KR20120077779A - Plant mat gabion and it's making method - Google Patents

Plant mat gabion and it's making method Download PDF

Info

Publication number
KR20120077779A
KR20120077779A KR1020100139861A KR20100139861A KR20120077779A KR 20120077779 A KR20120077779 A KR 20120077779A KR 1020100139861 A KR1020100139861 A KR 1020100139861A KR 20100139861 A KR20100139861 A KR 20100139861A KR 20120077779 A KR20120077779 A KR 20120077779A
Authority
KR
South Korea
Prior art keywords
loading space
network
vegetation mat
installing
gabion
Prior art date
Application number
KR1020100139861A
Other languages
Korean (ko)
Inventor
길인환
Original Assignee
(주)남영산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)남영산업 filed Critical (주)남영산업
Priority to KR1020100139861A priority Critical patent/KR20120077779A/en
Publication of KR20120077779A publication Critical patent/KR20120077779A/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • A01G24/44Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a vegetation mat Gabion and a method for producing the same.
Vegetation mat Gabion manufacturing method of the present invention, after preparing the bottom mesh is formed integrally on one side wall portion on both sides of the bending step of bending the one side wall portion; A loading space forming step of forming a loading space therein by installing the other meshes configured to have both side surfaces and the lower circumference thereof contact with both ends of the bottom mesh; A partition installation step of installing a partition network in the bottom mesh; Filling step of filling the filling space consisting of gravel and sand in the loading space; A separation prevention member installation step of preventing an external separation of the packing material inside the loading space by installing a separation prevention member on the one side wall part, the other side network and the partition network; A cover net installation step of installing a cover net on an upper portion of the loading space; It is configured to include; vegetation mat installation step of installing a vegetation mat on the upper or lower portion of the cover mesh.
According to the present invention, by filling the gravel and sand that can be taken directly at the construction site instead of the aggregate difficult to supply the inside of the Gabion, by installing a separation prevention member for preventing the separation of gravel and sand on the partition and the wall easily at low construction costs It is possible to manufacture the vegetation mat Gabion, and at this time, the separation prevention member is configured to be folded based on the side connecting the center while using a soft material such as cloth or non-woven fabric, so that the one wall part, the other network, and the partition network By simply installing it to be easy to fix the separation prevention member can be easily installed.

Description

Vegetation mat gabion and its manufacturing method

The present invention relates to a vegetation mat gabion and a method for manufacturing the same, and to fill the gravel and sand instead of a bulky, difficult to find inside, to prevent the separation of the gravel and sand, relates to a vegetation mat gabion and a method of manufacturing the same will be.

In installing a retaining wall on a roadside or a slope protection structure for protecting a slope of a lake, application examples of the Gabion method using an environmentally friendly gabion are increasing.

In the Gabion method, a lattice-shaped gabion is manufactured using a wire mesh, and then aggregate is filled in the gabion.

Such aggregates have mainly used coarse gravel or crushed aggregates.

However, in recent years, it is difficult to obtain aggregates due to environmental destruction problems or reduced production of aggregates.

Problems caused by the supply and demand of these aggregates eventually had a problem consisting of an increase in construction costs.

As an example of the technique related to the Gabion method, "vegetation gabion and its construction method" (Korean Patent Publication No. 10-0922466) has been published.

As described above, the lower stone layer was formed on the inner bottom surface of the mesh body, and a moisturizing support layer and an upper stone layer were installed thereon.

The above technique has the purpose of creating a stable vegetation environment by improving the ability of retaining moisture in the mesh, but in order to minimize the amount of aggregate that is difficult to collect in the field, a moisturizing support layer is formed in the middle. will be.

In other words, it is difficult to mass-produce aggregates, which are increasingly difficult to supply and demand, and therefore, the necessity of a new form of gabion is required.

1) KR10-0922466 (2009.10.12)

The vegetation mat Gabion of the present invention and its manufacturing method to solve the problems caused in the prior art as described above, the partition and the filling while filling the gravel and sand that can be taken directly from the construction site instead of the difficult aggregate in the inside of Gabion By installing a separation prevention member for preventing the separation of gravel and sand on the wall surface is to be able to easily manufacture the vegetation mat Gabion at a low construction cost.

At this time, the separation prevention member is configured to be folded based on the side connecting the center while using a soft material such as cloth or nonwoven fabric, and is easily installed in such a manner as to cover one side wall portion, the other side network or the partition network, thereby easily fixing the separation prevention member. To make it easier to construct.

Vegetation mat Gabion manufacturing method of the present invention is to solve the above technical problems, after preparing the bottom mesh is formed integrally on one side wall portion on both sides of the bending step of bending the one side wall portion on both sides; A loading space forming step of forming a loading space therein by installing the other meshes configured to have both side surfaces and the lower circumference thereof contact with both ends of the bottom mesh; A partition installation step of installing a partition network in the bottom mesh; Filling step of filling the filling space consisting of gravel and sand in the loading space; A separation prevention member installation step of preventing an external separation of the packing material inside the loading space by installing a separation prevention member on the one side wall part, the other side network and the partition network; A cover net installation step of installing a cover net on an upper portion of the loading space; It is configured to include; vegetation mat installation step of installing a vegetation mat on the upper or lower portion of the cover mesh.

At this time, in the separation prevention member installation step, the separation prevention member is configured to be folded based on the side connecting the center, the side connecting the center of any one selected from one side wall portion, the other side mesh, the partition network. It is characterized by being installed on the upper side.

In addition, the vegetation mat Gabion of the present invention, the bottom of the bottom mesh, and the one side wall portion and the other side mesh is installed around the bottom mesh has a loading space is formed inside, the partition network is installed inside the loading space, Inside the loading space is filled with a filling consisting of gravel and sand, the separation prevention member is installed on one side wall part and the other side mesh and partition network, and the cover net with vegetation mat is installed on the upper side of the loading space. It is done.

According to the present invention, by filling the gravel and sand that can be taken directly at the construction site instead of the aggregate difficult to supply the inside of the Gabion while installing a separation prevention member for preventing the separation of gravel and sand on the partition and the wall easily at low construction costs It is possible to prepare a vegetation mat Gabion.

At this time, the separation prevention member is configured to be folded based on the side connecting the center while using a soft material such as cloth or nonwoven fabric, and is easily installed in such a manner as to cover one side wall portion, the other side network or the partition network, thereby easily fixing the separation prevention member. This makes it easy to construct.

1 is a perspective view showing a state that one side wall portion is banded in the bottom mesh in the present invention.
Figure 2 is an exploded perspective view showing a loading space forming step and the partition installation step in the present invention.
Figure 3 is a perspective view showing the filling step in the present invention.
Figure 4 is an exploded perspective view showing the separation prevention member installation step in the present invention.
Figure 5 is an exploded perspective view showing the cover net installation step in the present invention.

Hereinafter, the vegetation mat Gabion of the present invention and a manufacturing method thereof will be described in detail with reference to the accompanying drawings.

The vegetation mat Gabion manufacturing method of the present invention is largely composed of a bending step, a loading space forming step, partition installation step, filling step, separation prevention member installation step, cover mesh installation step and vegetation mat installation step.

1. Banding Step

As shown in FIG. 1, after preparing the bottom mesh 10 in which one side wall part 11 is integrally formed on both sides, the one side wall part 11 on both sides is bent at a right angle.

At this time, the bottom mesh 10 will have a mesh structure of various structures and materials used for known gabions and the like.

2. Formation stage of loading space

As shown in FIG. 2, the other side meshes 20 are prepared and installed so that both side surfaces and the lower circumference of the bottom mesh body 10 abut on both ends.

In this way, when the other side network 20 is installed, the loading space 21 surrounded by the other side network 20 and the one side wall portion 11 is formed to fill the packing 40 to be described later. You can do it.

The method of fixing the other side network 20 to the bottom network 10 is connected by using a variety of known connection methods, such as by using a connector or by twisting the connection point of the other side network 20 or the bottom network 10 to each other. .

The other side network 20 will have a variety of network structures, such as the bottom network 10.

3. Partition installation step

As shown in FIG. 2, a partition net 30 is installed in the bottom net 10.

Partition network 30 has a variety of well-known network structure, such as the other side network 20 or the bottom network 10, and the fixing method is fixed through a variety of methods, such as connecting or twisting fixed like the other side network (20) do.

The partition may be installed in parallel with the one side wall portion 11 or in parallel with the other side mesh 20.

4. Filling stage

As shown in FIG. 3, a filling 40 composed of gravel and sand is charged to the loading space 21.

At this time, the charged gravel and sand can be saved by the input of the gravel and sand collected at the construction site as it is, save the cost and time required to produce, transport the aggregate.

5. Installation step of release prevention member

The separation preventing member 50 is installed in the one side wall part 11, the other side network 20, and the partition network 30 to prevent the internal filling 40 of the loading space 21 from being separated.

The separation preventing member 50 may be composed of a vegetation mat, synthetic resin or wood plate, such that the gravel and sand does not escape to the outside of the loading space (21).

However, in the case of a synthetic resin or a wood board, it is hard to prevent the occurrence of gaps at the boundary portions of the one side wall portion 11, the other side network 20, and the partition network 30.

Therefore, in order to minimize the occurrence of such a gap, it is preferable to constitute a soft nonwoven fabric or sheet, vegetation mat and the like.

