KR20110016649A - Sewer using reinforcement and the formation system - Google Patents

Sewer using reinforcement and the formation system Download PDF

Info

Publication number
KR20110016649A
KR20110016649A KR1020090074258A KR20090074258A KR20110016649A KR 20110016649 A KR20110016649 A KR 20110016649A KR 1020090074258 A KR1020090074258 A KR 1020090074258A KR 20090074258 A KR20090074258 A KR 20090074258A KR 20110016649 A KR20110016649 A KR 20110016649A
Authority
KR
South Korea
Prior art keywords
reinforcing
reinforcing rod
profile
rod
hollow
Prior art date
Application number
KR1020090074258A
Other languages
Korean (ko)
Other versions
KR101066958B1 (en
Inventor
김경훈
Original Assignee
김경훈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김경훈 filed Critical 김경훈
Priority to KR1020090074258A priority Critical patent/KR101066958B1/en
Publication of KR20110016649A publication Critical patent/KR20110016649A/en
Application granted granted Critical
Publication of KR101066958B1 publication Critical patent/KR101066958B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/02Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material
    • B29C63/04Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material by folding, winding, bending or the like
    • B29C63/06Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material by folding, winding, bending or the like around tubular articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/03Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor characterised by the shape of the extruded material at extrusion
    • B29C48/09Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels
    • B29C48/11Articles with cross-sections having partially or fully enclosed cavities, e.g. pipes or channels comprising two or more partially or fully enclosed cavities, e.g. honeycomb-shaped
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/88Thermal treatment of the stream of extruded material, e.g. cooling
    • B29C48/911Cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/02Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material
    • B29C63/04Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material by folding, winding, bending or the like
    • B29C63/08Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material by folding, winding, bending or the like by winding helically
    • B29C63/10Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor using sheet or web-like material by folding, winding, bending or the like by winding helically around tubular articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Sewage (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Shaping Of Tube Ends By Bending Or Straightening (AREA)

Abstract

PURPOSE: A sewer pipe using a reinforcing bar and a molding device thereof are provided to increase strength by accurately settling each reinforcing support in the hollow portion of a profile. CONSTITUTION: A sewer pipe comprises first and second reinforcing supports(11,12) and a reinforcing profile(20). The first and second reinforcing supports are formed in lengthwise. A reinforcing blade(11a) is projected on the left side center of the first reinforcing support. A reinforcing wing(12a) is projected on the right side center of the second reinforcing support.

Description

보강대를 이용한 하수관 및 그 성형장치{Sewer using reinforcement and the formation system}Sewer pipe using reinforcement and its forming system {Sewer using reinforcement and the formation system}

본 발명은 보강대를 이용한 하수관 및 그 성형장치에 관한 것으로, 더욱 상세하게는 보강날개를 형성한 제1, 2보강대가 세로방향에서 일체형으로 연결된 열십자 보강대에 의하여 강하고 견고한 하중을 효과적으로 견딜 수 있도록 강도를 향상시킬 수 있는 보강대를 이용한 하수관 및 그 성형장치에 관한 것이다.The present invention relates to a sewage pipe using a reinforcing bar and a molding apparatus thereof, and more particularly, the first and second reinforcing bars in which reinforcing blades are formed are strengthened to effectively withstand strong and solid loads by a cross reinforcing bar integrally connected in a longitudinal direction. It relates to a sewer pipe and its molding apparatus using a reinforcing bar that can improve the.

종래 하수관은 중공이 형성된 사각형의 프로파일을 압출하여 와인딩장치에 나선형으로 공급하면서 성형하는 이중벽 하수관과, 도 1에 도시한 바와 같이 중공에 열십자 형태의 보강대(3)를 일체형으로 형성하는 프로파일(1)을 공급하여 4개의 중공(2)이 형성되는 복층벽 하수관이 제안되었다.Conventional sewage pipe is a double-wall sewer pipe formed by extruding a rectangular profile having a hollow formed while feeding spirally to the winding device, and a profile for integrally forming a cross-shaped reinforcement 3 in the hollow as shown in FIG. ), A multi-walled sewer pipe is proposed in which four hollows 2 are formed.

종래의 복층벽 하수관은 강도를 향상시키기 위한 열십자 보강대를 프로파일과 일체형으로 압출 성형하게 되므로 중공이 있는 내경 부분이 압출되면서 곧바로 냉각되어야 하지만 외부와의 온도편차에 의해 용융된 원료가 열십자 보강대를 성형 하면서 성형상태가 그대로 있도록 냉각하지 못하므로 열십자 형태가 무너져 가로방향과 세로방향이 정확하게 열십자 형태로 형성되지 못하여 더 많은 원료를 제공받아 압출함에도 강도를 향상시키는 것에 한계성이 있는 결점이 있었다.Conventional multi-wall sewer pipe extrudes the cross reinforcing rod to improve the strength integrally with the profile, so the hollow inner portion must be cooled immediately as the inner diameter part is extruded. During molding, the cross shape was collapsed because it was not cooled so that the cross shape and the vertical direction could not be precisely formed in the shape of crisscross. Therefore, there was a drawback that there was a limitation in improving the strength even when extrusion was received with more raw materials.

그리고 상기와 같이 열십자 보강대를 중공에 삽입하여 일체형으로 성형함에도 강도를 향상시키는 것에는 한계가 있어서, 하수관의 사용범위를 더욱 넓히지 못하므로 하수관의 사용범위가 제한되는 결점이 있었다.In addition, there is a limit in improving the strength even when the crisscross reinforcing rod is inserted into the hollow as described above, thereby improving the strength, and thus the use range of the sewer pipe is not limited.

본 발명은 이러한 종래의 결점을 해소하기 위하여 안출된 것으로, 열십자 보강대의 열십자 형태가 정확하게 세워질 수 있도록 보강날개를 중앙 좌측으로 형성한 제1 보강대와 보강날개를 중앙 우측으로 형성한 제2 보강대를 독립되게 성형한 후 중공에 공급되어 각각의 보강대가 정확하게 성형되어 강도를 향상시킬 수 있도록 함을 목적으로 하는 것이다.The present invention has been devised to solve such a conventional drawback, the first reinforcing rod formed in the reinforcement wing to the center left so that the cruciform shape of the cross reinforcement stand and the second reinforcing rod formed to the center right side It is intended for the purpose of molding to be independently and then supplied to the hollow so that each reinforcing rod is molded accurately to improve the strength.

본 발명은 중공에 열십자 보강대를 성형하는 프로파일을 공급하여 냉각시킨 후 와인딩장치에 나선형으로 공급하여 이음부재로 연결되는 하수관에 있어서,In the present invention, in the sewage pipe which is connected to the joint member by supplying a spiral to the winding device after cooling by supplying a profile for forming a cruciform reinforcement in the hollow,

좌측 중앙에 보강날개가 돌출되어 세로방향으로 성형하는 제1 보강대와;A first reinforcing rod protruding from the left center to be molded in the longitudinal direction;

우측 중앙에 보강날개가 돌출되어 세로방향으로 성형하는 제2 보강대와;A second reinforcing bar protruding from the right center to be molded in the longitudinal direction;

상기 제1 보강대의 보강날개가 중공 내면의 좌측에 연결되고,제2 보강대의 보강날개가 중공 내면의 우측에 연결되며 상기 제1 보강대와 제2 보강대가 소정의 간격을 두고 세로방향으로 세워지도록 연결되며;The reinforcing blade of the first reinforcing rod is connected to the left side of the hollow inner surface, the reinforcing blade of the second reinforcing rod is connected to the right side of the hollow inner surface and connected so that the first reinforcing rod and the second reinforcing rod stand vertically at a predetermined interval. Become;

상기 상기 제1 보강대와 제2 보강대가 중공에 공급되고 이음부재로 연결되는 보강 프로파일로 이루어짐을 특징으로 하는 것이다.The first reinforcing bar and the second reinforcing bar is characterized in that it is made of a reinforcing profile is supplied to the hollow and connected to the joint member.

본 발명은 보강날개를 중앙 좌측으로 형성하며 세로방향으로 세워지게 성형한 제1 보강대와 보강날개를 중앙 우측으로 형성하며 세로방향으로 세워지게 형성한 제2 보강대를 독립되게 형성한 후 프로파일의 중공에서 각각의 보강대가 정확하게 세워지도록 공급하여 강도를 향상시키도록 하는 것이다.The present invention is formed in the hollow of the profile after forming the reinforcing blade to the center left and the first reinforcing rod formed in the longitudinal direction and the second reinforcing rod formed in the longitudinal right and formed to stand in the longitudinal direction independently from the hollow of the profile Each reinforcing bar is supplied to stand upright to improve strength.

본 발명은 보강대의 형태가 정확하게 세워질 수 있도록 보강날개를 중앙 상측으로 형성하며 가로방향으로 형성한 제1 보강대와 보강 날개를 중앙 하측으로 형성하며 가로방향으로 형성한 제2 보강대를 독립되게 형성한 후 프로파일의 중공에서 각각의 보강대가 정확하게 세워지도록 공급하여 강도를 크게 향상시켜 하수관의 사용범위를 더욱 넓힐 수 있도록 하는 것이다.The present invention forms the reinforcing blades to form the upper reinforcement wings to the upper right, and the first reinforcing rods formed in the horizontal direction and the reinforcing blades formed in the lower center and the second reinforcing bars formed in the horizontal direction independently In the hollow of the profile, each reinforcing bar is supplied so that it is erected upright, so that the strength can be greatly improved, so that the use range of the sewer pipe can be further extended.

이하에서 본 발명의 바람직한 실시예를 첨부시킨 도면에 따라서 상세하게 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2a는 본 발명의 제1 보강대에 대한 정면도이고, 도 2b는 본 발명의 제2 보강대에 대한 정면도이며, 도 2c는 본 발명의 제 1, 2보강대를 이용한 보강 프로파일의 단면도를 나타낸 것이다.Figure 2a is a front view of the first reinforcing bar of the present invention, Figure 2b is a front view of the second reinforcing bar of the present invention, Figure 2c shows a cross-sectional view of the reinforcing profile using the first, second reinforcing bar of the present invention.

보강대 압출장치(60)를 통하여 좌측 중앙에 보강날개(11a)를 돌출되게 형성하며 세로방향에 직립되게 형성되는 제1 보강대(11)를 성형하는 것이다.The reinforcing bar extruder 60 is formed to protrude the reinforcing blade 11a at the center of the left side, and the first reinforcing bar 11 is formed to be formed upright in the longitudinal direction.

보강대 압출장치(60)를 통하여 상기 제1 보강대(11)와 분리되어 함께 성형하고 우측 중앙에 보강날개(12a)를 돌출되게 형성하며 세로방향에 직립되게 형성되는 제2 보강대(12)를 성형하는 것이다.The first reinforcing rod 11 is separated from the first reinforcing rod 11 through the reinforcing rod extrusion device 60 and formed to protrude the reinforcing blades 12a at the right center, and the second reinforcing rod 12 is formed to be upright in the longitudinal direction. will be.

상기 제1 보강대(11)와 제2 보강대(12)는 보강대 압출장치(60)에서 압출되어 보강대 냉각장치(61)에서 냉각되는 것이며, 분리되어 성형된 제1 보강대(11)와 제2 보강대(12)가 세로방향에서 보강날개(11a, 12a)가 양쪽으로 돌출되도록 소정의 간격에서 공급되는 것이다.The first reinforcing rod 11 and the second reinforcing rod 12 are extruded from the reinforcing rod extruder 60 to be cooled in the reinforcing rod cooling device 61, and the first reinforcing rod 11 and the second reinforcing rod separately formed ( 12) is supplied at predetermined intervals such that the reinforcing blades 11a and 12a protrude to both sides in the longitudinal direction.

상기 제1 보강대(11)와 제2 보강대(12)를 공급하여 프로파일 성형장치(63)에 의해 성형되는 보강 프로파일(20)의 내부 중공(2)에 위치하도록 일체형으로 성형되는 것이다.The first reinforcing rod 11 and the second reinforcing rod 12 are supplied to be integrally molded so as to be located in the inner hollow 2 of the reinforcing profile 20 formed by the profile forming apparatus 63.

상기 보강 프로파일(20)의 중공(2)에 일체형으로 성형되는 제1 보강대(11)의 보강날개(11a)는 중공(2)의 좌측벽에 연결되고, 제2 보강대(12)의 보강날개(12a)는 중공(2)의 우측벽에 연결되도록 성형하는 것이며, 제1 보강대(11)와 제2 보강대(12)는 소정의 간격을 두고 세로방향에 설치되는 것이다.The reinforcing blade 11a of the first reinforcing rod 11 formed integrally with the hollow 2 of the reinforcing profile 20 is connected to the left wall of the hollow 2, and the reinforcing wing of the second reinforcing rod 12 ( 12a) is molded to be connected to the right wall of the hollow 2, and the first reinforcing rod 11 and the second reinforcing rod 12 are installed in the longitudinal direction at a predetermined interval.

보강 프로파일(20)은 프로파일 냉각장치(64)에서 냉각되어 와인딩장치(66)에 나선형으로 공급되는 것이다.The reinforcing profile 20 is cooled in the profile chiller 64 and spirally fed to the winding device 66.

도 3은 본 발명의 보강 프로파일에 이음부재를 공급하여 성형한 상태의 단면도이고, 도 4는 본 발명의 복층벽 하수관에 대한 일부 단면상태 사시도이다.3 is a cross-sectional view of a state in which a joint member is formed by supplying a joint member to the reinforcing profile of the present invention, and FIG. 4 is a partial cross-sectional perspective view of the multilayer wall sewer pipe of the present invention.

보강 프로파일(20)은 압출에 의해 중공(2)을 성형하면서 제1 보강대(11)와 제2 보강대(12)를 공급하여 일체형으로 성형하므로 제1 보강대(11)와 제2 보강대(12)가 보강 프로파일(20)의 중공(2)에 정확하게 위치를 잡아 일체형으로 연결된 상태가 되도록 생산되는 것이다.Since the reinforcing profile 20 is formed by integrally supplying the first reinforcing rod 11 and the second reinforcing rod 12 while forming the hollow 2 by extrusion, the first reinforcing rod 11 and the second reinforcing rod 12 are formed. It is produced to be in a state of being integrally connected by accurately positioning the hollow (2) of the reinforcing profile (20).

상기 보강 프로파일(20)은 와인딩장치(66)에 나선형으로 공급되면서 보강 프로파일(20)의 사이에 이음부재 압출장치(65)로부터 이음부재(21)를 공급하여 하수관(30)을 성형하는 것이다.The reinforcing profile 20 is supplied to the winding device 66 in a spiral manner to supply the joint member 21 from the joint member extrusion device 65 between the reinforcing profile 20 to form the sewer pipe 30.

상기 하수관(30)은 냉각장치(67)에서 냉각된 후 절단장치(68)에서 소정의 길이로 절단되는 것이다.The sewage pipe 30 is cooled by the cooling device 67 and then cut into a predetermined length by the cutting device 68.

도 6a는 본 발명의 제1 보강대에 대한 다른 실시예의 정면도를 나타낸 것이며, 도 6b는 본 발명의 제2 보강대에 대한 다른 실시예의 정면도이고, 도 6c는 본 발명의 보강 프로파일에 대한 다른 실시예의 단면도를 나타낸 것이다.6A shows a front view of another embodiment of the first reinforcement of the present invention, FIG. 6B is a front view of another embodiment of the second reinforcement of the present invention, and FIG. 6C is a cross-sectional view of another embodiment of the reinforcement profile of the present invention. It is shown.

보강대 압출장치(60)를 통하여 중앙 상측에 보강날개(41a)를 돌출되게 형성하며 가로방향에 형성되는 제1 보강대(41)를 성형하는 것이다.The reinforcing bar extruder 60 is formed so as to protrude the reinforcing blade 41a on the upper side and to form the first reinforcing bar 41 formed in the transverse direction.

보강대 압출장치(60)를 통하여 상기 제1 보강대(41)와 분리되어 함께 성형하고 중앙 하측에 보강날개(42a)를 돌출되게 형성하며 가로방향에 형성되는 제2 보강대(42)를 성형하는 것이다.The first reinforcing rod 41 is separated from the first reinforcing rod 41 through the reinforcing rod extrusion device 60, and the second reinforcing rod 42 is formed in the transverse direction and is formed to protrude the reinforcing blade 42a at the center bottom.

상기 제1 보강대(41)와 제2 보강대(42)는 보강대 압출장치(60)에서 압출되어 보강대 냉각장치(61)에서 냉각되는 것이며, 분리되어 성형된 제1 보강대(41)와 제2 보강대(42)가 공급되는 것이다.The first reinforcing rod 41 and the second reinforcing rod 42 is extruded from the reinforcing rod extruder 60 to be cooled in the reinforcing rod cooling unit 61, and the first reinforcing rod 41 and the second reinforcing rod formed separately ( 42) is supplied.

상기 제1 보강대(41)와 제2 보강대(42)를 공급하여 프로파일 성형장치(63)에 의해 성형되는 보강 프로파일(50)의 내부 중공(2)에 위치하도록 일체형으로 성형되 는 것이다.By supplying the first reinforcing rod 41 and the second reinforcing rod 42 is formed integrally to be located in the inner hollow (2) of the reinforcing profile (50) formed by the profile forming apparatus (63).

상기 보강 프로파일(50)의 중공(2)에 일체형으로 성형되는 제1 보강대(41)의 보강날개(41a)는 중공(2)의 상측 내벽에 일체형으로 연결되고, 제2 보강대(42)의 보강날개(42a)는 중공(2)의 하측 내벽에 일체형으로 연결되며, 제1 보강대(41)와 제2 보강대(42)는 소정의 간격을 두고 중공의 내벽 양쪽에 각각 일체형으로 연결되는 것이다.The reinforcing blade 41a of the first reinforcing bar 41 integrally formed in the hollow 2 of the reinforcing profile 50 is integrally connected to the upper inner wall of the hollow 2 and the reinforcing of the second reinforcing bar 42. The blade 42a is integrally connected to the lower inner wall of the hollow 2, and the first reinforcing rod 41 and the second reinforcing rod 42 are integrally connected to both sides of the hollow inner wall at predetermined intervals.

상기 보강 프로파일(50)은 프로파일 냉각장치(64)에서 냉각되어 와인딩장치(66)에 나선형으로 공급되는 것이다.The reinforcing profile 50 is cooled in the profile cooling device 64 and spirally supplied to the winding device 66.

이러한 구성으로 이루어진 본 발명은 보강대 압출장치(60)에 수지를 공급하여 용융시켜 중앙 좌측으로 보강날개(11a)가 형성된 제1 보강대(11)와 중앙 우측으로 보강날개(12a)가 형성된 제2 보강대(11)를 각각 압출하여 소정의 형태가 정확하게 압출되도록 하고, 보강대 냉각장치(61)에 공급하여 압출된 형태가 변형되지 않도록 냉각되어 공급된다.According to the present invention having the above configuration, the resin is supplied to the reinforcing rod extrusion device 60 to melt the first reinforcing rod 11 having the reinforcing blade 11a formed at the center left side and the second reinforcing rod having the reinforcing blade 12a formed at the center right side. Each of 11 is extruded so that a predetermined shape is accurately extruded, and is supplied to the reinforcing rod cooling device 61 to be cooled and supplied so as not to deform the extruded shape.

상기 제1 보강대(11)와 제2 보강대(12)가 각각 냉각되어 공급되는 과정에서 프로파일 성형장치(63)에 공급하면 제1 보강대(11)와 제2 보강대(12)가 프로파일을 성형하면서 중공(2)에 공급되어 일체형의 보강 프로파일(20)을 성형하게 된다.When the first reinforcing rod 11 and the second reinforcing rod 12 are cooled and supplied to the profile forming apparatus 63, respectively, the first reinforcing rod 11 and the second reinforcing rod 12 are hollow while forming the profile. It is supplied to (2) to form the integral reinforcement profile 20.

보강 프로파일(20)을 프로파일 냉각장치(64)에 공급하여 냉각시킨 후 와인딩장치(66)에 나선형으로 공급하면서 이음부재 압출장치(65)에서 수지를 용융시켜 압출하여 이음부재(21)를 보강 프로파일(20)의 사이에 공급하여 복층벽 하수관(30)을 성형하는 것이다.After supplying the reinforcing profile 20 to the profile cooling device 64 and cooling it, supplying the spiral to the winding device 66 while melting the resin in the joint member extrusion device 65 and extruding the joint member 21 to reinforce the profile. It supplies between 20 and forms the multilayer wall sewer pipe 30. As shown in FIG.

하수관(30)은 냉각장치(67)에 공급되어 냉각된 후 절단장치(68)에서 소정의 길이로 절단되어 공급되는 것이다.The sewage pipe 30 is supplied to the cooling device 67 to be cooled and then cut and supplied to the cutting device 68 by a predetermined length.

하수관(30)은 중공(2)에 제1 보강대(11)와 제2 보강대(12)가 세로방향에서 소정의 간격을 갖고 공급되므로 내압강도와 외압강도를 더 향상시키게 되는 것이며, 제1 보강대(11)와 제2 보강대(12)가 독립되게 압출되어 성형된 것이므로 보강대의 형태가 정확하게 성형되어 제공되므로 강도를 최대한 향상시킬 수 있게 되는 것이다.Sewage pipe 30 is the first reinforcing rod 11 and the second reinforcing rod 12 is supplied to the hollow (2) at a predetermined interval in the longitudinal direction to further improve the pressure resistance and external pressure strength, the first reinforcing rod ( 11) and the second reinforcing rod 12 is formed to be independently extruded, so that the shape of the reinforcing rod is accurately molded and provided so that the strength can be improved as much as possible.

그리고 본 발명은 도 6a 내지 도 6d에 도시한 바와 같이, 보강대 압출장치(60)에 수지를 공급하여 용융시켜 중앙 좌측으로 보강날개(41a)가 형성된 제1 보강대(41)와 중앙 우측으로 보강날개(42a)가 형성된 제2 보강대(41)를 각각 압출하여 소정의 형태가 정확하게 압출되도록 하고, 보강대 냉각장치(61)에 공급하여 압출된 형태가 변형되지 않도록 냉각되어 공급된다.6A to 6D, the resin is supplied to the reinforcing rod extruder 60 to melt the first reinforcing rod 41 and the reinforcing blade to the center right. Each of the second reinforcing bars 41 having the 42a formed therein is extruded so that a predetermined shape is accurately extruded, and is supplied to the reinforcing bar cooling device 61 to be cooled and supplied so as not to deform the extruded shapes.

상기 제1 보강대(41)와 제2 보강대(42)가 각각 냉각되어 공급되는 과정에서 프로파일 성형장치(63)에 공급하면 제1 보강대(41)와 제2 보강대(42)가 프로파일을 성형하면서 중공(2)에 공급되어 제1 보강대(41)와 제2 보강대(42)가 일체형의 보강 프로파일(50)을 성형하게 된다.When the first reinforcing rod 41 and the second reinforcing rod 42 are respectively cooled and supplied to the profile forming apparatus 63, the first reinforcing rod 41 and the second reinforcing rod 42 are hollow while forming the profile. It is supplied to (2) and the 1st reinforcement stand 41 and the 2nd reinforcement stand 42 shape the integral reinforcement profile 50. As shown in FIG.

보강 프로파일(50)을 프로파일 냉각장치(64)에 공급하여 냉각시킨 후 와인딩장치(66)에 나선형으로 공급하면서 이음부재 압출장치(65)에서 수지를 용융시켜 압 출하여 이음부재(21)를 보강 프로파일(50)의 사이에 공급하여 하수관(50)을 성형하는 것이다.After supplying the reinforcing profile 50 to the profile cooling device 64 and cooling it, the resin is melted and extruded in the joint member extrusion device 65 while being spirally supplied to the winding device 66 to reinforce the joint member 21. The sewage pipe 50 is formed by feeding between the profiles 50.

하수관(50)은 냉각장치(67)에 공급되어 냉각된 후 절단장치(68)에서 소정의 길이로 절단되어 공급되는 것이다.The sewage pipe 50 is supplied to the cooling device 67 to be cooled and then cut and supplied to the cutting device 68 by a predetermined length.

본 발명은 보강날개를 갖는 제1 보강대와 제2 보강대를 각각 독립되게 성형하여 연결부에서 일체형으로 연결함으로써 정확한 보강대를 성형하고, 상기 보강대를 프로파일의 중공에 공급하여 중공에서 소정의 간격을 갖고 정확하게 세워지면서 보강하여 강도를 향상시킬 수 있도록 하는 것이다.According to the present invention, the first reinforcing bar having the reinforcing blades and the second reinforcing bar are molded independently and connected to each other in one piece at the connecting portion to form an accurate reinforcing bar. It is to reinforce and improve strength.

도 1 은 종래 하수관의 프로파일에 대한 단면도1 is a cross-sectional view of the profile of a conventional sewage pipe

도 2a 는 본 발명의 제1 보강대에 대한 정면도Figure 2a is a front view of the first reinforcement of the present invention

도 2b 는 본 발명의 제2 보강대에 대한 정면도2b is a front view of the second reinforcement of the present invention;

도 2c 는 본 발명의 보강대 프로파일의 단면도2C is a cross-sectional view of the reinforcement profile of the present invention.

도 3 은 본 발명의 보강 프로파일에 이음부재를 공급하여 성형한 상태의 단면도Figure 3 is a cross-sectional view of the molded state by supplying a joint member to the reinforcing profile of the present invention

도 4 는 본 발명의 복층벽 하수관에 대한 일부 단면상태 사시도4 is a partial cross-sectional perspective view of the multi-walled sewer pipe of the present invention

도 5 는 본 발명의 복층벽 하수관 성형장치에 대한 블럭도5 is a block diagram of a multi-walled sewer pipe forming apparatus of the present invention;

도 6a 는 본 발명의 제1 보강대에 대한 다른 실시예의 정면도6A is a front view of another embodiment of a first reinforcement of the present invention;

도 6b 는 본 발명의 제2 보강대에 대한 다른 실시예의 정면도6B is a front view of another embodiment of a second reinforcement of the present invention;

도 6c 는 본 발명의 보강 프로파일에 대한 다른 실시예의 단면도6C is a cross-sectional view of another embodiment of a reinforcing profile of the present invention.

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

1 : 프로파일 2 : 중공1: profile 2: hollow

3 : 열십자 보강대 11, 41 : 제1 보강대3: crisscross reinforcement 11, 41: first reinforcement

11a, 12a, 41a, 42a : 보강날개 12, 42 : 제2 보강대11a, 12a, 41a, 42a: reinforcement wings 12, 42: second reinforcement stand

20, 50 : 보강 프로파일 21 : 이음부재 20, 50: reinforcing profile 21: joint member

30 : 하수관 60 : 보강대 압출장치 30: sewer pipe 60: reinforcing rod extrusion device

61 : 보강대 냉각장치 63 : 프로파일 성형장치61: reinforcing bar cooling device 63: profile forming device

64 : 프로파일 냉각장치 65 : 이음부재 압출장치64: profile cooling device 65: joint member extrusion device

66 : 와인딩장치 67 : 냉각장치66: winding device 67: cooling device

68 : 절단장치68: cutting device

Claims (4)

중공(2)에 열십자 보강대(3)를 성형하는 프로파일(1)을 공급하여 냉각시킨 후 와인딩장치에 나선형으로 공급하여 이음부재(21)로 연결되는 하수관에 있어서,In the sewer pipe connected to the joint member 21 by supplying the cooling (1) for forming the cruciform reinforcement (3) to the hollow (2) and then cooling it to the winding device, 좌측 중앙에 보강날개(11a)가 돌출되어 세로방향으로 성형하는 제1 보강대(11)와;A first reinforcing rod 11 which protrudes in the center of the left side and is molded in the longitudinal direction; 우측 중앙에 보강날개(12a)가 돌출되어 세로방향으로 성형하는 제2 보강대(12)와;A second reinforcing rod 12 protruding from the right center thereof to protrude in the longitudinal direction; 상기 제1 보강대(11)의 보강날개(11a)가 중공 내면의 좌측에 연결되고,제2 보강대(12)의 보강날개(12a)가 중공 내면의 우측에 연결되며 상기 제1 보강대(11)와 제2 보강대(12)가 소정의 간격을 두고 세로방향으로 세워지도록 연결되며;The reinforcing blade 11a of the first reinforcing rod 11 is connected to the left side of the hollow inner surface, and the reinforcing blade 12a of the second reinforcing rod 12 is connected to the right side of the hollow inner surface and is connected to the first reinforcing rod 11. The second reinforcing rods 12 are connected to stand vertically at a predetermined interval; 상기 상기 제1 보강대(11)와 제2 보강대(12)가 중공(2)에 공급되고 이음부재(21)로 연결되는 보강 프로파일(20)로 이루어짐을 특징으로 하는 보강대를 이용한 하수관.The sewer pipe using the reinforcing rod, characterized in that the first reinforcing rod (11) and the second reinforcing rod (12) is made of a reinforcing profile (20) is supplied to the hollow (2) and connected to the joint member (21). 중공(2)에 열십자 보강대(3)를 성형하는 프로파일(1)을 공급하여 냉각시킨 후 와인딩장치에 나선형으로 공급하여 이음부재(21)로 연결되는 복층벽 하수관에 있어서,In the multi-wall wall sewer pipe connected to the joint member 21 by supplying and cooling the profile (1) for molding the cruciform reinforcement (3) to the hollow (2), and then spirally supplied to the winding device, 중앙 상측에 보강날개(41a)가 돌출되어 가로방향으로 성형하는 제1 보강 대(41)와;A first reinforcing bar 41 formed to protrude in the horizontal direction by reinforcing blades 41a protruding from the center; 중앙 하측에 보강날개(42a)가 돌출되어 세로방향으로 성형하는 제2 보강대(42)와;A second reinforcing rod 42 protruding from the central lower side to protrude in the longitudinal direction; 상기 제1 보강대(41)의 보강날개(41a)가 중공 내면의 상측에 연결되고,제2 보강대(42)의 보강날개(42a)가 중공 내면의 하측에 연결되며 상기 제1 보강대(41)와 제2 보강대(42)가 소정의 간격을 두고 가로방향으로 연결되며;The reinforcing blade 41a of the first reinforcing rod 41 is connected to the upper side of the hollow inner surface, and the reinforcing blade 42a of the second reinforcing rod 42 is connected to the lower side of the hollow inner surface and is connected to the first reinforcing rod 41. The second reinforcing bars 42 are connected in the transverse direction at predetermined intervals; 상기 제1 보강대(41)와 제2 보강대(42)가 중공(2)의 중앙에 공급되며 이음부재(21)로 연결되는 보강 프로파일(50)로 이루어짐을 특징으로 하는 보강대를 이용한 복층벽 하수관.The first reinforcing bar 41 and the second reinforcing bar 42 is supplied to the center of the hollow (2) is a multi-wall wall sewer using a reinforcing bar, characterized in that made of a reinforcing profile (50) connected to the joint member (21). 중공(2)에 열십자 보강대(3)를 성형하는 프로파일(1)을 압출 공급하여 냉각시킨 후 와인딩장치(66)에 나선형으로 공급하여 이음부재 압출장치(65)에서 공급되는 이음부재(21)로 연결되고, 냉각장치(67)에서 냉각되어 성형되는 복층벽 하수관 성형장치에 있어서,Profile (1) for molding the cross reinforcement (3) to the hollow (2) by cooling the extrusion and then spirally supplied to the winding device (66) joint member 21 supplied from the joint member extrusion device (65) In the multi-walled sewer pipe forming apparatus which is connected to the cooling system and cooled by the cooling device 67, 좌측 중앙에 보강날개(11a)가 돌출되어 세로방향으로 성형하는 제1 보강대(11)와 우측 중앙에 보강날개(12a)가 돌출되어 세로방향으로 성형하는 제2 보강대(12)를 성형하는 보강대 압출장치(60)와;Reinforcing bar extrusion for forming the first reinforcing rod 11 protruding in the longitudinal center to form the first reinforcement 11 and the reinforcing wing 12a protruding in the right center to form the second reinforcing rod 12 forming in the longitudinal direction Device 60; 상기 제1 보강대(11)와 제2 보강대(12)가 압출되는 것을 냉각시키는 보강대 냉각장치(61)와;A reinforcing bar cooling device (61) for cooling the extruded first and second reinforcing bars (11) and 12; 상기 제1 보강대(11)와 제2 보강대(12)의 보강날개(11a, 12a)가 양쪽으로 돌출되도록 하고 중공(2)의 중앙에 공급하여 제1 보강대(11)와 제2 보강대(12)가 일체형으로 성형되는 보강 프로파일(20)을 성형하는 프로파일 성형장치(63)와;The reinforcing blades 11a and 12a of the first reinforcing rod 11 and the second reinforcing rod 12 protrude to both sides, and are supplied to the center of the hollow 2 to supply the first reinforcing rod 11 and the second reinforcing rod 12. A profile molding apparatus 63 for forming a reinforcing profile 20 in which the molded parts are integrally formed; 상기 보강 프로파일(20)을 공급하여 냉각시키는 프로파일 냉각장치(64)와;A profile cooling device (64) for supplying and cooling the reinforcing profile (20); 상기 보강 프로파일(20)을 와인딩장치(66)에 나선형으로 공급하며 보강 프로파일(20)의 사이에 이음부재(21)를 공급하는 이음부재 압출장치(65)와;A joint member extrusion device 65 which spirally supplies the reinforcing profile 20 to the winding device 66 and supplies a joint member 21 between the reinforcing profiles 20; 상기 보강 프로파일(20)의 사이에 이음부재(21)가 공급되어 하수관(30)을 성형함을 특징으로 하는 보강대를 이용한 하수관 성형장치.Sewage pipe forming apparatus using a reinforcing rod characterized in that the joint member 21 is supplied between the reinforcing profile 20 to form the sewer pipe (30). 제 3항에 있어서,The method of claim 3, wherein 보강대 압출장치(60)는 중앙 상측으로 보강날개(41a)가 형성된 제1 보강대(41)와 중앙 하측으로 보강날개(42a)가 형성된 제2 보강대(42)를 성형하는 것임을 특징으로 하는 보강대를 이용한 하수관 성형장치.The reinforcing rod extrusion device 60 uses a reinforcing rod to form a first reinforcing rod 41 having a reinforcing blade 41a formed above the center and a second reinforcing rod 42 having a reinforcing blade 42a formed below the center. Sewer pipe forming device.
KR1020090074258A 2009-08-12 2009-08-12 Sewer using reinforcement and the formation system KR101066958B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090074258A KR101066958B1 (en) 2009-08-12 2009-08-12 Sewer using reinforcement and the formation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090074258A KR101066958B1 (en) 2009-08-12 2009-08-12 Sewer using reinforcement and the formation system

Publications (2)

Publication Number Publication Date
KR20110016649A true KR20110016649A (en) 2011-02-18
KR101066958B1 KR101066958B1 (en) 2011-09-23

Family

ID=43774955

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090074258A KR101066958B1 (en) 2009-08-12 2009-08-12 Sewer using reinforcement and the formation system

Country Status (1)

Country Link
KR (1) KR101066958B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101634229B1 (en) * 2015-11-24 2016-06-28 (주) 대현테크 Fuel-saving type method of manufacturing multiple wall sewer
KR101657959B1 (en) * 2015-11-24 2016-09-20 (주) 대현테크 Fuel-saving type multiple wall forming machines sewer
KR101705571B1 (en) * 2016-06-09 2017-02-10 (주) 대현테크 Forming apparatus of the fuel-saving multi-wall hardness stiffened girder multiple wall sewage pipe
KR102560219B1 (en) * 2022-05-18 2023-07-27 주식회사 태경화학 A synthetic resin sewer pipe manufacturing method that recycles waste plastic and waste plastic sawdust

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101748634B1 (en) 2014-11-12 2017-07-03 유옥수 Uneven conjoined triple wall drainpipe for improved hardness and cohesion forming device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200204043Y1 (en) * 2000-06-27 2000-11-15 신원씨씨주식회사 Large plastic pipe with grate reinforcement
KR100474564B1 (en) * 2001-05-15 2005-03-10 주식회사 예가건축사사무소 Structural reinforcement spiral pipe for sewage pipe and conduit pipe in civil engineering and road construction
KR100661103B1 (en) * 2004-08-31 2006-12-26 (주) 대경프라스틱 A plastic pipe that have multiplex reinforcement structure and the manufacture device
KR100871645B1 (en) 2008-03-19 2008-12-02 일우산업 주식회사 A plastic pipe with double fly wall and its manufacturing method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101634229B1 (en) * 2015-11-24 2016-06-28 (주) 대현테크 Fuel-saving type method of manufacturing multiple wall sewer
KR101657959B1 (en) * 2015-11-24 2016-09-20 (주) 대현테크 Fuel-saving type multiple wall forming machines sewer
KR101705571B1 (en) * 2016-06-09 2017-02-10 (주) 대현테크 Forming apparatus of the fuel-saving multi-wall hardness stiffened girder multiple wall sewage pipe
KR102560219B1 (en) * 2022-05-18 2023-07-27 주식회사 태경화학 A synthetic resin sewer pipe manufacturing method that recycles waste plastic and waste plastic sawdust

Also Published As

Publication number Publication date
KR101066958B1 (en) 2011-09-23

Similar Documents

Publication Publication Date Title
KR101039350B1 (en) Duplex wall sewer using reinforcement and the formation system
KR101066958B1 (en) Sewer using reinforcement and the formation system
KR101007975B1 (en) A sewer pipe device of duplex wall and that making method
KR101634229B1 (en) Fuel-saving type method of manufacturing multiple wall sewer
KR101705573B1 (en) Fuel-saving hardness stiffened girder multiple wall and sewage pipe its manufacturing method
KR100929939B1 (en) Polyethylene manufacturing method and the device duplexwall drainpipe
KR100926540B1 (en) Strength improvement style duplex wall sewer of internal
KR100787208B1 (en) A process of manufacture pipe of intensity improvement type anf that device
KR101705571B1 (en) Forming apparatus of the fuel-saving multi-wall hardness stiffened girder multiple wall sewage pipe
KR101705568B1 (en) Fuel-saving hardness stiffened girder multiple wall and sewage pipe its manufacturing method
KR101808247B1 (en) Multi-wall sewer pipe with a water wall and its forming device
KR101791411B1 (en) Rigid reinforced multi-wall sewer pipe and its forming device
KR100922601B1 (en) Strength improvement style sewer and that manufacture system
KR101816009B1 (en) Stiffened reinforced multi-wall wall sewer that maintains the shape by separating and extruding the profile and provides a bonding force on both sides and a manufacturing method thereof
KR20080017158A (en) Reinforce structure for dual triangle of plastic pipe and that making method
KR101808244B1 (en) Multi-wall sewer pipe with a water wall and its manufacturing method
KR100929900B1 (en) Sewage usual profile junction groove formation system and the manufacturing method
KR100743217B1 (en) Pipe of intensity improvement type
KR101007974B1 (en) A sewer pipe device of duplex wall and that making method
KR101816012B1 (en) Stiffened reinforced multi-walled wall sewer pipe which maintains the shape by separating and extruding the profile and provides the bonding force on both side surfaces and its molding device
KR101570196B1 (en) Prepared by Eco Green Island High rigidity sewers and apparatus and method
KR101023768B1 (en) A sewer pipe of duplex wall
KR102057857B1 (en) Multiple Wall Sewage Pipes and their Manufacturing Methods Using Double Cross Reinforcement
KR100922603B1 (en) Strength improvement style duplex wall sewer and that manufacture system
KR100922604B1 (en) Strength improvement style sewer and that manufacture system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150707

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160907

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170927

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180913

Year of fee payment: 8