JP2015101440A - Stair lifting device and stair lifting method of heavy load - Google Patents

Stair lifting device and stair lifting method of heavy load Download PDF

Info

Publication number
JP2015101440A
JP2015101440A JP2013243032A JP2013243032A JP2015101440A JP 2015101440 A JP2015101440 A JP 2015101440A JP 2013243032 A JP2013243032 A JP 2013243032A JP 2013243032 A JP2013243032 A JP 2013243032A JP 2015101440 A JP2015101440 A JP 2015101440A
Authority
JP
Japan
Prior art keywords
heavy
lifting
stair
gate
stairs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013243032A
Other languages
Japanese (ja)
Other versions
JP6167025B2 (en
Inventor
淳紀 関根
Atsunori Sekine
淳紀 関根
康弘 酒井
Yasuhiro Sakai
康弘 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2013243032A priority Critical patent/JP6167025B2/en
Publication of JP2015101440A publication Critical patent/JP2015101440A/en
Application granted granted Critical
Publication of JP6167025B2 publication Critical patent/JP6167025B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a stair lifting device and a stair lifting method of a heavy load in which the heavy load can be carried via a narrow stair with a loop back.SOLUTION: A stair lifting device 1 according to the present invention is configured to lift and carry a heavy load 10 over a stair 100. The stair lifting device includes two portal type structures, a rail 5 provided by connecting top parts of two portal type structures, a trolley 7 provided to the rail 5, and a portal type auxiliary fixture 50 provided in a trolley 7 and having a chain block 8 for lifting a heavy load 10. Also, the present embodiment includes base parts 11a, 11b mounted with the heavy load 10, rollers 12a-12d provided in the base parts 11a, 11b, and legs 13a, 13b attached to the base part 11b. The heavy load 10 is lifted by the portal type auxiliary fixture 50 and moved horizontally, and is held on the stair 100 by the rollers 12a-12d and the legs 13a, 13b except when moved.

Description

本発明は、エレベータの巻上機などの重量物を階段を経由して揚重する重量物の階段揚重装置及び階段揚重方法に関する。   The present invention relates to a stair lifting device and a stair lifting method for lifting a heavy object such as an elevator hoist through a stair.

従来、新設のエレベータ工事の巻上機の揚重に際しては、例えばエレベータの昇降路内を経由して巻上機を揚重することは可能であったが、例えば巻上機と制御盤のみを交換して実施するエレベータのリニューアル工事においては、新設エレベータ工事におけるような巻上機の揚重を行うことは困難であった。   Conventionally, when lifting a hoisting machine for a new elevator construction, for example, it was possible to lift the hoisting machine via the elevator hoistway, but for example, only the hoisting machine and the control panel were installed. In the renewal work of the elevator to be carried out by exchanging, it was difficult to lift the hoisting machine as in the new elevator work.

このようなエレベータのリニューアル工事においては、例えば建物の階段を経由して巻上機と制御盤とを建物の屋上に設置されているエレベータの機械室が設けられている階床まで揚重する必要があった。なお、特許文献1に、階段を経由してエスカレータなどの重量物を揚重する技術が開示されている。この特許文献1に開示された従来技術は、建物内で見通しが利く上下階の離れたフロアに揚重装置を設け、その揚重装置によってエスカレータなどの重量物を揚重するものであった。   In such elevator renewal work, for example, it is necessary to lift the hoisting machine and the control panel to the floor where the elevator machine room installed on the roof of the building is installed via the stairs of the building. was there. Patent Document 1 discloses a technique for lifting a heavy object such as an escalator via a staircase. The prior art disclosed in this Patent Document 1 is provided with a lifting device on a floor that is distant from the upper and lower floors where the line of sight is visible, and lifts heavy objects such as escalators by the lifting device.

特許第4058098号公報Japanese Patent No. 4058098

しかしながら、エレベータのリニューアル工事における重量物の揚重においては、特許文献1に記載されているような工事環境であるとは限らない。例えば狭く、かつ踊り場のような折り返しのある階段を経由して、重量物をエレベータの機械室が設けられている階床まで揚重しなければならないことがあるが、特許文献1に開示された従来技術は、このような工事環境に対応できるものではなかった。また、特許文献1に開示された従来技術は、構成が大型で、しかも複雑であることから、施工工数及び施工費用が高くなる懸念があった。   However, in the lifting of heavy objects in the renewal work of an elevator, the construction environment described in Patent Document 1 is not always limited. For example, it may be necessary to lift a heavy object to a floor where an elevator machine room is provided via a narrow and folded stairs like a landing. The prior art has not been able to cope with such a construction environment. Moreover, since the prior art disclosed in Patent Document 1 has a large configuration and is complicated, there is a concern that the number of construction steps and the construction cost are increased.

本発明は、前述した従来技術における実情からなされたもので、その目的は、狭く、かつ折り返しのある階段を経由して重量物を運搬することができる重量物の階段揚重装置及び階段揚重方法を提供することにある。   The present invention has been made from the above-described situation in the prior art, and an object of the present invention is to provide a heavy-weight stair lifting device and a stair lifting capable of transporting a heavy material via a narrow and folded stair. It is to provide a method.

前記目的を達成するために、本発明に係る重量物の階段揚重装置は、重量物を、階段上を吊り上げて運搬する重量物の階段揚重装置において、2つの門型構造体と、前記2つの門型構造体の頂部を結合して設けられたレールと、前記レールに設けられたトロリと、前記トロリに設けられ、前記重量物を揚重する揚重手段とを有する門型雇と、前記重量物が搭載される台部と、前記台部の下部に設けたローラと、前記台部に取り付けた脚とを備え、前記重量物は、前記門型雇により吊り上げられて水平方向に移動させられ、移動時以外は前記ローラと前記脚とで前記階段上に保持されることを特徴としている。   In order to achieve the above object, a stair lifting apparatus for heavy objects according to the present invention is a stair lifting apparatus for heavy objects that lifts and conveys heavy objects on a staircase, and includes two portal structures, A gate-type hire comprising a rail provided by joining the tops of two gate-type structures, a trolley provided on the rail, and a lifting means provided on the trolley for lifting the heavy object. , A platform on which the heavy load is mounted, a roller provided at a lower portion of the platform, and a leg attached to the platform, the heavy load being lifted by the gate type worker in a horizontal direction The roller and the leg are held on the stairs except when moved.

また、本発明に係る重量物の階段揚重方法は、前記重量物の階段揚重装置を用いて、前記重量物を前記階段上を吊り上げて運搬する重量物の階段揚重方法において、前記階段上に前記揚重手段を有する前記門型雇を設置する第1ステップと、前記門型雇の前記揚重手段により前記重量物を揚重する第2ステップと、前記揚重手段によって揚重された状態の前記重量物を水平方向に移動させる第3ステップと、前記重量物を前記ローラと前記脚を介して前記階段上に保持させる第4ステップと、前記門型雇を、前記階段上を移設させる第5ステップとを含むことを特徴としている。   Further, the stair lifting method for a heavy object according to the present invention is the stair lifting method for a heavy object in which the heavy object is lifted and conveyed on the stair using the heavy object stair lifting device. A first step of installing the gate-type hire having the lifting means thereon; a second step of lifting the heavy object by the lifting means of the gate-type hire; and being lifted by the lifting means A third step of moving the heavy load in a horizontal state, a fourth step of holding the heavy load on the stairs via the rollers and the legs, and And a fifth step of relocation.

本発明に係る重量物の階段揚重装置及び階段揚重方法は、狭く、かつ折り返しのある階段を経由して重量物を運搬することができる。したがって、従来技術では困難であった狭く、かつ折り返しのある階段を経由して重量物を揚重しなければならないエレベータのリニューアル工事等にも適用でき、本発明は従来技術に比べて優れた汎用性を確保することができる。また本発明は、従来技術よりも簡単な構成とすることができ、これにより従来技術に比べて施工工数及び施工費用を低減させることができる。   The stair lifting device and the stair lifting method according to the present invention can transport a heavy object via a narrow and folded stair. Therefore, it can also be applied to renewal work for elevators that must lift heavy objects via narrow and folded stairs, which was difficult with the prior art, and the present invention is superior in general purpose compared to the prior art. Sex can be secured. In addition, the present invention can have a simpler configuration than that of the prior art, thereby reducing the number of construction steps and the construction cost as compared with the prior art.

本発明に係る重量物の階段揚重装置の一実施形態を示す斜視図である。It is a perspective view which shows one Embodiment of the stair lifting device of the heavy article which concerns on this invention. 本発明に係る重量物の階段揚重方法の一実施形態における第1ステップ(重量物の揚重前)の状態を示す側面図である。It is a side view which shows the state of the 1st step (before lifting of a heavy load) in one Embodiment of the stair lifting method of the heavy load which concerns on this invention. 本実施形態に係る階段揚重方法における第2ステップ(重量物の揚重中)の状態を示す側面図である。It is a side view which shows the state of the 2nd step (during the lifting of a heavy article) in the stair lifting method which concerns on this embodiment. 本実施形態に係る階段揚重方法における第3ステップ(重量物の移動中)の状態を示す側面図である。It is a side view which shows the state of the 3rd step (during the movement of a heavy article) in the stairlifting method which concerns on this embodiment. 本実施形態に係る階段揚重方法における第4ステップ(重量物の階段保持)の状態を示す側面図である。It is a side view which shows the state of the 4th step (stair holding of a heavy article) in the stair lifting method which concerns on this embodiment. 本実施形態に係る階段揚重方法における第5ステップ(門型雇移動)の状態を示す側面図である。It is a side view which shows the state of the 5th step (gate type employment movement) in the stairlifting method which concerns on this embodiment.

以下、本発明に係る重量物の階段揚重装置及び階段揚重方法の実施の形態を図面に基づいて説明する。   Embodiments of a stair lifting device and a stair lifting method according to the present invention will be described below with reference to the drawings.

図1に示すように、本発明の一実施形態に係る階段揚重装置1は、2つの門型構造体と、2つの門型構造体の頂部を結合して設けられたレール5と、このレール5に設けられたトロリ7と、このトロリ7に設けられ、重量物10を揚重する揚重手段、例えばチェーンブロック8とを有する門型雇50を備えている。また、本実施形態に係る階段揚重装置1は、重量物10が搭載される台部11a,11bと、これらの台部11a,11bの下部に設けたローラ12a,12b,12c,12dと、台部11bに取り付けた脚13a,13bとを備えている。   As shown in FIG. 1, a stairlift device 1 according to an embodiment of the present invention includes two gate-type structures, rails 5 provided by connecting the tops of the two gate-type structures, A trolley 7 provided on the rail 5 and a gate-type hire 50 provided on the trolley 7 and having lifting means, for example, a chain block 8, for lifting a heavy object 10 are provided. Further, the stair lifting device 1 according to the present embodiment includes base parts 11a and 11b on which heavy objects 10 are mounted, rollers 12a, 12b, 12c and 12d provided below the base parts 11a and 11b, Leg 13a, 13b attached to the base part 11b is provided.

門型雇50の前述した2つの門型構造体のそれぞれは、互いに対向して配置される伸縮可能な一対の支柱、すなわち一対の前側柱2a,2b及び一対の後側柱3a,3bと、対応する一対の支柱の上部を連結するつなぎ柱、すなわち一対の前側柱2a,2bの上部を連結するつなぎ柱4a、及び一対の後側柱3a,3bの上部を連結するつなぎ柱4bとを備えている。2つの門型構造体の一方の門型構造体のつなぎ柱4aと、他方の門型構造体のつなぎ柱4bとを連結するように前述したレール5を設けてある。   Each of the above-described two gate-type structures of the gate-type hire 50 includes a pair of extendable struts arranged opposite to each other, that is, a pair of front columns 2a and 2b and a pair of rear columns 3a and 3b, A connecting column that connects the upper portions of a pair of corresponding columns, that is, a connecting column 4a that connects the upper portions of the pair of front columns 2a and 2b, and a connecting column 4b that connects the upper portions of the pair of rear columns 3a and 3b. ing. The rail 5 described above is provided so as to connect the connecting pillar 4a of one of the two gate-type structures to the connecting pillar 4b of the other gate-type structure.

前側柱2a,2bと、後側柱3a,3bは、その長さが可変なパイプサポート等によって構成されている。つなぎ柱4a,4bは、例えばH型鋼材によって構成されている。つなぎ柱4aは前側柱2a,2bの例えば頂部にボルトで水平になるように固定されている。同様につなぎ柱4bも、後側柱3a,3bの例えば頂部にボルトで水平になるように固定されている。   The front pillars 2a and 2b and the rear pillars 3a and 3b are configured by pipe supports and the like whose lengths are variable. The connecting pillars 4a and 4b are made of, for example, an H-shaped steel material. The connecting pillar 4a is fixed so as to be horizontal with bolts, for example, at the tops of the front pillars 2a, 2b. Similarly, the connecting column 4b is also fixed so as to be horizontal with bolts, for example, at the tops of the rear columns 3a and 3b.

レール5は、例えばH型鋼材やI型鋼材によって構成されており、つなぎ柱4a,4bの中点において結合するようにボルトで固定されている。なお、レール5とつなぎ柱4a,4bとをボルトでなく、レールクリップや万力等で固定してもよい。また、本実施形態では、つなぎ柱4a,4bとレール5とを例えば互いに直交するように配置してある。   The rail 5 is made of, for example, an H-type steel material or an I-type steel material, and is fixed with bolts so as to be coupled at the midpoint between the connecting columns 4a and 4b. In addition, you may fix the rail 5 and the connection pillars 4a and 4b with a rail clip, a vise, etc. instead of a volt | bolt. In the present embodiment, the connecting pillars 4a and 4b and the rail 5 are arranged so as to be orthogonal to each other, for example.

また、本実施形態は、一対の支柱を形成する前側柱2a,2b、及び他の一対の支柱を形成する後側柱3a,3bをそれぞれ補強する補強材6a,6b,6c,6dを備えている。これらの補強材6a〜6dは、前側柱2a,2bと後側柱3a,3bとが広がらずに鉛直状態に保つようにする補強材である。補強材6aは前側柱2aと前側柱2bとを接続し、補強材6bは後側柱3aと後側柱3bとを接続し、補強材6cは前側柱2aと後側柱3aとを接続し、補強材6dは前側柱2bと後側柱3bとを接続している。なお、前側柱2a,2bと後側柱3a,3bとの間隔は、階段の寸法などを考慮して設定される。   In addition, the present embodiment is provided with reinforcing members 6a, 6b, 6c, and 6d that reinforce the front columns 2a and 2b that form a pair of columns and the rear columns 3a and 3b that form another pair of columns, respectively. Yes. These reinforcing members 6a to 6d are reinforcing members that keep the front columns 2a and 2b and the rear columns 3a and 3b in a vertical state without spreading. The reinforcing member 6a connects the front column 2a and the front column 2b, the reinforcing member 6b connects the rear column 3a and the rear column 3b, and the reinforcing member 6c connects the front column 2a and the rear column 3a. The reinforcing member 6d connects the front column 2b and the rear column 3b. In addition, the space | interval of the front side pillars 2a and 2b and the rear side pillars 3a and 3b is set in consideration of the dimension of stairs.

前述した重量物10は、例えばエレベータのリニューアル工事に使用される巻上機、制御盤、及び停電時の動力源として使用されるバッテリの少なくとも1つを含んでいる。本実施形態では、重量物10として新製巻上機を例示してある。   The above-described heavy object 10 includes at least one of a hoisting machine used for, for example, elevator renewal work, a control panel, and a battery used as a power source in the event of a power failure. In the present embodiment, a new hoisting machine is illustrated as the heavy article 10.

台部11a,11bの上に新製巻上機である重量物10が搭載されており、台部11a,11bに設けられた図示しないねじ穴に螺合するボルトによって重量物10が台部11a,11bに固定されている。台部11a,11bの下部にはローラ12a,12b,12c,12dが設けられている。このように構成することにより、重量物10は台部11a,11bと一体化して台車のような状態で床面101上等を移動可能に、すなわち横引きして運搬させることが可能になっている。   A heavy article 10 that is a new hoist is mounted on the base parts 11a and 11b, and the heavy article 10 is attached to the base part 11a by bolts that are screwed into screw holes (not shown) provided in the base parts 11a and 11b. , 11b. Rollers 12a, 12b, 12c, and 12d are provided below the base portions 11a and 11b. By comprising in this way, the heavy article 10 is integrated with the base parts 11a and 11b and can move on the floor surface 101 etc. in a state like a carriage, that is, it can be transported laterally. Yes.

台部11bには前述した脚13a,13bとともに、脚補強材14が設けられている。脚13a,13bは、伸縮可能に、すなわち台部11bに対して相対的にその取り付け高さを可変に設けられているものであり、階段100上で重量物10の荷重を支持する。脚13a,13bの取り付け高さを可変とする構造としては、例えば脚13a,13bに所定の間隔で複数のボルト穴を設け、これらのボルト穴に選択的に固定用のボルトを挿入して固定後、脚13a,13bの下端部に設けられたジャッキベースを使用して取り付け高さを可変とする構造である。   The base 11b is provided with a leg reinforcing member 14 together with the above-described legs 13a and 13b. The legs 13a and 13b are provided so that they can be expanded and contracted, that is, their mounting heights are variable relative to the base 11b, and support the load of the heavy object 10 on the stairs 100. As a structure in which the mounting height of the legs 13a and 13b is variable, for example, a plurality of bolt holes are provided at predetermined intervals in the legs 13a and 13b, and fixing bolts are selectively inserted into these bolt holes and fixed. The structure is such that the mounting height is variable using a jack base provided at the lower ends of the legs 13a and 13b.

脚補強材14は、脚13aと脚13bとを補強するために、脚13aの頂部付近と脚13bの頂部付近を水平に接続している。この脚補強材14は、重量物10を床面101上等を横引きして運搬させる際に、取っ手としても活用可能になっている。   The leg reinforcing member 14 horizontally connects the vicinity of the top of the leg 13a and the vicinity of the top of the leg 13b in order to reinforce the leg 13a and the leg 13b. The leg reinforcing member 14 can be used as a handle when the heavy object 10 is transported while being pulled horizontally on the floor surface 101 or the like.

次に、前述した本実施形態に係る階段揚重装置1を用いて行う重量物10の階段揚重方法の一実施形態について説明する。本実施形態に係る重量物10の階段揚重方法は、例えばエレベータのリニューアル工事に際し、重量物10をエレベータの機械室が設けられる階床まで運搬する経路を形成する階段100において揚重するものである。   Next, an embodiment of a method for stair lifting a heavy article 10 using the stair lifting device 1 according to the present embodiment described above will be described. The stair lifting method for the heavy object 10 according to the present embodiment is a method for lifting the heavy object 10 in the staircase 100 that forms a route for transporting the heavy object 10 to the floor where the elevator machine room is provided, for example, in the renovation work of the elevator. is there.

本実施形態に係る階段揚重方法は、以下に詳述するように、階段100上に揚重手段、すなわちチェーンブロック8を有する門型雇50を設置する第1ステップと、門型雇50の揚重手段、すなわちチェーンブロック8により重量物10を揚重する第2ステップと、チェーンブロック8によって揚重された状態の重量物10を水平方向に移動させる第3ステップと、重量物10をローラ12a,12bと、脚13a,13bを介して階段100上に保持させる第4ステップと、門型雇50を、階段100上を移設させる第5ステップとを含んでいる。また、本実施形態に係る階段揚重方法は、前述した第1ステップの一部から第5ステップまでを、繰り返し実施するものである。さらに本実施形態は、重量物10を、台部11a,11bに搭載させた状態でローラ12a〜12dを介して床面101上等を移動させるステップを含んでいる。   As will be described in detail below, the stairlifting method according to the present embodiment includes a first step of installing a gate type employment 50 having a lifting means, that is, a chain block 8 on the staircase 100, and Lifting means, that is, a second step of lifting the heavy object 10 by the chain block 8, a third step of moving the heavy object 10 lifted by the chain block 8 in the horizontal direction, and the heavy object 10 as a roller 12a, 12b, the 4th step held on stairs 100 via leg 13a, 13b, and the 5th step which moves gate type employment 50 on stairs 100 are included. Further, the stair lifting method according to the present embodiment repeatedly performs the above-described part of the first step to the fifth step. Further, the present embodiment includes a step of moving the heavy object 10 on the floor surface 101 and the like via the rollers 12a to 12d in a state where the heavy object 10 is mounted on the base parts 11a and 11b.

すなわち、本実施形態に係る階段揚重方法は、初めに第1ステップとして、前側柱2a,2bの頂部につなぎ柱4aをボルトにて水平に締結し、図2に示すように、階段100の所定の段に立設する。次に、後側柱3a,3bの頂部につなぎ柱4bをボルトにて水平に締結し、床面101に立設する。   That is, in the stair lifting method according to the present embodiment, as a first step, the connecting column 4a is fastened horizontally with bolts to the tops of the front columns 2a and 2b, and as shown in FIG. Stand up on a predetermined stage. Next, the connecting pillar 4b is fastened to the top of the rear pillars 3a and 3b with bolts and is erected on the floor surface 101.

次に、レール5をつなぎ柱4a,4bの中点を結合するようにボルトで固定し、レール5が水平となるように前側柱2a,2b、後側柱3a,3bを伸縮させて、これらの前側柱2a,2b、後側柱3a,3bの長さを調整する。   Next, the rail 5 is fixed with bolts so as to connect the midpoints of the connecting columns 4a and 4b, and the front columns 2a and 2b and the rear columns 3a and 3b are expanded and contracted so that the rail 5 is horizontal. The lengths of the front pillars 2a and 2b and the rear pillars 3a and 3b are adjusted.

次に、補強材6aを前側柱2aと前側柱2bとに接続し、補強材6bを後側柱3aと後側柱3bに接続し、補強材6cを前側柱2aと後側柱3aとに接続し、補強材6dを前側柱2bと後側柱3bとに接続する。これらの補強材6a〜6dによって、前側柱2a,2bと後側柱3a,3bとが広がらず鉛直状態に保たれる。   Next, the reinforcing member 6a is connected to the front column 2a and the front column 2b, the reinforcing member 6b is connected to the rear column 3a and the rear column 3b, and the reinforcing member 6c is connected to the front column 2a and the rear column 3a. The reinforcing member 6d is connected to the front column 2b and the rear column 3b. By these reinforcing materials 6a to 6d, the front pillars 2a and 2b and the rear pillars 3a and 3b are not spread and kept in a vertical state.

最後に、レール5にトロリ7とチェーンブロック8を取り付ける。なお、トロリ7はレール5上を移動可能である。これらの工程により、門型雇50の踏み段100上への設置が完了する。   Finally, the trolley 7 and the chain block 8 are attached to the rail 5. The trolley 7 can move on the rail 5. With these steps, the installation of the gate-type hire 50 on the step 100 is completed.

門型雇50の設置後、台部11a,11bに搭載された重量物10を、ローラ12a〜12dを介して、床面101を横引きし、階段100の直前に配置する。本工程で、第1ステップは完了する。   After installing the gate-type hire 50, the heavy object 10 mounted on the base parts 11a and 11b is horizontally pulled through the rollers 12a to 12d and arranged immediately before the stairs 100. In this process, the first step is completed.

次に第2ステップに移り、同図2に示すように、チェーン9を重量物10の頂部に設けられている図示しない吊り穴に接続し、チェーンブロック8を操作して、図3に示すように重量物10を予め定めた高さ位置まで吊り上げる。ここで予め定めた高さ位置とは例えば、重量物10が搭載される台部11a,11bの下部に設けたローラ12a〜12dの下端の位置が、前側柱2a,2bが設置されている階段の高さに一致する高さ位置、または前側柱2a,2bが設置されている階段の一つ手前の階段の高さに一致する高さ位置である。   Next, the process proceeds to the second step. As shown in FIG. 2, the chain 9 is connected to a suspension hole (not shown) provided on the top of the heavy object 10, and the chain block 8 is operated, as shown in FIG. The heavy object 10 is lifted to a predetermined height position. Here, the predetermined height position refers to, for example, the positions of the lower ends of the rollers 12a to 12d provided at the lower portions of the base portions 11a and 11b on which the heavy objects 10 are mounted, and the stairs where the front pillars 2a and 2b are installed. Or a height position corresponding to the height of the stairs immediately before the stairs where the front pillars 2a and 2b are installed.

次に第3ステップに移り、吊り上げた重量物10を、後側柱3a,3b側から前側柱2a,2b側に向けて、トロリ7を使用して図4に示すように、ローラ12a,12bが階段100に接地するまで移動させる。この場合、重量物10の移動は、前側柱2a,2b側からチェーン9を引いてもよく、また、後側柱3a,3b側から脚補強材14を持って押してもよい。   Next, moving to the third step, the heavy object 10 that has been lifted is directed from the rear pillars 3a, 3b to the front pillars 2a, 2b, as shown in FIG. 4 using rollers 7a, 12b. Is moved until it contacts the stairs 100. In this case, the heavy object 10 may be moved by pulling the chain 9 from the front pillars 2a and 2b, or by pushing the leg reinforcements 14 from the rear pillars 3a and 3b.

次に第4ステップに移り、脚13a,13bに所定の間隔で設けられた複数のボルト穴のうちの所定のボルト穴に固定用のボルトを挿入して固定後、脚13a,13bの下端部に設けられたジャッキベースを使用して脚13a,13bの取り付け高さを調整する。これにより、重量物10は図5に示すように、ローラ12a,12b及び脚13a,13bを介して階段100上に保持される状態となる。この時点でチェーンブロック8を操作してチェーン9を降ろし、重量物10からチェーン9を取り外す。次に、レール5からチェーンブロック8とトロリ7を取り外す。このようにすることにより門型雇5の重量を軽減できる。   Next, the process proceeds to the fourth step, and after fixing by inserting fixing bolts into predetermined bolt holes among a plurality of bolt holes provided at predetermined intervals on the legs 13a, 13b, lower ends of the legs 13a, 13b. The mounting height of the legs 13a and 13b is adjusted using the jack base provided on the head. As a result, the heavy article 10 is held on the staircase 100 via the rollers 12a and 12b and the legs 13a and 13b as shown in FIG. At this point, the chain block 8 is operated to lower the chain 9 and remove the chain 9 from the heavy object 10. Next, the chain block 8 and the trolley 7 are removed from the rail 5. By doing in this way, the weight of the gate type employment 5 can be reduced.

次に第5ステップに移り、例えば4名の作業者のそれぞれが、該当する前側柱2a,2bと後側柱3a,3bのいずれかを同時に把持し、門型雇50を階段100上を、図6に示すように、後側柱3a,3bが脚13a,13bが載置されている床面101上における脚13a,13bの近傍に位置するまで1段ずつ上方に移動させる。移動後、前側柱2a,2bは、縮小させて該当する階段上に接地するようにその高さが調整される。このように移動させた後、第1ステップの一部を実施することにより、すなわちレール5にトロリ7とチェーンブロック8を取り付けることにより、前述した図3に示す第2ステップにおけるように重量物10の吊り上げが可能な状態となる。以降、第2ステップ〜第5ステップ、及び第1ステップの一部を繰り返すことにより、重量物10を階段100を経由してエレベータの機械室が設置されている階床まで揚重することができる。   Next, the process moves to the fifth step. For example, each of the four workers holds the corresponding front pillars 2a, 2b and the rear pillars 3a, 3b at the same time. As shown in FIG. 6, the rear columns 3a and 3b are moved upward one step at a time until they are positioned in the vicinity of the legs 13a and 13b on the floor surface 101 on which the legs 13a and 13b are placed. After the movement, the heights of the front pillars 2a and 2b are adjusted so that the front pillars 2a and 2b are reduced in size and contact with the corresponding stairs. After moving in this way, by performing a part of the first step, that is, by attaching the trolley 7 and the chain block 8 to the rail 5, the heavy object 10 as in the second step shown in FIG. Can be lifted. Thereafter, by repeating the second step to the fifth step and a part of the first step, the heavy object 10 can be lifted up to the floor where the elevator machine room is installed via the stairs 100. .

なお、階段100を利用して重量物10を高階床から低階床まで降ろす場合には、前述の第1ステップ〜第5ステップを順次逆に行えばよい。   In addition, when the heavy article 10 is lowered from the upper floor to the lower floor using the stairs 100, the first to fifth steps described above may be performed in reverse order.

なお、前述した重量物10を階段100を利用して機械室が設けられている階床まで揚重する際、階段100の途中に踊り場のような例えば狭い折り返しがあるような場合には、図4に示すように脚13a,13bを下方に伸ばさない状態で固定し、重量物10が搭載された台部11a,11bの下部に設けたローラ12a〜12dが踊り場の床面に接地するようにする。そして作業者は踊り場において、脚補強材14を把持して重量物10を横引きしてその向きを変えて、次の階段100の直前となるように位置させる。以降前述と同様にして第1ステップ〜第5ステップを順次実行することにより、重量物10の階段揚重を継続して実施することができる。すなわち本実施形態は、途中に踊り場等の折り返しがある場合にも、支障なく階段100を利用して重量物10を目的の階床まで揚重させることができる。   When the above-described heavy object 10 is lifted up to the floor where the machine room is provided using the staircase 100, there may be a narrow turn such as a landing in the middle of the staircase 100. As shown in FIG. 4, the legs 13a and 13b are fixed in a state where they do not extend downward, and the rollers 12a to 12d provided at the lower portions of the base portions 11a and 11b on which the heavy objects 10 are mounted are brought into contact with the floor of the landing. To do. Then, at the landing, the operator grips the leg reinforcing member 14 and pulls the heavy object 10 in the horizontal direction to change its direction so that it is positioned immediately before the next staircase 100. Thereafter, the first step to the fifth step are sequentially executed in the same manner as described above, so that the stepped lifting of the heavy load 10 can be continued. That is, according to the present embodiment, the heavy object 10 can be lifted up to the target floor using the stairs 100 without any trouble even when there is a turnaround such as a landing.

なお、前述した実施形態では、重量物10がエレベータのリニューアル工事に際して使用される新製巻上機等としたが、本発明は、重量物がエレベータに関連して設けられる構造物に限られることはない。各種の重量物の揚重に際して本発明を適用させることができる。   In the above-described embodiment, the heavy load 10 is a new hoist used for elevator renewal work, but the present invention is limited to a structure in which the heavy load is provided in relation to the elevator. There is no. The present invention can be applied when lifting various heavy objects.

以上説明したように、本実施形態に係る重量物の階段揚重装置及び階段揚重方法によれば、狭く、かつ折り返しのある階段100を経由して重量物10を運搬することができる。したがって、従来技術では困難であったエレベータのリニューアル工事等にも適用でき、本実施形態は従来技術に比べて優れた汎用性を確保することができる。また本実施形態は、小型で比較的単純な構造の門型雇50と、台部11a,11b、ローラ12a〜12dとを含む構成で済むので、従来技術よりも簡単な構成とすることができる。これにより本実施形態は、従来技術に比べて施工工数及び施工費用を低減させることができる。   As described above, according to the stair lifting device and the stair lifting method according to the present embodiment, the heavy object 10 can be transported through the narrow and folded stair 100. Therefore, the present invention can be applied to elevator renewal work and the like, which is difficult with the prior art, and this embodiment can ensure superior versatility compared to the prior art. In addition, since the present embodiment only needs to include a small-sized and relatively simple structure of the gate type worker 50, the base portions 11a and 11b, and the rollers 12a to 12d, the configuration can be made simpler than that of the prior art. . Thereby, this embodiment can reduce a construction man-hour and construction cost compared with a prior art.

1 階段揚重装置
2a,2b 前側柱
3a,3b 後側柱
4a,4b つなぎ柱
5 レール
6a,6b,6c,6d 補強材
7 トロリ
8 チェーンブロック(揚重手段)
9 チェーン
10 重量物
11a,11b 台部
12a,12b,12c,12d ローラ
13a,13b 脚
14 脚補強材
50 門型雇
100 階段
101 床面
DESCRIPTION OF SYMBOLS 1 Stair lifting apparatus 2a, 2b Front side pillar 3a, 3b Rear side pillar 4a, 4b Connecting pillar 5 Rail 6a, 6b, 6c, 6d Reinforcement material 7 Trolley 8 Chain block (lifting means)
9 Chain 10 Heavy object 11a, 11b Base part 12a, 12b, 12c, 12d Roller 13a, 13b Leg 14 Leg reinforcement 50 Gate type employment 100 Stairs 101 Floor

Claims (7)

重量物を、階段上を吊り上げて運搬する重量物の階段揚重装置において、
2つの門型構造体と、前記2つの門型構造体の頂部を結合して設けられたレールと、前記レールに設けられたトロリと、前記トロリに設けられ、前記重量物を揚重する揚重手段とを有する門型雇と、
前記重量物が搭載される台部と、前記台部の下部に設けたローラと、前記台部に取り付けた脚とを備え、
前記重量物は、前記門型雇により吊り上げられて水平方向に移動させられ、移動時以外は前記ローラと前記脚とで前記階段上に保持されることを特徴とする重量物の階段揚重装置。
In heavy equipment for lifting heavy items that are lifted and transported on stairs,
Two gate-type structures, a rail provided by connecting the tops of the two gate-type structures, a trolley provided on the rail, and a lift provided on the trolley for lifting the heavy object A gate-type hire with heavy means,
A platform on which the heavy object is mounted; a roller provided at a lower portion of the platform; and a leg attached to the platform.
The heavy object is lifted by the gate type worker and moved in the horizontal direction, and is held on the stairs by the roller and the legs except during the movement. .
請求項1に記載の重量物の階段揚重装置において、
前記門型雇の前記2つの門型構造体のそれぞれは、互いに対向して配置される伸縮可能な一対の支柱と、対応する一対の支柱の上部を連結するつなぎ柱とを備え、
2つの門型構造体の一方の門型構造体の前記つなぎ柱と、他方の門型構造体の前記つなぎ柱とを連結するように前記レールを設け、
前記揚重手段がチェーンブロックから成り、
前記脚を伸縮可能に形成したことを特徴とする重量物の階段揚重装置。
The stair lifting device for heavy objects according to claim 1,
Each of the two gate-type structures of the gate-type hire includes a pair of extendable struts arranged to face each other, and a connecting pillar connecting the upper portions of the corresponding pair of struts,
The rail is provided so as to connect the connecting pillar of one of the two gate-type structures and the connecting pillar of the other gate-type structure;
The lifting means comprises a chain block;
A heavy object stair lifting device, wherein the legs are formed to be extendable and contractible.
請求項2に記載の重量物の階段揚重装置において、
前記一対の支柱を補強する補強材を備えたことを特徴とする重量物の階段揚重装置。
The stair lifting device for heavy objects according to claim 2,
A stair lifting device for heavy objects, comprising a reinforcing material for reinforcing the pair of support columns.
請求項1〜3のいずれか1項に記載の重量物の階段揚重装置において、
前記階段は、前記重量物をエレベータの機械室が設けられている階床まで運搬する経路を形成する階段から成り、
前記重量物は、前記エレベータのリニューアル工事に使用される巻上機、制御盤、及び停電時の動力源として使用されるバッテリの少なくとも1つを含むことを特徴とする重量物の階段揚重装置。
In the stairlifting device for heavy objects according to any one of claims 1 to 3,
The stairs consist of stairs that form a path for transporting the heavy objects to the floor where the elevator's machine room is provided,
The heavy load stair lifting device, wherein the heavy load includes at least one of a hoist used for renewal work of the elevator, a control panel, and a battery used as a power source at the time of power failure .
請求項1に記載の重量物の階段揚重装置を用いて、前記重量物を前記階段上を吊り上げて運搬する重量物の階段揚重方法において、
前記階段上に前記揚重手段を有する前記門型雇を設置する第1ステップと、
前記門型雇の前記揚重手段により前記重量物を揚重する第2ステップと、
前記揚重手段によって揚重された状態の前記重量物を水平方向に移動させる第3ステップと、
前記重量物を前記ローラと前記脚を介して前記階段上に保持させる第4ステップと、
前記門型雇を、前記階段上を移設させる第5ステップとを含むことを特徴とする重量物の階段揚重方法。
In the stair lifting method of the heavy article which lifts and conveys the heavy article on the staircase using the heavy article stair lifting apparatus according to claim 1,
A first step of installing the portal worker having the lifting means on the stairs;
A second step of lifting the heavy load by the lifting means of the gate type employment;
A third step of moving the weight in the state lifted by the lifting means in a horizontal direction;
A fourth step of holding the heavy object on the stairs via the roller and the leg;
And a fifth step of moving the gate-type hire on the stairs.
請求項5に記載の重量物の階段揚重方法において、
前記第1ステップから前記第5ステップまでを、繰り返し実施することを特徴とする重量物の階段揚重方法。
The method for lifting a heavy object according to claim 5,
A method for lifting a heavy object in steps, wherein the steps from the first step to the fifth step are repeated.
請求項5または6に記載の重量物の階段揚重方法において、
前記重量物を、前記台部に搭載させた状態で前記ローラを介して床面上を移動させるステップを含むことを特徴とする重量物の階段揚重方法。
In the method for lifting stairs of heavy objects according to claim 5 or 6,
A method for lifting a heavy article in steps, comprising the step of moving the heavy article on a floor surface via the roller in a state where the heavy article is mounted on the platform.
JP2013243032A 2013-11-25 2013-11-25 Stair lifting device and method for lifting heavy objects Active JP6167025B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013243032A JP6167025B2 (en) 2013-11-25 2013-11-25 Stair lifting device and method for lifting heavy objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013243032A JP6167025B2 (en) 2013-11-25 2013-11-25 Stair lifting device and method for lifting heavy objects

Publications (2)

Publication Number Publication Date
JP2015101440A true JP2015101440A (en) 2015-06-04
JP6167025B2 JP6167025B2 (en) 2017-07-19

Family

ID=53377474

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013243032A Active JP6167025B2 (en) 2013-11-25 2013-11-25 Stair lifting device and method for lifting heavy objects

Country Status (1)

Country Link
JP (1) JP6167025B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016088709A (en) * 2014-11-06 2016-05-23 株式会社日立ビルシステム Lifting device and lifting method
JP2017043465A (en) * 2015-08-27 2017-03-02 株式会社日立ビルシステム Stair lifting device and stair lifting method for heavy load
JP2019152053A (en) * 2018-03-05 2019-09-12 鹿島建設株式会社 Lifting device, and construction method of concrete structure using lifting device
JP2021021214A (en) * 2019-07-25 2021-02-18 東芝エレベータ株式会社 Lifting device
JP2022076058A (en) * 2020-11-09 2022-05-19 北海道電力株式会社 Conveyor, transport aid, transport system, and transport method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000143145A (en) * 1998-11-06 2000-05-23 Chudenko Corp On-stair heavy cargo conveying device
JP2001233600A (en) * 1999-12-14 2001-08-28 Nkk Corp Carrying device and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000143145A (en) * 1998-11-06 2000-05-23 Chudenko Corp On-stair heavy cargo conveying device
JP2001233600A (en) * 1999-12-14 2001-08-28 Nkk Corp Carrying device and method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016088709A (en) * 2014-11-06 2016-05-23 株式会社日立ビルシステム Lifting device and lifting method
JP2017043465A (en) * 2015-08-27 2017-03-02 株式会社日立ビルシステム Stair lifting device and stair lifting method for heavy load
JP2019152053A (en) * 2018-03-05 2019-09-12 鹿島建設株式会社 Lifting device, and construction method of concrete structure using lifting device
JP2021175871A (en) * 2018-03-05 2021-11-04 鹿島建設株式会社 Lifting device, and construction method of concrete structure using lifting device
JP7202424B2 (en) 2018-03-05 2023-01-11 鹿島建設株式会社 Lifting device and construction method of concrete structure using the lifting device
JP2021021214A (en) * 2019-07-25 2021-02-18 東芝エレベータ株式会社 Lifting device
JP2022076058A (en) * 2020-11-09 2022-05-19 北海道電力株式会社 Conveyor, transport aid, transport system, and transport method
JP7130023B2 (en) 2020-11-09 2022-09-02 北海道電力株式会社 Conveying device, Conveying system and Conveying method
JP2022166000A (en) * 2020-11-09 2022-11-01 北海道電力株式会社 Auxiliary carriage frame and carriage system
JP7422817B2 (en) 2020-11-09 2024-01-26 北海道電力株式会社 Transport auxiliary frame and transport system

Also Published As

Publication number Publication date
JP6167025B2 (en) 2017-07-19

Similar Documents

Publication Publication Date Title
JP6348888B2 (en) Stair lifting device and method for lifting heavy objects
JP6167025B2 (en) Stair lifting device and method for lifting heavy objects
TWI657996B (en) Elevator hoistway working floor device and method for setting elevator hoistway working floor device
JP6270692B2 (en) Lifting device and lifting method
CN110562856B (en) Hoisting device for heavy object and hoisting and carrying method
JP5769961B2 (en) Construction method and removal method of structure
JP2009057198A (en) Elevator car, assembly method of elevator car, and lifting tool
JP5955280B2 (en) Lifting method for heavy elevators
JP2019206423A (en) Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP2017071488A (en) Device and method for stair lifting of heavy load
JP6621732B2 (en) Work floor equipment
JP6195551B2 (en) Carrying device
JP5169604B2 (en) Elevator installation work floor apparatus and its assembly method
JP2006232489A (en) Inclined passenger conveyor facility, its installation method and its conveying out method
KR102242485B1 (en) Method for vertical transportation of a heavy module using of a module lifting system inculding of a strand jack
KR20210000005A (en) Lift Worktable For Railway
JP6898161B2 (en) Temporary passage system and repair method for high-rise structures
JP2729017B2 (en) Elevator car gantry
JP2004143677A (en) Carrying in/out device of construction machine and material
JP2008063873A (en) Transfer mechanism of ceiling and execution method
WO2020261804A1 (en) Method for laying guide rails and rotation prevention jig
JP7415657B2 (en) Roof construction system and roof construction method
JP6031295B2 (en) Scaffolding trolley and work stage
JP6984795B1 (en) How to install the elevator installation work floor device and the elevator installation work floor device
JP7172549B2 (en) Overhead crane replacement method and cart

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170110

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170613

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170626

R150 Certificate of patent or registration of utility model

Ref document number: 6167025

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150