A fixing structure of pillar

Info

Publication number
KR20090110169A
KR20090110169A KR1020080035816A KR20080035816A KR20090110169A KR 20090110169 A KR20090110169 A KR 20090110169A KR 1020080035816 A KR1020080035816 A KR 1020080035816A KR 20080035816 A KR20080035816 A KR 20080035816A KR 20090110169 A KR20090110169 A KR 20090110169A
Authority
KR
South Korea
Prior art keywords
pillar
column
tubular support
fixing structure
main body
Prior art date
Application number
KR1020080035816A
Other languages
Korean (ko)
Other versions
KR100991886B1 (en
Inventor
유조웅
Original Assignee
대실종합건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대실종합건설 주식회사 filed Critical 대실종합건설 주식회사
Priority to KR1020080035816A priority Critical patent/KR100991886B1/en
Publication of KR20090110169A publication Critical patent/KR20090110169A/en
Application granted granted Critical
Publication of KR100991886B1 publication Critical patent/KR100991886B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2269Mounting poles or posts to the holder in a socket
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

PURPOSE: A column anchoring structure is provided to stably use the column without the concern of the lifetime reduction due to the corrosion of an anchor bolt or a anchor nut for a long term because plural anchor bolts and plural anchor nuts are not used when installing a column. CONSTITUTION: A column anchoring structure is composed of a support(10), a combining projection, and a column(20). The support is fixed to a concrete foundation structure under the ground. The combining projection is formed in the lower part of the support. The column is inserted in the support. The column is combined to the combining projection by a cut groove(22). The plate type in-corner main body is composed of a panel and a reinforcing plate attached to the back of the panel.

Description

기둥 정착구조{A fixing structure of pillar}A fixing structure of pillar

본 발명은 도로의 교통 신호등, 가로등, 도로표지판 등 시설물의 기둥을 설치하는 기둥 정착구조에 관한 것으로서, 더욱 상세하게는 지하 콘크리트 기초 구조물에 매립되어 고정되거나 또는 관형 지지체(10)가 매립된 프리캐스트 콘크리트(PC)로 제작되어 지하 콘크리트 기초 구조물에 매립된 관형 지지체에 기둥의 하부를 삽입하는 것만으로 기둥을 설치하므로 시공이 용이하여 공기의 단축과 시공비용을 현저하게 절감할 수 있는 기둥 정착구조에 관한 것이다. The present invention relates to a pillar fixing structure for installing pillars of a facility such as traffic lights, street lamps, road signs, etc. of the road, and more particularly, precast embedded in an underground concrete foundation structure or fixed with a tubular support 10 embedded therein. It is easy to install because the pillar is installed by inserting the lower part of the column into the tubular support made of concrete (PC) and embedded in the underground concrete foundation structure. It is about.

일반적으로 도로의 교통 신호등, 가로등, 도로표지판 등 시설물의 설치에 있어서는 지반에 콘크리트 기초를 매설하고 이에 돌출된 앵커 볼트에 너트로서 지주의 하단의 플랜지를 조립하는 구성으로 설치하는 것이 대부분인바, 이러한 설치방법은 지주 하단의 플랜지에 형성된 볼트 삽입공의 위치와 기초콘크리트의 앵커볼트의 돌출위치를 일치시켜야만 그 기립설치가 가능하였는데, 콘크리트 기초 제작시 앵커 볼트의 위치가 조금씩 변경되는 문제점이 있어 기초콘크리트 상에 지주를 기립설치하는데 많은 어려움이 야기된다고 하는 결점이 있다.In general, in the installation of facilities such as traffic lights, street lights, road signs of roads, most of the installations are constructed by embedding concrete foundations in the ground and assembling the flanges of the lower ends of the pillars with nuts to protruding anchor bolts. The method can be erected only if the position of the bolt insertion hole formed in the flange at the bottom of the support coincides with the projected position of the anchor bolt of the foundation concrete, but the position of the anchor bolt is slightly changed when manufacturing the concrete foundation. There is a drawback that many difficulties are caused to stand up the land.

특히 가로등은 거리의 조명이나 교통의 안전, 또는 미관(美觀) 따위를 위하 여 길가를 따라 설치해 놓은 조명시설로서, 고속도로, 시가지의 주요도로, 상업지구 도로, 주택지구 도로 등 설치장소에 따라 그에 알맞은 종류가 사용되는 것으로서, 가로등의 가로등주의 형식에는 여러 가지가 있는데, 하단부가 일직선형의 원통형으로 제작된 가로등주가 본 발명의 적용 대상이 된다.In particular, street lamps are lighting facilities installed along the streets for street lighting, traffic safety, or beauty. The street lamps are suitable for installation places such as highways, main roads in the city, commercial roads, and residential district roads. As the type is used, there are various types of street lamps of street lamps, street lamps of which the lower end is made of a linear cylindrical shape is the object of the present invention.

이와 같은 구조의 교통신호등, 가로등, 도로표지판 등 시설물의 기둥 설치는 장소에 따라 그 길이가 달라지게 제작하고 기둥의 하부에는 앵커 볼트를 삽입 체결할 수 있도록 볼트공이 형성된 판형상의 플랜지를 일체로 용접하여 기초바닥에 설치되는 콘크리트 기초 구조물에 앵커 볼트를 직립으로 설치하여 너트로 체결하는 것이다.The installation of the pillars of facilities such as traffic lights, street lamps, road signs, etc. has the same length depending on the location. The anchor bolt is installed upright on the concrete foundation structure installed on the foundation floor and fastened with nuts.

즉, 상기 가로등이나 도로표지판 등 시설물의 기둥 설치공법은 기둥 설치시 기둥의 기초 콘크리트 구조물을 타설하기 위하여 터파기를 시행하고, 터파기를 한 후에 거푸집 설치하고, 거푸집의 양측에서 상면으로 돌출되게 전선관을 끼우고, 바닥면에서 사방으로 돌출되게 앵커 볼트를 설치한 후 기초 구조물을 설치하기 위해 콘크리트를 타설하고, 그 기초 구조물을 양생하는 것이다.In other words, the pillar installation method of the facilities such as street lamps and road signs are carried out in order to pour the foundation concrete structure of the pillar when installing the pillar, install the formwork after the excavation, and pinch the conduit to protrude from the sides of the formwork to the upper surface. After installing anchor bolts to protrude in all directions from the bottom surface, the concrete is poured to install the foundation structure, and the foundation structure is cured.

이러한 종래의 기둥 설치방법을 채용한 가로등 설치예는 도 1 및 도 2a, 도 2b에 도시한 바와 같이 콘크리트에 의해 양생된 콘크리트 기초 구조물(7)의 상단에는 다수개의 앵커 볼트(6)가 상방으로 돌출되고, 측면과 상단 중심부가 서로 연결되는 전선관(9)이 구성된 것으로, 상단이 노출하도록 콘크리트 기초 구조물(7)을 지면까지 매립하고, 가로등주(2)의 플랜지(5)에 형성된 볼트공(5a)으로 앵커 볼트(6)를 삽입 시킨후 너트(3)로 체결하여 가로등주(2)를 세우고, 지면에 매설된 전 력선을 전선관(9) 내로 관통하여 가로등(1)과 연결하여 가로등(1)을 사용할 수 있도록 하는 것이다.Street lamp installation example employing such a conventional pillar mounting method is shown in Figure 1 and 2a, 2b is a plurality of anchor bolts (6) upward on the top of the concrete foundation structure (7) cured by concrete The conduit 9 is formed to protrude, and the side and the upper center are connected to each other. The concrete foundation structure 7 is embedded to the ground so as to expose the upper end, and the bolt hole 5a formed in the flange 5 of the street lamp column 2. Insert the anchor bolt (6) with the nut and tighten it with the nut (3) to erect the street light pole (2), and the electric power line embedded in the ground penetrates into the conduit (9) and connects with the street light (1). To make it available.

상기와 같이 가로등주(2)와 콘크리트 기초(7) 구조물을 앵커 볼트(6)와 너트(3)에 의해 조립할 수 있도록 하는 것은 가로등주(2) 내부에 전선교체나 기타의 부수작업을 할 수 있도록 하기 위함이다.The assembly of the street lamp column (2) and the concrete foundation (7) structure by the anchor bolts (6) and the nut (3) as described above to allow the replacement of the wire or other side work inside the street lamp column (2) For sake.

또한, 일부에서는 가로등주(2)와 콘크리트 기초(7)가 결합한 앵커 볼트(6)와 너트(6)를 보호하기 위하여 베이스 커버(4)로 감싸기도 한다.In addition, in some cases it is wrapped with a base cover (4) to protect the anchor bolt (6) and the nut (6) to which the street lamp pole (2) and the concrete foundation (7) are coupled.

도 2a는 종래방식으로 기초 구조물에 가로등주의 설치상태를 확대 도시해 보인 분리 사시도로, 콘크리트 기초 구조물(7) 위에 사방으로 돌출된 앵커 볼트(6)와 측면에서 삽입되어 중앙으로 돌출된 복수의 전선관(9)이 돌출되고, 콘크리트 기초(7)의 상면 보다 조금 작은 면적을 가지는 플랜지(5)의 볼트공(5a)에 앵커볼트를 끼우고 너트로 결합하여 가로등주(2)를 설치하는 것이다.Figure 2a is an exploded perspective view showing an enlarged state of the installation of the street lamp in the conventional structure in a conventional manner, the anchor bolts 6 protruding in all directions on the concrete foundation structure (7) and a plurality of conduits protruding from the side to the center (9) is protruding, the anchor bolt is inserted into the bolt hole (5a) of the flange (5) having a slightly smaller area than the upper surface of the concrete foundation (7) to install the street lamp (2) by coupling with a nut.

한편, 상기와 같이 가로등주(2)를 설치할 때는 하중이 무거운 가로등주(2)의 상부를 크레인으로 들어올린 후 기초 구조물(7)에서 돌출된 앵커 볼트(6)에 가로등주(2)의 플랜지(5)에 형성된 볼트공(5a)을 삽입하여 조립하고 있으나 하중이 무겁고, 크레인에 매달려 있기 때문에 작업자가 앵커 볼트(6)와 너트(3)의 중심을 서로 맞추기에 어려움이 수반되고, 다수의 앵커 볼트(6)와 너트(3)의 체결 등으로 시공에 시간과 인력이 많이 소요되어 시공에 소요되는 경비가 증가하게 되는 결점이 있다.On the other hand, when installing the street lamps (2) as described above, the lifting of the heavy load of the street lamps (2) with a crane and then the flange (5) of the street lamps (2) to the anchor bolt (6) protruding from the base structure (7) It is assembled by inserting the bolt hole (5a) formed in the but the load is heavy, it is difficult to align the center of the anchor bolt (6) and the nut (3) because the worker is hanging on the crane, a number of anchor bolts ( 6) and the nut (3), such as the construction takes a lot of time and manpower, there is a drawback to increase the cost required for construction.

또한, 상기 가로등주(2) 내부에 전선교체나 기타의 보수 작업을 할 경우에는 크레인으로 가로등주(2)의 상부를 고정한 후 앵커 볼트(6)에서 앵커 너트(3)를 일일이 풀어서 들어올린 후 전선교체나 보수 작업을 마친 후 다시 가로등주(2)를 콘크리트 기초 구조물(7)에 조립을 하여야 하기 때문에 처음 가로등(1)을 시공할 때와 마찬가지로 조립이 번거로운 문제점이 있다.In addition, in the case of wire replacement or other repair work inside the street lamp (2), after fixing the upper portion of the street lamp (2) with a crane, lifting the anchor nut (3) from the anchor bolt (6) one by one after lifting the wire replacement B) After the repair work, the lamppost 2 should be assembled again to the concrete foundation structure 7, and thus, the assembly is cumbersome as in the case of the construction of the first lamppost 1.

또한, 상기 가로등주(2)의 하부에 형성된 베이스(5)의 볼트공(5a)에 기초 구조물(7)의 앵커 볼트(6)를 삽입한 후 앵커 너트(3)로 체결하나, 시간이 경과하면 눈, 비 또는 먼지 등이 앵커 볼트(6)와 앵커 너트(3)의 체결부위에 인입되어 부식이 쉽게 되기 때문에 보수 작업시 분리하는 데 많은 어려움이 있다.In addition, the anchor bolt 6 of the foundation structure 7 is inserted into the bolt hole 5a of the base 5 formed in the lower part of the street lamp 2, and then tightened with the anchor nut 3, but when time passes Since snow, rain, or dust is introduced into the fastening portion of the anchor bolt 6 and the anchor nut 3 to facilitate corrosion, there is a lot of difficulty in separating during maintenance work.

또한, 가로등주(2)와 콘크리트 기초 구조물(7)에 앵커 볼트(6)를 삽입하여 앵커 너트(3)로 체결하면 베이스(5)의 상부로 앵커 볼트(6)가 돌출되어 야간에는 보행자가 발에 걸려 넘어져 다치는 안전사고를 방지하는 것은 물론 앵커 볼트(6)와 앵커 너트(3)에 눈, 비, 먼지 등이 인입되지 못하도록 가로등주(2)에 베이스 커버(4)를 끼움 설치하였으나 외력에 의하여 베이스 커버(4)가 쉽게 파손되어 외관상 미려하지 못한 문제점이 있다.In addition, when the anchor bolt 6 is inserted into the street lamp column 2 and the concrete foundation structure 7 and fastened with the anchor nut 3, the anchor bolt 6 protrudes from the upper part of the base 5 so that the pedestrian may foot at night. The base cover (4) is fitted to the street lamp (2) to prevent the safety accidents caused by falling over and to prevent snow, rain and dust from entering the anchor bolt (6) and the anchor nut (3). There is a problem that the base cover 4 is easily broken and not beautiful in appearance.

본 발명은 상기한 실정을 감안하여 종래 가로등이나 도로표지판 등 시설물의 기둥 설치시에 야기 되는 여러 가지 결점 및 문제점 들을 해결하고자 발명한 것으로서, 그 목적은 지하 콘크리트 기초 구조물에 매립되어 고정되거나 또는 관형 지지체가 매립된 프리캐스트 콘크리트(PC)로 제작되어 관형 지지체에 기둥의 하부를 삽입하는 것만으로 기둥이 설치되므로 시공이 용이하여 시간과 인력의 감소로 시공비용이 현저하게 절감되어 경제성이 탁월한 기둥 정착구조를 제공하는 데 있다.The present invention has been invented to solve various defects and problems caused by the installation of pillars of a conventional street light or road sign in view of the above situation, the purpose of which is embedded in an underground concrete foundation structure fixed or tubular support It is made of embedded precast concrete (PC), and the pillar is installed just by inserting the lower part of the column into the tubular support, so it is easy to install and the construction cost is significantly reduced due to the reduction of time and manpower. To provide.

본 발명의 다른 목적은 지상에 위치하는 기둥을 설치할 때에 지상에 위치하는 다수의 앵커 볼트와 너트를 사용하지 않으므로 앵커 볼트나 앵커 너트의 부식으로 인한 수명단축의 염려 없이 장기간 안정되게 사용할 수 있어 수명이 길면서도 분리가 용이하여 보수작업을 적은 비용으로 단시간에 간단히 할 수 있는 기둥 정착구조를 제공하는 데 있다.Another object of the present invention is not to use a plurality of anchor bolts and nuts located on the ground when installing the ground poles can be used stably for a long time without fear of shortening the life due to corrosion of anchor bolts or anchor nuts It is to provide a column fixing structure that can be easily separated in a short time at low cost due to long and easy separation.

본 발명의 또 다른 목적은 기둥을 설치하면 기둥 외에 지상으로 돌출되는 돌기 없이 단지 눈, 비, 먼지 등이 인입되지 못하도록 기둥에 끼워져 지면상에 덮여지는 판상의 커버링만이 지상이 위치하므로 보행자가 걸려 넘어져 다치는 안전사고를 방지하면서도 외관이 미려하게 되는 기둥 정착구조를 제공하는 데 있다.Still another object of the present invention is to install a column so that the pedestrian hangs because only the plate-like covering that is fitted on the ground to prevent snow, rain, dust, etc. from entering into the ground without projections protruding to the ground other than the pillar is covered. It is to provide a pillar fixing structure that prevents a safety accident from falling and is beautiful in appearance.

본 발명 기둥 정착구조는 지하에 매립되어 고정된 관형 지지체와, 상기 관형 지지체에 삽입되어 고정되는 기둥 및, 상기 기둥에 끼워져 콘크리트 기초 구조물상 에 덮여져 고정되는 판상의 커버링을 구비하는 것을 특징으로 한다.The pillar fixing structure of the present invention is characterized by having a tubular support buried and fixed underground, a pillar inserted and fixed to the tubular support, and a plate-like covering fitted to the pillar and covered on the concrete foundation structure. .

발명은 지하에 매립되어 콘크리트 기초 구조물에 고정되거나 또는 관형 지지체가 매립된 프리캐스트 콘크리트(PC)로 제작되어 관형 지지체에 기둥의 하부를 삽입하는 것만으로 기둥이 설치되므로 시공이 용이하여 시공에 소요되는 시간과 인력의 감소로 시공비용이 현저하게 절감되어 경제성이 탁월하고, 지상에 위치하는 기둥을 설치할 때에 지상에 위치하는 다수의 앵커 볼트와 너트를 사용하지 않으므로 앵커 볼트나 너트의 부식으로 인한 수명단축의 염려 없이 장기간 안정되게 사용할 수 있어 수명이 길뿐만 아니라 분리가 용이하여 보수작업을 적은 비용으로 단시간에 간단히 할 수 있고, 기둥 외에 지상으로 돌출되는 돌기 없이 단지 눈, 비, 먼지 등이 인입되지 못하도록 기둥에 끼워져 지면상에 덮여지는 판상의 커버링 만이 지상이 위치하므로 보행자가 걸려 넘어져 다치는 안전사고를 방지하면서도 외관이 미려하게 되는 각별한 장점이 있다.The invention is made of precast concrete (PC) embedded in the basement or fixed to the concrete foundation structure or embedded in the tubular support simply by inserting the lower part of the column to install the column is easy to install The construction cost is greatly reduced due to the reduction of time and manpower, and the economical efficiency is excellent. When installing the ground column, many ground anchor bolts and nuts are not used, which shortens the life due to corrosion of the anchor bolt or nut. It can be used stably for a long time without worrying about not only long life, but also easy separation, so that maintenance work can be simplified in a short time at low cost, and only snow, rain, dust, etc. can be prevented from entering without ground protrusions other than pillars. Since only the plate-like covering that is fitted to the pillar and covered on the ground is located above the ground, There is a special advantage that the appearance is beautiful while preventing pedestrians from falling and hurt.

이하, 첨부된 도면 및 바람직한 실시예로서 본 발명 기둥 정착구조를 상세하게 설명한다.Hereinafter, the pillar fixing structure of the present invention will be described in detail with the accompanying drawings and preferred embodiments.

도 3은 본 발명의 제 1실시예에 따른 기둥 정착구조의 분해 사시도, 도 4는 도 3의 단면도, 도 5는 본 발명의 제 2실시예에 따른 기둥 정착구조의 분해 사시도, 도 6은 본 발명의 제 3실시예에 따른 기둥 정착구조의 분해 사시도, 도 7은 본 발명의 제 1실시예에 따른 기둥의 설치상태 단면도, 도 8은 본 발명의 제 3실시예 에 따른 기둥의 설치상태 단면도, 도 9는 본 발명의 제 4실시예에 따른 기둥의 설치상태 사시도로서, 본 발명 기둥 정착구조는 지하 콘크리트 기초 구조물(7)에 매립되어 고정된 관형 지지체(10)와, 상기 관형 지지체(10)에 삽입되어 고정되는 기둥(20) 및, 상기 기둥(20)에 끼워져 관형 지지체(10)의 베이스판(12)에 덮여지는 일정두께의 판상의 커버링(30)으로 이루어져 있다.3 is an exploded perspective view of a column fixing structure according to a first embodiment of the present invention, FIG. 4 is a cross-sectional view of FIG. 3, FIG. 5 is an exploded perspective view of a column fixing structure according to a second embodiment of the present invention, and FIG. Exploded perspective view of a column fixing structure according to a third embodiment of the present invention, FIG. 7 is a cross-sectional view of an installation state of a column according to a first embodiment of the present invention, and FIG. 8 is a cross-sectional view of an installation state of a column according to a third embodiment of the present invention. 9 is a perspective view of the installation state of the column according to the fourth embodiment of the present invention, the column fixing structure of the present invention is a tubular support 10 is embedded and fixed in the underground concrete foundation structure (7), the tubular support (10) It is composed of a pillar 20 is inserted into the fixed) and the plate-shaped covering 30 of a predetermined thickness which is fitted to the pillar 20 and covered by the base plate 12 of the tubular support 10.

상기 관형 지지체(10)는 금속제 주물 또는 합성수지 성형으로 제작되는 것으로서, 관형 본체(11)와, 상기 본체(11)의 상단부가 방사상으로 연장되어 본체(11)와 일체로 형성된 베이스판(12)과, 상기 본체(11)의 하단 중앙부에서 아래로 연장되어 본체(11)와 일체로 형성된 배수관(13)과, 상기 본체(11)의 외측 중앙 하부가 하향 경사지게 연장되어 본체(11)와 일체로 형성된 전선관(14) 및, 상기 본체(11)의 하부 내측벽에 돌출되어 형성된 결합돌기(15)로 구성되어 있다.The tubular support 10 is manufactured by metal casting or synthetic resin molding, and has a tubular body 11 and a base plate 12 integrally formed with the main body 11 by radially extending an upper end of the main body 11. The lower end of the main body 11 extends downwardly and is integrally formed with the main body 11 and the drain pipe 13 and the outer central lower portion of the main body 11 is inclined downwardly formed integrally with the main body 11. The conduit 14 and the engaging projection 15 which protrudes in the lower inner side wall of the said main body 11 are comprised.

상기 전선관(14)은 필요에 따라 다수개 형성할 수 있으며, 필요에 따라 상기 배수관(13)을 전선관으로 사용할 수도 있다.The conduit 14 may be formed in plural as necessary, and may be used as the conduit if necessary.

상기 관형 지지체(10) 내측벽의 결합돌기(15)는 2-4개를 형성할 수 있고, 상기 결합돌기(15)가 형성된 부분의 상측 베이스판(12)에는 결합돌기(15) 부분을 표시하는 표시부를 형성하는 것도 바람직하다.Coupling protrusions 15 of the inner wall of the tubular support 10 may form 2-4, and the coupling protrusions 15 are displayed on the upper base plate 12 of the portion where the coupling protrusions 15 are formed. It is also preferable to form a display unit.

여기서 관형 지지체(10)가 합성수지일 경우에는 열가소성수지와 열경화성수지를 모두 사용할 수 있고, 폐 플라스틱류의 폐기물을 사용함으로써 플라스틱류 폐기물에 의한 공해방지와 원료 절감의 효과를 얻을 수 있다.Here, when the tubular support 10 is a synthetic resin, both thermoplastic resins and thermosetting resins can be used, and waste of plastic wastes can be used to prevent pollution and reduce raw materials by plastic wastes.

그리고, 상기 전선관(14)은 도 3에 도시한 바와 같이 1개 형성되거나 도 5에 도시한 바와 같이 2개 형성되며, 상기 본체(11)와 배수관(13) 및 전선관(14)의 외부 표면에는 관의 수직 및 수평 방향으로 다수의 보강리브(16)가 형성되고, 상기 결합돌기(15)는 본체(11)의 하부 내측벽에 대향하여 한쌍이 형성되어 있다.In addition, one conduit 14 is formed as shown in FIG. 3 or two as shown in FIG. 5, and the outer surface of the main body 11, the drain pipe 13, and the conduit 14 is formed. A plurality of reinforcing ribs 16 are formed in the vertical and horizontal directions of the pipe, and the coupling protrusion 15 is formed in a pair opposite the lower inner wall of the main body 11.

또한 기둥(20)은 하부가 상기 관형 지지체(10)에 삽입되도록 형성된 원통관(21)과, 상기 원통관(21)의 하단부에 상기 관형 지지체(10)의 결합돌기(15)가 삽입되도록 상향으로 일정 길이 절개되고 다시 수평방향으로 일정길이 절개되어 형성된 적어도 2이상의 절개홈(22) 및, 상기 관형 지지체(10)에 기둥(20)의 하부가 삽입 고정된 때 전선관(14)과 맞닿는 상기 원통관(21)의 측면에 형성된 전선 삽입구멍(23)으로 형성되어 있다.In addition, the column 20 is upward so that the lower end of the cylindrical tube 21 is formed to be inserted into the tubular support 10 and the coupling protrusion 15 of the tubular support 10 is inserted into the lower end of the cylindrical tube 21. At least two or more incision grooves 22 formed to be cut in a predetermined length and cut in a horizontal direction again, and the circle contacting the conduit 14 when the lower portion of the pillar 20 is inserted into and fixed to the tubular support 10. It is formed by the electric wire insertion hole 23 formed in the side surface of the clearance 21.

상기 원통관(21)의 절개홈(22)은 상향으로 경사지게 일정 길이 절개되고 다시 수평방향으로 일정길이 경사지게 절개하여 절개홈(22)을 형성할 수도 있다.The cutting groove 22 of the cylindrical tube 21 may be cut inclined upwardly to a predetermined length and then cut inclined to a predetermined length in the horizontal direction again to form the cutting groove 22.

상기와 같이 원통관(21)의 절개홈(22)을 상향으로 경사지게 일정 길이 절개하고 다시 수평방향으로 일정길이 경사지게 절개하면 기둥(20)의 하부 절개홈(22)을 관형 지지체(10)의 결합돌기(15)에 삽입만 하면 기둥(20)의 자중 및 경사진 절개홈에 의하여 회전하면서 자동적으로 견고하게 결합된다.As described above, when the incision groove 22 of the cylindrical tube 21 is inclined upwardly and then inclined in a predetermined length in the horizontal direction, the lower incision groove 22 of the column 20 is coupled to the tubular support 10. Just insert into the protrusions 15 are automatically and firmly coupled while rotating by the self-weight and inclined incision of the pillar 20.

여기서 관형 지지체(10)는 현장 타설 콘크리트 기초 구조물(7)에 매립되거나 또는 관형 지지체(10)가 매립된 프리캐스트 콘크리트(PC)로 제작되어 지하에 매립되는 것이므로 기둥(20)은 관형 지지체(10)에 삽입되는 하측부 부분만 원통관의 형상을 이루면 되므로 이 부분을 제외한 기둥(20)의 상부 부분은 특별한 형상 및 구조로 제한되지 않는다.Since the tubular support 10 is embedded in the cast-in-place concrete foundation structure 7 or is made of precast concrete (PC) with the tubular support 10 embedded therein, the pillar 20 is embedded in the tubular support 10. Since only the lower portion to be inserted into the cylindrical tube to form the shape of the upper portion of the pillar 20 except this portion is not limited to a special shape and structure.

예를 들면, 관형 지지체(10)에 삽입되는 부분을 제외한 기둥(20) 상부 부분은 원통상의 기둥이거나, 6각기둥, 8각기둥 등 다각 기둥이어도 되고, 하부가 굵고 상부로 가면서 점차 굵기가 가늘어지는 테이퍼 구성으로 하여도 된다.For example, the upper portion of the pillar 20 except for the portion inserted into the tubular support 10 may be a cylindrical pillar or a polygonal pillar such as a hexagonal pillar or an octagonal pillar, and the lower portion becomes thicker and gradually becomes thinner while going upward. You may make a taper structure.

따라서 본 발명의 기둥(20)은 가로등, 도로의 교통 신호등, 도로표지판 등 시설물의 기둥과 같이 어느 특정 기둥에 한정되지 않고, 지하에 매립되는 기둥(20)의 하부를 관형 지지체(10)에 삽입되어 고정될 수 있도록 구성하면, 그 외는 기둥의 형상이나 구조 및 용도에 관계없이 채용하여 사용할 수 있다.Therefore, the pillar 20 of the present invention is not limited to any particular pillar, such as a pillar of a facility such as a street lamp, a traffic light of a road, a road sign, and inserts a lower portion of the pillar 20 embedded in the basement into the tubular support 10. If it is configured to be fixed, the other can be adopted and used regardless of the shape, structure and use of the column.

그리고 상기 판상의 커버링(30)은 기둥의 외주연에 끼워지며 하부면에 얇은 고무패킹(31)이 부착 형성되어 있는 것으로서, 관형 지지체(10)에 기둥(20)이 삽입되어 설치되면, 상기 판상의 커버링(30)이 관형 지지체(10)의 베이스판(12)을 덮어 기둥(20)의 외주연과 관형 지지체(10) 사이로 빗물 등 물이 침투하는 것을 방지하게 되는데 상기 커버링(30)은 원형, 사각형, 다각형으로 형성할 수 있다.And the plate-like covering 30 is fitted to the outer periphery of the column is a thin rubber packing 31 is formed attached to the lower surface, when the column 20 is inserted into the tubular support 10 is installed, the plate-like The covering 30 of the tubular support 10 covers the base plate 12 of the tubular support 10 to prevent water from entering the water between the outer periphery of the pillar 20 and the tubular support 10, the covering 30 is circular It can be formed into a rectangle or a polygon.

또한, 도 9에서와 같이, 콘크리트 기초 구조물(7) 상부에 일정간격으로 다수개의 너트(35)를 매립하여 너트(35)가 구비된 콘크리트 기초 구조물(7)을 성형하고, 상기 판상의 커버링(30)을 일정두께의 금속재로 형성하고, 상기 금속재의 커버링(30)의 주변에 다수개의 볼트구멍(37)을 형성하고, 상기 커버링(30)을 기둥(20)에 끼운 후, 상기 기둥(20)을 콘크리트 기초 구조물(7)의 관형지지체(10)에 정착시키고, 상기 커버링(30)의 볼트구멍(37)과 상기 콘크리트 기초 구조물(7) 상부의 너트(35)의 구멍을 맞추고, 고정볼트(36)를 끼워 고정하면 상기 기둥(20)이 커버링(30)에 의하여 더 견고하게 고정되는 것이다.In addition, as shown in FIG. 9, a plurality of nuts 35 are embedded at a predetermined interval on the concrete foundation structure 7 to form a concrete foundation structure 7 having the nuts 35, and the plate-like covering ( 30 is formed of a metal material having a predetermined thickness, a plurality of bolt holes 37 are formed around the metal covering 30, and the covering 30 is inserted into the pillar 20, and then the pillar 20 ) Is fixed to the tubular support 10 of the concrete foundation structure 7, the bolt hole 37 of the covering 30 and the hole of the nut 35 of the upper portion of the concrete foundation structure 7, fixed bolt When the 36 is inserted and fixed, the pillar 20 is more firmly fixed by the covering 30.

다음에는 상기한 바와 같이 구성된 본 발명 기둥 정착구조를 이용하여 기둥을 설치하는 시공에 대하여 설명한다.Next, a description will be given of the installation of the column using the present invention column fixing structure configured as described above.

본 발명에서 관형 지지체(10)는 지하의 거푸집에 타설된 콘크리트 기초 구조물에 고정하거나, 관형 지지체(10)가 매립된 프리캐스트 콘크리트(PC)로 제작한 것을 지하에 매립하여 사용할 수 있으므로 프리캐스트 콘크리트(PC)로 제작한 관형 지지체(10)를 사용할 경우에는 도 8에 도시한 바와 같이 기둥(10)을 설치할 곳의 지면을 굴착기로 굴착하여 프리캐스트 콘크리트(PC)의 상부면이 지면과 일치하도록 프리캐스트 콘크리트(PC)를 매립한다.In the present invention, the tubular support 10 is fixed to the concrete foundation structure placed in the underground formwork, or precast concrete because the tubular support 10 is made of embedded precast concrete (PC) can be embedded in the basement In the case of using the tubular support 10 made of (PC), as shown in FIG. 8, the ground of the place where the column 10 is to be installed is excavated with an excavator so that the upper surface of the precast concrete (PC) coincides with the ground. Landfill precast concrete (PC).

이 상태에서 전선관(14)을 통해 관형 지지체(10) 내부로 인출되어 있는 전원선을 기둥(20)의 내부로 인출되는 전원선과 연결한 다음 관형 지지체(10)의 내부로 기둥(20)을 삽입하되 기둥(20)의 절개홈(22)을 관형 지지체(10) 결합돌기(15)를 향하도록 하여 삽입한다.In this state, the power line drawn out into the tubular support 10 through the conduit 14 is connected to the power line drawn out into the pillar 20, and then the pillar 20 is inserted into the tubular support 10. But insert the cutting groove 22 of the pillar 20 facing the tubular support 10, the coupling protrusion 15.

이와 같이하면, 기둥(20)에 자체의 무게가 있으므로 관형 지지체(10)의 결합돌기(15)에 기둥(20)의 절개홈(22)이 삽입되면서 절개홈(22)의 상향으로 들어가다가 수평방향에 와서는 기둥(20)을 약간 회전시키면 절개홈(22)의 수평방향 단부에 결합돌기(15)가 맞닿은 상태로 관형 지지체(10) 내에 기둥(20)이 삽입 고정된다.In this way, since the pillar 20 has its own weight, the cutting groove 22 of the pillar 20 is inserted into the coupling protrusion 15 of the tubular support 10 and enters the upper portion of the cutting groove 22 and then horizontally. When the pillar 20 is slightly rotated in the direction, the pillar 20 is inserted and fixed in the tubular support 10 in a state in which the engaging protrusion 15 abuts on the horizontal end of the incision groove 22.

그리고, 절개홈(22)의 수평방향이 경사진 경우에는, 관형 지지체(10)의 결합돌기(15)에 기둥(20)의 절개홈(22)이 삽입되면서 절개홈(22)의 상향으로 들어가다가 수평방향에 와서는 절개홈(22)의 상향 경사에 의해 기둥(20)이 자동적으로 회전하여 절개홈(22)의 수평방향 단부에 결합돌기(15)가 맞닿은 상태로 관형 지지 체(10) 내에 기둥(20)이 삽입 고정된다.In addition, when the horizontal direction of the incision groove 22 is inclined, the incision groove 22 of the pillar 20 is inserted into the coupling protrusion 15 of the tubular support 10 and enters upward of the incision groove 22. In the horizontal direction, the column 20 is automatically rotated by the upward inclination of the incision groove 22, the tubular support body 10 in a state in which the engaging projection 15 abuts on the horizontal end of the incision groove 22. The pillar 20 is inserted and fixed in the inside.

이와 같은 작업은 기둥(20)이 가로등, 교통표지판 기둥과 같이 고 중량물인 경우에는 크레인 등을 사용하여 시공하게 되며, 다음에 기둥에 끼워 놓았던 커버링(30)을 기둥(20) 상에서 하단으로 이동시켜 커버링(30)이 관형지지체(10)의 베이스판(12)을 덮어 밀착되도록 하면, 간단하게 기둥(20)이 설치된다.Such a work is constructed by using a crane or the like when the pillar 20 is a heavy object such as a street lamp or a traffic sign pillar, and then moves the covering 30 inserted into the pillar to the bottom on the pillar 20. When the covering 30 covers the base plate 12 of the tubular support 10 to be in close contact, the pillar 20 is simply installed.

또한, 도 9에서와 같이, 콘크리트 기초 구조물(7) 상부에 일정간격으로 다수개의 너트(35)를 매립하여 너트(35)가 구비된 콘크리트 기초 구조물(7)을 성형하고, 상기 판상의 커버링(30)을 일정두께의 금속재로 형성하고, 상기 금속재의 커버링(30)의 주변에 다수개의 볼트구멍(37)을 형성하고, 상기 커버링(30)을 기둥(20)에 끼운 후, 상기 기둥(20)을 콘크리트 기초 구조물(7)의 관형지지체(10)에 정착시키고, 상기 커버링(30)의 볼트구멍(37)과 상기 콘크리트 기초 구조물(7) 상부의 너트(35)의 구멍을 맞추고 고정볼트(36)를 끼워 고정하면 상기 기둥(20)이 커버링(30)에 의하여 더 견고하게 고정되는 것이다.In addition, as shown in FIG. 9, a plurality of nuts 35 are embedded at a predetermined interval on the concrete foundation structure 7 to form a concrete foundation structure 7 having the nuts 35, and the plate-like covering ( 30 is formed of a metal material having a predetermined thickness, a plurality of bolt holes 37 are formed around the metal covering 30, and the covering 30 is inserted into the pillar 20, and then the pillar 20 ) Is fixed to the tubular support 10 of the concrete foundation structure 7, the bolt hole 37 of the covering 30 and the hole of the nut 35 of the upper portion of the concrete foundation structure 7 and fixing bolt ( When the 36 is inserted and fixed, the pillar 20 is more firmly fixed by the covering 30.

일반적으로 기둥(20)이 설치되는 콘크리트 기초 구조물은 상부가 좁고 하부가 넓은 사각뿔형 프리캐스트 콘크리트(PC)로 인하여 가로등 등의 기둥이 인도로 많이 들어가 보도를 걷는 보행자를 불편하게 하므로 도7과 같이 일자형 사각통형, 일자형 원통형 프리캐스트 콘크리트(PC)를 사용하면 상기 기둥을 인도상에서 차도에 매우 가깝게 설치할 수도 있다.In general, the concrete foundation structure in which the pillars 20 are installed has a narrow pyramid-shaped precast concrete (PC) in the upper part, so that many pillars such as street lamps enter a sidewalk, thereby making it uncomfortable for pedestrians walking on the sidewalk, as shown in FIG. The use of straight square cylindrical, straight cylindrical precast concrete (PC) allows the column to be installed very close to the driveway on the sidewalk.

그리고, 본 발명의 기둥(20)은 금속제 이외에 합성수지로도 제작할 수 있으며, 상기 기둥(20)은 광고물을 부착할 수 없도록 기둥(20) 외측에 하단부로 부터 일정높이까지 요철부를 형성할 수도 있습니다.In addition, the pillar 20 of the present invention may be made of synthetic resin in addition to the metal, the pillar 20 may be formed in the concave-convex portion from the lower end to a certain height on the outside of the pillar 20 so as not to attach the advertisement. .

지금까지 본 발명을 바람직한 실시예로서 설명하였으나, 본 발명은 이에 한정되지 않고 발명의 요지를 이탈하지 않는 범위 내에서 다양하게 변형하여 실시할 수 있음은 물론이다.While the present invention has been described as a preferred embodiment, the present invention is not limited thereto, and various modifications can be made without departing from the gist of the invention.

도 1은 종래방식으로 기초구조물에 설치된 기둥으로서 가로등을 도시해 보인 예시도,1 is an exemplary view showing a street lamp as a pillar installed on a foundation in a conventional manner;

도 2a는 종래방식으로 기초구조물에 가로등 기둥의 설치상태를 나타낸 분해사시도,Figure 2a is an exploded perspective view showing the installation state of the lamppost on the foundation structure in a conventional manner,

도 2b는 종래방식으로 기초구조물에 가로등 기둥의 설치상태를 나타낸 사시도,Figure 2b is a perspective view showing the installation state of the lamppost to the foundation structure in a conventional manner,

도 3은 본 발명의 제 1실시예에 따른 기둥 정착구조의 분해 사시도,3 is an exploded perspective view of the column fixing structure according to the first embodiment of the present invention;

도 4는 도 3의 단면도,4 is a cross-sectional view of FIG.

도 5는 본 발명의 제 2실시예에 따른 기둥 정착구조의 분해 사시도,5 is an exploded perspective view of a column fixing structure according to a second embodiment of the present invention;

도 6은 본 발명의 제 3실시예에 따른 기둥 정착구조의 분해 사시도,6 is an exploded perspective view of a column fixing structure according to a third embodiment of the present invention;

도 7은 본 발명의 제 1실시예에 따른 기둥의 설치상태 단면도,7 is a cross-sectional view of the installation state of the pillar according to the first embodiment of the present invention;

도 8은 본 발명의 제 3실시예에 따른 기둥의 설치상태 단면도이다.8 is a cross-sectional view of the installation state of the pillar according to the third embodiment of the present invention.

도 9는 본 발명의 제 4실시예에 따른 기둥의 설치상태 사시도이다.9 is a perspective view of an installation state of the pillar according to the fourth embodiment of the present invention.

〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10 : 관형 지지체 11 : 본체10 tubular support 11 body

12 : 베이스판 13 : 배수관12 base plate 13 drain pipe

14 : 전선관 15 : 결합돌기14: conduit 15: coupling projection

16 : 보강리브 20 : 기둥16: reinforcement rib 20: pillar

21 : 원통관 22 : 절개홈21: cylinder 22: incision groove

23 : 전선 삽입구멍 30 : 커버링23: wire insertion hole 30: covering

31 : 고무패킹31: rubber packing

Claims (11)

지하의 콘크리트 기초 구조물(7)에 매립되어 고정된 관형 지지체(10)와, 상기 관형 지지체(10)의 하부에 형성된 결합돌기(15)와, 상기 관형 지지체(10)에 삽입되며 상기 결합돌기(15)에, 하부에 형성된 절개홈(22)이 결합되어 고정되는 기둥(20)으로 이루어진 것을 특징으로 하는 기둥 정착구조.A tubular support 10 embedded and fixed in an underground concrete foundation structure 7, a coupling protrusion 15 formed below the tubular support 10, and inserted into the tubular support 10 and the coupling protrusion ( 15), the column fixing structure, characterized in that consisting of a column 20 is fixed to the cutting groove 22 formed in the lower portion is coupled. 제 1항에 있어서, 상기 관형 지지체(10)는 관형 본체(11)와, 상기 본체(11)의 상단부가 방사상으로 연장되어 본체(11)와 일체로 형성된 베이스판(12)과, 상기 본체(11)의 하단 중앙부에서 아래로 연장되어 본체(11)와 일체로 형성된 배수관(13)과, 상기 본체(11)의 외측 중앙 하부가 하향 경사지게 연장되어 본체(11)와 일체로 형성된 전선관(14) 및, 상기 본체(11)의 하부 내측벽에 돌출되어 형성된 결합돌기(15)로 구성되어 있는 것을 특징의 하는 기둥 정착구조.The tubular support 10 of claim 1, wherein the tubular support 10 includes a tubular body 11, an upper end portion of the main body 11 extending radially, and a base plate 12 integrally formed with the main body 11, and the main body (11). 11, a drain pipe 13 extending downward from the lower center portion and integrally formed with the main body 11, and a conduit 14 formed integrally with the main body 11 by extending downward at an outer central lower portion of the main body 11; And a coupling protrusion (15) formed to protrude from the lower inner wall of the main body (11). 제 2항에 있어서, 상기 본체(11)와 배수관(13) 및 전선관(14)의 외부 표면에는 관의 수직 및 수평 방향으로 다수의 보강리브(16)가 형성되어 있는 것을 특징으로 하는 기둥 정착구조.3. The column fixing structure according to claim 2, wherein a plurality of reinforcing ribs 16 are formed on the outer surfaces of the main body 11, the drain pipe 13, and the conduit 14 in the vertical and horizontal directions of the pipe. . 제 2항에 있어서, 상기 배수관(13)은 필요에 따라 전선관으로 사용할 수 있는 것을 특징으로 하는 기둥 정착구조.3. The column fixing structure according to claim 2, wherein the drain pipe (13) can be used as a conduit if necessary. 제 1항에 있어서, 상기 기둥(20)은 하부가 상기 관형 지지체(10)에 삽입되도록 형성된 원통관(21)과, 상기 원통관(21)의 하단부에 상기 결합돌기(15)가 삽입되도록 상향으로 일정 길이 절개되고 다시 수평방향으로 일정길이 절개되어 형성된 절개홈(22) 및, 상기 관형 지지체(10)에 기둥(20)의 하부가 삽입 고정된 때 전선관(14)과 맞닿는 상기 원통관(21)의 측면에 형성된 전선 삽입구멍(23)으로 형성되어 있는 것을 특징으로 하는 기둥 정착구조.According to claim 1, The pillar 20 is a cylindrical tube 21 formed to be inserted into the tubular support 10, the lower portion, and the coupling protrusion 15 is inserted into the lower end of the cylindrical tube 21 is upwardly Incision groove 22 formed by cutting a predetermined length in the horizontal direction again and a predetermined length in the horizontal direction, and the cylindrical tube 21 which abuts with the conduit tube 14 when the lower portion of the column 20 is inserted and fixed to the tubular support 10 A pillar fixing structure, characterized in that it is formed by the wire insertion hole 23 formed in the side surface. 제 5항에 있어서, 상기 절개홈(22)은 상향으로 경사지게 일정 길이 절개되고 다시 수평방향으로 일정길이 상향 경사지게 절개되어 형성된 것을 특징으로 하는 기둥 정착구조.The column fixing structure according to claim 5, wherein the cutting groove (22) is formed by cutting a predetermined length inclined upwardly and inclined upward by a predetermined length in the horizontal direction. 제 1항 내지 제 6항 중 어느한 항에 있어서, 상기 관형 지지체(10)의 상부에는 일정두께의 판상의 커버링(30)이 더 설치되는 것을 특징으로 하는 기둥 정착구조.The column fixing structure according to any one of claims 1 to 6, wherein a plate-like covering (30) having a predetermined thickness is further provided on the tubular support (10). 제 7항에 있어서, 상기 판상의 커버링(30)의 주변에는 다수개의 볼트구멍이 형성되어 있는 것을 특징으로 하는 기둥 정착구조.8. The column fixing structure according to claim 7, wherein a plurality of bolt holes are formed around the plate-like covering (30). 제 7항에 있어서, 상기 판상의 커버링(30)은 하부면에 기둥(20)의 외주연을 따라 고무패킹(31)이 부착 형성되어 있는 것을 특징으로 하는 기둥 정착구조.8. The pillar fixing structure according to claim 7, wherein the plate-like covering (30) is formed with a rubber packing (31) attached to the lower surface of the plate (30) along the outer circumference of the pillar (20). 제 1항 내지 제 6항 중 어느한 항에 있어서, 상기 콘크리트 기초 구조물(7)의 상부에는 다수개의 너트(35)가 매립되어 있는 것을 특징으로 하는 기둥 정착구조.The pillar fixing structure according to any one of claims 1 to 6, wherein a plurality of nuts (35) are embedded in an upper portion of the concrete foundation structure (7). 제 1항 내지 제 6항 중 어느한 항에 있어서, 상기 기둥(20)은 광고물을 부착할 수 없도록 기둥(20) 외측에 하단부로 부터 일정높이까지 요철부가 형성되어 있는 것을 특징으로 하는 기둥 정착구조.The pillar fixing according to any one of claims 1 to 6, wherein the pillars 20 are formed with irregularities from a lower end portion to a predetermined height outside the pillars 20 so as not to attach advertisements. rescue.
KR1020080035816A 2008-04-17 2008-04-17 A fixing structure of pillar KR100991886B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080035816A KR100991886B1 (en) 2008-04-17 2008-04-17 A fixing structure of pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080035816A KR100991886B1 (en) 2008-04-17 2008-04-17 A fixing structure of pillar

Publications (2)

Publication Number Publication Date
KR20090110169A true KR20090110169A (en) 2009-10-21
KR100991886B1 KR100991886B1 (en) 2010-11-04

Family

ID=41538031

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080035816A KR100991886B1 (en) 2008-04-17 2008-04-17 A fixing structure of pillar

Country Status (1)

Country Link
KR (1) KR100991886B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130136116A (en) * 2012-06-04 2013-12-12 대우조선해양 주식회사 Supporting structure of overboard pipe for fixed drilling platform
CN103510535A (en) * 2013-10-17 2014-01-15 中国电力科学研究院 Steel tube with anchoring structure, steel tube insertion type foundation and tower fixing structure
KR101984772B1 (en) * 2017-12-22 2019-09-03 주식회사 새담엔지니어링 Post structure assembly for outdoors

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8011149B2 (en) 2008-06-27 2011-09-06 Knudsen N Eric Post sleeve assembly
US7861434B2 (en) 2009-03-13 2011-01-04 Knudsen N Eric Post sleeve positioning apparatus and method
US8820007B2 (en) 2011-09-12 2014-09-02 N. Eric Knudsen Device for forming post sleeves, and method of use
CA3055929A1 (en) 2016-03-11 2017-09-14 N. Eric Knudsen Post sleeve positioning apparatus and related methods

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990011952U (en) 1998-12-24 1999-03-25 박용운 Concrete structure for street light installation
KR200332046Y1 (en) * 2003-08-14 2003-11-03 홍성범 Street light foundation
KR100704365B1 (en) 2006-02-23 2007-04-09 정해상 A device for shock absorption the traffic sign

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130136116A (en) * 2012-06-04 2013-12-12 대우조선해양 주식회사 Supporting structure of overboard pipe for fixed drilling platform
CN103510535A (en) * 2013-10-17 2014-01-15 中国电力科学研究院 Steel tube with anchoring structure, steel tube insertion type foundation and tower fixing structure
KR101984772B1 (en) * 2017-12-22 2019-09-03 주식회사 새담엔지니어링 Post structure assembly for outdoors

Also Published As

Publication number Publication date
KR100991886B1 (en) 2010-11-04

Similar Documents

Publication Publication Date Title
KR100991886B1 (en) A fixing structure of pillar
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR100775816B1 (en) Support of streetlights which has a easy assembling system
KR101066030B1 (en) Pillar and hand hole cover apparatus for easy adjusting hight and gradient
KR100907078B1 (en) Fixing structure for light pole in outdoor lighting
KR100947852B1 (en) Joint Structure Betweeen Street Lighting Pole and Base
KR101114840B1 (en) Assembly for support which is reinforced
KR101066388B1 (en) Embed type installation jig and its installation method for street lamp post fabricated easily and installed accurately
KR100719950B1 (en) Fabricated baseplate for post
KR20090102355A (en) Lower part protection structure for roadlamp and others
KR101007729B1 (en) A Multipurpose Pole
KR100935790B1 (en) The reclamation style street lamp fundamental unit and the street lamp establishment method which uses this
KR200433150Y1 (en) upholder for street lamppost
KR20110137644A (en) A fixing structure of pillar and construction method thereof
KR100905889B1 (en) Foundation structure for installing poles
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR200463353Y1 (en) Apparatus for fixing the bottom end of the CCTV post or street lamp post
KR101594785B1 (en) Insert type transportation facilities steel pole fixed structure
KR101036237B1 (en) Pillar device for street furniture with street environment improvement structure
KR101148172B1 (en) Street Lighting Pole Laying Footing Structure and Electing Method of Street Lighting Pole using the same
KR100673583B1 (en) A Sign Board for Road Guide
KR20100000441U (en) post of the underground insertion type for the street
KR100920128B1 (en) A support structure object for a road traffic equipment and construction method
KR100686939B1 (en) Sleeve for connecting post and footing of traffic safety sign board and footing structure using the same
KR100940089B1 (en) Street light structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131028

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141020

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151022

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161025

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee