 구성하는 복수의 스티치를 상기 일측 베이스부 쪽의 일측 그룹과 상기 타측 베이스부 쪽의 타측 그룹으로 나누고, 상기 교차영역에 있어서의 상기 타측 베이스부측의 단부까지 상기 타측 그룹을 이동시킴과 동시에 상기 일측 그룹의 적어도 일부의 스티치를 상기 타측 베이스부의 측으로 이동시켜서, 상기 타측 그룹과 상기 일측 그룹의 사이 및 상기 일측 그룹의 편성폭내에 공침을 형성한다.[Process beta] ... A plurality of stitches constituting the first stitch row are divided into one side group of the one side base portion and the other side group of the other side base portion side and the other side group is moved to the end portion of the other side base portion in the cross region And at the same time, at least a part of the stitches of the one side group are moved to the side of the other side base, thereby forming a coprecipitation in the knitting width of the other side group and the one side group and in the knitting width of the one side group.

[공정γ]…상기 제2스티치열의 각 스티치를 상기 교차영역의 공침으로 분리하고, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성한다.[Process γ] ... The stitches of the second stitch row are separated by co-ordination of the cross regions, and the one side base portion and the second stitch row and the other side base portion are knitted without knitting the first stitch row.

[공정δ]…상기 제1스티치열의 스티치와 상기 제2스티치열의 스티치가 혼재하는 혼재영역에 있는 상기 제1스티치열의 스티치를 상기 타측 베이스부의 측으로 이동시킴과 동시에, 상기 혼재영역에 있는 상기 제2스티치열의 스티치를 상기 일측 베이스부의 측으로 이동시켜서, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성하는 것을, 상기 제1스티치열의 스티치와 상기 제2스티치열의 스티치의 혼재가 해소될 때까지 반복한다. 또 혼재영역이라는 것은, 제1스티치열과 제2스티치열이 니들베드의 길이방향으로 오버랩(overlap) 되는 영역으로서, 제2스티치열의 타측 베이스부 쪽의 단부로부터 제1스티치열의 일측 베이스부 쪽의 단부까지의 영역이다(후술하는 도2의 S7, S9 참조).[Process δ] ... The stitches of the first stitch row in the mixed region where the stitches of the first stitch row and the stitch of the second stitch row coexist are moved toward the other base portion and the stitches of the second stitch row in the mixed region are moved The first stitch row and the second stitch row are shifted to the side of the one base portion so that the one base portion and the second stitch row and the other base portion are knitted together by combining the stitches of the first stitch row and the stitches of the second stitch row Is repeated. The mixed region is a region in which the first stitch row and the second stitch row overlap in the longitudinal direction of the needle bed and extends from the end on the other side base portion side of the second stitch row to the end portion on one base side portion of the first stitch row (See S7 and S9 in Fig. 2, which will be described later).

본 발명의 케이블 패턴의 편성방법으로서, 상기 공정α를 실시하기 전에, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성하고, 상기 제1스티치열과 상기 제2스티치열과의 연결을 끊는 공정ε을 실시하는 형태를 들 수 있다.The method for knitting a cable pattern according to the present invention is characterized in that before performing the step a, the first stitch row is knitted, the one side base part, the second stitch row and the other side base part are knitted, And a step of terminating the connection with the second stitch row is performed.

본 발명의 케이블 패턴의 편성방법으로서, 상기 공정γ에 있어서 상기 제2스티치열을 상기 일측 베이스부의 측으로 이동시킬 때에, 상기 제2스티치열 중에서 상기 타측 베이스부 쪽의 단부스티치의 이동거리가 2바늘 이상 4바늘 이하가 되도록 상기 공정β의 그룹 나눔을 하는 형태를 들 수 있다. 이 구성은 총침편성(total needle 編成)의 경우에, 상기 공정β에 있어서 상기 타측 그룹의 스티치수가 2∼4개인 것과 동일한 의미이다.In the method of knitting a cable pattern according to the present invention, when the second stitch row is moved to the side of the one base portion in the process?, The moving distance of the end stitch on the other base portion side of the second stitch row is 2 needles And dividing the process? Into groups so as to be equal to or smaller than 4 needles. This configuration has the same meaning as in the case of the total needle knitting (total needle knitting) that the number of stitches in the other group in the step < RTI ID = 0.0 >

본 발명은, 유저가 편성포의 편성에 관한 편성정보를 입력하는 입력부와, 상기 편성정보에 의거하여 전후로 대향하는 제1니들베드와 제2니들베드를 구비하는 횡편기에 구비된 컴퓨터에 의하여 읽어낼 수 있는 편성 프로그램을 작성하는 편성 프로그램 작성부를 구비하는 편성포의 디자인 시스템에 관한 것이다. 이 본 발명의 편성포의 디자인 시스템은, 상기 편성정보 중에서 케이블 패턴의 편성에 관련되는 케이블 패턴 관련정보에 의거하여, 본 발명의 케이블 패턴의 편성방법을 실시하기 위한 편성조건을 결정하는 편성조건 결정부를 구비한다. 그리고 본 발명의 편성포의 디자인 시스템에 구비된 상기 편성 프로그램 작성부는, 상기 편성조건 결정부가 결정한 편성조건에 의거하는 상기 케이블 패턴의 편성방법을 횡편기에 실행시키기 위해서 상기 컴퓨터에 상기 횡편기를 제어시키는 편성 프로그램을 작성한다.The present invention relates to a knitting machine comprising a knitting machine having an input part for inputting knitting information about knitting of a knitting fabric by a user and a computer provided in a knitting machine having a first needle bed and a second needle bed opposing each other on the basis of the knitting information The present invention relates to a knitting fabric designing system having a knitting program creating section for creating a knitting program capable of producing a knitting program. The designing system of the knitted fabric of the present invention is characterized in that knitting conditions for determining the knitting conditions for performing the knitting method of the cable pattern of the present invention are determined based on the cable pattern- . The knitting program preparing section provided in the knitting fabric designing system of the present invention controls the knitting machine to control the knitting machine so as to control the knitting machine to control the knitting machine to execute the knitting method of the cable pattern based on knitting conditions determined by the knitting- Create a programming program.

본 발명은, 전후로 대향하는 제1니들베드와 제2니들베드를 구비하는 횡편기에 구비된 컴퓨터에 의하여 읽어낼 수 있는 편성 프로그램을 기억한 기억매체에 관한 것이다. 이 본 발명의 기억매체에 기억되는 편성 프로그램은, 본 발명의 케이블 패턴의 편성방법을 상기 횡편기에 실행시키도록 상기 컴퓨터에 상기 횡편기를 제어시키는 편성 프로그램이다.
The present invention relates to a storage medium storing a knitting program readable by a computer provided in a weft knitting machine having a first needle bed and a second needle bed which are opposed to each other in the front and rear directions. The knitting program stored in the storage medium of the present invention is a knitting program for causing the computer to control the knitting machine to execute the knitting method of the cable pattern of the present invention on the knitting machine.

본 발명의 케이블 패턴의 편성방법에 의하면, 제1스티치열의 위치와 제2스티치열의 위치를 교체시킬 때에 실 끊어짐이 발생하기 어렵다. 이것은 제1스티치열의 스티치를 이동시킬 때에도 제2스티치열의 스티치를 이동시킬 때에도, 실 끊어짐이 발생하지 않는 범위에서 스티치를 서서히 이동시키고 있기 때문이다. 그 상세한 것은 실시형태에서 언급한다.According to the method of knitting a cable pattern of the present invention, yarn breakage hardly occurs when the position of the first stitch row and the position of the second stitch row are exchanged. This is because even when the stitches of the first stitch row are moved and the stitches of the second stitch row are moved, the stitches are gradually moved within a range in which yarn breakage does not occur. The details are mentioned in the embodiments.

또한 본 발명의 케이블 패턴의 편성방법은, 베이스 편성포부의 조직패턴에 의하지 않고 범용적으로 이용할 수 있다. 케이블 패턴의 편성이 종료될 때까지의 사이에, 제1스티치열의 편성과 제2스티치열의 편성이 제1니들베드의 교차영역내에서만 이루어지기 때문에, 제1니들베드에 대하여 제2니들베드를 래킹한 상태에서밖에 편성할 수 없는 조직패턴을 베이스 편성포부에 형성하는 경우에도, 제2니들베드의 래킹 상태에 관계없이 케이블 패턴을 구성하는 스티치를 제1니들베드에서 편성할 수 있기 때문이다.Further, the method of knitting a cable pattern of the present invention can be used universally without depending on the pattern of the base knitted fabric part. Since the knitting of the first stitch row and the knitting of the second stitch row are performed only in the intersecting region of the first needle bed during the period until the knitting of the cable pattern is completed, The stitches constituting the cable pattern can be knitted in the first needle bed regardless of the racking state of the second needle bed even when a tissue pattern that can not be knitted only in one state is formed on the base knitted cloth part.

또한 공정ε을 실시하는 본 발명의 케이블 패턴의 편성방법에 의하면, 제1스티치열과 제2스티치열의 연결 및 제1스티치열과 일측 베이스부의 연결을 끊을 수 있기 때문에, 제1스티치열을 이동시킬 때의 실 끊어짐을 억제할 수 있다.Further, according to the method for knitting a cable pattern of the present invention for carrying out the process epsilon, the connection between the first stitch row and the second stitch row and the connection between the first stitch row and the one base portion can be disconnected, The yarn breakage can be suppressed.

제2스티치열 중에서 타측 베이스부 쪽의 단부스티치의 이동거리가 2바늘 이상 4바늘 이하이면, 공정γ에서 제2스티치열의 스티치의 분리를 할 때에, 제2스티치열과 타측 베이스부의 사이를 연결하는 교차사의 실 끊어짐을 억제할 수 있다.If the moving distance of the end stitch on the other side of the second stitch row is 2 or more and 4 or less stitches at the time of separating the stitches of the second stitch row in the process?, The intersection connecting the second stitch row and the other base portion The yarn breakage of the yarn can be suppressed.

본 발명의 편성포의 디자인 시스템에 의하면, 베이스 편성포부의 조직패턴에 제약되지 않는 케이블 패턴을 편성포에 편성할 수 있는 편성 프로그램을 작성할 수 있다. 유저는, 후술하는 실시형태에 나타나 있는 바와 같이 편성포의 디자인 시스템상에서 케이블 패턴을 편성하는 위치를 지정하는 것만으로 되고, 그 유저의 지정에 의거하여 편성포의 디자인 시스템은 자동으로 편성 프로그램을 작성한다.According to the knitting fabric design system of the present invention, it is possible to create a knitting program capable of knitting a cable pattern that is not restricted by the knitting pattern of the base knitting needles in the knitting fabric. The user merely designates a position at which the cable pattern is knitted on the knitting fabric design system as described later in the embodiment, and the knitting fabric designing system automatically creates the knitting program based on the designation of the user do.

본 발명의 기억매체에 기억된 편성 프로그램을 사용해서 횡편기에 의하여 편성포를 편성함으로써, 베이스 편성포부의 조직패턴에 제약되지 않는 케이블 패턴을 편성포에 편성할 수 있다.
By knitting the knitted fabric with the knitting machine using the knitting program stored in the storage medium of the present invention, it is possible to knit a cable pattern not limited to the knitting pattern of the base knitting needles in the knitted fabric.

도1은, 실시형태에 나타내는 케이블 패턴의 편성공정의 전반부분을 나타내는 편성공정도이다.
도2는, 실시형태에 나타내는 케이블 패턴의 편성공정의 후반부분을 나타내는 편성공정도이다.
도3은, 실시형태에 나타내는 편성포의 디자인 시스템의 기능 블럭도이다.
1 is a knitting process diagram showing the first part of the knitting process of the cable pattern shown in the embodiment.
2 is a knitting process diagram showing the second half of the knitting process of the cable pattern shown in the embodiment.
3 is a functional block diagram of the knitting fabric designing system shown in the embodiment.

좌우방향으로 연장되고 또한 전후방향으로 서로 대향(對向)하는 앞쪽 니들베드(front needle bed)(이하 FB)와 뒤쪽 니들베드(back needle bed)(이하 BB) 및 편사(編絲)를 급사(給絲)하는 급사구(給絲口)를 구비하고, BB가 좌우로 래킹(racking) 가능하고 또한 스티치(stitch)의 트랜스퍼(transfer)를 할 수 있는 2베드 횡편기(2-bed 橫編機)를 사용한 편성예를 설명한다. 물론 사용하는 횡편기는, 2베드 횡편기에 한정되는 것은 아니고 예를 들면 4베드 횡편기이더라도 상관없다.A front needle bed (hereinafter referred to as FB) and a back needle bed (hereinafter referred to as BB) and a knitting yarn which extend in the left-right direction and also face each other in the front- 2-bed knitting machine capable of racking left and right BB and capable of transferring stitches, having a yarn feeder for yarn feeding, ) Will be explained. Of course, the flat knitting machine to be used is not limited to the two-bed flat knitting machine, but may be, for example, a four-bed flat knitting machine.

<케이블 패턴(cable pattern)의 편성방법>&Lt; Method of knitting a cable pattern >

이 실시형태에서는, 케이블 패턴의 편성방법의 일례로서, 편성포(編成布)에 있어서의 좌우의 위치를 교체하는 제1스티치열(第1 stitch列)과 제2스티치열이 모두 6개의 스티치로 이루어지는 케이블 패턴(6×6의 케이블 패턴)을 편성하는 예를 도1, 도2에 의거하여 설명한다. 또 각 스티치열의 스티치의 수(數)는 특별하게 한정되지 않고, 예를 들면 4×4∼12×12의 케이블 패턴으로 할 수도 있다. 제1스티치열의 스티치수와 제2스티치열의 스티치수가 서로 다르게 되어 있더라도 상관없다(예를 들면 4×6의 케이블 패턴). 또한 통모양 편성포에 본 예의 케이블 패턴의 편성방법을 적용할 수도 있다.In this embodiment, as an example of a method of knitting a cable pattern, the first stitch row (first stitch row) and the second stitch row for replacing the left and right positions in the knitted fabric An example of knitting a cable pattern (6 x 6 cable pattern) is described with reference to Figs. 1 and 2. Fig. The number of stitches in each stitch row is not particularly limited. For example, the number of stitches may be 4 x 4 to 12 x 12. The number of stitches of the first stitch row and the number of stitches of the second stitch row may be different from each other (for example, a 4 x 6 cable pattern). It is also possible to apply the method of knitting the cable pattern of this embodiment to the tubular knitted fabric.

도1, 2의 좌란(左欄)의 「알파벳+숫자」는 편성공정(編成工程)의 번호를 나타내고, 우란(右欄)은 니들베드에 있어서의 편성상태(編成狀態)가 나타나 있다. 도면 중의 대문자 알파벳은 편침(編針)의 위치를, 화살표는 트랜스퍼의 방향을, 삼각표시는 급사구(8)를 나타낸다. 또한 케이블 패턴 이외의 베이스 편성포부(base 編成布部)인 일측 베이스부(一側 base部)(b1)와 타측 베이스부(他側 base部)(b2)의 스티치는 동그라미 표시, 제1스티치열(1)의 스티치는 다이아 표시, 제2스티치열(2)의 스티치는 5각 표시로 나타낸다. 각 공정에서 실제로 이루어지는 조작은 굵은 선·빈틈없이 칠하기로 나타낸다. 도1, 2에서는 BB의 래킹 동작은 생략한다.The alphabet + numerals in the left column (left column) in Figs. 1 and 2 show the number of the knitting process (knitting process), and the right column (right column) shows the knitting condition in the needle bed. The capital letters in the figure indicate the position of the knitting needles, the arrow indicates the direction of the transfer, and the triangular symbol indicates the feed opening 8. The stitches of one side base portion (b1) and the other side base portion (base side portion) b2, which are base knitted fabric portions other than the cable pattern, are indicated by circles, The stitch of the first stitch string 1 is represented by a diamond mark and the stitch of the second stitch row 2 is represented by a pentagon mark. The actual operations performed in each process are indicated by bold lines and painted lines. In Figs. 1 and 2, the racking operation of BB is omitted.

S0에는, 급사구(8)를 지면(紙面)의 우측방향으로 이동시켜서, FB와 BB의 길이방향으로 늘어선 일측 베이스부(b1), 제1스티치열(1), 제2스티치열(2) 및 타측 베이스부(b2)를 편성한 상태가 나타나 있다(양쪽 베이스부(b1, b2)도 복수의 스티치로 이루어지는 스티치열이다). 일측 베이스부(b1)는, BB의 편침(Q, R) 및 FB의 편침(S, T)에 결합되어 있다. 제1스티치열(1)은 FB의 편침(K∼P)에 결합되고, 제2스티치열(2)은 FB의 편침(E∼J)에 결합되어 있다. 타측 베이스부(b2)는, FB의 편침(A, B) 및 BB의 편침(C, D)에 결합되어 있다.The first stitch row 1, the second stitch row 2, and the second stitch row 3 are formed in the right and left sides of FB and BB by moving the feeding opening 8 in the right direction of the paper surface, And the other base portion b2 are knitted (both base portions b1 and b2 are stitch rows made up of a plurality of stitches). One base portion b1 is coupled to knitting needles Q and R of BB and knitting needles S and T of FB. The first stitch row 1 is joined to the knitting needles K to P of the FB and the second stitch row 2 is joined to the knitting needles E to J of the FB. The other base portion b2 is coupled to knitting needles A and B of FB and knitting needles C and D of BB.

여기에서 양쪽 베이스부(b1, b2)에 있어서 케이블 패턴의 형성영역측의 스티치를 BB에서 편성하여 백스티치(back stitch)로 하고 있는 것은, 케이블 패턴을 베이스 편성포부로부터 부상(浮上)시키기 위해서이다. 또한 이 백스티치의 형성에 의하여, 각 베이스부(b1, b2)와, 케이블 패턴을 구성하는 스티치열(1, 2)을 연결하는 교차사(cross-over yarn)가 길어지게 되어 케이블 패턴을 구성하는 스티치열(1, 2)을 이동시킬 때의 교차사의 실 끊어짐이 억제된다.Here, stitches on the side of the cable pattern formation area on both base portions b1 and b2 are knitted with BB to form a back stitch in order to float the cable pattern from the base knitted fabric portion . By forming the back stitches, the cross-over yarns connecting the base portions b1 and b2 and the stitch rows 1 and 2 constituting the cable pattern are lengthened, The thread breakage of the cross yarns when the stitch rows 1 and 2 are moved is suppressed.

S0에 나타내는 상태로부터, 편침(E∼P)에 있는 제1스티치열(1)의 위치와 제2스티치열(2)의 위치를 교체함으로써, 일측 베이스부(b1)와 타측 베이스부(b2)로 구성되는 베이스 편성포부의 편성폭(編成幅)내에 케이블 패턴을 형성한다. 케이블 패턴의 형성시에, 제1스티치열(1)이 제2스티치열(2)의 앞쪽이 되도록 양쪽 스티치열(1, 2)을 교차시킨다.The position of the first stitch row 1 and the position of the second stitch row 2 in the knitting needles E to P are exchanged from the state shown in S0 so that the one base portion b1 and the other base portion b2 are rotated, The cable pattern is formed within the knitting width of the base knitted cloth portion. The stitch rows 1 and 2 are intersected such that the first stitch row 1 is positioned in front of the second stitch row 2 at the time of forming the cable pattern.

여기에서 이하에 나타나 있는 편성공정에서는, 제1스티치열(1)의 편성과 제2스티치열(2)의 편성은, FB에 있어서의 제1스티치열(1)과 제2스티치열(2)이 늘어선 영역내(즉 FB의 편침(E∼P)의 영역내)에서만 이루어진다. 이 영역을 교차영역(交差領域)이라고 부르며, 도면상에서는 파선으로 둘러싸서 나타낸다.The knitting of the first stitch row 1 and the knitting of the second stitch row 2 are performed in the first stitch row 1 and the second stitch row 2 in the FB, (That is, within the area of the knitting needles E to P of the FB). This area is called a crossing area (crossing area), and is surrounded by a broken line in the drawing.

S1에서는, 급사구(8)를 좌측방향으로 이동시켜서, 제1스티치열(1)을 편성하지 않고 일측 베이스부(b1)와 제2스티치열(2)과 타측 베이스부(b2)를 편성한다(공정ε에 상당). 이 S1에 의하여, 제1스티치열(1)과 제2스티치열(2)의 연결 및 제1스티치열(1)과 일측 베이스부(b1)의 연결이 끊어져서, 이후의 공정에서 제1스티치열(1)을 이동시킬 때의 실 끊어짐을 방지할 수 있다. 또한 이 S1에는, 후공정에서 제2스티치열(2)을 이동시킬 때의 실 끊어짐을 방지하는 효과도 있다.In S1, the yarn feeding port 8 is moved to the left to knit one base portion b1, the second stitch row 2 and the other base portion b2 without knitting the first stitch row 1 (Corresponding to the process?). By this S1, the connection between the first stitch row 1 and the second stitch row 2 and the connection between the first stitch row 1 and the one base b1 are cut off, It is possible to prevent the yarn breakage when the yarn 1 is moved. This S1 also has an effect of preventing yarn breakage when the second stitch row 2 is moved in a subsequent step.

S2에서는, FB의 편침(K∼P)에 결합되는 제1스티치열(1)을 BB의 편침(K∼P)으로 이동시킴과 동시에, FB의 편침(E∼J)에 결합되는 제2스티치열(2)을 BB의 편침(E∼J)으로 이동시킨다. 이 S2는, 제1스티치열(1)의 위치와 제2스티치열(2)의 위치를 교체하는 준비이다.The first stitch row 1 coupled to the knitting needles K to P of the FB is moved to the knitting needles K to P of the BB and the second stitch row 1 to be engaged with the knitting needles E to J of the FB, Move column 2 to knitting needles E to J of BB. This S2 is a preparation for replacing the position of the first stitch row 1 and the position of the second stitch row 2 with each other.

도2에 나타내는 다음의 S3∼S5에서는, 제1스티치열(1)을 타측 베이스(b2)의 측으로 1바늘분 이동시켜서, 제2스티치열(2) 이외의 스티치열(b1, 1, b2)을 편성하는 것을 3회 반복한다(공정α에 상당). 제1스티치열(1)의 이동과 편성은, 제1스티치열(1)의 타측 베이스부(b2) 쪽의 단부스티치(端部stitch)(S3에 있어서는 FB의 편침(J)의 스티치)가, 제1스티치열의 최종적인 이동위치(FB의 편침(E)의 위치)로부터 2바늘∼4바늘분 떨어진 위치(FB의 편침(G∼I)의 위치)로 이동될 때까지 반복하면 된다. 또한 제1스티치열(1)의 1회의 이동거리는, 상기 예와 같이 1바늘분에 한정되는 것은 아니고, 제1스티치열(1)과 일측 베이스부(b1)를 연결하는 편사가 끊어지지 않을 정도로 하면 된다. 예를 들면 편성에 사용되는 편사가 통상의 편사(비탄성편사(非彈性編絲))인 경우에, 제1스티치열(1)의 이동거리는 2바늘분∼3바늘분 정도로 할 수도 있다. 다만 편성에 사용되는 편사가 탄성편사(彈性編絲)인 경우에, 제1스티치열(1)의 이동거리는 4바늘분 이상으로 할 수도 있다.2, stitch rows b1, 1, b2 other than the second stitch row 2 are formed by moving the first stitch row 1 toward the side of the other base b2 by one minute, Is knitted three times (corresponding to step a). The movement and knitting of the first stitch row 1 is performed by the end stitches (the stitches of the FB knitting needle J in S3) on the side of the other side base portion b2 of the first stitch row 1 (Positions of knitting needles G to I of FB) separated by 2 to 4 needles from the final movement position of the first stitch row (the position of the knitting needle E of the FB). Further, the movement distance of the first stitch row 1 is not limited to one needle as in the above-described example, and the movement distance of the knitting yarn connecting the first stitch row 1 and the one base portion b1 . For example, when the knitting yarn used for knitting is a normal knitting yarn (non-elastic knitting yarn), the moving distance of the first stitch row 1 may be about 2 to 3 stitches. However, in the case where the knitting yarn used for knitting is an elastic knitting yarn, the moving distance of the first stitch row 1 may be 4 or more stitches.

공정α의 일부인 S3에서는, 제2스티치열(2)을 BB에 홀딩(holding)시킨 그대로의 상태에서, 래킹과 트랜스퍼를 사용해서 BB의 편침(K∼P)에 결합되는 제1스티치열(1)을 FB의 편침(J∼O)으로 이동시킨다. 즉 도1의 S1의 상태로부터 제1스티치열(1)을 타측 베이스부(b2)의 측으로 1바늘분 이동시킨다. 또한 S3에서는, 급사구(8)를 우측방향으로 이동시켜서, 제2스티치열(2)을 편성하지 않고 일측 베이스부(b1)와 제1스티치열(1)과 타측 베이스부(b2)를 연속해서 편성한다. 이 이동과 편성에 의하여, 제1스티치열(1)과 일측 베이스부(b1)를 연결하는 교차사(3)가 길어지게 되어, 다음의 S4를 실시하기 쉬워진다.In the step S3 which is a part of the step alpha, the first stitch row 1 (1), which is joined to the knitting needles K to P of the BB by using the racking and transferring in the state in which the second stitch row 2 is held in the BB, ) To the knitting needles J to O of the FB. Namely, the first stitch row 1 is moved by one needle from the state of S1 in Fig. 1 toward the other base portion b2. In S3, the yarn feeding port 8 is moved to the right so that the first stitch row 1 and the second stitch row 1 are continuously connected to each other without knitting the second stitch row 2, . By this movement and knitting, the cross yarn 3 connecting the first stitch row 1 and the one base portion b1 becomes longer, and the following S4 can be easily performed.

여기에서 S3의 후에, 제1스티치열(1)을 이동시키지 않고, 스티치열(b1, 1, b2)을 적어도 1코스분(1 course分) 편성하더라도 상관없다. 제1스티치열(1)의 코스수(course數)(웨일방향(wale方向)의 단수(段數))가, 후술하는 제2스티치열(2)의 코스수보다 많은 쪽이, 케이블 패턴의 모양이 가지런해지기 쉽다.Here, after S3, the stitch rows b1, 1, and b2 may be knitted for at least one course (one course) without moving the first stitch row 1. The number of courses (the number of steps in the wale direction) of the first stitch row 1 is larger than the number of courses of the second stitch row 2 (described later) It's easy to get a shape.

S4, S5에서는, 상기 S3과 마찬가지로 제1스티치열(1)을 타측 베이스부(b2)의 측으로 1바늘분 이동시킴과 동시에, 제2스티치열(2)을 편성하지 않고 일측 베이스부(b1)와 제1스티치열(1)과 타측 베이스부(b2)를 편성한다.The first stitch row 1 is moved toward the other base portion b2 by one minute and the second stitch row 2 is not knitted and the one base portion b1 is not knitted, And the first stitch row (1) and the other side base portion (b2).

S6에서는, S5에 있어서의 제1스티치열(1)을 일측 베이스부(b1) 쪽의 일측 그룹(一側 group)(g1)과 타측 베이스부(b2) 쪽의 타측 그룹(他側 group)(g2)으로 나누고, 각 그룹(g1, g2)을 FB의 타측 베이스부(b2) 쪽의 편침으로 이동시킨다(공정β에 상당). 그때에 타측 그룹(g2)은 교차영역의 좌단(左端)까지 이동시켜서, 일측 그룹(g1)을 구성하는 스티치는 타측 그룹(g2)보다 일측 베이스부(b1) 쪽의 편침과 분리된다. 일측 그룹(g1)을 분리할 때에는, 타측 그룹(g2)과 일측 그룹(g1)의 사이 및 일측 그룹(g1)의 편성폭내에 공침(空針)이 형성되도록 한다(전자(前者)에 대해서는 FB의 편침(H), 후자(後者)에 대해서는 FB의 편침(J, L)을 참조).In S6, the first stitch row 1 in S5 is folded to one side group (g1) on the side of the base portion b1 on one side and the other group (the other side group) on the side of the other base portion b2 g2), and each of the groups g1 and g2 is moved to the knitting needle on the side of the other base portion b2 of the FB (corresponding to step beta). At this time, the other group g2 is moved to the left end of the intersection area so that the stitch constituting the one group g1 is separated from the knitting needle at the one base part b1 than the other group g2. When separating one side group g1, a cooperative needle is formed within the knitting width between the other group g2 and the one side group g1 and the one side group g1 (for the former, FB The knitting needle H of the FB, and the knitting needles J and L of the FB for the latter.

여기에서 각 그룹(g1, g2)에 몇 개의 스티치를 할당할지는, 다음의 S7에서 제2스티치열(2)을 이동시킬 때에, 제2스티치열(2)과 타측 베이스부(b2)를 연결하는 교차사(3)가 끊어지지 않는 범위에서 결정한다. 구체적으로는 제1스티치열(1)을 구성하는 스티치 중에서, 타측 베이스부(b2) 쪽의 1∼3개 정도의 스티치를 타측 그룹(g2)으로 하고, 나머지 스티치를 일측 그룹(g1)으로 한다. 예를 들면 제1스티치열(1)이 12개의 스티치로 구성되어 있었다고 하더라도, 타측 그룹(g2)을 2∼4개 정도의 스티치, 일측 그룹(g1)을 10∼8개 정도의 스티치로 한다. 다만 편성포를 탄성편사로 편성하는 경우에, 타측 그룹(g2)의 스티치수를 4개 이상으로 할 수도 있다.The number of stitches to be assigned to each of the groups g1 and g2 is determined by connecting the second stitch row 2 and the other base portion b2 when the second stitch row 2 is moved in the next step S7 Is determined within a range in which the cross yarns (3) are not cut off. More specifically, among the stitches constituting the first stitch row 1, about one to three stitches on the other side of the base portion b2 are used as the other group g2 and the remaining stitches are used as the one side group g1 . For example, even if the first stitch row 1 is composed of twelve stitches, the other group g2 is about 2 to 4 stitches and the one side group g1 is about 10 to 8 stitches. However, in the case of knitting a knitted fabric with an elastic knitting yarn, the number of stitches of the other group g2 may be four or more.

상기 S6에 있어서 스티치의 이동을 시키기 위해서는, BB를 좌측방향으로 래킹해서 제1스티치열(1)에 대향하는 위치에 BB의 공침이 배치되도록 한다. 계속하여 S5에 있어서의 FB의 편침(H∼M)에 결합되는 제1스티치열(1)의 스티치를 BB에 홀딩시킨다. 그리고 BB를 좌측방향으로 래킹하면서 BB에 홀딩된 스티치를 순차적으로 FB로 되돌리면 된다.In order to move the stitch in step S6, BB is stuck in the left direction so that the co-needle of BB is arranged at the position facing the first stitch row (1). Subsequently, the stitches of the first stitch row (1) coupled to the knitting needles (H to M) of the FB in S5 are held on the BB. Then, while straddling the BB in the left direction, the stitches held in the BB are successively returned to the FB.

S7에서는, 제2스티치열(2)을 구성하는 각 스티치를 파선으로 둘러싸이는 FB의 교차영역의 공침으로 이동시켜서, 제1스티치열(1) 이외의 스티치열(b2, 2, b1)을 편성한다(공정γ에 상당). 교차영역의 공침은 공정α와 공정β를 거침으로써 FB에 형성되는 공침으로서, 본 예의 경우에 FB의 편침(N, O, P)의 편침이 공정α에서 형성된 공침이며, FB의 편침(H, J, L)의 편침이 공정β에서 형성된 공침이다. 제2스티치열(2)의 이동시에는, 니들베드의 길이방향에 있어서 제2스티치열(2)의 스티치의 배열순서가 변화되지 않도록 한다. 본 예에서는 BB에 결합되는 제2스티치열(2)의 스티치 중에서, BB의 편침(E)의 스티치, 편침(F)의 스티치 및 편침(G)의 스티치를 각각 FB의 편침(H), 편침(J) 및 편침(L)으로 이동시킴과 동시에, BB의 편침(H, I, J)의 스티치를 각각 FB의 편침(N, O, P)으로 이동시킨다.The stitch rows b2, 2, b1 other than the first stitch row 1 are knitted in S7 by moving each of the stitches constituting the second stitch row 2 in the crossing area of the FB crossing area surrounded by the broken line, (Corresponding to the process?). The coprecipitation of the cross region is formed in the FB by passing through the steps? And?. In this example, the knitting needles of the FB needles (N, O, P) J, L) is a coprecipitate formed in step?. When the second stitch row 2 is moved, the order of arranging the stitches of the second stitch row 2 in the longitudinal direction of the needle bed is not changed. In this example, stitches of the knitting needles E of the BB, stitches of the knitting needles F and stitches of the knitting needles G are stitched together with knitting needles H of the FB, J and knitting needle L and the stitches of the knitting needles H, I and J of the BB are moved to the knitting needles N, O and P of the FB respectively.

여기에서 제2스티치열(2) 중에서 타측 베이스부(b2) 쪽의 단부스티치는, BB의 편침(E)으로부터 FB의 편침(H)(일측 그룹(g1)과 타측 그룹(g2) 사이의 공침)까지 니들베드의 길이방향으로 3바늘분 이동하고 있다. 3바늘분 정도의 이동이라면, 제2스티치열(2)과 타측 베이스부(b2)를 연결하는 교차사(3)가 끊어질 가능성은 낮다. 또한 제2스티치열(2)의 스티치 중에서 일측 베이스부(b1) 쪽의 단부스티치는, BB의 편침(J)으로부터 FB의 편침(P)까지 니들베드의 길이방향으로 6바늘분 이동하고 있다. 이 단부스티치는 도1의 S1에 나타나 있는 바와 같이 일측 베이스부(b1)에 연결되어 있어, 단부스티치와 일측 베이스부(b1)를 연결하는 교차사는 매우 길어져 있다. 단부스티치의 이동방향은, 단부스티치와 일측 베이스부(b1)와의 거리를 단축시키는 방향이기 때문에 실 끊어짐의 걱정은 없다.The end stitches on the other side of the second stitch row 2 on the other side of the second stitch row 2 are arranged in such a manner that knitting needles H of the FB (knitting needles between the one side group g1 and the other side group g2) ) In the longitudinal direction of the needle bed. In the case of a movement of about three needles, the possibility that the cross yarn 3 connecting the second stitch row 2 and the other base portion b2 is cut off is low. The end stitches on the base portion b1 side of the stitches of the second stitch row 2 are moved by 6 stitches in the lengthwise direction of the needle bed from the knitting needle J of the BB to the knitting needle P of the FB. The end stitch is connected to the base part b1 as shown in S1 of Fig. 1, and the cross yarn connecting the end stitch to the base part b1 is very long. Since the direction of movement of the end stitches is a direction of shortening the distance between the end stitches and the one base portion b1, there is no fear of thread breakage.

다음의 S8∼S11에서는, 제1스티치열(1)의 스티치와 제2스티치열(2)의 스티치가 혼재되는 혼재영역(混在領域)에 있는 제1스티치열(1)의 스티치와 제2스티치열(2)의 스티치를 각각 타측 베이스부(b2)의 측과 일측 베이스부(b1)의 측으로 이동시켜서 제2스티치열(2)을 편성하는 것을, 양쪽 스티치열(1, 2)의 스티치의 혼재가 해소될 때까지 반복한다(공정δ에 상당). 제2스티치열(2)의 편성시에는, 제1스티치열(1) 이외의 스티치열(b1, 2, b2)을 편성한다.In the next S8 to S11, the stitches of the first stitch row 1 and the second stitch row 1 in the mixed region where the stitches of the first stitch row 1 and the stitches of the second stitch row 2 are mixed, The knitting of the second stitch row 2 by moving the stitches of the row 2 to the side of the other side base portion b2 and the side of the base portion b1 of the one side is the same as that of the stitches of the stitch rows 1, The process is repeated until the mixture is dissolved (equivalent to the process δ). At the time of knitting the second stitch row 2, the stitch rows b1, 2, b2 other than the first stitch row 1 are knitted.

공정δ의 일부인 S8에서는, S7에 나타내는 혼재영역(4)에 있는 FB의 편침(H∼M)의 스티치를 BB의 편침(H∼M)으로 이동시킨다. 혼재영역(4)은, S7의 종료후에 있어서 제2스티치열(2)의 타측 베이스부(b2) 쪽의 단부(端部)(편침(H) 참조)로부터 제1스티치열(1)의 일측 베이스부(b1) 쪽의 단부(편침(M) 참조)까지의 영역이다.In S8 which is a part of the process delta, the stitch of the knitting needles H to M of the FB in the mixed region 4 shown in S7 is moved to the knitting needles H to M of BB. The mixed region 4 is formed from one end of the first stitch row 1 to the other side of the second stitch row 2 after the end of S7 (See the knitting needle M) of the base portion b1.

S9에서는, 래킹과 트랜스퍼를 사용하여 BB의 편침(I, K, M)에 결합되는 제1스티치열(1)의 스티치를 FB의 편침(H, J, L)으로 이동시킴과 동시에, BB의 편침(H, J, L)에 결합되는 제2스티치열(2)의 스티치를 FB의 편침(I, K, M)으로 이동시킨다. 또한 S9에서는, 급사구(8)를 우측방향으로 이동시켜서, 제1스티치열(1)을 편성하지 않고 타측 베이스부(b2), 제2스티치열(2) 및 일측 베이스부(b1)를 연속해서 편성한다.In step S9, the stitches of the first stitch row 1 bonded to the knitting needles I, K and M of the BB are moved to knitting needles H, J and L of the FB using racking and transfer, The stitches of the second stitch row 2 bonded to the knitting needles H, J and L are moved to knitting needles I, K and M of the FB. In the step S9, the yarn feeding port 8 is moved to the right so that the other side base portion b2, the second stitch row 2 and the one side base portion b1 are continuously connected without knitting the first stitch row 1, .

상기 S8, S9에 의하여, 제1스티치열(1)의 스티치와 제2스티치열(2)의 스티치의 혼재가 일부 해소되어, FB의 편침(I∼L)이 새로운 혼재영역(5)으로 된다. 그래서 S10에서는, 혼재영역(5)에 있는 FB의 편침(I∼L)의 스티치를 BB의 편침(I∼L)으로 이동시킨다.The mixed stitches of the stitches of the first stitch row 1 and the second stitch row 2 are partially eliminated by the steps S8 and S9 so that the knitting needles I to L of the FB become the new mixed region 5 . Thus, in S10, the stitches of the knitting needles I to L of the FB in the mixed region 5 are moved to the knitting needles I to L of the BB.

S11에서는, BB의 편침(J, L)에 결합되는 제1스티치열(1)의 스티치를 FB의 편침(I, J)으로 이동시킴과 동시에, BB의 편침(I, K)에 결합되는 제2스티치열(2)의 스티치를 FB의 편침(K, L)으로 이동시킨다. 또한 S11에서는, 급사구(8)를 좌측방향으로 이동시켜서, 제1스티치열(1)을 편성하지 않고 타측 베이스부(b2), 제2스티치열(2) 및 일측 베이스부(b1)를 편성한다. 이 S10, S11에 의하여, 양쪽 스티치열(1, 2)의 스티치의 혼재가 해소되어, 제1스티치열(1)의 위치와 제2스티치열(2)의 위치가 교체된 상태 즉 제1스티치열(1)이 제2스티치열(2)보다 앞쪽에 교차된 케이블 패턴이 형성된 상태로 된다.In S11, the stitches of the first stitch row 1 bonded to the knitting needles J and L of the BB are moved to the knitting needles I and J of the FB and the stitches of the knitting needles I and K 2 Move the stitches of the stitch row 2 to knitting needles (K, L) of FB. In S11, the yarn feeding port 8 is moved to the left to knit the other base portion b2, the second stitch row 2 and the one base portion b1 without knitting the first stitch row 1. [ do. By this S10 and S11, the mixed state of the stitches of the stitch rows 1 and 2 is canceled and the state of the first stitch row 1 and the second stitch row 2 are replaced, A cable pattern in which the row 1 is crossed in front of the second stitch row 2 is formed.

이후에 케이블 패턴의 편성을 더 하는 것이라면, 도1, 2의 S1∼S11을 반복하면 된다. 또한 지면의 좌측으로부터 순서대로 일측 베이스부(b1), 제1스티치열(1), 제2스티치열(2), 타측 베이스부(b2)로 규정하여, S1∼S11과 동일한 편성을 할 수도 있다. 그 경우에 도1의 S0에 있어서의 FB의 편침(E∼J)의 스티치열이 편성포의 표면측에 배치되는 케이블 패턴을 형성할 수 있다.If the cable pattern is to be knitted later, the steps S1 to S11 in Figs. 1 and 2 may be repeated. The same stitches as S1 to S11 may also be stipulated by one side base portion b1, the first stitch row 1, the second stitch row 2 and the other side base portion b2 in this order from the left side of the drawing sheet . In this case, it is possible to form a cable pattern in which stitch rows of the knitting needles E to J of the FB in S0 of Fig. 1 are arranged on the surface side of the knitting fabric.

이상에서 설명한 편성공정에 따르면, 제1스티치열(1)의 위치와 제2스티치열(2)의 위치를 교체할 때에 실 끊어짐이 발생하는 것을 회피할 수 있다. 이것은 교차사에 의하여 연결된 두개의 스티치 중에서, 교차사가 신장되는 방향으로 일방(一方)의 스티치를 이동시킬 때에, 그 이동거리가 많아도 4바늘분 이하로 되어 있기 때문이다.According to the knitting process described above, yarn breakage can be avoided when the position of the first stitch row 1 and the position of the second stitch row 2 are exchanged. This is because, when one stitch is moved in the direction in which the cross yarns are stretched out of the two stitches connected by the cross yarn, the movement distance is 4 knots or less even if the movement distance is large.

또한 상기 편성공정에서는, 케이블 패턴의 편성이 종료될 때까지의 사이에, 파선으로 둘러싸이는 FB의 교차영역내에서만 제1스티치열(1)과 제2스티치열(2)이 편성되어 있기 때문에, FB에 대하여 BB를 래킹한 상태에서밖에 편성할 수 없는 조직패턴(組織pattern)을 베이스 편성포부(베이스부(b1, b2))에 형성하는 경우에도, BB의 래킹 상태에 관계없이 케이블 패턴을 구성하는 스티치를 FB에서 편성할 수 있다. 즉 실시형태에 나타내는 케이블 패턴의 편성방법은, 교차영역 밖의 베이스 편성포부에 어떤 조직패턴을 형성했다고 하더라도, 케이블 패턴을 형성할 수 있는 범용성(汎用性)을 구비하고 있다.Further, in the knitting process, since the first stitch row 1 and the second stitch row 2 are knitted only in the intersection area of the FB surrounded by the dashed line until the knitting of the cable pattern is completed, Even when a tissue pattern (tissue pattern) that can not be knitted only in the state where the BB is racked against the FB is formed on the base knitted shoulders (base portions b1 and b2) Stitches can be knitted in FB. That is, the method of knitting a cable pattern shown in the embodiment has a general versatility capable of forming a cable pattern, regardless of which pattern is formed on the base knitted shoulder outside the crossing area.

또한 상기 편성공정에서는, 프론트 스티치(front stitch)로 이루어지는 제1스티치열의 뒤쪽에 숨은 제2스티치열도 프론트 스티치로 되기 때문에, 케이블 패턴에 있어서의 제1스티치열의 부분과 제2스티치열의 부분의 조직에 통일감이 있어, 케이블 패턴의 외관이 향상된다.Further, in the knitting process, since the second stitch row behind the first stitch row made of the front stitch is also the front stitch, it is possible to prevent the portion of the first stitch row and the portion of the second stitch row in the cable pattern There is a sense of unity, and the appearance of the cable pattern is improved.

<편성 프로그램(編成 program) 및 기억매체(記憶媒體)>&Lt; Organizing program (program) and storage medium (storage medium) >

상기 케이블 패턴의 편성방법을 횡편기에 실시하게 하는 편성 프로그램은, 하기 스텝(step)을 횡편기에 실행시키도록, 횡편기에 구비되는 컴퓨터에 횡편기를 제어시키기 위한 편성 프로그램이다. 하기 스텝이 실행됨으로써, 도1의 S0에 나타내는 일측 베이스부(b1)와 타측 베이스부(b2)의 사이에 배치되는 제1스티치열(1)의 위치와 제2스티치열(2)의 위치를 교체시킨 케이블 패턴을 편성포에 형성할 수 있다.The knitting program for causing the horizontal knitting machine to perform the knitting method of the cable pattern is a knitting program for controlling the horizontal knitting machine in the computer provided in the horizontal knitting machine so as to execute the following steps in the horizontal knitting machine. The position of the first stitch row 1 and the position of the second stitch row 2 arranged between the one base portion b1 and the other base portion b2 shown in S0 in Fig. The replaced cable pattern can be formed in the knitted fabric.

여기에서 횡편기에서는, 니들베드상을 주행하는 캐리지(carriage)에 구비되는 캠(cam)이 편침에 구비되는 버트(butt)에 작용되고, 편침이 니들베드의 니들홈(needle groove)을 따라 진퇴함으로써 스티치가 형성된다. 이 횡편기에는, 어느 편침에 어떤 움직임을 시킬지를 결정하는 선침기구(選針機構)와, 캐리지의 주행과 캠의 출몰을 제어하는 캐리지 제어기구와, 니들베드의 래킹을 제어하는 래킹 제어기구가 구비되어 있다. 편성 프로그램은, 이들의 기구에 지령을 내어 니들베드의 래킹 위치와 개개의 편침의 움직임을 제어함으로써 하기 스텝의 편성을 실현시킨다.Here, in the weft knitting machine, a cam provided on a carriage running on the needle bed acts on a butt provided on the knitting needle, and the knitting needle moves forward and backward along the needle groove of the needle bed Whereby stitches are formed. This needle-type knitting machine includes a needle selection mechanism (needle selection mechanism) for determining which kind of knitting needles to move, a carriage control mechanism for controlling the running and camming of the carriage, and a racking control mechanism for controlling the racking of the needle bed Respectively. The knitting program realizes knitting of the following steps by issuing a command to these mechanisms to control the racking position of the needle bed and the movement of the individual knitting needles.

FB에 있어서 제1스티치열(1)과 제2스티치열(2)이 늘어선 영역을 교차영역이라고 하고, 제2스티치열(2)을 BB에 홀딩시킨 상태에서 제1스티치열(1)을 교차영역내의 타측 베이스부(b2)의 측으로 이동시켜서, 제2스티치열(2)을 편성하지 않고 일측 베이스부(b1)와 제1스티치열(1)과 타측 베이스부(b2)를 편성하는 것을 적어도 1회 이상 하는 스텝1.The area where the first stitch row 1 and the second stitch row 2 are arranged in the FB is referred to as an intersection area and the first stitch row 1 is intersected with the second stitch row 2 in the state of holding the second stitch row 2 at BB The first stitch row 1 and the second side stitch b2 are knitted without moving the second stitch row 2 by moving the first stitch row 1 and the second stitch row 2 to the side of the other base portion b2 Step 1 or more steps 1.

제1스티치열(1)을 구성하는 복수의 스티치를 일측 베이스부(b1) 쪽의 일측 그룹(g1)과 타측 베이스부(b2) 쪽의 타측 그룹(g2)으로 나누고, 교차영역의 단부까지 타측 그룹(g2)을 이동시킴과 동시에 일측 그룹(g1)의 일부의 스티치를 타측 베이스부(b2)의 측으로 이동시켜서, 타측 그룹(g2)과 일측 그룹(g1)의 사이 및 일측 그룹(g1)의 편성폭내에 공침을 형성하는 스텝2.A plurality of stitches constituting the first stitch row 1 are divided into one group g1 on one side of the base part b1 and the other group g2 on the other side of the base part b2, The stitches of one side group g1 are moved to the side of the other side base portion b2 and the stitches of the other side group g2 and the one side group g1 are moved Step 2 of forming a co-needle in the knitting width.

제2스티치열(2)의 각 스티치를 교차영역의 공침으로 분리하고, 제1스티치열(1)을 편성하지 않고 일측 베이스부(b1)와 제2스티치열(2)과 타측 베이스부(b2)를 편성하는 스텝3.The respective stitches of the second stitch row 2 are separated by the copulation of the intersection area and the first stitch row 1 is not knitted and the one side b1, the second stitch row 2 and the other side b2 ) Step 3.

제1스티치열(1)의 스티치와 제2스티치열(2)의 스티치가 혼재되는 혼재영역(4, 5)에 있는 제1스티치열(1)의 스티치를 타측 베이스부(b2)의 측으로 이동시킴과 동시에, 혼재영역(4, 5)에 있는 제2스티치열(2)의 스티치를 일측 베이스부(b1)의 측으로 이동시켜서, 제1스티치열(1)을 편성하지 않고 일측 베이스부(b1)와 제2스티치열(2)과 타측 베이스부(b2)를 편성하는 것을, 제1스티치열(1)의 스티치와 제2스티치열(2)의 스티치의 혼재가 해소될 때까지 반복하는 스텝4.The stitches of the first stitch row 1 in the mixed regions 4 and 5 where the stitches of the first stitch row 1 and the stitches of the second stitch row 2 are mixed are moved to the side of the other side base portion b2 The stitches of the second stitch row 2 in the mixed regions 4 and 5 are moved to the side of the one base portion b1 so as not to knit the first stitch row 1, And repeating the step of knitting the second stitch row 2 and the other base portion b2 until the mixed stitches of the stitches of the first stitch row 1 and the second stitch row 2 are eliminated 4.

상기 편성 프로그램을 기억하는 기억매체는, 편성포의 디자인 시스템(design system)에 탑재된 형태일 수 있고, 횡편기에 탑재된 형태일 수 있고, 편성포의 디자인 시스템에 의하여 작성된 편성 프로그램을 횡편기에 이행(移行)시키는 CD롬(Compact Disc read only memory)이나 USB 메모리, 자기 디스크(磁氣 disk) 등의 리무버블 기억매체(removable 記憶媒體)의 형태일 수 있다. 여기에서 편성포의 디자인 시스템이란 것은, 유저(user)가 화면상에서 편성포를 디자인함으로써 그 유저의 디자인에 의거하여 횡편기를 동작시키기 위한 편성 프로그램을 작성하는 시스템이다(예를 들면 일본국 특허 제2916990호 공보를 참조).The storage medium for storing the knitting program may be a form mounted on a design system of a knitted fabric and mounted on a weft knitting machine, and a knitting program created by the knitting fabric design system may be mounted on a weft knitting machine Or a removable storage medium such as a CD-ROM (Compact Disc read only memory), a USB memory, or a magnetic disk. Here, the design system of the knitting fabric is a system for creating a knitting program for operating the weft knitting machine based on the user's design by designing the knitting fabric on the screen by the user (for example, 2916990).

<편성포의 디자인 시스템><Design system of knitting fabric>

도3의 기능 블럭도에 나타나 있는 바와 같이 유저의 디자인에 의거하는 상기 편성 프로그램을 작성하는 편성포의 디자인 시스템(100)은, 입력부(10)와 자동처리부(20)와 메모리(30)와 표시부(40)를 구비한다. 이 편성포의 디자인 시스템(100)은, 유저가 편성포의 일부에 케이블 패턴을 편성하는 위치(예를 들면 케이블 패턴의 편성을 시작하는 위치)나 케이블 패턴의 폭을 지정했을 때에, 자동으로 상기 편성 프로그램을 작성하도록 구성되어 있다. 이하에서는 각 부(部)(10, 20, 30, 40)의 구성을 간단하게 설명하고, 이어서 유저가 입력한 정보에 의거하여 편성포의 디자인 시스템(100)이 편성 프로그램을 작성하는 순서를 설명한다.As shown in the functional block diagram of Fig. 3, the knitting fabric design system 100 for creating the knitting program based on the user's design includes an input unit 10, an automatic processing unit 20, a memory 30, (40). The design system 100 of this knitting fabric automatically sets the position of the knitting fabric to be knitted when a user designates a position at which a cable pattern is to be knitted (for example, a position at which knitting of the cable pattern starts) So as to create a programming program. Hereinafter, the structure of each of the parts (10, 20, 30, 40) will be briefly described, and then a description will be given of a procedure in which the knitting fabric design system 100 creates a knitting program based on the information input by the user do.

≪입력부≫«Input section»

입력부(10)는, 유저가 디자인 데이터(design data)를 편집할 때에 사용되는 것으로서, 키보드(keyboard)나 마우스(mouse), 스캐너(scanner), 디지타이저(digitizer) 등의 형태로 구성된다. 유저가 입력하는 정보로서는, 어떤 형상·크기의 편성포를 편성할지에 관한 정보(형지(型紙)의 정보)나, 편사의 종류에 관한 정보, 편성포를 구성하는 편성단위의 정보, 각 편성단위에 할당하는 편성코드(編成code)의 정보(편성단위의 위치와 그 위치에 배치되는 편성코드의 정보) 등이 있다. 이하에서 이들 편성포의 편성에 관한 정보를 편성정보(編成情報)라고 부른다.The input unit 10 is used when a user edits design data and is configured in the form of a keyboard, a mouse, a scanner, a digitizer, or the like. The information input by the user includes information on the knitting fabric of a certain shape and size (information on a type of paper), information on the type of knitting yarn, information on a knitting fabric constituting a knitting fabric, (The position of the combination unit and the information of the combination code arranged at the position), and the like. Hereinafter, the information on the knitting of these knitting fabrics is referred to as knitting information (knitting information).

여기에서 편성포의 편성단위는, 편성포에 있어서의 스티치 1개분에 해당하는 것이다. 또한 각 편성단위에 할당되는 편성코드는, 횡편기가 실시하는 편성동작을 예를 들면 색이나 숫자, 도형 혹은 이들의 조합에 의하여 표현한 것이다. 예를 들면 적색(녹색)으로 나타내는 편성코드는, 프론트 스티치(백스티치)를 횡편기에 편성시키는 편성코드라고 하도록 규정된다. 물론 하나의 편성코드에 의하여 복수의 편성동작이 규정되어 있더라도 좋고, 케이블 패턴의 편성에 관한 편성코드는 그 전형적인 예이다. 예를 들면 적자(赤紫) 및 청자(靑紫)로 나타내는 편성코드를, 케이블 패턴의 앞쪽에 배치되는 부분(도1, 2의 제1스티치열(1)) 및 뒤쪽에 배치되는 부분(제2스티치열(2))을 각각 횡편기에 편성시키는 편성코드라고 할 수 있다. 제1스티치열(1)을 규정하는 편성코드(이하 제1편성코드)와, 제2스티치열(2)을 규정하는 편성코드(이하 제2편성코드)는, 반드시 쌍(雙)으로 사용된다. 이들 편성코드는 후술하는 메모리(30)에 기억되어 있다.Here, the knitting unit of the knitting fabric corresponds to one stitch in the knitting fabric. The knitting code assigned to each knitting unit is represented by a color, a number, a graphic, or a combination thereof, for example, a knitting operation performed by the knitting machine. For example, a knitting code represented by red (green) is defined as a knitting code for knitting a front stitch (back stitch) into a weft knitting machine. Of course, a plurality of knitting operations may be specified by one knitting code, and a knitting code for knitting a cable pattern is a typical example thereof. For example, a knitting code represented by reddish violet and blue-violet can be used as a knitting code in the front portion (the first stitch row 1 in Figs. 1 and 2) and the rear portion 2 stitch rows 2) are knitted into the flat knitting machines, respectively. A knitting code (hereinafter referred to as a first knitting code) for defining the first stitch row 1 and a knitting code (hereinafter referred to as a second knitting code) for defining the second stitch row 2 are necessarily used in pairs . These combination codes are stored in the memory 30 described later.

≪자동처리부≫«Automatic processing unit»

자동처리부(20)는, 편성포의 편성 프로그램의 작성을 하는 것으로서, 예를 들면 컴퓨터로 구성할 수 있다. 이 자동처리부(20)는, 유저가 입력한 편성정보 중에서 케이블 패턴의 편성에 관련되는 케이블 패턴 관련정보에 의거하여 케이블 패턴의 편성조건을 결정하는 편성조건 결정부(編成條件 決定部)(21)와, 편성조건 결정부(21)에 의하여 결정된 편성조건에 의거하여 편성 프로그램을 작성하는 편성 프로그램 작성부(29)를 구비한다. 편성조건 결정부(21)가 편성조건의 결정에 사용하는 케이블 패턴 관련정보에는, 케이블 패턴의 편성을 규정하는 편성코드의 정보, 그 편성코드가 배치되는 위치의 정보 및 케이블 패턴을 구성하는 편사의 종류의 정보 등이 포함된다.The automatic processing section 20 is for creating a knitting fabric knitting program and can be constituted by a computer, for example. The automatic processing section 20 includes a knitting condition determining section (knitting condition determining section) 21 for determining knitting conditions of the cable pattern based on the cable pattern related information related to knitting of the cable pattern among the knitting information inputted by the user, And a knitting program creating section (29) for creating a knitting program based on knitting conditions determined by the knitting condition determining section (21). The cable-pattern-related information used by the knitting-condition determining unit 21 to determine the knitting condition includes information on a knitting code that specifies knitting of the cable pattern, information on the position where the knitting code is disposed, Type information, and the like.

[편성조건 결정부][Knitting condition determining section]

편성조건 결정부(21)는, 케이블 패턴 관련정보에 의거하여 본 발명의 케이블 패턴의 편성방법을 실시하기 위한 편성조건 즉 상기한 편성 프로그램의 각 스텝의 편성조건을 결정한다. 결정해야 할 편성조건으로서 예를 들면 다음의 5개를 들 수 있다.The knitting condition determining unit 21 determines a knitting condition for performing the knitting method of the cable pattern of the present invention, that is, a knitting condition of each step of the knitting program, based on the cable pattern-related information. For example, the following five conditions can be given.

(1)…스텝1에 있어서의 제1스티치열(1)의 1회의 이동거리.(One)… The moving distance of the first stitch row 1 in Step 1 once.

(2)…스텝1에 있어서의 제1스티치열(1)의 이동과 편성을 반복하는 횟수.(2)… The number of times that the movement and combination of the first stitch row 1 in step 1 are repeated.

(3)…스텝2에 있어서의 제1스티치열(1)의 그룹 나눔의 방법(일측 그룹(g1)과 타측 그룹(g2)을 각각 몇 개의 스티치로 구성할 것인지).(3) ... (How many stitches are to be formed of the one group g1 and the other group g2, respectively) of the first stitch row 1 in step 2.

(4)…스텝2에 있어서의 공침의 형성 장소.(4)… A place where co-op is formed in step 2.

(5)…스텝4에 있어서의 제1스티치열(1)과 제2스티치열(2)의 스티치의 혼재를 해소하기 위한 제1스티치열(1)과 제2스티치열(2)의 이동 패턴.(5) ... The movement pattern of the first stitch row 1 and the second stitch row 2 for eliminating the mixture of the stitches of the first stitch row 1 and the second stitch row 2 in Step 4.

본 예의 편성포의 디자인 시스템(100)에서는, 상기 (1)∼(5)의 편성조건이 각각 복수 준비되어 있으며, 그들 편성조건은 후술하는 메모리(30)에 기억되어 있다. 각 편성조건은, 편사의 종류나, 제1스티치열(1) 및 제2스티치열(2)을 구성하는 스티치의 수(즉 케이블 패턴 관련정보)에 따라 미리 설정되어 있다. 예를 들면 양쪽 스티치열(1, 2)의 스티치수가 각각 4개인 경우의 편성조건은 “X”, 양쪽 스티치열(1, 2)의 스티치수가 각각 5개인 경우의 편성조건은 “Y”라고 한 것과 같이, 케이블 패턴 관련정보의 변화에 따른 복수의 편성조건이 미리 설정되어 있다. 즉 본 예의 편성조건 결정부(21)는, 케이블 패턴 관련정보를 참조하여 복수의 편성조건 중에서 케이블 패턴 관련정보에 대응하는 편성조건을 선택하는 구성으로 되어 있다.In the knitted fabric design system 100 of this embodiment, a plurality of knitting conditions (1) to (5) are prepared in advance, respectively, and these knitting conditions are stored in a memory 30 described later. Each knitting condition is set in advance according to the kind of knitting yarn and the number of stitches (i.e., cable pattern-related information) constituting the first stitch row 1 and the second stitch row 2. For example, a knitting condition when the number of stitches on both stitch rows 1 and 2 is four and a knitting condition when the number of stitches on both stitch rows 1 and 2 are five is &quot; Y &quot; As described above, a plurality of knitting conditions corresponding to changes in the cable pattern-related information are set in advance. In other words, the knitting condition determining unit 21 of this embodiment selects a knitting condition corresponding to the cable pattern-related information among a plurality of knitting conditions by referring to the cable pattern-related information.

[편성 프로그램 작성부][Organizing Program Creation Department]

편성 프로그램 작성부(29)는, 유저가 입력한 편성정보에 의거하여 실제의 편침의 동작이나 편사의 풀어내는 순서 등을 설정한 편성 프로그램을 작성한다. 편성 프로그램 작성부(29)에 의하여 작성된 편성 프로그램은, 자기 디스크 등의 기록매체나 유선, 무선 등을 통하여 횡편기로 보내진다.The knitting program creating section 29 creates a knitting program in which an operation of an actual knitting needle and a knitting procedure of a knitting yarn are set based on the knitting information input by the user. The knitting program created by the knitting program creating section 29 is sent to a knitting machine through a recording medium such as a magnetic disk or the like via wired or wireless.

≪메모리≫«Memory»

메모리(30)는, 유저가 입력한 편성정보(케이블 패턴 관련정보를 포함한다)와, 편성조건 결정부(21)가 참조하는 편성조건을 기억하는 하드디스크(hard disk) 등의 기억매체이다. 물론 메모리(30)는, 편성포의 디자인에 관계되는 그 이외의 정보 예를 들면 유저가 편성단위에 할당하는 편성코드 등을 기억할 수 있다.The memory 30 is a storage medium such as a hard disk for storing knitting information (including cable pattern-related information) input by the user and knitting conditions referred to by the knitting-condition determining unit 21. [ Of course, the memory 30 may store other information related to the design of the knitted fabric, such as a knitting code that the user assigns to the knitting unit.

≪표시부≫«Display section»

표시부(40)는, 편성포의 디자인에 관한 정보를 시각적으로 파악하기 위한 것으로서, 특별하게 한정되지 않는다. 표시부(40)로서는 예를 들면 액정 디스플레이(液晶 display) 등을 들 수 있다. 표시부(40)로서 터치패널(touch panel)을 이용하면, 표시부(40)에 입력부(10)의 역할의 일부를 담당하게 할 수 있다.The display unit 40 is for visually grasping information on the design of the knitted fabric, and is not particularly limited. The display unit 40 may be, for example, a liquid crystal display. When a touch panel is used as the display unit 40, the display unit 40 can be part of the role of the input unit 10.

≪케이블 패턴의 편성 프로그램의 작성순서≫<< Creation sequence of cable pattern program >>

이상의 구성을 구비하는 편성포의 디자인 시스템(100)에 의하여 편성 프로그램을 작성하는 순서를 설명한다. 우선 유저는, 입력부(10)를 통하여 복수의 편성단위로 이루어지는 형지에 편성코드를 배치한다. 그때에 케이블 패턴의 편성에 관한 편성코드가 편성포의 편성단위에 배치되었을 경우에 편성포의 디자인 시스템(100)은, 그 케이블 패턴에 관한 편성코드가 배치된 위치에 의거하여 케이블 패턴의 편성 프로그램을 작성한다.A procedure for creating a knitting program by the knitting fabric design system 100 having the above-described configuration will be described. First, the user places a combination code in a pattern made up of a plurality of combination units through the input unit 10. [ At that time, when the knitting code relating to the knitting of the cable pattern is arranged in the knitting unit of the knitting fabric, the designing system 100 of the knitting fabric determines, based on the position where the knitting code about the cable pattern is arranged, .

자동처리부(20)는, 우선 편성폭 방향으로 연속해서 늘어선 제1편성코드의 수와, 편성폭 방향으로 연속해서 늘어선 제2편성코드의 수 중에서 큰 쪽이 3개 이하인지 여부를 판단한다. 큰 쪽이 3개 이하이면, 자동처리부(20)의 편성 프로그램 작성부(29)는, 제1스티치열(1)의 위치와 제2스티치열(2)의 위치를 한번에 교체시키는 종래의 케이블 패턴의 편성방법을 포함하는 편성 프로그램을 작성한다.The automatic processing section 20 determines whether the number of the first knitting yarns continuously lined up in the knitting width direction and the number of the second knitting yarns continuously arranged in the knitting width direction are three or less. The knitting program creating section 29 of the automatic processing section 20 can change the position of the first stitch row 1 and the position of the second stitch row 2 at a time, And a method of organizing the program.

연속하는 제1편성코드(제2편성코드)의 수가 4개 이상이면, 자동처리부(20)의 편성조건 결정부(21)는, 케이블 패턴 관련정보를 참조하여 메모리(30)에 기억되는 복수의 편성조건 중에서 그 참조 결과에 따른 편성조건(1∼5)을 결정한다. 예를 들면 제1스티치열(1)의 1회의 이동거리에 관한 편성조건(1)은, 편사가 탄성편사가 아니라고 하는 정보에 의거하여 결정하면 된다. 또한 상기한 편성조건(2∼5)은, 편사가 탄성편사인지 여부 및 각 스티치열(1, 2)의 스티치의 수가 몇인지 라는 정보에 의거하여 결정하면 된다.The knitting condition determination unit 21 of the automatic processing unit 20 refers to the cable pattern related information to determine whether the number of the first knitting yarns The knitting conditions (1 to 5) in accordance with the reference results are determined in the knitting conditions. For example, the knitting condition (1) for the movement distance of the first stitch row 1 may be determined based on information that the knitting yarn is not an elastic knitting yarn. The knitting conditions (2 to 5) described above may be determined based on information on whether the knitting yarn is an elastic knitting yarn and how many stitches of the stitch rows (1, 2) are.

편성조건(1∼5)이 결정되면, 편성 프로그램 작성부(29)는, 결정된 편성조건(1∼5)을 충족시키는 케이블 패턴의 편성방법을 횡편기에 실시시키기 위한 편성 프로그램을 작성한다.
When the knitting conditions (1 to 5) are determined, the knitting program creating section 29 creates a knitting program for causing the knitting machine to knit a cable pattern satisfying the determined knitting conditions (1 to 5).

b1 ; 일측 베이스부
b2 ; 타측 베이스부
1 ; 제1스티치열
2 ; 제2스티치열
3 ; 교차사
8 ; 급사구
g1 ; 일측 그룹
g2 ; 타측 그룹
4, 5 ; 혼재영역
100 ; 편성포의 디자인 시스템
10 ; 입력부
20 ; 자동처리부
21 ; 편성조건 결정부
29 ; 편성 프로그램 작성부
30 ; 메모리
40 ; 표시부
b1; The one-
b2; The other-
One ; The first stitch row
2 ; The second stitch row
3; Crossing
8 ; Feeding hatch
g1; One side group
g2; The other group
4, 5; Mixed area
100; Design system of knitting fabric
10; Input
20; Automatic processor
21; The knitting-
29; The program-
30; Memory
40; Display portion

Claims (5)

적어도 전후로 대향(對向)하는 제1니들베드(第1 needle bed)와 제2니들베드를 구비하는 횡편기(橫編機)를 사용하여 니들베드의 길이방향으로, 일측 베이스부(一側 base部), 제1스티치열(第1 stitch列), 제2스티치열, 타측 베이스부(他側 base部)의 순서로 늘어선 상태로부터, 상기 제1스티치열의 위치와 상기 제2스티치열의 위치를 교체함으로써 편성포(編成布)에 케이블 패턴(cable pattern)을 형성하는 케이블 패턴의 편성방법에 있어서,
상기 제1니들베드에 있어서의 상기 제1스티치열과 제2스티치열이 늘어선 영역을 교차영역(交差領域)이라고 했을 때에,
상기 제2스티치열을 상기 제2니들베드에 홀딩(holding)시킨 상태에서, 상기 제1스티치열을 상기 교차영역에 있어서의 상기 타측 베이스부의 측으로 이동시켜서, 상기 제2스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제1스티치열과 상기 타측 베이스부를 편성하는 것을 적어도 1회 이상 하는 공정α와,
상기 제1스티치열을 구성하는 복수의 스티치를 상기 일측 베이스부 쪽의 일측 그룹(一側 group)과 상기 타측 베이스부 쪽의 타측 그룹(他側 group)으로 나누고, 상기 교차영역에 있어서의 상기 타측 베이스부측의 단부(端部)까지 상기 타측 그룹을 이동시킴과 동시에 상기 일측 그룹의 적어도 일부의 스티치를 상기 타측 베이스부의 측으로 이동시켜서, 상기 타측 그룹과 상기 일측 그룹의 사이 및 상기 일측 그룹의 편성폭(編成幅)내에 공침(空針)을 형성하는 공정β와,
상기 제2스티치열의 각 스티치를 상기 교차영역의 공침으로 분리하고, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성하는 공정γ와,
상기 제1스티치열의 스티치와 상기 제2스티치열의 스티치가 혼재하는 혼재영역(混在領域)에 있는 상기 제1스티치열의 스티치를 상기 타측 베이스부의 측으로 이동시킴과 동시에, 상기 혼재영역에 있는 상기 제2스티치열의 스티치를 상기 일측 베이스부의 측으로 이동시켜서, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성하는 것을, 상기 제1스티치열의 스티치와 상기 제2스티치열의 스티치의 혼재가 해소될 때까지 반복하는 공정δ를
실시하는 케이블 패턴의 편성방법.
A knitting machine having a first needle bed and a second needle bed facing at least in front and rear directions is used to guide the needle bed in the longitudinal direction of the needle bed, The position of the first stitch row and the position of the second stitch row are changed from the state in which the first stitch row (first stitch row), the first stitch row (first stitch row), the second stitch row and the other base portion To form a cable pattern on a knitted fabric, the method comprising the steps of:
When an area in which the first stitch row and the second stitch row in the first needle bed are arranged is referred to as an intersecting area (crossing area)
The second stitch row is held on the second needle bed and the first stitch row is moved to the side of the other base portion in the cross region so as not to knit the second stitch row, A step (?) Of knitting the one base part, the first stitch row and the other base part at least once,
A plurality of stitches constituting the first stitch row are divided into one side group (one side group) of the one side base portion and the other group (the other side group) of the other side base portion side, and the other side The other side group is moved to the end of the base portion side and at least a part of the stitches of the one side group is moved toward the other side base portion so that the knitting width between the other side group and the one side group, A step of forming a coin needle in the knitting width,
A step of separating each stitch of the second stitch row by coprecipitation of the cross area and knitting the one side base part and the second stitch row and the other side base part without knitting the first stitch row,
The stitches of the first stitch row in the mixed region where the stitches of the first stitch row and the stitches of the second stitch row coexist are moved to the side of the other base portion and the stitches of the second stitch row The stitch of the first stitch row and the stitch of the second stitch row are moved to the side of the one base portion so as to knit the one base portion and the second stitch row and the other base portion without knitting the first stitch row, Repeat the process δ until the mixed stitches of the heat are removed
A method of knitting a cable pattern to be carried out.
제1항에 있어서,
상기 공정α를 실시하기 전에, 상기 제1스티치열을 편성하지 않고, 상기 일측 베이스부와 상기 제2스티치열과 상기 타측 베이스부를 편성하고, 상기 제1스티치열과 상기 제2스티치열과의 연결을 끊는 공정ε을 실시하는 케이블 패턴의 편성방법.
The method according to claim 1,
A step of knitting the one side base part and the second stitch row and the other side base part without knitting the first stitch row and disconnecting the first stitch row and the second stitch row from each other before the step? lt; RTI ID = 0.0 &gt; epsilon. &lt; / RTI &gt;
제1항 또는 제2항에 있어서,
상기 공정γ에 있어서 상기 제2스티치열을 상기 일측 베이스부의 측으로 이동시킬 때에, 상기 제2스티치열 중에서 상기 타측 베이스부 쪽의 단부스티치(端部stitch)의 이동거리가 2바늘 이상 4바늘 이하가 되도록 상기 공정β의 그룹 나눔을 하는 케이블 패턴의 편성방법.
3. The method according to claim 1 or 2,
When the second stitch row is moved to the side of the one base portion in the step &lt; RTI ID = 0.0 &gt; y, &lt; / RTI &gt; the moving distance of the end stitch on the other side of the second stitch row is 2 or more and 4 or less Wherein the step of dividing the group of the process?
유저(user)가 편성포의 편성에 관한 편성정보(編成情報)를 입력하는 입력부와, 상기 편성정보에 의거하여 전후로 대향하는 제1니들베드와 제2니들베드를 구비하는 횡편기에 구비된 컴퓨터에 의하여 읽어낼 수 있는 편성 프로그램(編成 program)을 작성하는 편성 프로그램 작성부를 구비하는 편성포의 디자인 시스템(design system)에 있어서,
상기 편성정보 중에서, 케이블 패턴의 편성에 관련되는 케이블 패턴 관련정보에 의거하여, 제1항 내지 제3항 중의 어느 하나의 항의 케이블 패턴의 편성방법을 실시하기 위한 편성조건을 결정하는 편성조건 결정부(編成條件 決定部)를 구비하고,
상기 편성 프로그램 작성부는, 상기 편성조건 결정부가 결정한 편성조건에 의거하는 상기 케이블 패턴의 편성방법을 횡편기에 실행시키기 위해서 상기 컴퓨터에 상기 횡편기를 제어시키는 편성 프로그램을 작성하는 편성포의 디자인 시스템.
A computer provided in a flat knitting machine provided with a first needle bed and a second needle bed opposed to each other on the basis of the knitting information on the basis of the knitting information, And a knitting program creating unit for creating a knitting program that can be read by the knitting machine,
A knitting condition determining unit for determining knitting conditions for performing the knitting method of the cable pattern according to any one of claims 1 to 3, based on the knitting information related to the knitting of the cable pattern, (A knitting condition determining unit)
Wherein the knitting program creating section creates a knitting program that causes the computer to control the knitting machine to execute the knitting method of the cable pattern based on knitting conditions determined by the knitting condition determining section.
전후로 대향하는 제1니들베드와 제2니들베드를 구비하는 횡편기에 구비된 컴퓨터에 의하여 읽어낼 수 있는 편성 프로그램을 기억한 기억매체(記憶媒體)에 있어서,
상기 편성 프로그램은, 제1항 내지 제3항 중의 어느 하나의 항의 케이블 패턴의 편성방법을 상기 횡편기에 실행시키도록 상기 컴퓨터에 상기 횡편기를 제어시키는 편성 프로그램인 기억매체.
A storage medium (storage medium) storing a knitting program readable by a computer provided in a weft knitting machine having a first needle bed and a second needle bed which are opposed to each other in the front and back,
Wherein the knitting program is a knitting program that controls the knitting machine to cause the knitting machine to execute the method of knitting a cable pattern according to any one of claims 1 to 3 to the knitting machine.
KR1020150097546A 2014-07-14 2015-07-09 Method for knitting cable pattern, design system of knitted fabric, and storage medium KR101753629B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JPJP-P-2014-144589 2014-07-14
JP2014144589A JP5980273B2 (en) 2014-07-14 2014-07-14 Rope pattern knitting method, knitted fabric design system, and storage medium

Publications (2)

Publication Number Publication Date
KR20160008465A true KR20160008465A (en) 2016-01-22
KR101753629B1 KR101753629B1 (en) 2017-07-04

Family

ID=53717893

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150097546A KR101753629B1 (en) 2014-07-14 2015-07-09 Method for knitting cable pattern, design system of knitted fabric, and storage medium

Country Status (4)

Country Link
EP (1) EP2975165B1 (en)
JP (1) JP5980273B2 (en)
KR (1) KR101753629B1 (en)
CN (1) CN105256450B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109023684B (en) * 2018-09-20 2020-11-13 江苏金龙科技股份有限公司 Method for weaving twisted fabric by flat knitting machine
JP7357506B2 (en) * 2019-10-04 2023-10-06 株式会社島精機製作所 How to knit tubular knitted fabric
CN110725048B (en) * 2019-10-25 2021-04-23 惠州学院 Method for transversely arranging twisting-imitating line on surface of knitted fabric
GB2604626A (en) * 2021-03-10 2022-09-14 Prevayl Innovations Ltd Fabric article and method of making the same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3887410B2 (en) 2001-02-02 2007-02-28 株式会社島精機製作所 How to knit a rope pattern on a tubular knitted fabric

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH382359A (en) * 1961-01-20 1964-09-30 Dubied & Cie Sa E Process for the automatic production of a plait pattern on a fully automatic motorized flat knitting machine with 1/2 and multiple offset and with stitch transfer device
US5557527A (en) * 1993-08-31 1996-09-17 Shima Seiki Manufacturing Ltd. Knit design system and a method for designing knit fabrics
JP2916990B2 (en) 1993-08-31 1999-07-05 株式会社島精機製作所 Knit paint system and knit paint method
JP3406085B2 (en) * 1994-10-12 2003-05-12 株式会社島精機製作所 How to knit a rope pattern on the side edge of the knitting width of a tubular knitted fabric
JP4233409B2 (en) * 2003-08-01 2009-03-04 株式会社島精機製作所 Knitting design apparatus and knit design apparatus
WO2007058123A1 (en) * 2005-11-17 2007-05-24 Shima Seiki Manufacturing, Ltd. Knit design device and knit design method and its program
EP1914335B1 (en) * 2006-10-16 2010-03-17 H. Stoll GmbH &amp; Co. KG Method of producing a knitwear with cable-stitch pattern
KR100799308B1 (en) 2006-12-11 2008-01-29 정승연 Partial knit method of knit fabrics
EP2273002B1 (en) * 2008-03-12 2016-04-27 Shima Seiki Manufacturing., Ltd. Knitted fabric designing system
JP5632389B2 (en) * 2009-11-26 2014-11-26 株式会社島精機製作所 Knit design equipment, design method, design program
CN102776687B (en) * 2012-07-27 2013-10-23 宁波慈星股份有限公司 Method for weaving 5*5 cable with four plain stitches
CN103320951A (en) * 2013-06-25 2013-09-25 宁波慈星股份有限公司 Double-color twisted pattern knitting method of flat knitting machine

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3887410B2 (en) 2001-02-02 2007-02-28 株式会社島精機製作所 How to knit a rope pattern on a tubular knitted fabric

Also Published As

Publication number Publication date
CN105256450A (en) 2016-01-20
KR101753629B1 (en) 2017-07-04
JP2016020546A (en) 2016-02-04
CN105256450B (en) 2017-07-14
JP5980273B2 (en) 2016-08-31
EP2975165B1 (en) 2018-01-03
EP2975165A1 (en) 2016-01-20

Similar Documents

Publication Publication Date Title
KR101753629B1 (en) Method for knitting cable pattern, design system of knitted fabric, and storage medium
CN101668886B (en) Plating-knitted cylindrical fabric, knitting method therefor, and design device
CN107938126A (en) Mattress ticking jacquard knitted fabric and its weaving method
CN102859057B (en) Joining method of neighboring knitted fabric pieces, and knitted fabric
CN103882613B (en) The on-run method of stocking yarn
CN104975427A (en) Process For Production Of Knitted Articles
JPWO2009072617A1 (en) Cylindrical knitted fabric having a swing pattern and its knitting method
JP5161297B2 (en) Knitted fabric design system
JP2011110141A (en) Controller, control program, sewing machine, and sewing machine control program
EP0931866A2 (en) Jacquard fabric and method of manufacturing
ES2817006T3 (en) Method for preparing a tuft insertion process
JP5674631B2 (en) How to design a mold knitting based on vector contour data
EP4101962A1 (en) Knitted fabric knitting method, knit designing system, and storage medium
JP2000027055A (en) Design device
KR20200081252A (en) Design system for knitted fabric
CN102650093A (en) Knit design apparatus and knit design method
JP2007291551A (en) CYLINDRICAL 1x1 RIB KNITTING METHOD IN 4 SHEET BED FLAT KNITTING MACHINE AND DESIGN APPARATUS
EP2955258B1 (en) Design system for knitted fabric
CN110725048B (en) Method for transversely arranging twisting-imitating line on surface of knitted fabric
INDRIE et al. THE USE OF CORELDRAW PROGRAM FOR THE REPRESENTATION OF WEFT KNITTED STRUCTURES
JP2754748B2 (en) Control device based on color scheme data for knitting machines
JPS62282049A (en) Knitting needle indicator relating to knitting of pattern intraverse knitting machine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant