KR20090098760A - Apparatus for preventing water leakage of bridge - Google Patents

Apparatus for preventing water leakage of bridge Download PDF

Info

Publication number
KR20090098760A
KR20090098760A KR1020090060740A KR20090060740A KR20090098760A KR 20090098760 A KR20090098760 A KR 20090098760A KR 1020090060740 A KR1020090060740 A KR 1020090060740A KR 20090060740 A KR20090060740 A KR 20090060740A KR 20090098760 A KR20090098760 A KR 20090098760A
Authority
KR
South Korea
Prior art keywords
plate
slab
bridge
buried
frame
Prior art date
Application number
KR1020090060740A
Other languages
Korean (ko)
Other versions
KR100922599B1 (en
Inventor
박종수
박민철
Original Assignee
주식회사 리노이엔지
박종수
박민철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=41357686&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR20090098760(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 주식회사 리노이엔지, 박종수, 박민철 filed Critical 주식회사 리노이엔지
Publication of KR20090098760A publication Critical patent/KR20090098760A/en
Application granted granted Critical
Publication of KR100922599B1 publication Critical patent/KR100922599B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/062Joints having intermediate beams
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/065Joints having sliding plates
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An interchangeable buried water leakage prevention apparatus of a bridge is provided to install and replace a drain board easily by replacing the drain board of the buried frame. An interchangeable buried water leakage prevention apparatus of a bridge comprises a pair of buried frames(200) and a drain board(300). The buried frame comprises a frame body(210) having an insertion space(220) inside, an upper and a lower protruding plate(230,240) on the upper and lower sides which contact the side of a slab, and an insert path(250) which is formed between the upper and the lower protruding plate and connected to the insertion space of the frame body.

Description

교체가 가능한 교량의 매립형 누수방지장치{APPARATUS FOR PREVENTING WATER LEAKAGE OF BRIDGE}Refillable Leakage Prevention Device for Bridges {APPARATUS FOR PREVENTING WATER LEAKAGE OF BRIDGE}

본 발명은 교체 가능한 교량의 매립형 누수방지장치에 관한 것으로서, 더욱 상세하게는 교량의 슬래브와 슬래브 사이에 유입되는 우수 및 토사가 슬래브의 하부로 누수되는 것을 방지하고, 반영구적으로 사용이 가능한 배수판을 슬래브와 슬래브 사이 상부에서 하부로 이송시켜 교량의 슬래브 양측면에 매립설치된 매립프레임에 배수판의 양측이 매립프레임에 안정적으로 지지되고, 설치가 용이하며, 작업에 따른 작업시간 및 비용을 줄일 수 있고, 배수판과 교량의 슬래브(slab)에 매립되는 매립프레임의 결합 구조가 단순하여 생산성을 향상시킬 수 있으며, 교량의 측면에서 슬라이딩 방식으로 배수판만을 삽입 및 인출할 수 있는 교체가 가능한 교량의 매립형 누수방지장치에 관한 것이다.The present invention relates to a buried type leakage preventing device of a replaceable bridge, and more particularly, to prevent rainwater and earth and sand from leaking into the lower part of the slab between the slab and the slab of the bridge, and to use a semi-permanently drainage slab. Both sides of the drain plate are stably supported by the buried frame in the buried frame installed on both sides of the slab of the bridge by moving from the upper part to the lower part between the slab and the slab. Regarding the interchangeable buried type leak prevention device for bridges, which can improve productivity due to the simple structure of the embedding frame embedded in the slab of the bridge, the insertion and withdrawal of only the drainage plate by sliding in the side of the bridge will be.

일반적으로 교량은 다수 개의 기둥을 세운 후에 상기 기둥의 상부에 철골 구조로 골격을 형성하고, 철골 구조의 골격에 콘크리트가 타설되어 교량 상판을 이루며, 교량 상판의 상면에는 통상 아스팔트가 도포되어 일반 도로와 같은 조건으로 형성된다.In general, a bridge is formed of a steel frame structure on the upper part of the pillar after erecting a plurality of pillars, concrete is poured into the steel frame skeleton to form a bridge deck, and the upper surface of the bridge deck is usually coated with asphalt and normal roads It is formed under the same conditions.

상기 교량 상판은 계절에 따라 발생되는 온도변화에 의해 상판의 길이가 늘어나거나 또는 줄어드는 등의 길이 변화가 발생되는 데, 이러한 교량 상판의 신축 현상을 보상하기 위해서 교량 상판은 다수 개의 유닛(이하의 설명에서 교량 슬래브라는 용어를 사용키로 한다)으로 구성되어 슬래브와 슬래브가 신축 가능하게 연결된다. 여기서, 교량 상판을 형성하는 교량의 슬래브와 슬래브 사이에는 신축이음장치가 설치되며, 이러한 신축이음장치에 의해 교량 상판을 형성하는 다수의 교량 슬래브는 신축 현상에 기인하는 손상으로부터 보호되는 동시에 차량의 원활한 주행을 보장하게 된다.The bridge deck has a length change such as the length of the roof deck increases or decreases due to temperature changes occurring according to seasons. In order to compensate for the expansion and contraction of the bridge deck, the bridge deck has a plurality of units (described below). Bridge slab is used in the terminology), and the slab and the slab are elastically connected. Here, the expansion joint is installed between the slab of the bridge forming the bridge top plate and the slab, the plurality of bridge slabs forming the bridge top plate by this expansion joint is protected from damage due to the expansion phenomenon and at the same time smoothly Driving is guaranteed.

그리고 다양한 구성의 신축이음 장치가 교량의 신축이음부에 제공되고 있지만, 통상의 교량용 신축이음 장치는 교량 상판의 수축 및 팽창에 따라 유연하게 신축되기는 하나, 물의 침투를 저지하는 데는 구조적으로 취약하다.In addition, although expansion joints of various configurations are provided in expansion joints of bridges, conventional expansion joints for bridges are flexibly stretched due to contraction and expansion of the bridge deck, but are structurally weak in preventing water penetration. .

이에 본 발명의 출원인은 대한민국 등록특허공보 제10-0707484호를 통해 교량 신축이음부의 누수 방지장치("교체용 신축이음 누수방지 장치")를 제안한 바 있으며, 이러한 "교체용 신축이음 누수방지 장치"는 신축이음 장치 및 그 주연에서 누수되는 물이 교량 슬래브 하부의 교좌장치나 금속재 빔으로 유입되지 못하면서 원활하게 배수될 수 있도록 한다.Accordingly, the applicant of the present invention has proposed a leak preventing device ("expansion expansion joint leak prevention device for replacement") bridge expansion joint through the Republic of Korea Patent Publication No. 10-0707484, such "expansion expansion joint leakage prevention device for replacement" ”Ensures that the expansion joints and the water leaking from the periphery can be drained smoothly without entering the bridges or metal beams under the bridge slabs.

도 1을 참조하면, 상기 교체용 신축이음 누수방지 장치는 교량 상판(도면에서는 철도 교량 및 그에 설치되는 신축이음 장치를 예로 한 것임)을 형성하는 교량 슬래브 간의 사이 공간(이하의 설명에서 교량 슬래브 간의 사이 공간에 대해 "유간"이라는 용어를 사용한다)에 설치되며, 고정받침대(10)와 고정대(20) 및 신축부 재(30)를 포함하여 이루어진다.Referring to FIG. 1, the replacement expansion joint leakage preventing device includes a space between bridge slabs forming a bridge top plate (in the drawing, taking an example of a railway bridge and a expansion joint installed therein) (between the bridge slabs in the following description). Installed in the space between), and includes a fixed support 10, a fixed base 20 and an elastic member (30).

상기 고정받침대(10)는 고정홈(10a)을 형성한 형태로 이루어지며, 두 교량 슬래브(70)의 마주하는 측면을 기준으로 한 쌍의 고정받침대(10)가 서로 대칭을 이루는 상태로 두 교량 슬래브(70)의 마주하는 측면에 각각 매립된다. 여기서, 한 쌍의 고정받침대(10)는 고정홈(10a)과 유간을 통하게 하는 개방구(10b)를 형성한 형태로 이루어진다. 그리고, 한 쌍의 고정받침대(10)에 한 쌍의 고정대(20)가 각각 끼워져 고정되며, 한 쌍의 고정대(20)는 그 내측을 고정받침대(10)의 개방구(10b)를 통해 유간에 각각 노출하는 상태이다. 그리고, 한 쌍의 고정대(20)에 신축부재(30)의 양단이 결합되며, 이러한 신축부재(30)는 교량 슬래브(70)들 사이의 유간에서 "U"자형으로 설치되어 배수기능을 한다.The fixed support 10 is formed in the form of a fixed groove (10a), a pair of fixed support 10 in the state in which the pair of fixed support 10 is symmetrical with respect to the opposite sides of the two bridge slab (70) It is embedded in the opposite side of the slab 70, respectively. Here, the pair of fixed pedestal (10) is formed in the form of the opening (10b) for passing through the fixing groove (10a) and the flow path. Then, a pair of fixing brackets 20 are fitted into and fixed to the pair of fixing pedestals 10, respectively, and the pair of fixing pedestals 20 are connected to the inner space through the opening 10b of the fixing pedestal 10. Each is exposed. Then, both ends of the elastic member 30 is coupled to the pair of fixed base 20, the elastic member 30 is installed in the "U" shape between the bridge slabs 70 between the functions of drainage.

여기서, 상기한 본 고안의 출원인이 고안한 교체용 신축이음 누수방지 장치는 교량의 교량슬래브 간 신축이음부에 매립 상태로 설치된다. 즉, 교량슬래브의 형성을 위해 거푸집을 설치시, 거푸집의 내측면에 고정받침대(10)를 고정한 다음, 거푸집 내측에 콘크리트를 타설하여 교량 슬래브(70)의 유간쪽 측면에 고정받침대(10)를 매립 설치한다. 이에 따라, 고정받침대(10)는 교량 슬래브(70)에 반영구적인 상태로 매립 설치되며, 이러한 레일 형의 고정받침대(10)에 신축부재(30)를 결합시켜 교량 신축이음부에서 발생되는 누수를 교좌장치나 빔으로 유입됨 없이 교량 외부로 배수시킬 수 있다.Here, the expansion expansion joint leakage prevention device devised by the applicant of the present invention is installed in the expansion joint between the bridge slab between the bridge. That is, when the formwork is installed for the formation of the bridge slab, the fixing support 10 is fixed to the inner side of the formwork, and then concrete is placed inside the formwork to fix the support 10 to the side of the rail side of the bridge slab 70. Install landfill. Accordingly, the fixed pedestal 10 is buried in a semi-permanent state in the bridge slab 70, by coupling the expansion and contraction member 30 to the rail-shaped fixed pedestal 10 to prevent leakage from the bridge expansion joint portion It can be drained outside the bridge without entering the bridge system or beam.

그러나, 상기한 교체용 신축이음 누수방지 장치는 그 신축부재(30)가 고정대(20)를 매개로 고정받침대(10)에 고정 설치되는 것이므로, 신축부재(30)의 폭 방 향의 양단에 한 쌍의 고정대(20)를 각각 결합하는 작업을 필요로 한다. 이에 따라, 신축부재(30)를 교량 슬래브(70)의 매립된 고정받침대(10)에 지지시켜 설치하기 위한 사전 작업이 비교적 번거롭게 되고, 그 결과 신축이음 누수방지 장치를 교량 슬래브(70)의 유간에 설치하는 작업에 소요되는 시간이 비교적 길어지게 된다. 이는 기존에 설치된 신축이음 누수방지 장치에서 신축부재(30)를 교체하는 작업시에도 동일한 현상으로 나타난다.However, the above expansion joint leakage preventing device is that the expansion member 30 is fixed to the fixed support 10 via the fixing table 20, so that the ends of the expansion member 30 in the width direction It is necessary to work with each of the pair of the fixed base 20. Accordingly, the preliminary work for supporting and installing the stretchable member 30 on the embedded fixed support 10 of the bridge slab 70 becomes relatively cumbersome, and as a result, the expansion joint leakage preventing device is provided with the bridge slab 70. The time required to install the liver will be relatively long. This is the same phenomenon when replacing the expansion member 30 in the existing expansion joint leak prevention device installed.

또한, 신축부재(30)가 고무나 기타 연질의 재료로 형성시, 일광(日光)에 지속적으로 노출되면서 단기간에 노후되어 내구성 저하를 초래할 수 있다.In addition, when the elastic member 30 is formed of rubber or other soft materials, it may be aging in a short period of time while being continuously exposed to daylight, which may lead to deterioration in durability.

그리고 상기와 같이 노후된 신축부재(30)는 그 정상적인 기능 수행을 위해 새것으로 교체해야 하므로, 신축이음 누수방지 장치는 그 신축부재(30)의 교체 주기가 비교적 빠르다. 이에 따라, 관리자는 신축이음 누수방지 장치의 유지보수에 보다 많은 신경을 써야 하는 동시에, 신축부재(30)의 잦은 교체로 인해 번거로움 및 비용 지출이 초래된다.And because the old expansion and contraction member 30 must be replaced with a new one to perform its normal function, expansion joint leakage prevention device is relatively fast replacement cycle of the expansion member (30). Accordingly, the manager has to pay more attention to the maintenance of the expansion joint leak prevention device, and the cumbersome and cost is incurred due to the frequent replacement of the elastic member 30.

또한, 신축부재(30)에 대한 일광의 복사열을 최소화하기 위한 방편으로서, 유간의 상부를 가리는 강판덮개(50)를 교량 슬래브(70)의 상부에 유간마다 설치하게 되며, 이는 신축이음 누수방지 장치는 물론 그를 포함하는 교량의 유지관리에 소요되는 비용 증가를 초래하는 동시에, 교량의 관리를 담당하는 기관이나 단체의 예산증가를 초래하게 된다.In addition, as a means for minimizing the radiant heat of daylight for the expansion and contraction member 30, the steel plate cover 50 that covers the upper portion of the clearance is installed in each of the clearance between the bridge slab 70, which is a expansion joint leak prevention device This, of course, would lead to an increase in the cost of maintaining the bridges containing them, as well as an increase in the budget of the institution or organization responsible for the management of the bridges.

한편 상기와 같은 종래의 누수방지장치는 신축부재(30)를 고정받침대(10)가 설치된 교량의 슬래브(70) 외측에서 신축부재(30)를 지지하면서 고정받침대(10) 내 부로 고정대(20)를 각각 슬라이딩으로 삽입하여 결합시키는 방식으로 그 작업이 매우 어렵고, 작업시간이 오래 걸리는 문제점이 있었다. Meanwhile, the conventional leakage preventing device as described above supports the expansion and contraction member 30 inside the fixing support 10 while supporting the expansion and contraction member 30 from the outside of the slab 70 of the bridge in which the fixing support 10 is installed. There is a problem in that the work is very difficult, the work takes a long time in the manner of coupling by inserting each sliding.

본 발명은 상기와 같은 종래의 문제점을 극복하기 위한 것으로서, 본 발명의 목적은 교량의 슬래브와 슬래브 사이에 유입되는 우수 및 토사가 슬래브의 하부로 누수되는 것을 방지하고, 반영구적으로 사용이 가능한 배수판을 슬래브와 슬래브 사이 상부에서 하부로 이송시켜 교량의 슬래브 양측면에 매립설치된 매립프레임에 배수판의 양측이 삽입되어 매립프레임에 안정적으로 지지되고, 설치가 용이하며, 교량의 측면에서 배수판만을 삽입 및 인출할 수 있는 교체가 가능한 교량의 매립형 누수방지장치를 제공하는데 있다.The present invention is to overcome the conventional problems as described above, an object of the present invention is to prevent the rainwater and earth and sand flowing into the lower portion of the slab flowing between the slab and the slab of the bridge, and to use a drain plate that can be used semi-permanently Both sides of the drainage plate are inserted into the buried frame installed on both sides of the slab of the bridge by transferring from the upper part to the lower part between the slab and the slab so that it is stably supported by the buried frame, easy to install, and only the drain plate can be inserted and withdrawn from the side of the bridge. The present invention provides a replaceable leak-proof device for bridges that can be replaced.

그리고 본 발명은 교량의 슬래브 양측면에 매립설치된 매립프레임에 양측이 삽입되어 지지된 배수판을 교량의 슬래브와 슬래브 사이에서 상부로 이송시켜 매립프레임으로부터 배수판을 분리할 수 있어 배수판의 설치 및 교체가 용이하고, 설치 및 교체 작업에 따른 작업시간 및 비용을 줄일 수 있으며, 필요시 배수판만을 교체가 가능한 교량의 매립형 누수방지장치를 제공하는 데 다른 목적이 있다.And the present invention can transfer the drain plate supported by both sides inserted into the buried frame embedded in the both sides of the slab of the bridge to the upper portion between the slab and the slab of the bridge to separate the drain plate from the buried frame is easy to install and replace the drain plate In addition, the purpose of the present invention is to provide a bridge-type leakproof device for reducing the work time and cost according to the installation and replacement work and replacing only the drain plate if necessary.

또한 본 발명의 또 다른 목적으로는 교량의 슬래브 양측면에 매립설치되는 매립프레임과 배수판의 결합 구조가 단순하여 생산성을 향상시킬 수 있는 교체가 가능한 교량의 매립형 누수방지장치를 제공하는 데 있다.In addition, another object of the present invention is to provide a bridge-type leak-proof leak-proof device that can be replaced to improve the productivity by the simple structure of the combination of the buried frame and the drain plate buried on both sides of the slab of the bridge.

상기한 목적을 달성하기 위해 본 발명에 의한 교체 가능한 교량의 매립형 누수방지장치는 교량의 슬래브(slab)와 슬래브 사이에 설치되는 매립형 누수방지장치에 있어서,In order to achieve the above object, the buried type leakage preventing device of a replaceable bridge according to the present invention is a buried type leak preventing device installed between a slab of a bridge and a slab,

중공형으로 프레임 몸체(210) 내부에 삽입공간(220)이 형성되고, 프레임 몸체(210)의 일측 상부에는 프레임 몸체(210)의 상부로 돌출되어 슬래브(100)의 측면에 밀착되는 상부돌출판(230)이 형성되며, 프레임 몸체(210)의 일측 하부에는 하부로 돌출되어 슬래브(100)의 측면에 밀착되는 하부돌출판(240)이 형성되고, 상기 상부돌출판(230)과 하부돌출판(240) 사이에 프레임 몸체(210)의 내부 삽입공간(220)과 연통되도록 삽입통로(250)가 형성되어 상기 교량의 슬래브(100) 양측면에 삽입통로(250)가 대칭되도록 각각 매립 설치되는 한 쌍의 매립프레임(200)과;An insertion space 220 is formed inside the frame body 210 in a hollow shape, and an upper protrusion plate protruding to an upper portion of the frame body 210 on one side of the frame body 210 to be in close contact with the side of the slab 100. 230 is formed, a lower protrusion plate 240 protruding downward to be in close contact with the side surface of the slab 100 is formed on the lower side of the frame body 210, the upper protrusion plate 230 and the lower protrusion plate As long as the insertion passage 250 is formed between the 240 to communicate with the internal insertion space 220 of the frame body 210 so that the insertion passage 250 is symmetrically installed on both sides of the slab 100 of the bridge. A pair of buried frames 200;

배수판 본체(310)의 양측 상단에 외측으로 연장되고, 끝단부가 하향으로 굴곡되어 매립프레임(200)의 삽입통로(220)를 통해 프레임 몸체(210)의 내부 삽입공간(220)에 삽입 하단부가 삽입공간(220)의 하부 프레임 몸체(210)에 지지되어 배수판 본체(310)의 양측을 각각 지지하는 지지판(320)이 형성되고, 상기 배수판 본체(310)와 지지판(320) 사이에 내측으로 경사지게 굴곡되어 굴곡부(330)가 형성된 배수판(300)을 포함하는 것을 특징으로 한다.The lower end is inserted into the inner insertion space 220 of the frame body 210 through the insertion path 220 of the buried frame 200 is extended to the outside on the upper end of both sides of the drainage plate body 310 A support plate 320 which is supported by the lower frame body 210 of the space 220 and supports both sides of the drain plate body 310 is formed, and is bent inwardly between the drain plate body 310 and the support plate 320. It characterized in that it comprises a drain plate 300, the bent portion 330 is formed.

그리고 상기 배수판(300)은 탄성이 있고, 반영구적으로 사용이 가능한 스텐레스판이나 동판, 폴리염화비닐(polyvinyl chloride:PVC)과 폴리에틸렌(polyethylene:PE) 및 엔지니어링플라스틱(engineering plastics) 중 어느 하나의 소재를 배수판 본체(310)와 배수판 본체(310)의 양측 지지판(320), 굴곡부(330) 가 일체로 굴곡된 형태로 성형되는 것을 특징으로 한다.In addition, the drain plate 300 is elastic, semi-permanently used stainless steel plate or copper plate, polyvinyl chloride (PVC) and polyethylene (polyethylene: PE) and engineering plastics (material of any one material) Both sides of the drainage plate body 310 and the drainage plate body 310, the support plate 320, the bent portion 330 is characterized in that it is molded in a shape that is integrally bent.

또한 상기 배수판(300)은 배수판 본체(310)의 내측면에 배수판 본체(310)의 이송을 위한 이송고리(500)가 결합되는 걸림편(400)을 포함한다.  In addition, the drainage plate 300 includes a locking piece 400 to which the transfer ring 500 for the transfer of the drainage plate main body 310 is coupled to the inner surface of the drainage plate main body 310.

상기와 같은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치는 교량의 슬래브와 슬래브 사이에 유입되는 우수 및 토사가 슬래브의 하부로 누수되는 것을 방지하고, 반영구적으로 사용이 가능한 배수판을 슬래브와 슬래브 사이 상부에서 하부로 이송시켜 교량의 슬래브 양측면에 매립설치된 매립프레임에 배수판의 양측이 삽입되어 매립프레임에 안정적으로 지지되고, 설치가 용이한 효과가 있다.The buried type leakage preventing device of the replaceable bridge according to the present invention as described above prevents rainwater and soil from leaking between the slab and the slab of the bridge and leaks to the lower part of the slab, and a semi-permanently used drainage plate between the slab and the slab. Both sides of the drainage plate are inserted into the buried frame installed on both sides of the slab of the bridge by moving from the top to the bottom to be stably supported by the buried frame, and easy to install.

그리고 본 발명은 교량의 슬래브 양측면에 매립설치된 매립프레임에 양측이 삽입되어 지지된 배수판을 교량의 슬래브와 슬래브 사이에서 상부로 이송시켜 매립프레임으로부터 배수판을 분리할 수 있어 배수판의 설치 및 교체가 용이하고, 성치 및 교체작업에 따른 작업시간 및 비용을 줄일 수 있는 효과가 있다.And the present invention can transfer the drain plate supported by both sides inserted into the buried frame embedded in the both sides of the slab of the bridge to the upper portion between the slab and the slab of the bridge to separate the drain plate from the buried frame is easy to install and replace the drain plate In addition, it has the effect of reducing the working time and cost according to the configuration, replacement and replacement work.

또한 본 발명의 또 다른 효과로는 교량의 슬래브 양측면에 매립설치되는 매립프레임과 배수판의 결합 구조가 단순하여 생산성을 향상시킬 수 있고, 필요시 배수판만을 교량의 측면에서 슬라이딩 방식으로 삽입 및 인출할 수 있어 교체가 용이하다. In addition, another effect of the present invention is to simplify the coupling structure of the buried frame and the drain plate installed on both sides of the slab of the bridge to improve the productivity, and if necessary, only the drain plate can be inserted and withdrawn from the side of the bridge in a sliding manner. Easy to replace

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치를 나타낸 예시도이고, 도 3은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 매립프레임과 배수판이 분리된 상태를 나타낸 예시도이며, 도 4는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 매립프레임이 교량의 슬래브에 설치된 상태를 나타낸 예시도, 도 5에서 도 8은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 교량에 설치된 매립프레임에 배수판이 결합되는 상태를 나타낸 예시도이다.Figure 2 is an exemplary view showing a buried type leakage preventing device of the replaceable bridge according to the present invention, Figure 3 is an exemplary view showing a state in which the buried frame and the drain plate of the replaceable bridge preventing leak type bridge according to the present invention. 4 is an exemplary view showing a state in which a buried frame of a replaceable bridge-type leak-proof device according to the present invention is installed in the slab of the bridge, Figures 5 to 8 is a replaceable bridge-type leak-proof device of the present invention It is an exemplary view showing a state in which the drain plate is coupled to the buried frame installed in the bridge.

본 발명의 일 실시예에 따른 교체 가능한 교량의 매립형 누수방지장치는 한 쌍의 매립프레임(200)과 배수판(300)을 포함하여 형성된다.The buried type leakage preventing device of a replaceable bridge according to an embodiment of the present invention is formed including a pair of buried frames 200 and a drain plate 300.

상기 매립프레임(200)은 도 2와 도 3에 도시된 바와 같이 중공형으로 프레임 몸체(210) 내부에 삽입공간(220)이 형성되고, 프레임 몸체(210)의 일측 상부에는 프레임 몸체(210)의 상부로 돌출되어 슬래브(100)의 측면에 밀착되는 상부돌출판(230)이 형성된다.The buried frame 200 is hollow as shown in Figures 2 and 3, the insertion space 220 is formed inside the frame body 210, the frame body 210 on one side upper portion of the frame body 210 Protruding to the top of the upper protrusion plate 230 is in close contact with the side of the slab 100 is formed.

그리고 상기 매립프레임(200)의 프레임 몸체(210) 일측 하부에는 하부로 돌출되어 슬래브(100)의 측면에 밀착되는 하부돌출판(240)이 형성되고, 상기 상부돌출판(230)과 하부돌출판(240) 사이에는 프레임 몸체(210)의 내부 삽입공간(220)과 연통되도록 삽입통로(250)가 형성된다. In addition, a lower protrusion plate 240 protruding downward to be in close contact with the side surface of the slab 100 is formed at one lower side of the frame body 210 of the buried frame 200, and the upper protrusion plate 230 and the lower protrusion plate are formed. An insertion passage 250 is formed between the 240 to communicate with the internal insertion space 220 of the frame body 210.

이때 상기 매립프레임(200)의 하부돌출판(240)은 상부돌출판(230) 길이에 비해 상대적으로 상하 길이를 길게 형성하는 것이 바람직하다. In this case, it is preferable that the lower protrusion plate 240 of the buried frame 200 has a length longer than the length of the upper protrusion plate 230.

상기와 같은 한 쌍의 매립프레임(200)은 교량의 서로 다른 슬래브(130)의 마 주하는 양측면에 삽입통로(250)가 대칭되도록 나란히 배치되는 상태로 각각 매립 설치된다. 한편 배수판(300)은 배수판 본체(310)의 양측 상단에 외측으로 연장되고, 끝단부가 하향으로 굴곡되어 매립프레임(200)의 삽입통로(220)를 통해 프레임 몸체(210)의 내부 삽입공간(220)에 삽입, 하단부가 삽입공간(220)의 내측 하부, 즉 프레임 몸체(210)에 지지되어 배수판 본체(310)의 양측을 각각 지지하는 지지판(320)이 형성된다.A pair of buried frame 200 as described above is installed in each of the embedded side by side so that the insertion passage 250 is symmetrical on both sides facing the different slab 130 of the bridge. Meanwhile, the drainage plate 300 extends outwardly at both upper ends of the drainage plate body 310, and the end portion thereof is bent downward so that the drainage plate 300 has an internal insertion space 220 of the frame body 210 through the insertion passage 220 of the buried frame 200. ), The lower end is supported on the inner lower portion of the insertion space 220, that is, the frame body 210 to form a support plate 320 for supporting both sides of the drainage plate body 310, respectively.

그리고 상기 배수판(300)의 배수판 본체(310)와 지지판(320) 사이에는 지지판의 하부에서 내측으로 경사지게 굴곡되어 굴곡부(330)가 형성된다.In addition, between the drain plate body 310 and the support plate 320 of the drain plate 300 is bent inclined inward from the lower portion of the support plate to form a bent portion 330.

이때 상기 배수판(300)은 배수판 본체(310)와 배수판 본체(310)의 양측 지지판(320), 굴곡부(330)가 일체로 굴곡된 형태로 성형되는 것이 바람직하다.At this time, the drainage plate 300 is preferably formed in a shape in which the drainage plate main body 310 and the support plate 320, the bent portion 330 of the drainage plate main body 310 is integrally bent.

또한 상기 배수판(300)은 탄성이 있고 반영구적으로 사용이 가능한 스텐레스판이나 동판, 폴리염화비닐(polyvinyl chloride:PVC)과 폴리에틸렌(polyethylene:PE) 및 엔지니어링플라스틱(engineering plastics) 또는 금속판 중 하나의 소재로 실시하여 배수판 본체(310)의 양측면을 외측에서 내측으로 누르면 탄성력에 의해 배수판 본체(310)의 양측 상단부에 형성된 양측 지지판(320) 사이의 길이가 줄어들고, 양측면을 누르는 힘을 해제하면 원래의 양측 지지판(320) 사이 길이로 복귀되도록 실시하는 것이 바람직하다.In addition, the drainage plate 300 is made of a material of one of elastic or semi-permanent stainless steel plate or copper plate, polyvinyl chloride (PVC) and polyethylene (PE) and engineering plastics or metal plate When the two sides of the drainage plate main body 310 are pushed inward from the outside, the length between the two side support plates 320 formed at both upper ends of the drainage plate main body 310 is reduced by elastic force, and when the pressing force on both sides is released, the original two side support plates are released. It is preferable to return to a length between 320.

그리고 상기 배수판(300)의 배수판 본체(310) 양측을 각각 지지하는 지지판(320)은 하단부에서 상단부까지의 높이가 매립프레임(200)의 삽입공간(220) 내측 바닥면으로부터 상부돌출판(230) 하단부 즉, 삽입통로(250)의 상부 높이보다 짧게 형성되도록 실시하는 것이 바람직하다.In addition, the support plates 320 respectively supporting both sides of the drainage plate main body 310 of the drainage plate 300 have a height from the lower end to the upper end of the upper protruding plate 230 from the inner bottom surface of the insertion space 220 of the buried frame 200. The lower end, that is, it is preferably implemented to be shorter than the upper height of the insertion passage (250).

또한 상기 매립프레임(200)의 삽입통로(250) 반대쪽에 위치하는 프레임 본체(210) 타면에는 볼트삽입홈(260)이 프레임 본체(210)를 따라 길이방향으로 형성된다. In addition, a bolt insertion groove 260 is formed along the frame main body 210 in the longitudinal direction on the other surface of the frame main body 210 located opposite the insertion passage 250 of the buried frame 200.

그리고 상기와 같은 볼트삽입홈(260)에는 다수의 고정볼트(270)의 머리가 슬라이딩 방식으로 삽입되는 동시에, 삽입된 고정볼트(270)는 볼트삽입홈(260)의 길이 방향을 따라 슬라이딩 방식으로 이동되면서 적당한 간격으로 위치 조절이 가능하다.And the head of the plurality of fixing bolts 270 is inserted into the bolt insertion groove 260 as described above in a sliding manner, the fixed bolt 270 is inserted into the sliding manner along the longitudinal direction of the bolt insertion groove 260. The position can be adjusted at appropriate intervals while moving.

상기와 같은 고정볼트(270)는 교량의 슬래브(100) 철근(110)에 고정되는 용도이다. 따라서 상기 고정볼트(270)가 볼트삽입홈(260)의 길이 방향으로 슬라이딩 이동되므로, 철근(110)과 고정볼트(270)를 용접 결합시, 철근(110)과 용접이 용이하도록 고정볼트(270)의 위치를 자유롭게 조정하여 용이하게 용접 작업을 할 수 있는 것이다.The fixing bolt 270 as described above is used to be fixed to the reinforcing bar 110 of the slab 100 of the bridge. Therefore, the fixing bolt 270 is slidably moved in the longitudinal direction of the bolt insertion groove 260, when welding the reinforcing bar 110 and the fixing bolt 270, the fixing bolt 270 to facilitate welding with the reinforcing bar 110 The position of) can be freely adjusted to facilitate welding work.

한편 상기와 같은 매립프레임(200)은 도 4에 도시된 바와 같이 교량의 슬래브(100) 철근(110)에 프레임 몸체(210)의 볼트삽입홈(260)에 삽입된 다수의 고정볼트(270)를 용접하여 고정한 후 콘크리트를 타설하여 슬래브(100)의 양측면에 프레임 몸체(210)가 매설되도록 설치한다.Meanwhile, the buried frame 200 as described above has a plurality of fixing bolts 270 inserted into the bolt insertion grooves 260 of the frame body 210 in the slab 100 and the reinforcement 110 of the bridge as shown in FIG. 4. After fixing by welding the concrete is installed so that the frame body 210 is embedded on both sides of the slab (100).

이때 상기 매립프레임(200)의 프레임 몸체(210)의 일측에 상부와 하부로 돌출형성된 상부돌출판(230)과 하부돌출판(240)이 슬래브(100)의 양측면에 수직선상 에 위치되도록 설치하고, 프레임 몸체(210)의 일측에 형성된 삽입통로(250)가 슬래브와 슬래브 사이 양측면에 서로 대칭되도록 설치하는 것이 바람직하다.At this time, the upper protruding plate 230 and the lower protruding plate 240 protruding to the upper and lower on one side of the frame body 210 of the buried frame 200 is installed so as to be located on the vertical line on both sides of the slab (100) The insertion passage 250 formed at one side of the frame body 210 may be installed to be symmetrical with each other on both sides between the slab and the slab.

상기와 같이 슬래브(100)와 슬래브(100)의 양측면에 매립프레임(200)의 프레임 몸체(210)를 삽입통로(250)가 서로 대칭되도록 매립 설치한 후 도 5에 도시된 바와 같이 슬래브(100)와 슬래브(100) 사이의 상부에 배수판(300)의 배수판 본체(310)를 위치시킨다.As shown in FIG. 5, the frame body 210 of the buried frame 200 is embedded in both sides of the slab 100 and the slab 100 so that the insertion passage 250 is symmetric with each other. ) And the drainage plate body 310 of the drainage plate 300 at an upper portion between the slab 100 and the slab 100.

이때 상기 배수판(300)은 도면에 도시되지는 않았지만 슬래브(100)의 하부로 떨어지지 않도록 전후 양끝단이 지지된다.At this time, the drain plate 300 is not shown in the drawings, but is supported before and after both ends so as not to fall to the bottom of the slab (100).

그리고 상기와 같이 슬래브(100)와 슬래브(100) 사이의 상부에 배수판(300)의 배수판 본체(310)를 위치시킨 후 도 6에 도시된 바와 같이 배수판(300)의 배수판 본체(310) 양측에 형성된 지지판((320)의 외측을 내측으로 밀면 배수판 본체(310)의 탄성에 의해 지지판(320)이 내측으로 회동되고, 상기와 같이 내측으로 회동되는 양측 지지판(320)의 하부 끝단부 사이의 길이가 슬래브(100)와 슬래브(100) 사이로 삽입될 수 있도록 회동시킨다.And after placing the drainage plate main body 310 of the drainage plate 300 in the upper portion between the slab 100 and the slab as described above, as shown in Figure 6 on both sides of the drainage plate main body 310 of the drainage plate 300 When the outer side of the formed support plate 320 is pushed inward, the support plate 320 is rotated inward by the elasticity of the drainage plate main body 310, and the length between the lower end portions of both side support plates 320 rotated inward as described above. Rotate so that it can be inserted between the slab 100 and the slab 100.

상기와 같이 배수판(300)의 양측 지지판(320)을 내측으로 회동시킨 상태에서 배수판 본체(310)를 슬래브(100)와 슬래브(100) 사이로 삽입되도록 하향으로 이송시키면 도 7에 도시된 바와 같이 배수판 본체(310)의 양측 지지판(320)의 끝단부가 슬래브(100)와 슬래브(100) 사이 양측 벽면을 따라 슬라이딩되며 하부로 이송된다.As described above, when the drain plate main body 310 is downwardly moved to be inserted between the slab 100 and the slab 100 in a state in which both side support plates 320 of the drain plate 300 are rotated inward, the drain plate as shown in FIG. 7. End portions of both side support plates 320 of the main body 310 slide along both wall surfaces between the slab 100 and the slab 100 and are transported downward.

그리고 상기와 같이 슬래브(100)와 슬래브(100) 사이에서 하부로 이송되는 배수판(300)은 슬래브(100)와 슬래브(100)의 양측면에 각각 매립 설치된 매립프레 임(200)의 프레임 몸체(210) 상부로 돌출형성된 상부돌출판(230)을 지나 삽입통로(250)로 이송되고, 삽입통로(250)로 하향 이송되는 배수판(300) 양측에 형성된 지지판(320)의 하부 끝단부는 도 8에 도시된 바와 같이 배수판 본체(310)의 탄성력에 의해 외측으로 벌어지며 삽입통로(250)의 내측으로 삽입된다.And the drain plate 300 which is transferred to the lower side between the slab 100 and the slab 100 as described above is the frame body 210 of the buried frame 200 is buried in both sides of the slab 100 and the slab 100 The lower end portion of the support plate 320 formed on both sides of the drain plate 300 which is transferred to the insertion passage 250 through the upper protrusion plate 230 protruding upward, and downwardly transferred to the insertion passage 250 is shown in FIG. As described above, the outer plate is opened to the outside by the elastic force of the drainage plate main body 310 and inserted into the insertion passage 250.

상기와 같이 매립프레임(200)의 프레임 몸체(210) 삽입통로(250)로 삽입되는 배수판(300)의 지지판(320)은 배수판 본체(310)가 하부로 이송됨에 따라 지지판(320) 하부 끝단부가 프레임 몸체(210)의 내부 삽입공간(220)으로 삽입되면서 삽입공간(220)의 하부, 즉 프레임 몸체(310)의 내측 하부면에 밀착되고, 상기와 같은 상태에서 배수판 본체(310)의 탄성력에 의해 양측 지지판(320)이 프레임 몸체(210)의 삽입공간(220)으로 완전히 삽입된다.As described above, the support plate 320 of the drainage plate 300 inserted into the frame body 210 insertion passage 250 of the buried frame 200 has a lower end portion of the support plate 320 as the drainage plate body 310 is transferred downward. While being inserted into the inner insertion space 220 of the frame body 210 is in close contact with the lower portion of the insertion space 220, that is, the inner lower surface of the frame body 310, in the above state to the elastic force of the drainage plate body 310 Both sides of the support plate 320 is completely inserted into the insertion space 220 of the frame body 210.

이때 상기 배수판(300)의 배수판 본체(310) 상부 양측단에 형성된 지지판(320)은 하단부에서 상단부까지의 길이가 매립프레임(200)의 프레임 몸체(210) 내측 하부면에서 상부돌츨판(230)의 하단부, 즉 삽입통로(250)의 상부까지 길이보다 작아 배수판 본체(310)의 탄성력에 의해 프레임 몸체(210)의 내부 삽입공간(220)으로 용이하게 삽입되는 것이다. At this time, the support plate 320 formed on both sides of the upper portion of the drainage plate body 310 of the drainage plate 300 has a length from the lower end to the upper end of the upper projection plate 230 at the inner bottom surface of the frame body 210 of the buried frame 200. The lower end of the, that is, less than the length of the insertion passage 250 is less than the length is easily inserted into the internal insertion space 220 of the frame body 210 by the elastic force of the drain plate body 310.

또한 상기 배수판(300)의 배수판 본체(310)와 양측 지지판(320) 사이에는 배수판 본체(310)의 내측으로 경사지게 굴곡된 굴곡부(330)가 형성되어 매립프레임(200)의 프레임 몸체(210) 일측에 하부로 돌출형성된 하부돌출판(240)의 상부로 굴곡부(330)가 위치되면서 지지판(320)은 프레임 몸체(210) 내부의 삽입공간(220)으로 삽입되고, 배수판(300)의 배수판 본체(310)는 슬래브(100)와 슬래브(100) 사 이에 위치된다.In addition, between the drain plate main body 310 and the both side support plate 320 of the drain plate 300 is formed bent portion 330 bent inclined inwardly of the drain plate main body 310, one side of the frame body 210 of the buried frame 200 As the bent portion 330 is positioned at the upper portion of the lower protrusion plate 240 protruding downward, the support plate 320 is inserted into the insertion space 220 inside the frame body 210, and the drain plate body of the drain plate 300 ( 310 is located between the slab 100 and the slab 100.

그리고 상기 배수판(300)의 배수판 본체(310) 양측 굴곡부(330)는 교량의 슬래브(100)와 슬래브(100) 사이로부터 유입되는 오수나 토사가 매립프레임(200)의 프레임 몸체(210) 내측 삽입공간(220)으로 유입되는 것을 방지하는 동시에 상기 배수판 본체(310)의 내부로 유입되도록 유도한다.And both sides of the drain plate body 310 of the drain plate 300, the bent portion 330 is inserted into the frame body 210 of the sewage or earth and sand is introduced from between the slab 100 and the slab 100 of the bridge buried frame 200 It is prevented from flowing into the space 220 and at the same time guides the flow into the drain plate body 310.

상기와 같이 배수판(300)의 배수판 본체(310) 양측에 형성된 지지판(300) 하부가 매립프레임(200)의 프레임 몸체(210) 내부 삽입공간(220)에 삽입통로(250)를 통해 삽입되어 프레임 몸체(210)의 내측 상부면에 지지됨으로써 배수판(300)의 배수판 본체(310)가 더이상 하부로 이송되지 않고 매립프레임(200)의 프레임 몸체(210)에 지지된다. The lower portion of the support plate 300 formed on both sides of the drainage plate body 310 of the drainage plate 300 as described above is inserted into the frame body 210 of the buried frame 200 through the insertion passage 250 in the insertion space 220. By being supported on the inner upper surface of the body 210, the drainage plate body 310 of the drainage plate 300 is no longer transported to the bottom and is supported by the frame body 210 of the buried frame 200.

그리고 상기 배수판(300)의 배수판 본체(310)는 U자 형상으로 실시하는 것이 바람직하다.And the drain plate body 310 of the drain plate 300 is preferably performed in a U-shape.

한편 도 9는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치가 교량에 설치된 상태를 나타낸 예시도이고, 도 10은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치가 교량에 설치된 상태를 나타낸 단면도로써, 상기와 같이 슬래브(100)와 슬래브(100)0 사이에 배수판(300)을 설치한 후에 슬래브(100)와 슬래브(100) 사이의 상부에는 도 9와 도 10에 도시된 바와 같이 슬래브(100)와 슬래브(100) 사이의 상부가 외부로부터 가려지도록 상판덮개(120)가 볼트에 의해 고정 설치된다.On the other hand, Figure 9 is an exemplary view showing a state in which the buried type leakage preventing device of the replaceable bridge installed in the bridge, Figure 10 is a cross-sectional view showing a state in which the buried type leakage prevention device of the replaceable bridge in accordance with the present invention is installed on the bridge As such, after installing the drainage plate 300 between the slab 100 and the slab 100 as described above, the slab (100) and the slab (100) between the slab 100 as shown in Figure 9 and 10 Top cover 120 is fixed by a bolt so that the upper portion between the 100 and the slab 100 is covered from the outside.

그리고 본 발명에서는 상기와 같이 슬래브(100)와 슬래브(100) 사이의 상부 에 상판덮개(120)가 고정설치되는 것을 실시 예로 설명하지만, 교량에 따라 슬래브(100)와 슬래브(100) 사이에 상기 상판덮개(120) 대신에 신축이음장치(도면에 미도시)가 설치될 수 있다.And in the present invention will be described in the embodiment that the upper plate cover 120 is fixed to the upper portion between the slab 100 and the slab 100 as described above, according to the bridge between the slab 100 and the slab 100 Instead of the top cover 120 may be installed expansion expansion device (not shown in the figure).

이와 같이 슬래브(100)와 슬래브(100) 사이 양측면에 매립프레임(200)의 프레임 몸체(210)가 매립설치되고, 슬래브(100)와 슬래브(100) 사이에 상기 매립프레임(200)에 양측이 지지된 배수판(300)이 설치된 본 발명은 교량의 슬래브(100)와 슬래브(100) 사이로 오수나 토사이 유입될 경우 상기 오수나 토사의 일부는 배수판(300)의 배수판 본체(310) 내측으로 유입되고, 슬래브(100)와 슬래브(100) 사이의 양측면을 따라 유입되는 오수나 토사는 매립프레임(200)의 상부돌출판(230)을 따라 하부로 이송되어 배수판(300)의 배수판 본체(310) 양측에 형성된 굴곡부(330)를 따라 배수판(300)의 배수판 본체(310) 내측으로 유입된다. As such, the frame body 210 of the buried frame 200 is embedded in both sides between the slab 100 and the slab 100, and both sides of the buried frame 200 are disposed between the slab 100 and the slab 100. In the present invention, in which the supported drainage plate 300 is installed, when the sewage or soil is introduced between the slab 100 and the slab 100 of the bridge, some of the sewage or the soil is introduced into the drainage plate body 310 of the drainage plate 300. The sewage or earth and sand flowing along both sides between the slab 100 and the slab 100 are transferred downward along the upper protrusion plate 230 of the buried frame 200 to drain plate main body 310 of the drain plate 300. Along the bent portion 330 formed on both sides is introduced into the drainage plate body 310 of the drainage plate 300.

그리고 상기와 같이 배수판(300)의 배수판 본체(310) 내측으로 유입된 토사는 배수판 본체(310)의 내측에 적층되고, 오수는 배수판 본체(310)의 전후 끝단부를 통해 슬래브(100)의 외측으로 배출되어 슬래브(100)와 슬래브(100) 사이 양측면에 매립된 매립프레임(200)의 프레임 몸체(210) 내부로 오수가 유입되는 것을 방지하고, 슬래브(100)의 내부로 오수가 유입되는 것을 사전에 방지할 수 있는 것이다.In addition, the earth and sand introduced into the drainage plate main body 310 of the drainage plate 300 is stacked inside the drainage plate main body 310, and the sewage flows outward from the slab 100 through the front and rear ends of the drainage plate main body 310. It is discharged to prevent the inflow of sewage into the frame body 210 of the buried frame 200 buried on both sides between the slab 100 and the slab 100, the pre-flow of the sewage into the interior of the slab 100 To prevent it.

한편 상기와 같이 슬래브(100)와 슬래브(100) 사이에 설치된 배수판(300)의 배수판 본체(310) 내부에 장시간에 걸쳐 토사가 적층되어 배수판 본체(310) 내부의 토사을 청소하거나, 배수판(300)을 교체할 경우에는 슬래브(100)의 외측에서 상기 배수판(300)의 배수판 본체(310)를 외부 인출장치(도면에 미도시)이송시켜 매립프 레임(200)의 프레임 몸체(210) 내부 삽입공간(220)에 삽입된 지지판(220)이 삽입공간(220)을 따라 슬래브(100)의 외측으로 슬라이딩 이송되며, 매립프레임(200)으로부터 배수판(300)이 분리되면 배수판 본체(310)의 내부에 적층된 토사를 제거하고, 전술한 바와 같이 슬래브(100) 상부 상판덮개(120)를 분리시킨 후 상기 배수판(300)을 슬래브(100)와 슬래브(100) 사이 상부에서 하부로 이송시켜 매립프레임(200)에 다시 결합하거나 새로운 배수판(300)을 설치하면 되는 것이다.On the other hand, the soil is laminated for a long time in the drainage plate body 310 of the drainage plate 300 installed between the slab 100 and the slab 100 as described above to clean the soil in the drainage plate body 310, or drain plate 300 In the case of replacing the slab 100, the drainage plate body 310 of the drainage plate 300 is transferred from the outside drawing device (not shown in the drawing) from the outside of the slab 100, the insertion space inside the frame body 210 of the buried frame 200 The support plate 220 inserted into the 220 is slid and transported to the outside of the slab 100 along the insertion space 220, and when the drain plate 300 is separated from the buried frame 200, the drain plate body 310 is disposed inside the drain plate body 310. After removing the stacked soil, and separating the upper plate cover 120 of the slab 100 as described above, the drainage plate 300 is transferred from the upper portion between the slab 100 and the slab from the bottom to the buried frame ( Re-attach to 200 or install a new drain plate 300 It is.

그리고 상기와 같이 매립프레임(200)으로부터 배수판(300)을 슬래브(100)의 외측으로 이송시켜 매립프레임(200)과 분리시킴과 동시에 슬래브(100)의 상부에서는 새로운 배수판(300)을 슬래브(100)와 슬래브(100) 사이에서 하부로 이송시켜 매립프레임(200)에 결합시킴으로써 배수판의 설치 작업시간을 단축할 수 있다. As described above, the drainage plate 300 is transferred from the buried frame 200 to the outside of the slab 100 to be separated from the buried frame 200, and at the same time, a new drainage plate 300 is disposed at the top of the slab 100. By transferring to the bottom between the slab and 100 and coupled to the buried frame 200 it is possible to shorten the installation work time of the drain plate.

또한 상기와 같이 탄성이 있는 스텐레스판이나 동판과 같은 금속재질로 된 배수판(300)은 교량에 설치된 상태에서 일광으로 인한 변형 및 노후를 사전에 방지할 수 있다. 이는 배수판(300)이 교량에 설치된 후 잦은 교체나 보수 작업을 필요로 하지 않아 전체 누수방지장치의 유지관리를 비교적 용이하게 하는 동시에, 유지관리에 소요되는 비용을 절감할 수 있는 것이다.In addition, the drainage plate 300 made of a metal material such as a stainless steel plate or a copper plate having elasticity as described above may prevent deformation and aging due to sunlight in a state of being installed in a bridge in advance. This does not require frequent replacement or maintenance work after the drain plate 300 is installed on the bridge relatively easy to maintain the entire leak prevention device, while reducing the cost of maintenance.

한편 도 11은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판의 다른 실시 예를 나타낸 예시도이고, 도 12는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 다른 실시 예의 배수판이 매립프레임에 삽입되는 상태를 나타낸 예시도로써, 배수판(300)의 배수판 본체(310) 상부 양 내측면 또는 굴곡부(330)의 양 내측면에 걸림편(400)을 각각 구비하여 와이어의 끝단부에 구비 된 이송고리(500)를 이용하여 배수판(300)을 슬래브(100)와 슬래브(100) 사이 상부에서 하부로 이송시킬 수 있다.Meanwhile, FIG. 11 is an exemplary view showing another embodiment of a drain plate in a replaceable bridge-type leak prevention device of a replaceable bridge according to the present invention, and FIG. 12 is a view of another embodiment of a drain plate embedded in a replaceable bridge-type leak prevention device according to the present invention. As an exemplary view showing a state of being inserted into the frame, the engaging pieces 400 are respectively provided on both inner surfaces of the upper portion of the drain plate body 310 or both inner surfaces of the bent portion 330 of the drain plate 300 and provided at the end of the wire. The drain plate 300 may be transferred from the upper side to the lower side between the slab 100 and the slab 100 using the transfer ring 500.

즉 상기 와이어의 끝단부에 구비된 이송고리(500)를 배수판(220)의 배수판 본체(310) 상부 양 내측면 또는 굴곡부(330)의 양 내측면에 구비된 걸림편(400)에 결합하여 용이하고 안전하게 슬래브(100)와 슬래브(100) 사이로 이송시켜 매립프레임(200)의 삽입공간(220)으로 삽입하여 배수판(300)이 설치되도록 실시할 수 있다.That is, the transfer ring 500 provided at the end of the wire is easily coupled to the engaging pieces 400 provided on both inner surfaces of the upper portion of the drain plate body 310 of the drainage plate 220 or both inner surfaces of the curved portion 330. And it can be carried out so that the drain plate 300 is installed by safely transporting between the slab 100 and the slab 100 to be inserted into the insertion space 220 of the buried frame 200.

그리고 도 13은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판의 또 다른 실시 예를 나타낸 예시도로써, 상기 배수판(300)의 배수판 본체(310) 상부 양 내측면 또는 굴곡부(330)의 양 내측면에 구비된 걸림편(400)은 도 13에 도시된 바와 같이 일정한 간격으로 다수 설치되도록 실시할 수 있다.And Figure 13 is an exemplary view showing another embodiment of the drainage plate in the buried type leakage preventing device of the replaceable bridge according to the present invention, the upper side of the drainage plate body 310 of the drainage plate 300 of the inner side or the bent portion 330 The engaging pieces 400 provided on both inner side surfaces may be implemented to be installed in a plurality at regular intervals as shown in FIG. 13.

상기와 같은 걸림편(400)을 본 실시 예에서는 원형의 봉 형태로 이루어져 배수판(300)의 배수판 본체(310)나 굴곡부(330)의 양 내측면에 설치되는 것을 예로 들어 설명하였으나, 본 발명이 이에 한정되는 것은 아니며, 상기 걸림편(400)은 단면 사각이나 다각형 등 와이어의 끝단부에 설치된 이송고리(500)가 결합될 수 있으면 다양한 형태로 변형 실시될 수 있고, 도면에 도시하지는 않았지만 배수판 본체(310)의 상부 양측면이나 굴곡부(330)의 양 내측면에 볼트 결합 등을 통해 상기 볼트에 이송고리가 결합되는 형태로 실시할 수 있다.In the present embodiment, as described above, the engaging piece 400 is formed in the shape of a circular rod, but is described as an example in that it is installed on both inner surfaces of the drainage plate body 310 or the bent portion 330 of the drainage plate 300. It is not limited to this, the locking piece 400 may be modified in various forms if the transfer ring 500 installed in the end of the wire such as square or polygonal cross section can be combined, it is not shown in the figure drainage body It can be carried out in the form that the transfer ring is coupled to the bolt through the bolt coupling to the upper both side surfaces of the 310 or both inner surfaces of the bent portion 330.

그리고 본 발명에서는 상기와 같은 이송고리를 이용하여 슬래브(100)와 슬래브(100) 사이 양측면에 매립된 매립프레임(200)에 슬래브와 슬래브 사이의 하부에서 배수판(300)을 상부로 이송시켜 슬래브(100)의 양측면에 매립된 매립프레 임(200)의 프레임 몸체(210) 내부 삽입공간(220)에 배수판(300)의 양측 지지판(320)이 삽입되도록 실시할 수 있다.And in the present invention by using the transfer ring as described above to transfer the drain plate 300 from the bottom between the slab and the slab to the buried frame 200 buried in both sides between the slab 100 and the slab 100 to the upper slab ( Both support plates 320 of the drain plate 300 may be inserted into the insertion space 220 of the frame body 210 of the buried frame 200 embedded in both sides of the 100.

한편 도 14는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판이 매립프레임에 삽입되는 다른 실시 예를 나타낸 예시도로써, 슬래브(100)와 슬래브(100) 사이 양측면에 매립된 매립프레임(200)에 배수판(300)을 결합할 때 도 14에 도시된 바와 같이 슬래브(100)의 일측에서 매립프레임(200)의 프레임 몸체(210) 내부 삽입공간(220)으로 배수판(300)의 배수판 본체(310) 양측에 형성된 지지판(320)을 슬라이딩 방식으로 삽입하여 매립프레임(200) 내부에 배수판(300)을 설치할 수 있다.Meanwhile, FIG. 14 is an exemplary view showing another embodiment in which a drain plate is inserted into a buried frame in a buried type leakage preventing device of a replaceable bridge according to the present invention, and a buried frame embedded in both sides between the slab 100 and the slab 100 ( When the drainage plate 300 is coupled to the drainage plate 300, the drainage plate main body of the drainage plate 300 is inserted into the frame body 210 inside the insertion space 220 of the buried frame 200 at one side of the slab 100, as shown in FIG. 14. The drain plate 300 may be installed in the buried frame 200 by inserting the support plates 320 formed at both sides in a sliding manner.

이상에서 설명한 것은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치를 실시하기 위한 하나의 실시예에 불과한 것으로서, 본 발명은 상기한 실시예에 한정되지 않고, 이하의 특허청구범위에서 청구하는 바와 같이 본 발명의 요지를 벗어나지 않는 범위 내에서 당해 발명이 속하는 분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변경 실시가 가능한 것이다.What has been described above is just one embodiment for implementing a replaceable bridge-type leak prevention device according to the present invention, the present invention is not limited to the above embodiment, as claimed in the claims below Various modifications can be made by those skilled in the art to which the present invention pertains without departing from the gist of the present invention.

도 1은 종래의 매립형 누수방지장치가 교량에 설치된 상태를 보인 예시도.1 is an exemplary view showing a state in which a conventional buried type leakage preventing device is installed on the bridge.

도 2는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치를 나타낸 예시도.Figure 2 is an exemplary view showing a buried type leakage preventing device of the replaceable bridge according to the present invention.

도 3은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 매립프레임과 배수판이 분리된 상태를 나타낸 예시도.Figure 3 is an exemplary view showing a state in which the buried frame and the drain plate of the buried type leakage preventing device of the replaceable bridge according to the present invention.

도 4는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 매립프레임이 교량의 슬래브에 설치된 상태를 나타낸 예시도.Figure 4 is an exemplary view showing a state in which the buried frame of the buried type leakage preventing device of the replaceable bridge according to the present invention is installed on the slab of the bridge.

도 5에서 도 8은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치의 교량에 설치된 매립프레임에 배수판이 결합되는 상태를 나타낸 예시도.5 to 8 is an exemplary view showing a state in which the drain plate is coupled to the buried frame installed on the bridge of the buried type leakage preventing device of the replaceable bridge according to the present invention.

도 9는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치가 교량에 설치된 상태를 나타낸 예시도.Figure 9 is an exemplary view showing a state in which the replaceable leak-proof leak-proof device of the bridge is installed on the bridge.

도 10은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치가 교량에 설치된 상태를 나타낸 단면도.Figure 10 is a cross-sectional view showing a state of being installed on the bridge of the buried type leak-proof device of the replaceable bridge according to the present invention.

도 11은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판의 다른 실시 예를 나타낸 예시도.Figure 11 is an exemplary view showing another embodiment of the drain plate in the buried type leakage preventing device of the replaceable bridge according to the present invention.

도 12는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 다른 실시 예의 배수판이 매립프레임에 삽입되는 상태를 나타낸 예시도.Figure 12 is an exemplary view showing a state in which the drain plate of another embodiment is inserted into the buried frame in the buried type leakage preventing device of the replaceable bridge according to the present invention.

도 13은 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판의 또 다른 실시 예를 나타낸 예시도.Figure 13 is an exemplary view showing another embodiment of the drain plate in the buried type leakage preventing device of the replaceable bridge according to the present invention.

도 14는 본 발명에 따른 교체 가능한 교량의 매립형 누수방지장치에서 배수판이 매립프레임에 삽입되는 다른 실시 예를 나타낸 예시도.14 is an exemplary view showing another embodiment in which the drain plate is inserted into the buried frame in the buried type leakage preventing device of the replaceable bridge according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

100 : 슬래브100: slab

110 : 철근 120 : 상판덮개110: reinforcing bar 120: top cover

200 : 매립프레임200: buried frame

210 : 프레임 몸체 220 : 삽입공간210: frame body 220: insertion space

230 : 상부돌출판 240 : 하부돌출판230: upper protrusion plate 240: lower protrusion plate

250 : 삽입통로 260 : 볼트삽입홈250: insertion path 260: bolt insertion groove

270 : 고정볼트270 fixing bolt

300 : 배수판300: drain plate

310 : 배수판 본체 320 : 지지판310: drain plate body 320: support plate

330 : 굴곡부330 bend

400 : 걸림편400: hanging piece

Claims (6)

교량의 슬래브(slab)와 슬래브 사이에 설치되는 매립형 누수방지장치에 있어서,In the buried leak prevention device installed between the slab of the bridge and the slab, 중공형으로 프레임 몸체(210) 내부에 삽입공간(220)이 형성되고, 프레임 몸체(210)의 일측 상부에는 프레임 몸체(210)의 상부로 돌출되어 슬래브(100)의 측면에 밀착되는 상부돌출판(230)이 형성되며, 프레임 몸체(210)의 일측 하부에는 하부로 돌출되어 슬래브(100)의 측면에 밀착되는 하부돌출판(240)이 형성되고, 상기 상부돌출판(230)과 하부돌출판(240) 사이에 프레임 몸체(210)의 내부 삽입공간(220)과 연통되도록 삽입통로(250)가 형성되어 상기 교량의 슬래브(100) 양측면에 삽입통로(250)가 대칭되도록 각각 매립 설치되는 한 쌍의 매립프레임(200)과;An insertion space 220 is formed inside the frame body 210 in a hollow shape, and an upper protrusion plate protruding to an upper portion of the frame body 210 on one side of the frame body 210 to be in close contact with the side of the slab 100. 230 is formed, a lower protrusion plate 240 protruding downward to be in close contact with the side surface of the slab 100 is formed on the lower side of the frame body 210, the upper protrusion plate 230 and the lower protrusion plate As long as the insertion passage 250 is formed between the 240 to communicate with the internal insertion space 220 of the frame body 210 so that the insertion passage 250 is symmetrically installed on both sides of the slab 100 of the bridge. A pair of buried frames 200; 배수판 본체(310)의 양측 상단에 외측으로 연장되고, 끝단부가 하향으로 굴곡되어 매립프레임(200)의 삽입통로(220)를 통해 프레임 몸체(210)의 내부 삽입공간(220)에 삽입 하단부가 삽입공간(220)의 하부 프레임 몸체(210)에 지지되어 배수판 본체(310)의 양측을 각각 지지하는 지지판(320)이 형성되고, 상기 배수판 본체(310)와 지지판(320) 사이에 내측으로 경사지게 굴곡되어 굴곡부(330)가 형성된 배수판(300)을 포함하는 것을 특징으로 하는 교체가 가능한 교량의 매립형 누수방지장치.The lower end is inserted into the inner insertion space 220 of the frame body 210 through the insertion path 220 of the buried frame 200 is extended to the outside on the upper end of both sides of the drainage plate body 310 A support plate 320 which is supported by the lower frame body 210 of the space 220 and supports both sides of the drain plate body 310 is formed, and is bent inwardly between the drain plate body 310 and the support plate 320. The buried type leak-proof device of the replaceable bridge, characterized in that it comprises a drain plate 300, the bent portion 330 is formed. 제 1 항에 있어서, 상기 배수판(300)은 배수판 본체(310)와 배수판 본 체(310)의 양측 지지판(320), 굴곡부(330)가 일체로 굴곡된 형태로 성형된 것을 특징으로 하는 교체가 가능한 교량의 매립형 누수방지장치.According to claim 1, wherein the drainage plate 300 is a replacement plate characterized in that the drainage plate body 310, the support plate 320, the bent portion 330 of the both sides of the drainage plate body 310 is formed integrally curved. Built-in leak prevention device for bridges. 제 2 항에 있어서, 상기 배수판(300)은 폴리염화비닐(polyvinyl chloride:PVC)과 폴리에틸렌(polyethylene:PE) 및 엔지니어링플라스틱(engineering plastics) 중 어느 하나의 소재를 배수판 본체(310)와 배수판 본체(310)의 양측 지지판(320), 굴곡부(330)가 일체로 굴곡된 형태로 성형된 것을 특징으로 하는 교체가 가능한 교량의 매립형 누수방지장치.The drain plate 300 is formed of any one of polyvinyl chloride (PVC), polyethylene (PE), and engineering plastics. Both sides of the support plate 320, the bent portion 330 of the 310 is a buried type leak-proof device of the replaceable bridge, characterized in that formed in the form bent integrally. 제 1 항에 있어서, 상기 배수판(300)은 배수판 본체(310)의 내측면에 배수판 본체(310)의 이송을 위한 이송고리(500)가 결합되는 걸림편(400)을 포함하는 것을 특징으로 하는 교체가 가능한 교량의 매립형 누수방지장치.According to claim 1, wherein the drainage plate 300 is characterized in that it comprises a locking piece 400 is coupled to the transfer ring 500 for the transfer of the drainage plate main body 310 to the inner surface of the drainage plate main body (310). Interchangeable built-in leak prevention device for bridges. 제 1 항에 있어서, 상기 배수판(300)은 슬래브(100)와 슬래브(100) 사이 상부에서 하향으로 이송되며 배수판 본체(310)의 양측 지지판(320)이 매립프레임(200)의 삽입통로(250)를 통해 삽입공간(220)으로 삽입되어 지지되는 것을 특징으로 하는 교체가 가능한 교량의 매립형 누수방지장치.According to claim 1, wherein the drainage plate 300 is transferred downward from the upper side between the slab 100 and the slab 100, both support plates 320 of the drainage plate body 310 is inserted passage 250 of the buried frame 200 Refillable leak-proof device of the replaceable bridge, characterized in that is inserted into the insertion space 220 through the support. 제 1 항에 있어서, 상기 배수판(300)은 배수판 본체(310)의 양측 지지판(320)이 매립프레임(200)의 일측면에서 프레임 몸체(210) 내부의 삽입공간(220) 에 슬라이드 이동 방식으로 삽입되어 지지되는 것을 특징으로 하는 교체가 가능한교량의 매립형 누수방지장치.According to claim 1, wherein the drainage plate 300 is a support plate 320 of the drainage plate body 310 is a slide movement method in the insertion space 220 inside the frame body 210 on one side of the buried frame 200 Refillable bridge of the interchangeable bridge, characterized in that the support is inserted.
KR1020090060740A 2008-10-18 2009-07-03 Apparatus for preventing water leakage of bridge KR100922599B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020080102259 2008-10-18
KR1020080102259A KR20090098652A (en) 2008-10-18 2008-10-18 Embedded expansion joint apparatus for bridge

Publications (2)

Publication Number Publication Date
KR20090098760A true KR20090098760A (en) 2009-09-17
KR100922599B1 KR100922599B1 (en) 2009-10-21

Family

ID=41357686

Family Applications (4)

Application Number Title Priority Date Filing Date
KR1020080102259A KR20090098652A (en) 2008-10-18 2008-10-18 Embedded expansion joint apparatus for bridge
KR1020090060740A KR100922599B1 (en) 2008-10-18 2009-07-03 Apparatus for preventing water leakage of bridge
KR1020090065005A KR100936970B1 (en) 2008-10-18 2009-07-16 Apparatus for preventing water leakage of bridge
KR1020090065189A KR100936969B1 (en) 2008-10-18 2009-07-17 Apparatus for preventing water leakage of bridge

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020080102259A KR20090098652A (en) 2008-10-18 2008-10-18 Embedded expansion joint apparatus for bridge

Family Applications After (2)

Application Number Title Priority Date Filing Date
KR1020090065005A KR100936970B1 (en) 2008-10-18 2009-07-16 Apparatus for preventing water leakage of bridge
KR1020090065189A KR100936969B1 (en) 2008-10-18 2009-07-17 Apparatus for preventing water leakage of bridge

Country Status (1)

Country Link
KR (4) KR20090098652A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101698589B1 (en) * 2016-04-05 2017-01-20 주식회사 다인기술 A expansion joint for bridge
KR102298113B1 (en) * 2021-01-18 2021-09-06 대봉비엠텍 주식회사 Expansion joint for easy rubber seal assembly
KR20210112038A (en) * 2020-03-04 2021-09-14 주식회사 브리오 Draining apparatus for expansion joint of sleeve bridge

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100938114B1 (en) * 2009-06-25 2010-01-21 한국철도시설공단 A bridge structure water spout combined expansion joint apparatus
KR101273878B1 (en) * 2011-06-30 2013-07-17 주식회사 리노이엔지 Reclamaion frame construntion apparatus of concrete slab and reclamaion frame construntion method using the same
KR101235246B1 (en) * 2012-07-05 2013-02-20 안태환 Supporting member, drain apparatus installed slab laying gap for pier and constructing method
KR200472004Y1 (en) * 2012-07-26 2014-04-03 삼성중공업 주식회사 Heli-deck having water draining structure
KR101491405B1 (en) * 2014-01-27 2015-02-06 고재용 extended drain installation structure of high-level road or step by step foundation construction
KR101664230B1 (en) 2014-02-28 2016-10-10 삼우기연 주식회사 supporting member and constructing method of drain apparatus installed slab laying gap for pier
KR101489877B1 (en) 2014-05-15 2015-02-06 삼우기연 주식회사 waterspout sealing assembly for drain apparatus installed slab laying gap for pier and constructing method of repairing the same
KR101544448B1 (en) * 2014-12-01 2015-08-13 박준표 Sleeve expansion joint and the construction method therefor
KR101599823B1 (en) * 2015-06-08 2016-03-04 유니슨이테크(주) Exchangeable elastic joint apparatus for a bridge structure
KR101678604B1 (en) 2015-07-24 2016-11-23 주식회사 베스탑 Water leakage prevention device constructing method for bridge
KR101761476B1 (en) 2015-07-28 2017-07-27 (주)지승컨설턴트 Change construction method of bridge expansion joint for quick construction
KR20170029720A (en) 2015-09-07 2017-03-16 주식회사 베스탑 Exchangeable equipment system with leak stop
KR101904334B1 (en) 2016-12-14 2018-10-05 (주)대영산업 Railway bridge expansion joint and its construction method
KR101887937B1 (en) 2017-11-21 2018-09-10 삼우엠텍(주) watertight type slip joint apparatus for bridge
KR102008773B1 (en) 2018-04-02 2019-08-09 (주)지승컨설턴트 Elastic form precast joint member and quick construction method of bridge expansion joint using of the same
CN109208466A (en) * 2018-11-28 2019-01-15 黑龙江建筑职业技术学院 A kind of big displacement gapless combination expansion joint and bridge
KR102052012B1 (en) * 2018-12-10 2019-12-04 주식회사 유니텍 Leakage prevention method of concrete structure flexible joint
KR102337480B1 (en) * 2019-10-25 2021-12-08 고재용 A drainage device for preventing leakage of expansion joints on a bridge
KR102337479B1 (en) * 2019-10-28 2021-12-08 고재용 A drainage device for expansion joints of bridges with leak-proofing

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200272166Y1 (en) 2002-01-16 2002-04-17 (주)지승산업 A connection equipment to expansion and contraction for bridge
KR200332532Y1 (en) 2003-07-28 2003-11-07 (주)엠피기술산업 Expansion joint for a bridge structure
KR20050118058A (en) * 2004-05-28 2005-12-15 박종수 System and method for bedplate of expanasion joint with leak stop
KR200411577Y1 (en) 2005-09-10 2006-03-15 박종수 Exchangeable equipment system with leak stop for expansion joint
KR200436436Y1 (en) * 2006-11-17 2007-08-17 박종수 Exchangeable flexible joint for preventing water leakage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101698589B1 (en) * 2016-04-05 2017-01-20 주식회사 다인기술 A expansion joint for bridge
KR20210112038A (en) * 2020-03-04 2021-09-14 주식회사 브리오 Draining apparatus for expansion joint of sleeve bridge
KR102298113B1 (en) * 2021-01-18 2021-09-06 대봉비엠텍 주식회사 Expansion joint for easy rubber seal assembly

Also Published As

Publication number Publication date
KR100922599B1 (en) 2009-10-21
KR100936970B1 (en) 2010-01-14
KR100936969B1 (en) 2010-01-14
KR20090098762A (en) 2009-09-17
KR20090098763A (en) 2009-09-17
KR20090098652A (en) 2009-09-17

Similar Documents

Publication Publication Date Title
KR100922599B1 (en) Apparatus for preventing water leakage of bridge
KR100930253B1 (en) Embedded expansion joint apparatus for bridge
KR101960303B1 (en) Expansion joints for bridge and its construction method
KR100994805B1 (en) Multipurpose reservoir apparatus
US5568995A (en) Method and apparatus for adding a double liner to a trench
KR100931596B1 (en) Non-welding center drainage device for expansion joint of bridge
WO1996028615A1 (en) Holding means for securing a liner to a trench
KR100893777B1 (en) Embedded expansion joint apparatus for bridge and the constructing method thereof
KR101229001B1 (en) Expansion joint for railroad bridges, and its production and installation methods
KR200453460Y1 (en) Buried rail type expanasion joint system for a part of flexible coupling in bridge
KR20200085573A (en) Gravity type leveling method for precast members including expansion joint
KR101352893B1 (en) Bridge expansion joints are leak-proof device and its construction method
KR101229000B1 (en) Expansion joint for bridges, and its production and installation methods
CN209228391U (en) A kind of tunnel lining structure
KR101555302B1 (en) In-frame stretch-type leak-proof expansion joint
KR20120066206A (en) Apparatus for preventing water leakage of bridge
KR20120029055A (en) Expansion joint structure of bridge
KR101821570B1 (en) Joint device with expandable elastic filler and method of construction
KR20210112038A (en) Draining apparatus for expansion joint of sleeve bridge
KR100258297B1 (en) Expansion joint matter using concrete slab
KR20120039149A (en) Repairing device for preventing water leakage of bridge
KR20150016196A (en) Reinforcing method of open conduit tensile side for aqueduct bridge
KR20140112186A (en) Reinforcing method of open conduit tensile side for aqueduct bridge
JP2014169539A (en) Hybrid seal for joint of road bridge, and road bridge expansion device
KR200459910Y1 (en) Apparatus for preventing water leakage of bridge

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
G15R Request for early opening
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J206 Request for trial to confirm the scope of a patent right
J204 Request for invalidation trial [patent]
J301 Trial decision

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20110708

Effective date: 20120416

J2X1 Appeal (before the patent court)

Free format text: CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE

J2X1 Appeal (before the patent court)

Free format text: CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE

J121 Written withdrawal of request for trial
J122 Written withdrawal of action (patent court)
FPAY Annual fee payment

Payment date: 20130320

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140211

Year of fee payment: 6

J206 Request for trial to confirm the scope of a patent right
FPAY Annual fee payment

Payment date: 20150625

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20160624

Year of fee payment: 8

J301 Trial decision

Free format text: TRIAL NUMBER: 2015100000495; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20150213

Effective date: 20161116

FPAY Annual fee payment

Payment date: 20170615

Year of fee payment: 9

J204 Request for invalidation trial [patent]
J206 Request for trial to confirm the scope of a patent right
J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2016200009295; JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20161215

Effective date: 20170616

J303 Written judgement (supreme court)

Free format text: TRIAL NUMBER: 2017300001625; JUDGMENT (SUPREME COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20170713

Effective date: 20171026

J301 Trial decision

Free format text: TRIAL NUMBER: 2017100002083; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20170705

Effective date: 20180119

Free format text: TRIAL NUMBER: 2017100002082; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20170705

Effective date: 20180119

Free format text: TRIAL NUMBER: 2017100002084; TRIAL DECISION FOR INVALIDATION REQUESTED 20170705

Effective date: 20180119

J202 Request for trial for correction [limitation]
J301 Trial decision

Free format text: TRIAL NUMBER: 2018105000028; TRIAL DECISION FOR CORRECTION REQUESTED 20180313

Effective date: 20180430

FPAY Annual fee payment

Payment date: 20180627

Year of fee payment: 10

J301 Trial decision

Free format text: TRIAL NUMBER: 2017130000169; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20171106

Effective date: 20180709

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2018200001967; JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20180219

Effective date: 20181116

J303 Written judgement (supreme court)

Free format text: TRIAL NUMBER: 2018300012110; JUDGMENT (SUPREME COURT) FOR INVALIDATION REQUESTED 20181206

Effective date: 20190314

Free format text: TRIAL NUMBER: 2018300012127; JUDGMENT (SUPREME COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20181206

Effective date: 20190314

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2018200006160; JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20180727

Effective date: 20181116

J303 Written judgement (supreme court)

Free format text: TRIAL NUMBER: 2018300012134; JUDGMENT (SUPREME COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20181206

Effective date: 20190314

J301 Trial decision

Free format text: TRIAL NUMBER: 2019130000059; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20190328

Effective date: 20190521

FPAY Annual fee payment

Payment date: 20190703

Year of fee payment: 11

J204 Request for invalidation trial [patent]
J301 Trial decision

Free format text: TRIAL NUMBER: 2019100003299; TRIAL DECISION FOR INVALIDATION REQUESTED 20191022

Effective date: 20200317

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2020200003409; JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20200413

Effective date: 20200924

J301 Trial decision

Free format text: TRIAL NUMBER: 2020130000156; TRIAL DECISION FOR INVALIDATION REQUESTED 20201014

Effective date: 20201123