In particular, it is preferable to form a breathable and permeable material that can pass through moisture or air while preventing the passage of gravel and sand.

This is to ensure that the ecology environment of the loading space 21 is not isolated from the outside by allowing the microorganisms, etc., to pass through the inside and the outside smoothly in terms of the filling 40 and the external ecological environment in the loading space 21. will be.

As an example of a structure in which the separation preventing member 50 is installed, the first separation preventing member 51 and the second separation preventing member 52 are installed on the inner side surfaces of the one side wall part 11 and the other side mesh 20. The third detachment preventing member 53 may be installed on one side or left and right sides of the partition net body 30.

At this time, the separation preventing member 50 is configured to be folded on the basis of the side connecting the center, the side connecting the center of any one selected from one side wall portion 11, the other side mesh 20, the partition network 30 to It can also be configured to be installed on three upper sides.

In this way, when installing in a way to fold the separation prevention member 50, there is no need to fix the separation prevention member 50 separately, the installation becomes simple.

The installation order of the separation preventing member 50 is installed after the bending step in the case of the first separation preventing member 51, rather than proceeding after the filling of the aggregate, and in the case of the second separation preventing member 52 to form a loading space. After the step is installed, it will be preferable to install after the partition installation step in the case of the third departure preventing member 53.

6. Cover net installation step

The cover mesh 60 has a variety of known mesh structures similar to the above-described various meshes, and the fixing method may also be fixed by using a connector or twisting fixing method.

7. Vegetation mat installation step

Before installing the cover mesh 60, the vegetation mat 61 is installed on the lower portion of the cover mesh 60, or the vegetation mat (on the upper portion of the cover mesh 60 at a later point before or after the cover mesh 60 is installed). 61) install.

The vegetation mat 61 can be provided with a variety of known vegetation mat 61, such as jute, corenet, nonwoven fabric.

In addition, the seed spray layer may be additionally formed on the vegetation mat 61.

The object of the present invention is to facilitate the construction by filling the gravel, sand, stone, etc. in the field in the Gabion, and installed the separation prevention member 50 in order to prevent the filling 40 filled in the inside to escape to the outside. .

At this time, in order to smooth the flow of water and air, the separation preventing member 50 is formed of a material having excellent breathability and permeability.

In the vegetation mat Gabion of the present invention manufactured by the above manufacturing method, the bottom mesh 10 and the one side wall portion 11 and the other side mesh 20 are installed around the bottom mesh 10. The loading space 21 is formed in the loading space 21, the partition network 30 is installed inside the loading space 21, the filling 40 consisting of gravel and sand is filled, one side The separation prevention member 50 is installed in the wall portion 11, the other side network 20 and the partition network 30, and the cover network 60 having the vegetation mat 61 attached to the loading space 21 is provided. It is characterized by being installed.

The vegetation mat gabion is easily collected by filling the loading space 21 after collecting the gravel and sand in the field, while preventing the separation of the gravel and sand filled inside due to the installation of the separation prevention member 50. Will be.

Vegetation mat Gabion prepared by the manufacturing method of the present invention will be installed in a variety of places, such as river banks, roadside retaining wall.

10: floor mesh 11: one side wall portion
20: other network 21: loading space
30: partition network 40: filler
50: departure preventing member 51: first departure preventing member
52: second departure preventing member 53: third departure preventing member
60: cover mesh 61: vegetation mat

Claims (3)

In the manufacturing method of vegetation mat Gabion,
A bending step of bending the one side wall part 11 on both sides after preparing the bottom mesh 10 in which one side wall part 11 is integrally formed on both sides;
A loading space forming step of forming a loading space 21 therein by installing the other side meshes 20 configured so that both sides and the lower circumference of the bottom mesh 10 come in contact with both ends of the bottom mesh 10;
A partition installation step of installing the partition network 30 in the bottom mesh 10;
Filling step of filling the filling space consisting of gravel and sand into the loading space 21;
A separation prevention member installation step of installing a separation prevention member 50 in the one side wall portion 11, the other side network 20, the partition network 30 to prevent the external separation of the filling 40 in the loading space 21. ;
Cover network installation step of installing a cover network 60 in the upper portion of the loading space 21;
Consists of a vegetation mat installation step of installing the vegetation mat 61 on the upper or lower portion of the cover mesh 60,
Method for producing vegetation mat gabion.
The method of claim 1,
In the detachment preventing member installation step,
The separation preventing member 50 is configured to be folded based on the side connecting the center, the side connecting the center of any one selected from one side wall portion 11, the other side mesh 20, the partition network 30 to It is characterized by being installed on three upper sides,
Method for producing vegetation mat gabion.
In vegetation mat gabion,
It is prepared by the manufacturing method of any one of claims 1 to 2,
The bottom net 10 and the bottom wall 10, the one side wall portion 11 and the other side 20 is installed around the bottom net 10 is formed inside the loading space 21, the inside of the loading space 21 The partition network 30 is installed in the inside of the loading space 21, the filling material 40 consisting of gravel and sand is filled, one side wall portion 11 and the other side network 20 and the partition network 30 Detachment member 50 is installed in, characterized in that the cover net 60 is attached to the vegetation mat 61 is installed on the loading space 21,
Vegetation mat Gabion.
KR1020100139861A 2010-12-31 2010-12-31 Plant mat gabion and it's making method KR20120077779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100139861A KR20120077779A (en) 2010-12-31 2010-12-31 Plant mat gabion and it's making method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100139861A KR20120077779A (en) 2010-12-31 2010-12-31 Plant mat gabion and it's making method

Publications (1)

Publication Number Publication Date
KR20120077779A true KR20120077779A (en) 2012-07-10

Family

ID=46711223

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100139861A KR20120077779A (en) 2010-12-31 2010-12-31 Plant mat gabion and it's making method

Country Status (1)

Country Link
KR (1) KR20120077779A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806411A (en) * 2014-01-26 2014-05-21 河海大学 Landscape stepped ecological stone cage protective bank purification forming method
KR101879729B1 (en) * 2018-01-23 2018-07-19 (주)에코블록 Non Woven Fabric Type Vegetation Partition Wire Net and Afforesting Method using thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806411A (en) * 2014-01-26 2014-05-21 河海大学 Landscape stepped ecological stone cage protective bank purification forming method
KR101879729B1 (en) * 2018-01-23 2018-07-19 (주)에코블록 Non Woven Fabric Type Vegetation Partition Wire Net and Afforesting Method using thereof
WO2019146972A1 (en) * 2018-01-23 2019-08-01 (주)푸른공간 Vegetation partition wire mesh including nonwoven fabric, and slope greening method using same
CN111630228A (en) * 2018-01-23 2020-09-04 株式会社绿色空间 Vegetation separation wire mesh containing non-woven fabric and slope greening method
JP2021510783A (en) * 2018-01-23 2021-04-30 グリーン スペース カンパニー, リミテッドGreen Space Co., Ltd. Vegetation partition wire mesh containing non-woven fabric and slope greening method using it
EP3744901A4 (en) * 2018-01-23 2021-10-27 Green Space Co., Ltd. Vegetation partition wire mesh including nonwoven fabric, and slope greening method using same
CN111630228B (en) * 2018-01-23 2022-01-07 株式会社绿色空间 Vegetation separation wire mesh containing non-woven fabric and slope greening method

Similar Documents

Publication Publication Date Title
KR100525641B1 (en) Environmental restoration techniques by nonwoven geotextile vegetation soil-bags
TWI773876B (en) Scour-preventing unit and scour-prevent method
KR101244710B1 (en) Filter partition unfolding gabion, filter partition box type gabion and revetment reinforcement method by gabion overlapping-unification construction
JP4800140B2 (en) Anti-overflow dike mat and dike reinforcement method
KR20120077779A (en) Plant mat gabion and it's making method
EA026936B1 (en) Method for forming a ground-covering layer and the ground-covering layer
CN205917704U (en) Novel multi -functional highway bank protection
CN210066391U (en) Shock attenuation environmental protection roadbed structure
KR101936013B1 (en) Eco-friendly vegetative soil
KR101860911B1 (en) Green turtle-shaped gabion manufacturing and the construction method.
RU2285085C2 (en) Protective covering to prevent underwater pipeline scouring
RU2528836C2 (en) Method to erect horizontal underground water intake of combined design
KR20160109206A (en) A gabion
KR200444259Y1 (en) Pro-Environmentally Vegetational gabion with basket
KR102486882B1 (en) Protection Wall capable of Connecting in Various Arrangement
KR20090058939A (en) The method of restorer for a mode of life of liver an incline
CN102995646A (en) Net cage protection pad type revetment structure and construction method thereof
KR20110088020A (en) Mattress gabion combined with ecology restoration mat
KR101508592B1 (en) Retaining wall frame and construction method of retaining wall
KR200461490Y1 (en) Vegetation Mat
JP5457047B2 (en) Groundwater drain structure
KR100275594B1 (en) Process for making a mattress-type gabion for soil stabilization
KR200408274Y1 (en) Vegetation Restoration Improvement for Stream Bed Aquatic Zone Protection
JP6533986B1 (en) Futon rice cake and its manufacturing method
JP3062646B2 (en) Blind drainage pipe and drainage method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application