KR20120015064A KR1020100077296A KR20100077296A KR20120015064A KR 20120015064 A KR20120015064 A KR 20120015064A KR 1020100077296 A KR1020100077296 A KR 1020100077296A KR 20100077296 A KR20100077296 A KR 20100077296A KR 20120015064 A KR20120015064 A KR 20120015064A
Authority
KR
South Korea
Prior art keywords
finishing
wall
panel
concrete
euroform
Prior art date
Application number
KR1020100077296A
Other languages
Korean (ko)
Other versions
KR101161142B1 (en
Inventor
김용국
Original Assignee
주식회사 월드와이즈월
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 월드와이즈월 filed Critical 주식회사 월드와이즈월
Priority to KR1020100077296A priority Critical patent/KR101161142B1/en
Publication of KR20120015064A publication Critical patent/KR20120015064A/en
Application granted granted Critical
Publication of KR101161142B1 publication Critical patent/KR101161142B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0889Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
    • E04F13/0891Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections with joint fillings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/10Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

PURPOSE: A construction method for a concrete external wall with an integrated finishing panel having a joint hole is provided to improve the bonding strength of a finishing panel by filling the inner side of the finishing panel with enough concrete mortar. CONSTITUTION: A construction method for a concrete external wall with an integrated finishing panel having a joint hole is as follows. The flat planes of finishing panels(10,10') having coupling holes(11) are attached on the flat planes of euro forms. Space retainers are inserted between the finishing panels. The euro forms having the finishing panels are arranged on the outer surface of a wall, and the euro forms which do not have the finishing panels are arranged on the inner surface of the wall. Concrete is placed using the forms. After the concrete is cured, the space retainers are removed from the euro forms. Joints(40) are formed between the finishing panels exposed to the outside through sealant caulking.

Description

결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법{Method for constructing outer wall of concrete with integrated finishing pannel having joint hole}Method for constructing outer wall of concrete with integrated finishing pannel having joint hole}

본 발명은 다양한 건축물의 외벽을 시공함에 있어, 일측에 결속공을 갖는 마감패널이 벽체 외면에 일체화 시공되게 한 외벽 시공방법에 관한 것으로, 더욱 상세하게는 벽체를 시공하기 위한 유로폼의 일측면에 별도의 마감패널을 부착 형성한 상태에서 상기 유로폼에 의한 거푸집의 내측으로 콘크리트를 타설함에 따라 그 콘크리트가 마감패널의 결속공을 통해 내부로 침투 및 벽체와 함께 양생되면서 상기의 마감패널이 일체화된 미려한 외벽을 빠르게 시공할 수 있도록 한 것이다.
The present invention relates to an exterior wall construction method in which a finishing panel having a binding hole on one side is integrally constructed on an outer surface of a wall in constructing exterior walls of various buildings, and more specifically, on one side of a euroform for constructing a wall. As the concrete is poured into the formwork by the Euroform in the state where the finishing panel is attached, the concrete penetrates into the interior through the binding hole of the finishing panel and is cured together with the wall. It is to be able to construct quickly.

일반적으로 건축물을 시공하고자 하는 경우에는 시공부에 따라 설계된 수치를 갖도록 미리 거푸집을 설치한 상태에서 상기 거푸집의 내측에 콘크리트를 타설한 후 콘크리트에 대한 양생이 충분히 이루어지면 상기의 거푸집을 제거하는 것으로서 내벽이나 외벽 또는 슬래브 등이 완성되는 것이다.In general, when the building is to be constructed, after the formwork is installed in advance in order to have the designed value according to the construction part, after the concrete is poured into the inside of the formwork, the curing of the concrete is sufficient to remove the formwork as the inner wall. The outer wall or slab is completed.

이와 같은 거푸집은 통상적으로 목판과 각목을 이용하여 직사각 형태로 만들어진 것을 주로 사용하였으나, 내구성이 현저히 떨어져 근자에 들어서는 유로폼을 대부분 사용하고 있는 것이다.Such formwork is usually used in the form of a rectangular shape using a wooden board and a lumber, but the durability is remarkably low, most of the Euroform is used to enter the roots.

상기의 유로폼은 금속재로 된 프레임의 일측에 표면 처리된 목판 또는 합판을 고정 형성하여 만들어지는 것인데, 금속 프레임에 의해 우수한 내구성과 견고한 체결 고정성을 확보하면서도 표면 처리된 목판 또는 합판은 콘크리트 양생면으로부터 분리가 용이하게 이루어지므로 근자의 건축 분야에서 매우 널리 사용되고 있는 것이다.The euroform is made by fixing the surface treated wood or plywood on one side of the frame made of metal, and the surface-treated wood or plywood is secured from the concrete curing surface while ensuring excellent durability and fastening fixability by the metal frame. Since it is easy to separate, it is very widely used in the field of architecture of near-by.

또한, 근자에 들어서는 콘크리트 양생에 의해 만들어진 외벽에 대하여 다양한 표면 마감처리를 수행함에 따라 외벽에 대한 미려한 마감 시공을 수행하게 되는 것인데, 콘크리트에 의해 양생되어진 외벽은 표면이 매우 지저분하고 거칠며 콘크리트 본연의 색상이 그대로 드러나 있는 상태일 것이므로 금속패널이나 석재패널 또는 페인트 등을 도색함에 따라 그 외벽에 대한 마감 공사를 추가로 수행하게 되는 것이다.In addition, by performing various surface finishes on the outer wall made by concrete curing in the recent years, the beautiful finish construction on the outer wall is performed. The outer wall cured by concrete has a very dirty and rough surface, and the natural color of concrete. Since it will be exposed as it is, as the metal panels, stone panels or paints are painted, the finishing work on the outer wall will be additionally performed.

여기서, 상기와 같은 금속패널이나 석재패널의 경우 별도의 몰탈을 이용하여 시공된 상태의 벽체 외면에 대하여 균등 간격으로 상하, 좌우 형태로 연속하여 나열 및 접착 시공하는 것과 트러스 철구조물을 설치한 후 리벳 또는 피스못으로 고정하는 것이 일반적이고, 페인트의 경우에는 스프레이 또는 직접 덧칠 등의 방법으로 작업을 수행하게 된다.Here, in the case of the metal panel or the stone panel as described above, the rivets after the truss steel structure is installed and arranged in the vertical and vertical, left and right in succession at equal intervals with respect to the outer surface of the wall constructed using a separate mortar Or, it is common to fix it with a piece of nail, and in the case of paint, the work is performed by spraying or direct coating.

이때, 상기와 같은 페인트의 경우 마감 시공 기간이 단축되면서도 다양한 색상의 연출이 가능한 장점을 갖고 있으나 외벽에 대한 균열이 그대로 드러나 유지 및 보수에 소요되는 기간과 비용이 막대하면서도 외벽 전체적으로 고급스러움이 떨어지는 단점을 갖게 된다.In this case, the above paint has the advantage of being able to produce a variety of colors while the finishing construction period is shortened, but the cracks on the exterior wall are exposed as it is, the time and cost required for maintenance and repair is enormous, and the overall quality of the exterior wall falls. Will have

이에 따라 근자에 들어서는 고급스러운 질감과 색감을 가장 잘 연출하면서도 뛰어난 내구성과 취급성 및 자재 수급성이 원활한 석재 또는 목재와 금속재의 마감패널을 주로 사용하는 추세이다.Accordingly, in recent years, the trend is to use stone or wood and metal finishing panels that have the best texture, color, and excellent durability, handling, and supply and demand.

상기와 같은 다양한 재질로 된 마감패널의 경우 본 발명의 출원인에 의해 안출된 다양한 형태와 모양을 갖고 있는 것인데, 기본적인 구성은 판재를 일측으로 절곡하여 일측이 개방된 함체 상 몸체를 구성하고, 본체의 개방측에 대하여 다수의 결속공이 나열 관통된 상태의 고정판을 부착 형성함에 따라 완성되는 것이다.Finishing panels made of various materials as described above have a variety of forms and shapes drawn by the applicant of the present invention, the basic configuration is to form a body on the open side of the body by bending the plate to one side, It is completed by attaching and forming a fixing plate in a state where a plurality of binding holes are arranged in the open side.

따라서, 콘크리트에 의해 양생된 외벽에 대하여 별도의 몰탈을 바른 상태에서 상기 마감패널의 결속공이 몰탈을 향하도록 한 상태에서 벽체를 향하여 마감패널을 가압하게 되면 상기의 몰탈이 결속공을 통해 마감패널의 내측으로 침투하면서 양생됨에 따라 상기의 외벽에 대한 마감패널의 견고한 시공이 이루어지게 되는 것이다.Therefore, the mortar of the finishing panel through the binding hole when pressing the finishing panel toward the wall in a state in which the binding hole of the finishing panel toward the mortar in a state in which a separate mortar is applied to the outer wall cured by concrete. As it is cured while penetrating into the interior, a solid construction of the finishing panel for the outer wall is made.

이와 같은 마감패널은 외벽을 미려하게 장식하면서도 다양한 시공 방법을 통해 단열이나 방음 등의 기능성 부재로서의 역할도 수행하게 되는 것이다.
Such a finishing panel is to be a function of such a functional member, such as insulation or sound insulation through a variety of construction methods while decorating the outer wall beautifully.

그러나, 상기와 같은 마감패널을 이용한 외벽의 마감 시공방법은 거푸집에 의해 양생된 상태의 외벽에 대한 추가 작업을 통해 이루어지는 것이므로 구조물 전체에 대한 시공 기간이 지나치게 길어지는 단점을 갖고 있는 것이고 그에 따라 과도한 공사비를 지출하게 되는 원인으로 작용하고 있는 것이다.However, the finishing method of the outer wall using the finishing panel as described above is made through the additional work on the outer wall cured by the formwork, which has the disadvantage that the construction period for the entire structure is too long and accordingly excessive construction cost It is working as a cause for spending.

즉, 다양한 형태의 거푸집을 이용하여 콘크리트 외벽을 양생한 상태에서 상기의 거푸집이 제거된 외벽에 대하여 몰탈을 타설하고 그 몰탈을 이용하여 마감패널을 부착 시공하는 많은 단계를 반복적으로 수행하여야 하므로 오랜 공사 기간과 더불어 많은 작업 인원이 소요되어 극히 비경제적이라 할 수 있는 것이다.That is, in the state of curing concrete exterior wall using various forms of formwork, many steps of placing mortar on the exterior wall from which the formwork has been removed and attaching the finishing panel using the mortar must be repeatedly performed. In addition to the period, a large number of workers are required, which is extremely uneconomical.

특히, 미리 양생된 외벽에 대하여 별도의 철구조물의 트러스를 설치하고 리벳이나 피스못으로 고정하는 방식과 몰탈을 이용하여 마감패널을 부착 시공하는 방법이므로 외벽과 몰탈 또는 몰탈과 마감패널 간의 부착 및 접착성이 균일하지 못할 수도 있어 상기의 마감패널이 시일이 경과함에 따라 들뜨거나 휨 또는 심한 경우 지상으로 추락할 위험성을 갖고 있어 시공 품질 및 안정성면에서 가장 최선의 방법이라 볼 수 없는 것이다.In particular, since the truss of a separate steel structure is installed on the externally cured outer wall and fixed with rivets or pegs, and the finishing panel is attached using mortar, it is attached and adhered between the outer wall and mortar or mortar and the finishing panel. The finish panel may not be the best method in terms of construction quality and stability because the finish panel has the risk of lifting, bending or falling to the ground in the severe case as the seal passes.

이에 따라 상기와 같은 외벽에 대한 마감패널의 안전하고도 견고한 시공방법이 절실하게 요구되고 있는 실정이다.
Accordingly, there is an urgent need for a safe and robust construction method of the finishing panel for the outer wall as described above.

본 발명은 전기한 바와 같은 문제점을 개선한 것으로서, 일측에 결속공을 갖는 마감패널을 공지의 유로폼에 부착 고정하여 벽체의 외면에 위치되게 하고, 벽체의 내면에는 유로폼 만을 구성하여 된 거푸집을 이용하여 콘크리트 타설 및 벽체가 양생되게 하면, 상기의 마감패널이 그 벽체에 일체화 시공되도록 함으로써,The present invention is to solve the problems as described above, by fixing the closing panel having a binding hole on one side to a known flow path to be located on the outer surface of the wall, by using a formwork consisting of only the flow path on the inner surface of the wall When the concrete is poured and the wall is cured, the finishing panel is integrated into the wall,

다양한 재질의 마감패널이 갖는 고유의 질감이나 색감이 그대로 드러나는 벽체를 빠르고 효과적으로 시공할 수 있을 뿐만 아니라, 마감패널의 부착 강도 향상 및 안정성이 뛰어난 특징을 갖는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법을 제공함에 본 발명의 목적이 있는 것이다.
It is not only possible to quickly and effectively construct walls that exhibit the original texture and color of finishing panels of various materials, but also to integrate the finishing panels with binding holes that have the characteristics of improving the adhesion strength and stability of the finishing panels. It is an object of the present invention to provide a concrete outer wall construction method.

상기한 바와 같은 목적을 달성하기 위한 본 발명은, 일측에 결속공이 형성된 마감패널을 다수 구비하여 그 마감패널의 평탄면을 유로폼의 평탄면에 부착하는 사전준비공정과; 유로폼에 부착된 상태로 서로 이웃하는 마감패널의 사이에 간격유지구를 삽입하는 간격조정공정과; 마감패널을 갖는 유로폼은 벽체의 외면에 해당되게 하고, 마감패널을 갖지 아니한 유로폼은 벽체의 내면에 해당하도록 서로 이격 설치하는 거푸집 설치공정과; 상기 거푸집을 이용하여 콘크리트를 주입하는 타설공정과; 콘크리트가 양생된 상태에서 상기 유로폼 및 마감패널 사이의 간격유지구를 제거하는 분리공정과; 양생된 벽체의 외면으로 노출되는 마감패널의 사이 틈새에 실란트 코킹에 의한 줄눈 형성공정;을 순차적으로 수행하여 이루어지는 것이다.
The present invention for achieving the above object comprises a pre-preparation process comprising a plurality of finishing panels with a binding hole formed on one side and attaching the flat surface of the finishing panel to the flat surface of the euroform; A gap adjusting step of inserting a gap holding hole between adjacent finishing panels in a state of being attached to the flow path; Euroform having a finishing panel corresponds to the outer surface of the wall, the formwork installation step of installing the Euroform not having a closing panel spaced apart from each other to correspond to the inner surface of the wall; A pouring process of injecting concrete using the formwork; A separation step of removing the gap retaining space between the flow path and the finishing panel in the state where the concrete is cured; Joint formation by sealant caulking in the gap between the finishing panel exposed to the outer surface of the cured wall;

본 발명은, 콘크리트 벽체를 시공함에 있어 그 벽체의 외면에 대하여 다양한 재질로 된 마감패널이 일체화 시공됨에 따라 시공 기간의 단축은 물론 시공비의 절감이 가능한 것이고, 마감패널의 내측으로 콘크리트 몰탈이 충분히 채워지며 양생되므로 그 마감패널에 대한 부착 강도의 현격한 향상은 물론 우수한 시공 품질과 설치 안정성이 매우 뛰어난 것이며, 유로폼의 사이와 마감 패널의 내부가 콘크리트에 의해 일체화 시공되므로 상호 간의 계면이 발생하지 않아 더욱 고품질의 벽체를 시공할 수 있는 특징을 갖게 된다.
The present invention, in the construction of a concrete wall, as the finishing panels made of various materials are integrally constructed with respect to the outer surface of the wall, it is possible to shorten the construction period and to reduce the construction cost, and the concrete mortar is sufficiently filled inside the finishing panel. As it is cured, it is not only a dramatic improvement in the adhesive strength to the finishing panel but also excellent in construction quality and installation stability.The interface between the Eurofoam and the interior of the finishing panel is integrated by concrete so that no interface between each other occurs. It has the characteristics to construct high quality walls.

도 1은 본 발명에 따른 시공방법 중 벽체 외면에 해당하는 유로폼에 대한 사전 작업도
도 2는 본 발명에 따른 시공방법 중 마감패널에 대한 간격 유지 작업도
도 3은 본 발명에 따른 시공방법 중 유로폼을 이용한 거푸집의 완성도
도 4는 본 발명에 따른 시공방법 중 콘크리트 타설 상태도
도 5는 본 발명에 따른 시공방법 중 유로폼을 분리 제거하는 과정도
도 6은 본 발명에 따른 시공방법 중 벽체에 대한 마무리 작업 상태도
도 7은 본 발명에 따른 시공방법에서 마감패널에 대한 다른 실시예도
도 8은 도 7의 시공방법에 의한 벽체의 시공 완성 상태도
1 is a preliminary operation diagram for the euroform corresponding to the outer surface of the wall in the construction method according to the invention
Figure 2 is a working interval maintenance for the finishing panel of the construction method according to the invention
Figure 3 is a complete view of the formwork using the euroforms of the construction method according to the invention
Figure 4 is a concrete pouring state of the construction method according to the present invention
5 is a process for separating and removing the flow path of the construction method according to the invention
Figure 6 is a state of finishing work for the wall of the construction method according to the invention
Figure 7 is another embodiment of the finish panel in the construction method according to the invention
8 is a view showing the construction completion state of the wall by the construction method of FIG.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.
The terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings and the inventor may properly define the concept of the term to describe its invention in the best possible way And should be construed in accordance with the principles and meanings and concepts consistent with the technical idea of the present invention.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 시공방법 중 벽체 외면에 해당하는 유로폼에 대한 사전 작업도이다.1 is a preliminary operation diagram for the flow path corresponding to the outer surface of the wall in the construction method according to the present invention.

도시된 바와 같이 판재를 절곡 형성하여 된 마감패널(10)(10')에는 일측면에 다수의 결속공(11)이 관통된 상태로 형성되어 있는 것이고, 그 마감패널(10)(10')의 반대측 평탄면에는 박리지(12)를 갖는 접착층(13)이 형성되어 있는 것인데, 상기의 박리지(12)는 마감패널(10)(10')의 표면을 보호하기 위한 보호 시트의 역할도 겸하게 된다.As shown, the finishing panels 10 and 10 'formed by bending the plate are formed in a state where a plurality of binding holes 11 penetrate through one side thereof, and the finishing panels 10 and 10'. An adhesive layer 13 having a release paper 12 is formed on the opposite flat surface of the release paper 12. The release paper 12 also serves as a protective sheet for protecting the surface of the finishing panels 10 and 10 '. Will also serve.

이때, 상기의 마감패널(10)(10')은 전기한 바와 같이 판재를 절곡 형성하여 제작할 수도 있을 것이나, 결속공(11)을 갖는 일측 판재만을 구성하고 시공된 벽체의 외면으로 노출되는 측의 패널 타측면에는 석재나 목재 등의 다양한 재질의 표면 마감재를 적용하여 제작할 수도 있는 것으로서, 상기의 결속공(11)이 형성된 측을 타공판으로 지칭하고 타공판이 부착되는 평판을 표면판으로 지칭하는 것이 통상적이다.At this time, the finishing panels 10 and 10 'may be manufactured by bending the plate as described above, but only the one side having the binding hole 11 and the side exposed to the outer surface of the constructed wall. The other side of the panel may be manufactured by applying a surface finishing material of various materials such as stone or wood, and the side on which the binding hole 11 is formed is referred to as a perforated plate and a flat plate to which the perforated plate is attached is called a surface plate. to be.

이와 같은 마감패널(10)(10')을 구비한 상태에서 상기 박리지(12)를 제거한 후 노출된 접착층(13)을 이용하여 상기의 마감패널(10)(10')을 공지의 유로폼(20)(20')에 부착 고정하게 된다.After removing the release paper 12 in a state in which the finishing panels 10 and 10 'are provided, the finishing panels 10 and 10' using the exposed adhesive layer 13 are formed in a known flow path ( 20) and 20 '.

이때, 상기의 유로폼(20)(20')은 건축물의 콘크리트 시공 과정에서 거푸집을 완성하기 위한 분할 개체를 이르는 것으로서, 철재를 프레임 형태로 가공한 상태에서 그 프레임의 일측에 표면 코팅 처리된 목판이나 합판을 부착 고정함에 따라 만들어지는 것이고, 상기의 목판이나 합판의 평탄면을 이용하여 매끄러운 벽면이 형성되도록 하는 것이다.At this time, the euroform 20, 20 'is to reach the divided object for completing the formwork in the concrete construction process of the building, the wooden board surface-treated on one side of the frame in the state of processing the steel frame It is made by attaching and fixing the plywood, so that a smooth wall surface is formed using the flat surface of the wood or plywood.

이에 따라 상기와 같은 유로폼(20)(20')의 평탄면에 대한 전기한 마감패널(10)(10')의 평탄면이 마주하도록 서로 부착 고정하면 되는 것이고, 상기의 마감패널(10)(10')은 다양한 크기로 제작될 수 있어 단일 개체의 유로폼(20)(20')에 대하여 적어도 하나 이상의 마감패널(10)(10')를 연속하여 나열 부착시킬 수 있을 것이다.
Accordingly, the flat panels of the finishing panels 10 and 10 'described above with respect to the flat surfaces of the flow paths 20 and 20' may be attached and fixed to each other so as to face each other. 10 ') may be manufactured in various sizes so that at least one or more finishing panels 10 and 10' may be sequentially attached to the single object flow forms 20 and 20 '.

도 2는 본 발명에 따른 시공방법 중 마감패널에 대한 간격 유지 작업도이다.Figure 2 is a working interval maintenance for the finishing panel of the construction method according to the invention.

상기와 같이 유로폼(20)(20')에 대하여 마감패널(10)(10')을 선행하여 부착하는 과정에서 서로 이웃하는 마감패널(10)(10')의 사이에는 별도의 간격유지구(30)를 통해 이들 마감패널(10)(10')이 서로 일정한 간격을 갖도록 부착하는 것이 중요한 것인데, 상기의 마감패널(10)(10')은 벽체의 외면으로부터 그대로 드러나는 구성물이므로 균일한 간격과 상호 구분성을 확연하게 하기 위한 틈새를 형성하는 것이 보편적인데, 이와 같은 간격의 균일화 및 틈새의 형성을 위해 상기의 간격유지구(30)를 이용하게 되는 것이다.As described above, in the process of attaching the finishing panels 10 and 10 'to the euroforms 20 and 20' in advance, there is a separate spacing between the adjacent finishing panels 10 and 10 '. It is important to attach these finishing panels 10, 10 'to be spaced apart from each other through the 30, the finishing panels 10, 10' is a composition that is exposed as it is from the outer surface of the wall as a uniform gap and It is common to form a gap for clarity of mutual distinction, and to use the gap retaining hole 30 for uniformizing the gap and forming the gap.

이때의 간격유지구(30)는 압출 또는 발포 성형된 수지물이 가장 이상적인 것이고, 필요에 따라서는 금속재 또는 목재를 이용하여 마감패널(10)(10') 간의 틈새에 적합한 두께와 길이를 갖는 다양한 개체로서 구성할 수 있을 것이다.
At this time, the gap retaining region 30 is the most ideal is an extruded or foam molded resin material, if necessary, a variety of thickness and length suitable for the gap between the finishing panels 10, 10 'by using a metal or wood. It can be configured as an entity.

도 3은 본 발명에 따른 시공방법 중 유로폼을 이용한 거푸집의 완성도이다.3 is a complete view of the formwork using the flow-foam of the construction method according to the invention.

상기와 같이 마감패널(10)(10')과 유로폼(20)(20')에 대한 사전 준비 작업 및 간격 유지 작업이 완료되면, 이들 유로폼(20)(20')을 이용하여 콘크리트 벽체를 시공하기 위한 거푸집을 형성하여야 되는데, 상기 마감패널(10)(10')이 부착된 상태의 유로폼(20)(20')은 마감패널(10)(10')이 벽체의 내측을 향하도록 배치하고 마감패널(10)(10')을 갖지 않는 공지의 유로폼(20)(20')은 시공하고자 하는 벽체의 내면에 해당하도록 각기 구분 배치하게 된다.When the preliminary preparation work and the gap maintenance work for the finishing panels 10, 10 'and the Euroforms 20 and 20' are completed as described above, the concrete walls are constructed using these Euroforms 20 and 20 '. The formwork for forming the mold should be formed, and the flow forms 20 and 20 'of the finishing panels 10 and 10' are attached so that the finishing panels 10 and 10 'face the inner side of the wall. Known euroforms 20 and 20 'which do not have the finishing panels 10 and 10' are respectively arranged to correspond to the inner surface of the wall to be constructed.

이때, 상기의 유로폼(20)(20')에 의한 거푸집은 서로 마주하는 유로폼(20)(20')을 연결하는 공지의 타이바와 타이핀에 의해 견고하게 고정 설치할 수도 있을 것이고, 지면을 이용하여 별도의 경사버팀재를 유로폼(20)(20')의 시공 배면에 고정 장착함에 따라 상기의 유로폼(20)(20')에 의한 거푸집의 견고한 설치가 이루어질 수 있을 것이다.At this time, the formwork by the flow forms 20, 20 'may be firmly fixed by a well-known tie bar and tie pins connecting the flow forms 20, 20' facing each other, by using the ground As the fixed inclined bracing material is fixedly mounted on the construction rear surface of the euroforms 20 and 20 ', a solid installation of the formwork by the euroforms 20 and 20' may be made.

이에 따라 상기와 같은 거푸집을 이용하여 양생된 벽체는 외면으로 마감패널(10)(10')이 일체화 노출될 것이고, 내면으로는 콘크리트 양생면 만이 노출될 것이다.
Accordingly, the cured wall using the formwork as described above will be exposed to the panel 10, 10 'integrally integrated on the outer surface, only the concrete curing surface will be exposed to the inner surface.

도 4는 본 발명에 따른 시공방법 중 콘크리트 타설 상태도이다.Figure 4 is a concrete pouring state of the construction method according to the invention.

전기한 바와 같이 유로폼(20)(20')을 이용하여 거푸집을 완성한 상태에서 이들 유로폼(20)(20')의 사이로 콘크리트를 타설함에 따라 서로 마주하고 있는 유로폼(20)(20')의 사이 공간 및 벽체 외면 측에 위치하고 있는 마감패널(10)(10')의 내측으로 결속공(11)을 통해 상기의 콘크리트가 충입되는 것이다.As described above, as the concrete is poured between the euroforms 20 and 20 'in a state in which the form is completed using the euroforms 20 and 20', between the euroforms 20 and 20 'facing each other. The concrete is filled through the binding hole 11 into the interior of the finishing panels 10, 10 'located on the outer surface side of the space and the wall.

이때, 상기와 같은 유로폼(20)(20')의 내측에는 다양한 개체 및 굵기와 형태의 보강 철근이 위치하게 될 것이다.
In this case, reinforcing bars of various objects and thicknesses and shapes will be positioned inside the flow paths 20 and 20 '.

도 5는 본 발명에 따른 시공방법 중 유로폼을 분리 제거하는 과정도이다.5 is a process chart for separating and removing the flow path foam in the construction method according to the invention.

상기와 같은 콘크리트 타설 공정이 종료된 후, 소정의 양생 기간을 거쳐 상기의 콘크리트에 대한 충분한 양생이 이루어지면 양생된 벽체로부터 거푸집의 해체 과정을 수행하게 되는 것인데, 상기와 같은 벽체의 외면 및 내면에 위치하고 있는 유로폼(20)(20')에 대한 분리 및 제거 공정을 수행하는 과정에서 상기의 마감패널(10)(10')은 콘크리트 벽체와 일체화 시공되어 있으므로 분리되지 않을 것이다.After the concrete placing process is finished, if sufficient curing of the concrete is made through a predetermined curing period, the process of dismantling the formwork from the cured wall is carried out on the outer surface and the inner surface of the wall as described above. In the process of performing the separation and removal process for the Euroforms 20, 20 'located, the finishing panels 10, 10' will not be separated because it is integrated with the concrete wall.

즉, 벽체의 외면에 위치하고 있는 유로폼(20)(20')을 분리하는 경우 상기의 유로폼(20)(20')은 마감패널(10)(10')과 접착층(13)에 의해 부착되어 있는 상태이므로 상기의 마감패널(10)(10')은 콘크리트 벽체로부터 노출된 매립 상태를 그대로 유지하면서 상기의 유로폼(20)(20') 만이 분리되는 것이다.That is, in the case of separating the flow paths 20 and 20 'located on the outer surface of the wall, the flow paths 20 and 20' are attached to each other by the finishing panels 10 and 10 'and the adhesive layer 13. Since the finishing panels 10 and 10 'are in the state, only the flow paths 20 and 20' are separated while maintaining the embedded state exposed from the concrete wall.

이때, 상기의 유로폼(20)(20')의 분리와 함께 마감패널(10)(10')의 사이에 삽입되어 있는 간격유지구(30)를 제거하여 이들 마감패널(10)(10')의 사이에 일정한 깊이와 간격의 틈새가 형성되도록 하는 것이다.At this time, with the separation of the flow paths 20 and 20 ', the gap retaining holes 30 inserted between the finishing panels 10 and 10' are removed to remove these closing panels 10 and 10 '. A gap of constant depth and spacing is formed between the gaps.

또한, 상기의 마감패널(10)(10')에 형성된 접착층(13)은 마감패널(10)(10') 측 보다는 유로폼(20)(20')을 향하는 면에 대한 점성을 강화시켜 상기의 유로폼(20)(20')에 대한 분리과정에서 점성이 강한 측으로 인해 접착층(13)이 유로폼(20)(20')에 그대로 부착된 상태로 분리될 수 있도록 함에 따라 마감패널(10)(10')의 노출 표면에 대하여 잔류하는 접착층(13)을 후 작업을 통해 제거하여야 하는 번거로움을 탈피할 수 있도록 하는 것이 이상적일 것이다.
In addition, the adhesive layer 13 formed on the finishing panels 10 and 10 'may enhance the viscosity of the surface facing the flow forms 20 and 20' rather than the finishing panels 10 and 10 '. Finishing panels 10 and 10 as the adhesive layer 13 can be separated in the state of being adhered to the Euroforms 20 and 20 'due to the strong viscosity in the separation process for the Euroforms 20 and 20'. Ideally, the adhesive layer 13 remaining on the exposed surface of ') can be eliminated in a post operation.

도 6은 본 발명에 따른 시공방법 중 벽체에 대한 마무리 작업 상태도이다.Figure 6 is a state of finishing work on the wall of the construction method according to the invention.

전기한 바와 같이 유로폼(20)(20')과 간격유지구(30)에 대한 해체와 분리 작업이 이루어진 상태에서 양생된 벽체의 외면으로 노출된 마감패널(10)(10')에 대한 줄눈부(40)를 형성하면 되는 것인데, 상기의 줄눈 작업은 마감패널(10)(10') 간의 구분선을 형성함에 따라 이들의 구획 및 구분이 명확하게 보여지도록 하여 시각적인 안정감과 미려함을 연출하는 것이고, 마감패널(10)(10')의 사이 틈새로 빗물 등이 유입되는 것을 차단하는 목적을 갖게 된다.As described above, the joints for the finishing panels 10 and 10 'exposed to the outer surface of the cured wall in the state of disassembly and separation of the euroforms 20 and 20' and the spacing support 30 are made. 40 is to be formed, the above work is to create a division line between the finishing panels 10, 10 'to make the division and division clearly visible, to produce a visual sense of security and beauty, Has a purpose to block the rain water flows into the gap between the finishing panels 10, 10 '.

따라서, 상기의 마감패널(10)(10') 간의 틈새에 대하여 직접 실란트 코킹을 수행하는 줄눈 작업을 수행하거나 그 틈새 내에 미리 별도의 백업재(50)를 끼워 넣은 상태에서 실란트 코킹 처리를 통해 줄눈부(40)를 형성할 수도 있을 것이다.Therefore, the joint work for performing sealant caulking is directly performed on the gap between the finishing panels 10 and 10 'or the sealant caulking process is performed in a state in which a separate backup material 50 is previously inserted in the gap. The snow 40 may be formed.

이때, 상기의 마감패널(10)(10')에 대한 두께가 얇은 경우에는 백업재(50) 없이 바로 실란트 코킹에 의한 줄눈부(40)의 형성이 이루어질 것이고, 마감패널(10)(10')에 대한 두께가 두꺼운 경우이거나 벽체에 작용하는 압력이나 수축 및 팽창력을 완화 및 흡수하기 위한 목적으로 상기의 백업재(50)를 삽입한 상태에서 실란트 코킹 처리를 수행할 수도 있을 것이다.At this time, when the thickness of the finishing panels 10, 10 'is thin, the joint portion 40 is formed by the sealant caulking without the backing material 50, and the finishing panels 10, 10'. Sealant caulking may be performed with the backing material 50 inserted for the purpose of relieving and absorbing pressure or contraction and expansion force acting on the wall.

이때의 백업재(50)는 통상적으로 고압축성 발포 수지 또는 고무 등을 이용하여 만들어지는 것이 대표적이라 할 것이다.
At this time, the backup material 50 will typically be made of a high-compression foam resin or rubber.

또한, 상기와 같은 시공방법에 있어 그 마감패널(10)(10')의 경우 통상적으로 미리 제작된 규격의 마감패널(10)(10')을 유로폼(20)(20') 표면 규격에 대하여 종,횡방향으로 균등 간격을 갖도록 부착하는 작업을 거치게 되는 것인데, 이들 마감패널(10)(10')이 유로폼(20)(20')에 대하여 균일한 간격을 갖고 부착되는 것은 수작업의 특성상 매우 곤란하고 어려운 것이 사실이다.In addition, in the construction method as described above, in the case of the finishing panels 10 and 10 ', the finishing panels 10 and 10' of the pre-fabricated standard are generally used for the surface dimensions of the Euroforms 20 and 20 '. It is to be attached to have a uniform interval in the longitudinal, transverse direction, these finishing panels 10, 10 'is attached with a uniform spacing with respect to the flow forms 20, 20' is very characteristic of the manual work. It is true that it is difficult and difficult.

따라서, 상기와 같은 마감패널(10)(10')을 제작함에 있어 기존의 유로폼(20)(20')과 1:1로 대응하는 크기로 제작함에 따라 그 마감패널(10)(10')을 상기의 유로폼(20)(20')에 간편하게 대응 부착하여 사용되게 하는 것이 이상적일 것이다.Therefore, in manufacturing the finishing panels 10 and 10 'as described above, the finishing panels 10 and 10' are manufactured in a size corresponding to 1: 1 with the existing Euroforms 20 and 20 '. It would be ideal to make it correspond to the flow paths 20 and 20 '.

또한, 다른 실시예로서 7의 도시와 같이 유로폼(20)(20')의 크기와 일치되게 만들어진 타공판(10a)을 구비하고, 그 타공판(10a)에 대하여 다수(적어도 2분할 이상)로 구분 및 분할 제작된 동일 크기의 표면판(10b)(10b')을 접합 고정하여 상기의 마감패널(10)(10')을 제작함에 따라 상기와 같이 균등 간격을 갖고 다수로 분할 접합된 상태의 표면판(10b)(10b')을 갖는 마감패널(10)(10')을 이용하여 이를 유로폼(20)(20')에 간단하게 접착시키기만 하면 최종 시공된 벽체의 표면으로 노출되는 표면판(10b)(10b')은 기존 수작업에 의한 것보다 더욱 균일하고 일정한 틈새를 갖는 외관 형태가 연출될 것이므로 그 시공 품질을 가일층 향상시키는 역할을 하게 되는 것이다.In another embodiment, a perforated plate 10a made to match the size of the euroforms 20 and 20 'is provided as shown in FIG. 7, and the perforated plate 10a is divided into a plurality (at least two divisions) Surface plates 10b and 10b 'of the same size are manufactured by joining and fixing the finished panels 10 and 10' by the same size. The surface plate 10b exposed to the surface of the final constructed wall simply needs to be simply adhered to the euroforms 20 and 20 'by using the finishing panels 10 and 10' having the 10b and 10b '. (10b ') is to produce a more uniform and uniform appearance than the existing manual work will play a role in further improving the construction quality.

또한, 상기의 표면판(10b)(10b')을 다수로 분할 제작하여 단일의 타공판(10a)에 대하여 접합 형성하는 방식이 아닌 상기 표면판(10b)(10b')을 절곡 형성하여 줄눈홈이 수직 및 수평방향으로 형성되게 하여 마치 그 표면판이 다수로 분할된 형태로 제작되게 함에 따라 도 8의 도시와 같이 일체의 표면판(10b)(10b')으로부터 구획된 심미감을 연출하는 형태의 마감패널(10)(10')을 적용하여 시공할 수도 있을 것이다.In addition, the grooves are formed by bending the surface plates 10b and 10b 'rather than forming the plurality of surface plates 10b and 10b' by joining them to a single perforated plate 10a. It is formed in the vertical and horizontal direction as if the surface plate is manufactured in a divided form as shown in Figure 8 as shown in Figure 8 finish panel of the form to produce aesthetics partitioned from the integral surface plate (10b) (10b ') It may be applied by applying (10) (10 ').

이에 따라 상기와 같은 각 공정을 통해 시공되어진 벽체의 경우 그 마감패널(10)(10')이 일체화 시공된 상태이므로 벽체에 대한 미려한 외관을 형성하는 동시에 마감패널(10)(10')의 견고한 부착성 및 우수한 설치 안정성을 확보할 수 있게 된다.
Accordingly, in the case of the wall constructed through the above-described processes, the finishing panels 10 and 10 'are integrally constructed, thereby forming a beautiful appearance for the walls and at the same time firmly finishing the finishing panels 10 and 10'. It is possible to secure the adhesion and excellent installation stability.

이상과 같은 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일실시예에 불과할 뿐이고 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 이들을 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.
It is to be understood that both the foregoing general description and the following detailed description of the present invention are exemplary and explanatory and are intended to provide further explanation of the present invention as defined by the appended claims. Examples should be understood.

10,10' : 마감패널 10a : 타공판
10b,10b' : 표면판 11 : 결속공
12 : 박리지 13 : 접착층
20,20' : 유로폼
30 : 간격유지구
40 : 줄눈부
50 : 백업재
10,10 ': Finishing panel 10a: Perforated plate
10b, 10b ': surface plate 11: binding hole
12: release paper 13: adhesive layer
20,20 ': Euroform
30: spacing zone
40: joint
50: backup material

Claims (8)

일측에 결속공이 형성된 마감패널을 구비하여 그 마감패널의 평탄면을 유로폼의 평탄면에 부착하는 사전준비공정과;
유로폼에 부착된 상태로 서로 이웃하는 마감패널의 사이에 간격유지구를 삽입하는 간격조정공정과;
마감패널을 갖는 유로폼은 마감패널이 시공될 벽체의 내측을 향하도록 벽체의 외면에 해당되게 배치하고, 마감패널을 갖지 아니한 유로폼은 벽체의 내면에 위치하도록 배치하여 설치하는 거푸집 설치공정과;
상기 거푸집을 이용하여 콘크리트를 타설하는 주입공정과;
콘크리트가 양생된 상태에서 상기 유로폼 및 마감패널 사이의 간격유지구를 제거하는 분리공정과;
양생된 벽체의 외면으로 노출되는 마감패널의 사이 틈새에 실란트 코킹 처리를 하는 줄눈 형성공정;을 순차적으로 수행하여 이루어짐을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
A preliminary preparation step including a finishing panel having a binding hole formed at one side thereof, and attaching the flat surface of the finishing panel to the flat surface of the euroform;
A gap adjusting step of inserting a gap holding hole between adjacent finishing panels in a state of being attached to the flow path;
Euroform having a closing panel is disposed so as to correspond to the outer surface of the wall facing the inner side of the wall to be constructed, the formwork installation process is installed by placing the Euroform without the closing panel is located on the inner surface of the wall;
An injection step of pouring concrete using the formwork;
A separation step of removing the gap retaining space between the flow path and the finishing panel in the state where the concrete is cured;
A joint forming process for performing a sealant caulking process in a gap between the finishing panels exposed to the outer surface of the cured wall; Concrete exterior wall construction method for the integrated construction of the finishing panel having a binding hole, characterized in that performed sequentially.
제 1항에 있어서,
마감패널은, 결속공이 형성되지 않은 타측 평탄면에 박리지를 갖는 접착층을 형성하여 상기의 마감패널의 박리지를 제거한 상태에서 그 접착층을 통해 유로폼에 부착 고정되도록 함을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
The finishing panel has a closing panel having a binding hole, characterized in that to form an adhesive layer having a release paper on the other flat surface where the binding hole is not formed to be attached to the euroform through the adhesive layer in a state where the release paper of the finishing panel is removed. The concrete outer wall construction method which made this integral construction.
제 2항에 있어서,
접착층은 마감패널에 부착되는 부분보다 유로폼에 부착되는 부분의 점성이 강하도록 적층 형성하여, 유로폼의 분리공정에서 그 접착층이 유로폼과 함께 마감패널로부터 분리 제거되도록 함을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 2,
The adhesive layer is formed to be laminated so that the viscosity of the portion attached to the euroform than the portion attached to the finish panel, the adhesive layer is characterized in that the adhesive layer is separated and removed from the finish panel with the euroform in the separation process of the euroform. Concrete exterior wall construction method that allows panel to be integrated.
제 1항에 있어서,
거푸집 설치공정은, 서로 마주하는 유로폼이 공지의 타이바와 타이핀에 의해 서로 이격 고정되어 이루어짐을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
The formwork installation process is a concrete outer wall construction method in which the finishing panel having a binding hole is integrally constructed, characterized in that the Euroforms facing each other are fixed to each other by a known tie bar and a tie pin.
제 1항에 있어서,
거푸집 설치공정은, 서로 마주하는 유로폼이 그 유로폼의 배면부로부터 지상을 연결하는 경사버팀재에 의해 서로 이격 고정되게 이루어짐을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
The formwork installation process is a concrete exterior wall construction method in which the finishing panels having binding holes are integrally constructed, wherein the Euroforms facing each other are fixed to be spaced apart from each other by an inclined support material connecting the ground from the rear portion of the Euroform.
제 1항에 있어서,
줄눈 형성공정에서, 마감패널의 사이 틈새에 별도의 백업재를 미리 삽입한 상태에서 실란트 코킹 작업이 이루어지도록 함을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
In the joint forming process, a concrete outer wall construction method in which a finishing panel having a binding hole is integrally constructed, wherein a sealant caulking operation is performed while a separate backing material is previously inserted into a gap between the finishing panels.
제 1항에 있어서,
마감패널은, 유로폼과 대응하는 1:1의 크기를 갖고 제작되어 그 유로폼에 부착 사용되게 함을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
The finishing panel is a concrete outer wall construction method that is made with a size of 1: 1 corresponding to the euroform and attached to the euroform to be used as a finishing panel having a binding hole integrally constructed.
제 1항에 있어서,
마감패널은, 결속공을 갖는 평판 형태로 된 타공판과 그 타공판에 접합되는 절곡함체의 표면판으로 구성하되, 상기의 타공판은 유로폼의 크기와 일치하는 단일 개체로 이루어지고 상기의 표면판은 타공판에 대하여 적어도 2분할 이상으로 구분 제작되어 타공판으로부터 종,횡으로 간격을 갖고 이격 배치됨에 따라 시공된 벽체의 외면으로 간격을 갖는 표면판이 노출되도록 함을 특징으로 하는 결속공을 갖는 마감패널이 일체화 시공되게 한 콘크리트 외벽 시공방법.
The method of claim 1,
The finishing panel is composed of a perforated plate in the form of a flat plate having a binding hole and a surface plate of a bending enclosure joined to the perforated plate, wherein the perforated plate is composed of a single object corresponding to the size of the euroform and the surface plate is formed on the perforated plate. The finishing panel having a binding hole is integrally constructed so that the surface plate having a gap is exposed to the outer surface of the constructed wall as it is divided into at least two divisions and spaced apart from the perforated plate vertically and horizontally. How to construct a concrete exterior wall.
KR1020100077296A 2010-08-11 2010-08-11 Method for constructing outer wall of concrete with integrated finishing pannel having joint hole KR101161142B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100077296A KR101161142B1 (en) 2010-08-11 2010-08-11 Method for constructing outer wall of concrete with integrated finishing pannel having joint hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100077296A KR101161142B1 (en) 2010-08-11 2010-08-11 Method for constructing outer wall of concrete with integrated finishing pannel having joint hole

Publications (2)

Publication Number Publication Date
KR20120015064A true KR20120015064A (en) 2012-02-21
KR101161142B1 KR101161142B1 (en) 2012-06-29

Family

ID=45837917

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100077296A KR101161142B1 (en) 2010-08-11 2010-08-11 Method for constructing outer wall of concrete with integrated finishing pannel having joint hole

Country Status (1)

Country Link
KR (1) KR101161142B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670755A (en) * 2019-09-30 2020-01-10 深圳龙源精造建设集团有限公司 Assembly type indoor dry-hanging wall brick system and construction method thereof
KR102377405B1 (en) * 2021-05-14 2022-03-22 홍종수 Interior wall block

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200491614Y1 (en) 2018-05-30 2020-05-08 라인강건산업주식회사 finishing panel assembly having pollution preventing and quake proof structure
KR102021454B1 (en) 2018-12-27 2019-09-16 라인강건산업주식회사 open joint panel assembly for earthquake-proof having over drain structure
KR102021445B1 (en) 2019-01-23 2019-09-16 라인강건산업주식회사 open joint type earthquake-proof panel assembly with easy fixing structure of decorating louver
KR102277966B1 (en) 2019-05-07 2021-07-15 라인강건산업주식회사 open joint panel assembly without gasket
KR102277972B1 (en) 2019-05-07 2021-07-15 라인강건산업주식회사 open joint panel assembly improved air permeability and insulation
KR102280637B1 (en) 2021-03-18 2021-07-22 라인강건산업주식회사 open joint panel assembly having flame retardant function and seismic performance
KR102406903B1 (en) 2021-12-31 2022-06-10 라인강건산업주식회사 open joint panel assembly having fire spread prevention function and seismic performance
KR102534003B1 (en) 2022-01-10 2023-05-18 신혜연 Wall panel and wall having same
KR102520870B1 (en) 2022-07-26 2023-04-12 라인강건산업주식회사 non-welding type open joint panel assembly without horizontal panel frame
KR20240014758A (en) 2022-07-26 2024-02-02 라인강건산업주식회사 non-welding seismic constructing structure using panel frame connecting bracket
KR102494717B1 (en) 2022-10-04 2023-02-06 라인강건산업주식회사 Building-Integrated Photovoltaic apparatus having open joint seismic composite panel assembly
KR102583703B1 (en) 2023-01-19 2023-09-27 라인강건산업주식회사 open joint construction assembly of fire-resistant composite panel
KR102672682B1 (en) 2023-07-06 2024-06-05 라인강건산업주식회사 seismic insulation panel assembly with functions for fire spread prevention and thermal break

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH061972Y2 (en) 1986-04-08 1994-01-19 直光 佐野 Insulation wall structure
JPH1162069A (en) 1997-08-07 1999-03-05 Chichibu Onoda Cement Corp Construction method for concrete decoration wall surface
KR100957494B1 (en) 2008-04-28 2010-05-14 주식회사 월드와이즈월 Wall for waterproofing, soundproofing, and thermal isolation with easy fixing structure of finishing pannel
KR101069943B1 (en) * 2008-08-21 2011-10-04 심재업 Aluminum composite panel for wet process of construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670755A (en) * 2019-09-30 2020-01-10 深圳龙源精造建设集团有限公司 Assembly type indoor dry-hanging wall brick system and construction method thereof
KR102377405B1 (en) * 2021-05-14 2022-03-22 홍종수 Interior wall block
WO2022240118A1 (en) * 2021-05-14 2022-11-17 홍종수 Block for prefabricated interior wall

Also Published As

Publication number Publication date
KR101161142B1 (en) 2012-06-29

Similar Documents

Publication Publication Date Title
KR101161142B1 (en) Method for constructing outer wall of concrete with integrated finishing pannel having joint hole
CA2608219C (en) Masonry system
KR101024963B1 (en) Buildform for constructing finishing-pannel-imbedded outer wall
CN203783128U (en) Building template system
EP1736609A1 (en) System for construction with pre-fabricated panels, and pre-fabricated panel
US10415236B2 (en) Outer insulation integrated insulating block system easy to dry-finish and a construction method thereby
KR100927342B1 (en) Formwork wall finishes
JP3439436B2 (en) Raising method of concrete frame
KR200447273Y1 (en) The joint molding apparatus for the euro-form mold
US20210301529A1 (en) Systems and methods for adhering cladding
KR20190078792A (en) Multi system bracket
CN105040864A (en) Formwork supporting method for constructional column in limited space
JP4546979B2 (en) Formwork member having attachment means and concrete wall forming method
US9630340B2 (en) System of forming walls with exterior applied finish panels
KR20120025137A (en) Finishing board for constructing ourt wall
KR20040030756A (en) Concrete Block with (steel)-reinforced Edges
US12098547B2 (en) Method of forming a composite wall structure
JPH08246546A (en) Work execution method and structure of concrete body wall fitted with lining panel
KR20110004641A (en) One light weight outer wall fire insulating complex panel and manufacturing method thereof
KR200179051Y1 (en) Concrete form
KR19980024968U (en) Composite interior and exterior stucco wire mesh precast concrete panel formwork.
KR20000032500A (en) Method for reinforcing surface of concrete structure
KR960003315Y1 (en) Building panel
CN105350713A (en) Assembled wall board with integrated function for decoration, fire-proofing, temperature keeping and weight-bearing, and manufacture method thereof
JPH04315659A (en) Driving mold construction method using framed sheathing board

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150623

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160725

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170725

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180625

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190625

Year of fee payment: 8