KR20130023655A - System and method for physcical distribution management - Google Patents

System and method for physcical distribution management Download PDF

Info

Publication number
KR20130023655A
KR20130023655A KR1020110086588A KR20110086588A KR20130023655A KR 20130023655 A KR20130023655 A KR 20130023655A KR 1020110086588 A KR1020110086588 A KR 1020110086588A KR 20110086588 A KR20110086588 A KR 20110086588A KR 20130023655 A KR20130023655 A KR 20130023655A
Authority
KR
South Korea
Prior art keywords
management system
logistics
processing
communication network
supply chain
Prior art date
Application number
KR1020110086588A
Other languages
Korean (ko)
Inventor
김상균
Original Assignee
현대중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대중공업 주식회사 filed Critical 현대중공업 주식회사
Priority to KR1020110086588A priority Critical patent/KR20130023655A/en
Publication of KR20130023655A publication Critical patent/KR20130023655A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services

Abstract

The present invention relates to a logistics management system and method.
The present invention is a logistics management system that manages the logistics of materials generated between a material supplier that supplies materials and a processing company that receives and processes materials, and includes a material logistics that occurs between a material supplier terminal and a processing company terminal that are connected through a communication network. A supply chain management system providing a service for management of information; A material supply company terminal which communicates with the supply chain management system through a communication network to perform material supply schedule management, transaction statement preparation, and receipt processing request management; It is characterized in that it comprises a processing operator terminal for communication connection to the supply chain management system through a communication network to perform raw material delivery request management and acceptance material registration management.
According to the present invention, the processing of a plurality of materials, such as a large ship or a large machine, in real time to understand the logistics movement between the material supplier that supplies the material in the enterprise producing a large structure and the processing company that processes the material and the receipt processing Can be efficiently carried out, so material logistics can be managed economically with little manpower.

Description

System and Method for Physcical Distribution Management

The present invention relates to logistics management, in particular, in the case of producing a large structure by processing a plurality of materials, such as large vessels or large machines to grasp the logistics movement between the material supplier that supplies the material and the processing company processing the material in real time In addition, the present invention relates to a logistics management system and method for efficiently carrying out receipt processing.

In general, in the case of producing a large structure such as a large vessel or a large machine, a plurality of materials are processed to assemble and produce the large structure.

In order to produce such a large structure, several kinds of materials are required, and the materials must be processed to be suitable for producing the structure.

In the past, when a logistics movement occurred between a material supplier supplying a material and a processing company processing the material, the logistics movement was exchanged between the material supplier and the processing company and managed according to the document. It takes a long time to determine the location of the logistics movement between the processing company and the processing company and takes a long time to receive the processing, there is a problem that can not efficiently perform the logistics management between the various material suppliers and processing providers.

Republic of Korea Patent Application 10-2007-0131162

The present invention has been proposed in order to solve the problems of the prior art as described above, the object of which is to supply a material supplier and a material supplier in the case of producing a large structure by processing a plurality of materials, such as a large ship or a large machine The present invention provides a logistics management system and method for identifying logistics movement between processing companies processing materials in real time and efficiently carrying out receipt processing.

The present invention for achieving the above object is a logistics management system for managing the material logistics generated between the material supplier for supplying the material and the processing company receiving and processing the material, the material supplier terminal communicated through the communication network A supply chain management system for providing a service for management of material logistics information occurring between the terminal and the processing operator; A material supply company terminal which communicates with the supply chain management system through a communication network to perform material supply schedule management, transaction statement preparation, and receipt processing request management; It is characterized in that it comprises a processing operator terminal for communication connection to the supply chain management system through a communication network to perform raw material delivery request management and acceptance material registration management.

According to the logistics management system according to the present invention, in response to the receipt processing request from the material supplier terminal received through the supply chain management system by communication connection to the supply chain management system via a communication network to receive the goods processing result through the supply chain management system The integrated receipt management system for notifying the supplier terminal further comprises.

In addition, according to the logistics management system according to the present invention, by further connecting to the supply chain management system via a communication network monitoring system for real-time monitoring of the material logistics information generated between the material supplier terminal, processing company terminal and integrated receipt management system in real time Include.

The present invention for achieving the above object, as a logistics management method for managing the material logistics occurring between the material supplier for supplying the material and the processing company receiving and processing the material, the supply chain management system from the material supplier terminal through the communication network Receiving a scheduled supply date of the material to the processing company, and transmitting a notification of the scheduled supply date of the material to the processing company terminal through a communication network; Receiving, by the supply chain management system, the material supply request date transmitted from the processing company terminal through the communication network, and transmitting the material supply request date to the material supplier terminal through the communication network and notifying; Causing the supply chain management system to prepare a transaction specification for the material to be supplied to the processing company based on the command inputted from the material supplier terminal and to print out the created transaction statement; Receiving, by the supply chain management system, the arrival schedule material information to the processing company transmitted from the material supplier company terminal through the communication network, and transmitting the notification of the arrival arrival material information to the processing company terminal through the communication network; The supply chain management system is characterized in that it comprises the step of receiving the material acquisition information transmitted from the processing company terminal through the communication network, and transmitting the material acquisition information to the material supplier terminal through the communication network to notify.

According to the logistics management method according to the present invention, the supply chain management system receives a receipt processing request transmitted from the material supplier terminal through the communication network, and transmits the corresponding receipt processing request to the integrated receipt system through the communication network and the receipt processing request; ; The supply chain management system further includes receiving the receipt processing related information transmitted after the receipt processing in the integrated receipt system through the communication network, and transmitting the corresponding receipt processing related information to the material supplier terminal through the communication network to notify the receipt of the receipt.

In addition, according to the logistics management method according to the invention, the supply chain management system further comprises the step of providing information generated from the material supplier terminal, processing company terminal and the integrated receiving system to the monitoring system in real time through the communication network.

According to the present invention, when producing a large structure by processing a plurality of materials, such as a large ship or a large machine, the logistics movement between the material supplier that supplies the material and the processing company that processes the material in real time and the receipt processing Will be performed efficiently.

1 is a diagram illustrating a logistics management system according to the present invention.
Figure 2 illustrates a supply chain management system applied to the present invention.
Figure 3 is a view showing a material supplier terminal applied to the present invention.
Figure 4 is a diagram showing a processing operator terminal applied to the present invention.
5 illustrates a monitoring system applied to the present invention.
Figure 6 illustrates an integrated goods receipt system applied to the present invention.
7 is a diagram illustrating a logistics management process of the logistics management system according to the present invention.

Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

Logistics management system according to the present invention, as shown in Figure 1, material supplier terminal 10, processing company terminal 20, supply chain management system 30, monitoring system 50, integrated goods receipt system 60 And a communication network 70.

The material supplier terminal 10 is a terminal installed and operated in a material supplier that supplies materials to a processing company. The material supplier terminal 10 communicates with the supply chain management system 30 through a communication network 70 to manage material supply schedules, create transaction statements, and receive goods. Perform request management.

The processing company terminal 20 is a terminal installed and operated in a processing company processing materials by receiving materials from a material supplier, and communicates with the supply chain management system 30 through a communication network 70 to manage raw material supply requests and take over materials. Perform registration management.

The supply chain management system 30 provides a service for managing material logistics information generated between the material supplier and the processing company, but for the material supplier terminal 10 and the processing company terminal 20 connected through the communication network 70. Provides various services for the management of material logistics information.

The supply chain management system 30 provides a service for material supply schedule management, transaction statement preparation, and receipt processing request management for the material supplier terminal 10, and raw material delivery request management and acquired materials for the processing company terminal 20. Provides services for registration management.

In addition, the supply chain management system 30 provides a monitoring service for real-time monitoring of material logistics information generated between the material supply company terminal 10 and the processing company terminal 20, and monitoring connected through communication network 70. The system 50 provides a monitoring service for real-time monitoring of material logistics information generated between the material supplier and the processing company.

In addition, the supply chain management system 30 transmits the goods receipt processing request generated from the material supply company terminal 10 to the integrated goods receipt system 60 through the communication network 70, and the goods receipt processing result transmitted from the integrated goods receipt system 60. By transmitting the information to the material supplier terminal 10 provides a service for managing the goods receipt request to the material supplier.

Meanwhile, as shown in FIG. 2, the supply chain management system 30 includes a control unit 31, a database 32, a communication unit 33, an output unit 34, an input unit 35, a display unit 36, and a memory. It comprises a portion 37.

The control unit 31 performs various control processes for material logistics management according to a program stored in the memory unit 37. The input unit 35 includes input means such as a keypad and a mouse, and inputs various data and commands for operating the supply chain management system 30 to the controller 31 according to a user's manual operation.

The display unit 36 displays various screens for operation management of the supply chain management system 30 under the control of the control unit 31. The memory unit 37 stores the various programs for managing the material logistics and provides them to the controller 31. The database 32 stores the material logistics information or provides the stored material logistics information to the controller 31 under the control of the controller 31.

In addition, the communication unit 33 communicates with the material supply company terminal 10, the processing company terminal 20, the monitoring system 50, and the integrated receiving system 60 through the communication network 70 under the control of the control unit 31. Send and receive material logistics related information. The output unit 34 prints and outputs material logistics information under the control of the control unit 31.

And, the control unit 31 provides all the services for the management of material logistics information to the material supplier terminal 10 and the processing company terminal 20 connected through the communication unit 33, the material supplier terminal 10 Provides services for material supply schedule management, transaction statement creation and receipt processing request management, and the service provider terminal 20 for the raw material delivery request management and acceptance material registration management.

In addition, the control unit 31 causes the monitoring system 50 to provide material monitoring information generated between the material supply company terminal 10 and the processing company terminal 20 to the monitoring system 50 in real time through the communication unit 33. It provides a monitoring service that enables real-time monitoring of material logistics information occurring between material suppliers and processing companies.

In addition, the control unit 31 receives the receipt processing request generated from the material supplier terminal 10 through the communication unit 33 and transmits to the integrated goods receipt system 60, the receipt processing result transmitted from the integrated goods receipt system 60 The information is received through the communication unit 33 and delivered to the material supplier terminal 10 to provide a service for managing the receipt processing request to the material supplier terminal 10.

Meanwhile, as illustrated in FIG. 3, the material supplier terminal 10 includes the control unit 11, the display unit 12, the communication unit 13, the input unit 14, the output unit 15, and the storage unit 16. It is made to include.

The control unit 11 performs overall control processing of the material supplier terminal 10 according to a program stored in the storage unit 16. The input unit 14 includes input means such as a keypad and a mouse, and inputs various data and commands for material logistics management to the control unit 11 according to a user's manual operation.

The display unit 12 connects to the supply chain management system 30 under the control of the control unit 11 and displays various screens for material logistics management. The storage unit 16 stores various programs and data for material logistics management and provides them to the control unit 11.

In addition, the communication unit 13 transmits and receives material logistics related information by communicating with the supply chain management system 30 through the communication network 70 under the control of the control unit 11. The output unit 15 prints and outputs material logistics information under the control of the control unit 11.

In addition, the control unit 11 communicates with the supply chain management system 30 through the communication unit 13 according to the command input from the input unit 14 to manage the overall logistics for material supply schedule management, transaction statement creation and receipt processing request management. By sending and receiving information, material supply schedule management, transaction statement preparation and receipt processing request management are performed.

On the other hand, the processing company terminal 20, as shown in Figure 4, the control unit 21, the display unit 22, the communication unit 23, the input unit 24, the output unit 25 and the storage unit 26 It is made to include.

The input unit 24 includes input means such as a keypad and a mouse, and inputs various data and commands for material logistics management to the control unit 21 according to a user's manual operation. The control unit 21 performs overall control processing of the processing company terminal 20 according to the program stored in the storage unit 26.

The display unit 22 communicates with the supply chain management system 30 under the control of the control unit 21 and displays various screens for material logistics management. The storage unit 26 stores various programs and data for material logistics management and provides them to the controller 21.

In addition, the communication unit 23 transmits and receives material logistics related information by communicating with the supply chain management system 30 through the communication network 70 under the control of the control unit 21. The output unit 25 outputs the material logistics information under the control of the control unit 21.

In addition, the control unit 21 communicates with the supply chain management system 30 through the communication unit 23 according to the command input from the input unit 24 to transmit and receive all the logistics related information for raw material delivery request management and acceptance material registration management. It also manages raw material delivery request management and receiving material registration management.

In addition, as shown in FIG. 5, the monitoring system 50 includes a control unit 51, a display unit 52, a communication unit 53, an input unit 54, an output unit 55, and a storage unit 56. It is done by

The input unit 54 includes input means such as a keypad and a mouse, and inputs various data and commands for monitoring material logistics information to the controller 51 according to a user's manual operation. The control unit 51 performs overall control processing of the monitoring system 50 in accordance with the program stored in the storage unit 56.

The display unit 52 communicates with the supply chain management system 30 under the control of the control unit 51 and displays various screens for monitoring the material logistics information in real time. The storage unit 56 stores various programs and data for monitoring material logistics information and provides the same to the controller 51.

In addition, the communication unit 53 communicates with the supply chain management system 30 through the communication network 70 under the control of the control unit 51 to transmit and receive general information for real-time monitoring of material logistics information. The output unit 55 prints and outputs material logistics monitoring information under the control of the controller 51.

Then, the control unit 51 communicates with the supply chain management system 30 through the communication unit 53 according to the command input from the input unit 54 to receive the material logistics information generated from the supply chain management system 30 to display the 52 ), The material logistics information generated between the material supplier terminal 10 and the processing company terminal 20 is monitored in real time.

Meanwhile, as shown in FIG. 6, the integrated goods receipt system 60 includes a control unit 61, a database 62, a communication unit 63, an output unit 64, an input unit 65, a display unit 66, and a memory. It comprises a portion 67.

The control unit 61 performs overall control processing of the integrated goods receipt system 60 in accordance with the program stored in the memory unit 67. The input unit 65 includes input means such as a keypad and a mouse, and inputs various data and commands for operating the integrated receiving system 60 according to a user's manual operation to the control unit 61.

The display unit 66 displays various screens for operating the integrated goods receipt system 60 under the control of the controller 61. The memory unit 67 stores various programs for the integrated goods receipt management and provides them to the control unit 61. The database 62 stores the goods receipt management information under the control of the controller 61 or provides the stored goods receipt management information to the controller 61.

In addition, the communication unit 63 communicates with the supply related information by communicating with the supply chain management system 30 through the communication network 70 under the control of the control unit 61. The output unit 64 prints and outputs the goods receipt related information under the control of the controller 61.

And, the control unit 61 performs the goods receipt process by sending and receiving the goods-related information with the supply chain management system 30 connected to communicate through the communication unit 63, the supply chain management request generated from the material supply company terminal 10 Received through the system 30 and displayed on the display unit 66, and according to the command input through the input unit 65, the goods receipt processing result information is transmitted to the material supplier terminal 10 through the supply chain management system 30 material The goods receipt process is performed according to the goods receipt request from the supplier.

The logistics management system according to the present invention having the function as described above processes as shown in FIG. 7 when managing the material logistics generated between the material supplier and the processing company.

First, the material supplier terminal 10 transmits the scheduled supply date of the material to the processing company received through the input unit 14 to the supply chain management system 30 via the communication network 70 (step S11).

Accordingly, the supply chain management system 30 transmits the scheduled supply date of the material received from the material supply company terminal 10 to the processing company terminal 20 via the communication network 70, and the processing company terminal 20 is scheduled to supply the material. Is displayed on the display unit 22, thereby causing the processing company to confirm the scheduled supply date of the material (step S12).

Thereafter, the processing company terminal 20 transmits the material supply request date received through the input unit 24 to the supply chain management system 30 via the communication network 70 (step S13).

Accordingly, the supply chain management system 30 transmits the corresponding material supply request date to the material supply company terminal 10 via the communication network 70, and the material supply company terminal 10 receives the corresponding material supply request date and displays the display unit 12. ), The material supplier confirms the material supply request date from the processing company (step S14).

In addition, the material supplier terminal 10 prepares a transaction specification for the material to be supplied to the processing company according to the command input through the input unit 14, and prints and outputs the created transaction statement through the output unit 15. (Step S15).

In addition, the material supplier terminal 10 is expected to arrive in the supply chain management system 30 as a processing operator via the communication network 70 (material supplier, material specification, material quantity, arrival date, arrival time and vehicle driver information). And the supplier management system 30 transmits the corresponding arrival schedule material information to the processing operator terminal 20 via the communication network 70, thereby causing the processing operator terminal 20 to receive the corresponding arrival material. The information is displayed on the display unit 22 to provide the processing company with the expected arrival material information (step S16).

In addition, after the processing company acquires the material and the transaction specification transferred from the material supplier, the processing company terminal 20 enters the communication network 70 when inputting the material acquisition information through the input unit 24 of the processing company terminal 20. The material acquisition information is transmitted to the supply chain management system 30 through step S17.

Accordingly, the supply chain management system 30 transmits the corresponding material acquisition information to the material supplier terminal 10 via the communication network 70, thereby causing the material supplier terminal 10 to display the corresponding material acceptance information on the display unit 12. To allow the material supplier to check the material acceptance information (step S18).

Thereafter, the material supply company terminal 10 transmits the goods receipt processing request message to the supply chain management system 30 via the communication network 70 according to the command input through the input unit 14, and the supply chain management system 30 Sending the goods receipt processing request message to the integrated goods receipt system 60 via the communication network 70, thereby processing the goods receipt in the integrated goods receipt management system 60 installed in the parent company which is in charge of material logistics for a plurality of material providers and processing companies. Make a request (step 19).

At this time, the integrated goods receipt system 60 performs the goods receipt processing according to the command input through the input unit 65, stores the goods receipt processing related information in the database 62, and stores the goods receipt processing related information in the communication network 70. Is transmitted to the supply chain management system 30 via step S20.

Then, the supply chain management system 30 transmits the goods receipt processing related information received from the integrated goods receipt system 60 to the material supply company terminal 10 via the communication network 70, thereby causing the material supply company terminal 10 to receive the corresponding goods receipt. The processing related information is displayed on the display unit 12 to confirm receipt of goods to the material supplier (step S21).

On the other hand, when the supply chain management system 30 performs the processes for material logistics management by performing the above-described steps S11 to S21, the material distribution information generated between the material supply company terminal 10 and the processing company terminal 20. By providing the monitoring system 50 in real time via the communication network 70 allows the monitoring system 50 to monitor the material logistics situation in real time.

The supply chain management system 30 provides the corresponding material supply scheduled date information to the monitoring system 50 in real time as the material supply scheduled date is input from the material supplier terminal 10 in step S11, and the processing company terminal 20 in step S13. As the material supply request date is inputted from the system, the corresponding material supply request date is provided to the monitoring system 50 in real time, and the expected arrival material information is input as the estimated arrival material information is input from the material supplier terminal 10 in step S16. The communication network is provided to the monitoring system 50 in real time.

Then, the supply chain management system 30 provides the material acquisition information to the management system 50 in real time as the material acquisition information is input from the processing company terminal 20 in step S17, and the integrated goods receipt system 60 in step S20. As the receipt processing related information is inputted from), the corresponding receipt processing related information is provided to the management system 50 in real time.

Logistics management system according to the present invention described in real time to identify the logistics movement between the material supplier and the processing company processing the material to supply the material in the enterprise producing a large structure by processing a plurality of materials, such as large vessels or large machines In addition, the goods handling process can be carried out efficiently, thereby managing the material logistics economically with little manpower.

The present invention is not limited to the above description, and a person of ordinary skill in the art may change the present invention in various forms without departing from the technical spirit of the present invention. It will be appreciated that such modifications will fall within the technical scope of the present invention.

The present invention can be usefully applied in the case of managing material logistics in a company producing a large structure by processing a plurality of materials such as a large ship or a large machine. According to the present invention, the processing of a plurality of materials, such as a large ship or a large machine, in real time to understand the logistics movement between the material supplier that supplies the material in the enterprise producing a large structure and the processing company that processes the material and the receipt processing Can be efficiently carried out, so material logistics can be managed economically with little manpower.

10; Material supplier terminal 20; Processing company terminal
30; Supply chain management system 50; Surveillance system
60; Integrated receipt system 70; communications network

Claims (11)

Logistics management system that manages the material logistics that occur between the material supplier that supplies the material and the processing company that receives and processes the material.
A supply chain management system for providing a service for managing material logistics information generated between a material supplier company terminal and a processing company terminal connected through a communication network;
A material supply company terminal which communicates with the supply chain management system through a communication network to perform material supply schedule management, transaction statement preparation, and receipt processing request management;
And a processing operator terminal communicating with the supply chain management system through a communication network to perform raw material delivery request management and acceptance material registration management.
The method of claim 1,
An integrated goods receipt management system which communicates to the supply chain management system via a communication network and notifies the material supplier terminal of a receipt processing result through a supply chain management system in response to a receipt processing request from a material supplier terminal received through a supply chain management system. Logistics management system, characterized in that it further comprises.
The method according to claim 1 or 2,
And a monitoring system for communicating in real time with the supply chain management system through a communication network to monitor material logistics information generated between a material supplier company, a processing company terminal, and an integrated goods receipt management system in real time.
The method of claim 1,
The supply chain management system,
A control unit which performs various control processes for material logistics management according to a program stored in a memory unit;
An input unit for inputting general data and commands for operating the supply chain management system to the controller according to a manual operation;
A display unit which displays various screens for operation management of a supply chain management system under control of the controller;
A memory unit which stores various programs for material logistics management and provides them to the controller;
A database for storing material logistics information under the control of the controller;
A communication unit for transmitting and receiving material logistics related information through the communication network under the control of the controller;
Logistics management system characterized in that it comprises an output unit for printing out the material logistics information under the control of the control unit.
The method of claim 1,
The material supplier terminal,
A control unit which performs overall control processing of the material supply company terminal according to a program stored in the storage unit;
An input unit for inputting various data and commands for material logistics management according to a manual operation to the controller;
A display unit which displays various screens for managing material logistics by connecting to a supply chain management system under the control of the controller;
A storage unit which stores various programs and data for material logistics management and provides them to the controller;
A communication unit for transmitting and receiving material logistics related information by communicating through a communication network under the control of the controller;
Logistics management system characterized in that it comprises an output unit for printing out the material logistics information under the control of the control unit.
The method of claim 1,
Processing company terminal,
A control unit which performs overall control processing of the processing company terminal according to the program stored in the storage unit;
An input unit for inputting various data and commands for material logistics management according to a manual operation to the controller;
A display unit which displays various screens for managing material logistics by connecting to a supply chain management system under the control of the controller;
A storage unit which stores various programs and data for material logistics management and provides them to the controller;
A communication unit for transmitting and receiving material logistics related information through a communication network under the control of the controller;
Logistics management system characterized in that it comprises an output unit for printing out the material logistics information under the control of the control unit.
The method of claim 2,
The integrated goods receipt management system,
A control unit which performs overall control processing for the integrated goods receipt management according to the program stored in the memory unit;
An input unit which inputs various data and commands for operating the integrated goods receipt system to the controller according to a manual operation;
A display unit which displays various screens for the operation of the integrated goods receipt system under the control of the controller;
A memory unit which stores a program for integrated goods receipt management and provides the same to the controller;
A database for storing goods management information under the control of the controller;
A communication unit configured to transmit and receive goods-related information through a communication network under the control of the controller;
Logistics management system characterized in that it comprises an output unit for printing and outputting the receipt-related information under the control of the controller.
The method of claim 3,
The surveillance system,
A control unit which performs overall control processing of the monitoring system according to the program stored in the storage unit;
An input unit for inputting general data and instructions for monitoring material logistics information according to a manual operation to the controller;
A display unit for communicating with a supply chain management system under the control of the controller and displaying all screens for real-time monitoring of material logistics information;
A storage unit which stores various programs and data for monitoring material logistics information and provides them to the controller;
A communication unit for transmitting and receiving general information for real-time monitoring of material logistics information through a communication network under the control of the controller;
Logistics management system characterized in that it comprises an output unit for printing and outputs the material logistics monitoring information under the control of the controller.
As a logistics management method that manages material logistics that occurs between a material supplier that supplies materials and a processing company that receives and processes materials,
Receiving, by the supply chain management system, the material supply scheduled date from the material supplier terminal through the communication network to the processing company, and transmitting the material supply scheduled date to the processing company terminal through the communication network to notify the processing company terminal;
Receiving, by the supply chain management system, the material supply request date transmitted from the processing company terminal through the communication network, and transmitting the material supply request date to the material supplier terminal through the communication network and notifying;
Causing the supply chain management system to prepare a transaction specification for the material to be supplied to the processing company based on the command inputted from the material supplier terminal and to print out the created transaction statement;
Receiving, by the supply chain management system, the arrival schedule material information to the processing company transmitted from the material supplier company terminal through the communication network, and transmitting the notification of the arrival arrival material information to the processing company terminal through the communication network;
And receiving, by the supply chain management system, material acquisition information transmitted from the processing company terminal through the communication network, and transmitting the material acquisition information to the material supplier terminal through the communication network and notifying.
10. The method of claim 9,
Receiving, by the supply chain management system, a receipt processing request transmitted from the material supplier company terminal through a communication network, and transmitting the corresponding receipt processing request to the integrated receipt system through the communication network to request receipt processing;
The supply chain management system further comprises the step of receiving the goods receipt processing-related information transmitted after the goods receipt processing in the integrated goods receipt system through the communication network, and transmitting the goods receipt processing related information to the material supplier terminal through the communication network to notify receipt confirmation Logistics management method.
11. The method according to claim 9 or 10,
And supplying information generated from the material supply company terminal, the processing company terminal and the integrated receiving system to the monitoring system in real time through the communication network.
KR1020110086588A 2011-08-29 2011-08-29 System and method for physcical distribution management KR20130023655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110086588A KR20130023655A (en) 2011-08-29 2011-08-29 System and method for physcical distribution management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110086588A KR20130023655A (en) 2011-08-29 2011-08-29 System and method for physcical distribution management

Publications (1)

Publication Number Publication Date
KR20130023655A true KR20130023655A (en) 2013-03-08

Family

ID=48175842

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110086588A KR20130023655A (en) 2011-08-29 2011-08-29 System and method for physcical distribution management

Country Status (1)

Country Link
KR (1) KR20130023655A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366263A (en) * 2013-06-21 2013-10-23 上海北臣实业有限公司 Supply chain management system of one-stop integrated logistic service
CN104978643A (en) * 2015-05-15 2015-10-14 王群智 Supply chain management apparatus and supply chain order processing method
CN108074152A (en) * 2016-11-15 2018-05-25 北京京东尚科信息技术有限公司 The system and method declared for cross-border business of importation
KR102008827B1 (en) 2019-03-11 2019-10-21 김형섭 System and method for providing cable data management service, recording medium for performing the method
KR20210106737A (en) 2020-02-21 2021-08-31 (주)비앤비시스템 Material supply and management system using material consumption collection module

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366263A (en) * 2013-06-21 2013-10-23 上海北臣实业有限公司 Supply chain management system of one-stop integrated logistic service
CN104978643A (en) * 2015-05-15 2015-10-14 王群智 Supply chain management apparatus and supply chain order processing method
CN108074152A (en) * 2016-11-15 2018-05-25 北京京东尚科信息技术有限公司 The system and method declared for cross-border business of importation
CN108074152B (en) * 2016-11-15 2021-03-30 北京京东尚科信息技术有限公司 System and method for cross-border import service declaration
KR102008827B1 (en) 2019-03-11 2019-10-21 김형섭 System and method for providing cable data management service, recording medium for performing the method
KR20210106737A (en) 2020-02-21 2021-08-31 (주)비앤비시스템 Material supply and management system using material consumption collection module

Similar Documents

Publication Publication Date Title
KR20130023655A (en) System and method for physcical distribution management
KR101373369B1 (en) Network-Based Production Management System And Method
CN102722785A (en) Workshop operation management method, system and server
CN104283967A (en) Third-party data service system based on Internet-of-Things data collecting
US20070185754A1 (en) Task responsibility system
US20140025785A1 (en) System, Apparatus and Method for Activity Guidance and Monitoring
CA2735955C (en) Equipment management system, equipment management method and program
CN105069590A (en) Factory order goods tracing and monitoring method
CN106100931A (en) A kind of automobile factory intelligent maintaining maintenance system
KR20180036091A (en) Logistic automatization equipment maintenance system and method based on cloud server
KR20030019078A (en) Distribution management system, distribution management method and recording medium
US8036923B2 (en) Method and system for executing work orders
US20080234851A1 (en) System and method for managing a product manufacturing process
CN113837611A (en) Automatic worker dispatching recommendation method and system
KR20080016514A (en) Manufacturing execution management system
KR100775940B1 (en) The manufacturing execution data input output module to manage manufactuing execution
JP6320025B2 (en) Demand management system and demand management method
KR20100043386A (en) Apparstus and method for distributing electronic drawing use of the drawing information related to bom
KR100817489B1 (en) The Method And System For Real Time Manufacturing Execution Data Communication
KR101921096B1 (en) Remote managing system of equipment
CN209980303U (en) Transportation process management system based on Internet of things
JPH0512304A (en) Integrated production control system
KR20180036090A (en) Logistic automatization equipment maintenance database constructing system based on cloud server, and method thereof
KR20100026755A (en) System for managing real-time manufacturing information
KR101201100B1 (en) Steel Logistics Information System

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination