KR20140065879A - Mounting instruction jig for crane and mounting instruction method using the same - Google Patents

Mounting instruction jig for crane and mounting instruction method using the same Download PDF

Info

Publication number
KR20140065879A
KR20140065879A KR1020120132878A KR20120132878A KR20140065879A KR 20140065879 A KR20140065879 A KR 20140065879A KR 1020120132878 A KR1020120132878 A KR 1020120132878A KR 20120132878 A KR20120132878 A KR 20120132878A KR 20140065879 A KR20140065879 A KR 20140065879A
Authority
KR
South Korea
Prior art keywords
jig
leg
gantry crane
vertical frame
crane
Prior art date
Application number
KR1020120132878A
Other languages
Korean (ko)
Inventor
이원중
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020120132878A priority Critical patent/KR20140065879A/en
Publication of KR20140065879A publication Critical patent/KR20140065879A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C6/00Girders, or track-supporting structures, specially adapted for cranes

Abstract

A jig for installing a crane according to the present invention comprises a horizontal frame horizontally installed at a temporary assembling position, a first vertical frame vertically installed on one upper end of the horizontal frame and having legs vertically coupled to one surface thereof, And a second vertical frame vertically installed on the other upper end of the horizontal frame opposite to the one vertical frame and having the other end of the gantry crane coupled to the upper end thereof.
The installation method using a jig using a jig may include a jig installation step for installing the assembly jig at a temporary assembly position, a leg installation step for coupling the leg vertically to one side of the installation jig installed, An assembling step of joining one lower end of a gantry crane at an upper end and a lower end of the other side of the gantry crane to an upper end of the assembling jig to integrate the assembling jig with the leg and the gantry crane, A separating step of separating the lower end of one side of the gantry crane and the upper end of the assembling jig and separating the leg and the assembling jig, and a step of transporting the integrated gantry crane and the fitting leg together, And an on-site installation step for completing the assembling to the outside.

Description

Technical Field [0001] The present invention relates to a jig for installing a crane,

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jig for installing a crane and a method for installing a crane using the jig. More particularly, the present invention relates to a jig for installing a crane and a gantry crane, To a jig for installing a crane and a method of installing a crane using the jig.

Generally, a gantry crane is provided with a boom at the upper end of a column that moves along a rail installed parallel to the shore, and a trolley that moves along the rail is installed on the boom so as to be moved by the machine room provided on the upper side of the boom.

A hoist installed on a trolley, a sprider connected to a wire rope, a cab to operate a trolley and a gantry crane are installed on the lower side of the trolley of the gantry crane.

These gantry cranes are installed on the rail in the field after the equipment such as the support and the boom are moved to the site separately.

However, in the conventional gantry crane installation method, a plurality of equipment are individually transported, and each transported equipment is sequentially assembled. Therefore, there are many work operations, installation process is unstable, and there is a risk of a safety accident , Equipment damage could occur during installation.

A prior art related to the present invention is Korean Patent Laid-Open No. 10-2009-0036969 (Apr. 15, 2009), which discloses a gantry crane having a rechargeable battery.

It is an object of the present invention to improve the workability and prevent equipment damage by assembling the legs and the gantry cranes using the assembly jig in the preassembling process and then transporting and installing the integrated legs and the gantry cranes in the field, A jig for installing a crane and a method for installing a crane using the jig can reduce the risk of a safety accident.

A jig for installing a crane according to the present invention comprises a horizontal frame horizontally installed at a temporary assembling position, a first vertical frame vertically installed on one upper end of the horizontal frame and having legs vertically coupled to one surface thereof, And a second vertical frame vertically installed on the other upper end of the horizontal frame opposite to the one vertical frame and having the other end of the gantry crane coupled to the upper end thereof.

Here, the second vertical frame may further include a plurality of connection parts forming a multi-layered layer along the vertical direction.

In addition, the connecting portions may be coupled with each other in the vertical direction of the legs at different heights.

In addition, a plurality of supports may be further provided on both sides of the top of the horizontal frame, the support being connected to one surface of the first vertical frame and the second vertical frame.

A method of installing a crane using a jig for installing a crane according to the present invention includes a jig installing step of installing an assembling jig at a temporary assembling position, a leg mounting step of vertically connecting the leg to one side of the assembling jig, A lower end of a gantry crane is coupled to an upper end of the leg and a lower end of the other side of the gantry crane is coupled to an upper end of the assembly jig to assemble the assembly jig and the leg and the gantry crane A separating step of separating the lower end of one side of the gantry crane and the upper end of the assembling jig and separating the leg and the assembling jig from each other and transporting the integrated gantry crane and the leg together, And a field installation step of completing the assembly at the installation position.

Here, it is possible to further include a carrying step of moving the assembly jig, the leg, and the gantry crane to a temporary assembling position by using the transportation safety before the jig mounting step.

The present invention has an effect of preventing workability and equipment damage by transporting and installing integrated legs and gantry cranes in the field after assembling the legs and gantry cranes using the assembly jig in the preassembling process .

Further, the legs and the gantry crane can be combined using the assembly jig, thereby reducing the risk of a safety accident.

1 is a perspective view showing a jig for installing a crane according to the present invention.
2 is a block diagram for sequentially showing each step of a crane installation method using a jig for installing a crane according to the present invention.
3 is a view showing a step of installing a leg in a crane installation method using a jig for installing a crane according to the present invention.
4 is a view showing a crane installation step in a crane installation method using a jig for installing a crane according to the present invention.

Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

BRIEF DESCRIPTION OF THE DRAWINGS The advantages and features of the present invention and the manner of achieving it will become apparent with reference to the embodiments described in detail below with reference to the accompanying drawings.

The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. To fully disclose the scope of the invention to those skilled in the art, and the invention is only defined by the scope of the claims.

In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail.

1 and 2, the jig 100 for installing a crane according to the present invention includes a horizontal frame 110, a first vertical frame 120, and a second vertical frame 130.

First, the horizontal frame 110 is horizontally installed at a temporary assembling position, and functions as a base to which a pinned leg 10 and a gantry crane 20 can be installed.

A plurality of supports 111 connected to the first vertical frame 120 and the second vertical frame 130 may be further provided on both sides of the upper end of the horizontal frame 110.

The lower ends of the supporting frames 111 are coupled to the upper ends of the horizontal frames, and the other ends of the supporting frames 111 are connected to corresponding surfaces of the first vertical frame 120 and the second vertical frame 130, Lt; / RTI >

That is, the first vertical frame 120 and the second vertical frame 130 can be firmly installed around the horizontal frame 110 by the supports 111.

The first vertical frame 120 is vertically installed on one upper end of the horizontal frame 110 and the legs 10 are vertically coupled to one side of the first vertical frame 120.

The first vertical frame 120 supports the leg 10 coupled to the lower end of the gantry crane vertically.

To this end, the first vertical frame 120 and the legs 10 may be provided with fastening portions for mutual coupling.

The second vertical frame 130 is vertically installed at the other upper end of the horizontal frame 110 opposite to the first vertical frame 120.

The other end of the gantry crane 20 is temporarily coupled to the upper end of the second vertical frame 130.

Here, the second vertical frame 130 may further include a plurality of connection portions 131 forming a multi-layered layer along the vertical direction.

The connecting portions 131 may be respectively coupled to the upper and lower longitudinal directions of the legs 10 at different heights.

The horizontal frame 110, the first vertical frame 120, and the second vertical frame 130 may be combined into a frame using a plurality of beams.

The gantry crane 20 may be provided with first and second engaging portions for engaging the legs 10 and the jig 100 at both lower ends thereof.

The gantry crane 20 is provided with various driving devices (driving motors, etc.) for traction.

3 and 4, the jig mounting step S100, the leg mounting step S200, the assembling step S300, the separating step S400, And a field installation step S500.

First, in the step of installing the jig S100, the assembly jig 100 is installed at a temporary assembling position.

At this time, the horizontal frame 110 of the assembly jig 100 is positioned on the ground, and the first vertical frame 120 and the second vertical frame 130 coupled to both ends of the horizontal frame 110 are positioned at a predetermined height .

Here, before the jig installing step S100, a carrying step for moving and positioning the assembly jig 100, the leg 10, and the gantry crane 20 to a temporary assembling position may be further included using the transportation equipment .

Next, the leg installing step S200 temporarily links the leg 10 to one side of the installed assembly jig 100.

That is, the legs 10 are vertically installed at the upper end of the first vertical frame 120 located at one side of the assembly jig 100.

As described above, since the legs are coupled to the first vertical frame of the pre-installed jig in the leg installing step (S200), the gantry crane described later can be stably coupled to the legs.

Next, in the assembly step S300, the lower end of one side of the gantry crane 20 is engaged with the upper end of the leg 10, and the other lower end of the gantry crane 20 is temporarily attached to the upper end of the assembly jig 100 Lt; / RTI >

At this time, in the assembly step S300, the assembly jig 100, the leg 10, and the gantry crane 20 are integrally joined.

The assembling step S300 is a pre-assembling process for carrying the gantry cranes and the legs to a single body in a field installation step to be described later.

That is, the legs 10 and the gantry cranes 20 can be stably assembled using the assembly jig, thereby improving the workability and preventing the equipment damage, and reducing the risk of safety accidents.

Next, in the separation step S400, the lower end of the gantry crane 20 is separated from the upper end of the assembly jig 100, and the legs 10 and the assembly jig 100 are separated.

Finally, the field installation step S500 carries the integrated gantry cranes 20 and the leg together to complete the assembly at the transfer rail installation position.

That is, since the gantry cranes 20 and the legs 10 are integrated with each other in the extended installation step (S500), they can be installed at one time.

As a result, in the pre-assembly process, the legs and the gantry cranes are assembled using the assembly jig, and then the integrated legs 10 and the gantry cranes 20 are transported and installed in the field, Damage can be prevented.

Further, the legs 10 and the gantry cranes 20 can be joined to each other using the assembly jig 100, so that the risk of a safety accident can be reduced.

Although the present invention has been described with respect to specific embodiments for a crane installation jig and a crane installation method using the same, it is apparent that various modifications may be made without departing from the scope of the present invention.

Therefore, the scope of the present invention should not be limited to the above-described embodiments, but should be determined by the scope of the appended claims and equivalents thereof.

It is to be understood that the foregoing embodiments are illustrative and not restrictive in all respects and that the scope of the present invention is indicated by the appended claims rather than the foregoing description, It is intended that all changes and modifications derived from the equivalent concept be included within the scope of the present invention.

10: Legs
20: Gentry Crane
100: jig
110: Horizontal frame
111: Support
120: first vertical frame
121:
130: second vertical frame

Claims (5)

A horizontal frame horizontally installed at a temporary assembling position;
A first vertical frame vertically installed at one end of the horizontal frame and having legs vertically coupled to one surface thereof; And
And a second vertical frame vertically installed on the other upper end of the horizontal frame opposite to the first vertical frame and having the other end of the gantry crane coupled to the upper end thereof.
The method according to claim 1,
Wherein the second vertical frame comprises:
A plurality of connecting portions forming a multi-stage layer are formed along the vertical direction,
The connection portions
And the upper and lower longitudinal directions of the legs are coupled to each other at different heights.
The method according to claim 1,
At both upper ends of the horizontal frame,
Further comprising a plurality of supports connected to one surface of the first vertical frame and the second vertical frame facing each other.
A jig installing step of installing the assembly jig at the temporary assembly position;
A leg mounting step for vertically connecting the leg to one side of the assembling jig installed;
A lower end of a gantry crane is coupled to an upper end of the leg and a lower end of the other side of the gantry crane is coupled to an upper end of the assembly jig to assemble the assembly jig and the leg and the gantry crane step;
A separating step of separating the lower end of one side of the gantry crane and the upper end of the assembly jig and separating the leg and the assembly jig; And
And a field installation step of transporting the integrated gantry cranes and the legs together and completing the assembly at the transfer rail installation position.
5. The method of claim 4,
Prior to the step of installing the jig,
Further comprising a transporting step of moving the assembly jig, the leg, and the gantry crane to a temporary assembling position by using a transporting device.
KR1020120132878A 2012-11-22 2012-11-22 Mounting instruction jig for crane and mounting instruction method using the same KR20140065879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120132878A KR20140065879A (en) 2012-11-22 2012-11-22 Mounting instruction jig for crane and mounting instruction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120132878A KR20140065879A (en) 2012-11-22 2012-11-22 Mounting instruction jig for crane and mounting instruction method using the same

Publications (1)

Publication Number Publication Date
KR20140065879A true KR20140065879A (en) 2014-05-30

Family

ID=50892631

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120132878A KR20140065879A (en) 2012-11-22 2012-11-22 Mounting instruction jig for crane and mounting instruction method using the same

Country Status (1)

Country Link
KR (1) KR20140065879A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113021253A (en) * 2021-04-13 2021-06-25 广西建工集团建筑机械制造有限责任公司 Auxiliary bracket for mounting and dismounting pin shaft and using method thereof
KR102607240B1 (en) 2023-04-25 2023-11-29 대륜엔지니어링 주식회사 Harbor crane installation apparatus and harbor crane installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113021253A (en) * 2021-04-13 2021-06-25 广西建工集团建筑机械制造有限责任公司 Auxiliary bracket for mounting and dismounting pin shaft and using method thereof
KR102607240B1 (en) 2023-04-25 2023-11-29 대륜엔지니어링 주식회사 Harbor crane installation apparatus and harbor crane installation method

Similar Documents

Publication Publication Date Title
US11680411B2 (en) System and method of assembling and installing commercial roofing
JP4858822B2 (en) Building steel construction method
JP5769961B2 (en) Construction method and removal method of structure
KR20140065879A (en) Mounting instruction jig for crane and mounting instruction method using the same
CN104863374A (en) Slip mechanism of long-span steel structure and slip method of same
JP2015101440A (en) Stair lifting device and stair lifting method of heavy load
JP4869253B2 (en) Elevator heavy load temporary storage device and heavy load installation method
CN104527924A (en) Special tool for supporting upper deck combination of semi-submersible type ocean platform
JPH0812262A (en) Installing method for overhead traveller and its device
JP2019096665A (en) Method for carrying in stationary induction apparatus
KR20140000687U (en) Stiffener jig of a ship's block or a pffshore structure's block
JP2014084199A (en) Method for installing overhead crane
JP5603805B2 (en) Lifting jig, lifting jig mounting structure, and balcony unit lifting method
KR20160137126A (en) Floating tower body raising equipment and method thereof
JP4988941B1 (en) Support jig transfer jig and support transfer method
CN104153559B (en) Attachment type raise scaffold
KR20150000608A (en) Riser gantry crane installation method
CN204059914U (en) Attachment type raise scaffold
CN104960627A (en) Bracket for superstructure of ship
JP2004068523A (en) No-scaffolding construction method for assembling building material
WO2012132161A1 (en) Module structure, and module construction method
CN103741939A (en) Climbing type building construction operating platform on outer portion of building and installing method
CN204452793U (en) Semi-submersible offshore platform upper deck closes up support special tooling
CN103899078A (en) Mounting method of attached automatic lifting protection shield
JP5169326B2 (en) Assembly method of guide rail

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination