KR20120140030A - The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail - Google Patents

The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail Download PDF

Info

Publication number
KR20120140030A
KR20120140030A KR1020110059637A KR20110059637A KR20120140030A KR 20120140030 A KR20120140030 A KR 20120140030A KR 1020110059637 A KR1020110059637 A KR 1020110059637A KR 20110059637 A KR20110059637 A KR 20110059637A KR 20120140030 A KR20120140030 A KR 20120140030A
Authority
KR
South Korea
Prior art keywords
epoxy
concrete
crack
packer
pedestal
Prior art date
Application number
KR1020110059637A
Other languages
Korean (ko)
Inventor
이우용
권세곤
Original Assignee
한국철도공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국철도공사 filed Critical 한국철도공사
Priority to KR1020110059637A priority Critical patent/KR20120140030A/en
Publication of KR20120140030A publication Critical patent/KR20120140030A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J163/00Adhesives based on epoxy resins; Adhesives based on derivatives of epoxy resins
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/40Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/04Direct mechanical or chemical fixing of sleepers onto underground

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE: A method for repairing crack for preventing movement of concrete sleeper on concrete ballast for a rail is provided to completely fill a crack repair material and to prevent recracking. CONSTITUTION: A method for repairing crack for preventing movement of concrete sleeper on concrete ballast for a rail comprises: a step of inclinedly cutting the upper portion of the concrete sleeper for a V cutting par(S10); a step of inclindely drilling a packer hole to the lower side of the concrete sleeper to inject epoxy to the cracked site(S20); a step of mounting a packer to the packer hole(S30); and a step of injecting epoxy to the cracked site(S40). [Reference numerals] (AA) Start; (S10) Step of forming a V cutting part; (S20) Step of forming a packer hole; (S30) Step of mounting a packer; (S40) Step of injecting epoxy; (S50) Step of mounting a support; (S60) Step of injecting to an unidentified crack part; (S70) Step of supplementing epoxy; (S80) Step of removing the support

Description

철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법{The Method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail}The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail}

본 발명은 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법으로서, 더욱 상세하게는 철도 콘크리트도상에 콘크리트 침목이 설치되었을 경우 콘크리트도상과 콘크리트침목 사이에 균열을 보수 및 보강방법에 관한 것이다.
The present invention relates to a crack repair method for preventing the flow of concrete sleepers located on railroad concrete drawings, and more particularly, to a method of repairing and reinforcing cracks between concrete beds and concrete sleepers when concrete sleepers are installed on railroad concrete drawings. .

콘크리트 구조물의 보수 및 보강산업 분야에서는 실온 또는 저온에서도 취급하기가 용이하고, 습윤 상태에서도 경화가 균일하고 일정하며, 경화된 후의 탄성력과 인장강도가 우수한 보수재의 필요성이 인식되어 왔었다.In the field of repair and reinforcement of concrete structures, it has been recognized that it is easy to handle even at room temperature or low temperature, the uniformity and uniform curing even in the wet state, and the need for repair materials having excellent elasticity and tensile strength after curing.

또한, 환경오염 문제를 야기하지 않고 보수작업 후에도 환경에 영향을 주지 않는 무용제형이고 불수용성인 보수재로 사용할 수 있는 제품의 개발이 필요하였다.In addition, it was necessary to develop a product that can be used as a solvent-free and insoluble repair material that does not cause environmental pollution problems and does not affect the environment even after repair work.

종래의 경우에는 상기와 같은 문제점을 해결하기위해 균열부위에 에폭시 수지를 투입하여 콘크리트 구조물의 균열을 보수 및 보강하는 방법을 제공하였다.In the related art, in order to solve the above problems, an epoxy resin is added to a crack to provide a method of repairing and reinforcing a crack of a concrete structure.

종래의 균열보수는 균열부확인단계, 이물질제거단계, 먼지청소단계, 실링단계, 패커설치단계, 균열보수재 주입단계, 패커제거단계, 및 씰링재 제거단계를 포함하였다.Conventional crack repairs included cracks identification step, foreign material removal step, dust cleaning step, sealing step, packer installation step, crack repair material injection step, packer removal step, and sealing material removal step.

상기 이물질제거단계는 균열부에 이물질을 제거하기 위해 균열부를 그라인딩하여 표면을 매끄럽게 하는 단계이다.The foreign material removal step is to smooth the surface by grinding the crack to remove the foreign matter in the crack.

상기 먼지청소단계는 상기 이물질제거단계에서 그라인딩하여 발생한 먼지를 제거하는 단계이다.The dust cleaning step is a step of removing dust generated by grinding in the foreign material removal step.

상기 씰링단계는 상기 균열부의 상부에 균열보수재 주입시 누수를 방지하기 위해서 씰링재를 설치하는 단계이다.The sealing step is a step of installing a sealing material to prevent leakage when the crack repair material is injected into the upper portion of the crack.

상기 패커설치단계는 상기 균열부에 균열보수재를 투입하기 위해서 균열부와 일정거리 떨어진 곳에서 경사지게 하부방향으로 패커구멍을 천공한 후 패커를 설치하는 단계이다.The packer installation step is a step of installing the packer after drilling the packer hole downwardly inclined at a predetermined distance away from the crack in order to inject the crack repair material to the crack.

상기 균열보수재 주입단계는 상기 패커설치단계에서 설치된 패커를 통해서 균열보수재 투입장치를 사용하여 상기 균열보수재를 상기 균열부에 투입하는 단계이다.The crack repair material injection step is a step of injecting the crack repair material to the crack portion by using a crack repair material input device through the packer installed in the packer installation step.

상기 패커제거단계는 상기 균열보수재를 투입하기 위해 상기 패커구멍에 패커를 설치한 상기 페커를 제거하는 단계이다.The packer removing step is a step of removing the pecker having a packer installed in the packer hole to inject the crack repair material.

상기 씰링제거단계는 상기 씰링단계에서 설치된 씰링재를 제거하는 단계이다.
The sealing removing step is to remove the sealing material installed in the sealing step.

종래의 균열보수방법을 철도 콘크리트 침목과 콘크리트 도상 사이에 발생한 균열부에 시행할 경우, 열차운행에 의한 진동으로 씰링재가 갈라지게 되고, 균열보수재가 갈라진 부분으로 유출되어 콘크리트 침목의 바닥과 측면 균열부를 메우기전에 주입이 완료가 되는 문제점이 있었다.When the conventional crack repair method is applied to the cracks generated between the railroad concrete sleepers and the concrete bed, the sealing material splits due to the vibration caused by the train operation, and the crack repair material leaks to the cracked parts, causing the bottom and side cracks of the concrete sleepers to break down. There was a problem that the injection is completed before filling.

또한, 빠른시간(약 3시간) 내에 작업을 마무리해야하는 철도 보수작업에서 씰링재를 사용함으로써, 상기 씰링재가 경화하기위해서 24시간 이상 지나야하기 때문에 철도 보수작업에 사용이 부적합한 문제점이 있었다.In addition, by using the sealing material in the railway repair work that must finish the work within a short time (about 3 hours), there is a problem that the use of the railway repair work because the sealing material has to pass more than 24 hours to cure.

또한, 상기 균열부의 상부에 씰링재를 설치함에 따라 균열보수재의 주입상태를 확인할 수가 없어, 균열보수재를 완벽하게 채워지지 않는 문제점이 있었다.In addition, as the sealing material is installed on the upper part of the crack, it is not possible to check the injection state of the crack repair material, and thus there is a problem in that the crack repair material is not completely filled.

이때, 상기 균열보수재를 상기 균열부에 완전히 채우더라도, 일정시간이 경과한 후에 미확인 균열부에 상기 균열보수재가 흘러들어가 상기 균열부를 채우지 못하는 문제점이 있었다.At this time, even if the crack repair material is completely filled in the crack portion, there is a problem that the crack repair material flows into the unidentified crack portion after a predetermined time has not filled the crack portion.

상기와 같은 문제점으로 인해 상기 균열보수재가 상기 균열부를 완전히 채우지 못해, 철도 균열보수 후에 재균열부가 발생되는 문제점이 있었다.
Due to the problems described above, the crack repair material did not completely fill the cracks, and there was a problem in that a crack crack was generated after railway crack repair.

본 발명은 상기와 같은 문제를 해소하려는 것으로, 더욱 상세하게 철도 콘크리트도상과 콘크리트침목 사이에 발생한 균열부를 보수할 경우, 보수시간을 단축시키고, 균열부에 재균열부가 발생되는 것을 방지하며, 균열부에 균열보수재가 완전히 채워지는 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법을 제공하려는데 그 목적이 있다.
The present invention is to solve the above problems, more specifically, when repairing the cracks generated between the concrete railroad concrete bed and the concrete sleeper, shortening the repair time, to prevent the re-cracking portion is generated in the cracks, cracks The purpose of the present invention is to provide a crack repair method for preventing the flow of concrete sleepers located on railroad concrete islands in which the crack repair material is completely filled.

본 발명의 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법은 철도에 설치되는 콘크리트도상(10)과 콘크리트침목(20)사이에 발생되는 균열부(40)를 보수하는 균열보수방법에 있어서, 상기 균열부(40)와 인접한 상기 콘크리트도상(10)의 상부를 경사지게 절삭하여 V컷팅부(50)를 형성하는 V컷팅부 형성단계(S10), 상기 균열부(40)에 에폭시를 주입하기 위해 상기 콘크리트도상(10)에 상기 콘크리트침목(20)의 하면까지 경사지게 패커구멍(60)을 천공하는 패커구멍형성단계(S20), 상기 패커구멍(60)에 패커(61)를 설치하는 패커설치단계(S30), 및 상기 패커구멍(60)에 에폭시주입기기(62)를 사용하여 상기 균열부(40)에 에폭시(70)를 상기 V컷팅부(50)까지 고이도록 주입하는 에폭시주입단계(S40)를 포함하는 것을 특징으로 한다.Crack repair method for preventing the flow of concrete sleepers located on the railway concrete diagram of the present invention to the crack repair method for repairing the cracks 40 generated between the concrete bed 10 and the concrete sleeper 20 is installed on the railway In the cutting process, the V-cutting part forming step (S10) of forming the V-cutting part 50 by obliquely cutting the upper portion of the concrete figure 10 adjacent to the crack part 40 and injecting epoxy into the crack part 40 is performed. Packer hole forming step (S20) for drilling the packer hole 60 inclined to the lower surface of the concrete sleeper 20 in the concrete bed 10, the packer 61 is installed in the packer hole 60 Installation step (S30), and using the epoxy injection device 62 in the packer hole 60, the epoxy injection step to inject the epoxy 70 to the V-cutting portion 50 to the crack portion 40 It characterized by including (S40).

또한, 상기 에폭시주입단계(S40) 다음단계로 받침대 설치단계(S50)와 받침대 제거단계(S80)를 더 포함하되, 상기 받침대 설치단계(S50)는 상기 콘크리트침목(20)의 유동을 억제하기위한 철도레일(30)의 하부에 받침대(90)를 설치하고, 상기 받침대 제거단계(S80)는 상기 에폭시(70)가 양생된 후에 상기 받침대(90)를 제거하는 것을 특징으로 한다.In addition, the epoxy injection step (S40) to the next step further comprises a pedestal installation step (S50) and pedestal removal step (S80), the pedestal installation step (S50) is for suppressing the flow of the concrete sleeper 20 The pedestal 90 is installed in the lower portion of the railway rail 30, and the pedestal removing step S80 is characterized in that the pedestal 90 is removed after the epoxy 70 is cured.

또한, 상기 받침대 설치단계(S50)와 상기 받침대 제거단계(S80) 사이에 미확인균열부 주입단계(S60)와 에폭시 보충단계(S70)를 더 포함하되, 상기 미확인균열부 주입단계(S60)는 상기 에폭시주입단계에서 주입된 에폭시(70)가 외관상으로 확인되지 않는 미확인균열부에 스며들어 상기 V컷팅부(50)에 고여 있는 에폭시(70)가 내려가 공극을 매우고, 상기 에폭시 보충단계(S70)는 상기 V컷팅부(50)에 에폭시재보충기구(80)를 이용하여 에폭시(70)를 추가로 보충하는 것을 특징으로 한다.In addition, between the pedestal installation step (S50) and the pedestal removal step (S80) further comprises an unidentified crack injection step (S60) and epoxy replenishment step (S70), the unidentified crack injection step (S60) is The epoxy 70 injected in the epoxy injection step penetrates into the unidentified crack which is not apparent in appearance, and the epoxy 70 accumulated in the V-cutting part 50 goes down to fill the voids, and the epoxy replenishing step (S70) The V-cutting portion 50 is characterized by further supplementing the epoxy 70 by using the epoxy refill mechanism 80.

또한, 상기 콘크리트도상(10)의 표면이 불규칙적으로 기울어져 있는 경우 상기 V컷팅부(50)에 상기 에폭시(70)를 전체적으로 채울 수가 없기 때문에 상기 에폭시(70)를 고점도 에폭시로 사용하는 것을 특징으로 한다.
In addition, when the surface of the concrete phase 10 is inclined irregularly, the epoxy 70 is used as a high-viscosity epoxy because the V-cutting part 50 cannot fill the epoxy 70 as a whole. do.

본 발명의 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법은 씰링재를 설치하지 않아 균열부를 보수하는 시간을 단축시키고, 균열부의 상부에 V컷팅부를 형성하여 균열부에 균열보수재가 채워지는 것을 확인할수 있으며, V컷팅부를 통해 부족한 균열보수재를 보충할 수 있어 균열부에 균열보수재를 완전히 채울 수 있어 재균열부가 발생되는 것을 방지할 수 있다.
Crack repair method for preventing the flow of concrete sleepers located on the railway concrete diagram of the present invention is to shorten the time to repair the cracks by not installing the sealing material, to form a V-cutting portion on the top of the cracks to fill the crack repair material It can be confirmed that, through the V-cutting part can make up for the lack of crack repair material to completely fill the crack repair material in the crack can prevent the occurrence of re-cracking part.

도 1은 본 발명의 철도 콘크리트 침목유동을 방지를 위한 균열보수 방법 단계도
도 2는 본 발명의 철도를 나타내는 단면도
도 3은 본 발명의 V컷팅부 형성단계를 나타내는 단면도
도 4는 본 발명의 패커구멍형성단계 및 패커설치단계를 나타내는 단면도
도 5는 본 발명의 에폭시주입단계를 나타내는 단면도
도 6은 본 발명의 받침대설치단계를 나타내는 단면도
도 7은 본 발명의 미확인균열부 주입단계를 나타내는 단면도
도 8은 본 발명의 에폭시보충단계를 나타내는 단면도
Figure 1 is a crack repair method step for preventing railway concrete sleeper flow of the present invention
2 is a cross-sectional view showing a railway of the present invention
3 is a cross-sectional view showing a V-cutting portion forming step of the present invention.
Figure 4 is a cross-sectional view showing the packer hole forming step and the packer installation step of the present invention
5 is a cross-sectional view showing the epoxy injection step of the present invention
6 is a cross-sectional view showing a pedestal installation step of the present invention.
7 is a cross-sectional view showing an unidentified cracking step of the present invention
Figure 8 is a cross-sectional view showing the epoxy replenishment step of the present invention

이하, 본 발명의 기술적 사상을 첨부된 도면을 사용하여 더욱 구체적으로 설명한다.Hereinafter, the technical idea of the present invention will be described more specifically with reference to the accompanying drawings.

그러나 첨부된 도면은 본 발명의 기술적 사상을 더욱 구체적으로 설명하기 위하여 도시한 일예에 불과하므로 본 발명의 기술적 사상이 첨부된 도면의 형태에 한정되는 것은 아니다.
However, the accompanying drawings are only examples to illustrate the technical idea of the present invention in more detail, and thus the technical idea of the present invention is not limited to the accompanying drawings.

본 발명의 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법은 철도에 설치되는 콘크리트도상(10)과 콘크리트침목(20)사이에 발생되는 균열부(40)를 보수하는 균열보수방법으로서, V컷팅부 형성단계(S10), 패커구멍형성단계(S20), 패커설치단계(S30), 및 에폭시주입단계(S40)를 포함하는 것을 특징으로 한다.
Crack repair method for preventing the flow of concrete sleepers located on the railway concrete diagram of the present invention as a crack repair method for repairing the cracks 40 generated between the concrete bed 10 and the concrete sleepers 20 installed on the railway , V-cutting part forming step (S10), packer hole forming step (S20), packer installation step (S30), and the epoxy injection step (S40).

상기 V컷팅부형성단계(S10)는 상기 균열부(40)와 인접한 상기 콘크리트도상(10)의 상부를 경사지게 절삭하여 V컷팅부(50)를 형성하는 단계이다.(도3 참조)The V-cutting part forming step (S10) is a step of forming the V-cutting part 50 by obliquely cutting the upper portion of the concrete figure 10 adjacent to the crack part 40 (see FIG. 3).

이때, 상기 V컷팅부(50)를 형성할 경우 V컷팅날을 사용하여 깊이와 폭이 10mm 이하의 길이로 형성하는 것이 바람직하다.At this time, when the V-cutting portion 50 is formed, it is preferable to use a V-cutting blade to form a length of 10 mm or less in depth and width.

상기 패커구멍형성단계(S20)는 상기 균열부(40)에 에폭시(70)를 주입하기 위해 상기 콘크리트도상(10)에 상기 콘크리트침목(20)의 하면까지 경사지게 패커구멍(60)을 천공하는 단계이다.(도 4 참조)The packer hole forming step (S20) is a step of drilling the packer hole 60 inclined to the bottom surface of the concrete sleeper 20 in the concrete phase 10 to inject the epoxy 70 into the crack 40 (See Fig. 4).

이때, 상기 패커구멍(61)을 드릴을 사용하여 상기 콘크리트도상(10)에 상기 콘크리트침목(20)의 하면방향으로 약 45ㅀ로 천공하여 형성한다.At this time, the packer hole 61 is formed by drilling about 45 kW in the lower surface direction of the concrete sleeper 20 in the concrete bed 10 using a drill.

상기 패커설치단계(S30)는 상기 패커구멍형성단계(S20)에서 형성된 상기 패커구멍(60)에 패커(61)를 설치하는 단계이다.(도 4 참조)The packer installation step (S30) is a step of installing the packer 61 in the packer hole 60 formed in the packer hole forming step (S20) (see Fig. 4).

상기 에폭시주입단계(S40)는 상기 패커구멍(60)에 에폭시주입기기(62)를 사용하여 상기 균열부(40)에 상기 에폭시(70)를 상기 V컷팅부(50)까지 고이도록 주입하는 단계이다.(도 5 참조)The epoxy injection step (S40) is a step of injecting the epoxy 70 to the V-cutting portion 50 to the crack portion 40 using the epoxy injection device 62 in the packer hole 60 (See Fig. 5).

이때, 상기 에폭시(70)가 고이도록 주입할 경우, 상기 V컷팅부(50)를 통해서 상기 균열부(40)에 상기 에폭시(70)가 채워지는 상황을 알 수 있다.
At this time, when the epoxy 70 is injected, it can be seen that the epoxy 70 is filled in the cracks 40 through the V-cutting portion 50.

또한, 상기 에폭시주입단계(S40) 다음단계로 받침대 설치단계(S50)와 받침대 제거단계(S80)를 더 포함할 수 있다.In addition, the epoxy injection step (S40) may further include a pedestal installation step (S50) and the pedestal removing step (S80) to the next step.

상기 받침대 설치단계(S50)는 상기 콘크리트침목(20)의 유동을 억제하기위한 철도레일(30)의 하부에 받침대(90)를 설치하고, 상기 받침대 제거단계(S80)는 상기 에폭시(70)가 양생된 후에 상기 받침대(90)를 제거한다.(도 6 참조)The pedestal installation step (S50) is installed pedestal 90 to the lower portion of the railroad rail 30 for suppressing the flow of the concrete sleeper 20, the pedestal removing step (S80) is the epoxy 70 After curing, the pedestal 90 is removed (see FIG. 6).

상기 받침대(90)를 설치함으로써, 열차가 운행하여도 강한 진동이 상기 균열부(40)에 전달되는 것을 방지할 수 있다.
By installing the pedestal 90, it is possible to prevent strong vibrations from being transmitted to the cracks 40 even when the train is running.

또한, 상기 받침대 설치단계(S50)와 상기 받침대 제거단계(S80) 사이에 미확인균열부 주입단계(S60)와 에폭시보충단계(S70)를 더 포함할 수 있다.In addition, between the pedestal installation step (S50) and the pedestal removal step (S80) may further comprise an unidentified crack injection step (S60) and epoxy supplement step (S70).

상기 미확인균열부 주입단계(S60)는 상기 에폭시주입단계(S40)에서 상기 균열부(40)에 상기 에폭시(70)가 주입된 후 일정 시간이 경과 할 경우, 상기 에폭시(70)가 콘크리트로 흡수되거나 외관상으로 확인되지 않은 미확인균열부(11)에 스며들어 상기 V컷팅부(50)에 고여 있는 상기 에폭시(70)가 상기 미확인균열부(11)로 침투되어 공극을 매우는 단계이다.(도 7 참조)The unidentified crack part injection step (S60) is the epoxy 70 is absorbed into concrete when a certain time elapses after the epoxy 70 is injected into the crack part 40 in the epoxy injection step (S40). It is a step of infiltrating into the unidentified cracking portion 11, which is not visible or apparently infiltrated, and the epoxy 70 accumulated in the V-cutting portion 50 penetrates into the unidentified cracking portion 11 to fill the voids. 7)

상기 미확인균열부 주입단계(S60) 전단계에서 상기 받침대(90)를 설치함으로써, 중량이 큰 열차가 운행할 때 미세진동이 상기 콘크리트도상(10)과 상기 콘크리트침목(20)에 전달되어 미확인부균열부(11)에 상기 에폭시(70)가 잘 스며들어 완벽하게 충진된다.By installing the pedestal 90 in the step of injecting the unidentified crack part S60, fine vibrations are transmitted to the concrete bed 10 and the concrete sleeper 20 when a heavy train runs, thereby unidentified part cracks. The epoxy 70 penetrates into the portion 11 and is completely filled.

상기 에폭시 보충단계(S70)는 상기 미확인균열부 주입단계(S60)에서 상기 에폭시(70)가 콘크리트로 흡수되어나 상기 미확인균열부(11)에 스며들어 소진된 에폭시(70)를 상기 V컷팅부(50)에 에폭시재보충기구(80)를 이용하여 에폭시(70)를 추가로 보충하는 단계이다.(도 8 참조)The epoxy replenishing step (S70) is the epoxy cutting 70 is absorbed into the concrete in the unidentified crack portion injection step (S60) or seeped into the unidentified crack portion 11 exhausted epoxy 70 is the V-cutting portion 50 is an additional step of supplementing the epoxy 70 using the epoxy replenishment mechanism 80 (see Fig. 8).

상기 에폭시 보충단계(S70)에서 상기 에폭시(70)를 보충하고 일정시간이 경과하여 상기 에폭시(70)가 양생된 후, 상기 받침대(90)를 제거한다.
After replenishing the epoxy 70 in the epoxy replenishing step (S70) and the epoxy 70 is cured after a predetermined time, the pedestal 90 is removed.

또한, 상기 콘크리트도상(10)의 표면이 불규칙적으로 기울어져 있는 경우 상기 V컷팅부(50)에 상기 에폭시(70)를 전체적으로 채울 수가 없기 때문에 상기 에폭시(70)를 고점도 에폭시로 사용하여 상기 V컷팅부(50)에 상기 에폭시(70)가 채워지도록 한다.
In addition, when the surface of the concrete phase 10 is inclined irregularly, the V-cutting part 50 cannot fully fill the epoxy 70, so that the V-cutting is performed using the epoxy 70 as a high viscosity epoxy. The epoxy 50 is filled in the portion 50.

따라서, 본 발명의 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법은 씰링재를 설치하지 않아 상기 균열부(40)를 보수하는 시간을 단축시키고, 상기 균열부(40)의 상부에 상기 V컷팅부(50)를 형성하여 상기 균열부(40)에 상기 에폭시(70)가 채워지는 것을 확인할 수 있으며, 상기 V컷팅부(50)를 통해 부족한 상기 에폭시(70)를 보충할 수 있어 상기 균열부(40)에 상기 에폭시(70)를 완전히 채울 수 있어 재균열부가 발생되는 것을 방지할 수 있다.
Therefore, the crack repair method for preventing the flow of concrete sleepers located on the railway concrete diagram of the present invention shortens the time for repairing the cracks 40 by not installing a sealing material, and the upper part of the cracks 40. It can be confirmed that the epoxy 70 is filled in the cracks 40 by forming the V-cutting part 50, and the epoxy 70 that is insufficient through the V-cutting part 50 can be replenished. The epoxy 70 may be completely filled in the crack 40, thereby preventing the recracking portion from occurring.

10 : 콘크리트도상 11 : 미확인균열부
20 : 콘크리트침목 30 : 철도
40 : 균열부 50 : V컷팅부
60 : 패커구멍 61 : 패커
62 : 에폭시주입기기 70 : 에폭시
80 : 에폭시재보충기구 90 : 받침대
S10~S80 : 본 발명의 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법의 단계
10: concrete diagram 11: unidentified crack part
20: concrete sleeper 30: railway
40: crack part 50: V cutting part
60: packer hole 61: packer
62: epoxy injection machine 70: epoxy
80: epoxy refill mechanism 90: pedestal
S10 ~ S80: step of crack repair method for preventing concrete sleeper flow located on railway concrete diagram of the present invention

Claims (4)

철도에 설치되는 콘크리트도상(10)과 콘크리트침목(20)사이에 발생되는 균열부(40)를 보수하는 균열보수방법에 있어서,
상기 균열부(40)와 인접한 상기 콘크리트도상(10)의 상부를 경사지게 절삭하여 V컷팅부(50)를 형성하는 V컷팅부 형성단계(S10);
상기 균열부(40)에 에폭시를 주입하기 위해 상기 콘크리트도상(10)에 상기 콘크리트침목(20)의 하면까지 경사지게 패커구멍(60)을 천공하는 패커구멍형성단계(S20);
상기 패커구멍(60)에 패커(61)를 설치하는 패커설치단계(S30);
상기 패커구멍(60)에 에폭시주입기기(62)를 사용하여 상기 균열부(40)에 에폭시(70)를 상기 V컷팅부(50)까지 고이도록 주입하는 에폭시주입단계(S40);
를 포함하는 것을 특징으로 하는 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법.
In the crack repair method for repairing the cracks 40 generated between the concrete bed 10 and the concrete sleeper 20 is installed on the railroad,
A V-cutting part forming step (S10) of forming an V-cutting part 50 by obliquely cutting the upper portion of the concrete figure 10 adjacent to the crack part 40;
Packer hole forming step (S20) for puncturing the packer hole 60 inclined to the lower surface of the concrete sleeper 20 in the concrete phase (10) to inject epoxy to the crack (40);
A packer installation step (S30) for installing the packer 61 in the packer hole 60;
An epoxy injection step (S40) of injecting the epoxy 70 into the crack portion 40 to the V-cutting portion 50 by using the epoxy injection device 62 in the packer hole 60;
Crack repair method for preventing the flow of concrete sleepers located on the concrete road railroad, characterized in that it comprises a.
제 1항에 있어서,
상기 에폭시주입단계(S40) 다음단계로 받침대 설치단계(S50)와 받침대 제거단계(S80)를 더 포함하되,
상기 받침대 설치단계(S50)는 상기 콘크리트침목(20)의 유동을 억제하기위한 철도레일(30)의 하부에 받침대(90)를 설치하고, 상기 받침대 제거단계(S80)는 상기 에폭시(70)가 양생된 후에 상기 받침대(90)를 제거하는 것을 특징으로 하는 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법.
The method of claim 1,
Next to the epoxy injection step (S40) further comprises a pedestal installation step (S50) and pedestal removal step (S80),
The pedestal installation step (S50) is installed pedestal 90 to the lower portion of the railroad rail 30 for suppressing the flow of the concrete sleeper 20, the pedestal removing step (S80) is the epoxy 70 Crack repair method for preventing the flow of concrete sleepers located on the railway concrete road, characterized in that after removing the pedestal (90).
제 2항에 있어서,
상기 받침대 설치단계(S50)와 상기 받침대 제거단계(S80) 사이에 미확인균열부 주입단계(S60)와 에폭시 보충단계(S70)를 더 포함하되,
상기 미확인균열부 주입단계(S60)는 상기 에폭시주입단계에서 주입된 에폭시(70)가 외관상으로 확인되지 않는 미확인균열부에 스며들어 상기 V컷팅부(50)에 고여 있는 에폭시(70)가 내려가 공극을 매우고, 상기 에폭시 보충단계(S70)는 상기 V컷팅부(50)에 에폭시재보충기구(80)를 이용하여 에폭시(70)를 추가로 보충하는 것을 특징으로 하는 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법.
The method of claim 2,
Between the pedestal installation step (S50) and the pedestal removal step (S80) further comprises an unidentified crack injection step (S60) and epoxy replenishment step (S70),
In the unidentified crack part injection step (S60), the epoxy 70 injected in the epoxy injection step penetrates into the unidentified crack part which is not apparent in appearance, and the epoxy 70 accumulated in the V-cutting part 50 goes down to the voids. To very high, the epoxy replenishing step (S70) is concrete that is located on the railway concrete diagram, characterized in that the supplementary epoxy (70) is further supplemented by using the epoxy refill mechanism 80 to the V-cutting portion (50). Crack repair method to prevent sleeper flow.
제 1항에 있어서,
상기 콘크리트도상(10)의 표면이 불규칙적으로 기울어져 있는 경우 상기 V컷팅부(50)에 상기 에폭시(70)를 전체적으로 채울 수가 없기 때문에 상기 에폭시(70)를 고점도 에폭시로 사용하는 것을 특징으로 하는 철도 콘크리트도상에 위치하는 콘크리트침목유동 방지를 위한 균열보수 방법.
The method of claim 1,
When the surface of the concrete phase 10 is inclined irregularly because the epoxy 70 is not able to fill the V-cutting portion 50 as a whole, the railway characterized in that the epoxy 70 is used as a high viscosity epoxy Crack repair method to prevent the flow of concrete sleepers located on the concrete floor.
KR1020110059637A 2011-06-20 2011-06-20 The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail KR20120140030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110059637A KR20120140030A (en) 2011-06-20 2011-06-20 The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110059637A KR20120140030A (en) 2011-06-20 2011-06-20 The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail

Publications (1)

Publication Number Publication Date
KR20120140030A true KR20120140030A (en) 2012-12-28

Family

ID=47906194

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110059637A KR20120140030A (en) 2011-06-20 2011-06-20 The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail

Country Status (1)

Country Link
KR (1) KR20120140030A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064153A (en) * 2015-07-21 2015-11-18 中南大学 Method for treating cracks at seam positions of CRTS II ballastless track plates
KR20170020000A (en) * 2015-08-13 2017-02-22 주식회사 천경기업 a concrete track bed repair method for railway
IT201800006889A1 (en) * 2018-07-03 2020-01-03 EQUIPMENT AND METHOD FOR THE RESTORATION OF THE BASE OF A RAILWAY LINE
CN112160201A (en) * 2020-06-19 2021-01-01 湖北木之君工程材料有限公司 Construction method for repairing fracture dislocation of ballastless track
CN112268800A (en) * 2020-10-19 2021-01-26 南京航空航天大学 Performance test method before and after repairing simulated crack of oblique angle plate
KR20220077188A (en) 2020-11-30 2022-06-09 한국철도기술연구원 concrete crack repairing apparatus for railway
KR102498128B1 (en) 2022-11-07 2023-02-10 주식회사 브리텍 Hump repair and reinforcement method of railway concrete sleepers

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064153A (en) * 2015-07-21 2015-11-18 中南大学 Method for treating cracks at seam positions of CRTS II ballastless track plates
KR20170020000A (en) * 2015-08-13 2017-02-22 주식회사 천경기업 a concrete track bed repair method for railway
IT201800006889A1 (en) * 2018-07-03 2020-01-03 EQUIPMENT AND METHOD FOR THE RESTORATION OF THE BASE OF A RAILWAY LINE
EP3591118A1 (en) * 2018-07-03 2020-01-08 IVECOS S.p.A. Apparatus and method for the rehabilitation of the base of a railway line
CN112160201A (en) * 2020-06-19 2021-01-01 湖北木之君工程材料有限公司 Construction method for repairing fracture dislocation of ballastless track
CN112268800A (en) * 2020-10-19 2021-01-26 南京航空航天大学 Performance test method before and after repairing simulated crack of oblique angle plate
CN112268800B (en) * 2020-10-19 2021-07-06 南京航空航天大学 Performance test method before and after repairing simulated crack of oblique angle plate
KR20220077188A (en) 2020-11-30 2022-06-09 한국철도기술연구원 concrete crack repairing apparatus for railway
KR102498128B1 (en) 2022-11-07 2023-02-10 주식회사 브리텍 Hump repair and reinforcement method of railway concrete sleepers

Similar Documents

Publication Publication Date Title
KR20120140030A (en) The method of repairing crack to prevent movement of concrete sleeper on concrete ballast for rail
KR101801318B1 (en) concrete ballast turnout construction method
US7810741B2 (en) Method of adjusting the height of a fixed rail carriageway
KR101011502B1 (en) Speedy Recovering Method for Concrete Track
CN105484110B (en) Method for treating slurry leakage of gap between base plate of CRTSI type plate ballastless track of high-speed railway and surface layer of roadbed
CN204185728U (en) Ballast bed of track regulation repair structure
KR102240816B1 (en) Sleeper renewal method for wooden sleeper installed on concrete bed
KR101260397B1 (en) Single Pile Concrete Track Structure and Its Settlement Recovering Device
CN102505582B (en) Method for repairing filling layer of high-speed railway slab ballastless track
KR100838227B1 (en) Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof
CN111827022A (en) Quick maintenance method for double-block ballastless track
KR101225656B1 (en) Concrete ballast turnout renewal construction method
KR100683589B1 (en) Amethod for solidification of railroad bridge and public works-connection part
CN104452499A (en) Method for rapidly repairing open joint of cement-emulsified asphalt mortar of longitudinally-connected-plate type ballastless track
KR100677899B1 (en) Method for repairing crack of construction structure
KR101759692B1 (en) Sleeper renewal method for concrete bed
KR20070074835A (en) Slaa jabking methoc
KR100709099B1 (en) Construction method of paving track for asphalt filling type and structure thereof
JP2012031699A (en) Track support force reinforcement method
CN105568933A (en) Construction method of concrete poured gate
KR100968218B1 (en) A method of construction for mending road
KR20150030689A (en) railway concrete roadbed anti-crack sleepers and it's construction method
RU2277616C2 (en) Railroad ground bed repair method
CN209779368U (en) Ballastless track sleeper separation and empty hoisting repair structure
KR100767736B1 (en) Method for mending a crack of concrete structures

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application