KR20090055063A - 프리 스트레스 콘크리트 보의 시공방법 - Google Patents
프리 스트레스 콘크리트 보의 시공방법 Download PDFInfo
- Publication number
- KR20090055063A KR20090055063A KR1020070121786A KR20070121786A KR20090055063A KR 20090055063 A KR20090055063 A KR 20090055063A KR 1020070121786 A KR1020070121786 A KR 1020070121786A KR 20070121786 A KR20070121786 A KR 20070121786A KR 20090055063 A KR20090055063 A KR 20090055063A
- Authority
- KR
- South Korea
- Prior art keywords
- steel
- guide member
- concrete
- support
- construction method
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Abstract
Description
Claims (6)
- 교량에 적용되는 V 형 단면을 가지는 프리 스트레스 콘크리트 보의 시공방법으로서,(S1) 거푸집을 설치하고 철근을 배근하여 V 형 단면을 가지는 보의 철골구조체를 형성하는 단계;(S2) 거푸집 설치 시 철골구조체를 가로횡단하는 방향으로 하나 이상의 안내 부재를 삽입하고 상기 안내부재를 회전가능하게 지지하는 지지대를 철골구조체의 외측에 설치하는 단계;(S3) PC 강재를 회전가능한 안내부재 사이로 삽입하여 안내부재에 의해 절곡시키고 PC 강재의 단부를 안내부재보다 높은 위치에서 고정부에 고정하는 단계;(S4) PC 강재의 양 단부를 인장시켜 인장력을 도입하는 단계;(S5) PC 강재에 인장력이 가해진 상태에서 거푸집의 내부에 콘크리트를 타설하여 양생하는 단계; 및(S6) 콘크리트 양생 후 PC 강재를 개별 보의 단위로 절단하여 콘크리트를 프리 스트레싱하는 단계를 포함하는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
- 제 1 항에 있어서,상기 안내부재는 내부에 중공부가 형성된 파이프로 이루어지고, 상기 지지대 에는 상기 안내부재의 중공부에 삽입되어 상기 안내부재를 회전가능하게 지지하는 안내봉이 고정되는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
- 제 2 항에 있어서,상기 단계 (S5) 에서 지지대를 제거하고 안내부재의 중공부를 콘크리트로 타설하는 것을 포함하는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
- 제 1 항 내지 제 3 항 중 어느 한 항에 있어서,상기 안내부재 및 지지대는 PC 강재의 절곡점에 설치되는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
- 제 1 항 내지 제 3 항 중 어느 한 항에 있어서,상기 V 형 단면은 웨브와 플랜지부로 구성되며 상기 웨브의 내부에는 PC 강재가 배치되지 않는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
- 제 1 항 내지 제 3 항 중 어느 한 항에 있어서,상기 단계 (S1) 내지 (S5) 를 종방향으로 배열된 복수 개의 보에 대해 동시에 수행하는 것을 특징으로 하는 프리 스트레스 콘크리트 보의 시공방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070121786A KR100949585B1 (ko) | 2007-11-28 | 2007-11-28 | 프리 스트레스 콘크리트 보의 시공방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070121786A KR100949585B1 (ko) | 2007-11-28 | 2007-11-28 | 프리 스트레스 콘크리트 보의 시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090055063A true KR20090055063A (ko) | 2009-06-02 |
KR100949585B1 KR100949585B1 (ko) | 2010-03-25 |
Family
ID=40986784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070121786A KR100949585B1 (ko) | 2007-11-28 | 2007-11-28 | 프리 스트레스 콘크리트 보의 시공방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100949585B1 (ko) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817325A (zh) * | 2012-09-13 | 2012-12-12 | 永升建设集团有限公司 | 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法 |
CN103469732A (zh) * | 2013-09-22 | 2013-12-25 | 中建八局第三建设有限公司 | 一种桥梁支座地脚螺栓预留孔的施工方法 |
CN106869012A (zh) * | 2017-03-28 | 2017-06-20 | 上海市城市建设设计研究总院(集团)有限公司 | 采用体内预应力系统的预制薄壁盖梁 |
CN107858930A (zh) * | 2017-11-21 | 2018-03-30 | 重庆建工市政交通工程有限责任公司 | 多层现浇箱梁重叠施工方法 |
CN110468715A (zh) * | 2019-08-20 | 2019-11-19 | 山东省路桥集团有限公司 | 移动模架过孔方法及过孔装置 |
CN112779852A (zh) * | 2021-03-19 | 2021-05-11 | 上海市城市建设设计研究总院(集团)有限公司 | 空腹式连续梁桥v撑节段及适应软土地基区域的施工方法 |
WO2022242103A1 (zh) * | 2021-05-18 | 2022-11-24 | 中铁四局集团有限公司 | 一种下行式双跨移动模架及施工方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102113430B1 (ko) | 2019-10-23 | 2020-05-20 | 장현옥 | 내부격벽수단과 내부반력대를 이용한 프리텐션 psc 구조물의 제작 방법 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3420719B2 (ja) | 1999-04-02 | 2003-06-30 | 株式会社ピーエス三菱 | 外ケーブルを用いたプレストレストコンクリート桁 |
KR200274881Y1 (ko) | 2002-01-30 | 2002-05-11 | 주식회사 제일엔지니어링 | 피에스 강선으로 보강된 스틸 박스 거더 |
KR100755605B1 (ko) | 2006-05-29 | 2007-09-06 | 삼성물산 주식회사 | 양방향 프리스트레싱 시스템 |
-
2007
- 2007-11-28 KR KR1020070121786A patent/KR100949585B1/ko active IP Right Grant
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817325A (zh) * | 2012-09-13 | 2012-12-12 | 永升建设集团有限公司 | 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法 |
CN102817325B (zh) * | 2012-09-13 | 2015-05-13 | 永升建设集团有限公司 | 负弯矩束预应力预制箱梁先简支后连续转换体系施工方法 |
CN103469732A (zh) * | 2013-09-22 | 2013-12-25 | 中建八局第三建设有限公司 | 一种桥梁支座地脚螺栓预留孔的施工方法 |
CN103469732B (zh) * | 2013-09-22 | 2015-07-15 | 中建八局第三建设有限公司 | 一种桥梁支座地脚螺栓预留孔的施工方法 |
CN106869012A (zh) * | 2017-03-28 | 2017-06-20 | 上海市城市建设设计研究总院(集团)有限公司 | 采用体内预应力系统的预制薄壁盖梁 |
CN106869012B (zh) * | 2017-03-28 | 2018-06-26 | 上海市城市建设设计研究总院(集团)有限公司 | 采用体内预应力系统的预制薄壁盖梁 |
CN107858930A (zh) * | 2017-11-21 | 2018-03-30 | 重庆建工市政交通工程有限责任公司 | 多层现浇箱梁重叠施工方法 |
CN110468715A (zh) * | 2019-08-20 | 2019-11-19 | 山东省路桥集团有限公司 | 移动模架过孔方法及过孔装置 |
CN110468715B (zh) * | 2019-08-20 | 2021-05-18 | 山东省路桥集团有限公司 | 移动模架过孔方法及过孔装置 |
CN112779852A (zh) * | 2021-03-19 | 2021-05-11 | 上海市城市建设设计研究总院(集团)有限公司 | 空腹式连续梁桥v撑节段及适应软土地基区域的施工方法 |
WO2022242103A1 (zh) * | 2021-05-18 | 2022-11-24 | 中铁四局集团有限公司 | 一种下行式双跨移动模架及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100949585B1 (ko) | 2010-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100949585B1 (ko) | 프리 스트레스 콘크리트 보의 시공방법 | |
KR100682794B1 (ko) | 프리스트레스트 강합성보의 제작 방법 | |
KR101222620B1 (ko) | 프리텐셔닝 강판을 이용한 프리스트레스트 콘크리트 거더와 이의 제작 및 교량 시공방법 | |
JP7175725B2 (ja) | 組積造建物の補強構造 | |
KR101585594B1 (ko) | 듀얼-프리스트레싱 강합성빔 및 그 시공방법 | |
JP5444203B2 (ja) | 橋梁の閉合部施工方法 | |
JP2007270600A (ja) | プレキャストコンクリート部材間の間詰め部に対するプレストレス導入方法 | |
KR101067717B1 (ko) | 프리스트레스트 콘크리트 거더 구조체 및 그 제조방법 | |
KR100400980B1 (ko) | 강선을 이용한 교각 보강공법 및 그 장치 | |
KR100840190B1 (ko) | 연속교용 프리스트레스 강합성 콘크리트 상부플랜지를가지는 아이빔 세그멘트 연결방법 | |
KR101181160B1 (ko) | 프리스트레싱을 원활히 하기 위한 긴장 및 정착 구조를 갖는 프리스트레스트 프리캐스트 콘크리트 보 | |
KR20040091350A (ko) | 피에스에스 거더 | |
KR20090045826A (ko) | 조립식 라멘교 시공방법 | |
KR100881700B1 (ko) | 장 경간용 피피씨 거더를 이용한 조립식 라멘교 시공방법 | |
KR102315988B1 (ko) | 정착구의 다양한 배치가 가능한 지압판 및 이를 이용한 강합성 거더 제조방법 | |
JP3663394B2 (ja) | 橋脚の段落とし部耐震補強構造および橋脚の段落とし部耐震補強方法 | |
KR100565359B1 (ko) | 교량연속화공법 | |
JP4947469B2 (ja) | プレキャストプレストレスト鉄筋コンクリート梁及びプレキャストプレストレスト鉄筋コンクリート梁の製造方法 | |
JP7144341B2 (ja) | コンクリート床版の接合構造及びコンクリート床版の接合方法 | |
KR100793158B1 (ko) | 후긴장 프리캐스트 바닥판이 설치되는 거더교 시공방법 | |
KR100530025B1 (ko) | 확대된 단면에 프리스트레스를 도입하여 철근 콘크리트구조물의 지지력 보강을 위한 단면 확대 보수보강장치 및이를 이용한 보수보강 시공방법 | |
KR100549986B1 (ko) | 교량 빔의 내하력 보강을 위한 조립식 보수보강장치 및이를 이용한 시공방법 | |
KR100565422B1 (ko) | 가설 프리스트레싱 장치를 이용한 피에스씨 빔의 연속화공법 | |
KR100493514B1 (ko) | 철근 콘크리트 교량에 있어서 교각의 지지력 보강을 위한단면확대보수보강장치 및 이를 이용한 단면확대 보수보강시공방법 | |
KR200240385Y1 (ko) | 정착구 설치용 슬리브가 구비된 psc 거더 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130318 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20141126 Year of fee payment: 5 |
|
R401 | Registration of restoration | ||
FPAY | Annual fee payment |
Payment date: 20150309 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160321 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170320 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190319 Year of fee payment: 10 |