KR200463353Y1 - Apparatus for fixing the bottom end of the CCTV post or street lamp post - Google Patents

Apparatus for fixing the bottom end of the CCTV post or street lamp post Download PDF

Info

Publication number
KR200463353Y1
KR200463353Y1 KR2020120003441U KR20120003441U KR200463353Y1 KR 200463353 Y1 KR200463353 Y1 KR 200463353Y1 KR 2020120003441 U KR2020120003441 U KR 2020120003441U KR 20120003441 U KR20120003441 U KR 20120003441U KR 200463353 Y1 KR200463353 Y1 KR 200463353Y1
Authority
KR
South Korea
Prior art keywords
bolt
cctv
pipe
holes
support
Prior art date
Application number
KR2020120003441U
Other languages
Korean (ko)
Inventor
나충용
Original Assignee
나충용
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 나충용 filed Critical 나충용
Priority to KR2020120003441U priority Critical patent/KR200463353Y1/en
Application granted granted Critical
Publication of KR200463353Y1 publication Critical patent/KR200463353Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2261Mounting poles or posts to the holder on a flat base
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2292Holders used for protection, repair or reinforcement of the post or pole

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The lower fixing device of the CCTV prop and street lamp according to the present invention, the inner base member 200 is coupled to the lower end of the prop pipe; An outer housing 100 that covers the inner base member 200 by being fitted from an upper end of the strut pipe and includes the outer housing 100, wherein the outer housing 100 protrudes in a vertical direction at the center thereof, and the strut pipe is formed therein. The second vertical pipe body 130 provided with a post insertion hole 14 that can be inserted therein, and a concrete foundation structure having an area extending horizontally with respect to the post insertion hole 14 and having its bottom embedded in the ground. A second bolt provided in the plurality of positions spaced apart from the periphery of the outer flange portion 110 and the support insertion hole 14 to be in contact with the upper surface of the (8) and formed through the connection to the support insertion hole 14 Fastening holes 131, the second bolt fixing holes 131 are respectively inserted and fixed to the second holding fixing bolts 132 for fixing the support pipe inserted in the support insertion hole 14, and the outside flange Anchor bolt through holes 15 are formed through the edge portions of the 110 in the vertical direction and can be inserted into each of the anchor bolts (8a) buried in the concrete foundation structure (8), The nut 9 is fastened to the anchor bolts 8a protruding from the anchor bolt through holes 15 to protrude above the outer flange portion 110, thereby being fixed to the concrete foundation structure 8.

Description

Apparatus for fixing the bottom end of the CCTV post or street lamp post}

The present invention relates to a lower fixing device of CCTV props and street lamps, and in particular, it is possible to easily assemble and install the lower part of the prop pipe at the CCTV installation site so that the installation of the props can be easily and efficiently performed. The present invention relates to a lower fixing device for CCTV props and street lamps that can greatly reduce the overall costs and manpower required for transportation, thereby improving the economics of prop installation works.

Recently, in Korea, closed circuit TVs (closed circuits) on roads, entertainment districts, residential areas and children's sanctuaries in urban areas are used to help prevent crimes and detect criminals in various cities such as security, robbery, rape, and murder. The number of television (CCTV) installations is increasing rapidly. In particular, criminals that could have been neglected as permanent US cases without the CCTV were arrested and resolved by video footage recorded on CCTV, so CCTV is now essential to curb crimes in the city and promote citizen safety. Is in charge of.

In response to these times, CCTV has been actively used in almost all places such as roads, residential areas, nightlife, schools, apartments, parks and parking lots, not only by the government and local governments, but also by private companies such as corporations, residents' groups or individuals. The installation method of CCTV is slightly different depending on the place. In other words, when CCTV is installed inside the building, on the outside wall, or on the roof, you can fix the bracket at the proper location of the building and install CCTV. CCTV should be installed in the upper part of the landlord.

1 and 2 show the installation structure of a conventional CCTV prop 1. Referring to FIG. 1, existing CCTV props 1 embed concrete foundation structures 8 on the ground, as in the case of installing general facilities such as traffic lights, street lamps, road signs, or steel pipe poles. And the flange 6 of the support 1 is attached to the anchor bolt 8a protruding from the concrete foundation structure 8 to the ground.

In FIG. 1, a camera connection arm 3a extending in a horizontal direction is coupled to an upper portion of the CCTV support 1, and a CCTV camera 2 is installed at an end of the camera connection arm 3a. The camera connection arm 3a is connected to the support upper end 1a by a support wire 3a for structural stability thereof, and is supported by an upper reinforcing member 3b below. In most cases, a control box 4 is installed at the intermediate height of the CCTV post 1, and the control box 4 has a power device, an electronic device, and an earth leakage breaker for operation and signal transmission of the CCTV camera 2. Other necessary provisions such as surge protectors, speakers, etc. are built in.

On the other hand, in recent years, wooden or synthetic resin materials are used around the CCTV props (1) in order to supplement the shortcomings that the metallic props (1) appear too simple and cold and to enhance the aesthetic value and functionality of the CCTV props installed in the street. There is an increasing number of cases to attach the outer cover (5).

Figure 2 shows in more detail the manner in which the conventional CCTV prop 1 is combined with the concrete foundation structure 8 of the underground. The CCTV post 1 is usually made of a cylindrical or angular pipe. A flat flange 6 is joined to the lower end of the support pipe by welding, and a plurality of vertical lines are formed along the circumference of the post 1. The reinforcing plates 7 are welded to reinforce the connection structure between the support 1 and the flange 6. A plurality of anchor bolts 8a are embedded in the concrete foundation structure 8 embedded in the ground, and the upper ends of the anchor bolts 8a are exposed to the outside by a suitable length so that they are exposed to the anchor bolts 8a. The flange 6 of the support 1 can be fixed. Since the bolt through holes 6a are drilled in the flange 6 of the support 1 at positions corresponding to the anchor bolts 8a of the concrete foundation structure 8, the anchor bolts 8a Protruding upward through the flange 6 through the bolt through holes 6a, and tightening the anchor bolts 8a with the nuts 9 respectively, the support 1 becomes the concrete foundation structure 8 It is installed upright on the phase. In FIG. 2, reference numeral 9a denotes a washer fitted between the nut 9 and the anchor bolt 8a to prevent the nut 9 from loosening.

The installation structure of the conventional CCTV prop 1 as described above has no problem in terms of structural stability, but the installation process is required because the flange 6 and the vertical reinforcement plates 7 must be directly welded to the prop pipe every time. It was very complicated and cumbersome and had a disadvantage of poor workability. In addition, even when the holding pipe is taken to the installation site and coupled to the anchor bolt 8a of the concrete foundation structure 8, the position of the anchor bolt 8a is determined by the position of the bolt through hole 6a formed in the flange 6. If it does not fit, it was also very inconvenient to work because the holding pipe had to be fixed on the crane.

 In addition, if the angle of the flange (6) and the support (1) is not exactly orthogonal, there is a problem that becomes hard when the CCTV support (1) is up, so the flange (6) to the lower end of the support (1) Work-related factors, such as the need to attach exactly orthogonal, also exist, the existing installation structure of CCTV props had a disadvantage in that the overall workability, such as labor costs, material costs, installation costs, etc. significantly increased.

The conventional prop pipe used as CCTV prop is welded to the installation site by the vehicle after welding the flange 6 and the vertical reinforcement plates 7 at the factory. Another problem was that it was difficult to load a large amount in the vehicle with the reinforcing plates 7 attached. Due to the protruding flange (6) and the vertical reinforcement plates (7), it is very unfortunate in these days of high oil prices that it is not possible to carry a large number of prop pipes at once and to transport them by several cars. The increase is also a big factor in raising CCTV installation costs.

Problems related to the installation structure of the conventional CCTV props as described above are equally applicable to other urban facilities installed using the props. That is, traffic lights, street lamps, road signs, and steel pipe poles are all installed by installing concrete foundation structures in the ground and fixing metal pillars on the ground, as in the case of CCTV shores. There was a problem with this high.

The present invention, in order to solve the above problems, by introducing a completely new type of lower fixing device that can be easily assembled and installed at the bottom of the holding pipes such as CCTV props and street lamps in the field, due to the existing complicated construction work It is an object of the present invention to provide a post anchor fixing device for CCTV props or street lamp holders to eliminate inconveniences.

In addition, the present invention facilitates the construction and streamlining of the construction by transporting the prop pipe as shipped from the factory to the CCTV installation site, and then completing the prop installation work by simply assembling and installing the lower part of the prop pipe at the site. It aims to provide a lower fixing device for CCTV props and street lamps that can significantly reduce the overall costs and manpower required for the installation and transportation of props.

In addition, the present invention aims to provide a lower fixing device of a pillar that can be applied as it is in the case of urban facilities such as traffic lights and street lamps that are installed by using the prop pipes of the same or similar structure as the prop pipe used for CCTV props. do.

The lower fixing device of the CCTV prop and street light pole provided by the present invention to achieve the above object, is protruded in the vertical direction in the center, can be provided with a prop insertion hole 14 can be inserted therein CCTV prop or street lamp Straight body portion 13; A flange portion 11 having an area extending in a horizontal direction about the post insertion hole 14, the bottom surface of which is in contact with the upper surface of the concrete foundation structure 8 embedded in the ground; Bolt fastening holes 16 provided at a plurality of positions spaced from the periphery of the support insertion hole 14 and formed to be connected to the support insertion hole 14; Shoring fixing bolts (16b) for pressing and supporting the CCTV post or street lamp in the pillar insert hole 14 by being inserted into the bolt fastening holes (16), respectively, on its outer circumferential surface; And anchor bolt through holes 15 formed by penetrating the edge portions of the flange portion 11 in a vertical direction and into which anchor bolts 8a buried in the concrete foundation structure 8 may be inserted. The nut 9 is fastened to the anchor bolts 8a protruding over the flange portion 11 through the anchor bolt through holes 15 to the concrete foundation structure 8. It is characterized in that it is fixed.

In addition, the CCTV anchor and the lower fixing device provided by the present invention in order to achieve the above object, the inner base member 200 coupled with the lower end of the prop pipe constituting the CCTV post (1) or street lamp; And an outer housing (100) covering the inner base member (200) by being fitted from the upper end of the strut pipe (200), wherein the outer housing (100) is formed to protrude in a direction perpendicular to the center of the strut A second vertical pipe portion 130 having a support insertion hole 14 through which a pipe can be inserted; An outer flange portion 110 having an area extending in a horizontal direction about the post insertion hole 14, the bottom surface of which is in contact with the upper surface of the concrete foundation structure 8 embedded in the ground; Second bolt fastening holes 131 provided at a plurality of positions spaced from the periphery of the support insertion hole 14 and formed to be connected to the support insertion hole 14; Second holding bolts 132 fixed to the second bolt fastening holes 131 to fix the support pipes inserted into the support insertion holes 14; And anchor bolt through holes 15 formed by penetrating the edge portions of the outer flange portion 110 in a vertical direction and into which anchor bolts 8a buried in the concrete foundation structure 8 can be inserted, respectively. The nut 9 is fastened to the anchor bolts 8a protruding from the anchor bolt through-holes 15 to protrude above the outer flange portion 110, thereby providing the concrete foundation structure 8. It is characterized in that fixed to.

The lower fixing device of the CCTV prop and street lamp according to the present invention is a concrete foundation structure embedded in the ground just by being easily assembled and installed at the lower end of the prop pipe at the place where CCTV is to be installed, unlike the existing prop installation structure. Since the anchor bolt and the prop pipe can be connected easily and safely, there is an advantage that can significantly reduce the overall manpower and cost for the production, transportation and installation of the prop.

In addition, the support lower fixing device according to the present invention can be easily manufactured by casting work and excellent strength can not only reduce the construction cost for the installation of CCTV props, but also has the advantage of improving the structural stability of the support. And when installing the CCTV support using the lower supporter according to the present invention can be ensured that the CCTV support is always upright due to the structural characteristics of the lower fixing device, so if the support is installed crooked only in the bay There is an advantage that can prevent the inconvenience and loss caused by the need to do.

In the present specification, the present invention is mainly described as a content of a lower fixing device for fixing CCTV props to the ground, but traffic light lamps and street lamps and the like installed using prop pipes having the same or similar structure as the prop pipes used for CCTV props. In the case of the same urban facilities can be applied to all the same, the scope of use of the present invention should not be construed as being limited to CCTV props, and should be interpreted as being applicable to street lamps and pillars of traffic lights.

Figure 1 shows the installation structure of the conventional CCTV post (1), Figure 2 is a concrete foundation structure 8 and the support (1) embedded in the ground in the installation structure of Figure 1 anchor bolt (8a) and flange The relationship fixed by the combination between (6) is shown.
3 and 4 are a perspective view and a plan view of the support lower fixing device 10 according to the first embodiment of the present invention.
FIG. 5 is an exploded perspective view showing a relationship in which the support lower fixing device 10 of FIGS. 3 and 4 is coupled with the concrete foundation structure 8 and the CCTV support 1.
FIG. 6 shows a state in which the support lower fixing device 10 is installed on the concrete foundation structure 8 in the first embodiment, and FIG. 7 shows the installation state of FIG.
FIG. 8 shows the support post anchoring device 10a according to the second embodiment of the present invention, and FIG. 9 shows the support post anchoring device 10a of FIG. 8 with the outer housing 100 and the inner base member 200. Decompose into and shows the coupling relationship.
FIG. 10 is a view illustrating an outer housing 100 of the support lower fixing device 10a according to the second embodiment, in which a bolt head receiving space 151 and a bolt storing hole 152 are provided in an inner space thereof. have.
FIG. 11 is a bottom perspective view of the outer housing 100 of FIG. 10, and FIG. 12 shows the outer housing 100 in the form of a plan view (<a>) and a front sectional view (<b>).
FIG. 13 illustrates a process of coupling the inner base member 200 to the lower end of the CCTV support 1 in the support lower fixing device 10a according to the second embodiment of the present invention.
FIG. 14 shows the inner base member 200 in the form of a plan view (<a>) and a front sectional view (<b>) in the support lower fixing device 10a according to the second embodiment of the present invention.
15 is a cross-sectional view (<a> figure) and a front sectional view (<a> view) of the coupling relationship between the inner base member 200 and the CCTV support 1 in the support lower fixing device 10a according to the second embodiment of the present invention. b> drawings).
16 and 17 show a support lower fixing device 10a according to the third embodiment of the present invention, and a second bolt through hole 132a is formed in the CCTV support 1, and the second bolt passes. After the second holding bolt 132 is inserted into the ball (132a) shows a structure that is fastened and fixed by the fixing nut 133 on the inner peripheral surface of the support (1).
18 shows a state in which the CCTV support 1 is installed by the support lower fixing device 10a according to the present invention.

Hereinafter, with reference to the accompanying drawings will be described in detail the configuration and effect of the CCTV holding and the lower fixing device of the street lamp according to the present invention.

3 and 4 are a perspective view and a plan view of the support lower fixing device 10 according to the first embodiment of the present invention. 3 and 4, the lower pillar fixing device 10 according to the first embodiment of the present invention has a shape similar to that of the top of the top, the vertical tube portion provided with a pillar insertion hole 14 in the center (13) protrudes in the vertical direction, and an intermediate inclined portion 12 and a flange portion 11 are formed around the periphery thereof. CCTV props 1 may be inserted into the prop insertion holes 14 of the vertical tubular part 13 (see FIGS. 5 to 7), and a plurality of anchor bolts formed at edges of the flange part 11. An anchor bolt 8a of the concrete foundation structure 8 (see FIGS. 5 to 7) buried in the ground may be inserted into the through holes 15.

The flange portion 11 has an area extending in the horizontal direction about the post insertion hole 14, the anchor bolt through holes 15 provided in the flange portion 11 is an anchor bolt (8a) Considering that a slight error occurs in the installation position of the post bottom fixing device 10 it is preferable to manufacture in the form of a long groove in the length in the circumferential direction than the length in the radial direction.

In addition, in the flange portion 11, the anchor bolt through holes 15 are formed in the position formed with the first recessed portion 15a formed recessed from the surface of the support lower fixing device 10, the anchor Although the bolts 8a, 6 and 7 are fastened by the nuts 9 and 6 through the anchor bolt through holes 15, the ends of the anchor bolts 8a and the nuts 9 are lower than the support posts. It does not protrude out of the surface of the fixing device 10. This is for the pedestrian affinity of the CCTV support (1) installed on the ground using the support lower fixing device (10) according to the present invention, people passing by the CCTV support if the foot is caught in the anchor bolt (8a) It is to prevent the occurrence or inconvenience.

Meanwhile, the intermediate inclined portion 12 of the support lower fixing device 10 is a portion that gradually decreases in height while connecting the vertical tubular portion 13 and the flange portion 11, and the intermediate inclined portion 12 The circumference of the plurality of bolt fastening holes 16 are formed. The bolt fastening holes 16 are connected to the post insertion hole 14, and female threads are formed on an inner circumferential surface thereof. When the support fixing bolts 16b (see FIG. 5) are inserted into and fixed to the bolt fastening holes 16, the support fixing bolts 16b are tightened from all sides by tightening the CCTV support 1 inserted into the support insertion holes 14. Is given. The second fastening portion 16a is also provided at a position where the bolt fastening holes 16 are formed to be recessed from the surface of the intermediate inclined portion 12, so that the support fixing bolt 16b is formed in the bolt fastening hole 16. Although coupled, the head of the holding fixing bolt (16b) does not protrude from the surface of the intermediate inclined portion (12).

FIG. 5 is an exploded perspective view showing a relationship in which the support lower fixing device 10 of FIGS. 3 and 4 is coupled with the concrete foundation structure 8 and the CCTV support 1. Referring to FIG. 5, the CCTV post 1 having a circular rod shape or pipe shape is fitted into a post insertion hole 14 provided in the center of the lower support 10, and the post insertion hole ( The CCTV support 1 is firmly fixed without shaking by the support fixing bolts 16b spaced apart at predetermined intervals along the periphery of the periphery 14.

FIG. 6 shows a state in which the CCTV support 1 is fixed onto the concrete foundation structure 8 using the support lower fixing device 10 according to the first embodiment of the present invention, and FIG. It is shown in the form.

Referring to FIG. 6, anchor bolts 8a are fitted into anchor bolt through holes 15 provided in the flange portion 11 of the support lower fixing device 10, and then the nut 9 on the flange portion 11. By fastening, the lower supporter 10 can be stably fixed on the concrete foundation structure 8a. As shown in FIG. 6, the support lower fixing device 10 of the present invention makes the anchor bolts 8a and the support fixing bolts 16b to be recessed than the peripheral portions so as to recess the first recesses 15a. And the second depressions 16a are formed, respectively, so that the anchor bolts 8a and the support fixing bolts 16b do not protrude outward from the surfaces of the peripheral portions, thereby improving the safety and convenience of pedestrians. You can.

On the other hand, as shown in Figures 6 and 7, by using the support lower fixing device 10 of the subject innovation of the CCTV post (1) to the ground and then welded along the upper periphery of the vertical pipe portion 13 In this case, since the vertical tube portion 13 and the CCTV support 1 are firmly coupled by the welding part 18, the structural stability of the CCTV support 1 can be further increased.

FIG. 8 shows the support post anchoring device 10a according to the second embodiment of the present invention, and FIG. 9 shows the support post anchoring device 10a of FIG. 8 with the outer housing 100 and the inner base member 200. Decompose into and shows the coupling relationship.

8 and 9, the support lower fixing device 10a according to the second embodiment of the present invention consists of an inner base member 200 and an outer housing 100, which is composed of only one housing. This is different from the lower supporter 10 of the first embodiment (see FIGS. 3 to 7).

The inner base member 200 is fitted into the inner space of the prop pipe from the lower end of the CCTV prop (1) in the form of a pipe (see Fig. 9), the lower end of the support pipe (1) for fixing the position bolt 210 By inserting the strut pipe 1 is engaged with the first vertical tubular portion 230 of the inner base member 200 fitted therein (see Figs. 9 and 13). On the other hand, since the second embodiment of the present invention necessarily covers only the pipe-shaped support, in the following description for the convenience of the description will be used to substantially the same meaning CCTV and support pipe, and the same reference numerals will be used. .

The outer housing 100, which is coupled to the outside of the inner base member 200, has an appearance similar to that of the support lower fixing device 10 of the first embodiment. In the center of the outer housing 100, there is a second vertical tubular portion 130 protruding in the vertical direction, and in the column insertion hole 14 provided inside the second vertical tubular portion 130, the CCTV prop pipe 1 ) Are combined. The outer flange portion 110 is formed in an inclined shape while gradually decreasing in height at the periphery of the second vertical pipe portion 130, and the plurality of anchor bolts pass through the outer flange portion 110. Balls 15 are provided. At the positions where the anchor bolt through holes 15 are located, the first recesses 15a are formed to have a recessed shape than the height of the surroundings.

A plurality of second bolt fastening holes 131 are formed through the circumference of the second vertical pipe body 130 of the outer housing 100, and a second second fastening hole 131 is formed in the second housing. When the pillar fixing bolts 132 are fastened, the pillar pipes 1 inserted into the pillar insertion holes 14 of the second vertical pipe body 130 are tightened from all directions.

On the other hand, referring to Figure 9, when explaining the method of installing the lower supporter 10a according to the second embodiment of the present invention, first insert the inner base member 200 from the lower end of the CCTV support pipe (1) After coupling, the outer housing 200 is inserted into the upper end of the CCTV post 1 and slides downward, thereby covering the outer housing 200 on the outside of the inner base member 200. In FIG. 9, reference numeral 210 denotes a position fixing bolt, by which the fixing bolt 210 is inserted backwards into the bolt hole at the bottom side of the inner flange 201 so that only the bolt body has the inner flange 201. To protrude upward.

10 and 11 show an outer housing 100 of the support lower fixing device 10a according to the second embodiment of the present invention, FIG. 10 is a perspective view from above, and FIG. 11 is a perspective view from below. .

10 and 11, the outer housing 100 has special spaces therein to accommodate portions of the inner flange 201 of the inner base member 200 and bolts 210, 220. have. That is, inside the outer housing 100, there is an inner stepped part 150 raised from the bottom of the outer flange part 110 by a predetermined height, and closer to the center slightly closer than the inner stepped part 150. The positions are provided in a form in which the bolt receiving hole 152 and the bolt head receiving space 151 are recessed. In FIG. 10, only two or three bolt head receiving spaces 151 and bolt receiving holes 152 are shown for convenience, but in reality, as shown in FIG. 11, the bolt head accommodation is provided along the periphery of the support insertion hole 14. The space 151 and the bolt storage hole 152 are continuously provided at regular intervals.

The inner stepped part 150 in the outer housing 100 is to provide a space for accommodating the inner base member 200, and the bolt head receiving space 151 is a lower end of the CCTV prop 1. It is for accommodating the bolt head portion 220a (see FIG. 15) of the first support fixing bolt 220 coupled to. The bolt receiving hole 152 provides a space for accommodating the bolt body portion of the position fixing bolt 210.

Fig. 12 shows the outer housing 100 in the form of a plan view (<a> drawing) and a front sectional view (<b> drawing). As shown in FIG. 12, the outer housing 100 has a plurality of bolt head receiving spaces 151 and bolt storing holes 152 around the center of the second vertical pipe portion 130 at the bottom thereof. Formed alternately with each other while forming a circle, a second bolt fastening hole 131 is formed around the upper end of the second vertical pipe portion 130. A female screw portion is formed on an inner wall surface of the second bolt fastening hole 131, and the second holding bolt 132 (see FIG. 10) inserted therein is fixed by fastening with a female screw portion of the second bolt fastening hole 131. Will be.

On the other hand, the number and location of the anchor bolt through holes 15 shown in the embodiments of the present invention is the number and installation of the actual anchor bolts (8a) installed in the concrete foundation structure (8, 8 and 9) It can be modified as much as the position. That is, although the number of anchor bolt through holes 15 provided in the outer housing 100 is shown as four in FIGS. 8 to 12, the number of anchor bolt through holes 15 is three or five. , 6 or 7 can be changed as many as possible.

FIG. 13 illustrates a process of coupling the inner base member 200 to the lower end of the CCTV support 1 in the support lower fixing device 10a according to the second embodiment of the present invention. In the second embodiment of the present invention, first, the inner base member 200 is inserted from the lower end side of the CCTV prop pipe 1, and the inner base member 200 has a ring-shaped first vertical tubular portion 230. And an inner flange 201 having an area extending in an outward direction by bending in an L-shape at the lower end of the first vertical pipe portion 230.

A plurality of first bolt fastening holes 221 are formed in the first vertical pipe body 230 of the inner base member 200 along the circumference thereof, and the first bolt through holes are formed in the CCTV holding pipe 1. (1d) is formed, the first bolt fastening holes 221 of the inner base member 200 and the first bolt through holes (1d) of the CCTV holding pipe (1) are in positions that correspond exactly to each other. Is formed so that the first holding bolt 220 can be fitted. Since internal threaded portions are formed on inner wall surfaces of the first bolt fastening holes 221 of the inner base member 200, the first holding bolts 220 may be fastened and fixed.

In addition, third bolt fastening holes 211 are formed in the inner flange 201 of the inner base member 200, and an internal thread is formed on an inner wall surface of the third bolt fastening holes 211. Fixing bolt 210 may be fastened and fixed. As shown in FIG. 13A, when the fixing bolt 210 is inserted into the third bolt fastening hole 211 at the bottom of the inner base member 200, the bolt body of the fixing bolt 210 is fixed. Only part protrudes above the inner flange 201.

FIG. 14 shows the inner base member 200 in the form of a plan view (<a>) and a front sectional view (<b>) in the support lower fixing device 10a according to the second embodiment of the present invention. Fig. 15 shows the coupling relationship between the inner base member 200 and the CCTV post 1 in the form of a planar section (<a>) and a front section (<b>). Here, the <b> drawing in FIG. 14 shows a sectional view when cut along the AA ′ line of the <a> drawing, and the <b> drawing in FIG. 15 shows the mouth when the BB ′ of the <a> drawing is The cross section is shown.

As shown in Fig. 14A and Fig. 15B, after the CCTV holding pipe 1 is coupled to the outer side of the first vertical pipe portion 230 of the inner base member 200, The fixing bolt 210 is fastened to the third bolt fastening holes 211 formed at a position immediately outside the CCTV prop pipe 1.

In the enlarged view shown in FIG. 15A, the first holding bolt 220 is fixed to penetrate the CCTV holding pipe 1 and the first vertical pipe portion 230. Only a hole is formed in the first bolt through hole 1d of the CCTV support 1, and only the first bolt fastening hole 221 provided in the first vertical pipe portion 230 of the inner base member 200 is female threaded. It is good to form wealth. Meanwhile, reference numeral 220b in FIG. 15A refers to a bolt body of the first holding bolt 220, and 220c indicates a thread.

15 shows a cross-sectional shape of the third bolt fastening hole 211 formed in the inner flange 201 of the inner base member 200. The third bolt fastening hole 211 is designed to enter all of the bolt head portion of the position fixing bolt 210 so that the bolt head of the position fixing bolt 210 does not protrude on the bottom surface of the inner base member 200. It is desirable to avoid. The length (H 2 ) of the female screw portion (211a) formed on the inner wall surface of the third bolt fastening hole 211 is set to a length capable of exerting a sufficient fastening force enough to fix the position fixing bolt 210 It is preferable. In FIG. 5, reference numeral 211b denotes a bolt head seating surface for allowing the head portion of the fixing bolt 210 to be seated in the third bolt fastening hole 211, and reference numeral H 1 denotes the first . The total length of the three-bolt fastening hole 211, H 3 refers to the height of the bolt head seating surface. And D 1 indicates the maximum diameter of the bolt head portion of the third bolt fastening hole 211, D 2 indicates the diameter of the female screw portion (211a).

As described above, the support lower fixing device 10a according to the second embodiment of the present invention has an inner base member 200 and the inner base member 200 which are inserted and fixed inwardly from the lower end of the support pipe 1. It consists of two members called the outer housing 100 to cover the outer side of the coupling, in particular, the inner base member 200 coupled to the lower end of the holding pipe (1) the inner space of the bottom of the outer housing 100 Since the inner base member 200 is once combined with the outer housing 100, there is no shaking or floating in the outer housing 100 since the inner base member 200 is engaged with the outer housing 100 so that it fits snugly and fits into the CCTV holding pipe. (1) has the advantage of ensuring the structural stability to a very high level.

16 and 17 illustrate a support lower fixing device 10a according to the third embodiment of the present invention. The third embodiment of the present invention is almost similar to the second embodiment described above, except that the second bolt through hole 132a is formed in the CCTV holding pipe 1.

In the second embodiment (Figs. 8 to 15), the second holding bolt 132 inserted through the second vertical pipe portion 130 of the outer housing 100 presses the surface of the prop pipe 1. In the third embodiment, the second holding bolt 132 penetrates into the holding pipe 1 at all, and then the second holding bolt 132 is held in the holding pipe (1). There is a structural feature in that the fastening and fixing using the fixing nut 133 on the inner peripheral surface.

As shown in Fig. 17, the inner base member 200 is coupled to the lower end of the CCTV prop pipe 1, and then the outer housing 100 is inserted from the upper end side of the CCTV prop pipe 1 so that the inner base member ( When positioned above 200, the second holding bolt 132 can be inserted into the second bolt fastening hole 131 of the second vertical pipe portion 130, wherein the second holding bolt 132 is Passing through the second bolt through hole 132a previously formed in the support pipe 1 is protruded into the internal space of the support pipe 1. Since this state is still before the outer housing 100 is coupled to the anchor bolt 8a of the concrete foundation structure 8, the worker inserts his hand into the lower hole of the prop pipe 1 to remove the fixing nut 133. Can be filled in two holding bolts (132). As such, when the second holding bolt 132 coupled from the upper end of the outer housing 100 is fastened with the nut 133 in the holding pipe, the fastening effect of the second holding bolt 132 can be further improved. There is an advantage that can further improve the structural stability of the shore.

In addition, when the second holding bolt 132 is fastened with the fixing nut 133 in the inside of the holding pipe 1, the second holding bolt 132 is loosened before the fixing nut 133 is loosened. Since it becomes difficult, there is an advantage that can be prevented in advance, such as accidents such as dismantling or damage of the support lower fixing device (10a) by someone's mischief.

Fig. 18 shows a state in which the CCTV support 1 is installed by the support lower fixing device 10a in the second or third embodiment of the present invention.

The lower supporters 10 and 10a according to the present invention are preferably manufactured by a metal material by casting, and may be manufactured by using a synthetic resin material having excellent strength and durability. Alternatively, the metal material may be manufactured by joining a plurality of parts by welding.

The lower fixing device of the CCTV prop and street lamp according to the present invention is a concrete foundation structure embedded in the ground just by being easily assembled and installed at the lower end of the prop pipe at the place where CCTV is to be installed, unlike the existing prop installation structure. Since the anchor bolt and the prop pipe can be connected easily and safely, there is an advantage that can significantly reduce the overall manpower and costs for the production, transportation and installation of the prop.

And since the lower post fixing device according to the present invention is combined in such a way that it is fitted in direct contact with the side of the CCTV post, when installing the CCTV post using the lower support post, due to the structural characteristics of the lower post fixing device, Has the advantage of ensuring that it is always upright.

On the other hand, in the present specification, the present invention mainly described as a content of the lower fixing device for fixing the CCTV props (pipes) to the ground, in fact, even in the case of urban facilities such as traffic lights and street lamps, prop pipes used for CCTV props Since strut pipes of the same or similar structure are used, the present invention can be equally applied to the struts of these other urban facilities. Therefore, the scope of use of the present invention should not be construed as being limited to CCTV props, but should be interpreted as being applicable to street lamps or pillars of traffic lights.

1: CCTV Shore 1a: Shore Top
1d: 1st bolt through hole 2: CCTV camera
3: camera arm 3a: support wire
3b: upper reinforcing member 4: control box
5: CCTV Shore Cover 6: Flange
6a: Bolt through hole 7: Vertical gusset
8: concrete foundation structure 8a: anchor bolt
8b: conduit 9: nut
9a: washer 10, 10a: bottom support fixture
11: flange portion 12: middle inclined portion
13: vertical tube 14: prop insertion hole
15: anchor bolt through hole 15a: the first depression
16: bolt fastener 16a: second recess
16b: Shoring Fixing Bolt 18: Welding Part
100: outer housing 110: outer flange
130: second vertical pipe 131: second bolt fastening
132: fixing bolt of the second column 132a: bolt through hole
133: fixing nut 150: internal step
151: bolt head storage space 152: bolt storage hole
200: inner base member 201: inner flange
210: Position fixing bolt 211: Third bolt fastening
211a: female thread portion 211b: bolt head seating surface
220: first holding bolt 220a: bolt head
220b: bolt body 220c: thread
221: 1st bolt fastener 221a: female thread part
230: first vertical pipe portion GR: ground

Claims (9)

delete delete delete delete An inner base member 200 coupled with the lower end of the prop pipe constituting the CCTV prop 1 or the street lamp; And
And an outer housing (100) covering the inner base member (200) by being fitted from the upper end of the prop pipe.
The outer housing 100,
A second vertical pipe portion 130 protruding from the center in a vertical direction and having a support insertion hole 14 through which the support pipe can be inserted;
An outer flange portion 110 having an area extending in a horizontal direction about the post insertion hole 14, the bottom surface of which is in contact with the upper surface of the concrete foundation structure 8 embedded in the ground;
Second bolt fastening holes 131 provided at a plurality of positions spaced from the periphery of the support insertion hole 14 and formed to be connected to the support insertion hole 14;
Second holding bolts 132 fixed to the second bolt fastening holes 131 to fix the support pipes inserted into the support insertion holes 14; And
Anchor bolt through holes 15 formed by penetrating the edge portions of the outer flange portion 110 in a vertical direction and into which anchor bolts 8a buried in the concrete foundation structure 8 may be inserted, respectively. ;;
The nut 9 is fastened to the anchor bolts 8a protruding from the anchor bolt through holes 15 and protruding from the outer flange part 110, thereby being fixed to the concrete foundation structure 8. CCTV fixtures and streetlight cautions the bottom fixture.
The method of claim 5, wherein the inner base member 200,
A first vertical pipe portion 230 inserted into an inner space of a lower end of the shore pipe and contacting an inner circumferential surface of the shore pipe;
An inner flange 201 contacting the lower end of the prop pipe by extending in a horizontal direction from the lower end of the first vertical pipe part 230; And
And a plurality of first bolt fastening holes 221 formed in the first vertical pipe portion 230.
The prop pipe includes first bolt through holes 1d provided at positions corresponding to the first bolt fastening holes 221.
The first holding bolt 220 is coupled to the first bolt fastening holes 221 of the inner base member 200 through the first bolt through holes 1d of the prop pipe, thereby allowing the inner base member ( Characterized in that the 200 is fixed to the lower end of the holding pipe, CCTV holding and lower street light fixture.
The method of claim 6, wherein the inner base member 200 further comprises a plurality of third bolt fastening holes 211 formed in the inner flange 201,
Since the fixing bolts 210 are inserted into and fixed to the third bolt fastening holes 211 from the bottom of the inner flange 201, the bolt bodies of the fixing bolts 210 are fixed to the inner flange ( A lower fixing device for CCTV props and streetlights, characterized in that it protrudes above the upper surface of 201).
8. The method according to claim 6 or 7,
The outer housing 100 further includes bolt head receiving spaces 151 and bolt storage holes 152 formed by recessing in the periphery of the post insertion hole 14 at the bottom thereof.
Each of the bolt head receiving spaces 151 corresponds to the size of the first holding bolts 220 coupled to the first vertical pipe portion 230 of the inner base member 200,
Each of the bolt receiving holes 152 corresponds to the size of the fixing bolts 210 coupled to the inner flange 201 of the inner base member 200, CCTV prop and street light Lower Fixture.
According to claim 5, The holding pipe is formed with a plurality of second bolt through holes 132a corresponding to the second bolt fastening holes 131 of the outer housing 100, the second holding bolt 132 is the CCTV post and characterized in that the fastening and fixing by the fixing nut 133 in the inner surface of the support pipe after passing through the second bolt fastening hole 131 and the second bolt through hole (132a) Lower fixture of street light caution.
KR2020120003441U 2012-04-26 2012-04-26 Apparatus for fixing the bottom end of the CCTV post or street lamp post KR200463353Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020120003441U KR200463353Y1 (en) 2012-04-26 2012-04-26 Apparatus for fixing the bottom end of the CCTV post or street lamp post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020120003441U KR200463353Y1 (en) 2012-04-26 2012-04-26 Apparatus for fixing the bottom end of the CCTV post or street lamp post

Publications (1)

Publication Number Publication Date
KR200463353Y1 true KR200463353Y1 (en) 2012-10-30

Family

ID=47565825

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020120003441U KR200463353Y1 (en) 2012-04-26 2012-04-26 Apparatus for fixing the bottom end of the CCTV post or street lamp post

Country Status (1)

Country Link
KR (1) KR200463353Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200468618Y1 (en) * 2013-01-07 2013-08-28 배용준 A baluster
KR101540267B1 (en) * 2014-11-26 2015-07-29 (유)도로앤도시 Steel pole for traffic facility with simplified structure
KR101920335B1 (en) * 2017-05-30 2018-11-20 (유)도로앤도시 Steel pole for an assembly type traffic facility

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100684255B1 (en) * 2006-10-10 2007-02-22 에이컴조명 주식회사 Combination structure of base plate for a street lamp

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100684255B1 (en) * 2006-10-10 2007-02-22 에이컴조명 주식회사 Combination structure of base plate for a street lamp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200468618Y1 (en) * 2013-01-07 2013-08-28 배용준 A baluster
KR101540267B1 (en) * 2014-11-26 2015-07-29 (유)도로앤도시 Steel pole for traffic facility with simplified structure
KR101920335B1 (en) * 2017-05-30 2018-11-20 (유)도로앤도시 Steel pole for an assembly type traffic facility

Similar Documents

Publication Publication Date Title
KR100611553B1 (en) Connecting structure of street lamp prop
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR101408770B1 (en) Street lights or modular integrated antenna mounting device support structures object and construction methods
KR100991886B1 (en) A fixing structure of pillar
KR200463353Y1 (en) Apparatus for fixing the bottom end of the CCTV post or street lamp post
KR101387362B1 (en) Apparatus for assembling stand
KR100907078B1 (en) Fixing structure for light pole in outdoor lighting
KR101066388B1 (en) Embed type installation jig and its installation method for street lamp post fabricated easily and installed accurately
KR20090102355A (en) Lower part protection structure for roadlamp and others
KR20110137644A (en) A fixing structure of pillar and construction method thereof
KR200463352Y1 (en) Upper portion connector for CCTV post
KR200433150Y1 (en) upholder for street lamppost
KR100908802B1 (en) Framework for foundation of pole and foudation and pole thereof
KR101161814B1 (en) Roadlamp foundation
KR101007729B1 (en) A Multipurpose Pole
KR100905889B1 (en) Foundation structure for installing poles
KR101044022B1 (en) Supporting structure
KR101474736B1 (en) A roadlamp post fixing apparatus
KR101148172B1 (en) Street Lighting Pole Laying Footing Structure and Electing Method of Street Lighting Pole using the same
KR20100042446A (en) A fixing structure of pillar and construction method thereof
KR200455034Y1 (en) Strut structures for road traffic facilities
KR101350834B1 (en) Streetlight a pillar
KR200455468Y1 (en) CCT Shore with External Cover
JP4698661B2 (en) Concrete block for standing upright
KR101284918B1 (en) Storm Resisting Pressure Device

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee