KR20120090334A - System for delivering seedlings beds automatically - Google Patents

System for delivering seedlings beds automatically Download PDF

Info

Publication number
KR20120090334A
KR20120090334A KR1020110010705A KR20110010705A KR20120090334A KR 20120090334 A KR20120090334 A KR 20120090334A KR 1020110010705 A KR1020110010705 A KR 1020110010705A KR 20110010705 A KR20110010705 A KR 20110010705A KR 20120090334 A KR20120090334 A KR 20120090334A
Authority
KR
South Korea
Prior art keywords
carry
seedling bed
germination
unit
import
Prior art date
Application number
KR1020110010705A
Other languages
Korean (ko)
Other versions
KR101264016B1 (en
Inventor
민영봉
Original Assignee
경상대학교산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 경상대학교산학협력단 filed Critical 경상대학교산학협력단
Priority to KR1020110010705A priority Critical patent/KR101264016B1/en
Publication of KR20120090334A publication Critical patent/KR20120090334A/en
Application granted granted Critical
Publication of KR101264016B1 publication Critical patent/KR101264016B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/029Receptacles for seedlings
    • A01G9/0299Handling or transporting of soil blocks or seedlings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/08Devices for filling-up flower-pots or pots for seedlings; Devices for setting plants or seeds in pots
    • A01G9/088Handling or transferring pots
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/14Greenhouses
    • A01G9/1423Greenhouse bench structures
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/14Greenhouses
    • A01G9/143Equipment for handling produce in greenhouses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/52Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G61/00Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

PURPOSE: An automatic transportation system for a seed raising bed is provided to reduce the manpower and the labor costs by automatically transporting the seed raising bed storing seedling boxes in a seed raising plant. CONSTITUTION: An automatic transportation system for a seed raising bed comprises the following: an insertion unit(100) transporting the seed raising bed inserted from the outside, and successively laminating the bed; a sprouting unit(200) sprouting crops inside the seed raising bed; a discharging unit(300) successively discharging the seed raising bed transported from the sprouting unit; an insertion loading frame for laminating the seed raising bed in multiple stages; an insertion transfer unit connected to the insertion loading frame; an insertion lifting unit moving the seed raising bed up and down on the insertion transfer unit; an insertion controller detecting the seed raising bed moving on the insertion transfer unit; and an insertion outlet unit discharging the seed raising bed in plural at the same time.

Description

육묘베드 자동운반 시스템{System for delivering seedlings beds automatically}System for delivering seedlings beds automatically}

본 발명은 육묘베드 자동운반 시스템에 관한 것으로서, 보다 상세하게는 공정 육묘공장 내에서 육묘상자를 적재한 육묘베드를 자동 운반하는 육묘베드 자동운반 시스템에 관한 것이다.The present invention relates to a seedling bed automatic transport system, and more particularly to a seedling bed automatic transport system for automatically transporting a seedling bed loaded with a seedling box in the process seedling plant.

일반적으로, 공정 육묘공장 내에서 각종 재배작물의 육묘를 대량으로 생산하기 위한 시설로서 비닐온실 또는 유리온실 등으로 구성되며 크기는 방대하다.In general, as a facility for producing a large amount of seedlings of various cultivated crops in the process seedling plant, it consists of a vinyl greenhouse or a glass greenhouse, and the size is enormous.

이와 같은 육묘공장은 내부가 대부분 육묘상자를 올려놓을 수 있는 베드가 정열 되어 있는 육묘실과, 파종실과, 발아실 등 여러 공정 등으로 구성되어 있다.Such a seedling plant is composed of various processes such as a seedling room, a seeding room, a germination room, and the like, in which most beds are arranged in which a seedling box can be placed.

그런데 이와 같은 육묘공장에서 특히, 육묘베드를 발아실 까지 적재, 반입 하며 발아된 육묘베드를 반출, 출하 등 운반 정렬하는 것을 모두 인력이 처리하고 있기 때문에 많은 인력이 필요하며 따라서 인건비가 증대되고, 작업이 신속히 이루어지지 못하여 균일한 육묘의 생산이 어려운 실정이다.However, in this kind of seedling factory, especially manpower is required to load and import seedling beds to germination room, and to carry out transporting and sorting of germinated seedling beds. It is difficult to produce uniform seedlings because it is not made quickly.

본 발명은, 공정 육묘공장 내에서 육묘상자를 적재한 육묘베드를 자동 운반하는 육묘베드 자동운반 시스템을 제공하는 것을 목적으로 한다.An object of the present invention is to provide a seedling bed automatic transportation system for automatically carrying a seedling bed in which a seedling box is loaded in a process seedling factory.

본 발명은, 공정 육묘공장의 육묘베드를 운반하는 자동운반 시스템에 있어서, 외부로부터 이송된 육묘베드를 내부로 전달하여 순차적으로 다단 적재하고, 동시에 이송시키는 반입부와, 상기 반입부에서 이송 받은 상기 육묘베드를 발아시키는 복수 개의 발아실들이 순차적으로 배열되고, 상기 육묘베드의 재배작물의 발아 소요 기간에 따라 상기 복수 개의 발아실들 중 설정된 개수의 발아실에서 발아되도록 하는 발아부 및 상기 발아부에서 배출된 상기 육묘베드를 동시에 전달받아 순차적으로 반출시키는 반출부를 포함하는 육묘베드 자동운반 시스템을 제공한다.The present invention, in the automatic transport system for transporting the seedling bed of the process seedling plant, the carrying part to transfer the seedling bed transported from the outside to sequentially multi-stage loading, at the same time transported, and the transfer received from the carry-in In the germination part and the germination part are arranged in a plurality of germination chambers for germinating the seedling bed in sequence, and germinating in a predetermined number of germination chambers of the plurality of germination chambers according to the germination requirements of the cultivation of the seedling bed Provides a seedling bed automatic transport system including an export unit for receiving the discharged seedling bed at the same time and sequentially carried out.

본 발명에 있어서, 상기 반입부는, 외부에서 전달받은 육묘베드를 다단으로 적재하기 위해 설치한 반입적재틀과, 상기 반입적재틀에 연결 설치되며, 중앙에는 외부에서 전달받은 상기 육묘베드를 상기 반입적재틀 내부로 이송시키는 반입이송부와, 상기 반입적재틀에 설치되며, 상단에는 상기 반입이송부에 의해 전달된 상기 육묘베드를 상기 반입이송부 상에서 상하로 승강시키는 반입승강부와, 상기 반입적재틀의 일 측에 결합되어 상기 반입이송부 상에서 승 하강된 상기 육묘베드를 감지하는 반입제어부 및 상기 반입적재틀 상에 적재된 다단의 상기 육묘베드를 동시에 배출시키는 반입배출부를 포함할 수 있다.In the present invention, the carry-in portion, the carry-on loading frame installed to load the seedling bed received from the outside in multiple stages, and is connected to the carrying-in loading frame, the seedling bed received from the outside in the center An carry-on and transfer unit for transferring the inside of the frame, and a carry-in / out unit for raising and lowering the seedling bed delivered by the carry-in unit to the upper and lower portions on the carry-in unit, at the top; Is coupled to one side of the carry-in control unit for sensing the seedling bed raised and lowered on the carry-in transfer portion and may include a carry-in discharge portion for simultaneously discharging the multi-stage seedling bed loaded on the loading frame.

또한 본 발명에 있어서, 상기 반입적재틀은, 내부 일 측 및 대향하는 타 측에 각각 결합되는 반입고정플레이트 및 상기 반입고정플레이트의 측면에서 슬라이딩 가능하게 결합되는 반입승강플레이트를 포함할 수 있다.In addition, in the present invention, the carry-in loading frame may include a carry-in fixed plate coupled to the inner one side and the other side opposite to each other and a carry-in lifting plate that is slidably coupled from the side of the carry-in fixing plate.

또한 본 발명에 있어서, 상기 반입고정플레이트는, 양측에 수직으로 각각 결합되는 반입가이드 샤프트와, 가운데에 수직으로 결합되는 반입스크류 샤프트를 포함하며, 상기 반입승강플레이트는, 양 측이 상기 반입가이드 샤프트에 슬라이딩 가능하게 결합되는 반입고정블록과, 가운데에 상기 반입스크류 샤프트에 나사 체결되도록 결합되는 반입블록너트와, 상기 반입승강플레이트 후면의 양측에서 상기 반입부의 내부를 향하여 각각 결합되며 높이 방향으로 이격되게 배열되는 반입연결바들 및 상기 반입연결바들의 양측을 가로질러 결합되며 높이 방향으로 이격되게 배열되는 반입이송바들을 포함할 수 있다.In addition, in the present invention, the carry-in fixing plate, the carry-in guide shaft is coupled to each side vertically, and the carry-in screw shaft coupled to the center vertically, the carry-in lifting plate, both sides of the carry-in guide shaft An import block block slidably coupled to the carry-in block nut coupled to the carry-in screw shaft in the middle, and coupled to both sides of the carry-in lifting plate rearward toward the inside of the carry-in part and spaced apart in the height direction; The carrying connection bars are arranged to be coupled across both sides of the carry-in connection bar and the carry-in transfer bars are arranged spaced apart in the height direction.

또한 본 발명에 있어서, 상기 반입이송부는, 반입구동부와, 상기 반입구동부에 연결되어 회전되는 반입이송체인 및 상기 반입이송체인에 결합되어 외부에서 전달받은 상기 육묘베드를 걸림 시켜 함께 이송되는 반입걸림브라켓을 포함할 수 있다.In addition, in the present invention, the carry-in portion, the carry-in and the carry-in portion is coupled to the carry-in and the carry-in conveying chain and the carry-in transfer chain is coupled to the carry-in conveying chain and the carry-on bed conveyed from the outside to be transported together It may include a bracket.

또한 본 발명에 있어서, 상기 반입승강부는, 반입동력제공부와, 상기 반입동력제공부에 연결되어 회전되는 반입회전축과, 상기 반입회전축의 양 측에 결합되며, 상기 반입고정플레이트들의 반입연결기어와 맞물려 상기 반입스크류 샤프트를 회전시키는 반입회전기어 및 상기 반입제공부와 연결되어 상기 반입회전축을 회전시키는 반입구동체인을 포함할 수 있다.In addition, in the present invention, the carry-in lifting portion, the carry-in power supply unit, the carry-in rotation shaft is connected to the carry-in force providing portion, coupled to both sides of the carry-in rotation shaft, the carry-in connection gear of the carry-in fixed plate It may include an carry-in gear and meshing to rotate the carry-in screw shaft and the carry-in chain is connected to the carry-in provision portion to rotate the carry-in shaft.

또한 본 발명에 있어서, 상기 반입제어부는, 상기 반입적재틀의 일 측에 결합되어 상기 반입이송부 상에서 승강되는 상기 육묘베드를 정지 또는 승강 가능상태를 판별하기 위한 반입적재센서 및 상기 반입적재틀의 타 측에 결합되어 상기 육묘베드의 배출 여부를 판별하기 위한 반입배출센서를 포함할 수 있다.In addition, in the present invention, the carry-in control unit, coupled to one side of the carry-on loading frame of the carry-on loading sensor and the carry-on loading frame for determining the state capable of stopping or lifting the seedling bed to be elevated on the carry-on transfer unit Is coupled to the other side may include a carry-in discharge sensor for determining whether the seedling bed discharged.

또한 본 발명에 있어서, 상기 반입배출부는, 상기 반입적재틀의 상부 하단에 결합되는 반입지지플레이트와, 상기 반입지지플레이트의 하부에 설치는 반입배출이송실린더 및 상기 반입배출이송실린더의 일 측에서 상기 육묘베드를 동시에 배출 가능하게 밀어주는 반입푸셔를 포함할 수 있다. In addition, in the present invention, the carry-in and discharge unit, the carry-on support plate coupled to the upper lower end of the carry-on loading frame, installed in the lower portion of the carry-in support plate, the carry-in discharge transfer cylinder and the carry-in discharge transfer cylinder at one side of the carry-in discharge cylinder It may include a loading pusher for pushing the seedling bed at the same time.

또한 본 발명에 있어서, 상기 발아부는, 상기 반입부에서 이송된 육묘베드를 적재하기위해 설치되는 발아적재틀 및 상기 발아적재틀 내부 일 측 및 타 측에 설치되는 발아고정플레이트를 포함할 수 있다.In addition, in the present invention, the germination part may include a germination loading frame installed to load the seedling bed transferred from the carry-in portion and a germination fixing plate installed on one side and the other side inside the germination loading frame.

또한 본 발명에 있어서, 상기 발아고정플레이트는, 양 측이 내부를 향하여 각각 결합되는 발아연결바들 및 상기 발아연결바들의 양 측을 가로질러결합되는 발아이송바들를 포함하고, 상기 발아연결바들과 상기 발아이송바들이 높이방향으로 이격되게 배치될 수 있다.In addition, in the present invention, the germination fixing plate, the germination connecting bars are coupled to both sides toward the inside and the germination link bars are coupled across both sides of the germination connecting bars, the germination connecting bars and the germination The transfer bars may be arranged to be spaced apart in the height direction.

또한 본 발명에 있어서, 상기 반출부는, 상기 발아부에서 배출되는 상기 육묘베드를 적재하기 위해 설치된 반출적재틀과, 상기 반출적재틀의 일 측에 설치되며 이송되는 상기 육묘베드를 동시에 걸림 시켜 상기 반출적재틀의 내부로 이동시키는 반출이송모듈과, 상기 반출적재틀에 설치되며, 상단에는 상기 육묘베드를 상하로 이동시키는 반출승강부와, 상기 반출적재틀의 일 측에 설치되며 상기 반출승강부 상에서 하강된 상기 육묘베드를 감지하는 반출제어부 및 상기 반출적재틀에 연결 설치되며, 중앙에는 하강된 상기 육묘베드를 상기 반출적재틀 외부로 순차적으로 배출시키는 반출배송부를 포함할 수 있다.In addition, in the present invention, the carrying out portion, the carrying out the loading tray to be installed to load the seedling bed discharged from the germination part, and the seedling bed is installed on one side of the carrying out the loading frame at the same time to catch the carrying out An export transport module for moving to the inside of the loading frame, and installed in the carrying out loading frame, an upper and lower lifting section for moving the seedling bed up and down, and installed on one side of the carrying out loading frame on the carrying out lifting unit It is connected to the carrying out control unit for detecting the lowered seedling seedling bed and the carrying out loading frame, the center may include a carrying out delivery unit for discharging the lowered seedling seedling bed sequentially out of the carrying out loading frame.

또한 본 발명에 있어서, 상기 반출이송모듈은, 상기 다단의 육묘베드들을 동시에 걸림 시키는 반출회전부 및 상기 걸림된 육묘베드를 상기 반출부 내부로 이송시키는 반출이송실린더를 포함할 수 있다.In addition, in the present invention, the carry-out and transfer module may include a carrying out rotating portion for locking the multi-stage seedling bed at the same time and a carrying-out transport cylinder for transferring the caught seedling bed into the carrying out portion.

본 발명에 따른 육묘베드 자동운반 시스템은, 다음과 같은 효과를 가진다.The seedling bed automatic transportation system according to the present invention has the following effects.

첫째, 인력에 의해 운반하던 육묘베드를 자동 공정으로 운반이 이루어지므로 인건비가 감소되는 경제적인 효과를 가진다.First, since the seedling bed transported by manpower is carried out in an automatic process, labor costs are reduced.

둘째, 한 번에 하나씩 이루어지던 공정을 다단 적재하여 동시에 이송하므로 작업속도가 빨라지고 생산성이 증대된다.Secondly, because the process was carried out in one step at a time by multi-stage loading, the work speed is increased and productivity is increased.

셋째, 복수개의 발아실부는 직렬로 배치되고, 발아 시간에 따라 자동공정에 이 순차적으로 이루어지므로, 균일한 육묘생산이 가능한 효과를 가진다.Third, since the plurality of germination chambers are arranged in series and are sequentially made in an automatic process according to germination time, it is possible to produce uniform seedlings.

도 1은 본 발명의 일실시예에 따른 육묘베드 자동운반 시스템의 정면도이다.
도 2는 도 1의 평면도이다.
도 3은 도 1에 도시된 반입부의 사시도이다.
도 4는 도 1에 도시된 반입부의 정면도이다.
도 5는 도 1에 도시된 반입부의 평면도이다.
도 6은 도 1에 도시된 반입부의 측면도이다.
도 7은 도 3에 도시된 반입부에 육묘베드를 제외한 사시도이다.
도 8은 도 1에 도시된 승강플레이트의 확대사시도이다.
도 9는 도 1에 도시된 발아부의 사시도이다.
도 10은 도 1에 도시된 반출부의 사시도이다.
도 11은 도 1에 도시된 반출부의 정면도이다.
도 12는 도 1에 도시된 반출부의 측면도이다.
도 13은 도 1에 도시된 반출부의 평면도이다.
도 14는 도 10에 도시된 반출부에 육묘베드를 제외한 사시도이다.
1 is a front view of a seedling bed automatic transport system according to an embodiment of the present invention.
2 is a plan view of Fig.
FIG. 3 is a perspective view of the import unit illustrated in FIG. 1. FIG.
4 is a front view of the carrying-in part shown in FIG. 1.
FIG. 5 is a plan view of the import unit illustrated in FIG. 1. FIG.
FIG. 6 is a side view of the fetch unit shown in FIG. 1. FIG.
FIG. 7 is a perspective view excluding a seedling bed in the carrying-in unit illustrated in FIG. 3.
8 is an enlarged perspective view of the lifting plate shown in FIG. 1.
9 is a perspective view of the germination part shown in FIG. 1.
10 is a perspective view of the carrying out portion shown in FIG. 1.
11 is a front view of the carrying out portion shown in FIG. 1;
12 is a side view of the carrying out portion shown in FIG. 1;
FIG. 13 is a plan view of the carrying out unit illustrated in FIG. 1; FIG.
FIG. 14 is a perspective view of the export unit excluding the seedling bed shown in FIG. 10.

이하, 첨부된 도면을 참조로 본 발명의 바람직한 실시예들을 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 14를 참조하면, 상기 자동운반 시스템은 반입부(100)와 발아부(200) 및 반출부(300)를 포함한다.1 to 14, the automatic transport system includes an import unit 100, a germination unit 200, and an export unit 300.

상기 반입부(100)는, 반입적재틀(110)과 반입이송부(120)와 반입승강부(130)와 반입제어부(140) 및 반입배출부(150)를 포함한다.The import unit 100 includes an import loading frame 110, an import transport unit 120, an import lift unit 130, an import control unit 140, and an import discharge unit 150.

이러한 상기 반입부(100)는, 외부(도면 미도시)에서 이송된 상기 육묘베드(10)를 순차적으로 다단 적재하고, 상기 다단 적재된 육묘베드(10)들을 동시에 발아부(200)로 이송시키는 역할을 수행한다.The carry-in unit 100, the stacking the seedling bed 10 transported from the outside (not shown) in sequence and multi-stage, and transfers the multi-stacked seedling bed 10 to the germination part 200 at the same time. Play a role.

상기 반입적재틀(110)은, 반입고정플레이트(111)및 반입승강플레이트(115)를 포함한다. 여기서 상기 반입적재틀(110)은, 복수의 가로 및 세로 부재들이 결합되어 직육면체 형상을 가지며 상기 육묘베드(10)를 내부로 적재하는 공간을 형성한다.The carry-in loading frame 110 includes a carry-in fixing plate 111 and a carry-in elevating plate 115. Here, the loading frame 110, a plurality of horizontal and vertical members are combined to have a rectangular parallelepiped shape to form a space for loading the seedling bed 10 inside.

