KR20090100476A - A bridge lifting apparatus and bridge lifting method using the same - Google Patents

A bridge lifting apparatus and bridge lifting method using the same Download PDF

Info

Publication number
KR20090100476A
KR20090100476A KR1020080025657A KR20080025657A KR20090100476A KR 20090100476 A KR20090100476 A KR 20090100476A KR 1020080025657 A KR1020080025657 A KR 1020080025657A KR 20080025657 A KR20080025657 A KR 20080025657A KR 20090100476 A KR20090100476 A KR 20090100476A
Authority
KR
South Korea
Prior art keywords
support
pier
pillar
impression
piers
Prior art date
Application number
KR1020080025657A
Other languages
Korean (ko)
Other versions
KR101037210B1 (en
Inventor
김종민
김승규
김미희
Original Assignee
구일건설(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 구일건설(주) filed Critical 구일건설(주)
Priority to KR1020080025657A priority Critical patent/KR101037210B1/en
Publication of KR20090100476A publication Critical patent/KR20090100476A/en
Application granted granted Critical
Publication of KR101037210B1 publication Critical patent/KR101037210B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A device and a method for elevating a bridge using the surrounding environment are provided to enlarge the lower area while minimizing the load carrying capacity of the pier foundation. CONSTITUTION: A device for elevating a bridge using the surrounding environment comprises a lower pulling support stand(10), a top pulling support stand(20), a guide member(30), a jack(50), and a supporting board(60). The lower pulling support stand is installed in the bridge pier circumference in order to be located at the lower part of a cross section(70) of the bridge pier. The top imprint support stand is installed at the circumference of the bridge pier in order to be positioned on the top of the cross section. The guide member is combined with one part of the lower pulling support stand and the top pulling support stand. The guide member guides the increased bridge pier not to be transmitted. The jack is installed between the lower pulling support stand and top pulling support stand to be fixed on the top of the lower pulling support stand. The jack lifts the top pulling support stand in order to increase the cut bridge pier. The supporting board is installed between the top pulling support stand and the lower pulling support stand elevated by the jack.

Description

교각을 이용하여 교량을 인상하는 장치 및 이를 이용한 교량인상 방법{A bridge lifting apparatus and bridge lifting method using the same}Apparatus for raising bridges using bridges and bridge lifting methods using the same {A bridge lifting apparatus and bridge lifting method using the same}

본 발명은 교각을 이용하여 교량을 인상하는 장치 및 이를 이용한 교량인상 방법에 관한 것으로, 교각기둥을 절단한 후 연직방향으로 인상하여 교량의 상부구조물이 인상되도록 하고, 인상된 높이만큼 확장되도록 절단된 교각기둥을 연직방향으로 연결하여 교량의 형하고를 높여주는 교각을 이용하여 교량을 인상하는 장치 및 이를 이용한 교량인상 방법에 관한 것이다.The present invention relates to an apparatus for raising a bridge using a bridge and a method of raising a bridge using the same, wherein the bridge column is cut in the vertical direction to be lifted in the vertical direction, and the upper structure of the bridge is lifted and cut to extend by the height of the bridge. The present invention relates to a device for raising a bridge by using a bridge that connects the pillar columns in a vertical direction to increase the mold height of the bridge, and a bridge raising method using the same.

일반적으로, 교량의 하부공간을 추가로 확보하기 위한 교량 상부구조물 인상방법은 교각의 코핑부를 상부 수직방향으로 높여 하부공간을 확보하는 방법이 주로 사용되어 왔다.In general, a method of pulling a bridge superstructure to further secure a lower space of a bridge has been mainly used to secure a lower space by raising a coping portion of a bridge in an upper vertical direction.

이러한 종래의 교량 인상방법은 교각의 코핑부 확장에 따른 과도한 하중이 추가적으로 부가되어 교각 기초부분에서 내하력이 부족한 경우에는 시공할 수 가 없고, 무리하게 시공할 경우 교량이 붕괴되는 등의 안전사고가 발생하는 문제점이 있다.In the conventional bridge raising method, excessive loads due to the expansion of the coping portion of the bridge are additionally added, and thus, when the load capacity is insufficient at the foundation portion of the bridge, it cannot be constructed. There is a problem.

또한 상기한 코핑부의 단면확장으로 인하여 코핑부가 가분수 형상으로 형성됨으로써 시각적으로 불안한 상태를 보여 미관상으로도 문제점이 있었다.In addition, the coping portion is formed in an improper fraction due to the cross-sectional expansion of the coping portion, thereby showing a visually unstable state.

그리고 노후된 교량은 건설년도가 오래되어 설계도면의 분실 등으로 인하여 교량의 하부기초에 대한 구조제원의 확보가 불가능함으로써 교량의 하부공간을 추가로 확보하기 위해서는 기존 교량을 전면적으로 철거하고 재가설함에 따라 막대한 예산이 추가적으로 소요되는 문제점이 있다.In addition, the old bridges cannot be secured due to the loss of design drawings due to the age of construction, so that the existing bridges are completely removed and rebuilt to secure additional spaces. There is a problem that a huge budget is additionally required.

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은 교량의 형하공간 확장시 교각기둥을 절단하고 절단된 교각기둥과 상부구조물을 동시에 인상시킨 후 인상된 부분을 확장하여 교각기초에 구조적인 영향을 주지 않고 추가적인 교량의 하부공간을 확보할 수 있도록 하는 교각을 이용하여 교량을 인상하는 장치 및 이를 이용한 교량인상 방법을 제공함에 있다.An object of the present invention for solving the above problems is to cut the pier pillars at the time of expansion of the geometry space of the bridge, and simultaneously raise the cut pier pillars and the upper structure, and then expand the portions to be structurally affected by the pier foundation. The present invention provides a device for raising a bridge by using a bridge that can secure a lower space of an additional bridge, and a bridge raising method using the same.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은, 교각기둥의 절단면 하부에 위치하도록 교각기둥 둘레에 설치되어 교각기둥을 지지해주는 하부인상지지대; 상기 절단면의 상부에 위치하도록 교각기둥의 둘레에 설치되어 교각기둥을 지지해주는 상부인상지지대; 상기 하부인상지지대와 상부인상지지대에 가이드 되도록 끼워지고 하부인상지지대와 상부인상지지대 중 어느 한 부분에 결합되어 인상되는 교각기둥을 가이드해주고 전도되지 않도록 지지해주는 가이드부재; 상기 하부인상지지대의 상부에 고정되도록 하부인상지지대와 상부인상지지대의 사이에 설치되고 상기 상부인상지지대를 인상시켜 절단된 교각기둥이 인상되도록 하는 잭; 상기 잭에 의해 인상된 상부지지대와 하부지지대 사이에 설치되어 인상된 상부인상지지대를 받쳐주는 받침대; 를 포함하여 구성되는 것을 특징으로 한다.The present invention to achieve the object as described above and to perform the problem for eliminating the conventional defects, the lower impression support is installed around the pier pillar to be located below the cutting surface of the pier pillar pillar support; An upper lifting support installed around the piers to support the piers to be positioned on the cutting surface; A guide member inserted into the lower impression support and the upper impression support and guided to the pier pillar which is coupled to any one of the lower impression support and the upper impression support and is not supported to fall; A jack installed between the lower impression support and the upper impression support so as to be fixed to an upper portion of the lower impression support and to raise the upper impression support so that the cut pier pillar is raised; A pedestal that is installed between the upper support and the lower support lifted by the jack to support the lifted upper lift support; Characterized in that comprises a.

또한 상기 상부인상지지대 및 하부인상지지대는, 교각의 외주면을 따라 앵커볼트를 통해 고정되는 브래킷부; 상기 브래킷부의 상부에 설치되는 것으로 수평부재와, 수직부재, 경사부재가 종횡으로 교차되어 트러스형태의 구조물을 형성하는 지지부재; 상기 가이드부재가 끼워질 수 있도록 상기 수평부재의 측면에 설치되는 다수의 가이드고리를 포함하여 구성되는 것을 특징으로 한다.In addition, the upper impression support and lower impression support, the bracket portion is fixed through the anchor bolt along the outer peripheral surface of the piers; A support member installed on an upper portion of the bracket part such that a horizontal member, a vertical member, and an inclined member cross vertically and horizontally to form a truss-shaped structure; It characterized in that it comprises a plurality of guide rings installed on the side of the horizontal member so that the guide member can be fitted.

또한 상기 교각기둥의 절단면 위치에 따라 상부인상지지대의 상부와 하부인상지지대의 하부 모두에 설치되거나 또는 선택적으로 설치되어 상기 교각기둥을 지지해주는 확장지지대를 더 포함하여 구성되는 것을 특징으로 한다.In addition, it is characterized in that it further comprises an expansion support that is installed on both the upper and lower lower support of the upper impression support or selectively installed depending on the position of the cutting surface of the pier pillar to support the pier.

또한 상기 확장지지대는 상기 하부인상지지대와 상부인상지지대에 이격되도록 위치하고 상기 교각기둥의 둘레에 설치되는 교각기둥지지대; 상기 교각기둥지지대와 상기 수평부재를 연결하여 교각기둥이 지지되도록 하는 연결부재; 상기 교각기둥지지대의 하부에 결합되고 상기 교각기둥의 둘레를 감싸도록 설치되어 교각기둥에 발생되는 측면방향으로의 응력을 분산시켜주는 응력분산판; 을 포함하여 구성되는 것을 특징으로 한다.In addition, the expansion support is located on the lower lift support and the upper lift support is located pier pillar support is installed around the pier pillar; A connection member connecting the piers pillar support and the horizontal member to support the piers pillar; A stress distribution plate coupled to a lower portion of the pier pillar support and installed to surround a circumference of the pier pillar to distribute stress in a lateral direction generated in the pier pillar; Characterized in that comprises a.

또한 상기 교각을 안정적으로 지지하면서 상승시킬 수 있도록 상기 상부지지대와 코핑부 사이에 설치되는 쐐기를 더 포함하여 구성되는 것을 특징으로 한다.In addition, it is characterized in that it further comprises a wedge installed between the upper support and the coping portion to be raised while supporting the pier stably.

또한 교각기둥을 절단하여 수직으로 인상시키고 인상된 만큼 복구하여 교량을 인상해주는 방법에 있어서, 교각기둥의 둘레를 따라 하부인상지지대를 설치하는 단계; 이후 상기 하부인상지지대의 상측에 위치하도록 상기 교각기둥의 둘레에 상부인상지지대를 설치하는 단계; 이후 교각기둥을 인상시킬 수 있도록 상기 하부인 상지지대의 상부에 잭을 설치하는 단계; 이후 상기 상부인상지지대와 하부인상지지대 사이의 교각기둥을 절단한 후 철근 이음부를 치핑하는 단계; 이후 상부인상지지대와 하부인상지지대를 연결하도록 가이드부재를 설치하고 상부인상지지대와 하부인상지지대 중 어느 한 부분에 고정하는 단계; 이후 상기 잭을 작동시켜 상부인상지지대를 통해 교각기둥이 인상되도록 하고 인상된 높이만큼 받침대를 받쳐 지지하도록 하는 단계; 상기 잭인상 및 받침대 설치를 반복하여 원하는 위치까지 교각기둥을 인상한 후 인상된 교각기둥과 하부에 위치한 교각기둥을 연결할 수 있도록 철근을 배근하고 콘크리트를 타설하는 교각기둥 연결단계; 를 포함하여 이루어지는 것을 특징으로 한다.In addition, a method of cutting a bridge column by lifting it vertically and restoring as much as it is raised, the method comprising: installing a lower impression support along the circumference of the bridge column; Then installing an upper impression support around the piers to be positioned above the lower impression support; Thereafter, installing a jack on the upper portion of the upper support to lower the pier pillar; Thereafter cutting the piers between the upper and lower impression supports and chipping the reinforcing bars; Thereafter installing a guide member to connect the upper and lower support members and fixing it to any one of the upper and lower support members; Thereafter operating the jack to raise the piers through the upper impression support and supporting the pedestal by the raised height; Pier pillar connecting step of reinforcing the reinforcing bars and placing concrete to connect the pier pillar and the pier pillar located in the lower after raising the pier pillar to the desired position by repeating the jack-up and pedestal installation; Characterized in that comprises a.

이상에서 설명한 바와 같이 본 발명에 의하면, 교각기둥을 절단하여 수직방향으로 인상시켜 수직방향으로의 단면을 용이하게 확대할 수 있고, 교각기초의 내하력이 부족한 경우에도 교각기초에 추가적으로 가해지는 내하력의 부담을 최소화하면서 형하공간을 확대할 수 있으며, 상부인상지지대가 가이드부재를 통해 하부인상지지대와 연결되고 가이드 됨으로써, 안정적으로 교각을 인상시켜 줄 수 있으며 이로 인해 소요 형하고 확보가 용이하게 이루어지고, 교각이 위치한 주변 환경에 따라 교각의 상부, 중부, 하부를 선택적으로 절단하여 교각을 인상시켜 줄 수 있는 매우 유용한 발명이다.As described above, according to the present invention, it is possible to easily enlarge the cross section in the vertical direction by cutting the piers and pulling them in the vertical direction, and the burden of the additional load applied to the foundation of the piers even when the piling foundation lacks the load capacity. It is possible to enlarge the space of the mold while minimizing the height, and the upper impression support is connected to the lower impression support through the guide member and guided, so that the pier can be stably raised, thereby making it necessary and secured easily. It is a very useful invention that can raise the pier by selectively cutting the top, middle, and bottom of the pier according to the surrounding environment.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다.Hereinafter, the configuration and the operation of the embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted.

도 1 은 본 발명의 일실시예에 의한 교량인상장치를 나타낸 예시도, 도 2 는 본 발명의 일실시예에 의한 하부인상지지대 및 상부인상지지대를 나타낸 평면도, 도 3 은 도 2 의 A-A를 나타낸 단면도, 도 4 는 도 2 의 B-B를 나타낸 단면도로서, Figure 1 is an exemplary view showing a bridge lifting apparatus according to an embodiment of the present invention, Figure 2 is a plan view showing the lower and upper lifting support according to an embodiment of the present invention, Figure 3 is a AA of Figure 2 4 is a cross-sectional view showing the BB of FIG.

이들 도면에 도시된 바와 같이, 본 발명의 교량인상장치는, 교각(100)의 교각기둥(101)을 절단하여 상승시킨 후 교각기둥(10)을 수직방향으로 확장시켜 주는 것으로, 절단하고자 하는 교각기둥(101)의 절단면 하부에 위치하도록 교각기둥(101)의 둘레에 설치되어 교각기둥(101)을 지지해주는 하부인상지지대(10)와, 상기 교각기둥(101)의 절단면(70) 상부에 위치하도록 교각기둥(101)의 둘레에 설치되어 절단되는 교각기둥(101)을 지지해주는 상부인상지지대(20)와, 상기 하부인상지지대(10)와 상부인상지지대(20)를 가이드 하도록 수직방향으로 끼워지고 하부인상지지대(10)와 상부인상지지대(20) 중 어느 한 부분에 결합되어 인상되는 교각기둥(101)이 전도되지 않도록 지지해주는 가이드부재(30)와, 상기 하부인상지지대(10)와 상부인상지지대(20) 사이에 설치되는 것으로 하부인상지지대(10)에 고정되고 상기 상부인상지지대(20)를 인상시켜 절단된 교각기둥(101)이 인상되도록 하 는 잭(50)과, 상기 잭(50)에 의해 상부인상지지대(20)가 인상되면 상부인상지지대(20)와 하부인상지지대(10) 사이에 설치되어 상부인상지지대(20)를 받쳐줌으로써 교각기둥(101)의 인상상태를 유지해주는 받침대(60)를 포함하여 구성된다.As shown in these figures, the bridge lifting device of the present invention, by extending the pier pillar 10 in the vertical direction after cutting and raising the pier pillar 101 of the pier 100, pier to be cut It is installed around the pier pillar 101 so as to be located below the cut surface of the column 101, and the lower lifting support 10 for supporting the pier pillar 101, and located on the cut surface 70 of the pier pillar 101 Inserted in the vertical direction to guide the upper impression support 20 and the lower impression support 10 and the upper impression support 20 to support the column pier 101 is installed around the pier pillar 101 to be cut A guide member 30 which is coupled to any one of the lower lower support 10 and the upper upper support 20 to support the pillar column 101 to be prevented from falling, and the lower upper support 10 and the upper To be installed between the impression support 20 The jack 50 which is fixed to the lower impression support 10 and raises the upper impression support 20 so that the cut pier pillar 101 is impressed, and the upper impression support 20 by the jack 50. When it is raised is configured between the upper impression support 20 and the lower impression support 10 is supported by the upper impression support 20 is configured to include a pedestal 60 to maintain the lifting state of the pier pillar (101).

상기 상부인상지지대(20) 및 하부인상지지대(10)는 교각기둥(101)의 외주면에 앵커볼트(12a)를 통해 고정되는 브래킷부(11)와, 상기 브래킷부(11)의 상부에 고정되도록 설치되는 지지부재(14)와, 상기 가이드부재(30)가 삽입될 수 있도록 지지부재(14)의 측면을 따라 일정간격으로 설치되는 다수의 가이드고리(18)를 포함하여 구성된다. The upper impression support 20 and the lower impression support 10 is to be fixed to the bracket portion 11 and the upper portion of the bracket portion 11 is fixed to the outer circumferential surface of the pier pillar 101 by the anchor bolt 12a It includes a support member 14 is installed, and a plurality of guide rings 18 are installed at regular intervals along the side of the support member 14 so that the guide member 30 can be inserted.

상기 브래킷부(11)는 교각기둥(101)의 둘레에 앵커볼트(12a)를 통해 고정되는 지지빔(12)과, 상기 지지빔(12)의 측면에 날개형태로 결합되어 상기 지지부재(14)의 설치공간을 확보해주는 날개형브래킷(13)을 포함하여 구성되며, 상기 지지빔(12)은 교각기둥(101)의 형상에 따라 링형상, 사각형 형상 등 다양한 형태로 형성된다.The bracket 11 has a support beam 12 fixed to the circumference of the pier pillar 101 through an anchor bolt 12a, and is coupled to the side of the support beam 12 in a wing shape to support the support member 14. It is configured to include a wing-shaped bracket (13) to secure the installation space of, the support beam 12 is formed in a variety of forms, such as a ring shape, a rectangular shape according to the shape of the pillar pillar (101).

상기 지지부재(14)는 구조역학적으로 안정성을 기할 뿐만 아니라 축방향력으로 외력과 평행하여 휨과 전단력이 생기지 않도록 하기 위해 수평부재(15)와 수직부재(16)를 종횡으로 연결하여 프레임을 형성하고 그 내측에 경사부재(17)를 연결하여 사각형상이나 삼각형상으로 얽어서 짠 강철재 구조물이다.The support member 14 not only provides structural stability but also forms a frame by connecting the horizontal member 15 and the vertical member 16 vertically and horizontally in order to prevent bending and shearing forces in parallel with the external force in the axial force. And connected to the inclined member 17 on the inside is a steel structure woven in a square or triangular shape.

또한 상기 수평부재(15)는 지지부재(14)의 구조적인 안정을 위해서 I빔 형태의 강재를 사용하는 것이 바람직하며, 상기 브래킷부(11)의 상부에 용접 결합되어 교각기둥(101)에 고정되는 것이다.In addition, the horizontal member 15 is preferably used in the I-beam-shaped steel for structural stability of the support member 14, it is welded to the upper portion of the bracket portion 11 is fixed to the pillar column 101 Will be.

상기 가이드고리(18)는 상기 가이드부재(30)가 끼워질 수 있도록 수평부재(15)의 측면에 일정간격으로 설치된다.The guide ring 18 is installed at a predetermined interval on the side of the horizontal member 15 so that the guide member 30 can be fitted.

또한 상기 가이드부재(30)는 상기 가이드고리(18)에 삽입되고 하부인상지지대(10)와 상부인상지지대(20) 중 어느 하나에 연결되어 잭(50)을 통한 상부인상지지대(20)의 인상시에 가이드고리(18) 내부에서 가이드됨으로써, 절단된 교각기둥(101)을 전도되지 않도록 지지하고 가이드해 주게 되는 것이다. In addition, the guide member 30 is inserted into the guide ring 18 and connected to any one of the lower impression support 10 and the upper impression support 20 to raise the upper impression support 20 through the jack 50. By guiding the inside of the guide ring 18 at the time, it is to support and guide the cut pier pillar 101 so as not to fall.

한편 상기 잭(50)은 인상하고자 하는 상부인상구조물(20)의 하중에 따라 교각기둥(101)을 중심으로 서로 대칭되도록 2대 이상 설치하여 교각기둥(101)의 인상시 국부적 응력집중 현상이나 편심하중의 분포를 배제시켜 역학적으로 안정된 상태로 잭(50)의 인상작업이 이루어지도록 한다.On the other hand, the jack 50 is installed at least two symmetrical with respect to the piers pillars 101 according to the load of the upper impression structure 20 to be raised by the local stress concentration phenomenon or eccentricity when the piers pillars 101 are raised The distribution of the load is excluded so that the pulling operation of the jack 50 is performed in a mechanically stable state.

한편 본 발명은 교각기둥(101)의 절단면 위치에 따라 보다 안정적으로 교각(100)을 지지할 수 있도록 상기 상부인상지지대(202)의 상부와 하부인상지지대(10)의 하부에 확장지지대(40)를 더 설치할 수 있다.Meanwhile, the present invention supports the pier 100 more stably according to the position of the cut surface of the pier pillar 101. The extended support 40 is located at the upper portion of the upper and lower impression support 10 of the upper impression support 202. You can install more.

상기 확장지지대(40)는 상기 하부인상지지대(10)와 상부인상지지대(20)에 이격되도록 위치하고 상기 교각기둥(101)의 둘레에 설치되는 교각기둥지지대(41)와, 상기 교각기둥지지대(41)와 상기 수평부재(15)를 연결하여 교각기둥(101)이 지지되도록 하는 연결부재(42)와, 상기 교각기둥지지대(41)의 하부에 결합되고 상기 교각기둥(101)의 둘레를 감싸도록 설치되어 교각기둥(101)에 발생되는 측면방향으로의 응력을 분산시켜주는 응력분산판(43)을 포함하여 구성된다.The expansion support 40 is positioned so as to be spaced apart from the lower impression support 10 and the upper impression support 20, the pier pillar support 41 is installed around the pier pillar 101, and the pier pillar support 41 ) And the connecting member 42 to connect the horizontal member 15 so that the pier pillars 101 are supported, and coupled to the lower portion of the pier pillar support 41 to surround the pier pillars 101. It is configured to include a stress distribution plate 43 is provided to disperse the stress in the lateral direction generated in the pier pillar (101).

상기 교각기둥지지대(41)는 상기 지지빔(12)과 같이 교각기둥(101)의 둘레를 따라 앵커볼트에 의해 설치되는 것이다. 또한 상기 연결부재(42)는 상기 교각기둥지지대(41)와 상기 수평부재(15)를 경사지게 연결하여 교각기둥(101)에 가해지는 측면방향 응력을 지지해줄 수 있도록 하여 교각(100)이 전도되는 것을 방지해주게 된다.The pier pillar support 41 is installed by an anchor bolt along the circumference of the pier pillar 101 like the support beam 12. In addition, the connecting member 42 is inclined to connect the pier pillar support 41 and the horizontal member 15 to support the lateral stress applied to the pier pillar 101, the pier 100 is conducted To prevent it.

한편 상기 교각기둥지지대(41)의 둘레를 따라 다수의 가이드고리(18)를 더 설치하여 상기 가이드부재(30)가 교각기둥지지대(41)의 가이드고리(18)에도 끼워져 가이드될 수 있도록 함으로써 상부인상지지대(20)와 하부인상지지대(10)가 보다 안정적으로 가이드되고 지지될 수 있도록 한다.Meanwhile, a plurality of guide rings 18 may be further installed along the circumference of the pier pillar support 41 so that the guide member 30 may be fitted to the guide ring 18 of the pier pillar support 41 to be guided. The impression support 20 and the lower impression support 10 can be guided and supported more stably.

이하 본 발명에 따른 교량인상장치를 이용하여 교각의 하부, 중부, 상부를 절단한 후 인상하는 방법에 대하여 설명한다.Hereinafter, a method of pulling down after cutting a lower portion, a middle portion, and an upper portion of a pier using the bridge raising apparatus according to the present invention will be described.

도 5 는 본 발명의 일실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도, 도 6 은 본 발명의 일실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도, 도 7 은 본 발명의 일실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도로서,5 is an exemplary view showing a first impression state of the bridge lifting apparatus according to an embodiment of the present invention, Figure 6 is an exemplary view showing a second impression state of the bridge lifting apparatus according to an embodiment of the present invention, Figure 7 Is an exemplary view showing a third impression state of the bridge lifting apparatus according to an embodiment of the present invention,

교각기둥(101)의 하단부를 절단하여 인상할 경우, 도면에서와 같이 하부인상지지대(20)를 교각기초(103)의 상부에 놓여지도록 하여 교각기둥(101)에 설치한다. When the lower end of the pier pillar 101 is cut and pulled up, the lower impression support 20 is installed on the pier pillar 101 so as to be placed on the upper portion of the pier foundation 103 as shown in the drawing.

그런 다음 절단면(70)의 상부에 위치하도록 상기 상부인상지지대(20)를 교각기둥(101)에 설치한다.Then, the upper impression support 20 is installed on the pier pillar 101 so as to be positioned above the cutting surface 70.

이후 상기 상부인상지지대(20)를 인상하여 절단되는 교각기둥(101)을 상승시킬 수 있도록 상기 하부인상지지대(10)의 상부에 잭(50)을 설치한다.Thereafter, the jack 50 is installed on the upper portion of the lower impression support 10 so as to raise the pier pillar 101 which is cut by raising the upper impression support 20.

이후 교각기둥(101)의 절단면(70)을 커팅기를 이용하여 절단한 후 절단면(70)의 철근 이음부를 치핑한다.After cutting the cutting surface 70 of the pier pillar 101 using a cutting machine and then chipping the reinforcing bars of the cutting surface 70.

이후 상기 상부인상지지대(20)와 하부인상지지대(10)의 가이드고리(18)를 통해 가이드부재(30)를 끼워넣고 고정볼트를 이용하여 상부인상지지대(20) 또는 하부인상지지대(10) 중 어느 하나에 고정한다. Thereafter, the guide member 30 is inserted through the guide rings 18 of the upper and lower support 20 and the upper and lower support 20 or the upper and lower support 10. Fix it to either.

이후 상기 잭(50)을 작동시켜 상부인상지지대(20)를 상승시키면 가이드고리(18)에서 가이드부재(30)가 가이드되면서 상기 상부인상지지대(20)와 연결된 교각기둥(101)이 상승하게 된다. 바람직하게는 상부인상지지대(20)에 가이드부재(30)를 고정하고 하부인상지지대(10)에 가이드부재(30)가 가이드되도록 하면서 교각기둥(101)을 인상한다.Then, when the jack 50 is operated to raise the upper impression support 20, the guide member 30 is guided in the guide ring 18, and the pier pillar 101 connected to the upper impression support 20 is raised. . Preferably, the piercing column 101 is raised while fixing the guide member 30 to the upper impression support 20 and guide the guide member 30 to the lower impression support 10.

이후 잭(50)에 의해 인상된 교각기둥(101)을 받쳐줄 수 있도록 하부인상지지대(10)와 상부인상지지대(20) 사이에 받침대(60)를 설치하고 상기 잭(50)을 통한 인상작업을 반복시행하여 원하는 위치까지 교각기둥(101)을 인상시켜준다.After installing the pedestal 60 between the lower lifting support 10 and the upper lifting support 20 to support the pier pillar (101) raised by the jack 50 and the pulling operation through the jack 50 Repeatedly raises the piers 101 to the desired position.

이때 상기 잭(50)의 하부에도 받침대(60)를 설치하여 인상높이를 조절할 수 있도록 한다.At this time, by installing the pedestal 60 in the lower portion of the jack 50 to adjust the height of the impression.

상기와 같이 교각기둥(10)이 인상되면 절단면 하측의 교각기둥(101)과 인상된 교각기둥(101) 사이에 철근을 배근하여 연결하고 거푸집을 설치한 후 콘크리트를 타설하고 양생한 다음 상기 교량인상장치를 철거하여 완료된다.When the pier pillar 10 is raised as described above, the reinforcing bar is connected between the pier pillar 101 and the raised pier pillar 101 at the lower side of the cut surface, and after the formwork is installed, concrete is poured and cured, and then the bridge is raised. Complete by dismantling the device.

이렇게 교각기둥(101)이 수직방향으로 증설됨으로써 교량의 형하고가 상승되는 것이다.As such, the pillar pillar 101 is extended in the vertical direction, thereby increasing the mold height of the bridge.

이와 같이 교각기둥(101)의 하단부를 절단하여 교각(101)을 인상시킬 경우는, 교각(100)이 지상에 노출되어 하부인상지지대(10)와 상부인상지지대(20)의 설치가 용이하게 이루지는 시공환경에서 시공하도록 하고, 또한 상부구조물의 중량이 가벼울 경우에 시공이 가능하다.As such, when the lower end of the pier pillar 101 is cut to raise the pier 101, the pier 100 is exposed to the ground, so that the installation of the lower impression support 10 and the upper impression support 20 is easy. The construction is to be carried out in the construction environment, and the construction is possible when the weight of the upper structure is light.

도 8 은 본 발명의 다른 실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도, 도 9 는 본 발명의 다른 실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도, 도 10 은 본 발명의 다른 실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도,8 is an exemplary view showing a first impression state of the bridge lifting apparatus according to another embodiment of the present invention, Figure 9 is an exemplary view showing a second impression state of the bridge lifting apparatus according to another embodiment of the present invention, Figure 10 Is an exemplary view showing a third impression state of the bridge lifting apparatus according to another embodiment of the present invention,

교각기둥(101)의 중단부를 절단하여 교각(100)을 인상할 경우, 도면에서와 교각기둥(101)의 절단면(70) 하부에 하부인상지지대(10)를 설치하고 절단면(70) 상부에 상부인상지지대(20)를 설치한다.In the case of lifting the pier 100 by cutting the interruption portion of the pier pillar 101, the lower impression support 10 is installed at the lower portion of the piercing column 101 and the upper portion of the upper section of the piercing column 70. Install the impression support (20).

이후 교각기둥(101)을 상승시킬 수 있도록 상기 하부인상지지대(10)의 상부에 잭(50)을 설치하고, 커팅기를 이용하여 상기 교각기둥(101)의 절단면(70)을 절단한 후 절단면(70)의 철근 이음부를 치핑한다.After the jack 50 is installed on the upper portion of the lower lifting support 10 so as to raise the pier pillar 101, using a cutter to cut the cutting surface 70 of the pier pillar 101 after cutting surface ( Chipping the rebar seam of 70).

이후 상기 상부인상지지대(20)와 하부인상지지대(10)의 가이드고리(18)를 통해 가이드부재(30)를 끼워넣고 고정볼트를 이용하여 상부인상지지대(20) 또는 하부인상지지대(10) 중 어느 하나에 고정한다. Thereafter, the guide member 30 is inserted through the guide rings 18 of the upper and lower support 20 and the upper and lower support 20 or the upper and lower support 10. Fix it to either.

이후 상기 잭(50)을 작동시켜 상부인상지지대(20)를 상승시키면 가이드부 재(30)가 가이드고리(18) 내부에서 가이드되면서 상기 상부인상지지대(20)와 연결된 교각기둥(101)이 상승하게 된다.Then, when the jack 50 is operated to raise the upper impression support 20, the guide member 30 is guided in the guide ring 18 while the pier pillar 101 connected to the upper impression support 20 is raised. Done.

이후 잭(50)에 의해 인상된 교각기둥(101)을 받쳐줄 수 있도록 받침대(60)를 설치하고 상기 잭(50)을 통한 인상작업을 반복 시행하여 원하는 위치까지 교각기둥(101)을 인상시켜준다. 이때 상기 잭(50)의 하부에도 받침대(60)를 설치하여 인상높이를 조절할 수 있도록 한다.After installing the pedestal 60 to support the pier pillar (101) raised by the jack 50 and repeatedly performs the pulling operation through the jack 50 to raise the pier pillar 101 to the desired position. . At this time, by installing the pedestal 60 in the lower portion of the jack 50 to adjust the height of the impression.

상기와 같이 교각기둥(101)이 인상되면 절단면(70) 하측에 위치한 교각기둥(101)과 인상된 교각기둥(101) 사이에 철근을 배근하여 연결하고 거푸집을 설치한 후 콘크리트를 타설 양생함으로써 교각기둥(101)이 수직방향으로 확장되고 이로 인해 형하고가 상승되는 것이다.When the pier pillar 101 is raised as described above, reinforcing bars are connected between the pier pillar 101 and the raised pier pillar 101 positioned below the cutting surface 70 and installing the formwork, and then curing the pier by pouring concrete. The pillars 101 extend in the vertical direction, thereby raising the mold height.

한편 도면에서와 같이 교각기둥(101)의 중단부 절단할 경우 상부인상지지대(20)의 상부 및 하부인상지지대(20)의 하부에 확장지지대(40)를 더 설치할 수 있다.On the other hand, when cutting the interruption of the piers 101 as shown in the drawing may be further provided with an extended support 40 in the upper and lower lower support 20 of the upper impression support 20.

상기와 같이 교각기둥(101)에 확장지지대(40)를 더 설치하게 되면, 교각기둥(101)을 보다 안정적으로 지지하여 절단되는 교각기둥(101)이 전도되는 것을 방지할 수 있게 되는 것이다. When the expansion support 40 is further installed in the piers pillars 101 as described above, the piers pillars 101 which are cut by supporting the piers pillars 101 more stably may be prevented from falling.

이와 같은 실시예에 의한 본 발명은 상부구조물의 중량이 무거울 경우 교각기둥(101)의 중단부를 절단하고 확장지지대(40)를 더 설치하여 교각(100)을 안정적으로 지지하면서 인상시켜 주게 되는 것이다.When the weight of the upper structure is heavy, the present invention according to this embodiment is to raise the suspension while supporting the pier 100 stably by cutting the middle portion of the pier pillar 101 and further installing an extension support 40.

한편 도 11 은 본 발명의 또 다른 실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도, 도 12 는 본 발명의 또 다른 실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도, 도 13 은 본 발명의 또 다른 실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도로서,11 is an exemplary view showing a first impression state of the bridge lifting apparatus according to another embodiment of the present invention, Figure 12 is an illustration showing a second impression state of the bridge lifting apparatus according to another embodiment of the present invention. 13 is an exemplary view showing a third impression state of a bridge lifting device according to another embodiment of the present invention.

교각기둥(101)의 상단부를 절단하여 교각(100)을 인상할 경우, 도면에서와 같이 교각기둥(101)의 절단면(70) 하부에 하부인상지지대(10)를 설치하고 절단면(70) 상부에 상부인상지지대(20)를 설치한다.In the case of lifting the pier 100 by cutting the upper end of the pier pillar 101, the lower impression support 10 is installed below the cut surface 70 of the pier pillar 101 as shown in the figure, Install the upper impression support 20.

또한 상기 상부인상지지대(20)와 교각(100)의 코핑부(102) 사이에 상기 코핑부(102)의 단면형상과 동일한 형상을 가지는 쐐기(80)를 설치한다.In addition, a wedge 80 having the same shape as the cross-sectional shape of the coping portion 102 is installed between the upper impression support 20 and the coping portion 102 of the piers 100.

이와 같은 쐐기(80)는 교각기둥(101)의 상단부를 절단할 경우 상부인상지지대(20)가 코핑부(102)와 인접하도록 설치됨으로써, 상부인상지지대(20)와 코핑부(102) 사이에 설치되어 상부인상지지대(20)가 보다 안정적으로 교각을 지지하여 상승시킬 수 있도록 하는 것이다.Such wedge 80 is installed so that the upper impression support 20 is adjacent to the coping portion 102 when cutting the upper end of the column pillar 101, between the upper impression support 20 and the coping portion 102 Is installed so that the upper impression support 20 can be raised to support the pier more stably.

또한 상기 하부인상지지대(10)의 하측으로 확장지지대(40)를 더 설치한다. In addition, the expansion support 40 is further installed to the lower side of the lower support 10.

이후 교각기둥(101)을 상승시킬 수 있도록 상기 하부인상지지대(10)의 상부에 잭(50)을 설치하고, 커팅기를 이용하여 상기 교각기둥(101)의 절단면(70)을 절단한 후 절단면(70)의 철근 이음부를 치핑한다.After the jack 50 is installed on the upper portion of the lower lifting support 10 so as to raise the pier pillar 101, using a cutter to cut the cutting surface 70 of the pier pillar 101 after cutting surface ( Chipping the rebar seam of 70).

이후 상기 상부인상지지대(20)와 하부인상지지대(10) 및 확장지지대(40)의 가이드고리(18)를 통해 가이드부재(30)를 끼워넣고 고정볼트를 이용하여 상부인상지지대(20)에 고정한다.Thereafter, the guide member 30 is inserted through the guide ring 18 of the upper impression support 20, the lower impression support 10 and the expansion support 40, and fixed to the upper impression support 20 by using a fixing bolt. do.

이후 상기 잭(50)을 작동시켜 상부인상지지대(20)를 상승시키면 하부인상지지대(10)와 확장지지대(40)의 가이드고리(18)에서 가이드부재(30)가 가이드 되면서 상기 상부인상지지대(20)와 연결된 교각기둥(101)이 상승하게 된다.Then, when the jack 50 is operated to raise the upper impression support 20, the guide member 30 is guided by the guide ring 18 of the lower impression support 10 and the expansion support 40, and the upper impression support ( The pier pillar 101 connected with 20 is raised.

이후 잭(50)에 의해 인상된 교각기둥(101)을 받쳐줄 수 있도록 받침대(60)를 설치하고 상기 잭(50)을 통한 인상작업을 반복 시행하여 원하는 위치까지 교각기둥(101)을 인상시켜준다. 이때 상기 잭(50)의 하부에도 받침대(60)를 설치하여 인상높이를 조절할 수 있도록 한다.After installing the pedestal 60 to support the pier pillar (101) raised by the jack 50 and repeatedly performs the pulling operation through the jack 50 to raise the pier pillar 101 to the desired position. . At this time, by installing the pedestal 60 in the lower portion of the jack 50 to adjust the height of the impression.

상기와 같이 교각기둥(101)이 인상되면 절단면(70) 하측에 위치한 교각기둥(101)과 인상된 교각기둥(101) 사이에 철근을 배근하여 연결하고 거푸집을 설치한 후 콘크리트를 타설한 다음 양생한다. 또한 콘크리트가 양생되면 교량인상장치를 철거하여 완료된다.When the pier pillars 101 are raised as described above, the reinforcing bars are connected between the pier pillars 101 and the raised pier pillars 101 positioned below the cutting plane 70, the formwork is installed, and then the concrete is cured. do. In addition, when concrete is cured, it is completed by removing the bridge raising device.

한편 도면에서와 같이 교각기둥(101)의 상단부를 절단할 경우 절단면(70) 하부의 교각기둥(101)의 길이가 절단면(70) 상부의 교각기둥(101)보다 상대적으로 길게 형성되기 때문에 절단면(70) 하부에 상기 확장지지대(70)를 설치하여 보다 안정적으로 교각기둥(101)을 지지할 수 있도록 하는 것이다.On the other hand, when cutting the upper end of the pier pillar 101 as shown in the drawing because the length of the pier pillar 101 of the lower cutting surface 70 is formed relatively longer than the pier pillar 101 of the upper cutting surface 70 (cutting surface ( 70) by installing the expansion support 70 in the lower portion to support the pier pillar 101 more stably.

또한 상기 가이드부재(30)를 상기 확장지지대(40)의 가이드고리(18)에 끼워가이드함으로써, 교각기둥(101)의 상승시 교각기둥(101)을 지지해주는 지지범위가넓어져 교각기둥(101) 안정적으로 상승되고 지지될 수 있게 되는 것이다.In addition, by guiding the guide member 30 to the guide ring 18 of the expansion support 40, the support range for supporting the pier pillar 101 when the pier pillar 101 is raised, the pier pillar 101 Will be able to rise and be supported stably.

또한 상기와 같이 교각기둥(101)의 상단부를 절단하고 교각(100)을 인상시킬 경우는, 상부구조물의 중량이 무겁거나 교각이 물에 잠겨 있을때 시공하여 교각을 인상시켜 주도록 한다.In addition, in the case of cutting the upper end of the pier pillar 101 and to raise the pier 100 as described above, when the weight of the upper structure is heavy or the pier is immersed in water so as to raise the pier.

도 14 는 본 발명에 있어서 상부구조물의 중량이 큰 교각일 경우 교량인상장치의 설치상태를 나타낸 평면도로서,14 is a plan view showing the installation state of the bridge lifting device when the weight of the upper structure is a large bridge in the present invention,

상부구조물의 중량이 매우 클 경우 본 발명의 교량인상장치를 교각기둥(101)을 중심으로 서로 교차되도록 설치하여 교각(100)을 지지할 수 있도록 한다.When the weight of the upper structure is very large, the bridge lifting device of the present invention is installed so as to intersect with each other around the piers pillars 101 to support the piers 100.

즉 교각기둥(101)에 상부인상지지대(20) 및 하부인상지지대(10)를 교차되도록 설치하여 교각기둥(101)을 사방에서 지지해줌으로써, 상부구조물의 무게가 고중량일 경우에도 교각기둥(101)을 안정적으로 지지하면서 상승시킬 수 있게 되는 것이다. That is, by installing the upper impression support 20 and the lower impression support 10 to cross the pillar pillar 101 to support the pillar pillar 101 from all sides, even if the weight of the upper structure is a pier pillar 101 ) Can be increased while supporting stably.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

도 1 은 본 발명의 일실시예에 의한 교량인상장치를 나타낸 예시도,1 is an exemplary view showing a bridge lifting apparatus according to an embodiment of the present invention,

도 2 는 본 발명의 일실시예에 의한 하부인상지지대 및 상부인상지지대를 나타낸 평면도,Figure 2 is a plan view showing the lower and upper impression support according to an embodiment of the present invention,

도 3 은 도 2 의 A-A를 나타낸 단면도,3 is a cross-sectional view showing A-A of FIG.

도 4 는 도 2 의 B-B를 나타낸 단면도, 4 is a cross-sectional view showing the B-B of FIG.

도 5 는 본 발명의 일실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도,5 is an exemplary view showing a first impression state of the bridge lifting apparatus according to an embodiment of the present invention,

도 6 은 본 발명의 일실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도,Figure 6 is an exemplary view showing a second impression state of the bridge lifting apparatus according to an embodiment of the present invention,

도 7 은 본 발명의 일실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도,7 is an exemplary view showing a third impression state of the bridge lifting apparatus according to an embodiment of the present invention,

도 8 은 본 발명의 다른 실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도,8 is an exemplary view showing a first impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 9 는 본 발명의 다른 실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도,9 is an exemplary view showing a second impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 10 은 본 발명의 다른 실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도,10 is an exemplary view showing a third impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 11 은 본 발명의 또 다른 실시예에 의한 교량인상장치의 1차인상 상태를 나타낸 예시도,11 is an exemplary view showing a first impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 12 는 본 발명의 또 다른 실시예에 의한 교량인상장치의 2차인상 상태를 나타낸 예시도,12 is an exemplary view showing a second impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 13 은 본 발명의 또 다른 실시예에 의한 교량인상장치의 3차인상 상태를 나타낸 예시도,13 is an exemplary view showing a third impression state of the bridge lifting apparatus according to another embodiment of the present invention;

도 14 는 본 발명에 있어서 상부구조물의 중량이 큰 교각일 경우 교량인상장치의 설치상태를 나타낸 평면도,14 is a plan view showing the installation state of the bridge lifting device when the weight of the upper structure of the pier in the present invention,

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 하부인상지지대 (11) : 브래킷부(10): lower lift support (11): bracket

(12) : 지지빔 (12a) : 앵커볼트(12): support beam (12a): anchor bolt

(13) : 날개형브래킷 (14) : 지지부재(13): wing bracket (14): support member

(15) : 수평부재 (16) : 수직부재(15): horizontal member (16): vertical member

(17) : 경사부재 (18) : 가이드고리(17): inclined member (18): guide ring

(19) : 바닥판 (20) : 상부인상지지대(19): bottom plate (20): upper impression support

(30) : 가이드부재 (40) : 확장지지대(30): guide member 40: extension support

(41) : 교각기둥지지대 (42) : 연결부재(41): pier pillar support (42): connecting member

(43) : 응력분산판 (50) : 잭(43): stress distribution plate (50): jack

(60) : 받침대 (70) : 절단면60: pedestal 70: cutting surface

(80) : 쐐기 (100) : 교각 80: wedge 100: pier

(101) : 교각기둥 (102) : 코핑부(101): pier pillar (102): coping part

(103) : 교각기초(103): Pier foundation

Claims (6)

교각기둥의 절단면 하부에 위치하도록 교각기둥 둘레에 설치되어 교각기둥을 지지해주는 하부인상지지대;A lower lifting support installed around the piers to support the piers to be positioned below the cutting surface of the piers; 상기 절단면의 상부에 위치하도록 교각기둥의 둘레에 설치되어 교각기둥을 지지해주는 상부인상지지대;An upper lifting support installed around the piers to support the piers to be positioned on the cutting surface; 상기 하부인상지지대와 상부인상지지대를 가이드 하도록 수직방향으로 끼워지고 하부인상지지대와 상부인상지지대 중 어느 한 부분에 결합되어 인상되는 교각기둥이 전도되지 않도록 가이드해주고 지지해주는 가이드부재;A guide member that is inserted in a vertical direction to guide the lower and upper impression support and guides and supports the pier pillars that are coupled to any one of the lower and upper impression supports so that the pier columns do not fall; 상기 하부인상지지대의 상부에 고정되도록 하부인상지지대와 상부인상지지대의 사이에 설치되고 상기 상부인상지지대를 인상시켜 절단된 교각기둥이 인상되도록 하는 잭;A jack installed between the lower impression support and the upper impression support so as to be fixed to an upper portion of the lower impression support and to raise the upper impression support so that the cut pier pillar is raised; 상기 잭에 의해 인상된 상부지지대와 하부지지대 사이에 설치되어 인상된 상부인상지지대를 받쳐주는 받침대;를 포함하여 구성되는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 장치.An apparatus for raising a bridge using a pier, comprising: a pedestal installed between the upper support and the lower support lifted by the jack to support the raised upper support. 제 1 항에 있어서, The method of claim 1, 상기 상부인상지지대 및 하부인상지지대는, 교각의 외주면을 따라 앵커볼트를 통해 고정되는 브래킷부;The upper impression support and the lower impression support, the bracket portion is fixed through the anchor bolt along the outer peripheral surface of the piers; 상기 브래킷부의 상부에 설치되는 것으로 수평부재와, 수직부재, 경사부재가 종횡으로 교차되어 트러스형태의 구조물을 형성하는 지지부재;A support member installed on an upper portion of the bracket part such that a horizontal member, a vertical member, and an inclined member cross vertically and horizontally to form a truss-shaped structure; 상기 가이드부재가 끼워질 수 있도록 상기 수평부재의 측면에 설치되는 다수의 가이드고리; 를 포함하여 구성되는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 장치.A plurality of guide rings installed on the side surfaces of the horizontal members so that the guide members can be fitted; Apparatus for raising a bridge using a pier, characterized in that configured to include. 제 1 항에 있어서,The method of claim 1, 상기 교각기둥의 절단면 위치에 따라 상부인상지지대의 상부와 하부인상지지대의 하부 모두에 설치되거나 또는 선택적으로 설치되어 상기 교각기둥을 지지해주는 확장지지대; 를 더 포함하여 구성되는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 장치.An extended support installed at both the upper and lower lower support of the upper impression support or selectively installed according to the cut surface position of the pier to support the pillar; Apparatus for raising the bridge using the pier, characterized in that further comprises a. 제 3 항에 있어서,The method of claim 3, wherein 상기 확장지지대는 상기 하부인상지지대와 상부인상지지대에 이격되도록 위치하고 상기 교각기둥의 둘레에 설치되는 교각기둥지지대;The expansion support is located on the lower lifting support and the upper lifting support spaced apart pier pillar support is installed around the pier pillar; 상기 교각기둥지지대와 상기 수평부재를 연결하여 교각기둥이 지지되도록 하는 연결부재;A connection member connecting the piers pillar support and the horizontal member to support the piers pillar; 상기 교각기둥지지대의 하부에 결합되고 상기 교각기둥의 둘레를 감싸도록 설치되어 교각기둥에 발생되는 측면방향으로의 응력을 분산시켜주는 응력분산판; 을 포함하여 구성되는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 장치.A stress distribution plate coupled to a lower portion of the pier pillar support and installed to surround a circumference of the pier pillar to distribute stress in a lateral direction generated in the pier pillar; Apparatus for raising a bridge using a pier, characterized in that configured to include. 제 1 항에 있어서,The method of claim 1, 상기 교각을 안정적으로 지지하면서 상승시킬 수 있도록 상기 상부지지대와 코핑부 사이에 설치되되, 코핑부 단면형상과 동일하게 경사지도록 설치되어 코핑부를 지지해주는 쐐기를 더 포함하여 구성되는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 장치. The pier is installed between the upper support and the coping portion to be raised while supporting the pier stably, it is installed so as to be inclined in the same way as the cross section of the coping portion is configured to further comprise a wedge supporting the coping portion Device to raise the bridge by using. 교각기둥을 절단하여 수직으로 인상시키고 인상된 만큼 복구하여 교량을 인상해주는 방법에 있어서,In the method of cutting the piers and pulling them vertically and restoring the raised columns to raise the bridges, 교각기둥의 둘레를 따라 제 1 항 내지 제5항 중 어느 한 항의 하부인상지지대를 설치하는 단계;Installing the lower lifting support according to any one of claims 1 to 5 along the circumference of the piers; 이후 상기 하부인상지지대의 상측에 위치하도록 상기 교각기둥의 둘레에 제 1 항 내지 제5항 중 어느 한 항의 상부인상지지대를 설치하는 단계;Thereafter, installing the upper lifting support of any one of claims 1 to 5 around the pier pillar to be located on the upper side of the lower lifting support; 이후 교각기둥을 인상시킬 수 있도록 상기 하부인상지지대의 상부에 잭을 설치하는 단계;Installing a jack on an upper portion of the lower impression support so as to raise the piers; 이후 상기 상부인상지지대와 하부인상지지대 사이의 교각기둥을 절단한 후 철근 이음부를 치핑하는 단계;Thereafter cutting the piers between the upper and lower impression supports and chipping the reinforcing bars; 이후 상부인상지지대와 하부인상지지대를 연결하도록 가이드부재를 설치하고 상부인상지지대와 하부인상지지대 중 어느 한 부분에 고정하는 단계;Thereafter installing a guide member to connect the upper and lower support members and fixing it to any one of the upper and lower support members; 이후 상기 잭을 작동시켜 상부인상지지대를 통해 교각기둥이 인상되도록 하고 인상된 높이만큼 받침대를 받쳐 지지하도록 하는 단계;Thereafter operating the jack to raise the piers through the upper impression support and supporting the pedestal by the raised height; 상기 잭인상 및 받침대 설치를 반복하여 원하는 위치까지 교각기둥을 인상한 후 인상된 교각기둥과 하부에 위치한 교각기둥을 연결할 수 있도록 철근을 배근하고 콘크리트를 타설하는 교각기둥 연결단계; 를 포함하여 이루어지는 것을 특징으로 하는 교각을 이용하여 교량을 인상하는 방법.Pier pillar connecting step of reinforcing the reinforcing bars and placing concrete to connect the pier pillar and the pier pillar located in the lower after raising the pier pillar to the desired position by repeating the jack-up and pedestal installation; Method of raising a bridge using a pier, characterized in that consisting of.
KR1020080025657A 2008-03-20 2008-03-20 A bridge lifting apparatus KR101037210B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080025657A KR101037210B1 (en) 2008-03-20 2008-03-20 A bridge lifting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080025657A KR101037210B1 (en) 2008-03-20 2008-03-20 A bridge lifting apparatus

Publications (2)

Publication Number Publication Date
KR20090100476A true KR20090100476A (en) 2009-09-24
KR101037210B1 KR101037210B1 (en) 2011-05-26

Family

ID=41358642

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080025657A KR101037210B1 (en) 2008-03-20 2008-03-20 A bridge lifting apparatus

Country Status (1)

Country Link
KR (1) KR101037210B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101420222B1 (en) * 2013-12-24 2014-07-17 박영수 Socket type lifting apparatus and lifting construction method therewith
CN109944174A (en) * 2019-04-30 2019-06-28 厦门合诚工程技术有限公司 A kind of bridge maintaining reinforcing operating device
CN112064517A (en) * 2020-10-17 2020-12-11 安徽省路港工程有限责任公司 Jacking device and method for short-tower cable-stayed bridge

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015330A (en) * 2013-01-18 2013-04-03 四川省交通运输厅公路规划勘察设计研究院 Steel hoop support system of jacking bridge
KR102261122B1 (en) 2020-07-14 2021-06-07 농업회사법인 주식회사 오케이120 Composition for reduction of nicotine content in blood

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100408247B1 (en) * 2001-11-16 2003-12-01 주식회사 엘지이아이 Structure of base for hermetic rotary compressor
KR100454985B1 (en) * 2002-03-13 2004-11-06 오원균 A system for increase Heigrt a concrete building.
KR200340904Y1 (en) 2003-10-06 2004-02-11 노윤근 Apparatus for raising the upper structure of a bridge
KR100580225B1 (en) * 2004-12-13 2006-05-16 노윤근 Upper structure raising method using bridge upper structure support and lift equipment and this
KR100808212B1 (en) 2007-06-29 2008-02-29 노윤근 The bridge upper structure pulling up for which construction bent for bridge upper structure pulling up and this were used

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101420222B1 (en) * 2013-12-24 2014-07-17 박영수 Socket type lifting apparatus and lifting construction method therewith
CN109944174A (en) * 2019-04-30 2019-06-28 厦门合诚工程技术有限公司 A kind of bridge maintaining reinforcing operating device
CN109944174B (en) * 2019-04-30 2020-07-17 厦门合诚工程技术有限公司 Bridge maintenance is with consolidating operating means
CN112064517A (en) * 2020-10-17 2020-12-11 安徽省路港工程有限责任公司 Jacking device and method for short-tower cable-stayed bridge
CN112064517B (en) * 2020-10-17 2021-10-15 安徽省路港工程有限责任公司 Jacking device and method for short-tower cable-stayed bridge

Also Published As

Publication number Publication date
KR101037210B1 (en) 2011-05-26

Similar Documents

Publication Publication Date Title
KR100726163B1 (en) Apparatus for supporting an upper structure of a bridge
KR101243775B1 (en) Apparatus of Constructing Bridge and Method of Constructing Bridge by Using the Same
KR101300073B1 (en) Lifting device for girder
KR101037210B1 (en) A bridge lifting apparatus
KR101026012B1 (en) Bridge deck dismantling method by means of united pulling jack and pier
KR101527782B1 (en) Management and reverse displacement of composite bridge composite inclined support installation method
CN210458973U (en) Hydraulic jacking device with deviation correcting mechanism for bridge jacking construction
KR101889064B1 (en) Construction method of a long span bridge main tower
CN106894345A (en) Continuous beam end bay closing device and method
KR100580225B1 (en) Upper structure raising method using bridge upper structure support and lift equipment and this
CN111980439A (en) Wall bearing replacement device and wall bearing replacement construction method
KR101130166B1 (en) Apparatus and method for replacing bearings of box girder bridge
CN110424243A (en) A kind of Long span Tied-Arch Bridge Main Bridge jack-up system and jack-up construction method
CN210684474U (en) Follow-up supporting device for bridge jacking construction
CN113279341A (en) Bridge resetting support and bridge resetting method
CN213571600U (en) Bridge underpins bearing structure
CN203855879U (en) Novel high-pier turnout continuous beam support
JP3425352B2 (en) Self-elevating formwork device
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
KR100776671B1 (en) Construction method for confine concrete member of steel plate girder
KR200391232Y1 (en) Main Girder Launching System with Temporary Scaffolding
CN103233577A (en) Method for supporting framework of concrete beam through suspension truss
CN204715219U (en) Distribution beam hanging apparatus
CN110656581A (en) Temporary bridge construction process
CN211713706U (en) Large cantilever prefabricated bent cap installation lattice support device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee