KR20130046645A - A tunnel waterproofing construction method - Google Patents

A tunnel waterproofing construction method Download PDF

Info

Publication number
KR20130046645A
KR20130046645A KR1020110111159A KR20110111159A KR20130046645A KR 20130046645 A KR20130046645 A KR 20130046645A KR 1020110111159 A KR1020110111159 A KR 1020110111159A KR 20110111159 A KR20110111159 A KR 20110111159A KR 20130046645 A KR20130046645 A KR 20130046645A
Authority
KR
South Korea
Prior art keywords
adhesive
waterproof
tunnel
lining concrete
shotcrete
Prior art date
Application number
KR1020110111159A
Other languages
Korean (ko)
Other versions
KR101316718B1 (en
Inventor
이대우
이상윤
Original Assignee
이대우
명진 케미칼 주식회사
이상윤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이대우, 명진 케미칼 주식회사, 이상윤 filed Critical 이대우
Priority to KR1020110111159A priority Critical patent/KR101316718B1/en
Publication of KR20130046645A publication Critical patent/KR20130046645A/en
Application granted granted Critical
Publication of KR101316718B1 publication Critical patent/KR101316718B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2450/00Gaskets
    • E02D2450/10Membranes
    • E02D2450/105Membranes impermeable
    • E02D2450/106Membranes impermeable for liquids
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: A tunnel waterproofing construction method is provided to fundamentally prevent the water leakage of lining concrete by inductively draining and blocking leachate due to the bedrock cut or crack of tunnel construction. CONSTITUTION: A tunnel waterproofing construction method comprises the following steps: pouring shotcrete(20) into an excavated bedrock(10); forming an inductive waterproof layer for inductively draining leachate through the shotcrete to a drainpipe; installing a drainage nonwoven fabric(30) and subsequently a complex-type waterproof material(40) on the top for forming the inductive waterproofing layer; pouring lining concrete(50) on the waterproof layer for forming a blockage waterproof layer which integrally adheres to the inductive waterproofing layer; and removing the release paper of the complex-type waterproof material in order to expose a spot-adhesive material(44) for pouring the lining concrete.

Description

터널 방수 시공 방법{A TUNNEL WATERPROOFING CONSTRUCTION METHOD}Tunnel waterproofing construction method {A TUNNEL WATERPROOFING CONSTRUCTION METHOD}

본 발명은 터널에 관한 것으로, 좀 더 구체적으로는 신설 터널의 방수와 기존 터널 보수에 따른 방수 시공 방법에 관한 것이다.The present invention relates to a tunnel, and more particularly to a waterproof construction method according to the waterproofing of the new tunnel and the existing tunnel repair.

철도 터널, 고속도로 터널, 지하도 터널, 전력설비용 터널 등은 도로의 직선화 또는 인구밀집지역을 피하기 위해 산악지역 및 도시지하 심층부의 암반지대를 관통하여 건설된다. 터널에는 암반에 발생되는 절개 또는 균열 등에 의해 지하수 및 지표수가 터널내로 침수되며, 이러한 침출수의 유입을 차단하기 위한 방수 시공이 필수적이다. Railroad tunnels, highway tunnels, underpass tunnels, and power facility tunnels are constructed through rocky areas in mountainous areas and deep underground areas to avoid road straightening or densely populated areas. In the tunnel, groundwater and surface water are flooded into the tunnel by incisions or cracks generated in the rock, and waterproof construction is necessary to block the inflow of such leachate.

터널의 방수 시공은 대부분이 암반의 절개 또는 균열에 의해 침수되는 침출수를 유도하여 집수정을 통하여 밖으로 배출하는 유도방수공법을 시행하고 있다. 하지만, 이러한 터널 공사의 하자 중에는 방수공사의 부실시공에 의한 하자가 많은 부분을 차지한다. Most of the waterproof construction of tunnels is conducted by induction waterproofing which induces leachate that is flooded by rock cutting or crack and discharges it out through the sump. However, many of the defects of the tunnel construction due to the subconstruction of the waterproof construction work.

기존 터널의 방수 구조는 터널을 굴착한 후 숏크리트(shotcrete)를 타설하고 타설된 숏크리트 상부면에 물이 침수하는 배수용 부직포를 란델로 고정한 다음 란델을 매개로 하여 불투명 또는 반투명의 방수시트인 ECB, EVA, HDPE, PVC 등의 고분자합성수지시트(이하, 플라스틱 시트라 함)의 끝단부를 겹쳐서 부착 연결 시공하면서 플라스틱 시트와 시트를 고열의 열을 가하는 열융착방법으로 방수층을 시공을 한 후 라이닝 콘크리트 층을 타설하고, 타일 부착 등의 마감처리를 하여 이루어진다.The waterproof structure of the existing tunnel is made by placing a shotcrete after excavating the tunnel, fixing the drainage nonwoven fabric in which water is submerged on the upper surface of the poured shotcrete with Landel, and then using an opaque or translucent waterproof sheet ECL, The lining concrete layer is constructed after the waterproofing layer is applied by heat fusion method that applies high heat to the plastic sheet and sheets while attaching and connecting the ends of polymer synthetic resin sheets (hereinafter referred to as plastic sheets) such as EVA, HDPE, and PVC. It is made by pouring and finishing the tiles.

즉, 상기 기존 터널의 방수시공은 숏크리트를 통해 침투된 침층수 또는 표층수의 물이 배수용 부직포 또는 배수관을 타고 종방향으로 배수가 되며 종방향으로 배수된 물은 종방향과 연결된 횡방향 배수관을 통해 집수관으로 흘러 집수정에 모여 외부로 배수(배출)하는 유도방수공법으로 시공하고 있다. That is, the waterproof construction of the existing tunnel is the water of the sedimentation or surface water penetrated through the shotcrete is drained in the longitudinal direction by the nonwoven fabric or drainage pipe for drainage, the water drained in the longitudinal direction through the horizontal drain pipe connected to the longitudinal direction It is constructed by an induction waterproofing method that flows through a collecting pipe to a collecting well and drains it out.

현재까지 널리 사용되는 방수재를 크게 분류하여 보면 도막방수재와 시트방수재가 있으며 터널방수시공에서 도막방수재는 굴착한 터널의 밀폐된 조건에서 시공할 수 없어 적용(사용)이 어렵다. 시트방수재는 아스팔트, 우레탄 등의 소재로 조성된 방수시트가 있으나 이러한 시트방수재는 지하 또는 지상의 건축구조물의 요철(凹凸)이 없고 평탄한 콘크리트구조물의 외방수에는 적합 하지만, 터널 구조물의 경우에는 숏크리트의 면상이 평탄하지 않고 요철(凹凸)이 심하기 때문에 시트방수재가 손상되어 사용이 어렵다. 이러한 문제 때문에, 터널의 방수 시공에서는 부득이 숏크리트의 요철면에 적용할 수 있는 물성이 강인하고 다소 뻣뻣하고 경질인 ㄸEBC,EVA,PVC, HDPE 등의 플라스틱 시트를 방수재로 사용하고 있다. The waterproofing materials widely used up to now are classified into coating waterproofing and sheet waterproofing. In the waterproofing of tunnel, the coating waterproofing is difficult to apply (use) because it cannot be constructed in the sealed condition of the excavated tunnel. Sheet waterproofing material has waterproof sheet made of asphalt, urethane, etc. However, sheet waterproofing material is suitable for waterproofing of flat concrete structure without unevenness of building structure of underground or ground, but in case of tunnel structure, Because the surface is not flat and the unevenness is severe, the sheet waterproofing material is damaged and it is difficult to use. Because of this problem, in the waterproof construction of tunnels, plastic sheets such as EBC, EVA, PVC, HDPE, etc., which are inevitably applied to the uneven surface of shotcrete, are tough, somewhat stiff and hard, are used as waterproofing materials.

터널 방수에 적용하는 플라스틱시트인 ECB, EVA, HDPE, PVC 등의 시트는 시트방수재의 시공 특성상 시트와 시트의 일단부를 겹쳐서 연결 접합하여 확장시공을 해야 한다. 하지만, 플라스틱시트들을 연결접합하면서 매우 우수한 접착재를 사용하더라도 접착이 불가능하다. 플라스틱시트는 열가소성 합성고분자시트로 고열의 열에 용융된다는 원리를 이용한 열융착방법으로 확장 시공을 하고 있다. 열융착방법은 ECB, EVA, HDPE, PVC 등의 플라스틱시트들을 연결접합하면서 고온(600℃)의 열풍을 가해 융착 접합하는 방법이다. ECB, EVA, HDPE, PVC sheet, which is a plastic sheet applied to waterproofing tunnels, should be extended by connecting and overlapping the sheet and one end of the sheet due to the construction properties of the sheet waterproofing material. However, even when a very good adhesive is used while connecting and bonding the plastic sheets, it is impossible to bond. The plastic sheet is a thermoplastic synthetic polymer sheet and is expanded by a thermal fusion method using the principle of melting at high heat. The thermal fusion method is a method of fusion bonding by applying hot air at a high temperature (600 ° C.) while connecting and bonding plastic sheets such as ECB, EVA, HDPE, and PVC.

하지만, 열융착방법은 다음과 같은 문제점을 갖고 있다. 터널 방수 시공에서 EVB, EVA, HDPE, PVC 등의 플라스틱 시트들의 끝단부위를 연결접합하면서 고온(600℃)의 열풍을 가하는 열융착 접합 시공시에 배수용 부직포가 높은 열에 의해 탄화되어 배수용 부직포의 배수기능이 저하되는 문제점이 있다. 더 큰 문제는 EVA, ECB, HDPE, PVC 등의 플라스틱시트들을 연결접합하면서 열이 약하면 용융온도가 낮아 융착접합이 부실하고 또는 열이 너무 과하면 고열의 열에 의해 ECB, EVA, HDPE, PVC 등의 플라스틱시트에 구멍이 발생하여 이로 인하여 시트와 시트의 연결접합의 부실로 인한 방수층의 침수 및 누수가 발생되어 라이닝 콘크리트로 물이 침수되는 하자가 발생된다. However, the thermal fusion method has the following problems. In non-woven fabric for drainage, the nonwoven fabric for drainage is carbonized by high heat during heat fusion bonding construction where high temperature (600 ℃) is applied while joining and bonding the ends of plastic sheets such as EVB, EVA, HDPE, PVC in tunnel waterproof construction. There is a problem that the drainage function is reduced. The bigger problem is that when the plastic sheet of EVA, ECB, HDPE, PVC, etc. is connected and the heat is weak, the melting temperature is low and the fusion bonding is poor, or if the heat is excessive, the plastic of ECB, EVA, HDPE, PVC, etc. Holes are generated in the sheet, which causes flooding and leakage of the waterproof layer due to the poor connection between the sheet and the sheet, resulting in water defects in the lining concrete.

특히, 라이닝 콘크리트 층과 방수층(플라스틱시트로 이루어지는 층)이 일체형으로 접착되지 않고 들떠있는(이격) 상태이므로 시트와 시트의 연결접합 부실로 방수층의 부실에 의한 침수 및 누수되는 침출수가 방수층과 라이닝 콘크리트 사이 공간을 옮겨다니며 라이닝 콘크리트의 균열 부위 등의 취약부위으로 물이 새는 경우에는 누수되는 부위를 찾아서 보수하기에도 매우 어렵다.In particular, since the lining concrete layer and the waterproofing layer (layer made of plastic sheet) are not bonded together but are floating (separated), the leachate which is infiltrated and leaked by the insufficiency of the waterproofing layer due to the poor connection between the sheets and the waterproofing layer and the lining concrete If water leaks to weak areas such as cracks in lining concrete while moving between the spaces, it is very difficult to find and repair leaks.

또한 시공환경 조건이 매우 열악한 터널 굴착에서, 굴착된 내면에 숏크리트를 타설하고 배수층인 부직포를 란델로 고정하고 방수층을 형성하기 위하여 ECB, EVA, VLDPE, PVC, PE 등의 플라스틱시트들을 고열의 열을 가하면서 열융착하는 시공공정이 매우 번거롭고 근로노력이 많이 들고 시공기간이 많이 소요된다.In addition, in tunnel excavation where the construction environment is very poor, plastic sheets such as ECB, EVA, VLDPE, PVC, PE are heated to heat the shotcrete on the excavated inner surface, fix the non-woven fabric with randel and form a waterproof layer. The construction process of heat fusion while applying is very cumbersome, labor effort is high and construction time is long.

종래의 터널 방수시공 방법은, 터널을 천공 또는 굴착하여 숏크리트를 타설하고, 물이 투수되는 배수용 부직포를 고정하고 배수용 부직포 면상에 ECB, EVA, HDPE, PVC등의 플라스틱 방수시트들을 고온의 열풍기로 열을 가하여 열융착하고 부착하여 방수층을 형성하여 숏크리트에 침수하는 심층수 또는 표층수를 숏크리트와 방수층 사이의 배수용 부직포를 통하여 침출수를 유도하여 집수정에 모아 밖으로 배출하는 유도방수구조를 제공하고, 라이닝 콘크리트를 타설하고 타일 등의 내장재를 시공하여 터널시공을 완성하는데, 플라스틱 방수시트들의 접합부의 부실에 의한 시공하자로 침출수가 라이닝 콘크리트로 스며들어 누수 되므로 이의 개선이 절실히 필요한 것으로, 현재까지의 기존 터널방수공법에서 시행하고 있는 유도방수공법의 큰 문제점이며 이의 개선 공법이 절실히 필요하다. In the conventional tunnel waterproofing method, the shotcrete is poured by drilling or digging a tunnel, fixing a non-woven fabric for draining water, and placing plastic waterproof sheets such as ECB, EVA, HDPE, PVC on the surface of the non-woven fabric for high temperature hot air blower. It provides heat-induced structure by inducing heat fusion and attaching to form a waterproofing layer to induce leachate through the nonwoven fabric for drainage between shotcrete and waterproof layer by collecting the depth water or surface water immersed in the shotcrete and collecting it in the sump to discharge it out. Concrete is completed and the interior materials such as tiles are completed to complete the tunnel construction. The leaching water leaks into the lining concrete due to the poor construction of the joints of the plastic waterproof sheets, so it is urgently needed to improve the existing tunnel. This is a big problem of the induction waterproofing method implemented in the waterproofing method. There is an urgent need for improvement methods.

본 발명은, 종래의 터널 방수 시공 방법인 숏크리트와 방수층 사이의 배수용 부직포에 의해 숏크리트에서 침수되는 침출수를 터널 밖으로 유도하는 유도배수방법과 함께, 복합형 방수재를 라이닝 콘크리트에 일체형으로 전면 부착하여 방수층을 형성함으로서, 라이닝 콘크리트에 숏크리트의 침출수가 유입되는 것을 원천적으로 차단하는 차단방수를 시공함으로서, 터널 방수시공에서 유도방수공법과 차단방수공법을 동시에 2개의 방수시공 공법을 적용하여 2중의 터널 방수시공 방법을 제공하는데 있다. The present invention, with the induction drainage method for guiding the leachate immersed in the shotcrete out of the tunnel by the non-woven fabric for drainage between the shotcrete and the waterproofing layer, which is a conventional tunnel waterproofing method, the composite waterproofing material integrally attached to the lining concrete in front of the waterproof layer By constructing the barrier concrete to prevent the leakage of shotcrete into the lining concrete at the source, by applying two waterproof construction methods at the same time to the induction waterproofing method and the blocking waterproofing method in the tunnel waterproofing construction, the double tunnel waterproofing construction To provide a method.

또한, 종래의 터널 방수시공 방법에서 숏크리트에 배수용 부직포를 설치하고 이어서 EVA, ECB, HDPE, PVC 등의 플라스틱 방수시트들의 끝단부를 반드시 고열의 열풍기로 열융착 부착시공함으로서 시공 작업이 번거롭고 시공기간도 많이 소요되었던 것을, 본 발명에서는, 플라스틱 방수시트에 적층한 점접착재에 의해 고온의 열을 가하는 열융착 방법이 아닌 자착성능에 의해 상온에서 간단히 플라스틱 방수시트들을 부착하여 연결 시공함으로서 방수시공작업이 매우 간편하고 시공기간을 단축할 수 있는 터널 방수시공 방법을 제공하는데 있다. In addition, in the conventional tunnel waterproof construction method, the nonwoven fabric for drainage is installed on the shotcrete, and then the ends of the plastic waterproof sheets such as EVA, ECB, HDPE, PVC, etc. must be heat-sealed with a high temperature hot air blower, which makes the construction work cumbersome and construction period. In the present invention, the waterproof construction work is very simple by attaching and attaching the plastic waterproof sheets at room temperature simply by the self-adhesive performance, rather than the heat fusion method of applying high temperature heat by the adhesive agent laminated on the plastic waterproof sheet. It is to provide a tunnel waterproof construction method that can be simple and shorten the construction period.

또한, 본 발명의 터널 방수시공 방법은 숏크리트와 방수층 사이의 배수용 부직포로 유도 배수하는 유도방수공법을 시행하고, 복합 방수시트는 콘크리트와 일체형으로 전면 접착이 되므로 토목 및 건축구조물의 외부방수와 같은 효과를 얻게 하는 차단방수를 제공함으로써, 라이닝 콘크리트를 통한 누수 및 침출수를 근본적 차단하여 종래의 터널방수시공과 완연하게 다른 완벽한 2중의 방수시공 효과를 얻게 하는 것이다. In addition, the tunnel waterproof construction method of the present invention implements an induction waterproofing method of induction drainage to the non-woven fabric for drainage between the shotcrete and the waterproofing layer, and the composite waterproof sheet is integrally bonded to the front of the concrete, such as external waterproofing of civil engineering and building structures By providing a water barrier to achieve the effect, it is to fundamentally block the leakage and leachate through the lining concrete to achieve a perfect double waterproof effect that is completely different from the conventional tunnel waterproof construction.

본 발명이 해결하고자 하는 과제는 여기에 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 당업자에게 명확하게 이해될 수 있을 것이다. The problem to be solved by the present invention is not limited thereto, and other problems not mentioned will be clearly understood by those skilled in the art from the following description.

본 발명의 일측면에 따르면, 굴착된 암반에 숏크리트를 타설하는 단계; 상기 숏크리트를 통한 침출수를 배수관으로 유도 배수하는 유도 방수층을 형성하는 단계; 및 상기 방수층 상에 라이닝 콘크리트를 타설하되, 상기 라이닝 콘크리트가 상기 유도 방수층과 일체형으로 전면 접착되어 침출수를 차단하는 차단 방수층을 형성하는 단계를 포함하는 터널 방수 시공 방법이 제공될 수 있다.According to one aspect of the invention, the step of pouring shotcrete on the excavated rock; Forming an induction waterproofing layer for inductively draining the leachate through the shotcrete into a drain pipe; And placing lining concrete on the waterproof layer, wherein the lining concrete is integrally bonded with the induction waterproof layer to form a barrier waterproof layer for blocking leachate.

또한, 상기 유도 방수층을 형성하는 단계는 상기 숏크리트 상에 배수용 부직포를 설치하는 단계; 및 플라스틱시트의 일면에 점접착재가 적층된 복합형 방수재를 상기 배수용 부직포 상에 설치하되, 상기 복합형 방수재의 플라스틱시트가 상기 배수용 부직포를 향하도록 설치하는 단계를 포함하여, 상기 배수용 부직포와 상기 플라스틱시트에 의해 상기 유도방수층이 제공될 수 있다.In addition, the forming of the induction waterproof layer may include installing a nonwoven fabric for drainage on the shotcrete; And installing a composite waterproofing material having a point adhesive material laminated on one surface of a plastic sheet on the drainage nonwoven fabric, wherein the plastic sheet of the composite waterproofing material faces the drainage nonwoven fabric. And the induction waterproof layer may be provided by the plastic sheet.

또한, 상기 차단 방수층을 형성하는 단계는 상기 복합형 방수재의 점접착재에 부착된 이형지를 제거하는 단계; 및 상기 점접착재가 노출된 상기 복합형 방수재 상에 상기 라이닝 콘크리트를 타설하는 단계를 포함하여, 상기 복합형 방수재의 점접착재에 상기 라이닝 콘크리트가 일체형으로 전면 접착되면서 상기 차단 방수층이 제공될 수 있다. In addition, the forming of the blocking waterproof layer may include removing the release paper attached to the adhesive agent of the composite waterproofing material; And placing the lining concrete on the composite waterproof material to which the adhesive agent is exposed, and the barrier waterproof layer may be provided while the lining concrete is integrally bonded to the adhesive agent of the composite waterproof material as a whole.

본 발명의 일측면에 따르면, 굴착된 암반에 숏크리트를 타설하는 단계; 상기 숏크리트 상에 배수용 부직포를 설치하되, 상기 배수용 부직포의 끝단부가 서로 겹치도록 연결하고 타정못에 의해 상기 숏크리트에 타정되는 단계; 상기 배수용 부직포 상에 플라스틱시트의 끝단부가 겹치도록 연결하여 방수층을 설치하는 단계; 점접착 양면테이프의 한 면에 부착된 이형지를 제거한 후 상기 방수층에 상기 점접착 양면테이프를 부착하는 단계; 및 상기 점접착성 양면테이프가 부착된 상기 방수층 상에 라이닝 콘크리트를 타설하는 단계를 포함하되; 상기 라이닝 콘크리트 타설 단계는 상기 점접착성 양면테이프의 또 다른 면에 부착된 이형지를 제거하고 상기 라이닝 콘크리트를 타설하여, 상기 라이닝 콘크리트가 상기 방수층에 부착된 상기 점접착성 양면테이프의 점접착재에 접착되어 방수 구간이 구획되는 터널 방수 시공 방법이 제공될 수 있다. According to one aspect of the invention, the step of pouring shotcrete on the excavated rock; Installing a drainage nonwoven fabric on the shotcrete, connecting end portions of the drainage nonwoven fabric to overlap each other and tableting the shotcrete with a tableting nail; Installing a waterproof layer by connecting the ends of the plastic sheets to overlap the nonwoven fabric for drainage; Removing the release paper attached to one side of the adhesive double sided tape and attaching the adhesive double sided tape to the waterproof layer; And placing lining concrete on the waterproof layer to which the adhesive double-sided tape is attached; The lining concrete pouring step is to remove the release paper attached to the other side of the adhesive double-sided tape and cast the lining concrete, the lining concrete adheres to the adhesive of the adhesive double-sided tape attached to the waterproof layer Thus, a tunnel waterproof construction method in which the waterproof section is partitioned may be provided.

또한, 상기 점접착 양면테이프를 부착하는 단계는 상기 플라스틱 시트의 끝단부가 겹쳐서 연결시공된 상부에 덧붙임되도록 부착할 수 있다.In addition, the step of attaching the adhesive double-coated tape may be attached so that the end of the plastic sheet is superimposed on the top of the overlapped construction.

또한, 상기 방수층을 설치하는 단계는 상기 플라스틱 시트의 끝단부가 겹쳐서 연결 시공된 연결 접합부분에는 1면(한면) 점접착 테이프의 이형지를 벗겨내면서 부착하는 단계; 상기 1면 점접착 테이프가 부착된 상부에 와샤가 삽입된 타정못을 밖아 상기 플라스틱시트를 견고하게 고정 부착하는 단계를 포함하고, 상기 점접착 양면테이프를 부착하는 단계는 상기 방수층에 터널의 종방향 또는 횡방향으로 상기 점접착 양면테이프를 일정간격으로 부착할 수 있다.In addition, the step of installing the waterproof layer is a step of attaching while peeling off the release paper of the one side (one side) adhesive tape to the connection joint portion of the end of the plastic sheet is connected and constructed; And fixing the plastic sheet firmly by taking out the tableting nail into which the washer is inserted, and attaching the adhesive double-sided tape to the waterproof layer in the longitudinal direction of the tunnel. Alternatively, the adhesive adhesive double-sided tape may be attached at a predetermined interval in the transverse direction.

본 발명의 일측면에 따르면, 터널을 천공 및 굴착을 한 후 굴착된 암반 상에 터널의 원형이 되도록 숏크리트 타설을 하는 단계, 탁카 못으로 배수용 부직포를 숏크리트에 고정하는 단계, ECB, EVA, PVC HDPE 등의 고분자합성수지시트(플라스틱방수시트)의 일면에 콘크리트와 일체형으로 부착되는 점접착재가 적층된 복합형 방수재를 고분자합성수지시트가 배수용 부직포를 향하도록 하여 배수용 부직포와 고정 접합되도록 와셔가 삽입된 탁카 못을 탁카 건으로 타정하여 숏크리트에 고정하여 유도배수를 위한 유도배수시공을 하는 단계, 상기 복합형 방수재의 일면에 적층된 점접착재가 노출된 상태에서 라이닝 콘크리트를 타설하여(역타설 공법) 라이닝 콘크리트에 복합형 방수재가 일체형으로 전면 접착되도록 차단 방수시공을 하는 단계를 포함하는 터널 방수 시공 방법이 제공될 수 있다.According to one aspect of the invention, after drilling and drilling the tunnel shotcrete to form a tunnel of the tunnel on the excavated rock, fixing the nonwoven fabric to the shotcrete with a nail nail, ECB, EVA, PVC A washer is inserted into the composite waterproofing material in which a polymer adhesive sheet is laminated on one surface of a polymer synthetic resin sheet (plastic waterproof sheet) such as HDPE so that the polymer synthetic resin sheet faces the nonwoven fabric for drainage and is fixed to the nonwoven fabric for drainage. The tackka nails are compressed into a tackka gun and fixed to the shotcrete to induce drainage for induction drainage.The lining concrete is poured in the state in which the adhesive agent laminated on one surface of the composite waterproofing material is exposed (reverse casting method). Tunnel including the step of waterproofing the waterproof construction so that the composite waterproofing material is integrally bonded to the front of the concrete integrally Waterproof construction methods can be provided.

본 발명의 일측면에 따르면, 종래 터널 방수시공방법과 다르게 숏크리트에 부착된 배수시트(배수용 부직포 및 복합형 방수재)에 의해 숏크리트의 균열 및 크랙부위 등으로 누수되는 침출수를 터널 밖으로 유도하는 유도배수가 가능할 뿐만 아니라, 라이닝 콘크리트에 복합형 방수재가 일체형으로 접착되어 차단방수가 가능함으로써 유도배수시공과 차단방수시공의 2중 방수시공효과를 제공할 수 있다. According to an aspect of the present invention, unlike the conventional tunnel waterproof construction method, induced drainage to induce leachate leaked to the cracks and cracks of the shotcrete out of the tunnel by a drain sheet (non-woven fabric and composite waterproofing material for drainage) attached to the shotcrete In addition, the composite waterproofing material is integrally bonded to the lining concrete, and thus, the waterproofing is possible, thereby providing the double waterproofing effect of the induction drainage construction and the waterproofing construction.

본 발명의 일측면에 따르면. 1차적으로 유도배수시공을 하여 암반 등으로부터 유입되는 침출수가 유도되어 집수관을 통하여 터널 밖으로 배출되며, 2차적으로 복합형 방수재가 라이닝 콘크리트에 전면 접착되어 라이닝 콘크리트의 누수를 원천적으로 차단하는 차단방수 시공을 함으로, 만일에 라이닝 콘크리트 외면이 손상되어 누수가 발생하는 경우 라이닝 콘크리트의 누수 및 침출되는 부위만 간편하게 보수하면 되므로, 종래의 터널을 보수하기 위한 보수시공방법과 다르게 누수되는 부위를 쉽게 보수할 수 있는 터널방수 시공방법이 제공될 수 있다.According to one aspect of the invention. Leached water from the rock, etc. is induced by primary drainage and discharged out of the tunnel through the collecting pipe.Secondary waterproofing material is completely bonded to the lining concrete to prevent leakage of the lining concrete. In case of construction, if the outside surface of the lining concrete is damaged, water leakage and leaching of the lining concrete can be easily repaired. Therefore, it is easy to repair the leaking site unlike the conventional construction method for repairing the tunnel. Tunnel waterproof construction method can be provided.

또한, 복합형 방수재는, EVA, ECB, VLDPE, HDPE 등의 고분자합성수지시트(플라스틱시트)의 한 면에 점접착성을 갖는 점접착재가 적층된 복합형태의 방수시트로서 플라스틱시트에 적층된 점접착재는 강력한 점접착력에 의해 EVA, ECB, VLDPE, HDPE 등의 플라스틱시트들의 끝단부의 연결접합을 종래의 시공방법과 같이 고온의 열풍을 가하여 열융착할 필요가 없이, 상온에서 간단하게 강력하게 접합할 수 있으며, 또한 콘크리트와 일체형으로 접착될 수 있다. In addition, the composite waterproof material is a composite waterproof sheet in which a point adhesive having adhesive properties is laminated on one side of a polymer synthetic resin sheet (plastic sheet) such as EVA, ECB, VLDPE, and HDPE. With the strong adhesive force, the joints of the ends of plastic sheets such as EVA, ECB, VLDPE, and HDPE can be simply and strongly bonded at room temperature without the need for heat fusion by applying high temperature hot air as in the conventional construction method. It can also be integrally bonded with concrete.

또한, 복합형 방수재의 점접착재는 겔(Gel)타입의 유동성과 점접착성을 보유하고 있어 도막방수제의 성상을 나타냄으로서, 플라스틱시트의 방수기능과 점접착재의 도막방수재의 방수기능을 발휘함으로 2중의 방수기능을 발휘할 수 있다. In addition, the adhesive material of the composite waterproofing material has gel type fluidity and adhesiveness, which shows the property of the film waterproofing agent, thereby showing the waterproof function of the plastic sheet and the waterproofing material of the adhesive film of the adhesive material. The waterproof function can be exhibited.

또한, 본 발명에 따른 복합형 방수재를 구성하는 EVA, ECB, VLDPE, HDPE 등의 고분자 합성수지는 친환경이어야 하며, 한 면에 적층하는 점접착재도 친환경적이어야 한다.In addition, the polymer synthetic resin such as EVA, ECB, VLDPE, HDPE constituting the composite waterproofing material according to the present invention should be environmentally friendly, and the adhesive agent laminated on one side should also be environmentally friendly.

본 발명에 따른 터널 방수공법은 굴착된 암반에 숏크리트를 타설하는 단계; 숏크리트의 상부에 물이 침수하는 배수용 부직포를 부착하는 단계; 상기 배수용 부직포 상에 복합형 방수재의 플라스틱시트의 면을 부착하는 단계; 상기 부착된 복합형 방수재에 적층된 점접착재에 부착된 이형지를 떼어내고 라이닝 콘크리트를 타설하는 단계로 시공을 한다.Tunnel waterproofing method according to the present invention comprises the steps of pouring shotcrete on the excavated rock; Attaching a nonwoven fabric for drainage in which water is submerged on top of the shotcrete; Attaching a surface of a plastic sheet of a composite waterproof material on the drainage nonwoven fabric; Construction is carried out by removing the release paper attached to the adhesive agent laminated on the attached composite waterproof material and pouring lining concrete.

본 발명의 실시예들은, 터널 건설의 암반절개 또는 균열에 의한 침출수를 유도배수하고 차단하여 라이닝콘크리트의 누수를 근본적으로 방지할 수 있고, 시공이 간단하고 시공시간 및 시공노동력을 절감할 수 있다, Embodiments of the present invention, it is possible to fundamentally prevent the leakage of the lining concrete by inducing and draining and blocking the leachate due to rock cut or crack of the tunnel construction, it is easy to construction and can save construction time and construction labor,

또한, 본 발명의 실시예들은, 숏트크리트 상부에 부착한 배수용 부직포와 복합형 방수재의 플라스틱시트에 의해 유도 방수의 시공효과를 1차적으로 얻을 수 있고, 복합형 방수재의 점첩착재 층이 타설하는 라이닝 콘크리트와 일체형으로 전면 접착함으로서 라이닝콘크리트에 물이 침투하여 누수되는 것을 원천 봉쇄하는 차단 방수시공 효과를 동시에 기대할 수 있다. In addition, embodiments of the present invention, by the non-woven fabric for drainage attached to the shotcrete and the plastic sheet of the composite waterproofing material can obtain the construction effect of the induction waterproofing primarily, and the adhesive layer of the composite waterproofing material is poured By integrally bonding the lining concrete with the front surface, it is possible to expect the effect of water-proof construction to block the leakage of water from the lining concrete.

도 1은 본 발명의 제1실시예에 따른 터널의 방수 시공 방법을 설명하기 위한 터널 방수 구조물의 개략적인 단면도이다.
도 2는 도 1에 도시된 터널 방수 구조물의 요부 확대 단면도이다.
도 3a 내지 도 3e는 도 2에 도시된 방수 구조물의 시공 방법을 단계적으로 보여주는 도면들이다.
도 4는 본 발명의 제2실시예에 따른 방수 구조물의 요부 확대 단면도이다.
도 5a 내지 도 5e는 도 4에 도시된 방수 구조물의 시공 방법을 단계적으로 보여주는 도면들이다.
도 6은 점접착성 양면테이프가 플라스틱 시트의 테두리를 따라 부착된 상태를 평면적으로 보여주는 도면이다.
도 7은 본 발명의 제2실시예의 변형예를 보여주는 도면이다.
1 is a schematic cross-sectional view of a tunnel waterproof structure for explaining the waterproof construction method of the tunnel according to the first embodiment of the present invention.
FIG. 2 is an enlarged cross-sectional view illustrating main parts of the tunnel waterproof structure shown in FIG. 1.
3A to 3E are diagrams showing the construction method of the waterproof structure shown in FIG. 2 step by step.
4 is an enlarged cross-sectional view of main parts of a waterproof structure according to a second exemplary embodiment of the present invention.
5A to 5E are diagrams showing the construction method of the waterproof structure shown in FIG. 4 step by step.
6 is a plan view showing a state where the adhesive double-coated tape is attached along the edge of the plastic sheet.
7 is a view showing a modification of the second embodiment of the present invention.

이하, 본 발명의 실시 예를 첨부된 도면 도 1 내지 도 7을 참조하여 더욱 상세히 설명한다. 본 발명의 실시 예는 여러 가지 형태로 변형될 수 있으며, 본 발명의 범위가 아래의 실시 예들로 한정되는 것으로 해석되어서는 안 된다. 본 실시 예는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 더욱 완전하게 설명하기 위해 제공되는 것이다. 따라서 도면에서의 요소의 형상은 보다 명확한 설명을 강조하기 위해 과장되었다. 상기 도면들에 있어서 동일한 기능을 수행하는 구성요소에 대해서는 동일한 참조번호가 병기되어 있다. Hereinafter, exemplary embodiments of the present invention will be described in more detail with reference to FIGS. 1 to 7. The embodiments of the present invention may be modified in various forms, and the scope of the present invention should not be construed as being limited to the following embodiments. This embodiment is provided to more fully describe the present invention to those skilled in the art. Thus, the shape of the elements in the figures has been exaggerated to emphasize a clearer description. In the drawings, the same reference numerals are assigned to components that perform the same function.

본 발명은 터널 내부의 숏크리트과 라이닝 콘크리트 사이에 설치하는 배수용 부직포와 복합형 방수재의 방수층 설치에 의하여 숏크리트에서 침수(누수)되는 심층수와 표층수를 유도하여 터널 밖으로 배수하는 유도방수층을 1차로 얻게 하고, 라이닝 콘크리트에 복합형 방수재를 일체형으로 접착하여 숏크리트의 침출수가 라이닝콘크리트로 누수되지 못하도록 차단하는 차단방수층을 2차로 얻게 함으로서 종래의 터널방수 시공과 완전히 차별되는 완벽한 터널방수시공 효과를 얻게 한다.The present invention induces a deep water and surface water inundated (leakage) in the shotcrete by obtaining a non-woven fabric for drainage between the shotcrete and lining concrete inside the tunnel and the waterproof layer of the composite waterproofing material to obtain an induction waterproofing layer draining out of the tunnel as a primary, The composite waterproofing material is integrally bonded to the lining concrete to obtain a barrier waterproof layer that blocks the leaching of the shot concrete from leaking to the lining concrete, thereby obtaining a perfect tunnel waterproofing effect that is completely different from the conventional tunnel waterproofing construction.

일반적인 터널 방수시공의 경우를 살펴보면, 굴착된 암반 상에 터널의 원형이 되도록 콘크리트가 뿜칠되어 암반의 거친면을 없애고 터널의 둥근 원형의 골격이 되도록 형성하는 숏크리트를 뿜칠하지만 숏크리트를 뿜칠한 외면은 여전히 평탄하지 않고 요철(凹凸)이 심하다. In the case of the general tunnel waterproofing, concrete is sprayed to form a tunnel on the excavated rock, eliminating the rough surface of the rock and forming a round circular skeleton of the tunnel, but the exterior of the shotcrete is still sprayed. Uneven and severe unevenness.

터널방수에서 유도방수공법은, 요철(凹凸)이 심한 숏크리트 외면에 배수용 부직포를 전체적으로 덮어주어 설치하여 방수시트를 보호하는 완충 역할을 하면서 절개된 암반으로부터 숏크리트를 통해 침수하는 심층수 또는 표층수를 물이 투수되는 배수용 부직포의 성능과 방수층에 의해 물이 배수용 부직포를 통하여 집수정에 모여 터널 외부로 유도하여 배출하는 시공방법이다. In tunnel waterproofing, the induction waterproofing method covers the entire surface of shotcrete with irregularities and covers the drainage nonwoven fabric as a whole to protect the waterproof sheet, while protecting the waterproof sheet while water is infiltrated through the shotcrete from the cut rock. It is a construction method in which water is collected in the sump through the drainage nonwoven fabric and guided to the outside of the tunnel by the performance of the drained nonwoven fabric and the waterproof layer.

차단방수공법은, 지하건축 구조물의 외벽, 또는 옥상의 상부와 같이 요철이 심하지 않은 콘크리트구조물의 외부에 방수재를 전면 부착하여 콘크리트 구조물에 외부로부터 물이 침투 및 누수가 되지 않도록 하는 시공방법으로, 방수재를 콘크리트 구조물의 외벽에 밀착하여 전면 접착하여 방수시공하는 것을 차단 방수시공 공법이라고 한다. The blocking waterproof method is a construction method that prevents water from penetrating and leaking from the outside to the concrete structure by attaching the waterproofing material to the outside of the concrete structure such as the outer wall of the underground construction structure or the upper part of the roof. It is called blocking water-proof construction method to close the surface of the concrete structure and adhere it to the outer wall.

본 발명에서는 복합형 방수재를 이용한 역타설공법에 의해 라이닝 콘크리트에 복합형 방수재를 전면 접착하는 차단방수시공을 함으로서 터널 방수시공방법에서 유일하게 차단 방수 공법을 새로이 창안하여 제공한다. 역타설 공법에 관하여 부언 설명하면, 토목 및 건축물의 일반적인 방수시공은 구조물의 외벽에 방수재를 전면 접착함으로서 구조물 외부에서 내부로 물이 침수하는 것을 차단하는 방수시공을 하는 것이 보편적인 방수시공방법으로, 토목 및 건축구조물이 완성된 후의 구조물 외부가 협소하거나 방수시공을 하기 어려운 경우에는 방수시공을 선시공하여 방수층을 형성한 후 형성된 방수층에 구조물 콘크리트를 타설하여 외벽 방수하는 방법을 역타설 방수공법이라고 한다. In the present invention, by providing a waterproof waterproof construction to completely adhere the composite waterproofing material to the lining concrete by the reverse pouring method using a composite waterproofing material in the tunnel waterproofing construction method provides a new blocking waterproofing method. Regarding the reinforcement method, the general waterproof construction of civil engineering and buildings is a general waterproof construction method that performs waterproof construction that prevents water from invading from the outside of the structure by bonding the waterproof material to the outer wall of the structure. When the exterior of the structure is narrow or it is difficult to perform waterproofing after the completion of the civil and building structures, the method of waterproofing the exterior walls by placing the concrete on the waterproofing layer after forming the waterproofing layer is called the reverse casting waterproofing method.

상기와 같이 터널 방수시공에서 유도배수시공공법과 차단방수시공공법인 2개 형태의 방수시공공법을 병행하여 터널의 방수시공을 함으로서, 신설터널의 방수시공은 물론이고, 터널이 오랜 기간이 지나 손상이 발생한 기존의 터널에 대한 전반적인 보수와 이에 따른 방수시공에도 유용하게 적용하여 터널의 방수시공의 우수한 효과를 얻게 한다. As mentioned above, the tunnel is waterproofed in parallel with the induction drainage construction method and the two types of waterproof construction methods in the waterproof and waterproof construction method. It can be usefully applied to the overall repair of existing tunnels and the waterproof construction accordingly, and the excellent effect of waterproof construction of the tunnel is obtained.

본 발명의 또 다른 측면의 터널 방수시공방법은 ECB, EVA, PVC, HDPE 등의 고분자합성수지시트(플라스틱시트)를 중간으로 하여 양측면에 강력한 점접착성을 발휘하는 점접착재를 적층한 양면 점접착 테이프를 이용한 터널방수 시공방법을 제공한다.
Tunnel waterproof construction method according to another aspect of the present invention is a double-sided adhesive tape laminated with a point adhesive material exhibiting strong adhesiveness on both sides with a polymer synthetic resin sheet (plastic sheet) such as ECB, EVA, PVC, HDPE Provide a tunnel waterproof construction method using.

( 실시 예 )(Example)

도 1은 본 발명의 제1실시예에 따른 터널의 방수 시공 방법을 설명하기 위한 터널 방수 구조물의 개략적인 단면도이다. 도 2는 도 1에 도시된 터널 방수 구조물의 요부 확대 단면도이다. 1 is a schematic cross-sectional view of a tunnel waterproof structure for explaining the waterproof construction method of the tunnel according to the first embodiment of the present invention. FIG. 2 is an enlarged cross-sectional view illustrating main parts of the tunnel waterproof structure shown in FIG. 1.

도 1 및 도 2를 참조하면, 본 발명에 따른 터널의 방수 시공에 의한 방수 구조물은 암반(10) 표면으로부터 숏크리트(20), 배수용 부직포(30), 복합형 방수재(40) 그리고 라이닝 콘크리트(50)를 포함한다. 복합형 방수재(40)는 ECB, EVA, HDPE, PVC 등의 고분자합성수지인 플라스틱시트(42)의 면에 점접착재(44)가 적층되고 그 상부에 점접착재(44)를 보호하기 위한 이형지(46)가 부착된 구조를 갖으며, 이형지는 설치 과정에서 제거된다.1 and 2, the waterproof structure by the waterproof construction of the tunnel according to the present invention is shotcrete 20, drainage nonwoven fabric 30, composite waterproofing material 40 and lining concrete from the surface of the rock 10 50). The composite waterproofing material 40 is a adhesive paper 44 is laminated on the surface of the plastic sheet 42, which is a polymer synthetic resin such as ECB, EVA, HDPE, PVC, etc., and a release paper 46 for protecting the adhesive material 44 thereon. ) Is attached and the release paper is removed during installation.

도 3a 내지 도 3e는 도 2에 도시된 방수 구조물의 시공 방법을 단계적으로 보여주는 도면들이다. 3A to 3E are diagrams showing the construction method of the waterproof structure shown in FIG. 2 step by step.

방수 구조물의 시공 방법은 숏크리트 타설 단계, 유도 방수층을 형성하는 단계; 및 차단 방수층을 형성하는 단계를 포함할 수 있다. Construction method of the waterproof structure is a shotcrete pouring step, forming an induction waterproof layer; And forming a barrier waterproof layer.

도 3a 내지 도 3e을 참조하면, 숏크리트(20)는 굴착된 암반(10) 표면에 터널의 모양(원형)이 되도록 타설된다(도 3a). 배수용 부직포(30)는 숏크리트 상에 배수용 부직포의 끝단부가 겹치도록 확장 시공한다(도 3b). 배수용 부직포의 부착에는 타정못(90)이 이용된다. 타정못(90)에는 와셔와 같은 패킹재(92)가 포함될 수 있다. 타정못(90)의 머리는 배수용 부직포 상에 설치되는 복합용 방수재(40)의 손상이 없도록 가급적 낮고 평평한 것을 사용하는 것이 바람직하다. 3a to 3e, the shotcrete 20 is cast so as to have a tunnel shape (round shape) on the surface of the excavated rock 10 (FIG. 3A). The drainage nonwoven fabric 30 is expanded and constructed so that the ends of the drainage nonwoven fabric overlap on the shotcrete (FIG. 3B). A tableting nail 90 is used to attach the drainage nonwoven fabric. The tableting nail 90 may include a packing material 92 such as a washer. The head of the tableting nail 90 is preferably used as low and flat as possible so as not to damage the composite waterproofing material 40 installed on the drainage nonwoven fabric.

복합형 방수재(40)는 배수용 부직포 상에 복합형 방수재(40)의 끝단부가 겹치도록 확장 시공한다(도 3c). 복합형 방수재(40)의 겹쳐지는 부분은 점접착재(44)에 겹쳐지는 플라스틱시트(EVB, EVA, PVC, HDPE 등)가 접착된다. 이렇게 확장시공되는 복합형 방수재(40)의 고정에는 타정못(90)이 이용될 수 있다. 즉, 복합형 방수재(40)는 상호 겹쳐져 접착 연결된 부분에 와셔(92)가 삽입된 타정못(90)을 탁카건으로 타정하여 타정못(90)을 숏크리트(20)에 밖아 복합형 방수재(40)를 고정한다. 타정못(90)은 복합형 방수재(40)들이 폭 8㎝-10㎝로 겹쳐서 연결부착된 상부에 30㎝ -50㎝ 간격으로 박고, 복합형 방수재(40)의 중간에도 처지지 않도록 상태에 따라 일정한 간격으로 타정못(90)을 박아 주는 것이 바람직하다. The composite waterproofing material 40 is expanded and constructed so that the ends of the composite waterproofing material 40 overlap on the drainage nonwoven fabric (FIG. 3C). The overlapping portion of the composite waterproofing material 40 is bonded to the plastic sheet (EVB, EVA, PVC, HDPE, etc.) to be superposed on the adhesive agent 44. The fixing nail 90 may be used to fix the composite waterproof member 40 that is expanded in this way. That is, the composite waterproofing material 40 has a tableting nail 90 in which the washer 92 is inserted into the adhesively connected portion overlapping each other, and tableting the tableting nail 90 so that the tableting nail 90 is taken out of the shotcrete 20. Fix it. Tableting nail (90) is a composite waterproofing material (40) is overlapped with a width of 8cm-10cm and put at intervals of 30cm -50cm to the upper part attached, depending on the state so as not to sag even in the middle of the composite waterproofing material (40) It is preferable to drive the tableting nail 90 at regular intervals.

본 발명에서, 배수용 부직포(30) 상에 복합형 방수재(40)를 시공하는 과정을 좀 더 자세히 살펴보면, 복합형 방수재(40)의 끝단부를 8㎝~10㎝ 겹쳐서 연결 접착하면서 연결부위(겹쳐지는 부분)의 면에 부착된 이형지(46)를 떼어내고 복합형 방수재(40)들을 연결 접합하면서 확장 시공한다. 와셔(92)가 삽입된 타정못(90)은 연결 접합되는 부분에 타정되어 숏크리트(20)에 고정된다. 이렇게, 복합형 방수재(40)의 시공이 완료되면 1차로 숏크리트에서 침출되는 심층수 또는 지표수를 유도하여 집수정(2;도 1에 도시됨)에 모이게 한 후 터널밖으로 배출할 수 있는 유도방수층이 제공된다. In the present invention, when looking at the process of constructing the composite waterproofing material 40 on the drainage nonwoven fabric 30 in more detail, the connection portion (overlapping) while overlapping and bonding the ends of the composite waterproofing material 40 8cm ~ 10cm Removing the release paper 46 attached to the surface of the losing portion) and expand the construction while connecting and bonding the composite waterproofing material (40). The tableting nail 90 into which the washer 92 is inserted is compressed into a portion to be connected and fixed to the shotcrete 20. In this way, when the construction of the composite waterproofing material 40 is completed, the induction waterproofing layer capable of firstly inducing deep water or surface water leaching from the shotcrete to be collected in a sump well (2; shown in FIG. 1) and then discharged out of the tunnel. do.

즉, 유도 방수층은 배수용 부직포(30)와 복합형 방수재(40)의 플라스틱시트(42) 조합에 의해 제공된다. 배수용 부직포가 숏크리트의 벽체에 부착되고, 복합형 방수재의 한쪽면인 EVA, ECB, HDPE, PVC 등의 플라스틱시트가 배수용 부직포를 향한 상태에서 숏크리트의 벽체에 타정못으로 고정하면 복합형 방수재(40)와 숏크리트(20) 벽체 사이에 침출수를 유도할 수 있는 유도 방수층이 제공된다. That is, the induction waterproof layer is provided by the combination of the plastic sheet 42 of the nonwoven fabric 30 and the composite waterproof material 40 for drainage. If the nonwoven fabric for drainage is attached to the wall of shotcrete and the plastic sheet of EVA, ECB, HDPE, PVC, etc., which is one side of the composite waterproofing material, is fixed to the wall of the shotcrete with a tableting nail, the composite waterproofing material ( An induction waterproof layer is provided between the walls 40 and the walls of the shotcrete 20 to induce leachate.

라이닝 콘크리트(50)를 타설하기 전에 복합형 방수재(40)의 점접착면(44)에 부착된 이형지(46)를 제거한다(도 3d). 복합형 방수재(40)의 점접착재(44)가 노출된 상태에서 라이닝 콘크리트(50)를 타설하면(도 3e) 복합형 방수재(40)의 점접착재(44)에 라이닝 콘크리트(50)가 일체형으로 전면 접착되면서 차단 방수층이 제공된다. Before pouring the lining concrete 50, the release paper 46 attached to the adhesive surface 44 of the composite waterproofing material 40 is removed (FIG. 3D). When the lining concrete 50 is poured in the state where the adhesive agent 44 of the composite waterproof material 40 is exposed (FIG. 3E), the lining concrete 50 is integrally formed on the adhesive agent 44 of the composite waterproof material 40. It is bonded to the front, providing a barrier waterproof layer.

이처럼, 본 발명의 터널 방수 시공 방법은 유도방수와 차단 방수를 한번에 하여 완벽한 방수시공 효과를 얻을 수 있다.As such, the tunnel waterproof construction method of the present invention can achieve a perfect waterproof construction effect by the induction waterproofing and blocking waterproofing at once.

상기의 실시예에서, 굴착된 암반(10)에 숏크리트(20)를 설치하는 것은 기초터널의 굴착면을 원형이 되도록 안정시키고 방수하고자 하는 바탕면을 평활하게 하기 위함인데, 숏크리트(20)의 면이 매우 거칠고 요철(凹凸)이 심하여 숏크리트(20)의 돌출면에 배수용 부직포(30)와 복합형 방수재(40) 부착시 방수층 손상이 염려될 경우 배수용 부직포(30) 상부에 보강 부직포(미도시됨)를 덧붙이는 시공이 추가될 수 있다. In the above embodiment, the installation of the shotcrete 20 in the excavated rock 10 is to stabilize the excavation surface of the foundation tunnel to be circular and to smooth the base surface to be waterproof, the surface of the shotcrete 20 This very rough and uneven (凹凸) is so severe that when the non-woven fabric for drainage 30 and the composite waterproofing material 40 is attached to the protruding surface of the shotcrete 20, when the damage of the waterproof layer is concerned, the reinforcing non-woven fabric (top) Construction may be added.

본 발명에서, 본 발명자가 터널의 방수시공을 위한 복합형 방수재의 물성을 시험 검토한 결과 ECB, EVA, HDPE, PVC등의 플라스틱시트는 인장강도가 10 N/㎜ 이상, 인열성능은 30N이상, 신장율은 250% 이상의 물성을 발휘하는 것이 바람직하였고, 점접착재의 면은 플라스틱시트와 시트를 접합하여, 부착성능 시험인 Peel-Out 시험을 하여본 결과 1.5 N/㎜ 이상의 부착성능을 발휘할 때, ECB, EVA, HDPE, PVC 등의 시트와 시트를 연결 접착할 때 시트와 시트가 일체형으로 강력하게 접착이 됨으로 매우 훌륭한 방수성능을 발휘하였다. 또한 점접착재가 1.5N/㎜ 이상의 접착강도를 발휘하여야만 복합형 방수재의 점접착재와 라이닝 콘크리트가 일체형으로 강력하게 접착이 되어 본 발명의 차단방수기능을 발휘하게 된다. 따라서 본 발명의 터널 방수시공을 위한 복합형 방수재는 상기의 제반 물성을 확보하여야 바람직한 터널방수시공이 이루어짐으로 상기 제반 물성을 확보함이 바람직하다. In the present invention, the inventors test the physical properties of the composite waterproof material for waterproof construction of the tunnel, ECB, EVA, HDPE, PVC, plastic sheet, such as tensile strength of 10 N / ㎜ or more, tearing performance of 30 N or more, The elongation rate is preferably at least 250%, and the surface of the adhesive agent is bonded to the plastic sheet and the sheet, and when the Peel-Out test, which is the adhesion performance test, shows the adhesion performance of 1.5 N / mm or more, ECB When bonding sheets and sheets of EVA, HDPE, PVC, etc., the sheets and sheets are integrally and strongly adhered to each other. In addition, only when the adhesive material exhibits an adhesive strength of 1.5 N / mm or more, the adhesive material and the lining concrete of the composite waterproofing material are strongly bonded as one-piece, thereby exhibiting the blocking waterproof function of the present invention. Therefore, the composite waterproof material for waterproofing the tunnel of the present invention preferably secures the physical properties because the preferred tunnel waterproofing is achieved only when the various waterproof properties are secured.

한편, 본 발명자는 숏크리트에 배수용 부직포와 복합형 방수재를 겹쳐서 와셔가 삽입된 타정못으로 견고하게 부착한 후, 숏크리트에 배수용 부직포와 방수층을 뚫고 박은 타정못에 의해 침수 또는 누수가 되면 이로 인해 라이닝 콘크리트에 누수가 될 염려가 있어, 방수시트에 와셔가 삽입된 타정못을 박고 투수가 되는지를 알기 위하여 내정수압(0.1 N/㎟, 3시간) 시험을 하여 본 결과 1 N에서도 투수되지 않음을 확인하였다. On the other hand, the inventor overlaps the drainage non-woven fabric and the composite waterproofing material on the shotcrete firmly attached to the tableting nail with a washer inserted, and when the water is inundated or leaked by the tableting nail drilled through the drainage nonwoven fabric and waterproof layer on the shotcrete There is a risk of water leakage on the lining concrete, so we put a tableting nail with a washer inserted into the waterproof sheet and tested it to see if it is a pitcher. Confirmed.

내정수압의 시험에서 1 N은 수심10미터의 수압이 작용할 때의 압력에서 투수되지 않는 것과 같으므로, 본 발명에서 숏크리트에 배수부직포를 부착하고 본 발명의 복합형 방수재를 겹쳐 놓은 상태에서 타정총(탁카)에 와셔가 박힌 타정못을 고속으로 타정하여 복합형 방수재를 뚫고 고정시공 하여도 타정못으로 인한 방수성능에는 전혀 손상이 없음을 알게 되었다.In the test of hydrostatic pressure, 1 N is equal to not permeable at the pressure when a water pressure of 10 meters is applied. Therefore, in the present invention, a compression gun (with a nonwoven fabric attached to the shotcrete and the composite waterproofing material of the present invention superposed) It was found that there is no damage to the waterproofing performance due to the tableting nail even if the tableting nail embedded with the washer was fastened at high speed and then drilled and fixed through the composite waterproofing material.

또한, 본 발명의 복합형 방수재인 EVA, ECB, HDPE, PVC 등의 플라스틱시트의 한면에 적층된 점접착재는 고무계, 열가소성 수지 혹은 고무, 아크릴계 등의 소재로 조성되어도 가능하나, 다만 접착(부착)성능이 1.5N 이상을 발휘하는 것이 바람직하다. 일 예에 의하면, 복합형 방수재의 점접착재는 가열된 용해주제 오일에 고무와 점착부여제를 가열액상 교반기에서 혼합하고, 그 혼합물에 열안정제와 노화방지제, 보강제 그리고 충진제 중 적어도 하나 이상을 첨가 혼합하여 제조될 수 있다. 이렇게 제조된 점접착제는 일정한 온도로 가열한 상태에서 플라스틱시트의 일면에 도포될 수 있다. 점접착제의 제조시 오일의 중량은 고무의 중량보다 큰 것이 바람직하다. In addition, the adhesive layer laminated on one side of the plastic sheet of the composite waterproof material EVA, ECB, HDPE, PVC, etc. of the present invention may be made of a rubber, thermoplastic resin or rubber, acrylic, etc., but only adhesive (adhesive) It is preferable that performance exhibits 1.5N or more. According to one embodiment, the adhesive of the composite waterproofing material is mixed with a rubber and a tackifier in a heated liquid stirrer in a heated solvent oil, and at least one of a thermal stabilizer, an antioxidant, a reinforcing agent and a filler is added to the mixture Can be prepared. The adhesive agent thus prepared may be applied to one surface of the plastic sheet while heated to a constant temperature. It is preferable that the weight of the oil in preparing the adhesive is greater than the weight of the rubber.

<본 발명의 <Of the present invention 실시예Example 2> 2>

도 4는 본 발명의 제2실시예에 따른 방수 구조물의 요부 확대 단면도이고, 도 5a 내지 도 5e는 도 4에 도시된 방수 구조물의 시공 방법을 단계적으로 보여주는 도면들이다. 4 is an enlarged cross-sectional view of main parts of the waterproof structure according to the second exemplary embodiment of the present invention, and FIGS. 5A to 5E are views showing the construction method of the waterproof structure shown in FIG. 4 step by step.

도 4에 도시된 방수 구조물은 점접착 양면테이프(70)를 이용한 방수시공으로써, 플라스틱시트(60)들에 의해 제공되는 방수층과 라이닝 콘크리트(50) 사이의 공간이 점접착재에 의해 구획된 방수 구간으로 제공된다. The waterproof structure shown in FIG. 4 is a waterproof construction using an adhesive double-sided tape 70, wherein the space between the waterproof layer provided by the plastic sheets 60 and the lining concrete 50 is partitioned by the adhesive agent. Is provided.

도 5a 내지 도 5e를 참조하면, 점접착 양면테이프(70)를 이용한 방수 구조물의 시공 방법은 숏크리트 타설 단계, 방수층 형성 단계, 점접착 양면테이프 부착 단계 및 라이닝 콘크리트 타설 단계를 포함할 수 있다. 5A to 5E, the construction method of the waterproof structure using the adhesive double-sided tape 70 may include a shotcrete placing step, a waterproof layer forming step, an adhesive double-sided tape attaching step, and a lining concrete pouring step.

도 5a 내지 도 5e를 참조하면, 숏크리트(20)는 굴착된 암반(10) 표면에 터널의 모양(원형)이 되도록 타설된다(도 5a). 배수용 부직포(30)는 숏크리트 상에 배수용 부직포(30)의 끝단부가 겹치도록 확장 시공한다(도 5b). 배수용 부직포(30)의 부착에는 타정못(90)이 이용된다. 5a to 5e, the shotcrete 20 is poured into the shape (circle) of the tunnel on the surface of the excavated rock 10 (Fig. 5a). The drainage nonwoven fabric 30 is expanded and constructed so that the ends of the drainage nonwoven fabric 30 overlap on the shotcrete (FIG. 5B). A tableting nail 90 is used to attach the drainage nonwoven fabric 30.

방수층 형성 단계는 ECB, EVA, HDPE, PVC 등의 플라스틱시트(60)를 배수용 부직포(30) 상부에 플라스틱시트(60)의 끝단부가 10cm 겹치도록 확장 시공함으로써 제공된다(도 5c). 플라스틱시트(60)의 부착에는 타정못(90)이 이용될 수 있다. The waterproofing layer forming step is provided by expanding the plastic sheet 60 such as ECB, EVA, HDPE, PVC, and the like so that the ends of the plastic sheet 60 overlap 10 cm on the nonwoven fabric 30 for drainage (FIG. 5C). A tableting nail 90 may be used to attach the plastic sheet 60.

점접착 양면테이프 부착 단계는 점접착 양면테이프(70)의 한 면에 부착된 이형지를 제거한 후 플라스틱시트(60)의 끝단부가 겹쳐서 연결시공된 상부에 덧붙임되도록 부착한다(도 5d). 도시하지 않았지만, 추가적으로 점접착 양면테이프(70)가 부착된 플라스틱시트(60)는 점접착 양면테이프(70) 상에 와셔가 삽입된 타정못을 다시 한번 박아 견고하게 고정부착할 수 있다. Adhesive adhesive double-sided tape attaching step is to remove the release paper attached to one side of the adhesive double-sided tape 70, and then attached so that the ends of the plastic sheet 60 is overlapped and added to the top of the construction (Fig. 5d). Although not shown, the plastic sheet 60 to which the adhesive double-sided tape 70 is attached may be firmly fixed to the tableting nail into which the washer is inserted once again on the adhesive double-sided tape 70.

라이닝 콘크리트 타설 단계는 점접착성 양면테이프(70)의 또 다른 면에 부착된 이형지를 제거하고 라이닝 콘크리트(50)를 타설하여, 라이닝 콘크리트(50)가 플라스틱 시트(60)의 끝단부를 따라 부착된 점접착성 양면테이프(70)의 점접착재(74)에 접착됨으로써 방수 구간이 분리된다(도 5e). The lining concrete pouring step removes the release paper attached to the other side of the adhesive adhesive double-sided tape 70 and pours the lining concrete 50 so that the lining concrete 50 is attached along the end of the plastic sheet 60. By bonding to the adhesive agent 74 of the adhesive double-sided tape 70, the waterproof section is separated (FIG. 5E).

도 6은 점접착성 양면테이프(70)가 플라스틱 시트의 테두리를 따라 부착된 상태를 평면적으로 보여주는 도면이다. 도 6에서와 같이, 점접착성 양면테이프(70)는 플라스틱시트(60)의 가장자리를 따라 직사각형 형태로 부착된다. 6 is a plan view showing a state where the adhesive double-sided tape 70 is attached along the edge of the plastic sheet. As shown in Figure 6, the adhesive double-sided tape 70 is attached in a rectangular shape along the edge of the plastic sheet (60).

본 발명에서 점접착성 양면테이프(70)는 샌드위치와 같이 플라스틱시트(72)의 양쪽면에 점접착(74) 층을 적층하여 제조한 시트를 폭 10㎝~15㎝로 절단하여 테이프 형태로 제조한 것으로, 점접착성 양면테이프(70)는 실시 예 1의 복합형 방수재와 제반 물성이 같다. In the present invention, the adhesive adhesive double-sided tape 70 is manufactured in the form of a tape by cutting the sheet prepared by laminating the adhesive adhesive 74 layer on both sides of the plastic sheet 72 such as a sandwich in a width of 10 cm to 15 cm. As a matter of course, the adhesive double-sided tape 70 has the same physical properties as the composite waterproofing material of the first embodiment.

실시예 2의 시공방법의 효과는, 터널 방수시공을 하면서 숏크리트(20)의 상부에 배수용 부직포(30)를 부착하고 상부에 EBC, EVA, HDPE, PVC 등의 플라스틱시트(60)를 부착하여 방수층을 형성하여 유도배수에 의한 방수시공을 하는 것은 기존의 터널 시공공법과 같지만, 기존의 터널시공방법에서 방수층이 손상되는 등의 원인에 의해 숏크리트(20)로부터 침출되는 심층수 및 표층수가 손상된 방수층을 통해 라이닝 콘크리트(50)로 침수 및 누수가 되는 하자가 발생하면 방수층과 라이닝콘크리트(50)의 계면이 분리되어 있어 이러한 분리된 계면으로 침수 및 누수되는 물이 옮겨다님으로 인하여 침수 및 누수되는 부위를 찾기 어려워 하자 보수가 매우 어려운 것을, 본 발명은 라이닝 콘크리트(50)와 일체형으로 접착이 되는 점접착성 양면테이프(70)를 시공구간(플라스틱 시트로 이루어지는 방수층의 겹침부위)마다 설치함으로써 방수시공 구간을 분리하는 구획방수가 되므로 하자가 발생하여 보수하는 경우 하자가 발생한 구간구획을 보수하면 되므로 보수시공이 매우 편리하며 시공 효과는 완벽하다. The effect of the construction method of the second embodiment, while attaching the non-woven fabric 30 for drainage on top of the shotcrete 20 while attaching the plastic sheet 60, such as EBC, EVA, HDPE, PVC on the upper part while the tunnel waterproofing Waterproofing by induction drainage by forming a waterproof layer is the same as the existing tunnel construction method, but the deep layer and surface water leaching from the shotcrete 20 due to the damage of the waterproof layer in the conventional tunnel construction method When the defects inundated and leaked into the lining concrete (50) through the interface between the waterproof layer and the lining concrete (50) is separated, the inundation and leakage due to the water inundated and leaked to the separated interface It is difficult to find that repair is very difficult, the present invention is the construction section (plain) adhesive adhesive double-sided tape 70 is integrally bonded with the lining concrete (50) By providing each overlapping portion) of the waterproof layer composed of a sheet, so when a maintenance interval compartment defects occurred for maintenance and defect arises because the water compartment separating the waterproof construction interval maintenance construction is very convenient and effective construction is perfect.

또한, 점접착성 양면테이프(70)를 이용한 터널 방수 시공 방법은, 종래의 터널방수시공 공법과 같이 ECB, EVA, PVC, HDPE 등의 방수시트의 끝단부위(폭10㎝)를 연결접합하면서 고열의 열을 가하여 열융착하는 시공방법을 배제하고, 점접착성 양면테이프(70)의 점접착력에 의해 플라스틱시트(60)들의 끝단부를 겹쳐서 연결한 상부에 간편하게 접착하여 플라스틱시트(60)와 시트를 연결접합하며, 점접착성 양면테이프(70)의 반대면은 라이닝 콘크리트(50)와 일체형으로 접착되어 방수시공구간을 분리함으로써 터널방수의 시공이 간편하고 그 효과는 완벽할 뿐만 아니라, 만일의 경우 라이닝 콘크리트(50)로 숏크리트(20)의 심층수 및 표층수가 침수하는 하자가 발생하는 경우에 침수하는 방수시공구간인 구획공간을 보수하면 됨으로 보수시공이 간편하고 보수시공 효과는 완벽하다.  In addition, the tunnel waterproof construction method using the adhesive adhesive double-sided tape 70, high temperature while connecting and bonding the end portion (width 10cm) of the waterproof sheet, such as ECB, EVA, PVC, HDPE, as in the conventional tunnel waterproof construction method Excludes the construction method of heat fusion by applying the heat of the adhesive, by the adhesive strength of the adhesive double-sided tape 70 is easily adhered to the upper end of the overlapping and connecting the ends of the plastic sheet 60 to the plastic sheet 60 and the sheet The opposite side of the adhesive adhesive double-sided tape 70 is integrally bonded to the lining concrete 50 to separate the waterproof construction section so that the construction of the tunnel is easy and the effect is perfect. The repairing process is simple and easy to repair because the partition space, which is a waterproof construction section, is submerged when the deep concrete and surface water of the shotcrete 20 are flooded with the lining concrete 50. It is perfect.

도 7은 본 발명의 제2실시예의 변형예를 보여주는 도면이다. 7 is a view showing a modification of the second embodiment of the present invention.

도 7을 참조하면, 굴착된 암반 표면에 터널의 모양인 원형이 되도록 숏크리트를 타설하여 다진 후, 그 상부에 침수가 되는 배수용 부직포의 끝단과 끝단을 겹쳐서 확장하여 부착한다. 그리고 배수용 부직포 상부에 ECB, EVA, HDPE, PVC 등의 플라스틱 시트(60)와 시트의 일단부가 겹치도록 연결 접합한다. 플라스틱시트(60)와 시트의 일단부가 겹쳐서 연결 시공된 연결 접합부분에는 1면(한면) 점접착 테이프(80)의 이형지를 벗겨내면서 부착한다. 1면 점접착 테이프(80)가 부착된 상부에 와샤가 삽입된 타정못(90)을 밖아 견고하게 고정 부착한다. 배수용 부직포와 플라스틱시트가 타정못에 의해 견고하게 고정부착된 방수층에 일정한 간격으로 종방향으로 점접착성 양면테이프(70)의 한 면을 이형지를 벗겨내고 부착한다. 그리고 최종적으로 라이닝 콘크리트를 타설하기 전에 점접착성 양면테이프(70)의 또 다른 면에 부착된 이형지를 제거한 후 라이닝 콘크리트를 타설한다. Referring to FIG. 7, after the shotcrete is chopped to be circular in the shape of a tunnel on the excavated rock surface, the end and ends of the drainage nonwoven fabric which is submerged on the upper portion are extended and attached. And connect the joint sheet so that the plastic sheet 60, such as ECB, EVA, HDPE, PVC, and one end of the sheet overlap the upper portion of the nonwoven fabric for drainage. The plastic sheet 60 and one end of the sheet are overlapped and connected to each other, while the release sheet of the one side (one side) adhesive tape 80 is peeled off and attached. One side adhesive tape 80 is attached to the top of the tableting nail (90) with the washer is firmly fixed to the outside. The drainage nonwoven fabric and the plastic sheet are peeled off and attached to one side of the adhesive adhesive double-sided tape 70 in the longitudinal direction at regular intervals to the waterproof layer firmly fixed by the tableting nail. And finally, before placing the lining concrete, after removing the release paper attached to the other side of the adhesive double-sided tape 70, the lining concrete is poured.

상기 실시예 2의 변형예에 따른 시공 방법은, 터널 방수를 하면서 숏크리트 상부에 배수용 부직포를 부착하고, EBC, EVA, HDPE, PVC 등의 플라스틱시트들을 연결 부착시공하는 경우 플라스틱시트(60)들의 연결접합부가 터널의 종방향으로 일정하게 시공이 안되고 불규칙하게 부착되는 경우, 시공구간 형성도 불규칙하게 형성되어 만일의 경우 구간 형성이 잘못되는 것을 염려하여, 플라스틱시트(60)의 10㎝ 폭으로 연결접합하는 상부에 폭 10㎝- 15㎝의 1면(한면) 점접착 테이프(80)의 이형지를 떼어내면서 부착하여 플라스틱시트(60)들의 연결접합을 일체형으로 완전하게 접착하여 밀봉한 후, 폭 10㎝의 점접착성 양면테이프(70)의 한 면에 붙어있는 이형지를 떼어내면서 플라스틱시트(60)의 표면에 종방향으로 부착한다. 점접착성 양면테이프(70)는 1M ~ 1.5M 간격으로 터널의 종방향으로 부착된다. 점접착성 양면테이프(70)는 시공현장 여건에 따라 터널의 종방향 뿐만 아니라 횡방향으로도 부착 시공될 수 있다. 부착된 점접착성 양면테이프(70)의 반대면의 이형지를 떼어내고 라이닝 콘크리트를 타설하면, 터널 구간을 분리하는 구획방수 시공구간을 형성할 수 있다. 1면(한면) 점접착 테이프는 본 발명의 복합형 방수재를 폭 10㎝ ~15㎝로 세로로 절단하여 사용할 수 있다. The construction method according to the modification of the second embodiment, when attaching the nonwoven fabric for drainage on the shotcrete while waterproofing the tunnel, and connecting and attaching plastic sheets such as EBC, EVA, HDPE, PVC, etc. of the plastic sheet 60 If the joint is not uniformly attached and irregularly attached in the longitudinal direction of the tunnel, the construction section is also irregularly formed, and in case of concern that the section is formed incorrectly, the connection is made with a 10 cm width of the plastic sheet 60. After detaching and attaching the release paper of one side (one side) adhesive tape 80 of width 10cm-15cm on the upper part to be bonded, completely bonding and sealing the connection joint of the plastic sheets 60, and then sealing the width 10 While removing the release paper attached to one side of the adhesive adhesive double-sided tape 70 of cm, it is attached to the surface of the plastic sheet 60 in the longitudinal direction. The adhesive double-sided tape 70 is attached in the longitudinal direction of the tunnel at intervals of 1M to 1.5M. The adhesive double-sided tape 70 may be attached in the transverse direction as well as the longitudinal direction of the tunnel, depending on the construction site conditions. When the release paper on the opposite side of the adhesive adhesive double-sided tape 70 is removed and the lining concrete is poured, a partition waterproof construction section separating the tunnel section may be formed. One side (single side) adhesive tape can be cut | disconnected longitudinally the composite waterproofing material of this invention in width 10cm-15cm.

이상에서, 본 발명에 따른 터널의 방수 시공 방법을 상기한 설명 및 도면에 따라 도시하였지만 이는 예를 들어 설명한 것에 불과하며 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경이 가능함은 물론이다.In the above, the waterproof construction method of the tunnel according to the present invention has been shown in accordance with the above description and drawings, but this is merely an example, and various changes and modifications are possible without departing from the technical spirit of the present invention. .

10 : 암반 20 : 쇼크리트
30 : 배수용 부직포 40 : 복합형 방수재
50 : 라이닝 콘크리트
10: rock 20: shockcrete
30: non-woven fabric for drainage 40: composite waterproof material
50: lining concrete

Claims (9)

터널 방수 시공 방법에 있어서:
굴착된 암반에 숏크리트를 타설하는 단계;
상기 숏크리트를 통한 침출수를 배수관으로 유도 배수하는 유도 방수층을 형성하는 단계; 및
상기 방수층 상에 라이닝 콘크리트를 타설하되, 상기 라이닝 콘크리트가 상기 유도 방수층과 일체형으로 전면 접착되어 침출수를 차단하는 차단 방수층을 형성하는 단계를 포함하는 것을 특징으로 하는 터널 방수 시공 방법.
In the tunnel waterproofing method:
Placing shotcrete on the excavated rock;
Forming an induction waterproofing layer for inductively draining the leachate through the shotcrete into a drain pipe; And
Placing lining concrete on the waterproof layer, wherein the lining concrete is integrally bonded with the induction waterproof layer to form a barrier waterproof layer for blocking the leachate, characterized in that it comprises a step of forming a waterproof waterproof.
제 1 항에 있어서,
상기 유도 방수층을 형성하는 단계는
상기 숏크리트 상에 배수용 부직포를 설치하는 단계; 및
플라스틱시트의 일면에 점접착재가 적층된 복합형 방수재를 상기 배수용 부직포 상에 설치하되, 상기 복합형 방수재의 플라스틱시트가 상기 배수용 부직포를 향하도록 설치하는 단계를 포함하여, 상기 배수용 부직포와 상기 플라스틱시트에 의해 상기 유도방수층이 제공되는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 1,
Forming the induction waterproof layer is
Installing a nonwoven fabric for drainage on the shotcrete; And
Installing a composite waterproofing material laminated on one surface of the plastic sheet on the drainage nonwoven fabric, the plastic sheet of the composite waterproofing material to face the drainage nonwoven fabric, including the non-woven fabric for drainage Tunnel waterproof construction method characterized in that the induction waterproof layer is provided by the plastic sheet.
제 2 항에 있어서,
상기 차단 방수층을 형성하는 단계는
상기 복합형 방수재의 점접착재에 부착된 이형지를 제거하는 단계; 및
상기 점접착재가 노출된 상기 복합형 방수재 상에 상기 라이닝 콘크리트를 타설하는 단계를 포함하여, 상기 복합형 방수재의 점접착재에 상기 라이닝 콘크리트가 일체형으로 전면 접착되면서 상기 차단 방수층이 제공되는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 2,
Forming the blocking waterproof layer is
Removing the release paper attached to the adhesive agent of the composite waterproofing material; And
Including the step of pouring the lining concrete on the composite waterproofing material exposed to the adhesive agent, characterized in that the barrier waterproof layer is provided while the lining concrete is integrally bonded to the adhesive material of the composite waterproofing material as a whole. Tunnel waterproof construction method.
터널 방수 시공 방법에 있어서:
굴착된 암반에 숏크리트를 타설하는 단계;
상기 숏크리트 상에 배수용 부직포를 설치하는 단계;
플라스틱시트의 일면에 점접착재가 적층된 복합형 방수재를 상기 배수용 부직포 상에 설치하되; 상기 복합형 방수재의 플라스틱시트가 상기 배수용 부직포를 향하도록 설치하는 단계; 및
상기 복합형 방수재 상에 라이닝 콘크리트를 타설하는 단계를 포함하되;
상기 복합형 방수재를 설치하는 단계는
상기 복합형 방수재의 끝단부가 겹치도록 연결하고, 상기 복합형 방수재가 겹쳐지는 부분은 상기 복합형 방수재의 점접착재에 점접착력으로 상호 연결접합되는 것을 특징으로 하는 터널 방수 시공 방법.
In the tunnel waterproofing method:
Placing shotcrete on the excavated rock;
Installing a nonwoven fabric for drainage on the shotcrete;
Installing a composite waterproofing material laminated on one surface of the plastic sheet on the drainage nonwoven fabric; Installing the plastic sheet of the composite waterproofing material toward the drainage nonwoven fabric; And
Placing lining concrete on the composite waterproofing material;
Installing the composite waterproofing material
The end of the composite waterproofing material is connected so that the overlap, and the overlapping portion of the composite waterproofing material is a tunnel waterproof construction method characterized in that the interconnected adhesive bonding to the adhesive material of the composite waterproofing material with adhesive force.
제 4 항에 있어서,
상기 복합형 방수재는 타정못에 의해 상기 숏크리트에 타정되는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 4, wherein
The composite waterproof material is a tunnel waterproofing method, characterized in that the tableting is compressed to the shotcrete by a tableting nail.
제 4 항에 있어서,
상기 라이닝 콘크리트 타설 단계는
상기 복합형 방수재의 점접착재에 부착된 이형지를 제거하고 상기 라이닝 콘크리트를 타설하여, 상기 라이닝 콘크리트가 상기 복합형 방수재의 점접착재에 일체형으로 전면 접착되는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 4, wherein
The lining concrete pouring step
And removing the release paper attached to the adhesive adhesive of the composite waterproofing material, and pouring the lining concrete, wherein the lining concrete is integrally front bonded to the adhesive of the composite waterproofing material.
터널 방수 시공 방법에 있어서:
굴착된 암반에 숏크리트를 타설하는 단계;
상기 숏크리트 상에 배수용 부직포를 설치하되, 상기 배수용 부직포의 끝단부가 서로 겹치도록 연결하고 타정못에 의해 상기 숏크리트에 타정되는 단계;
상기 배수용 부직포 상에 플라스틱시트의 끝단부가 겹치도록 연결하여 방수층을 설치하는 단계;
점접착 양면테이프의 한 면에 부착된 이형지를 제거한 후 상기 방수층에 상기 점접착 양면테이프를 부착하는 단계; 및
상기 점접착성 양면테이프가 부착된 상기 방수층 상에 라이닝 콘크리트를 타설하는 단계를 포함하되;
상기 라이닝 콘크리트 타설 단계는
상기 점접착성 양면테이프의 또 다른 면에 부착된 이형지를 제거하고 상기 라이닝 콘크리트를 타설하여, 상기 라이닝 콘크리트가 상기 방수층에 부착된 상기 점접착성 양면테이프의 점접착재에 접착되어 방수 구간이 구획되는 것을 특징으로 하는 터널 방수 시공 방법.
In the tunnel waterproofing method:
Placing shotcrete on the excavated rock;
Installing a drainage nonwoven fabric on the shotcrete, connecting end portions of the drainage nonwoven fabric to overlap each other and tableting the shotcrete with a tableting nail;
Installing a waterproof layer by connecting the ends of the plastic sheets to overlap the nonwoven fabric for drainage;
Removing the release paper attached to one side of the adhesive double sided tape and attaching the adhesive double sided tape to the waterproof layer; And
Pouring lining concrete on the waterproof layer to which the adhesive double-sided tape is attached;
The lining concrete pouring step
Remove the release paper attached to the other side of the adhesive double-coated tape and cast the lining concrete, the lining concrete is bonded to the adhesive of the adhesive double-coated tape attached to the waterproof layer is partitioned waterproof section Tunnel waterproof construction method characterized in that.
제 7 항에 있어서,
상기 점접착 양면테이프를 부착하는 단계는
상기 플라스틱 시트의 끝단부가 겹쳐서 연결시공된 상부에 덧붙임되도록 부착하는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 7, wherein
Attaching the adhesive double-sided tape is
Tunnel waterproof construction method characterized in that the end portion of the plastic sheet is attached so as to be added to the overlapped construction.
제 7 항에 있어서,
상기 방수층을 설치하는 단계는
상기 플라스틱 시트의 끝단부가 겹쳐서 연결 시공된 연결 접합부분에는 1면(한면) 점접착 테이프의 이형지를 벗겨내면서 부착하는 단계;
상기 1면 점접착 테이프가 부착된 상부에 와샤가 삽입된 타정못을 밖아 상기 플라스틱시트를 견고하게 고정 부착하는 단계를 포함하고,
상기 점접착 양면테이프를 부착하는 단계는
상기 방수층에 터널의 종방향 또는 횡방향으로 상기 점접착 양면테이프를 일정간격으로 부착하는 것을 특징으로 하는 터널 방수 시공 방법.
The method of claim 7, wherein
Installing the waterproof layer is
Peeling off and attaching a release sheet of one side (one side) adhesive tape to the connection joint portion at which the ends of the plastic sheet are overlapped and connected;
And fixing the plastic sheet firmly by taking out the tableting nail into which the washer is inserted into the upper surface to which the one-side adhesive tape is attached.
Attaching the adhesive double-sided tape is
Tunnel waterproof construction method characterized in that for attaching the adhesive double-sided tape at regular intervals in the longitudinal or transverse direction of the tunnel to the waterproof layer.
KR1020110111159A 2011-10-28 2011-10-28 A tunnel waterproofing construction method KR101316718B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110111159A KR101316718B1 (en) 2011-10-28 2011-10-28 A tunnel waterproofing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110111159A KR101316718B1 (en) 2011-10-28 2011-10-28 A tunnel waterproofing construction method

Publications (2)

Publication Number Publication Date
KR20130046645A true KR20130046645A (en) 2013-05-08
KR101316718B1 KR101316718B1 (en) 2013-10-18

Family

ID=48658262

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110111159A KR101316718B1 (en) 2011-10-28 2011-10-28 A tunnel waterproofing construction method

Country Status (1)

Country Link
KR (1) KR101316718B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101336449B1 (en) * 2013-05-09 2013-12-04 정경선 Method for making waterproofing sheet integrated with concrete lining in tunnel and tunnel construction method
CN106401612A (en) * 2016-12-01 2017-02-15 河北工程大学 Precast steel plate supporting structure in tunnel
CN106437753A (en) * 2016-12-02 2017-02-22 河北工程大学 Tunnel supporting structure
CN106368717B (en) * 2016-12-01 2018-10-19 河北工程大学 A kind of tunnel anti-collapse supporting construction
CN112127917A (en) * 2020-09-16 2020-12-25 中国建筑第二工程局有限公司 Gasket device for fixing pre-paved cold self-adhesive waterproof roll and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000072175A (en) * 2000-08-10 2000-12-05 양영규 Waterproof sheet for tunnel waterproofing
KR20090010012U (en) * 2008-03-29 2009-10-05 김기철 High elastic composite waterproof sheet
KR100952689B1 (en) 2009-03-20 2010-04-13 명진 케미칼 주식회사 Waterproof sheet and manufacturing method of waterproof sheet for using adhesive and construction method for using the waterproof sheet
KR101171037B1 (en) * 2010-01-06 2012-08-03 지에스건설 주식회사 Method for compartmentalized tunnel waterproofing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101336449B1 (en) * 2013-05-09 2013-12-04 정경선 Method for making waterproofing sheet integrated with concrete lining in tunnel and tunnel construction method
CN106401612A (en) * 2016-12-01 2017-02-15 河北工程大学 Precast steel plate supporting structure in tunnel
CN106368717B (en) * 2016-12-01 2018-10-19 河北工程大学 A kind of tunnel anti-collapse supporting construction
CN106437753A (en) * 2016-12-02 2017-02-22 河北工程大学 Tunnel supporting structure
CN112127917A (en) * 2020-09-16 2020-12-25 中国建筑第二工程局有限公司 Gasket device for fixing pre-paved cold self-adhesive waterproof roll and construction method

Also Published As

Publication number Publication date
KR101316718B1 (en) 2013-10-18

Similar Documents

Publication Publication Date Title
CN111485585B (en) Underground windowless dual waterproofing membrane assembly and methods of making and using same
KR101316718B1 (en) A tunnel waterproofing construction method
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN104847382B (en) A kind of self-adhering type complex waterproof layer and its laying method for tunnel
CN111691467B (en) Construction method for basement water prevention and drainage combination
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN112663681B (en) Lapping method for different waterproof materials of bottom plate and side wall of large foot
KR100978890B1 (en) Opposite waterproof method using self-adhesion type composite sheet
CN112081143B (en) Anti-seepage construction method for preventing and draining combination of top plate deformation joints
KR100819822B1 (en) Water proof construction method for tunnel using union water proof sheet
KR102037135B1 (en) Waterproof Sheet with Protective Material for Exterior-Waterproof of Underground Structure and Exterior-Waterproofing Method Using the Same
KR100956144B1 (en) High elastic composite waterproof sheet
KR100672240B1 (en) Method for carrying out water-proof on the roof of old and new buildings
KR20060134754A (en) Partial coating waterproof tunnel and there of method
CN109736360A (en) Tunnel open excavation section waterproof construction method
US11427983B2 (en) Below grade, blind side, improved dual waterproofing membrane assembly incorporating a sheet membrane with adhesive to fully bond to concrete/shotcrete, and a method of making, and using same
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN210660137U (en) Shield constructs end ring beam and section of jurisdiction seam crossing seepage maintenance structure
RU2598635C2 (en) Method for sealing of joints of lining of channels and reservoirs with bentonitic cord
KR101326185B1 (en) Tunnel waterproofing sheet and construction method therefor
RU2278202C1 (en) Control joint for water-tight channel and water pool lining
CN204419202U (en) A kind of tunnel slot repair structure
WO2019237908A1 (en) Blocking and drainage combined treatment method for water leakage at construction joint of secondary lining of tunnel
KR100386913B1 (en) Waterproof stuff for waterproofing of concrete structure and working method using the same
CN207567829U (en) A kind of waterproof roll and equipment formula comprehensive pipe gallery structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171010

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20181001

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190930

Year of fee payment: 7