KR20140055748A - Balance jig for manufacturing pipe arrangement - Google Patents

Balance jig for manufacturing pipe arrangement Download PDF

Info

Publication number
KR20140055748A
KR20140055748A KR1020120123003A KR20120123003A KR20140055748A KR 20140055748 A KR20140055748 A KR 20140055748A KR 1020120123003 A KR1020120123003 A KR 1020120123003A KR 20120123003 A KR20120123003 A KR 20120123003A KR 20140055748 A KR20140055748 A KR 20140055748A
Authority
KR
South Korea
Prior art keywords
band
pipe
weight
plate
coupled
Prior art date
Application number
KR1020120123003A
Other languages
Korean (ko)
Other versions
KR101997640B1 (en
Inventor
주지훈
정평선
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020120123003A priority Critical patent/KR101997640B1/en
Publication of KR20140055748A publication Critical patent/KR20140055748A/en
Application granted granted Critical
Publication of KR101997640B1 publication Critical patent/KR101997640B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/02Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
    • B23Q3/06Work-clamping means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/15Devices for holding work using magnetic or electric force acting directly on the work
    • B23Q3/154Stationary devices
    • B23Q3/1546Stationary devices using permanent magnets

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a balance jig for processing a pipe capable of easily manufacturing a large pipe and increasing a process precision by preventing vibration and inclination during the rotation of a pipe for manufacturing a large pipe. The balance jigs (100, 100a) for processing a pipe comprise a band part (110) having a band side fixing plate (120) and fastened to a processing target pipe (11); a weight part mounted in the band part (110); and a fastening part (140) fixing the weight part to the band part (110) by being fastened to the band side fixing plate (120). The balance jig for processing a pipe can maintain the balance of the pipe (11) when the pipe (11) is rotated by a rotator (30), by making the weight part to be placed opposite to a protrusion (20) of the pipe (11).

Description

배관 파이프 가공용 밸런스 지그{BALANCE JIG FOR MANUFACTURING PIPE ARRANGEMENT}{BALANCE JIG FOR MANUFACTURING PIPE ARRANGEMENT}

본 발명은 대형 배관의 제작을 위한 대형 파이프의 회전 가공 시, 무게 중심을 맞추어 파이프의 회전 시에 발생하는 진동, 기울어짐 등의 발생을 방지하여, 대형 배관 파이프 제작을 용이하게 하고, 가공 정밀도를 향상시킬 수 있도록 하는 배관 파이프 가공용 밸런스 지그에 관한 것이다. The present invention prevents the generation of vibration and tilting during rotation of a pipe by adjusting the center of gravity when rotating a large pipe for manufacturing a large pipe, thereby facilitating the production of a large pipe, And more particularly, to a balance jig for pipe-pipe processing.

일반적으로, 대형 파이프를 제작하는 경우, 배관 공장에서 대형 배관 용접 및 절단 작업을 수행하며, 이 경우 가공대상 파이프를 로데이터를 이용하여 회전시키면서 가공하게 된다.Generally, in the case of manufacturing a large pipe, a large pipe welding and cutting operation is performed in a pipe factory. In this case, the pipe to be processed is rotated while being rotated by data.

도 1은 종래기술의 파이프 가공 과정을 나타내는 도면이다.Fig. 1 is a view showing a conventional pipe processing process.

도 1과 같이, 배관 공장에서 배관(10)를 제작하기 위해서는 관형, 엘보우형, T형 등의 다양한 종류의 파이프(11)들을 배관의 관로에 맞게 용접 부착하는 작업을 수행한다. 그리고 제작된 배관의 일부를 선박 등의 배관 설치 장소로 이송한 후 용접 결합시키는 것에 의해 전체 배관로를 제작한다.As shown in FIG. 1, in order to manufacture the piping 10 in the piping plant, various types of pipes 11 such as a tubular, an elbow, and a T-type are welded to the pipeline. Then, a part of the manufactured piping is transferred to a piping installation place of a ship or the like, and then welded together, thereby manufacturing an entire pipeline.

이때, 인력에 의한 작업이 어려운 큰 하중을 가지는 대형 배관의 경우에는 도 1과 같이, 로테이터(30)에 배관(10)의 일부로 되는 파이프(11)를 안착시킨 후, 로테이터(30)를 회전시켜 일정 위치에 고정시키는 것에 의해 작업자가 용접을 수행할 수 있는 용접 자세를 만든다. 이 후 작업자가 이동하며 파이프에 대한 용접 또는 절단 등의 파이프 가공 작업을 수행하게 된다.At this time, in the case of a large pipe having a large load, which is difficult to work with a human force, as shown in Fig. 1, the pipe 11 as a part of the pipe 10 is placed on the rotator 30 and then the rotator 30 is rotated By fixing it to a certain position, a welding posture in which an operator can perform welding is made. Thereafter, the operator moves and performs pipe processing such as welding or cutting to the pipe.

그러나 상술한 바와 같이, 로테이터(30)를 이용하여 파이프를 회전시켜 용접 자세를 만든 후 파이프에 대한 가공 작업을 수행하는 경우, T형 파이프와 같은 돌출부(20)가 부착되고 꺽임부(20a)를 구비한 경우에는 돌출부(20)나 꺽임부(20a)의 하중에 의해 무게중심이 로테이터(30)의 회전중심과 일치하지 않게 되어, 회전되는 파이프(11)가 회전위치별로 돌출부(20)나 꺽임부(20a)의 하중 및 토크력에 의해 진동을 하거나, 기울어지는 등의 위치 변화가 발생하거나 심한 경우 로테이터(30)로부터 이탈하는 사고가 발생하게 된다.However, as described above, when the pipe is rotated to rotate the pipe using the rotator 30 to perform a machining operation on the pipe, a protruding portion 20 such as a T-shaped pipe is attached and the bent portion 20a The center of gravity does not coincide with the center of rotation of the rotator 30 due to the load of the protruding portion 20 or the bent portion 20a so that the rotating pipe 11 is rotated by the protruding portion 20, An accident occurs in which a change in position, such as vibration, inclination, or the like occurs due to the load and the torque of the rotor 20a or when the rotor 20 is severely disengaged from the rotor 30.

따라서, 도 1의 종래기술의 방식으로 로테이터(30)를 이용하여 파이프(11)를 용접자세를 가지도록 회전시켜 파이프 가공 작업을 수행하는 경우, 용접면 또는 절단면에 불량이 많이 발생하는 문제점이 있었다.Therefore, when the pipe 11 is rotated in the welding posture by using the rotator 30 in the conventional technique of FIG. 1, there is a problem that a large number of defects are generated in the welded surface or the cut surface .

또한, 도 1의 로테이터(30)를 이용한 종래기술의 파이프 가공 장치의 경우, 로테이터(30)는 작업자의 용접 자세를 만들기 위하여 파이프(11)를 회전시키는 기능만을 수행하게 되므로, 작업자가 이동하며 용접을 수행하게 되므로, 용접 작업을 지연시키는 문제점을 가진다.1, the rotator 30 performs only the function of rotating the pipe 11 in order to make the welding posture of the worker. Therefore, So that the welding operation is delayed.

또한, 도 1의 로테이터(30)를 이용한 종래기술의 파이프 가공 장치의 경우, 파이프의 고정을 위하여 가압력을 더 크게 하는 경우 파이프(11)에 변형이 발생하는 문제점을 가진다.Further, in the conventional pipe processing apparatus using the rotator 30 of FIG. 1, when the pressing force is increased to fix the pipe, the pipe 11 is deformed.

또한, 도 1의 로테이터(30)를 이용한 종래기술의 파이프 가공 장치의 경우, 파이프(11)의 무게중심이 회전축과 일치되지 않아 로테이터(11)로부터 파이프(11)가 이탈하는 것에 의한 안전사고를 발생시킬 수 있는 문제점을 가진다.1, the center of gravity of the pipe 11 does not coincide with the axis of rotation, so that a safety accident due to the disengagement of the pipe 11 from the rotator 11 can be prevented There is a problem that can occur.

또한, 도 1의 로테이터(30)를 이용한 종래기술의 파이프 가공 장치의 경우, 작업자가 이동하며 용접 등의 파이프 가공 작업을 수행하게 되므로, 작업자세의 불편함으로 인한 작업자의 근골격계 질환의 발생 가능성의 문제점을 가진다.Further, in the case of the prior art pipe machining apparatus using the rotator 30 shown in Fig. 1, since the worker moves and performs the pipe machining work such as welding, the problem of the possibility of the musculoskeletal disease of the worker due to the inconvenience of the work posture .

또한, 도 1의 로테이터(30)를 이용한 종래기술의 파이프 가공 장치의 경우에는 무게 중심의 불일치로 인해 배관(10)에 변형이 발생할 수 있는 문제점을 가진다.In addition, in the conventional pipe processing apparatus using the rotator 30 of FIG. 1, there is a problem that deformation may occur in the pipe 10 due to the mismatch of the center of gravity.

따라서, 본 발명은 상술한 종래기술의 문제점을 해결하기 위한 것으로서, 배관의 제작을 위한 파이프의 가공시, 돌출부 등에 의해 파이프의 무게중심이 회전축에 위치하지 않는 경우, 돌출부의 토크력을 상쇄시키는 위치에 웨이트를 장착하여, 회전되는 파이프가 회전축을 중심으로 밸런스를 유지하도록 하여, 용접 또는 절단 등의 파이프 가공 작업을 용이하게 수행함은 물론, 가공 결과의 파이프의 가공면에 대한 품질을 현저히 향상시킬 수 있도록 하는 배관 파이프 가공용 밸런스 지그를 제공하는 것을 목적으로 한다.SUMMARY OF THE INVENTION Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and it is an object of the present invention to provide a pipe structure for a pipe, So that the rotating pipe can maintain a balance around the rotating shaft and the pipe can be easily machined such as welding or cutting and the quality of the processed surface of the pipe can be remarkably improved And to provide a balance jig for pipe pipe processing.

상술한 목적을 달성하기 위한 본 발명의 배관 파이프 가공용 밸런스 지그는, 밴드측고정판(120)을 구비하여 가공 대상 파이프(11)에 체결되는 밴드부(110);와, 상기 밴드부(110)에 장착되는 웨이트부;와, 상기 밴드측고정판(120)에 결합되어 상기 웨이트부를 상기 밴드부(110)에 고정시키는 결합부(140)를 포함하여 구성되는 것에 의해, 웨이트부를 파이프(11)의 돌출부(20)와 반대되는 위치에 위치하도록 하는 것에 의해 로테이터(30)에 의한 파이프(11)의 회전 시, 파이프(11)의 밸런스를 유지하도록 구성되는 것을 특징으로 한다.The present invention relates to a pipe jig for a pipe-pipe processing, comprising: a band portion 110 having a band-side fixing plate 120 and fastened to a pipe to be processed 11; And the engaging portion 140 coupled to the band side fixing plate 120 and fixing the weight portion to the band portion 110. The weight portion is connected to the projecting portion 20 of the pipe 11, So that the balance of the pipe 11 is maintained when the pipe 11 is rotated by the rotator 30. [

상기 밴드부(110)는, 호형의 파이프의 외경에 결합되도록 분리 결합되는 제1밴드(111a)와 제2밴드(111b)를 구비한 밴드(111);와, 상기 제1밴드(111a)와 제2밴드(111b)의 일측 결합부에서 상기 제1밴드(111a)와 제2밴드(111b)가 서로 회전 가능하게 결합시키는 힌지부(113);와, 상기 제1밴드(111a)와 제2밴드(111b)의 힌지부(113)의 반대측에서 파이프(11)에 삽입될 수 있도록 열리거나 삽입된 파이프(11)를 고정하도록 결합되는 밴드결합부(114);와, 상기 제1밴드(111a)와 제2밴드(111b) 중 하나 이상에서 파이프(11)의 외경 방향으로 돌출 형성되는 밴드측고정판(120);을 포함하여 구성되는 것을 특징으로 한다.The band part 110 includes a band 111 having a first band 111a and a second band 111b separated and coupled to an outer diameter of an arc-shaped pipe, A hinge part 113 for rotatably coupling the first band 111a and the second band 111b to each other at one coupling part of the two bands 111b, A band coupling portion 114 coupled to fix the pipe 11 which is opened or inserted so as to be inserted into the pipe 11 on the opposite side of the hinge portion 113 of the first band 111a, And a band side fixing plate 120 protruding from the at least one of the first band 111a and the second band 111b in the outer diameter direction of the pipe 11.

상기 밴드측고정판(120)의 중심부에는 고정판관통홀(123a)이 형성되고, 상기 밴드부(110)는 상기 고정판관통홀(123a)에 삽입되어 상기 밴드측고정판(120)에 결합되는 상기 결합부(140)를 고정시키는 하중체고정핀(122);을 더 포함하여 구성되는 것을 특징으로 한다.A fixing plate through hole 123a is formed in the center of the band side fixing plate 120. The band portion 110 is inserted into the fixing plate through hole 123a and is engaged with the band side fixing plate 120 And a load body fixing pin (122) for fixing the load body (140).

상기 하중체고정핀(122)은 자성체 고정핀인 것을 특징으로 한다.The load body fixing pin 122 is a magnetic body fixing pin.

상기 웨이트부는 관통구멍이 형성된 중공부가 형성된 중량체(151a);와, 상기 밴드부(110)에 결합되어 상기 관통구멍을 통해 상기 중량체(151a)가 삽입되는 고정바(153a);와, 상기 중공부를 관통하여 돌출된 고정바(153a)의 단부에 결합되어 상기 중량체(151a)를 고정바(153a)로부터 이탈하지 않도록 고정하는 고정구(153b);를 포함하여 구성되는 것을 특징으로 한다.The weight portion 151a has a hollow portion formed with a through hole, a fixing bar 153a coupled to the band portion 110 and through which the weight 151a is inserted, And a fastener 153b coupled to an end of the fastening bar 153a protruding through the fastening portion 153a and fixing the weight 151a so as not to be detached from the fastening bar 153a.

상기 웨이트부는 마그네트웨이트(151)로 구성되는 것을 특징으로 한다.And the weight portion is constituted by a magnet weight (151).

상기 결합부(140)는, 파이프(11) 측의 하부에 파이프(11)의 원주방향으로 절개 형성되는 삽입개구(140c)가 형성되고, 상기 밴드측고정판(120)이 삽입되어 상기 밴드측고정판(120)의 양측면에 밀착되도록 구성된 제1결합판(140a, 도 7 참조)과 제2결합판(140b, 도 7 참조);과, 상기 삽입개구(140c)의 일 측에 형성되는 잠금홀더(141a);와, 상기 잠금홀더(141a) 타측에서 잠금탄성체(141e)에 의해 상기 잠금홀더(141a)에 삽입되는 탄성력을 받도록 결합된 잠금바(141b)를 구비한 잠금부(141);와, 상기 잠금부(141)가 상기 삽입개구(140c)를 개방상태로 유지하도록 상기 잠금부(141)를 고정하는 잠금바로커부(143);를 포함하여 구성되는 것을 특징으로 한다.The engaging portion 140 is formed with an insertion opening 140c formed at a lower portion of the pipe 11 side in the circumferential direction of the pipe 11 so that the band side fixing plate 120 is inserted, (See FIG. 7) and the second engaging plate 140b (see FIG. 7) configured to be in close contact with both sides of the insertion opening 140c and a lock holder And a lock bar 141b coupled to receive a resilient force inserted into the lock holder 141a by a lock elastic body 141e at the other side of the lock holder 141a; And a locking bar portion 143 for fixing the locking portion 141 such that the locking portion 141 keeps the insertion opening 140c in an opened state.

상술한 구성의 상기 배관 파이프 가공용 밸런스 지그(100)는, 또한, 일단부는 상기 결합부(140)에 결합되고, 타 단부에는 상기 웨이트부가 슬라이드 이동 가능하게 결합되어 파이프(11)로부터 상기 웨이트부 사이의 길이 조절을 가능하게 하는 길이조절부(130)를 더 포함하여 구성되는 것을 특징으로 한다.The above-mentioned construction of the above-described pipe jig 100 for a pipe-pipe processing is further characterized in that one end portion is coupled to the engagement portion 140 and the other end portion is slidably engaged with the weight portion, And a length adjuster 130 for adjusting the length of the light emitting diode.

상기 길이조절부(130)는, 길이 방향으로 다수의 길이조절핀홀(133, 도 2 참조)이 형성되어 상기 결합부(140)에 결합되는 슬라이딩레일(131);과, 상기 슬라이딩레일(131)에 슬라이드 이동 가능하게 결합되는 레일가이드(137, 도 7 참조);와, 일 측에 레일플레이트홀(138, 도 2 참조)이 형성되어 상기 레일가이드(137, 도 7 참조)의 슬라이딩레일(131)이 결합되는 면에서 상기 레일가이드(137, 도 7 참조)에 결합되는 레일플레이트(135, 도 2 및 도 7 참조);와, 상기 웨이트부가 부착되는 받침판(157)을 포함하여 상기 레일플레이트(135, 도 2 및 도 7 참조)에 장착되는 중량체받침판보강재(155, 도 2 및 도 7 참조);와, 상기 길이조절핀홀(133, 도 2 참조)과 상기 레일플레이트홀(138, 도 2 참조)에 삽입되어 상기 슬라이딩레일(131) 상에서 상기 웨이트부의 위치를 고정시키는 길이조절핀(133a, 도 2 참조);을 포함하여 구성되는 것을 특징으로 한다.The length adjusting part 130 includes a sliding rail 131 formed with a plurality of length adjusting pinholes 133 in the longitudinal direction and coupled to the coupling part 140, And a rail plate hole 138 (see FIG. 2) is formed on one side of the rail guide 137 (see FIG. 7) to slide on the sliding rail 131 (See Fig. 2 and Fig. 7) coupled to the rail guide 137 (see Fig. 7) on the side where the weight plate (not shown) is coupled, and a support plate 157 (See FIG. 2 and FIG. 7) attached to the weight plate 131 (see FIG. 2) The length adjusting pins 133a and 133b are inserted into the sliding rail 131 to fix the position of the weight portion on the sliding rail 131, (See FIG. 2).

상술한 구성을 가지는 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는, 대형 파이프를 배관용 부품으로 가공하기 위하여 로테이터(30)를 이용하여 용접 또는 절단 등의 파이프 가공을 수행하는 경우, 파이프의 무게중심을 회전 중심에 일치시키도록 하는 것에 의해, 파이프 가공을 용이하게 하고, 파이프 가공부의 정밀도 및 품질을 향상시키는 효과를 제공한다.In the case of performing the pipe machining such as welding or cutting using the rotator 30 for machining a large pipe into piping parts, the balance jig 100 or 100a for pipe piping according to the present invention having the above- The center of gravity of the pipe is made to coincide with the center of rotation, thereby facilitating the pipe machining and improving the precision and quality of the pipe machined portion.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는, 웨이트부(150, 150a)에 의해 파이프(11)의 무게중심을 회전중심과 일치시킬 수 있어, 로테이터(30)를 이용하여 파이프를 회전시키면서 작업자가 특정 위치에 고정된 상태로 파이프에 대한 용접 또는 절단 작업을 수행할 수 있게 되므로, 용접 속도를 현저히 향상시키는 효과를 제공한다.The balance jigs 100 and 100a of the present invention can adjust the center of gravity of the pipe 11 to the center of rotation by the weight portions 150 and 150a, The worker can perform welding or cutting work on the pipe while being fixed at a specific position, thereby providing an effect of significantly improving the welding speed.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는, 파이프에 대한 가공 작업을 수행하는 경우, T형 파이프와 같은 돌출부(20)가 부착된 경우에는 T형 파이프의 하중에 의해 회전되는 파이프(11)가 회전위치별로 돌출부(20)의 토크력에 의해 진동을 하거나, 기울어지는 등의 위치 변화가 발생하지 않게 되므로, 용접면 또는 절단면의 파이프 가공 품질을 현저히 향상시키는 효과를 제공한다.In addition, in the case of a pipe jig 100 or 100a for pipe piping according to the present invention, when a work is performed on a pipe, when the projection 20 such as a T pipe is attached, the balance jig 100 or 100a is rotated by the load of the T pipe The pipe 11 does not vibrate or tilt due to the torque of the protruding portion 20 for each rotational position, and thus the pipe machining quality of the welded surface or the cut surface is remarkably improved.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는, 웨이트부(150, 150a)에 의해 무게 중심을 파이프(11)의 회전축에 위치시킬 수 있어, 파이프의 고정을 위한 가압력을 최소로 할 수 있으므로, 파이프 가공 시 파이프 고정을 위한 가압력에 의한 배관의 형상 변화를 최소화시키는 효과를 제공한다.The balance jigs 100 and 100a for pipe piping according to the present invention can position the center of gravity of the center of gravity of the center of gravity by the weight portions 150 and 150a on the rotary shaft of the pipe 11, It is possible to minimize the change in the shape of the pipe due to the pressing force for fixing the pipe during the pipe working.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는, 파이프(11)의 무게중심이 회전축과 일치되는 것에 의해 로테이터(30)로부터 파이프(11)가 이탈하는 것이 방지되어, 안전사고의 발생을 방지하는 효과를 제공한다.In the pipe jig 100 and 100a of the present invention, since the center of gravity of the pipe 11 coincides with the rotation axis, the pipe 11 is prevented from disengaging from the rotator 30, Thereby providing an effect of preventing the occurrence of the problem.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는 작업자가 고정 위치에서 용접을 수행하게 되므로, 가장 편리한 자세로 파이프 가공 작업을 수행할 수 있어, 작업자세의 불편함으로 인한 작업자의 근골격계 질환의 발생을 방지하는 효과를 제공한다.In addition, since the balance jigs 100, 100a for pipe piping according to the present invention perform welding at a fixed position, the pipe can be machined in the most convenient posture, and the worker's musculoskeletal diseases And the like.

또한, 본 발명의 배관 파이프 가공용 밸런스 지그(100, 100a)는 핀의 결합에 의해 설치되므로, 파이프 가공 작업을 위한 밴런스를 유지하기 위한 작업을 신속하게 수행할 수 있도록 하는 효과를 제공한다.In addition, since the piping pipe processing balance jigs 100 and 100a of the present invention are provided by the engagement of the pins, it is possible to rapidly perform the work for maintaining the balance for the pipe working.

도 1은 종래기술의 파이프 가공 과정을 나타내는 도면,
도 2는 본 발명의 일 실시예에 따르는 마크네트웨이트(151)로 이루어지는 제1웨이트부(150)를 구비한 배관 파이프 밸런스 지그(100)(이하 '밸런스 지그(100)라'함),의 정면도,
도 3은 파이프(11)에 결합된 상태의 도 2의 밸런스 지그(100)의 밴드부(110)의 사시도,
도 4는 도 2의 결합부(140)의 삽입개구(140c)를 개방한 상태를 나타내는 결합부(140)의 상세도면,
도 5는 도 2의 결합부(140)의 삽입개구(140c)를 닫혀진 상태를 나타내는 결합부(140)의 상세도면,
도 6은 본 발명의 다른 실시예에 따르는 가변중량체에 의해 하중 조절이 가능한 제2웨이트부(150a)를 구비한 밸런스 지그(100a)의 측면도,
도 7은 본 발명의 밸런스 지그(100, 100a)의 사용 상태도이다.
1 is a view showing a conventional pipe processing process,
2 is a perspective view of a piping pipe balance jig 100 (hereinafter referred to as a "balance jig 100") having a first weight portion 150 formed of a mark net weight 151 according to an embodiment of the present invention. Front view,
3 is a perspective view of the band portion 110 of the balance jig 100 of FIG. 2 in a state coupled to the pipe 11,
4 is a detailed view of a coupling portion 140 showing a state in which the insertion opening 140c of the coupling portion 140 of FIG. 2 is opened,
5 is a detailed view of a coupling portion 140 showing a closed state of the insertion opening 140c of the coupling portion 140 of FIG. 2,
6 is a side view of a balance jig 100a having a second weight portion 150a which can be controlled by a variable weight according to another embodiment of the present invention,
Fig. 7 is a use state diagram of the balance jigs 100 and 100a of the present invention.

이하, 본 발명의 실시예를 나타내는 첨부 도면을 참조하여 본 발명을 더욱 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings showing embodiments of the present invention.

도 2는 본 발명의 일 실시예에 따르는 마크네트웨이트(151)로 이루어지는 제1웨이트부(150)를 구비한 배관 파이프 밸런스 지그(100)(이하 '밸런스 지그(100)라'함),의 정면도이고, 도 3은 파이프(11)에 결합된 상태의 도 2의 밸런스 지그(100)의 밴드부(110)의 사시도이다.2 is a perspective view of a piping pipe balance jig 100 (hereinafter referred to as a "balance jig 100") having a first weight portion 150 formed of a mark net weight 151 according to an embodiment of the present invention. 3 is a perspective view of the band portion 110 of the balance jig 100 of Fig. 2 in a state coupled to the pipe 11. Fig.

도 2 및 도 3에 도시된 바와 같이, 상기 밸런스 지그(100)는, 파이프(101)에 결합되는 밴드부(110)와, 밴드부(110)에 결합되는 길이조절부(130)와, 길이조절부(130)에서 슬라이드 이도 가능하게 결합되어 파이프(11)에 형성된 돌출부(20)나 꺽임부(20a, 도 1 및 도 7 참조)에 의한 토크력에 대응하는 반대 방향의 토크력을 제공하도록 하중을 제공하는 제1웨이트부(150) 및 길이조절부(130) 또는 제1웨이트부(150)를 밴드부(110)에 결합 고정시키는 결합부(140)를 포함하여 구성된다.2 and 3, the balance jig 100 includes a band portion 110 coupled to the pipe 101, a length adjusting portion 130 coupled to the band portion 110, The slide is also capable of being engaged in the groove 130 so as to provide a load in the opposite direction corresponding to the torque force by the protruding portion 20 formed in the pipe 11 or the bent portion 20a (see Figs. 1 and 7) And a coupling unit 140 coupling and fixing the first weight unit 150 and the length adjuster 130 or the first weight unit 150 to the band unit 110.

상기 밴드부(110)는, 호형의 파이프의 외경에 결합되도록 분리 결합되는 제1밴드(111a)와 제2밴드(111b)를 구비한 밴드(111)를 구비한다. 상기 제1밴드(111a)와 제2밴드(111b)는 일 측 결합부에는 상기 제1밴드(111a)와 제2밴드(111b)가 서로 회전 가능하게 결합시키는 힌지부(113)가 형성된다. 상기 제1밴드(111a)와 제2밴드(111b)의 힌지부(113)의 반대 측에서 파이프(11)에 삽입될 수 있도록 열리거나 삽입된 파이프(11)를 고정하도록 결합되는 밴드결합부(114)가 형성된다.The band portion 110 includes a band 111 having a first band 111a and a second band 111b that are separated and coupled to be coupled to the outer diameter of the arc-shaped pipe. The first band 111a and the second band 111b are formed with a hinge portion 113 to which the first band 111a and the second band 111b are rotatably coupled to each other. A band coupling portion (not shown) coupled to fix the pipe 11 which is opened or inserted so as to be inserted into the pipe 11 at a side opposite to the hinge portion 113 of the first band 111a and the second band 111b 114 are formed.

상기 밴드결합부(114)는, 도 2와 같이 파이프(11)의 외주연에 삽입될 수 있도록 제1밴드(111a)와 제2밴드(111b)가 서로 개방되고 닫히는 단부 각각에 결합플랜지(112)가 돌출형성되고, 결합플랜지(112)에는 볼트(117a)와 너트(117b)에 의해 서로 결합 고정되도록 구성되는 것에 의해 파이프(11)의 외주연에 밀착 고정된다.2, the first band 111a and the second band 111b are opened and closed at the ends of the coupling band 114 and the coupling flange 112 And is tightly fixed to the outer peripheral edge of the pipe 11 by being configured to be engaged and fixed to the coupling flange 112 by bolts 117a and nuts 117b.

또한, 상기 밴드부(110)는 상기 제1밴드(111a) 또는 제2밴드(111b) 중 하나 이상에 밴드(111)의 원주방향으로 돌출 형성되어 길이조절부(130) 또는 제1웨이트부(150)를 고정시킬 수 있도록 돌출 형성되는 밴드측고정판(120)이 형성된다. 상기 밴드측고정판(120)의 중심부에는 하중체고정핀(122)이 삽입되어 결합되도록 관통 형성되는 고정판관통홀(123a, 도 3 참조)이 형성된다. 또한, 상기 밴드부(110)는 밴드측고정판(120)에 길이조절부(130) 또는 제1웨이트부(150)가 결합된 경우에는 고정판관통홀(123a)과 하기에 설명될 결합부(140)의 제1결합판(140a)와 제2결합판(140b)의 파이프측 단부에서 절개 형성되는 삽입개구(140c)에 삽입되어 밴드측고정판(120)에 길이조절부(130) 또는 제1웨이트부(150)를 고정시키는 하중체고정핀(122)을 포함하여 구성된다.The band part 110 may protrude in at least one of the first band 111a and the second band 111b in the circumferential direction of the band 111 to form a length adjusting part 130 or a first weight part 150 Side fixing plate 120 is formed so as to be able to fix the band-side fixing plate 120. A fixing plate through hole 123a (see FIG. 3) is formed in the central portion of the band side fixing plate 120 so as to be inserted through the load fixing pin 122. The band portion 110 may include a fixing plate through hole 123a and a coupling portion 140 to be described later when the length adjusting portion 130 or the first weight portion 150 is coupled to the band side fixing plate 120. [ Side fixing plate 120 is inserted into the insertion opening 140c formed at the pipe side end portion of the first coupling plate 140a and the second coupling plate 140b of the first and second weight plates 140a and 140b, And a load body fixing pin 122 for fixing the body 150.

상기 결합부(140)는 길이조절부(130) 또는 제1웨이트부(150)를 밴드부(110)에 결합시키도록 구성된다. The coupling portion 140 is configured to couple the length adjusting portion 130 or the first weight portion 150 to the band portion 110.

도 4는 도 2의 결합부(140)의 삽입개구(140c)를 개방한 상태를 나타내는 결합부(140)의 상세 도면이고, 도 5는 도 2의 결합부(140)의 삽입개구(140c)를 닫혀진 상태를 나타내는 결합부(140)의 상세도면이다.4 is a detailed view of a coupling portion 140 showing a state in which the insertion opening 140c of the coupling portion 140 of FIG. 2 is opened. FIG. 5 is a view showing the insertion opening 140c of the coupling portion 140 of FIG. And a coupling unit 140 for indicating a closed state.

이하, 도 2 내지 도 5를 참조하여 상기 결합부(140)의 구성을 상세히 설명한다.Hereinafter, the configuration of the coupling portion 140 will be described in detail with reference to FIGS. 2 to 5. FIG.

도 2 내지 도 5에 도시된 바와 같이, 상기 결합부(140)는 밴드측고정판(120)이 삽입될 수 있는 공간을 형성하여, 밴드측고정판(120)과 삽입결합되는 제1결합판(140a, 도 7 참조)과 제2결합판(140b, 도 7 참조)을 포함하여 구성된다.2 to 5, the coupling unit 140 includes a first coupling plate 140a which is inserted into and coupled with the band-side fixing plate 120 by forming a space into which the band-side fixing plate 120 can be inserted, 7), and a second coupling plate 140b (see Fig. 7).

상기 제1결합판(140a, 도 7 참조)과 제2결합판(140b, 도 7 참조)의 파이프(11) 측에는 하중체고정핀(122)이 삽입될 수 있도록 파이프(11)의 원주 방향으로 절개 형성되는 삽입개구(140c)와, 삽입개구(140c)에 삽입된 하중체고정핀(122)이 삽입개구(140c)로부터 이탈하지 않도록 잠그는 잠금부(141)가 형성된다.7) and the second coupling plate 140b (see FIG. 7) are provided on the pipe 11 side in the circumferential direction of the pipe 11 so that the load body fixing pin 122 can be inserted into the pipe 11 side of the first coupling plate 140a And a lock portion 141 for locking the load body fixing pin 122 inserted into the insertion opening 140c so as not to be separated from the insertion opening 140c are formed.

상기 잠금부(141)는 도 2 내지 도 5에 도시된 바와 같이, 잠금홀더(141a)와, 잠금바(141b)와, 잠금탄성체(141e)와, 잠금바로커부(143)를 포함하여 구성된다.2 to 5, the lock portion 141 includes a lock holder 141a, a lock bar 141b, a lock elastic body 141e, and a lock barrel portion 143 .

상기 잠금홀더(141a)는 상기 제1결합판(140a, 도 7 참조)과 제2결합판(140b, 도 7 참조)에 형성되는 삽입개구(140c)의 일측에서 잠금바(141b)의 단부가 내부로 삽입될 수 있도록 구성된다.The lock holder 141a has an end portion of the lock bar 141b at one side of the insertion opening 140c formed in the first engagement plate 140a (see FIG. 7) and the second engagement plate 140b As shown in FIG.

상기 잠금바(141b)는, 중심부에 잠금탄성체고정구(141f)가 이동 가능하게 슬라이드홀(141c)이 형성되고, 잠금홀더(141a)로 삽입되는 단부의 반대측 단부에는 잠금바(141b)를 삽입개구(140c)를 개방하는 상태로 이동시키는 잠금바손잡이(141g)가 형성된다. 그리고 슬라이드홀(141c)의 내측에는 제1결합판(140a, 도 7 참조)(또는 제2결합판(140b, 도 7 참조))에 고정되어 잠금탄성체(141e)의 일단을 고정시키는 잠금탄성체고정구(141f)가 결합된다. 잠금탄성체(141e)의 타측 단부는 잠금바손잡이(141g)에 고정되어 항상 잠금바(141b)가 잠금홀더(141a)로 삽입되도록 하는 탄성력을 잠금바(141b)에 가하도록 구성된다. 이때 상기 잠금바(141b)가 삽입개구(140c)를 개방한 상태를 유지할 수 있도록 잠금바(141b)의 상측면에서 잠금바손잡이(141g) 측은 밴드측고정판(120)의 면에 대하여 수직방향으로 일정 폭만큼 돌출 형성되어 하기에 설명될 잠금바로커부(143)의 로커(143c)가 걸리어지는 잠금바스토퍼(141d)가 형성된다.The lock bar 141b is formed with a slide hole 141c in a central portion thereof so that the lock elastomer fixture 141f can be moved. The lock bar 141b is inserted into the insertion hole 141b at the opposite end of the end inserted into the lock holder 141a. And a lock bar knob 141g for moving the lock bar knob 140c to the open state. 7) (or a second engaging plate 140b (see FIG. 7)) is provided on the inner side of the slide hole 141c so as to fix the one end of the lock elastic body 141e. (141f). The other end of the lock elastic body 141e is fixed to the lock bar knob 141g so that the lock bar 141b is always urged to apply an elastic force to insert the lock bar 141b into the lock holder 141a. The lock bar knob 141g on the upper side of the lock bar 141b is moved in a direction perpendicular to the surface of the band side fixing plate 120 so that the lock bar 141b can maintain the opened state of the insertion opening 140c A lock bar stopper 141d is formed which is protruded by a predetermined width and is engaged with the locker 143c of the lock bar portion 143 to be described later.

상기 잠금바로커부(143)는 상부는 로커레버(143a)를 형성하고, 수평방향으로 꺽인 부분은 잠금바스토퍼(141d)에 걸리어지는 로커(143c)로 기능하도록 'ㄴ'자 형상으로 형성되며, 꺽이는 부분은 회전 가능하게 제1결합판(140a, 도 7 참조)(또는 제2결합판(140b, 도 7 참조))에 장착된다. 그리고 로커레버(143a)와 제1결합판(140a, 도 7 참조)(또는 제2결합판(140b, 도 7 참조)) 사이에는 로커(143c)가 잠금바스토퍼(141d)에 걸리어지도록 로커레버(143a)로 탄성력을 가하는 로커탄성체(143d)가 결합 구성된다.The upper portion of the lock bar portion 143 forms a rocker lever 143a and the portion of the lock bar portion 143 that is bent in the horizontal direction is formed into a letter shape to function as a locker 143c engaged with the lock bar stopper 141d, The bent portion is rotatably mounted on the first engaging plate 140a (see FIG. 7) (or the second engaging plate 140b (see FIG. 7)). The locker 143c is engaged with the lock bar stopper 141d between the rocker lever 143a and the first engaging plate 140a (see FIG. 7) (or the second engaging plate 140b And a rocker elastic body 143d that applies an elastic force to the lever 143a.

상기 길이조절부(130)는 슬라이딩레일(131)과, 슬라이딩레일보강재(139)와, 레일가이드(137, 도 7 참조)와, 레일플레이트(135, 도 2 및 도 7 참조)와, 중량체받침판보강재(155, 도 2 및 도 7 참조)와, 길이조절핀(133a, 도 2 참조)을 포함하여 구성된다.The length adjuster 130 includes a sliding rail 131, a sliding rail reinforcement 139, a rail guide 137 (see FIG. 7), a rail plate 135 (see FIGS. 2 and 7) A supporting plate stiffener 155 (see Figs. 2 and 7), and a length adjusting pin 133a (see Fig. 2).

상기 슬라이딩레일(131)은 길이 방향으로 다수의 길이조절핀홀(133, 도 2 참조)이 형성되어 상기 결합부(140)에 길이조절핀(133a, 도 2 참조)에 의해 제1웨이트부(150)의 슬라이딩레일(131) 상의 위치를 조정할 수 있도록 구성된다.The sliding rail 131 is formed with a plurality of length-adjusting pinholes 133 (see FIG. 2) in the longitudinal direction thereof and the first weight portion 150 (see FIG. 2) Of the sliding rail 131 can be adjusted.

상기 슬라이딩레일보강재(139)는 슬라이딩레일(131)에 부착되어 슬라이딩레일(131)이 파이프(11)의 회전 중 제1웨이트부(150)의 하중에 의해 변형되는 것을 방지하도록 구성된다.The sliding rail reinforcement 139 is attached to the sliding rail 131 to prevent the sliding rail 131 from being deformed by the load of the first weight portion 150 during rotation of the pipe 11. [

상기 레일가이드(137, 도 7 참조)는 슬라이딩레일(131) 상에서 슬라이드 이동 가능하도록 슬라이딩레일(131)을 감싸면서 슬라이딩레일(131)에 결합되도록 구성된다.The rail guide 137 is configured to be coupled to the sliding rail 131 while sliding the sliding rail 131 to be slidable on the sliding rail 131.

상기 레일플레이트(135, 도 2 및 도 7 참조)는 슬라이딩레일(131)의 일 측에서 레일가이드(137, 도 7 참조)에 부착 구성된다.The rail plate 135 (see FIGS. 2 and 7) is attached to the rail guide 137 (see FIG. 7) at one side of the sliding rail 131.

상기 중량체받침판보강재(155, 도 2 및 도 7 참조)는 레일플레이트(135, 도 2 및 도 7 참조)의 단부에서 저면 레일플레이트(135, 도 2 및 도 7 참조)의 면에 수직 방향으로 돌출 형성되어 마그네트웨이트(151) 또는 중량체(151a)를 장착할 수 있도록 구성된다.2 and 7) are formed at the ends of the rail plate 135 (see Figs. 2 and 7) in a direction perpendicular to the surface of the bottom rail plate 135 (see Figs. 2 and 7) So that the magnet weight 151 or the weight 151a can be mounted.

도 2 내지 도 5의 경우에는 중량체(하중체)로서 마그네트웨이트(151)를 적용한 것으로 도시하였다.In FIGS. 2 to 5, the magnet weight 151 is applied as a weight (load body).

상기 길이조절핀(133a, 도 2 참조)은 상기 길이조절핀홀(133, 도 2 참조)과 상기 레일플레이트(135, 도 2 및 도 7 참조)에 형성된 레일플레이트홀(138, 도 2 참조)에 삽입되어 상기 슬라이딩레일(131) 상에서 상기 제1웨이트부(150)의 위치를 고정시키도록 구성된다. 이때 상기 길이조절핀(133a, 도 2 참조)은 자성체로 제작되어 상기 길이조절핀홀(133, 도 2 참조)과 상기 레일플레이트홀(138, 도 2 참조)에 삽입되는 경우 자력에 의해 부착되어 이탈하는 것을 방지하도록 구성될 수 있다.2) is formed in the rail plate hole 138 (see FIG. 2) formed in the length adjusting pinhole 133 (see FIG. 2) and the rail plate 135 (see FIGS. 2 and 7) So as to fix the position of the first weight part 150 on the sliding rail 131. The length adjusting pin 133a (see FIG. 2) is made of a magnetic material and attached to the length adjusting pinhole 133 (see FIG. 2) and the rail plate hole 138 (see FIG. 2) Or the like.

상기 제1웨이트부(150)는 파이프(11)에 형성되는 돌출부(20) 또는 꺽임부(20a)에 따라 서로 다른 하중의 중량체를 장착할 수 있도록 구성될 수도 있다.The first weight part 150 may be configured to mount a weight having a different load according to the protruding part 20 or the bent part 20a formed in the pipe 11.

도 2 내지 도 5의 경우 상기 제1웨이트부(150)는 마그네트스위치(153)에 의해 자성이 발생하거나 소멸되는 것에 의해 받침판에 영구자석의 자력에 의해 부착된 상태를 유지하는 마그네트웨이트(151)로 구성되는 것으로 도시하였다. 상기 마그네트웨이트(151)와 다수의 마크네트웨이트(151)의 추가 및 제거가 가능하도록 구성되어 돌출부(20) 또는 꺽임부(20a)의 크기나 하중에 따라 적합한 중량체(151a) 또는 마그네트웨이트(151)를 추가하거나 감소시킬 수 있도록 구성된다.2 to 5, the first weight unit 150 includes a magnet weight 151 that maintains a state in which the permanent magnet is attached to the base plate by the magnetic force due to the generation or disappearance of magnetism by the magnet switch 153, As shown in FIG. The magnet weights 151 and the plurality of mark net weights 151 can be added and removed so that the weight 151a or the magnet weights 151a, 151) to be added or reduced.

도 6은 본 발명의 다른 실시예에 따르는 가변중량체(151a)에 의해 하중 조절이 가능한 제2웨이트부(150a)를 구비한 밸런스 지그(100a)의 측면도이다.FIG. 6 is a side view of a balance jig 100a having a second weight portion 150a whose load can be adjusted by the variable weight 151a according to another embodiment of the present invention.

도 6과 같이 도 2 내지 도 5의 제1웨이트부(150)가 자성체가 아닌 일반적인 중량체를 장착 또는 탈착시키도록 구성되는 제2웨이트부(150a)로 구성될 수 있다.As shown in Fig. 6, the first weight portion 150 of Figs. 2 to 5 may be constituted by a second weight portion 150a configured to attach or detach a general weight body other than a magnetic body.

도 6의 밸런즈 지그(100a)에서 제2웨이트부(150a)를 제외한 밴드부(110)와 길이조절부(130)의 구성은 도 2 내지 도 5의 구성과 동일하므로 그 상세한 설명은 생략하고, 상기 제2웨이트부(150a)에 대하여만 설명한다.6, the configuration of the band portion 110 and the length adjusting portion 130 except for the second weight portion 150a is the same as that of FIG. 2 to FIG. 5, Only the second weight portion 150a will be described.

상기 제2웨이트부(150a)는 중량체와, 고정바(153a)와, 고정구(153b)를 포함하여 구성된다.The second weight portion 150a includes a weight, a fixing bar 153a, and a fixture 153b.

상기 중량체(151a)는 관통구멍이 형성된 중공부가 형성된 판 형상으로 구성된다.The weight 151a is formed in a plate shape having a hollow portion formed with a through hole.

상기 고정바(153a)는 받침판(157)에 대하여 수직으로 고정 형성되어, 상기 관통구멍을 통해 상기 중량체(151a)가 삽입되도록 구성된다.The fixing bar 153a is vertically fixed to the receiving plate 157, and the weight 151a is inserted through the through hole.

그리고 상기 고정구(153b)는 원하는 하중의 중량체(151a)들이 고정바(153a)에 장착된 후에는 고정바(153a)의 단부에 결합되어 중량체(151a)들이 고정바(153a)로부터 이탈하는 것을 방지하도록 구성된다.
After the weight 151a of the desired load is mounted on the fixing bar 153a, the fixing member 153b is coupled to the end of the fixing bar 153a so that the weight 151a is separated from the fixing bar 153a .

도 7은 본 발명의 밸런스 지그(100, 100a)의 사용 상태도이다.Fig. 7 is a use state diagram of the balance jigs 100 and 100a of the present invention.

이하, 도 2 내지 도 7을 참조하여 본 발명의 밸런지 지그(100, 100a)의 사용 상태를 설명한다.Hereinafter, the use states of the balancing jig 100 and 100a of the present invention will be described with reference to Figs. 2 to 7. Fig.

이하의 설명에서, 제1웨이트부(150)와 제2웨이트부(150a)를 통칭하는 경우 웨이트부라 하여 설명한다.In the following description, the case where the first weight portion 150 and the second weight portion 150a are collectively referred to will be described as a weight portion.

도 1과 같이 돌출부(20)나 꺽임부(20a)를 가지는 배관(10)의 부품의 제작을 위해 파이프(11)에 대한 용접 또는 절단 등의 파이프 가공 작업을 수행하고자 하는 경우, 도 3 및 도 7과 같이, 밴드부(110)를 파이프(11)의 돌출부(20)나 꺽임부(20a)가 형성된 반대 측에 장착하여 고정한다.In the case where a pipe machining operation such as welding or cutting is to be performed on the pipe 11 for manufacturing a component of the pipe 10 having the protruding portion 20 and the bent portion 20a as shown in Fig. 1, 7, the band portion 110 is mounted on the opposite side of the pipe 11 on which the projecting portion 20 or the bent portion 20a is formed and fixed.

이후, 밴드측고정판(120)의 관통홀(123a, 도 3 참조)에 하중체고정핀(122)을 삽입한 후, 길이조절부(130) 또는 웨이트부(150 또는 150a)가 장착된 결합부(140)를 부착한다. 이 과정에서 상기 하중체고정핀(122)이 삽입개구(140c)를 통해 삽입되도록 결합부(140)를 장착한다. 상기 하중체고정핀(122) 또한 자성체로 구성되어 삽입된 후에는 자성에 의해 밴드측고정판(120)과 결합부(140)의 제1결합판(140a, 도 7 참조) 및 제2결합판(140b, 도 7 참조)에 자력에 의해 부착됨으로써 고정을 위한 별도의 고정을 필요로 하지 않도록 구성되나, 비자성체인 볼트와 너트 등으로 구성될 수도 있다.After the load body fixing pin 122 is inserted into the through hole 123a of the band side fixing plate 120 (see FIG. 3), the length adjusting portion 130 or the weight portion 150 or 150a, (140). In this process, the engaging part 140 is mounted so that the load body fixing pin 122 is inserted through the insertion opening 140c. The load fixing pin 122 is also made of a magnetic material and is inserted into the band fixing plate 120 and the first coupling plate 140a (see FIG. 7) and the second coupling plate 140b, see FIG. 7) by a magnetic force so as not to require fixing for fixing, but it may be constituted by a bolt and a nut which are nonmagnetic.

이때, 상기 잠금바(141b)는 도 4와 같이, 로커(143c)가 잠금바스토퍼(141d)에 걸리어진 상태를 유지하는 것에 의해 삽입개구(140c)는 개방된 상태로 있게 된다.At this time, the lock bar 141b is kept in a state where the locker 143c is caught by the lock bar stopper 141d as shown in FIG. 4, so that the insertion opening 140c is kept open.

상술한 바와 같이, 개방된 상태의 삽입개구(140c)를 통해 결합부(140)를 밴드측고정판(120)에 장착한 후에는, 도 5와 같이, 로커레버(143d)를 반시계 방향으로 회전시켜 잠금바스토퍼(141d)로부터 로커(143c)의 걸림을 해제한다.5, the rocker lever 143d is rotated in the counterclockwise direction as shown in FIG. 5, after the engaging portion 140 is attached to the band side fixing plate 120 through the insertion opening 140c in the opened state, Thereby releasing the engagement of the locker 143c from the lock bar stopper 141d.

로커(143c)에 의한 잠금바스토퍼(141d)의 걸림이 해제되면, 잠금탄성체(141e)에 의해 잠금바(141b)가 잠금홀더(141a) 측으로 이동되면서 잠금바(141b)의 잠금홀더(141a) 측 단부가 잠금홀더(141a)로 삽입되어, 하중체고정핀(122)의 하부를 잠금바(141b)가 지지하게 되어 결합부(140)가 밴드측고정판(120)으로부터 이탈되지 않도록 고정된다.The lock bar 141b is moved to the lock holder 141a side by the lock elastic body 141e and the lock holder 141a of the lock bar 141b is released, Side end portion is inserted into the lock holder 141a so that the lock bar 141b supports the lower portion of the load body fixing pin 122 and is fixed so that the engaging portion 140 is not separated from the band side fixing plate 120. [

다음으로, 도 2와 같이, 길이조절부(130)의 슬라이딩레일(131) 상에서 웨이트부(150, 150a)의 토크가 돌출부(20) 또는 꺽임부(20a)의 하중에 의해 발생하는 토크를 상쇄시키는 위치로 중량체받침판보강재(155, 도 2 및 도 7 참조)의 위치를 이동시킨 후, 레일플레이트홀(138, 도 2 참조)과 적절한 위치의 길이조절핀홀(133, 도 2 참조)에 길이조절핀(133a, 도 2 참조)을 삽입하여 웨이트부의 적정 위치를 고정시킨다. 이 경우 길이조절핀(133a, 도 2 참조) 또한 자성체로 구성되어 별도의 고정구를 필요로 하지 않으나, 상술한 하중체고정핀(122)과 같이 비장성체인 볼트와 너트 등으로 구성될 수도 있다.Next, as shown in Fig. 2, the torque of the weight portions 150 and 150a on the sliding rail 131 of the length adjusting portion 130 is canceled by the load of the protruding portion 20 or the bent portion 20a (See FIG. 2 and FIG. 7) at a proper position with the rail plate hole 138 (see FIG. 2) after the position of the weight supporting plate stiffener 155 The adjustment pin 133a (see FIG. 2) is inserted to fix the proper position of the weight portion. In this case, the length adjusting pin 133a (see FIG. 2) is also made of a magnetic material and does not require a separate fastener. However, it may be formed of a bolt and a nut which are spindle bodies like the load body fastening pin 122 described above.

상술한 바와 같이 배관(10)의 회전 무게 중심이 로테이터(30)의 회전중심과 일치된 후에는 로테이터(30)를 이용하여 배관(10)을 회전시키면서, 작업자는 특정 위치에서 회전되는 배관(10)의 파이프(11)들에 대한 용접 또는 절단 등의 파이프 가공 작업을 수행할 수 있게 된다. After the center of rotation of the pipe 10 coincides with the center of rotation of the rotator 30 as described above, the operator rotates the pipe 10 using the rotator 30, To perform the pipe machining work such as welding or cutting to the pipes 11 of the pipe.

본 발명은, 상술한 도 2 내지 도 6의 구성에서 상기 길이조절부(130)는 구비하지 않고, 웨이트부(제1웨이트부(150) 또는 제2웨이트부(150a)가 직접 결합부(140)를 통해 밴드부(110)에 결합되도록 구성될 수도 있다. 이 경우에는 웨이트부의 하중을 조절하는 것에 의해 돌출부(20)나 꺽임부(20a)에 의한 토크를 상쇄시키게 된다.The present invention is not limited to the length adjusting part 130 in the configurations of the above-described Figs. 2 to 6, and the weight part (the first weight part 150 or the second weight part 150a) The torque applied to the protruding portion 20 or the bent portion 20a is canceled by adjusting the load of the weight portion.

100, 100a: (배관 파이프 가공용) 밸런스 지그
110: 밴드부 111: 밴드
113; 힌지부 114: 밴드결합부
115: 결합플랜지
130: 길이조절부 131: 슬라이딩레일
133: 길이조절핀홀 133a: 길이조절핀
135: 레일플레이트 138: 레일플레이트홀
140: 결합부 141: 잠금부
141a: 잠금홀더 141b: 잠금바
141c: 슬라이딩홀 141d: 잠금바스토퍼
141e: 잠금탄성체 141f: 잠금탄성체고정구
141g: 잠금바손잡이 150: 제1웨이트부
151: 마그네트웨이트 153: 마그네트스위치
150a: 제2웨이트부 151a: 중량체
153a: 고정바 153b: 고정구
155; 중량체받침판 157: 받침판
100, 100a: (for piping pipe processing) Balance Jig
110: band part 111: band
113; Hinge portion 114:
115: Coupling flange
130: length adjuster 131: sliding rail
133: length adjusting pinhole 133a: length adjusting pin
135: Rail plate 138: Rail plate hole
140: engaging portion 141:
141a: Lock holder 141b: Lock bar
141c: Sliding hole 141d: Lock bar stopper
141e: Locking elastic body 141f: Locking elastic body fixing member
141g: lock bar handle 150: first weight part
151: Magnet weight 153: Magnet switch
150a: second weight portion 151a: weight
153a: Fixing bar 153b: Fixture
155; Weight support plate 157: support plate

Claims (9)

밴드측고정판(120)을 구비하여 가공 대상 파이프(11)에 체결되는 밴드부(110);와,
상기 밴드부(110)에 장착되는 웨이트부;와,
상기 밴드측고정판(120)에 결합되어 상기 웨이트부를 상기 밴드부(110)에 고정시키는 결합부(140);를 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
A band portion 110 having a band side fixing plate 120 and fastened to the pipe to be processed 11;
A weight portion mounted on the band portion 110,
And a coupling part (140) coupled to the band side fixing plate (120) and fixing the weight part to the band part (110).
청구항 1에 있어서, 상기 밴드부(110)는,
호형의 파이프의 외경에 결합되도록 분리 결합되는 제1밴드(111a)와 제2밴드(111b)를 구비한 밴드(111);와,
상기 제1밴드(111a)와 제2밴드(111b)의 일측 결합부에서 상기 제1밴드(111a)와 제2밴드(111b)가 서로 회전 가능하게 결합시키는 힌지부(113);와,
상기 제1밴드(111a)와 제2밴드(111b)의 힌지부(113)의 반대측에서 파이프(11)에 삽입될 수 있도록 열리거나 삽입된 파이프(11)를 고정하도록 결합되는 밴드결합부(114);와,
상기 제1밴드(111a)와 제2밴드(111b) 중 하나 이상에서 파이프(11)의 외경 방향으로 돌출 형성되는 밴드측고정판(120);을 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
[2] The apparatus according to claim 1,
A band (111) having a first band (111a) and a second band (111b) detachably coupled to the outside diameter of the arched pipe,
A hinge part 113 for rotatably coupling the first band 111a and the second band 111b at one side of the first band 111a and the second band 111b,
And a band coupling portion 114 (not shown) coupled to fix the pipe 11 which is opened or inserted so as to be inserted into the pipe 11 at a side opposite to the hinge portion 113 of the first band 111a and the second band 111b );Wow,
And a band side fixing plate 120 protruding from the at least one of the first band 111a and the second band 111b in the outer diameter direction of the pipe 11, .
청구항 2에 있어서,
상기 밴드측고정판(120)의 중심부에는 고정판관통홀(123a)이 형성되고,
상기 밴드부(110)는 상기 고정판관통홀(123a)에 삽입되어 상기 밴드측고정판(120)에 결합되는 상기 결합부(140)를 고정시키는 하중체고정핀(122);을 더 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
The method of claim 2,
A fixing plate through hole 123a is formed in the center of the band side fixing plate 120,
The band portion 110 further includes a load body fixing pin 122 inserted into the fixing plate through hole 123a and fixing the coupling portion 140 coupled to the band side fixing plate 120 Features a balanced jig for pipe work.
청구항 3에 있어서,
상기 하중체고정핀(122)은 자성체 고정핀인 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
The method of claim 3,
Wherein the load body fixing pin (122) is a magnetic substance fixing pin.
청구항 1에 있어서, 상기 웨이트부는
관통구멍이 형성된 중공부가 형성된 중량체(151a);와,
상기 밴드부(110)에 결합되어 상기 관통구멍을 통해 상기 중량체(151a)가 삽입되는 고정바(153a);와,
상기 중공부를 관통하여 돌출된 고정바(153a)의 단부에 결합되어 상기 중량체(151a)를 고정바(153a)로부터 이탈하지 않도록 고정하는 고정구(153b);를 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
[2] The apparatus of claim 1,
A weight 151a formed with a hollow portion having a through hole,
A fixing bar 153a coupled to the band portion 110 to receive the weight 151a through the through hole,
And a fixture 153b coupled to an end of the fixing bar 153a protruding through the hollow portion to fix the weight 151a so as not to be separated from the fixing bar 153a. Balance jigs for pipe processing.
청구항 1에 있어서, 상기 웨이트부는,
마그네트웨이트(151)로 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
The apparatus according to claim 1,
And a magnet weight (151).
청구항 1에 있어서, 상기 결합부(140)는,
파이프(11) 측의 하부에 파이프(11)의 원주방향으로 절개 형성되는 삽입개구(140c)가 형성되고, 상기 밴드측고정판(120)이 삽입되어 상기 밴드측고정판(120)의 양측면에 밀착되도록 구성된 제1결합판(140a)과 제2결합판(140b);과,
상기 삽입개구(140c)의 일 측에 형성되는 잠금홀더(141a);와,
상기 잠금홀더(141a) 타측에서 잠금탄성체(141e)에 의해 상기 잠금홀더(141a)에 삽입되는 탄성력을 받도록 결합된 잠금바(141b)를 구비한 잠금부(141);와,
상기 잠금부(141)가 상기 삽입개구(140c)를 개방상태로 유지하도록 상기 잠금부(141)를 고정하는 잠금바로커부(143);를 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
The connector according to claim 1, wherein the coupling portion (140)
Side fixing plate 120 is inserted into the lower portion of the side of the pipe 11 so as to be in close contact with the both side surfaces of the band side fixing plate 120. [ A first coupling plate 140a and a second coupling plate 140b,
A lock holder 141a formed on one side of the insertion opening 140c;
A lock part 141 having a lock bar 141b coupled to receive the elastic force inserted into the lock holder 141a by the lock elastic body 141e at the other side of the lock holder 141a;
And a locking bar portion (143) for fixing the locking portion (141) so that the locking portion (141) keeps the insertion opening (140c) in an opened state.
청구항 1에 있어서,
일단부는 상기 결합부(140)에 결합되고, 타 단부에는 상기 웨이트부가 슬라이드 이동 가능하게 결합되어 파이프(11)로부터 상기 웨이트부 사이의 길이 조절을 가능하게 하는 길이조절부(130)를 더 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
The method according to claim 1,
And a length adjusting unit 130 coupled to the coupling unit 140 at one end and slidably coupled to the weight unit at the other end to enable adjustment of the length between the pipe 11 and the weight unit Wherein the first and second projections are formed in a substantially cylindrical shape.
청구항 8에 있어서, 상기 길이조절부(130)는,
길이 방향으로 다수의 길이조절핀홀(133)이 형성되어 상기 결합부(140)에 결합되는 슬라이딩레일(131);과,
상기 슬라이딩레일(131)에 슬라이드 이동 가능하게 결합되는 레일가이드(137);와,
일 측에 레일플레이트홀(138)이 형성되어 상기 레일가이드(137)의 슬라이딩레일(131)이 결합되는 면에서 상기 레일가이드(137)에 결합되는 레일플레이트(135);와,
상기 웨이트부가 부착되는 받침판(157)을 포함하여 상기 레일플레이트(135)에 장착되는 중량체받침판보강재(155);와,
상기 길이조절핀홀(133)과 상기 레일플레이트홀(138)에 삽입되어 상기 슬라이딩레일(131) 상에서 상기 웨이트부의 위치를 고정시키는 길이조절핀(133a);을 포함하여 구성되는 것을 특징으로 하는 배관 파이프 가공용 밸런스 지그.
[8] The apparatus of claim 8, wherein the length adjuster (130)
A sliding rail 131 formed with a plurality of length-adjusting pinholes 133 in the longitudinal direction and coupled to the coupling portion 140,
A rail guide 137 slidably coupled to the sliding rail 131,
A rail plate 135 having a rail plate hole 138 formed at one side thereof and coupled to the rail guide 137 at a surface of the rail guide 137 where the sliding rail 131 is engaged;
A weight support plate stiffener 155 mounted on the rail plate 135 including a support plate 157 to which the weight portion is attached,
And a length adjusting pin 133a inserted into the length adjusting pin hole 133 and the rail plate hole 138 to fix the position of the weight portion on the sliding rail 131. [ Workable balance jig.
KR1020120123003A 2012-11-01 2012-11-01 Balance jig for manufacturing pipe arrangement KR101997640B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120123003A KR101997640B1 (en) 2012-11-01 2012-11-01 Balance jig for manufacturing pipe arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120123003A KR101997640B1 (en) 2012-11-01 2012-11-01 Balance jig for manufacturing pipe arrangement

Publications (2)

Publication Number Publication Date
KR20140055748A true KR20140055748A (en) 2014-05-09
KR101997640B1 KR101997640B1 (en) 2019-07-08

Family

ID=50887342

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120123003A KR101997640B1 (en) 2012-11-01 2012-11-01 Balance jig for manufacturing pipe arrangement

Country Status (1)

Country Link
KR (1) KR101997640B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181817A (en) * 2016-08-14 2016-12-07 安徽盛运钢结构有限公司 Garbage vacuum transport pipeline tipping fixture
CN106956112A (en) * 2017-04-27 2017-07-18 沈阳飞机工业(集团)有限公司 A kind of positioning welding fixture processing method
KR20200048243A (en) * 2018-10-29 2020-05-08 대우조선해양 주식회사 Modular jig device for pipe welding
KR102126820B1 (en) * 2018-12-19 2020-06-25 보은에스앤씨 주식회사 Band for welding
CN112605601A (en) * 2020-12-10 2021-04-06 中国船舶重工集团公司第七一六研究所 Flexible clamping tool for rotary displacement of bent pipe
CN115338581A (en) * 2022-08-17 2022-11-15 成都飞机工业(集团)有限责任公司 Guide pipe welding fixture for additive manufacturing

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210091010A (en) 2020-01-13 2021-07-21 대우조선해양 주식회사 Rotation assistance apparatus for welding curved pipe

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62196435A (en) * 1986-02-21 1987-08-29 Babcock Hitachi Kk Deviated-load cylindrical article rotating device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62196435A (en) * 1986-02-21 1987-08-29 Babcock Hitachi Kk Deviated-load cylindrical article rotating device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181817A (en) * 2016-08-14 2016-12-07 安徽盛运钢结构有限公司 Garbage vacuum transport pipeline tipping fixture
CN106956112A (en) * 2017-04-27 2017-07-18 沈阳飞机工业(集团)有限公司 A kind of positioning welding fixture processing method
CN106956112B (en) * 2017-04-27 2018-12-07 沈阳飞机工业(集团)有限公司 A kind of positioning welding fixture processing method
KR20200048243A (en) * 2018-10-29 2020-05-08 대우조선해양 주식회사 Modular jig device for pipe welding
KR102126820B1 (en) * 2018-12-19 2020-06-25 보은에스앤씨 주식회사 Band for welding
CN112605601A (en) * 2020-12-10 2021-04-06 中国船舶重工集团公司第七一六研究所 Flexible clamping tool for rotary displacement of bent pipe
CN115338581A (en) * 2022-08-17 2022-11-15 成都飞机工业(集团)有限责任公司 Guide pipe welding fixture for additive manufacturing

Also Published As

Publication number Publication date
KR101997640B1 (en) 2019-07-08

Similar Documents

Publication Publication Date Title
KR101997640B1 (en) Balance jig for manufacturing pipe arrangement
JP5014352B2 (en) Work holding device and machine tool equipped with the work holding device
US7765662B2 (en) Holding fixture for machining bearing caps
JP5806310B2 (en) Work support device
US8172234B2 (en) Collet tool holder having adjustable axis
US9902033B1 (en) Tooling base
JP5272002B2 (en) Quick adjust draw rod positioning nut
WO2009057175A1 (en) Quick-attach precision mount for securing a telescopic sight to a weapon
JP2014205203A (en) Tool pot for chain
CN104896442A (en) Ceiling lamp and mounting support structure thereof
US20100301570A1 (en) Quick change jaw system for chucks
JP7370137B2 (en) Gimbal with improved ring assembly for quick tool changes
JP5758038B1 (en) Roller chain connection jig
EP2805793B1 (en) Guide frame support device
KR101440525B1 (en) Precision vice capable of adjusting angle
RU57182U1 (en) DEVICE FOR INSTALLATION OF PREPARATIONS (OPTIONS)
US20080012246A1 (en) Collet tool holder having adjustable axis
JP6476537B2 (en) Machine tools and tool holders
CN105500046B (en) Bindiny mechanism
JP7135247B2 (en) Chuck device
US7217073B2 (en) Broach tool holding system, broach tool, and method for mounting the broach tool
CN110891718B (en) Quick coupling unit for rod loader clamp
CN109551420B (en) A dismouting frock for stress round pin
CA2601838C (en) Holding fixture for machining bearing caps
JP5638509B2 (en) Hand device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant