KR20100043386A - Apparstus and method for distributing electronic drawing use of the drawing information related to bom - Google Patents

Apparstus and method for distributing electronic drawing use of the drawing information related to bom Download PDF

Info

Publication number
KR20100043386A
KR20100043386A KR1020080102405A KR20080102405A KR20100043386A KR 20100043386 A KR20100043386 A KR 20100043386A KR 1020080102405 A KR1020080102405 A KR 1020080102405A KR 20080102405 A KR20080102405 A KR 20080102405A KR 20100043386 A KR20100043386 A KR 20100043386A
Authority
KR
South Korea
Prior art keywords
unit
information
bom
production
erp
Prior art date
Application number
KR1020080102405A
Other languages
Korean (ko)
Inventor
주세훈
정승진
임경민
곽호규
이진희
김주천
Original Assignee
에스티엑스조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스티엑스조선해양 주식회사 filed Critical 에스티엑스조선해양 주식회사
Priority to KR1020080102405A priority Critical patent/KR20100043386A/en
Publication of KR20100043386A publication Critical patent/KR20100043386A/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/30Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
    • G06F16/38Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually
    • G06F16/381Retrieval characterised by using metadata, e.g. metadata not derived from the content or metadata generated manually using identifiers, e.g. barcodes, RFIDs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T1/00General purpose image data processing
    • G06T1/0021Image watermarking

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Databases & Information Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Library & Information Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: An apparatus for distributing an electronic drawing using drawing information associated with a BOM(Bill Of Material) and a method thereof are provided to build a drawing necessary for ship design and manufacture in a DB, thereby obtaining easy accessibility and real-time sharing features. CONSTITUTION: A PLM(Product Lifecycle Management) unit(100) comprises the following units. A memory unit(120) temporarily stores input drawings and drawing information. A BOM generating unit(140) generates a BOM about each drawing. An ERP(Enterprise Resource Planning) unit(200) comprises the following units. A production module unit(230) schedule a production schedule. A history management unit manages the history according to drawing inquiry or an output request.

Description

BOM에 연계된 도면 정보를 활용한 전자도면 배포장치 및 그 방법{APPARSTUS AND METHOD FOR DISTRIBUTING ELECTRONIC DRAWING USE OF THE DRAWING INFORMATION RELATED TO BOM}Electronic drawing distribution device and method using drawing information linked to OMROM {APPARSTUS AND METHOD FOR DISTRIBUTING ELECTRONIC DRAWING USE OF THE DRAWING INFORMATION RELATED TO BOM}

본 발명은 BOM(Bill Of Material)에 연계된 도면 정보를 활용한 전자도면 배포장치 및 그 방법에 관한 것으로, 보다 상세하게는 전자도면 배포를 통해 접근의 용이성과 실시간적 공유성을 높이되 보안성은 강화시켜 특히 선박 설계에 사용되는 도면의 활용성을 극대화시킬 수 있도록 한 BOM에 연계된 도면 정보를 활용한 전자도면 배포장치 및 그 방법에 관한 것이다.The present invention relates to an electronic drawing distribution device and method using drawing information linked to a bill of material (MOB), and more particularly, to improve accessibility and real-time sharing through electronic drawing distribution. The present invention relates to an electronic drawing distribution device and method using the drawing information associated with the GM so as to maximize the utilization of drawings used in ship design.

최근 조선산업을 비롯한 각종 산업분야에서는 세계경제의 급격한 변화에 대응하기 위해 많은 자구적인 노력들을 기울이고 있다.In recent years, many industries, including the shipbuilding industry, are making many efforts to cope with the rapid changes in the global economy.

특히, 조선산업의 경우 이러한 세계경제의 환경변화는 기업의 생존과 직결되기 때문에 경쟁력 유지를 위해 ERP(Enterprise Resource Planning)를 도입하여 제품(Item)의 설계에서부터 회계처리까지 원스텝으로 관리할 수 있도록 하는 등 보다 능동적이고 체계적이며 효율적인 시스템을 갖춰가고 있다.In particular, in the shipbuilding industry, the environmental changes of the global economy are directly related to the survival of the company. Therefore, ERP (Enterprise Resource Planning) is introduced to maintain competitiveness in one-step management from item design to accounting. Equipped with a more active, systematic and efficient system.

하지만, 선박 설계에 있어 가장 중요한 부분을 차지하는 도면의 경우는 여전 히 페이퍼(Paper)로 관리되고 있어 이러한 시스템에 적용하기 어려운 상황에 직면해 있다.However, the drawings, which are the most important part of ship design, are still managed by paper, which makes them difficult to apply to these systems.

더욱이, 산업의 글로벌화, 속도화로 인해 도면의 전자화가 요구되고 있으나 그에 대한 보안 유지 및 도면 정보의 실시간 공유를 위한 시스템이 구현되어 있지 않은 실정이다.In addition, due to the globalization and speed of the industry, digitalization of drawings is required, but a system for maintaining security and real-time sharing of drawing information is not implemented.

예컨대, 지금까지는 도 1에 예시된 바와 같이, 제품을 만들기 위한 도면이 작성되면(S10), 생산부서로의 배포를 위한 도면이 출력되고(S20), 출력된 도면을 최종 부서까지 배포하기 위해서는 복사의뢰서 및 배포전이 요구되며(S30), 이 과정을 거치게 되면 이어 결재(S40)를 받게 된다.For example, as illustrated in FIG. 1 so far, when a drawing for making a product is made (S10), a drawing for distribution to a production department is output (S20), and a copy request form is distributed to distribute the output drawing to the final department. And before the distribution is required (S30), and after this process will receive a payment (S40).

이렇게 하여 결재(S40)가 완료되면 복사실로 보내지면서 복사의뢰되고(S50), 복사실에서는 의뢰받은 도면을 복사/제본하여(S60) 최종 부서까지 배포(S70)하게 된다.In this way, when the payment is completed (S40) is sent to the copy room to be requested for copying (S50), in the copying room to copy / bind the requested drawings (S60) to distribute to the final department (S70).

이와 같은 일련의 과정은 거의 모두 사람에 의해 수작업으로 처리되기 때문에 불특정 다수인이 도면을 쉽게 확인할 수 있는 상황에 놓여 있게 되어 보안성이 매우 취약하며, 또 최종 배포시까지 많은 시간이 걸리기 때문에 도면에 대한 접근성이 용이치 못하여 생산성이 저하되는 등 많은 단점이 있었다.This series of processes are all handled manually by humans, which puts them in a situation where an unspecified number of people can easily view the drawings, which is very insecure and takes much time to final distribution. There are many disadvantages, such as poor accessibility and low productivity.

본 발명은 상술한 바와 같은 종래 기술상의 제반 문제점들을 감안하여 이를 해결하고자 창출된 것으로, 선박 설계 및 제작에 필요한 도면을 전자화하여 접근의 용이성 및 실시간 공유성을 확보하되 완벽한 보안성을 함께 갖추도록 하여 보다 체계적이고 효율적인 도면 관리시스템을 구축할 수 있도록 함으로써 생산효율을 극대화시키도록 한 BOM에 연계된 도면 정보를 활용한 전자도면 배포장치 및 그 방법을 제공함에 그 주된 해결 과제가 있다.The present invention was created in view of the above-mentioned problems in the prior art, and has been created to solve this problem. The main problem is to provide an electronic drawing distribution device and method using the drawing information linked to the GOM to maximize the production efficiency by enabling a more systematic and efficient drawing management system.

본 발명은 상기한 해결 과제를 달성하기 위한 수단으로, ERP의 종업원 DB와 연결되어 사용자 정보를 불러오거나 입력된 도면 및 도면 정보를 임시 저장하는 메모리부와, 상기 메모리부에 저장된 도면 및 도면 정보를 불러와 각 도면에 대한 BOM을 생성하는 BOM 생성부와, 상기 메모리부와 BOM 생성부를 통해 생성된 BOM 정보를 서로 매칭시켜 데이터 베이스화 하는 DB부와, 상기 메모리부, BOM 생성부, DB부를 신호제어하는 PLM제어부로 이루어진 PLM부와; 상기 PLM제어부와 교신하여 확정된 BOM 정보로부터 생산부서, 생산일정을 스케쥴링하는 생산모듈부와, 상기 생산모듈부로부터 스케쥴링된 정보를 토대로 작업자가 필요로 하는 도면과 그렇지 않은 도면으로 분리하는 도면빌드부와, 도면 조회 혹은 출력 요청에 따른 이력을 관리하는 이력관리부와, 상기 생산모듈부, 도면빌드부 및 이력관리부를 신호제어하는 ERP제어부로 이루어진 ERP부와; 상기 ERP제어부와 교신하여 작업에 필요한 도면에 대 한 조회를 요청하거나 혹은 출력을 요청하는 다수의 생산부서 단말기로 이루어진 생산부 단말기로 구성된 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포장치를 제공한다.The present invention is a means for achieving the above-mentioned problems, the memory unit is connected to the employee DB of the ERP to retrieve user information or temporarily store the input drawings and drawing information, and the drawings and drawing information stored in the memory unit A BOM generation unit for importing and generating a BOM for each drawing, a DB unit for matching and matching a database of BOM information generated by the memory unit and the BOM generation unit, and the memory unit, BOM generation unit, and DB unit for signal control A PLM unit comprising a PLM control unit; A production module unit for scheduling a production department and a production schedule from the BOM information determined in communication with the PLM control unit, and a drawing building unit for separating the drawings required by the operator from the drawings not required based on the information scheduled from the production module unit. An ERP unit configured to manage a history according to the drawing inquiry or output request, and an ERP control unit which controls the production module unit, the drawing build unit, and the history management unit; Electronic drawing distribution device utilizing drawing information linked to the GM, characterized in that consisting of a production unit terminal consisting of a plurality of production department terminals requesting inquiry or output request for drawings required for work in communication with the ERP control unit To provide.

이때, 상기 ERP부의 이력관리부에는 도면의 조회, 출력 신호를 수신하였을 때 상기 ERP제어부의 제어신호를 받아 조회, 출력되는 화면 혹은 프린트되는 페이퍼 상에 바코드를 출력하는 바코드 관리부가 더 구비된 것에도 그 특징이 있다.At this time, the history management unit of the ERP unit is further provided with a barcode management unit for receiving a control signal of the ERP control unit when receiving an inquiry signal and output signal in the drawing, and outputs a barcode on the screen to be displayed or printed or printed paper. There is a characteristic.

또한, 상기 바코드 관리부는 출력되는 바코드가 워터마크 형태로 표시되도록 하고, 출력시마다 카운트하도록 제어하는 것에도 그 특징이 있다.In addition, the bar code management unit is characterized in that the bar code to be output is displayed in the form of a watermark, and control to count every output.

뿐만 아니라, 본 발명은 상기한 해결 과제를 달성하기 위한 다른 수단으로, 선박 설계 및 제작에 필요한 도면이 입력되면 PLM 제어부는 해당 도면에 대한 BOM 정보를 생성하고, 생성된 BOM 정보와 해당 도면 정보를 매칭시켜 데이터 베이스화하여 저장하는 제1단계와; 상기 제1단계에서 생성된 BOM 정보를 수신한 ERP 제어부는 해당 도면이 사용될 생산부서, 생산일정에 관한 스케쥴링 및 이 스케쥴링을 토대로 사용자에게 제공될 도면과 그렇지 않을 도면을 분리하는 도면 빌드화 작업을 수행하는 제2단계와; 각 생산부서에 구비된 단말기를 통해 작업에 필요한 도면이 요청되면 상기 ERP 제어부는 상기 PLM 제어부와 교신하여 사용자의 정당성 여부를 확인하는 제3단계와; 상기 제3단계를 통해 사용자의 정당성이 확인되면 상기 ERP 제어부는 해당 단말기로 요청 도면 및 도면 정보를 출력하는 제4단계로 구성된 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포방법을 제공한다.In addition, the present invention is another means for achieving the above-described problem, when the drawings required for ship design and manufacturing is input, the PLM control unit generates BOM information for the corresponding drawing, and generates the generated BOM information and the corresponding drawing information A first step of matching and storing the database; Receiving the BOM information generated in the first step, the ERP controller performs a drawing build operation for separating the drawings to be provided to the user and the drawings that will not be provided to the user based on the production department, the scheduling of the production schedule, and the scheduling in which the corresponding drawings will be used. A second step of doing; A third step of confirming whether a user is legitimate by communicating with the PLM control unit when a drawing required for a job is requested through a terminal provided in each production department; When the legitimacy of the user is confirmed through the third step, the ERP control unit comprises a fourth step of outputting the request drawing and the drawing information to the corresponding terminal. to provide.

이 경우, 상기 제4단계에서, 출력되는 도면에는 바코드가 워터마크 형태로 함께 출력되는 것에도 그 특징이 있다.In this case, in the fourth step, the output figure is also characterized in that the bar code is output together in the form of a watermark.

본 발명에 따르면, 선박 설계 및 제작에 필요한 도면의 전자화를 통해 접근의 용이성, 실시간적 공유성을 확보하고, 나아가 철저한 보안성을 구비함으로써 도면 관리에 필요한 비용절감, 필요 도면 검색의 효율성 제공, 생산성 향상 등의 효과를 얻을 수 있다.According to the present invention, accessibility and real-time shareability are secured through the electronicization of drawings required for ship design and manufacture, and furthermore, through thorough security, cost reduction required for drawing management, providing efficiency of required drawing search, and productivity The improvement etc. can be acquired.

이하에서는, 첨부도면을 참고하여 본 발명에 따른 바람직한 실시예를 보다 상세하게 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment according to the present invention.

도 2는 본 발명에 따른 전자도면 배포장치의 예시적인 구성블럭도이고, 도 3은 본 발명에 따른 전자도면 배포방법을 보여주는 예시적인 플로우챠트이다.Figure 2 is an exemplary block diagram of an electronic drawing distribution apparatus according to the present invention, Figure 3 is an exemplary flowchart showing an electronic drawing distribution method according to the present invention.

도 2에 도시된 바와 같이, 본 발명에 따른 전자도면 배포장치는 PLM(Product Lifecycle Management)부(100)와, 상기 PLM(100)과 통신가능하게 연결되는 ERP(Enterprise Resource Planning)부(200)와, 상기 ERP(200)와 통신가능하게 연결되는 생산부(300)를 포함하여 구성된다.As shown in FIG. 2, the electronic drawing distribution device according to the present invention includes a product lifecycle management (PLM) unit 100 and an enterprise resource planning (ERP) unit 200 communicatively connected to the PLM 100. And, it is configured to include a production unit 300 is communicatively connected to the ERP (200).

이때, 상기 PLM부(100)는 제품이나 어셈블리를 이루는 구성부품들의 구조화된 리스트를 생성하는 부분으로, PLM제어부(110), 메모리부(120), DB부(130) 및 BOM(Bill Of Material)생성부(140)로 이루어진다.At this time, the PLM unit 100 is a part for generating a structured list of the components constituting the product or assembly, the PLM control unit 110, memory unit 120, DB unit 130 and Bill of Material (BOM) It is made of a generation unit 140.

뿐만 아니라, 상기 PLM부(100)에는 작성된 도면 정보를 입력하기 위한 입력 부(102) 및 입력된 도면 정보를 수정하거나 입력 현황 등을 확인하기 위한 출력부(104)를 더 포함한다. In addition, the PLM unit 100 further includes an input unit 102 for inputting the created drawing information and an output unit 104 for correcting the input drawing information or checking the input status.

여기에서, 상기 입력부(102)는 키보드를 비롯한 스캐너, 마우스, 광포인트 등 각종 입력수단을 의미하며, 출력부(104)는 프린터를 비롯한 모니터, 플로터 등의 각종 디스플레이 수단을 의미한다.Here, the input unit 102 means various input means such as a scanner, a mouse, an optical point, including a keyboard, and the output unit 104 means various display means such as a monitor, a plotter, etc., including a printer.

그리고, 상기 PLM제어부(110)는 상기 ERP부(300)와 통신에 필요한 모든 제어를 수행하며, 상기 PLM부(100)에 구성된 메모리부(120), DB부(130) 및 BOM생성부(140)의 처리와 관련된 모든 신호를 제어하게 된다.In addition, the PLM control unit 110 performs all the controls necessary for communication with the ERP unit 300, and the memory unit 120, DB unit 130 and BOM generation unit 140 configured in the PLM unit 100 Control all the signals related to

특히, 입력부(102)를 통한 자료 입력시 사용자 확인을 통한 보안과정을 거치도록 제어할 수 있는데, 이를테면 잘 알려져 있는 아이디와 비밀번호 입력방식을 사용할 수 있다.In particular, when inputting data through the input unit 102 can be controlled to go through a security process through the user confirmation, for example, a well-known ID and password input method can be used.

또한, 상기 메모리부(120)는 상기 입력부(102)를 통한 사용자 확인은 물론 후술되는 생산부(300)의 입력부(302)를 통한 사용자 확인에도 필요한 정보 및 입력된 도면 정보를 임시 저장하는 공간으로서 사용자 확인에 필요한 정보는 사용자 확인 요청시 ERP에 있는 종업원DB를 통해 해당 정보를 확인할 수 있을 것이며, DB부(130)는 상기 PLM제어부(110)의 제어신호를 받아 상기 메모리부(120)에 저장된 도면 정보를 불러와 데이터베이스화 하되 BOM생성부(140)로부터 생성된 해당 도면에 대한 BOM정보를 서로 매칭시킨 상태로 데이터베이스화 하게 된다.In addition, the memory unit 120 is a space for temporarily storing information and input drawing information necessary for user confirmation through the input unit 102 as well as user confirmation through the input unit 302 of the production unit 300 to be described later. Information required for confirmation may check the information through the employee DB in the ERP when the user confirmation request, DB unit 130 is stored in the memory unit 120 receives the control signal of the PLM control unit 110 The information is brought into a database, but the database is created in a state where the BOM information about the corresponding drawings generated from the BOM generation unit 140 is matched with each other.

그리고, 상기 ERP부(200)는 기업 자원 관리시스템에 포함된 도면 관리를 위한 부분으로서, ERP제어부(210), 도면빌드부(220), 생산모듈부(230) 및 이력관리 부(240)를 포함한다.In addition, the ERP unit 200 is a part for drawing management included in the enterprise resource management system, the ERP control unit 210, the drawing build unit 220, the production module unit 230 and the history management unit 240 Include.

여기에서, 상기 ERP제어부(210)는 상기 PLM부(100)와 교신하여 상기 DB부(130)로부터 각 도면 정보에 대한 BOM을 수신한 다음 생산모듈부(230)를 통해 확정된 BOM을 활용하여 해당 도면이 필요한 생산부서, 작업공정 등을 스케쥴링하게 된다.Here, the ERP control unit 210 communicates with the PLM unit 100 receives the BOM for each drawing information from the DB unit 130 and then utilizes the BOM determined through the production module unit 230. The production department, work process, etc. for which the corresponding drawings are required will be scheduled.

이때, 상기 PLM부(100)로부터 전송되는 BOM은 ECO(Engineering Change Order) 형태로 확정되어 ERP부(200)로 수신되고, 이 확정된 ECO 형태의 BOM을 상기 생산모듈부(230)가 활용하여 해당 도면이 필요한 생산부서, 작업공정 등을 자동으로 구조화시켜 스케쥴링하게 되는데, 스케쥴링은 각 생산부서별로 필요로 하는 도면을 분류하고, 또 작업공정별로 필요로 하는 도면을 분리하는 일련의 자동화된 작업을 총칭하는 의미이며, 인간의 행위가 포함되지 않는다.In this case, the BOM transmitted from the PLM unit 100 is determined in the form of an Engineering Change Order (ECO) and received by the ERP unit 200, and the production module unit 230 utilizes the determined ECO BOM. Production departments and work processes that require the corresponding drawings are automatically structured and scheduled.Scheduling is a series of automated tasks that classify the drawings needed by each production department and separate the drawings required by the work processes. Collective meaning, does not include human action.

또한, 상기 ECO란 도면에 생성/구성한 BOM을 확정하여 ERP로 전송하는 정보의 한 형태이다.In addition, the ECO is a form of information transmitted to the ERP by determining the BOM generated / configured in the drawing.

아울러, 상기 도면빌드부(220)는 상기 BOM을 통해 도면기준정보를 확인하고, 상기 생산모듈부(230)로부터 생성된 정보를 받아 도면 사용자에게 필요한 도면만을 배포되도록 빌드(Bild)하는 부분이며, 따라서 상기 BOM에는 도면기준정보가 포함된다.In addition, the drawing building unit 220 is a part for confirming the drawing reference information through the BOM, the build (Bild) to receive only the information required by the drawing user receives the information generated from the production module unit 230, Accordingly, the BOM includes drawing reference information.

여기에서, 상기 도면기준정보란 도면 번호별 정보, 작성부서, 배포부서 등의 정보를 말한다.Here, the drawing reference information refers to information such as drawing number information, a production department, a distribution department, and the like.

그리고, 상기 이력관리부(240)는 생산부(300)로부터 조회 혹은 출력 요청이 접수되면 상기 ERP제어부(210)의 제어신호를 받아 조회이력, 출력이력을 관리 기록하고, 조회자, 출력요청자에 대한 정보를 관리하게 된다.When the inquiry or output request is received from the production unit 300, the history management unit 240 receives the control signal of the ERP control unit 210 and records and records the inquiry history and the output history, and records information about the inquirer and the output requester. To manage.

나아가, 상기 이력관리부(240)에는 도면의 조회, 출력 신호를 수신하였을 때 상기 ERP제어부(210)의 제어신호를 받아 조회, 출력되는 화면 혹은 프린트되는 페이퍼 상에 바코드를 출력하는 바코드 관리부가 더 구비될 수 있으며, 또한 상기 바코드 관리부는 출력되는 바코드를 워터마크(Watermark) 형태로 표시되도록 하고 카운트하여 해당 도면에 대한 이력이 더욱 더 보안성있게 관리되도록 함이 바람직하다.Furthermore, the history manager 240 further includes a barcode manager that receives a control signal of the ERP controller 210 and outputs a barcode on a screen to be inquired and output or a paper to be printed when the inquiry and output signal of the drawing is received. In addition, it is preferable that the barcode management unit displays and counts the barcodes output in the form of a watermark, so that the history of the corresponding drawings can be more securely managed.

이 경우, 바코드에 더하여 해당 도면과 관련된 '조회/출력일자', '조회/출력자정보', '도면번호', '조회/출력부수', '호선/모델', '블럭' 등의 정보도 함께 출력되도록 구성할 수도 있다. In this case, in addition to the bar code, information such as 'view / print date', 'view / printer information', 'drawing number', 'view / print quantity', 'line / model', and 'block' related to the corresponding drawing It can also be configured to be output together.

한편, 생산부(300)는 선박 제작에 필요한 모든 작업을 수행하는 실 작업부서로서, 이를 테면 특정블럭에 대한 용접을 수행하는 생산부서1(310), 자재를 절단하는 생산부서2(320) 등과 같은 다수의 생산부서가 있을 수 있다.On the other hand, the production unit 300 is a real work department that performs all the work required for ship production, such as production department 1 310 to perform welding for a specific block, such as production department 2 (320) to cut the material There may be multiple production departments.

이때, 상기 생산부(300) 또는 생산부서1,2(310,320)는 해당 부서에 설치된 컴퓨터 혹은 그와 유사한 형태의 단말기, 즉 생산부(300)은 '생산부 단말기'를 의미하며, 생산부서1(310)은 '생산부서1 단말기'를 의미하며, 생산부서2(320)는 '생산부서2 단말기'를 의미하는데, 여기에서는 설명의 편의상 생산부, 생산부서1, 생산부서2로 표기하기로 한다.In this case, the production unit 300 or the production unit 1, 2 (310, 320) is a computer installed in the department or similar terminal, that is, the production unit 300 refers to the 'production unit terminal', the production unit 1 (310) Means 'production unit 1 terminal', and production unit 2 320 means 'production unit 2 terminal'. Here, for convenience of description, the production unit, production unit 1, and production unit 2 will be referred to.

뿐만 아니라, 상기 생산부(300)의 각 생산부서에서는 작업에 필요한 도면 열 람(조회) 및 도면 출력을 위한 입력부(302)와 출력부(304)를 각각 구비하게 되며, 이를 통해 해당 도면에 대한 정보를 확인할 수 있게 된다.In addition, each production department of the production unit 300 is provided with an input unit 302 and an output unit 304 for reading (viewing) and outputting the drawings required for the work, respectively, through this information about the drawings You can check.

이때, 상기 도면은 웹뷰(Web View)라는 소프트웨어를 통해 컴퓨터 모니터를 통해 실시간 확인할 수 있도록 함으로써 보안 등급을 더욱 높일 수 있다.In this case, the drawing can further increase the security level by enabling real-time check through a computer monitor through software called a web view.

이러한 구성으로 이루어진 본 발명에 따른 전자도면 배포장치는 도 3과 같은 방법으로 배포될 수 있다.Electronic drawing distribution device according to the present invention having such a configuration can be distributed in the same manner as in FIG.

즉, 도면 설계부서에서 계약호선별 도면 작성이 완료되면, 입력부(102)를 통해 해당 도면에 대한 정보와 함께 도면이 PLM부(100)로 입력되게 된다(S100).That is, when the drawing of the contract line is completed in the drawing design department, the drawing is input to the PLM unit 100 together with information about the corresponding drawing through the input unit 102 (S100).

이때, 필요한 경우 도면 입력시 사용자 정보를 확인하는 절차를 거침으로써 보안성을 더욱 강화시킬 수 있다.At this time, if necessary, security can be further enhanced by going through a procedure of checking user information when inputting drawings.

상기 S100 단계를 통해 도면이 입력되면, 상기 PLM부(100)에서는 해당 도면과 그에 대한 정보를 가지고 BOM을 생성하고, 생성된 BOM과 해당 도면을 서로 매칭시킨 상태로 DB부(130)에 저장하여 데이터 베이스화 하게 된다(S110).When a drawing is input through the step S100, the PLM unit 100 generates a BOM with the corresponding drawing and information about the drawing, and stores the generated BOM and the drawing in the DB unit 130 in a state in which the drawing is matched with each other. It becomes a database (S110).

상기 S110 단계를 거쳐 데이터 베이스화가 이루어지면 완료된 데이터의 BOM은 ERP부(200)로 송신되고, 상기 ERP부(200)의 생산모듈부(230)를 통해 생산스케쥴링이 수행되며, 동시에 스케쥴링된 정보와 BOM을 통해 도면빌드부(220)에서는 도면 요청시 제공해도 되는 도면과 그렇지 않은 도면을 분리하는 도면 빌드 작업을 수행하게 된다(S120).When the database is made through the step S110, the BOM of the completed data is transmitted to the ERP unit 200, and the production scheduling is performed through the production module unit 230 of the ERP unit 200, and simultaneously scheduled information and Through the BOM, the drawing building unit 220 performs a drawing build operation for separating drawings that are not provided with drawings and drawings that are not provided at the time of drawing request (S120).

이로써, 선박 설계 및 제조에 관한 도면 전자화 작업이 완료된다.This completes the drawing electronics work related to ship design and manufacture.

이 상태에서, 각 생산부서에서 생산일정과 생산 분야에 맞는 도면을 조회할 필요가 있거나 혹은 페이퍼로 출력해야 할 필요가 있을 때 요청자는 각 생산부서의 입력부(302)를 통해 도면 조회를 신청하거나 혹은 도면 출력을 요청하게 된다(S130).In this state, when each production department needs to inquire a drawing corresponding to the production schedule and production field, or needs to print it out on paper, the requestor can request a drawing inquiry through the input unit 302 of each production department, or The drawing output is requested (S130).

물론, 요청이 없다면 상술한 단계를 거쳐 도면이 전자화된 상태로 대기하게 된다.Of course, if there is no request, the drawing waits in an electronic state through the above-described steps.

그리고, 요청자의 도면 검색 요청이 있게 되면 해당 신호는 ERP부(200)를 거쳐 PLM부(100)로 전송되고, PLM부(100)에서는 메모리부(120)를 통해 사용자 정보를 확인하여 승인 혹은 거절하는 등의 보안절차를 수행하는 것이 바람직하다(S140).When the request of the drawing search request is made, the corresponding signal is transmitted to the PLM unit 100 via the ERP unit 200, and the PLM unit 100 confirms or rejects the user information through the memory unit 120. It is preferable to perform a security procedure, such as (S140).

이 경우, 사용자 확인이 잘못된 경우에는 재차 확인하게 되고(S150), 그래도 확인이 안될 경우, 즉 사용자 정보가 틀린 경우에는 보안상 해당 단계를 종료하여 보안을 유지하게 되며, 사용자 확인이 완료되면 이력관리부(240)를 통해 도면에 대한 이력이 관리되면서 요청자에게 도면 및 도면 정보를 출력하게 된다(S160).In this case, if the user confirmation is wrong, the user will be checked again (S150). If it still cannot be confirmed, that is, if the user information is wrong, the security will be maintained by ending the corresponding step for security. The history of the drawing is managed through 240, and the drawing and the drawing information are output to the requestor (S160).

이때, 이력관리부(240)는 요청자별 로그인 횟수, 요청자가 속한 생산부서, 요청자가 사용한 컴퓨터 등에 관한 정보도 함께 저장하여 관리할 수 있다.In this case, the history manager 240 may store and manage information on the number of logins for each requestor, a production department to which the requester belongs, and a computer used by the requestor.

또한, 출력시 특별히 인증되고 관리되는 웹뷰와 같은 소프트웨어를 통해 배포될 수 있다.It can also be distributed through software such as webviews that are specifically authenticated and managed at output.

이와 같은 단계를 통해 도면의 전자화 및 전자화된 도면을 배포함으로써 관리상의 이점은 물론 효율적인 관리와 비용절감, 실시간 공유를 통한 생산성 향상 등을 달성할 수 있게 된다.Through these steps, the digitalization of the drawings and the distribution of the electronic drawings can achieve not only management advantages but also efficient management, cost reduction, and productivity improvement through real-time sharing.

도 1은 종래 기술에 따른 도면 배포방법을 보여주는 예시적인 플로우챠트,1 is an exemplary flowchart showing a drawing distribution method according to the prior art,

도 2는 본 발명에 따른 전자도면 배포장치의 예시적인 구성블럭도,2 is an exemplary block diagram of an electronic drawing distribution apparatus according to the present invention;

도 3은 본 발명에 따른 전자도면 배포방법을 보여주는 예시적인 플로우챠트.3 is an exemplary flow chart illustrating a method for distributing electronic drawings in accordance with the present invention.

♧ 도면의 주요 부분에 대한 부호의 설명 ♧♧ description of the symbols for the main parts of the drawing ♧

100....PLM부 110....PLM제어부100 .... PLM section 110 .... PLM control section

120....메모리부 130....DB부120 ... Memory section 130 ... DB section

140....BOM 생성부 200....ERP부140 .... BOM generator 200 .... ERP

210....ERP제어부 220....도면빌드부210 .... ERP control part 220 .... drawing building part

230....생산모듈부 240....이력관리부230 .... Production module 240 .... History management

300....생산부300 .... Production Department

Claims (5)

ERP의 종업원 DB와 연결되어 사용자 정보를 불러오거나 입력된 도면 및 도면 정보를 임시 저장하는 메모리부와, 상기 메모리부에 저장된 도면 및 도면 정보를 불러와 각 도면에 대한 BOM을 생성하는 BOM 생성부와, 상기 메모리부와 BOM 생성부를 통해 생성된 BOM 정보를 서로 매칭시켜 데이터 베이스화 하는 DB부와, 상기 메모리부, BOM 생성부, DB부를 신호제어하는 PLM제어부로 이루어진 PLM부와;A memory unit which is connected to an employee DB of the ERP to retrieve user information or temporarily store the inputted drawings and drawing information, and a BOM generation unit which generates a BOM for each drawing by reading drawings and drawing information stored in the memory unit; A PLM unit comprising a DB unit for matching the BOM information generated by the memory unit and the BOM generation unit to a database, and a PLM control unit for signal control of the memory unit, the BOM generation unit, and the DB unit; 상기 PLM제어부와 교신하여 확정된 BOM 정보로부터 생산부서, 생산일정을 스케쥴링하는 생산모듈부와, 상기 생산모듈부로부터 스케쥴링된 정보를 토대로 작업자가 필요로 하는 도면과 그렇지 않은 도면으로 분리하는 도면빌드부와, 도면 조회 혹은 출력 요청에 따른 이력을 관리하는 이력관리부와, 상기 생산모듈부, 도면빌드부 및 이력관리부를 신호제어하는 ERP제어부로 이루어진 ERP부와;A production module unit for scheduling a production unit and a production schedule from the BOM information determined in communication with the PLM control unit, and a drawing building unit for separating a drawing required by an operator from a drawing that is not required based on information scheduled from the production module unit. An ERP unit configured to manage a history according to the drawing inquiry or output request, and an ERP control unit which controls the production module unit, the drawing build unit, and the history management unit; 상기 ERP제어부와 교신하여 작업에 필요한 도면에 대한 조회를 요청하거나 혹은 출력을 요청하는 다수의 생산부서 단말기로 이루어진 생산부 단말기로 구성된 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포장치.An electronic drawing distribution device utilizing drawing information linked to a GM, characterized in that the production unit terminal consisting of a plurality of production unit terminals requesting an inquiry or output request for a drawing required for a job in communication with the ERP control unit. 제1항에 있어서;The method of claim 1; 상기 ERP부의 이력관리부에는 도면의 조회, 출력 신호를 수신하였을 때 상기 ERP제어부의 제어신호를 받아 조회, 출력되는 화면 혹은 프린트되는 페이퍼 상에 바코드를 출력하는 바코드 관리부가 더 구비된 것을 특징으로 하는 BOM에 연계 된 도면 정보를 활용한 전자도면 배포장치.The history management unit of the ERP unit further includes a barcode management unit which receives a control signal of the ERP control unit and outputs a barcode on a screen to be inquired and output or a paper to be printed when the inquiry and output signal of the drawing is received. Electronic drawing distribution device utilizing drawing information linked to. 제2항에 있어서;The method of claim 2; 상기 바코드 관리부는 출력되는 바코드가 워터마크 형태로 표시되도록 하고, 출력시마다 카운트하도록 제어하는 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포장치.The bar code management unit is to display the output bar code in the form of a watermark, electronic drawing distribution device utilizing the drawing information associated with the GOM, characterized in that the control to count every output. 선박 설계 및 제작에 필요한 도면이 입력되면 PLM 제어부는 해당 도면에 대한 BOM 정보를 생성하고, 생성된 BOM 정보와 해당 도면 정보를 매칭시켜 데이터 베이스화하여 저장하는 제1단계와;A first step of generating a BOM information for the corresponding drawing, matching the generated BOM information with the corresponding drawing information, and converting the database into a database when a drawing necessary for ship design and manufacture is input; 상기 제1단계에서 생성된 BOM 정보를 수신한 ERP 제어부는 해당 도면이 사용될 생산부서, 생산일정에 관한 스케쥴링 및 이 스케쥴링을 토대로 사용자에게 제공될 도면과 그렇지 않을 도면을 분리하는 도면 빌드화 작업을 수행하는 제2단계와;Receiving the BOM information generated in the first step, the ERP controller performs a drawing build operation for separating the drawings to be provided to the user and the drawings that will not be provided to the user based on the production department, the scheduling of the production schedule, and the scheduling in which the corresponding drawings will be used. A second step of doing; 각 생산부서에 구비된 단말기를 통해 작업에 필요한 도면이 요청되면 상기 ERP 제어부는 상기 PLM 제어부와 교신하여 사용자의 정당성 여부를 확인하는 제3단계와;A third step of confirming whether a user is legitimate by communicating with the PLM control unit when a drawing required for a job is requested through a terminal provided in each production department; 상기 제3단계를 통해 사용자의 정당성이 확인되면 상기 ERP 제어부는 해당 단말기로 요청 도면 및 도면 정보를 출력하는 제4단계로 구성된 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포방법.And the ERP controller comprises a fourth step of outputting a request drawing and drawing information to a corresponding terminal when the user's legitimacy is confirmed through the third step. 제4항에 있어서;The method of claim 4; 상기 제4단계에서, 출력되는 도면에는 바코드가 워터마크 형태로 함께 출력되는 것을 특징으로 하는 BOM에 연계된 도면 정보를 활용한 전자도면 배포방법.In the fourth step, the electronic drawing distribution method using the drawing information associated with the GOM, characterized in that the bar code is output together in the form of a watermark on the output drawing.
KR1020080102405A 2008-10-20 2008-10-20 Apparstus and method for distributing electronic drawing use of the drawing information related to bom KR20100043386A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080102405A KR20100043386A (en) 2008-10-20 2008-10-20 Apparstus and method for distributing electronic drawing use of the drawing information related to bom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080102405A KR20100043386A (en) 2008-10-20 2008-10-20 Apparstus and method for distributing electronic drawing use of the drawing information related to bom

Publications (1)

Publication Number Publication Date
KR20100043386A true KR20100043386A (en) 2010-04-29

Family

ID=42218371

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080102405A KR20100043386A (en) 2008-10-20 2008-10-20 Apparstus and method for distributing electronic drawing use of the drawing information related to bom

Country Status (1)

Country Link
KR (1) KR20100043386A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609815A (en) * 2012-02-13 2012-07-25 浪潮集团山东通用软件有限公司 Implementation method achieving automatic location of Bills of Materials (BOMs) and supporting a plurality of planning strategies
KR20130119559A (en) * 2012-04-24 2013-11-01 대우조선해양 주식회사 Assembly tree modeling system and method for member of vessel
KR20200076120A (en) 2018-12-19 2020-06-29 두산메카텍 주식회사 Bom management system of electronic drawing and managing method thereof
WO2022055774A1 (en) * 2020-09-14 2022-03-17 Cornell Pump Company Interactive parts drawings with a real-time bill of materials
CN117474503B (en) * 2023-12-28 2024-05-31 广东美创希科技有限公司 Device information management method and device, electronic equipment and medium
US12131291B2 (en) 2021-09-01 2024-10-29 Cornell Pump Company, Llc Method, computer device, and non-transitory computer-readable device for interactive parts drawings with a real-time bill of materials

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102609815A (en) * 2012-02-13 2012-07-25 浪潮集团山东通用软件有限公司 Implementation method achieving automatic location of Bills of Materials (BOMs) and supporting a plurality of planning strategies
KR20130119559A (en) * 2012-04-24 2013-11-01 대우조선해양 주식회사 Assembly tree modeling system and method for member of vessel
KR20200076120A (en) 2018-12-19 2020-06-29 두산메카텍 주식회사 Bom management system of electronic drawing and managing method thereof
WO2022055774A1 (en) * 2020-09-14 2022-03-17 Cornell Pump Company Interactive parts drawings with a real-time bill of materials
US12131291B2 (en) 2021-09-01 2024-10-29 Cornell Pump Company, Llc Method, computer device, and non-transitory computer-readable device for interactive parts drawings with a real-time bill of materials
CN117474503B (en) * 2023-12-28 2024-05-31 广东美创希科技有限公司 Device information management method and device, electronic equipment and medium

Similar Documents

Publication Publication Date Title
US11829942B2 (en) Blockchain enabled transaction processing for an industrial asset supply chain
Hasan et al. Blockchain-based solution for the traceability of spare parts in manufacturing
US11783346B2 (en) Blockchain enabled collaborative transaction information processing for a supply chain
US11948215B2 (en) Intellectual property exchange ecosystem for additive manufacturing
CN109784631A (en) A kind of production work order generates processing method, system, platform and storage medium
US20050262112A1 (en) Method and apparatus to convert project plans into workflow definitions
US11453170B2 (en) Distribution of customized engineering models for additive manufacturing
CN105139151A (en) Information management system based on two-dimensional code technology
KR20100043386A (en) Apparstus and method for distributing electronic drawing use of the drawing information related to bom
US11820529B2 (en) System and method for monitoring and certifying aircrafts and components of aircrafts
CN113448693A (en) SAAS cloud platform of digital factory
CN101527012A (en) Flow template generation method, flow mission executor determining method and devices thereof
CN115187199A (en) Device and method for issuing electronic drawings by using drawing information related to bill of materials
KR20150012762A (en) Apparatus for managing production work and method thereof
Telles et al. Drum-Buffer-Rope in an engineering-to-order productive system: a case study in a Brazilian aerospace company
TW202240483A (en) Resource allocation system for maintaining a production facility
CN113657908A (en) Quality information tracing management and control system for products with complex structures
Kurfess et al. The role of the digital thread for security, resilience, and adaptability in manufacturing
JP2007148598A (en) Information processor
Wally et al. Modelling the Top Floor: Internal and External Data Integration and Exchange
JP7118925B2 (en) Manufacturing control system and manufacturing control method
CN118411004B (en) Vendor collaborative management method, device and system
JP2006268226A (en) Management system, and its management method
JP2006277451A (en) Operating assets management system, operating assets management method and program
KR20230154639A (en) Ai-based work scheduling device for textile production equipment and work scheduling method using it

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application