상기 반입고정플레이트(111)는, 상기 반입적재틀(110)의 내부 일 측 및 대향하는 타 측에 각각 결합된다. 여기서 상기 반입고정플레이트(111)는 반입가이드 샤프트(112)와 반입스크류 샤프트(113)를 포함한다. The loading fixed plate 111 is coupled to the inner one side and the other side of the loading loading frame 110, respectively. Here, the carry-in fixing plate 111 includes a carrying guide shaft 112 and a carrying screw shaft 113.

상기 반입가이드 샤프트(112)는, 상기 반입고정플레이트(111)의 양 측에서 수직으로 각각 고정된다. 또한 상기 반입스크류 샤프트(112)는 상기 반입고정플레이트(111)의 가운데에서 수직으로 결합된다. 여기서 상기 반입스크류 샤프트(113)는, 상기 반입고정플레이트(111)의 상단 및 하단에 설치된 반입베어링(114)에 의해 상대회전 가능하게 고정된다. 또한 상기 반입스크류 샤프트(113)는, 외주면은 나사산으로 형성되고, 상단에 반입연결기어(113a)가 결합된다. 여기서 상기 반입연결기어(113a)는, 후술할 반입회전기어(134)와 맞물려 회전된다. 이러한 상기 반입스크류 샤프트(113)는, 상기 반입연결기어(113a)와 동일하게 회전 된다. The carry-in guide shaft 112 is fixed at both sides of the carry-in fixing plate 111 vertically, respectively. In addition, the carry screw shaft 112 is vertically coupled in the center of the carry-in fixing plate 111. Here, the carry-in screw shaft 113 is fixed to the relative rotation by the carry-in bearing 114 is installed on the top and bottom of the carry-in fixing plate 111. In addition, the carry-in screw shaft 113, the outer peripheral surface is formed of a screw thread, the carry-in connection gear 113a is coupled to the upper end. Here, the carry-in connection gear 113a is rotated in engagement with the carry-in rotary gear 134 which will be described later. The carry screw shaft 113 is rotated in the same manner as the carry connection gear 113a.

상기 반입승강플레이트(115)는, 반입승강블록(116)들과 반입블록너트(117)와 반입연결바(118)들 및 반입이송바(119)들을 포함한다. 이러한 상기 반입승강플레이트(115)는, 상기 반입고정플레이트(111)의 측면에서 슬라이딩 가능하게 결합된다.The carry-in elevating plate 115, the carry-in lifting block 116, the carry-in block nut 117, the carry-in connection bar 118 and the carry-in transfer bar 119. The carry-in elevating plate 115 is slidably coupled to the side of the carry-in fixing plate 111.

상기 반입승강블록(116)들은, 반입승강플레이트(115)의 상단 양 측 및 하단 양 측에 각각 고정된다. 이러한 상기 반입승강블록(116)들은 상기 반입가이드 샤프트(112)들에 각각 슬라이딩 가능하게 결합된다.The carry-in elevating block 116 is fixed to the upper both sides and the lower both sides of the carry-in elevating plate 115, respectively. The carry-in and lift blocks 116 are slidably coupled to the carry-in guide shafts 112, respectively.

상기 반입블록너트(117)는, 상기 반입스크류 샤프트(113)에 나사 체결되도록 상기 반입승강플레이트(115)의 가운데 상단에 고정된다. 이러한 상기 반입블록너트(117)는, 상기 반입스크류 샤프트(113)의 회전에 따라 상기 반입승강플레이트(115)를 승 하강 시키는 수단이 된다.The carry-in block nut 117 is fixed to the top of the center of the carry-in elevating plate 115 to be screwed to the carry-in screw shaft 113. The carry-in block nut 117 is a means for raising and lowering the carry-in lifting plate 115 in accordance with the rotation of the carry-in screw shaft 113.

상기 반입연결바(118)들은, 제1반입연결바(118a)와 제2반입연결바(118b)와 제3반입연결바(118c) 및 제4반입연결바(118d)를 포함한다. The carry-in connection bars 118 include a first carry-in connection bar 118a, a second carry-in connection bar 118b, a third carry-in connection bar 118c and a fourth carry-in connection bar 118d.

이러한 상기 반입연결바(118)들은, 상기 반입승강플레이트(115) 후면의 양 측에서 높이 방향으로 이격되게 배열되며, 상기 반입부(100)의 내부를 향하도록 각각 결합된다. The carry-in connection bars 118 are arranged to be spaced apart in the height direction from both sides of the back of the carry-in lifting plate 115, respectively coupled to face the interior of the carry-in portion (100).

상기 반입이송바(119)들은, 제1반입이송바(119a)와 제2반입이송바(119b)와 제3반입이송바(119c) 및 제4반입이송바(119d)를 포함한다. 이러한 상기 반입이송바(119)들은, 상기 반입연결바(118)들을 가로질러 상기 반입연결바들(118) 상에 각각 결합되며, 후술할 상기 육묘베드(10)가 적재되도록 상방 지지하며, 이송시에는 가이드 수단이 된다.The carry-in transfer bar 119 includes a first carry-in bar 119a, a second carry-in bar 119b, a third carry-in bar 119c and a fourth carry-in bar 119d. These carry-in transfer bars 119 are respectively coupled to the carry-in connection bars 118 across the carry-in connection bars 118 and upwardly supported so that the seedling bed 10 to be described later is loaded and transported. There is a guide means.

상기 반입이송부(120)는, 반입구동부(121)와 반입이송체인(122) 및 반입걸림브라켓(123)을 포함한다. 여기서 상기 반입이송부(120)는, 상기 반입적재틀(110)에 중앙에 연결 설치되며 외부에서 전달된 상기 육묘베드(10)를 상기 반입이송바(119)들 상으로 이송시키는 역할을 수행한다. The carry-in and transfer unit 120 includes a carry-in unit 121, a carry-in transport chain 122 and the carry-in bracket (123). Here, the carry-in transfer part 120 is installed at the center of the carry-in loading frame 110 and serves to transfer the seedling bed 10 transmitted from the outside onto the carry-in transfer bars 119. .

상기 반입구동부(121)는, 상기 반입이송부(120)의 일 측에 결합되며, 상기 반입이송체인(122)을 연결한다. 한편 상기 반입구동부(121)는, 상기 반입이송체인(122)을 일정하게 제어할 수 있는 정속 구동모터(121)일 수 있다. 이러한 상기 정속 구동모터(121)는, 동력에 의해 상기 반입이송체인(122)을 회전시킨다. The carry-in driving part 121 is coupled to one side of the carry-in transfer part 120, and connects the carry-in transport chain 122. Meanwhile, the carry-in driver 121 may be a constant speed drive motor 121 capable of constantly controlling the carry-in transfer chain 122. The constant speed drive motor 121 rotates the carry-in transport chain 122 by power.

상기 반입걸림브라켓(123)은, 상기 반입이송체인(122)의 일 측에 결합되어 상기 반입이송체인(122)을 따라 회전하며, 외부에서 전달된 상기 육묘베드(10)를 걸림 시켜 상기 반입적재틀(110) 내부로 이송시킨다.The carry-in bracket 123 is coupled to one side of the carry-in transfer chain 122, rotates along the carry-in transfer chain 122, and hooks the seedling bed 10 transmitted from the outside to the carry-in loading Transfer to the inside of the mold (110).

상기 반입승강부(130)는, 반입동력제공부(131)와 반입회전축(132)과 반입구동체인(133) 및 반회전기어(134)를 포함한다. 상기 반입동력제공부(131)는 상기 반입적재틀(110) 상단에 일 측에 고정되며, 상기 반입구동체인(133)과 연결된다. 여기서 상기 반입동력제공부(131)는, 동력에 의해 상기 반입회전축(132)을 회전시키며, 상기 반입회전축(132)의 양 측에 연결된 반입회전기어(134)는, 상기 반입회전축(132)과 동일하게 회전된다. 이때 상기 반입회전기어(134)는, 상기 반입연결기어(112a)와 맞물려 상기 반입스크류 샤프트(113)를 회전시킨다. The carry-in elevating unit 130, the carry-in force providing unit 131, the carry-in rotary shaft 132, the carry-in chain 133 and the half-rotating gear 134. The carry-in force providing unit 131 is fixed to one side on the top of the carry-in loading frame 110, it is connected to the carry-in chain 133. Here, the carry-in force providing unit 131 rotates the carry-in rotary shaft 132 by the power, and the carry-in rotary gear 134 connected to both sides of the carry-in rotary shaft 132, and the carry-in rotary shaft 132 Rotate equally. In this case, the carry-in rotary gear 134 is engaged with the carry-in connection gear 112a to rotate the carry-in screw shaft 113.

한편, 상기 반입회전축(132)의 양 측에는, 반입베어링(114)이 고정 된다. 여기서 상기 반입베어링(114)은 상기 반입적재틀(110)의 상단 내측 부재에 고정되며, 상기 반입회전축(132)을 상대회전 가능하게 고정시키는 수단이 된다.On the other hand, on both sides of the carry-in rotary shaft 132, the carry-in bearing 114 is fixed. Here, the carry-in bearing 114 is fixed to the upper inner member of the carry-in loading frame 110, it is a means for fixing the carry-in rotary shaft 132 to be relatively rotatable.

상기 반입제어부(140)는, 반입적재센서(141)와 반입배출센서(142)를 포함한다. 상기 반입적재센서(141)는, 제1반입적재센서(141a)와 제2반입적재센서(141b)와 제3반입적재센서(141c) 및 제4반입적재센서(141d)를 포함한다. 여기서 상기 반입적재센서(141)는, 상기 반입적재틀(110)의 전단 일 측에 설치되며, 높이 방향으로 이격되게 배치된다. 이러한 반입적재센서(141)는, 상기 반입이송바(120)들 상에 상기 육묘베드(10)가 적재 되었는지 감지하여 승강 및 정지 가능상태를 판별하는 역할을 수행한다. The carry-in control unit 140 includes a carry-in load sensor 141 and a carry-in discharge sensor 142. The carry-in load sensor 141 includes a first carry-in load sensor 141a, a second carry-in load sensor 141b, a third carry-in load sensor 141c, and a fourth carry-in load sensor 141d. Here, the loading sensor 141 is installed on one side of the front end of the loading container 110, and is spaced apart in the height direction. The carry-in loading sensor 141 detects whether the seedling bed 10 is loaded on the carry-in transfer bars 120 and determines a lifting and stopping state.

상기 반입배출센서(142)는 상기 반입적재틀(110)의 후단 일 측에 설치되어, 다단 적재된 상기 육묘베드(10)들의 적재 완료 상태를 전달받아 배출 가능상태를 판별한다.The carry-in discharge sensor 142 is installed on one side of the rear end of the carry-in loading frame 110, and receives the loading completion state of the seedling bed 10 loaded in multiple stages to determine the discharge possible state.

상기 반입배출부(150)는, 반입지지플레이트(151)과 반입배출이송실린더(152) 및 반입푸셔(153)를 포함한다. 이러한 상기 반입배출부(150)는 상기 승강플레이트(115)에 적재된 다단의 육묘베드(10)들을 동시에 배출시키는 역할을 수행한다. The carry-out discharge unit 150 includes a carry-in support plate 151, a carry-in and discharge cylinder 152, and a carry-in pusher 153. The carry-in discharge unit 150 serves to discharge the multi-stage seedling bed 10 loaded on the elevating plate 115 at the same time.

상기 반입지지플레이트(151)는, 일 측면이 상기 반입적재틀(110)의 상부 하단에 결합되며, 후 측면에 상기 반입배출 이송실린더(152)를 결합한다. The carry-in support plate 151, one side is coupled to the upper lower end of the carry-in loading frame 110, and combines the carry-in discharge transfer cylinder 152 to the rear side.

상기 반입배출이송실린더(152)는, 일 측에 상기 반입푸셔(153)가 결합된다.The carry-in discharge transfer cylinder 152, the carry-in pusher 153 is coupled to one side.

상기 반입푸셔(153)는 상기 다단의 육묘베드(10)를 동시에 밀 수 있도록 수직 플레이트로 형성된다.The loading pusher 153 is formed of a vertical plate to simultaneously push the multi-stage seedling bed 10.

따라서 상기 반입부(100)는, 종래에 트레이 운반대차 등에 육묘베드를 인력에 의해 적재하여 상기 발아실(200)로 이동시키는 것을 대신하여, 자동으로 이동하는 시스템을 구성하므로, 인력이 감소되고 인건비가 감소하여 경제적인 효과를 가진다.Therefore, the carry-in part 100 is configured to automatically move the system instead of loading the seedling bed by the manpower in the tray transport cart and the like to move to the germination chamber 200, the manpower is reduced and labor costs Decreases and has an economic effect.

상기 발아부(200)는, 발아적재틀(210)을 포함한다. 이러한 상기 발아부(200)는, 상기 반입부(100)에서 이송된 다단의 육묘베드(10)들을 동시에 적재하며, 장시간 발아시키는 역할을 수행한다.The germination part 200 includes a germination loading frame 210. The germination part 200, simultaneously loading the multi-stage seedling bed 10 transferred from the carry-in portion 100, and serves to germinate for a long time.

상기 발아적재틀(210)은, 발아고정플레이트(211)를 포함한다. 상기 발아고정플레이트(211)는 상기 발아적재틀(210)의 내부 일 측 및 대향하는 타 측에 각각 결합된다. 여기서 상기 발아고정플레이트(211)는 발아연결바(212)들과 발아이송바(213)들을 포함한다. The germination loading frame 210 includes a germination fixing plate 211. The germination fixing plate 211 is coupled to the inner side and the other side of the germination loading frame 210, respectively. Here, the germination fixing plate 211 includes germination connection bars 212 and germination song bars 213.

상기 발아연결바(212)들은, 제1발아연결바(212a)와 제2발아연결바(212b)와 제3발아연결바(212c) 및 제4발아연결바(212d)를 포함한다. 이러한 상기 발아연결바(212)들은, 상기 발아고정플레이트(211)의 양 측에서 내부를 향하여 각각 결합되며, 높이방향으로 이격되게 배치된다. The germination link bars 212 include a first germination link bar 212a, a second germination link bar 212b, a third germination link bar 212c and a fourth germination link bar 212d. These germination connection bars 212 are respectively coupled inward from both sides of the germination fixing plate 211, and are spaced apart in the height direction.

상기 발아이송바(213)들은, 제1발아이송바(213a)와 제2발아이송바(213b)와 제3발아이송바(213c) 및 제4발아이송바(213d)를 포함한다. 여기서 상기 발아이송바(213)들은 상기 발아연결바(212)들을 가로질러 상기 발아연결바(212)들 상에 각각 결합 된다. 이러한 상기 제1,2,3,4발아이송바(113)들은, 상기 반입부(100)의 제1,2,3,4반입이송바들에 각각 대응하여 상기 반입부(100)에서 공급받은 다단의 육묘베드(10)들이 동시에 적재되도록 상방 지지하며, 이송시에는 가이드 수단이 된다.The foot child song bars 213 include a first foot child song bar 213a, a second foot child song bar 213b, a third foot child song bar 213c, and a fourth foot child song bar 213d. The germination song bars 213 are respectively coupled to the germination connection bars 212 across the germination connection bars 212. The first, second, third, and fourth foot transport bars 113 are provided in the multi-stage unit 100 corresponding to the first, second, third, and fourth transport bars of the carrying unit 100, respectively. Seedling bed 10 of the support upwards to be loaded at the same time, it is a guide means during transport.

따라서 복수개의 발아실부(200)는, 직렬로 배치되고 발아일수가 다른 작물에도 적용 가능하며, 발아 시간에 따라 자동공정에 이 순차적으로 이루어지므로, 균일한 육묘생산이 가능한 효과를 가진다. Therefore, the plurality of germination chambers 200, which are arranged in series and can be applied to crops having different germination days, and are sequentially made in an automatic process according to germination time, have a uniform seedling production effect.

상기 반출부(300)는, 반출적재틀(310)과 반출이송모듈(320)과 반출승강부(330)와 반출제어부(340) 및 반출배송부(150)를 포함한다.The carrying out unit 300 includes an carrying out stacking frame 310, an carrying out transport module 320, an carrying out lifting unit 330, an carrying out control unit 340, and an carrying out delivery unit 150.

이러한 상기 반출부(300)는 상기 발아부(200)에서 이송된 다단의 육묘베드(10)를 순차적으로 배출시키는 역할을 수행한다. The carrying out part 300 serves to sequentially discharge the multi-stage seedling bed 10 transferred from the germination part 200.

상기 반출적재틀(310)은, 반출고정플레이트(311)와 반출승강플레이트(315)를 포함한다. 여기서 상기 반출적재틀(310)은, 복수의 가로 및 세로 부재들이 결합되어 직육면체 형상을 가지며 상기 육묘베드(10)를 내부로 적재하는 공간을 형성한다.The carrying out loading frame 310 includes a carrying out fixing plate 311 and a carrying out lifting plate 315. Here, the transport stacking frame 310, a plurality of horizontal and vertical members are combined to have a rectangular parallelepiped shape to form a space for loading the seedling bed 10 inside.

상기 반출고정플레이트(311)는, 상기 반출적재틀(310)의 내부 일 측 및 대향하는 타 측에 각각 결합된다. 여기서 상기 반출고정플레이트(311)는 반출가이드 샤프트(312)와 반출스크류 샤프트(313)를 포함한다. The unloading fixing plate 311 is coupled to the inner side and the other side of the unloading stack 310, respectively. The carrying out fixing plate 311 includes a carrying guide shaft 312 and a carrying screw shaft 313.

상기 반출가이드 샤프트(312)는, 상기 반출고정플레이트(311)의 양 측에서 수직으로 각각 고정된다. 여기서 상기 반출스크류 샤프트(313)는, 상기 반출고정플레이트(311)의 상단 및 하단에 설치된 반출베어링(314)에 의해 상대회전 가능하게 고정된다. 또한 상기 반출스크류 샤프트(313)는, 외주면은 나사산으로 형성되고, 상단에 반출연결기어(313a)가 결합된다. 여기서 상기 반출연결기어(313a)는, 후술할 반출회전기어(334)와 맞물려 회전된다. 이러한 상기 반출연결기어(313a)는 하단의 상기 반출스크류 샤프트(313)와 동일하게 회전 된다. The carrying out guide shafts 312 are respectively fixed vertically at both sides of the carrying out fixing plate 311. Here, the unloading screw shaft 313 is fixed by the unloading bearing 314 provided on the upper and lower ends of the unloading fixing plate 311 so as to be relatively rotatable. In addition, the carrying out screw shaft 313, the outer peripheral surface is formed of a screw thread, the carrying out connection gear 313a is coupled to the upper end. Here, the export connection gear 313a is rotated in engagement with the export rotation gear 334, which will be described later. The carrying out connection gear 313a is rotated in the same manner as the carrying out screw shaft 313 at the lower end thereof.

상기 반출승강플레이트(315)는, 반출승강블록(316)들과 반출블록너트(317)들과 반출연결바(318)들 및 반출이송바(319)들을 포함한다. 이러한 상기 반출승강플레이트(315)는 상기 반출고정플레이트(311)의 측면에 슬라이딩 가능하게 결합된다.The unloading elevating plate 315 may include unloading elevating blocks 316, unloading block nuts 317, unloading connecting bars 318, and unloading transport bars 319. The unloading elevating plate 315 is slidably coupled to the side of the unloading fixed plate 311.

상기 반출승강블록(316)은, 상기 반출가이드 샤프트(312)에 각각 슬라이딩 가능하게 결합된다. 여기서 상기 반출승강블록(316)은, 상기 반출승강플레이트(315)의 상단 양 측 및 하단 양 측에 각각 고정된다.The unloading elevating block 316 is slidably coupled to the unloading guide shaft 312, respectively. Here, the lifting lift block 316 is fixed to both upper and lower sides of the lifting plate 315, respectively.

상기 반출블록너트(317)는, 상기 반출스크류 샤프트(312)에 나사 체결되도록 상기 반출승강플레이트(315)의 가운데 상단에 고정된다. 이러한 상기 반출블록너트(317)는, 상기 반출승강플레이트(315)를 상기 반입스크류 샤프트(113)의 회전에 따라 승 하강 시키는 수단이 된다.The unloading block nut 317 is fixed to the upper center of the unloading elevating plate 315 to be screwed to the unloading screw shaft 312. The carry-out block nut 317 is a means for raising and lowering the carry-on lifting plate 315 in accordance with the rotation of the carrying screw shaft 113.

상기 반출연결바(318)는, 제1반출연결바(318a)와 제2반출연결바(318b)와 제3반출연결바(318c) 및 제4반출연결바(318d)를 포함한다. The export connection bar 318 includes a first export connection bar 318a, a second export connection bar 318b, a third export connection bar 318c, and a fourth export connection bar 318d.

이러한 상기 반출연결바(318)들은, 상기 반출승강플레이트(315) 후면의 양 측에서부터 높이 방향으로 이격되게 배열되며, 상기 반출부(300)의 내부를 향하도록 각각 결합된다. The carrying out connection bars 318 are arranged to be spaced apart in the height direction from both sides of the back of the carrying out elevating plate 315, and are coupled to face the inside of the carrying out part 300, respectively.

상기 반출이송바(319)는, 제1반출이송바(319a)와 제2반출이송바(319b)와 제3반출이송바(319c) 및 제4반출이송바(319d)를 포함한다. 이러한 상기 반출이송바(319)들은, 상기 반출연결바(318)들을 가로질러 각각 결합되며, 공급받은 다단의 육묘베드(10)들이 적재되도록 상방 지지하며, 이송시에는 가이드 수단이 된다.The export transport bar 319 includes a first export transport bar 319a, a second export transport bar 319b, a third export transport bar 319c, and a fourth export transport bar 319d. The carry-out transport bars 319 are respectively coupled across the carry-out connection bars 318 and upwardly supported so that the supplied seedling beds 10 are stacked, and serve as guide means during transport.

상기 반출이송모듈(320)은 반출이송플레이트(321)와 반출이송실린더(322) 및 반출회전부(323)를 포함한다. 이러한 상기 반출이송모듈(320)은, 상기 발아부(200)에서 이송된 다단의 육묘베드(10)들을 동시에 걸림 시켜 상기 반출부(300) 내부로 이송시키는 역할을 수행한다. The carrying out transport module 320 includes an carrying out plate 321, an carrying out cylinder 322, and an carrying out rotating unit 323. The carry-out and transport module 320 serves to simultaneously transport the multi-stage seedling beds 10 transferred from the germination part 200 to the inside of the carry-out part 300.

상기 반출이송플레이트(313)는, 상기 반출부(300)의 후단 일 측에서"ㄷ" 형상으로 상기 반출적재틀(310)에 결합되며, 가운데는 상기 반출이송실린더(312)가 고정된다.The carrying out plate 313 is coupled to the carrying out stacking frame 310 in a "c" shape at the rear end of the carrying out part 300, and the carrying out cylinder 312 is fixed at the center.

상기 반출이송실린더(312)는, 상기 반출이송플레이트(313)의 가운데에 결합되며 일 측에는 상기 반출회전부(313)가 결합된다. 이러한 상기 반출이송실린더(312)는, 상기 반출회전부(313)를 상기 반출부(300)의 전단 및 후단으로 이동시키는 역할을 수행한다. 여기서 상기 반출회전부(313)는 걸림 수단(313a)들을 포함한다. The carry-out transport cylinder 312 is coupled to the center of the carry-out transport plate 313 and the carry-out rotation part 313 is coupled to one side. The carry-out transfer cylinder 312 serves to move the carry-out rotation part 313 to the front end and the rear end of the carry-out part 300. Here, the carrying out rotation part 313 includes locking means 313a.

상기 걸림 수단(313a)들은, 상기 다단의 육묘베드(10)들의 전단 하부에 고정된 걸림핀(11a)에 각각 대응되도록 상기 반출회전부(313)의 전면에서 높이 방향으로 복수개가 이격되어 설치된다. 이러한 상기 걸림 수단(313a)들은, 회전에 의해 상기 걸림핀(11a)을 걸림 시키는 수단이 된다. The locking means (313a), a plurality of spaced apart in the height direction from the front surface of the take-out rotation portion 313 so as to correspond to each of the locking pin (11a) fixed to the lower front end of the multi-stage seedling bed (10). The locking means (313a) is a means for locking the locking pin (11a) by rotation.

상기 반출승강부(330)는 반출동력제공부(331)와 반출회전축(332)과 반출구동체인(333) 및 반출회전기어(334)를 포함한다. The unloading elevating unit 330 includes a unloading force providing unit 331, a unloading rotating shaft 332, a unloading driving chain 333, and a unloading rotating gear 334.

상기 반출동력제공부(331)는 상기 반출적재틀(310) 상단에 일 측에 고정되며, 상기 반출구동체인(333)과 연결된다. 여기서 상기 반출동력제공부(331)는, 동력에 의해 상기 반출회전축(332)을 회전시킨다. 이러한 상기 반출회전축(332)은, 양 측에 연결된 상기 반출회전기어(334)와 동일하게 회전된다. 여기서 상기 반출회전기어(334)는, 상기 반출연결기어(312a)와 맞물려 상기 반입스크류 샤프트(313)를 회전시킨다. 또한 상기 반출회전축(332)의 양 측에는 반출베어링(314)이 고정된다. 이러한 상기 반출베어링(314)은 상기 반출적재틀(310)의 상단에 고정되어 상기 반출회전축(332)을 상대 회전 가능하게 고정시킨다.The carrying out force providing unit 331 is fixed to one side of the top of the carrying out the loading frame 310, it is connected to the carrying out drive chain 333. Here, the unloading power providing unit 331 rotates the unloading rotation shaft 332 by power. The carrying out shaft 332 is rotated in the same manner as the carrying out gear 334 connected to both sides. Here, the carry-out rotation gear 334 is engaged with the carry-out connection gear 312a to rotate the carrying screw shaft 313. In addition, a carrying bearing 314 is fixed to both sides of the carrying out rotating shaft 332. The unloading bearing 314 is fixed to the upper end of the unloading loading frame 310 to fix the unloading rotation shaft 332 to be relatively rotatable.

상기 반출제어부(340)는, 반출적재센서(341)와 반출배출센서(342)를 포함한다. 상기 반출적재센서(341)는, 제1반출적재센서(341a)와 제2반출적재센서(341b)와 제3반출적재센서(341c) 및 제4반출적재센서(341d)를 포함한다. 여기서 상기 반출적재센서(341)는, 상기 반출적재틀(310)의 전단 일 측에 설치되며, 높이 방향으로 이격되게 배치된다. 이러한 반출적재센서(341)는, 상기 반출이송바(320)들 상에서 상기 육묘베드(10)가 적재 되었는지 감지하여 승 하강 및 정지 가능상태를 제어하는 역할을 수행한다. The discharging control unit 340 includes a discharging loading sensor 341 and a discharging discharge sensor 342. The carrying out load sensor 341 includes a first carrying out load sensor 341a, a second carrying out load sensor 341b, a third carrying out loading sensor 341c, and a fourth carrying out loading sensor 341d. Here, the unloading sensor 341 is installed on one side of the front end of the unloading stack 310, and is spaced apart in the height direction. The carry-out load sensor 341 serves to control the lifting and stopping possible state by detecting whether the seedling bed 10 is loaded on the take-out and transport bars 320.

상기 반출배출센서(342)는 상기 반출적재틀(110)의 후단 일 측에 설치되어, 다단 적재된 상기 육묘베드(10)들의 적재 완료 상태를 전달받아 배출 가능상태를 제어한다.The discharging discharge sensor 342 is installed on one side of the rear end of the discharging stacking frame 110 to control the discharging state by receiving a stacking completion state of the seedling beds 10 loaded in multiple stages.

반출배송부(350)는, 반출구동부(351)와 반출이송체인(352)과 반출걸림브라켓(323)을 포함한다. 이러한 상기 반출배송부(350)는, 상기 반출적재틀(310)에 중앙에 연결 설치되며 상기 반출승강플레이트(315) 상에 하강된 상기 육묘베드(10)들을 외부(도면 미도시)로 배출시키는 역할을 수행한다. The export delivery unit 350 includes an export driving unit 351, an export transport chain 352, and an export catch bracket 323. The carrying out delivery unit 350 is connected to the center of the carrying out loading frame 310 and discharged to the outside (not shown) seedling bed 10 lowered on the lifting plate 315. Play a role.

상기 반출구동부(351)는, 상기 반출배송부(350)의 일 측에 결합되며, 상기 반출이송체인(352)과 연결된다. 여기서 상기 반출구동부(351)는, 동력에 의해 상기 반출이송체인(352)을 회전시킨다. The carrying out driving unit 351 is coupled to one side of the carrying out delivery unit 350, and is connected to the carrying out transport chain 352. In this case, the carry-out driving part 351 rotates the carry-out transport chain 352 by power.

상기 반출걸림브라켓(353)은, 상기 반출이송체인(352)의 일 측에 결합되어 상기 반출이송체인(352)을 따라 회전하며, 상기 반출승강플레이트(315)에서 하강된 상기 육묘베드(10)를 걸림 시키며 상기 반출적재틀(310) 외부(도면 미도시)로 이송시킨다. The unloading catching bracket 353 is coupled to one side of the unloading transport chain 352 and rotates along the unloading transport chain 352, and the seedling bed 10 lowered from the unloading lifting plate 315. To catch and transfer to the carrying out the loading frame 310 outside (not shown).

이하에서는 첨부도면을 참조하여 본 발명의 일실시예에 따른 육묘베드 자동운반 시스템의 작용 및 효과를 설명하도록 한다.Hereinafter, with reference to the accompanying drawings will be described the operation and effect of the seedling bed automatic transport system according to an embodiment of the present invention.

우선, 외부(도면 미도시)에서 상기 육묘베드(10)가 공급되기 전에는, 상기 반입승강플레이트(115)는 상기 반입고정플레이트(111)의 측면에서 하강된 상태이고, 상기 반출부(300)의 반출승강플레이트(315)는 상기 반출고정플레이트(111)의 측면에서 승강된 상태이다. First, before the seedling seed bed 10 is supplied from the outside (not shown), the carry-in lifting plate 115 is in a lowered state on the side of the carry-in fixing plate 111, and the The unloading elevating plate 315 is lifted from the side of the unloading fixing plate 111.

먼저, 외부에서 첫 번째 이송된 상기 육묘베드(10)는, 상기 반입이송부(120) 전단까지 이송된다. 이후 상기 반입이송부(120)는 상기 반입이송체인(122)에 결합된 반입걸림브라켓(123)에 의해 상기 육묘베드(10)를 걸림 시켜 상기 반입부(100) 내부로 이송시킨다. 이때 상기 육묘베드(10)는, 상기 반입승강플레이트(115)의 제4반입이송바(119d) 상에 이송되어 위치하게 된다. First, the seedling bed 10 transported first from the outside is transferred to the front end of the carry-in transfer unit 120. Thereafter, the carry-in transfer part 120 catches the seedling bed 10 by the carry-on bracket 123 coupled to the carry-in transport chain 122 and transfers the inside of the carry-on part 100. At this time, the seedling bed 10 is transported and positioned on the fourth carry-in transfer bar (119d) of the carry-in elevating plate 115.

이후 상기 제1반입적재센서(141a)는 상기 육묘베드(10)가 완전히 이송되었는지를 감지한 후 상기 반입승강부(130)를 동작시킨다. 이때 상기 반입승강부(130)는 동력에 의해 상기 반입회전축(132)을 회전시키고, 상기 반입회전축(132)에 연결된 상기 반입회전기어(134)와 상기 반입연결기어(112a)가 맞물려 회전된다. 그러면 상기 반입연결기어(112a)에 결합된 상기 반입스크류 샤프트(112)는 회전되어 상기 반입승강플레이트(115)를 승강시킨다. Thereafter, the first carry-in loading sensor 141a detects whether the seedling bed 10 is completely transferred and then operates the carry-in / out unit 130. At this time, the carry-in elevating unit 130 rotates the carry-in rotary shaft 132 by the power, and the carry-in rotary gear 134 and the carry-in connection gear 112a connected to the carry-in rotary shaft 132 is rotated in engagement. Then, the carry screw shaft 112 coupled to the carry connection gear 112a is rotated to elevate the carry-on lift plate 115.

이후 두 번째 이송된 상기 육묘베드(10)는, 상기 반입이송부(120) 전단까지 이송된다. 이후 상기 반입이송부(120)는 상기 반입이송체인(122)에 결합된 상기 반입걸림브라켓(123)에 의해 상기 육묘베드(10)를 걸림 시켜 상기 반입부(100) 내부로 이송시킨다. 여기서 상기 육묘베드(10)는 상기 반입승강플레이트(115)의 제3반입이송바(119c) 상에 이송되어 위치하게 된다. 이때 상기 제1반입적재센서(141a)는 상기 제2반입적재센서(142a)를 통해 상기 제1반입이송바(119a)가 상기 제2반입적재센서(141b) 상에 위치하였는지 감지한다. 그리고 상기 제1반입적재센서(141a)는 상기 육묘베드(10)가 상기 제2반입이송바(119b)에 완전히 이송되었는지를 감지한 후 상기 반입승강부(130)를 동작시킨다. 여기서 상기 반입승강부(130)는 상기 반입회전축(132)을 회전시키고 상기 반입회전축(132)에 연결된 반입회전기어(134)와 상기 반입연결기어(112a)가 맞물려 회전된다. 이때 상기 반입연결기어(112a)를 결합한 상기 반입스크류 샤프트(112)는 동일하게 회전되어 상기 반입승강플레이트(115)를 승강시킨다. Thereafter, the second seedling seedling bed 10 is transferred to the front end of the carrying-in transfer part 120. Thereafter, the carry-in and transfer unit 120 locks the seedling bed 10 by the carry-in hook bracket 123 coupled to the carry-in transport chain 122 and transfers it into the carry-in unit 100. Here, the seedling bed 10 is transported and positioned on the third carry-in transfer bar 119c of the carry-in elevating plate 115. In this case, the first carry-in load sensor 141a detects whether the first carry-in transfer bar 119a is positioned on the second carry-in load sensor 141b through the second carry-in load sensor 142a. The first carry-in load sensor 141a detects whether the seedling bed 10 is completely transferred to the second carry-in transfer bar 119b, and then operates the carry-in / out unit 130. Here, the carry-in elevating unit 130 rotates the carry-in rotary shaft 132 and the carry-in rotary gear 134 and the carry-in connection gear 112a connected to the carry-in rotary shaft 132 is rotated in engagement. At this time, the carry-in screw shaft 112 coupled to the carry-in connection gear (112a) is rotated in the same way to elevate the carry-in elevating plate (115).

상기와 같은 동작은 상기 제4반입이송바(119d) 상에 상기 육묘베드(10)가 적재 될 때까지 반복적이며 순차적으로 수행된다. The above operation is performed repeatedly and sequentially until the seedling bed 10 is loaded on the fourth carry-in transfer bar 119d.

따라서 이와 같은 동작이 완료되어 상기 반입이송바(119)들 상에 상기 육묘베드(10)들이 모두 적재되면, 상기 반입적재틀(110)의 후단 일 측에 설치된 상기 반입배출센서(142)가 상기 반입배출부(150)의 배출 여부를 판별하여 상기 반입배출부(150)를 작동 시킨다. Therefore, when this operation is completed and the seedling beds 10 are all loaded on the carry-in transfer bar 119, the carry-in discharge sensor 142 installed on the rear end side of the carry-on loading frame 110 is the Determine whether or not to discharge the carry-in discharge unit 150 to operate the carry-in discharge unit 150.

이후 상기 반입배출부(150)는 상기 반입배출 이송실린더(152)를 이용하여 상기 반입배출 이송실린더(152)의 일 측에 결합된 상기 반입 푸셔(153)를 밀어 줌으로서, 상기 다단의 육묘베드(10)는 상기 발아부(200)로 동시에 공급된다.Thereafter, the carry-out discharge unit 150 pushes the carry-in pusher 153 coupled to one side of the carry-in discharge transfer cylinder 152 using the carry-in discharge transfer cylinder 152, thereby raising the multi-stage seedling bed. 10 is simultaneously supplied to the germination part 200.

이후 상기 발아부(200)는, 상기 반입부(100)로부터 이송 받은 상기 다단의 육묘베드(10)들을 적재하며 발아시킨다. 이때 상기 발아부(200)는, 동일한 형상의 복수개의 발아실(200)들이 순차적으로 배열된다. 이런한 상기 발아부(200)는 재배작물의 발아 속도 기간에 따라 개수는 한 개 내지 복수개로 설정될 수 있다. Thereafter, the germination part 200 loads and germinates the multi-stage seedling beds 10 transferred from the carrying-in part 100. At this time, the germination part 200, a plurality of germination chambers 200 of the same shape are sequentially arranged. The germination part 200 may be set to one to a plurality depending on the germination rate period of the crop.

이후 발아된 상기 육묘베드(10)들은 상기 반입부(100)의 작동에 따라 순차적으로 상기 반출부(300)로 배출된다. 이때 상기 발아부(200)에서 배출된 상기 다단의 육묘베드(10)는 상기 반출부(300)의 전단까지 이송된다. 이후 상기 반출이송모듈(320)의 반출이송실린더(322)는 상기 반출회전부(323)를 상기 육묘베드(10)들의 전면까지 이동하게 된다. Thereafter, the seedling seedlings 10 germinated are sequentially discharged to the carrying-out part 300 according to the operation of the carrying-in part 100. In this case, the multistage seedling bed 10 discharged from the germination part 200 is transferred to the front end of the carrying out part 300. Thereafter, the transport transport cylinder 322 of the transport transport module 320 moves the transport rotation part 323 to the front of the seedling beds 10.

이후 상기 반출회전부(323)는 걸림수단(323a)들을 회전시켜 상기 육묘베드(10)들의 전방 하단에 고정된 상기 걸림핀(11a)을 걸림 시키게 된다. 그러면 상기 반출이송실린더(321)는 상기 다단의 육묘베드(10)들을 상기 반출부(300) 내부에 결합된 상기 반출이송바(319)들 상으로 동시에 잡아당겨 이송시키게 된다.Thereafter, the carrying out rotation part 323 rotates the locking means 323a to lock the locking pins 11a fixed to the front lower ends of the seedling beds 10. Then, the transfer transport cylinder 321 simultaneously pulls and transports the multi-stage seedling beds 10 onto the export transfer bars 319 coupled to the export unit 300.

이후 상기 반출적재센서(341)는 상기 다단의 육묘베드(10)들이 상기 반출부(300)내에 모두 적재된 상태를 감지하여 상기 반출승강부(330)의 반출회전축(332)을 회전시켜 상기 반출승강플레이트(315)를 하강 시킨다. 이때 하강된 상기 반출승강플레이트(115)의 제1반출이송바(319a)가 상기 반출배송부상(350)의 반출이송체인(352)에 위치하게 되고, 상기 반출이송체인(352)에 결합된 상기 반출걸림브라켓(353)에 걸림 되어 첫 번째 상기 육묘배드(10)를 외부(도면 미도시)배출되게 된다. Thereafter, the carry-out load sensor 341 detects a state in which the multi-stage seedling beds 10 are all loaded in the carry-out unit 300 to rotate the carry-out rotation shaft 332 of the carry-out elevating unit 330 to carry out the carry-out. The lifting plate 315 is lowered. In this case, the first transport bar 319a of the lowered lifting plate 115 is positioned on the transport chain 352 of the transport port 350 and the transport chain 352 is coupled to the transport port 352. Being caught in the take-out bracket 353, the first seedling seed 10 is discharged to the outside (not shown).

이후 상기 제1반입적재센서(141a)는 상기 첫 번째 육묘베드(10)가 완전히 배출되었는지를 감지한 후 다시 상기 반출승강부(330)를 동작시킨다. 여기서 상기 반출승강부(330)는 상기 반출회전축(332)을 회전시킨다. 또한 상기 반출회전축(332)에 연결된 반출회전기어(334)는 상기 반출연결기어(313a)가 맞물려 회전되고, 상기 반출연결기어(313a)에 결합된 상기 반출스크류 샤프트(313)는 회전되어 상기 반출승강플레이트(315)를 하강시킨다.  Thereafter, the first carry-in loading sensor 141a detects whether the first seedling bed 10 is completely discharged, and then operates the carry-out elevating unit 330 again. Here, the unloading elevating unit 330 rotates the unloading rotating shaft 332. In addition, the carrying out rotation gear 334 connected to the carrying out rotating shaft 332 is rotated by engaging the carrying out connection gear 313a, and the carrying out screw shaft 313 coupled to the carrying out connecting gear 313a is rotated and carried out. The lifting plate 315 is lowered.

이후 하강된 상기 반출승강플레이트(315)는 제3반입이송바(319c)가 상기 반출배출부(350)상의 반출이송체인(352)에 위치하게 되고, 상기 반출이송체인(352)에 결합된 상기 반출걸림브라켓(353)에 걸림 되어 외부로 배출되게 된다. Then, the lowered lifting plate 315 has a third carry-in bar 319c is located in the carry-out transport chain 352 on the carry-out discharge unit 350, the coupled to the carry-out transport chain 352 It is caught by the takeout bracket 353 and is discharged to the outside.

상기와 같은 동작은 상기 제1반출이송바(319a) 상의 상기 육묘베드(10)가 배출 될 때까지 반복적이며 순차적으로 수행 된다. The above operation is repeated and sequentially performed until the seedling bed 10 on the first transporting bar 319a is discharged.

따라서 상기 육묘베드(10)를 인력에 의해 일일이 출하 하던 작업을, 상기 반출부(300)가 자동운반 하므로, 인력이 감소되어 인건비가 감소되는 효과를 가진다.Therefore, since the carry-out unit 300 automatically carries out the work for which the seedling bed 10 is daily shipped by the manpower, the manpower is reduced and the labor cost is reduced.

본 발명은 도면에 도시된 실시 예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능하다는 점을 이해할 것이다. 따라서 본 발명의 진정한 기술적 보호 범위는 첨부된 특허청구범위의 기술적 사상에 의하여 정해져야 할 것이다.
Although the present invention has been described with reference to the embodiments illustrated in the drawings, this is merely exemplary, and it will be understood by those skilled in the art that various modifications and equivalent other embodiments are possible. Accordingly, the true scope of the present invention should be determined by the technical idea of the appended claims.

100: 반입부 110: 반입적재틀
120: 반입이송부 130: 반입승강부
140: 반입제어부 150: 반입배출부
200: 발아부 210: 발아적재틀
300: 반출부 310: 반출적재틀
320: 반출이송모듈 330: 반출승강부
340: 반출제어부 350: 반출배출부
10: 육묘베드
100: carrying in 110: carrying in
120: carry-on and transfer unit 130: carry-on and return unit
140: import control unit 150: import discharge unit
200: germination 210: germination frame
300: export unit 310: export loading frame
320: take-out transport module 330: take-out elevator
340: carrying out control unit 350: carrying out discharge unit
10: seedling bed

Claims (12)

공정 육묘공장의 육묘베드를 운반하는 자동운반 시스템에 있어서,
외부로부터 이송된 육묘베드를 내부로 전달하여 순차적으로 다단 적재하고, 동시에 이송시키는 반입부와;
상기 반입부에서 이송 받은 상기 육묘베드를 발아시키는 복수 개의 발아실들이 순차적으로 배열되고, 상기 육묘베드의 재배작물의 발아 소요 기간에 따라 상기 복수 개의 발아실들 중 설정된 개수의 발아실에서 발아되도록 하는 발아부; 및
상기 발아부에서 배출된 상기 육묘베드를 동시에 전달받아 순차적으로 반출시키는 반출부를 포함하는 육묘베드 자동운반 시스템.
In the automatic transportation system for transporting the seedling bed of the process seedling plant,
A carrying-in unit which transfers the seedling beds transferred from the outside into the multi-stage and sequentially transfers them;
A plurality of germination chambers for germinating the seedling beds transferred from the carrying-in part are arranged in sequence, and germinated in a predetermined number of germination chambers among the plurality of germination chambers according to the germination required period of the cultivation crop of the seedling bed. Germination part; And
A seedling bed automatic transport system including an export unit for receiving the seedling bed discharged from the germination at the same time and carried out sequentially.
청구항 1에 있어서,
상기 반입부는,
외부에서 전달받은 육묘베드를 다단으로 적재하기 위해 설치한 반입적재틀과;
상기 반입적재틀에 연결 설치되며, 중앙에는 외부에서 전달받은 상기 육묘베드를 상기 반입적재틀 내부로 이송시키는 반입이송부와;
상기 반입적재틀에 설치되며, 상단에는 상기 반입이송부에 의해 전달된 상기 육묘베드를 상기 반입이송부 상에서 상하로 승강시키는 반입승강부와;
상기 반입적재틀의 일 측에 결합되어 상기 반입이송부 상에서 승 하강된 상기 육묘베드를 감지하는 반입제어부; 및
상기 반입적재틀 상에 적재된 다단의 상기 육묘베드를 동시에 배출시키는 반입배출부를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 1,
The carry-in part,
An import loading frame installed to stack the seedling beds received from the outside in multiple stages;
It is connected to the loading loading frame, the transfer unit for transferring the seedling bed received from the outside into the loading loading frame at the center;
It is installed in the loading frame, the upper and lower carry-in section for lifting up and down the seedling bed delivered by the carry-in portion on the carry-in portion;
An import control unit coupled to one side of the loading container to sense the seedling bed raised and lowered on the import transfer unit; And
A seedling bed automatic conveying system including a carry-out discharge unit for simultaneously discharging the multi-stage seedling bed loaded on the loading frame.
청구항 2에 있어서,
상기 반입적재틀은,
내부 일 측 및 대향하는 타 측에 각각 결합되는 반입고정플레이트; 및
상기 반입고정플레이트에 측면에서 슬라이딩 가능하게 결합되는 반입승강플레이트를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 2,
The import loading frame,
Import fixed plate coupled to the inner one side and the other side opposite; And
Seedling bed automatic conveying system comprising a lifting step plate that is slidably coupled to the loading fixed plate side.
청구항 3에 있어서,
상기 반입고정플레이트는,
양측에 수직으로 각각 결합되는 반입가이드 샤프트와;
가운데에 수직으로 결합되는 반입스크류 샤프트를 포함하며,
상기 반입승강플레이트는,
양 측이 상기 반입가이드 샤프트에 슬라이딩 가능하게 결합되는 반입고정블록과;
가운데에 상기 반입스크류 샤프트에 나사 체결되도록 결합되는 반입블록너트와;
상기 반입승강플레이트 후면의 양측에서 상기 반입부의 내부를 향하여 각각 결합되며 높이 방향으로 이격되게 배열되는 반입연결바들; 및
상기 반입연결바들의 양측을 가로질러 결합되며 높이 방향으로 이격되게 배열되는 반입이송바들을 포함하는 육묘베드 자동운반 시스템.
The method according to claim 3,
The import fixed plate,
An import guide shaft coupled to each other perpendicularly to both sides;
It includes an incoming screw shaft coupled vertically in the center,
The carry-in elevating plate,
An import fixed block having both sides slidably coupled to the import guide shaft;
An import block nut coupled to a screw connection to the import screw shaft at a center thereof;
Carry-in connecting bars coupled to the inside of the carry-in portion at both sides of the back of the carry-in elevating plate and arranged spaced apart in the height direction; And
Seedling bed automatic transport system comprising a transfer port bars coupled across both sides of the carry-in connection bar and arranged spaced apart in the height direction.
청구항 2에 있어서,
상기 반입이송부는,
반입구동부와;
상기 반입구동부에 연결되어 회전되는 반입이송체인; 및
상기 반입이송체인에 결합되어 외부에서 전달받은 상기 육묘베드를 걸림 시켜 함께 이송되는 반입걸림브라켓을 포함하는 육묘베드 자동운반 시스템.
The method according to claim 2,
The carry-in transfer unit,
An import driving unit;
An import transport chain connected to the delivery driving unit and rotated; And
A seedling bed automatic transport system comprising an import hooking bracket which is coupled to the carry-in transport chain and is transported together by catching the seedling bed received from the outside.
상기 반입승강부는,
반입동력제공부와;
상기 반입동력제공부에 연결되어 회전되는 반입회전축과;
상기 반입회전축의 양 측에 결합되며, 상기 반입고정플레이트들의 반입연결기어와 맞물려 상기 반입스크류 샤프트를 회전시키는 반입회전기어; 및
상기 반입제공부와 연결되어 상기 반입회전축을 회전시키는 반입구동체인을 포함하는 육묘베드 자동운반 시스템.
The carry-in portion is,
An import power supply unit;
An import rotation shaft connected to the import power supply unit and rotated;
Coupled to both sides of the carry-in rotation shaft, meshing with the carry-in connection gear of the carry-in fixing plate to rotate the carry-in screw shaft; And
Seedling bed automatic transport system comprising a carry-in drive chain connected to the carry-in provision unit for rotating the carry-in rotary shaft.
청구항 2에 있어서,
상기 반입제어부는,
상기 반입적재틀의 일 측에 결합되어 상기 반입이송부 상에서 승강되는 상기 육묘베드를 정지 또는 승강 가능상태를 판별하기 위한 반입적재센서; 및
상기 반입적재틀의 타 측에 결합되어 상기 육묘베드의 배출 여부를 판별하기 위한 반입배출센서를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 2,
The import control unit,
An import loading sensor coupled to one side of the loading loading frame to determine a state capable of stopping or lifting the seedling bed lifted on the carry-on portion; And
Is coupled to the other side of the loading frame frame seedling bed automatic transport system including a carry-in discharge sensor for determining whether the seedling bed is discharged.
청구항 2에 있어서,
상기 반입배출부는,
상기 반입적재틀의 상부 하단에 결합되는 반입지지플레이트와;
상기 반입지지플레이트의 하부에 설치는 반입배출이송실린더; 및
상기 반입배출이송실린더의 일 측에서 상기 육묘베드를 동시에 배출 가능하게 밀어주는 반입푸셔를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 2,
The import discharge unit,
An loading support plate coupled to an upper lower end of the loading frame;
An installation discharge transport cylinder is installed in the lower portion of the loading support plate; And
A seedling bed automatic transport system comprising an import pusher for pushing the seedling bed at one side of the carry-in discharge transfer cylinder to be discharged at the same time.
청구항 1에 있어서,
상기 발아부는,
상기 반입부에서 이송된 육묘베드를 적재하기위해 설치되는 발아적재틀; 및
상기 발아적재틀 내부 일 측 및 타 측에 설치되는 발아고정플레이트를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 1,
The germination part,
A germination stacking frame installed to load the seedling beds transferred from the carrying-in part; And
Seedling bed automatic transport system comprising a germination fixing plate installed on one side and the other side inside the germination loading frame.
청구항 9에 있어서,
상기 발아고정플레이트는,
양 측이 내부를 향하여 각각 결합되는 발아연결바들 및
상기 발아연결바들의 양 측을 가로질러결합되는 발아이송바들를 포함하고,
상기 발아연결바들과 상기 발아이송바들이 높이방향으로 이격되게 배치되는 자동운반 시스템.
The method according to claim 9,
The germination fixing plate,
Germination connecting bars which are coupled to each side toward the inside and
It includes a gerison bars are coupled across both sides of the germination connection bar,
The germination connecting bars and the germination song bar are arranged in a height direction spaced automatic transport system.
청구항 1에 있어서,
상기 반출부는,
상기 발아부에서 배출되는 상기 육묘베드를 적재하기 위해 설치된 반출적재틀과;
상기 반출적재틀의 일 측에 설치되며 이송되는 상기 육묘베드를 동시에 걸림 시켜 상기 반출적재틀의 내부로 이동시키는 반출이송모듈과;
상기 반출적재틀에 설치되며, 상단에는 상기 육묘베드를 상하로 이동시키는 반출승강부와;
상기 반출적재틀의 일 측에 설치되며 상기 반출승강부 상에서 하강된 상기 육묘베드를 감지하는 반출제어부 및
상기 반출적재틀에 연결 설치되며, 중앙에는 하강된 상기 육묘베드를 상기 반출적재틀 외부로 순차적으로 배출시키는 반출배송부를 포함하는 육묘베드 자동운반 시스템.
The method according to claim 1,
The carrying out portion,
A carrying out frame installed to load the seedling beds discharged from the germination part;
An export transport module installed on one side of the transport stack and simultaneously engaging the seedling bed being transported to move into the transport stack;
It is installed on the unloading frame, the upper and lower lifting section for moving the seedling bed up and down;
A carrying out control unit installed at one side of the carrying out loading frame and sensing the seedling bed lowered on the carrying out lifting unit;
The seedling bed automatic transport system is connected to the unloading loading frame, and includes a carrying out delivery unit for discharging the lowered seedling bed to the outside of the unloading loading frame in the center.
청구항 11에 있어서,
상기 반출이송모듈은,
상기 다단의 육묘베드들을 동시에 걸림 시키는 반출회전부; 및
상기 걸림된 육묘베드를 상기 반출부 내부로 이송시키는 반출이송실린더를 포함하는 육묘베드 자동운반 시스템.


The method of claim 11,
The export transport module,
A carry-out / rotating part for simultaneously engaging the multi-stage seedling beds; And
Seeding seedling bed automatic transport system comprising a transporting cylinder for transporting the hooked seedling bed into the carrying out portion.


KR1020110010705A 2011-02-07 2011-02-07 System for delivering seedlings beds automatically KR101264016B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110010705A KR101264016B1 (en) 2011-02-07 2011-02-07 System for delivering seedlings beds automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110010705A KR101264016B1 (en) 2011-02-07 2011-02-07 System for delivering seedlings beds automatically

Publications (2)

Publication Number Publication Date
KR20120090334A true KR20120090334A (en) 2012-08-17
KR101264016B1 KR101264016B1 (en) 2013-05-13

Family

ID=46883426

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110010705A KR101264016B1 (en) 2011-02-07 2011-02-07 System for delivering seedlings beds automatically

Country Status (1)

Country Link
KR (1) KR101264016B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104025943A (en) * 2014-06-13 2014-09-10 同济大学 Rail-spliced type automatic seedbed moving system
CN104663417A (en) * 2015-03-13 2015-06-03 海南大学 Movable sand bed device
CN106945971A (en) * 2017-03-09 2017-07-14 西北农林科技大学 A kind of soilless culture is colonized plate automatic conveying device
CN109906822A (en) * 2018-12-17 2019-06-21 程曼莉 A kind of recyclable plants planter of combined intelligent
RU2762415C2 (en) * 2017-08-08 2021-12-21 Оно Экспоненшиал Фарминг С.Р.Л. Automatic modular system for managing vertical farms

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3521657B2 (en) 1996-10-31 2004-04-19 井関農機株式会社 Nursery facilities
JP3564931B2 (en) * 1997-03-17 2004-09-15 井関農機株式会社 Nursery facilities
JP2003246451A (en) * 2002-02-26 2003-09-02 Kubota Corp Seedling culture box stacking apparatus

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104025943A (en) * 2014-06-13 2014-09-10 同济大学 Rail-spliced type automatic seedbed moving system
CN104663417A (en) * 2015-03-13 2015-06-03 海南大学 Movable sand bed device
CN104663417B (en) * 2015-03-13 2017-03-15 海南大学 A kind of removable casting bed device
CN106945971A (en) * 2017-03-09 2017-07-14 西北农林科技大学 A kind of soilless culture is colonized plate automatic conveying device
RU2762415C2 (en) * 2017-08-08 2021-12-21 Оно Экспоненшиал Фарминг С.Р.Л. Automatic modular system for managing vertical farms
CN109906822A (en) * 2018-12-17 2019-06-21 程曼莉 A kind of recyclable plants planter of combined intelligent
WO2020124644A1 (en) * 2018-12-17 2020-06-25 程曼莉 Combined type intelligent recyclable plant growing device

Also Published As

Publication number Publication date
KR101264016B1 (en) 2013-05-13

Similar Documents

Publication Publication Date Title
KR101264016B1 (en) System for delivering seedlings beds automatically
KR101443433B1 (en) Automation equipment system of seedling process
JPH0646900B2 (en) Nursery facility
KR101251757B1 (en) Transfer beds for transportation seedling box
KR102145426B1 (en) Development of Port-seeder Automatic Stacking Appratus and It’control Methods
KR20180118900A (en) Automatic transportaion system for ginseng containers of multi-stage type
KR20220094378A (en) Automatic seedbed delivery system device
JPH07236362A (en) Conveyor for tray for pot used in transplanting grafted nursery plant
KR101338614B1 (en) Transfer and discharging apparatus for seedling bed
JP6424471B2 (en) Seedling box stacking device
JPS6194906A (en) Automatic racking device for seedling culture box
JP3521655B2 (en) Nursery facilities
JPS6374819A (en) Nursery box stacking device
KR101186231B1 (en) A feeding and discharging apparatus of pallet for laoding culture tray
KR100788234B1 (en) Crops rotation equipment of accumulative cultivation system
JPH0629922Y2 (en) Nursery box transfer device
JPS6371026A (en) Nursery box stacking device
JP3491490B2 (en) Nursery facilities
JP2596836Y2 (en) Nursery box loading device
JPH0629923Y2 (en) Nursery box transfer device
JPH041793Y2 (en)
JPS6371025A (en) Nursery box stacking device
JPS6374407A (en) Seedling growing box separating and taking-out apparatus
JPH0533469Y2 (en)
JPH0764421B2 (en) Nursery box assembly carrier at nursery facility

Legal Events

Date Code Title Description
A201 Request for examination
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20160509

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee